Tait TBCL0E Base Station Transceiver User Manual TB9300 Installation and Operation Manual
Tait Limited Base Station Transceiver TB9300 Installation and Operation Manual
Tait >
Exhibit D Users Manual per 2 1033 c3
DRAFT 1 Installation This chapter provides information on the site requirements for your TB9300 equipment and also describes how to install the base station in a standard 19 inch rack or cabinet. If this is your first time installing a TB9300 base station, we recommend that you read the entire chapter before beginning the actual installation. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 65 DRAFT 1 5.1 Before You Begin 5.1.1 Equipment Security The security of your base station equipment is a high priority. If the site is not fully secure, the base station should at least be locked in a secure cabinet to prevent unauthorized access. 5.1.2 Grounding and Lightning Protection Electrical Ground The base station modules are grounded by physical contact between the module case and the subrack. To ensure a good ground connection you must tighten each module retaining clamp securely (refer to “Final Reassembly” on page 110 for the correct torque). A threaded grounding connector is provided on the rear of the subrack for connection to the site ground point (refer to “Connecting Up the Base Station” on page 86 for more details). Lightning Ground 5.1.3 It is extremely important for the security of the site and its equipment that you take adequate precautions against lightning strike. Because it is outside the scope of this manual to provide comprehensive information on this subject, we recommend that you conform to your country’s standards organization or regulatory body. Equipment Ventilation Always ensure there is adequate ventilation around the base station. Notice Do not operate it in a sealed cabinet. You must keep the ambient temperature within the specified range, and we strongly recommended that you ensure that the cooling airflow is not restricted. Notice The cooling fans are mounted on the front panel and will only operate when the panel is fitted correctly to the front of the subrack. To ensure adequate airflow through the base station, do not operate it for more than a few minutes with the front panel removed (e.g. for servicing purposes). 5.1.4 Ambient Temperature Sensor The ambient temperature reading for the base station is provided by the temperature sensor located on the front panel circuit board. 66 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.1.5 Cabinet and Rack Ventilation The cooling airflow for the base station enters through the front panel and exits at the rear of the subrack. For optimum thermal performance, the heated air that has passed through a base station must not be allowed to reenter the air intakes on the front panel. Any space at the front of the cabinet not occupied by equipment should be covered by a blanking panel. Refer to Figure 5.1 on page 68. To allow enough cooling airflow through a cabinet-mounted base station, we recommend the following: ■ ■ ■ an area of at least 23in2 (150cm2) of unrestricted ventilation slots or holes in front of the air intakes for the fans for each subrack; for example, thirty 0.25x3.3in (6x85mm) slots will allow the recommended airflow a vent in the top of the cabinet with an area of approximately 23in2 (150cm2) per subrack, or a similar area of ventilation per subrack at the rear of the cabinet behind each subrack a 2U gap at the top of the cabinet. Notice The ventilation opening must be unrestricted. If the slots or holes are covered with a filter, mesh or grille, the open area must be increased to allow the same airflow as an unrestricted opening. The maximum ambient temperature entering the cabinet must not exceed +140°F (+60°C). If you are installing multiple subracks in a cabinet, ensure that there will be enough cooling airflow through the cabinet after the equipment has been installed. For example, the recommended maximum number of subracks in a 38U cabinet is five, as shown in Figure 5.1 on page 68. If the base station is installed in a rack or cabinet with other equipment with different ventilation requirements, we recommend that the base station be positioned below this equipment. Auxiliary Extractor Fans The base station does not require auxiliary extractor fans mounted in the top of the cabinet. If your cabinet is already fitted with fans, the following procedures apply: ■ if there are six or more 4.75in (12cm) fans, each capable of extracting 94.2 ft3 per minute (160m3 per hour), they must run continuously ■ if there are fewer than six fans, you must remove them and ensure the vent in the top of the cabinet has an area of approximately 23in2 (150cm2) per subrack. If you have any other configuration, the performance of your system will depend on how closely you comply with the base station airflow requirements described above. