Thomson Broadcast and Multimedia 8BUSDA1250C 1 - 12.5 Watts Average Power Transmitter User Manual 10 0046 SD5000C

Thomson Broadcast & Multimedia, Inc. 1 - 12.5 Watts Average Power Transmitter 10 0046 SD5000C

Contents

transmitter manual

1SDA1250C Transmitting System ManualCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS................................................................ 0612/00 CHECKED: DMW .............................................................06/12/00RELEASED: PRC..............................................................0612/00Document #: DOC33-0051REV: JUN.12.00Figure 1: SDA1250C Transmitting System.This is an unpublished work protected by United States copyright laws and is proprietary to Thomcast Communications, Inc.Disclosure, copying, reproduction, merger, translation, modification, enhancement or use by anyone other than authorizedemployees or licensees of Thomcast Communications, Inc. without the prior written consent of Thomcast Communications, Inc. isprohibited.Copyright (c) 2000 Thomcast Communications, Inc.  All rights reservedThis copyright notice should not be construed as evidence of publication.USER’S GUIDE47266362.00-108SDA1250C Frequency Agile, 12.5 Watt TransmitterCOMWAVE DIVISION
2SDA1250C Transmitting System ManualCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS................................................................ 0612/00 CHECKED: DMW .............................................................06/12/00RELEASED: PRC..............................................................0612/00Document #: DOC33-0051REV: JUN.12.00TABLE OF CONTENTSTITLE DOCUMENT #Warranty Information ...................................................................................................DOC12-0001SECTION 1Provides information describing the system and how it worksTop Level Description ..................................................................................................DOC13-0178Specifications  ...............................................................................................................47266362.00-306SECTION 2Provides information to assist in setting up and turning on your systemInstallation Procedure ...................................................................................................DOC17-0035Safety Practices and Guidelines  ...................................................................................DOC26-0031Cabling  .........................................................................................................................DOC17-0036External Interconnections .............................................................................................DOC30-0043ComView Status Monitoring Interconnections  ............................................................DOC30-0005Turn-On Procedure .......................................................................................................DOC26-0050SECTION 3Provides information to help with troubleshootingRecommended Test Equipment ....................................................................................DOC25-0007Troubleshooting ............................................................................................................DOC18-0073Node Addresses ............................................................................................................DOC22-0019Troubleshooting Worksheet  .........................................................................................DOC18-0072Equipment Fusing and Protection .................................................................................DOC18-0075Power Supply Plug-In Fusing and Protection ...............................................................DOC18-0071Maintenance  .................................................................................................................DOC18-0074Inspections and CleaningCalibrations  ..................................................................................................................DOC16-0057SECTION 4Provides information about individual segments of the system.We recommend you contact Thomcast1 customer service when repairs are necessary; please do not attemptto repair any modules and/or boards by yourself.Sub-Chassis Theory of Operation .................................................................................DOC14-0037Microcontroller Board Description (hardware) ............................................................DOC13-0175Upconverter Plug-In Module Theory of Operation  ......................................................DOC14-0039Front and Rear Panel DescriptionsSpecifications  ...............................................................................................................47266116.00-306Block Diagram ..............................................................................................................47266116.00-034Microwave Precorrector Module...................................................................................DOC13-0177Internal Interconnect .....................................................................................................47266116.00-050                                                          1 DOC20-0001 provides detailed contact information.  International phone 001-570-474-6751, USA & Canada phone 1-800-266-9283.
3SDA1250C Transmitting System ManualCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS................................................................ 0612/00 CHECKED: DMW .............................................................06/12/00RELEASED: PRC..............................................................0612/00Document #: DOC33-0051REV: JUN.12.00U/C Plug-In Module MCU State Machine, Firmware Description  ..............................DOC13-0187U/C Plug-In Module Firmware Description  .................................................................DOC13-0188LO Plug-In Module Theory of Operation .....................................................................DOC14-0038AAgile Synthesizer Drawer Manual ..................................................................DOC33-0037Specifications  ...............................................................................................................47266052.00-306Block Diagram ..............................................................................................................47266183.00-034Internal Interconnect .....................................................................................................47266183.00-050LO Plug-In Firmware Description ................................................................................DOC13-0184Power Supply Plug-In Module Theory of Operation ....................................................DOC14-0036Front and Rear Panel DescriptionsSpecifications  ...............................................................................................................47266099.00-306Block Diagram ..............................................................................................................47266099.00-034Internal Interconnect .....................................................................................................47266099.00-050Power Supply Plug-In Embedded Controller  ...............................................................DOC13-0173System Controller Firmware  ........................................................................................DOC13-0185Power Amplifier Segment Theory of Operation ...........................................................DOC14-0008Amplifier Segment State Flow Diagram  ......................................................................DOC21-0006Firmware Flowchart  .....................................................................................................DOC21-0005Internal Interconnect .....................................................................................................66-306-01SECTION 5Provides contact & return information, as well available options.Customer Service ..........................................................................................................DOC20-0001Power Amp Segment Return Packaging .......................................................................DOC20-0002
1Warranty InformationCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.Document #: DOC12-0001REV: DEC.02.99THOMCAST COMMUNICATIONS, COMWAVE DIVISION TWO YEARLIMITED WARRANTYThomcast warrants each product of its manufacture to be free from any defect in material and workmanship for aperiod of two years after delivery to, and return by the original purchaser.  No returns, however, will be acceptedunless accompanied by a written factory return authorization.The limit of liability under this warranty shall be to repair or replace any product, or part thereof, which proves to bedefective after inspection by Thomcast with the exception of tubes, semiconductor devices, lamps, fuses orequipment (i.e. modulators) manufactured by others, which are subject to only such loss adjustment as Thomcastmay obtain for the suppliers thereof.This warranty shall not apply to any Thomcast product which has been modified, physically or electrically damaged,or to modules which seals have been broken, or any product which has been subjected to conditions exceeding theapplicable specifications or ratings or improper service techniques