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 67 DRAFT 1 Figure 5.1 Typical cabinet ventilation requirements top view 8in (20cm) side view front view 2U ≥7in (≥17.5cm) 68 ventilation slots blanking panels Installation airflow entry airflow exit path TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.2 Unpacking and Moving the Subrack The subrack is packed in a strong corrugated cardboard carton with top and bottom foam cushions. To prevent personal injury and damage to the equipment, we recommend that two people unpack and move the subrack. To remove the subrack from the carton, follow the procedure illustrated in Figure 5.2. Caution A subrack complete with modules can weigh up to 62lb (28kg), or up to 66lb (30kg) complete with packaging. We recommend that you have another person help you unpack and move the equipment. The TBAA03-16 carrying handles will make it easier to move the equipment once it has been unpacked. If necessary, remove the modules from the subrack before moving it (refer to “Replacing Modules” on page 99). In all cases follow safe lifting practices. Figure 5.2 Unpacking the subrack 1. Cut the tape securing the flaps at the top of the carton and fold them flat against the sides b. 2. Rotate the carton carefully onto its side c and then onto its top d, ensuring that none of the flaps is trapped underneath. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 69 DRAFT 1 Disposal of Packaging 70 Installation 3. Slide the carton upwards over the foam cushions and lift it away e. Remove the cushion from the bottom of the subrack f. 4. Rotate the subrack and cushion carefully over the rear of the subrack g so that it is the right way up with the cushion on top h. Remove the cushion from the top of the subrack i. If you do not need to keep the packaging, we recommend that you recycle it according to your local recycling methods. The foam cushions are CFCand HCFC-free and may be burnt in a suitable waste-to-energy combustion facility, or compacted in landfill. TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.3 Identifying the Equipment You can identify the model and hardware configuration of the TB9300 modules by referring to the product code printed on labels at the rear of each module. The meaning of each character in the product code is explained in the tables below. This explanation of product codes is not intended to suggest that any combination of features is necessarily available in any one product. Consult your regional Tait office for more information regarding the availability of specific models and options. Reciter Product Codes Product Code Description T01-01105-XXXX Frequency Band D = 148MHz to 174MHz K = 400MHz to 440MHz L = 440MHz to 480MHz M = 470MHz to 520MHz N = 762 MHz to 870MHza Q = 896MHz to 902MHz (receive) Q = 927MHz to 941MHz (transmit) T01-01105-XXXX A = standard T01-01105-XXXX A = default T01-01105-XXXX A = default Tait Band Identifier B3 band H1 band H2 band H3 band K4 band L2 band L2 band a. The actual frequency coverage in this band is: Transmit: 762MHz to 776MHz and 850MHz to 870MHz Receive: 792MHz to 824MHz PA Product Codes Product Code Description T01-01136-XXXX Frequency Band C = 136MHz to 174MHz J = 380MHz to 520MHz N = 762MHz to 870MHza Q = 850MHz to 941MHz T01-01136-XXXX A = 50W B = 100W T01-01136-XXXX A = default T01-01136-XXXX A = default Tait Band Identifier B1 band H0 band K2 band L0 band a. The actual frequency coverage in this band when used with a K-band TB9300 reciter is 762MHz to 776MHz and 850MHZ to 870MHz. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 71 DRAFT 1 PMU Product Codes 72 Installation Product Code Description TBAXXXX-XXXX 3 = PMU TBA3XXX-XXXX 0 = default TBA3XXX-XXXX 0 = AC module not fitted A = AC module fitted TBA3XXX-XXXX 0 = DC module not fitted 1 = 12V DC module fitted 2 = 24V DC module fitted 4 = 48V DC module fitted TBA3XXX-XXXX 0 = standby power supply card not fitted 1 = 12VDC standby power supply card fitted 2 = 24VDC standby power supply card fitted 4 = 48VDC standby power supply card fitted TBA3XXX-XXXX 0 = auxiliary power supply board not fitted 1 = 12VDC auxiliary power supply board fitted 2 = 24VDC auxiliary power supply board fitted 4 = 48VDC auxiliary power supply board fitted TBA3XXX-XXXX 0 = default TBA3XXX-XXXX 0 = default TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.4 Initial Setting Up Before putting the base station into service, you may want to carry out some basic functional testing, configuration, and tuning (if required). This section provides an overview of these procedures: 5.4.1 ■ checking that the base station powers up correctly ■ checking the basic functionality of the base station by using the tests available in the web interface ■ customizing the configuration for the intended installation and verifying that the configuration is correct ■ changing the root password ■ tuning the base station (if required). Confirming Operation Notice Make sure that the RF output is connected to a suitable attenuator or dummy load. Do not remove the load while the PA is transmitting as this may damage the PA output stage. Applying Power 1. Apply power by turning on the PMU. 2. Check that the base station powers up correctly: ■ The front panel display will show “Please wait...” while the base station starts up (this may take up to two minutes). When the startup process is complete, the display will show the home screen. ■ The cooling fans in the front panel will run at full speed for a few seconds, then run at low speed while the base station starts up, and then assume standard operation. One or more fans may operate, depending on the temperature of the modules. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 73 DRAFT 1 Functional Tests Test The following table provides an overview of the tests available using the web interface. Refer to the Help for full details of these tests. Notes Menu receiver operation requires a suitable RF source Diagnose > RF Interface > Receiver transmitter operation requires connection to the network Diagnose > RF Interface > Transmitter ping checks the IP connection to Diagnose > Connection > Network another device with an IP address NTP query checks if the NTP-based time synchronization is working PMU mains failure requires a DC backup supply Diagnose > Subsystems > PMU Control Tests fan operation checks the operation of each fan individually Diagnose > Subsystems > Fan Tests 74 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.4.2 Customizing the Configuration The following steps provide an overview of the process used to configure the base station with the settings it needs. Refer to the Help for detailed information. 1. Log in to the base station (refer to “Connecting Your PC to the Base Station” on page 48 for more details). 2. Select Configure. The base station has many different settings that can be configured before it is put into operation, such as: 3. ■ channel configurations ■ alarm control and SNMP agent ■ network interfaces ■ quality of service ■ CWID ■ miscellaneous items such as minimum battery voltages, fan control, NTP and package servers. Make the changes needed in each form and click Save. We recommend that you save the configuration to your PC or network. First make a backup copy of the configuration (which is stored in the base station as a file), then save this file to a folder on your PC or network. This provides a backup which can be restored to the base station if the configuration information becomes lost or corrupted. 5.4.3 Recommended Configuration Settings In a dual base station only reciter 1 communicates directly with the PMU and front panel. Therefore the following configuration settings are recommended for dual base station operation: ■ Disable the “PMU not detected” alarm on base station 2 (Configure > Alarms > Control > PMU). ■ Disable the “FP not detected” alarm on base station 2 (Configure > Alarms > Control > Front panel). TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 75 DRAFT 1 5.4.4 Restricted Port Numbers Certain configuration settings in the base station’s web interface require you to enter a port number (for example, the trunking interface). Two ranges of port numbers are unavailable for use with the base station. The web interface will prevent you from entering a number from these ranges, as explained below. Restricted Port Numbers 5.4.5 Details 0 – 1023 The “well-known ports”, commonly used by other devices in a network. Using a port number in this range could cause compatibility problems with other devices. 12000 – 14999 Reserved for internal use in the base station. Using a port number in this range could cause the base station to malfunction. Changing the Root Password Notice The following procedure can be carried out only if secure shell access (SSH) is enabled. Secure shell access to the base station is disabled by default from version 1.35 onwards. To enable SSH, select Tools > Settings > Secure shell and click Start. The root password to the Linux operating system of the reciter is a possible security risk. The equipment is delivered with a default password that is well known. Knowledge of the password could be used to render the equipment inoperable, for example by deleting files. If you are concerned about the security risk that this poses, change the password. If Tait provides support services, it may need to know the password. Notice If you change the password and then lose it, the equipment must be returned to Tait. Make sure that you store the password securely and do not lose it. To change the root password, follow these steps. 76 Installation 1. Log in from your PC to the base station using SSH client software such as PuTTY. The username is “root” and the default password is “k1w1”. 2. At the # prompt, enter the command “passwd”. 3. Follow the on-screen instructions. 4. Record the password in a secure location. TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.4.6 Tuning the Reciter B3-Band Reciter Before the base station is installed on site, you may need to tune the receiver front end. The receiver front end requires tuning if the receive frequency is shifted more than 2MHz away from the previously set frequency, or the RSSI level of the new frequency is more than 1dB lower than the RSSI level of the previously set frequency. The receiver in the B3-band reciter covers the 148 to 174MHz frequency band. This is split into two sub-bands: 148 to 159MHz and 159 to 174MHz. Each sub-band has its own helical filter (shown in Figure 5.3 below) which is electronically switched in or out of circuit depending on the frequency programmed into the reciter. The bandwidth of these helical filters is approximately ±1.5MHz. Figure 5.3 Identifying the B3-band receiver front end helical filters 159 to 174MHz 148 to 159MHz To check the RSSI level and tune the receiver front end (if required), follow these steps. 1. Remove the reciter from the subrack and reconnect the system control bus cable to power up the reciter. 2. Log in to the reciter and select Monitor > Interfaces > RF Interface. For information on connecting directly to the reciter, refer to “Connecting a Networked PC to a Base Station” on page 52. 3. Feed a signal at the currently tuned receive frequency and at a level of –80dBm into the reciter’s RF input. Check that the RSSI reading on the RF Interface page is –80dBm ±1dB. Note this reading. 4. Set the reciter to the new receive frequency. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 77 DRAFT 1 5. Change the RF input signal to the new receive frequency at –80dBm. Check that the RSSI reading is –80dBm ±1dB. If it is, the receiver front end does not require tuning. If it is not, go to the next step. 6. Using the Johanson tuning tool1, adjust the correct helical filter for the new frequency (as shown in Figure 5.3) to obtain a peak RSSI reading. This reading should be within 1dB of the reading at the previous frequency. Adjust the center resonator of the filter first, followed by the two outer resonators (in any order). Each resonator should require approximately the same amount of adjustment when tuning. A change in frequency of 5MHz requires approximately one turn of the tuning slug. If tuning to a lower frequency, adjust the slug in (clockwise); for a higher frequency, adjust the slug out (counterclockwise). 7. Change the RF input signal and the reciter’s receive frequency to 0.5MHz above and below the required frequency and check that the RSSI reading does not drop by more than 0.5dB from the reading at the required frequency. 8. Recalibrate the RSSI at the new frequency (Calibrate > Reciter > RSSI). If you wish to confirm the accuracy of the tuning procedure, carry out a sensitivity measurement at the new frequency. 1. Included in the TBA0ST2 tool kit. Also available separately as part number 937-00013-00. 78 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 H-Band Reciter Before the base station is installed on site, you may need to tune the receiver front end. The receiver front end requires tuning if the receive frequency is shifted more than 5MHz away from the previously set frequency, or the RSSI level of the new frequency is more than 1dB lower than the RSSI level of the previously set frequency. The receiver in the H-band reciter covers one of the following frequency sub-bands, depending on the model: ■ H1 - 400 to 440MHz ■ H2 - 440 to 480MHz ■ H3 - 470 to 520MHz. Each sub-band uses the same helical filter (shown in Figure 5.4 below). The bandwidth of the helical filter is approximately ±5MHz. Figure 5.4 Identifying the H-band receiver front end helical filter H-band helical filter To check the RSSI level and tune the receiver front end (if required), follow these steps. 1. Remove the reciter from the subrack and reconnect the system control bus cable to power up the reciter. 2. Log in to the reciter and select Monitor > Interfaces > RF Interface. For information on connecting directly to the reciter, refer to “Connecting a Networked PC to a Base Station” on page 52. 3. Feed a signal at the currently tuned receive frequency and at a level of –80dBm into the reciter’s RF input. Check that the RSSI reading on the RF Interface page is –80dBm ±1dB. Note this reading. 4. Set the reciter to the new receive frequency. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 79 DRAFT 1 5. Change the RF input signal to the new receive frequency at –80dBm. Check that the RSSI reading is –80dBm ±1dB. If it is, the receiver front end does not require tuning. If it is not, go to the next step. 6. Using the Johanson tuning tool1, adjust the helical filter for the new frequency (as shown in Figure 5.4) to obtain a peak RSSI reading. This reading should be within 1dB of the reading at the previous frequency. Adjust the center resonator of the filter first, followed by the two outer resonators (in any order). Each resonator should require approximately the same amount of adjustment when tuning. If tuning to a lower frequency, adjust the slug in (clockwise); for a higher frequency, adjust the slug out (counterclockwise). 7. Change the RF input signal and the reciter’s receive frequency to 2MHz above and below the required frequency and check that the RSSI reading does not drop by more than 0.5dB from the reading at the required frequency. 8. Recalibrate the RSSI at the new frequency (Calibrate > Reciter > RSSI). If you wish to confirm the accuracy of the tuning procedure, carry out a sensitivity measurement at the new frequency. K-Band and L-Band Reciters The K-band and L-band reciters do not require tuning. 1. Included in the TBA0ST2 tool kit. Also available separately as part number 937-00013-00. 80 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.5 Installing the Base Station on Site 5.5.1 Base Stations for Trunked Systems When installing base stations that are part of a trunked system, it is very important to observe good site engineering rules. This is especially true when the channels are combined into a single antenna. If at all possible, the RF planner should avoid frequency plans in which the Rx to Tx spacing is an exact multiple of the trunked channel spacing, thus forcing Tx intermodulation products to fall outside the Rx channels. Cables and antennas should be of high quality construction. Solid shield heliax type cables are best, but if braided shield cables must be used for short distances, their braids must be silver-plated. Isolators should be used at all transmitter outputs. When the outputs of more than one transmitter are combined, their voltages add, and the resulting peak envelope power is not simply the sum of their powers, but is equal to the power of one of them multiplied by the square of the number of sources. Cables, components, and hardware must be rated to withstand the peak envelope power. During the commissioning process, all transmitters should be activated together using a diagnostic test tone, while the receiver RSSI is monitored. There should be no perceptible increase in RSSI while the transmitters are active. 5.5.2 Equipment Required It is beyond the scope of this manual to list every piece of equipment that an installation technician should carry. However, the following tools are specifically required for installing the base station: ■ Pozidriv PZ3 screwdriver for the M6 screws used in the DC input terminals on the PMU; M6 (0.25in) screws are also used to secure the subrack to the cabinet in factory-assembled systems ■ Pozidriv PZ2 screwdriver for the M4 screws used to secure the module retaining clamps, and for the fasteners used to secure the front panel to the subrack ■ 8mm AF spanner for the SMA connectors, and the subrack ground connector. You can also obtain the TBA0ST2 tool kit from your regional Tait office. It contains the basic tools needed to install, tune, and service the base station. TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 81 DRAFT 1 5.5.3 Mounting the Subrack Caution A subrack complete with modules can weigh up to 62lb (28kg), or up to 66lb (30kg) complete with packaging. We recommend that you have another person help you unpack and move the equipment. The TBAA03-16 carrying handles will make it easier to move the equipment once it has been unpacked. If necessary, remove the modules from the subrack before moving it (refer to “Replacing Modules” on page 99). In all cases follow safe lifting practices. Figure 5.5 Subrack mounting points front view rear view main mounting holes - front auxiliary mounting holes - rear 1. Remove the front panel, as described in “Preliminary Disassembly” on page 101. 2. Fit the subrack into the cabinet or rack and secure it firmly with an M6 (0.25in) screw, flat and spring washer in each of the four main mounting holes b, as shown in Figure 5.5. If you need extra mounting security, additional mounting holes c are provided at the rear of the subrack for auxiliary support brackets. 82 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 Figure 5.6 below gives the dimensions of the subrack and its mounting holes. Figure 5.6 Subrack dimensions 17 in (432 mm) 14.8 in (375.5 mm) 19 in (482.6 mm) 14.7 in (373.5 mm) 18.3 in (465.1 mm) 14.37 in (365 mm) 4 in 6.96 in (176.8 mm) (101.6 mm) 5.25 in (133.4 mm) 0.42 in (10.6 mm) 0.26 in (6.6 mm) TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 83 DRAFT 1 Auxiliary Support Bracket TBAA03-13 auxiliary support brackets can be fitted to the rear of the subrack to provide additional mounting security. Figure 5.7 shows a standard TBAA03-13 bracket b fitted in a typical Tait cabinet c. If you are not using the Tait cabinet, you may have to make your own brackets to suit your installation. Figure 5.7 Auxiliary support bracket Notice You must fit the auxiliary support brackets if you intend to transport a cabinet fitted with a fully built-up base station. We also recommend that you fit the brackets under the following conditions: General Cabling 84 Installation ■ when the installation is in an area prone to earthquakes ■ when third party equipment is installed hard up underneath the base station subrack. We recommend that you try to route all cables to and from the base station along the side of the cabinet so the cooling airflow is not restricted. TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 DC Power Cabling DC power cables should be well supported so that the terminals on the PMU and on the ends of the cables do not have to support the full weight of the cables. Figure 5.8 shows two recommended methods of securing these cables to prevent straining either set of terminals. We recommend that you fit the supplied covers to the DC terminals to protect against accidental shorts. Figure 5.8 DC power cabling secure the cables to the cabinet to support their weight TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 85 DRAFT 1 5.6 Connecting Up the Base Station This section provides information relevant to the task of connecting up the various inputs and outputs of the base station. 5.6.1 Connection Overview The connections at the rear of a dual 50W base station are identified in Figure 5.9. External connections are all located at the rear of the subrack. Figure 5.9 50W base station inputs and outputs b c d e 1@ 1! 1) Reciter 1 Reciter 2 serial RS-232 connectora 1PPS input external reference frequency input RF input RF output –VDC input PA 1 PMU PA 2 1) 1! 1@ +VDC input auxiliary DC output AC mains input Ethernet interface connector subrack ground connector system interface connector a. Factory use only. 86 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.6.2 Connecting AC Power The PMU is designed to accept a mains input of 88 to 264VAC at 45 to 65Hz. A standard 3-wire grounded socket outlet must be used to supply the AC power. The socket outlet must be installed near the equipment and must be easily accessible. This outlet should be connected to an AC power supply capable of providing at least 600W. The requirements of two typical AC supplies are given in the following table. Nominal Supply Current Requirementa Circuit Breaker/Fuse Ratinga 115VAC 8A 10A 230VAC 4A 6A a. The actual current consumption of the base station will be lower than these requirements (refer to the Specifications Manual for more information). Your base station should come supplied with a power supply cord to connect the male IEC connector on the PMU to the local AC supply. The pins of the IEC connector on the PMU are identified at right. phase ground neutral rear view TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 87 DRAFT 1 5.6.3 Connecting DC Power The PMU is designed to accept a nominal 12VDC, 24VDC or 48VDC input (depending on the model) with negative or positive ground. There is a minimum DC startup threshold to prevent damaging a battery which has little capacity left. You must connect the DC supply from the battery to the PMU via a fuse or DC-rated circuit breaker with the appropriate rating, as shown in the table below. The circuit breaker must have a contact separation of 3mm, an interrupt capacity of 1000A or more, and an inrush current capability of at least 500A for a minimum of 3.5ms. Notice The inrush current is not affected by the state of the DC module on/off switch on the PMU. This switch does not disconnect power from the DC converter itself. It disables the converter by switching off its control circuitry. Even when the DC converter is off, the DC input is still connected to its power circuitry. The DC input leads should be of a suitable gauge to ensure less than 0.2V drop at maximum load over the required length of lead. Nominal Supply Voltage Input Voltage Range Circuit Breaker/ Fuse Ratinga Recommended Wire Gaugeb 12VDC 10VDC to 16.8VDC 60A 2AWG / 35mm2 24VDC 20VDC to 33.6VDC 30A 5AWG / 16mm2 48VDC 40VDC to 60VDC 8AWG / 8mm2 15A a. The actual current consumption of the base station will be lower than these requirements (refer to the Specifications Manual for more information). b. For a length of 5ft to 6.5ft (1.5m to 2m) (typical). Terminate and insulate the DC input leads to protect them from accidentally shorting to the subrack if the PMU is removed before the leads are disconnected. Protective covers for the DC terminals are supplied with each PMU. We recommend a screw torque of 18–20lbf·in (2–2.25N·m). 88 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.6.4 Connecting the Auxiliary DC Power Output The PMU can provide an auxiliary DC output from the auxiliary power supply board. This board is available with an output of 13.65VDC, 27.3VDC, or 54.6VDC (depending on the model), and is current limited to 3A, 1.5A or 750mA respectively. This power supply is permanently on as soon as the base station has finished powering up, and is available on the auxiliary output connector on the rear panel. You can connect multiple auxiliary power supply boards in parallel for redundancy purposes, or to provide an output greater than 40W. Although no active current sharing is used, auxiliary boards connected in parallel will current-share before reaching their power limit. The failure (or switching off) of one auxiliary board will not load any other paralleled auxiliary boards in the circuit. The auxiliary power supply turns off briefly when the PMU restarts after a firmware upgrade. This interruption may also cause any ancillary equipment powered from the auxiliary supply to restart. If this is a problem for your system, we recommend connecting auxiliary power supply boards in parallel to ensure an uninterrupted power supply for the ancillary equipment. Auxiliary DC Power Output Cabling Network elements are supplied with a connector, as shown in Figure 5.10. You can use this to connect the PMU’s auxiliary DC power output to another device (refer to “PMU Auxiliary DC Output” on page 113 for the pin allocations). Contact your regional Tait office for details on the full range of wiring kits available. Figure 5.10 Auxiliary DC power connector Phoenix MVSTBR2.5HC/2-ST/5.08 female TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 89 DRAFT 1 5.6.5 Connecting RF Notice Do not remove the load from the PA while it is transmitting as this may damage the PA output stage. Before disconnecting any RF cables, put the base station into Offline mode to prevent any transmissions. The RF input to the base station is via the marked BNC connector on the rear panel of the reciter. The RF output is via the N-type connector on the rear panel of the PA (refer to Figure 5.9 on page 86). Cables and antennas should be of high quality construction. Solid shield heliax type cables are best, but if braided shield cables must be used for short distances, their braids must be silver-plated. Recommendations for Installing the PA We recommend the following installation procedures, which should protect the PA from damage under all but the most extreme operating conditions. 1. Do not connect the PA directly to the antenna. Fit an isolator or duplexer between the PA and the load. Fit the isolator as close as possible to the RF output connector on the PA. Do not connect any switching equipment between the isolator and the PA, unless the switch cannot operate while there is RF present (i.e. the base station is transmitting). 2. Fit a surge suppressor to the antenna cabling where it enters the building. 3. Inspect all cables and equipment connected to the base station for defects. Ice on the antenna, or a broken antenna, is unlikely to cause damage to the PA. Explanation The circuit design of the PA protects the circuitry from high VSWR. This makes it difficult to damage the RF power device by keying the PA into a mismatched load, or if the load deteriorates over even a short period of time (milliseconds). However, it is possible to damage the device if all the following conditions happen at the same time: ■ there is a step change in the PA load (for example, the load is removed) ■ the PA is transmitting ■ the feed line loss between the PA and the mismatch is <1dB. The effect of such conditions is variable: some devices will not be destroyed, and some may fail after repeated load interruptions. 90 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.6.6 Connecting an External Frequency Reference An external reference frequency is not normally required for B3 band. However, an external reference can be used when you need to maximize the range of the base station. For K4 Band, the internal frequency reference accuracy is inadequate, and an external reference must be used. The external reference frequency can be 10MHz or 12.8MHz, with an input level of 300mVpp to 5V pp. The stability of this reference should be better than 50 parts per billion. The reciter automatically detects the frequency of the external reference and configures itself accordingly. If an external reference is required, enable the external reference “Absent” alarm (Configure > Alarms > Control). Use a 50Ω coaxial cable (RG58 or RG223) to connect the external reference to the base station’s external reference frequency input. You can daisy-chain up to eight base stations using F-junctions. The maximum overall cable length is 30m. Terminate the last connection with a 50Ω load. Figure 5.11 Daisy-chaining an external frequency reference input maximum overall cable length is 30m maximum of eight base station loads on one frequency reference output 50Ω termination TB9300 Installation and Operation Manual © Tait Limited November 2014 Installation 91 DRAFT 1 5.6.7 Ethernet Connection The RJ-45 socket on the reciter’s rear panel provides the 10BASE-T or 100BASE-T Ethernet connection to the other devices in the network. Use Cat-5 cable to connect this socket to the Tait DMR Network via a router or switch. If necessary, refer to “Ethernet Connector” on page 113 for a list of Ethernet connection pin allocations. 92 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014 DRAFT 1 5.6.8 Connecting General Purpose Inputs and Outputs The base station has a number of general purpose inputs and outputs. These are connected via the 25-way D-range on the rear panel. The pin allocations for the D-range connector are given in the following table. Not all pins are used in this release of the base station. Pin Signal Name Signal Type Notes 1) 1! 1@ 1# 1$ 1% 1^ 1& 1* 1( 2) 2! 2@ 2# 2$ 2% external view not used reserved for future use 10 11 digital in 1 12 digital in 2 13 +5.2VDC output 14 digital in 3 15 digital in 4 16 digital in 5 17 digital in 6 18 digital in 7 19 digital in 8 20 digital in 9 21 digital in 10 22 digital in 11 23 digital in 12 24 not used 25 ground TB9300 Installation and Operation Manual © Tait Limited November 2014 input 5V TTL logic active low power output maximum current 200mA input 5V TTL logic active low reserved for future use ground Installation 93 DRAFT 1 94 Installation TB9300 Installation and Operation Manual © Tait Limited November 2014
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : Yes XMP Toolkit : 3.1-701 Producer : Acrobat Distiller 7.0 (Windows) Create Date : 2014:11:11 11:04:16+13:00 Modify Date : 2014:11:11 11:04:16+13:00 Metadata Date : 2014:11:11 11:03:55+12:00 Creator Tool : PScript5.dll Version 5.2.2 Document ID : uuid:5384F4762569E411B644FDE454EE0DE9 Instance ID : uuid:2cfba715-7b85-42f9-b31b-99a6da0baf09 Derived From Instance ID : uuid:06b15953-8673-4efd-953b-9d3579aa437c Derived From Document ID : uuid:36567047-a05c-46a3-b853-2f7af288e32a Format : application/postscript Title : TB9300 Installation and Operation Manual Creator : Tait Communications Description : TB9300 Installation and Operation Page Count : 30 Subject : TB9300 Installation and Operation Author : Tait CommunicationsEXIF Metadata provided by EXIF.tools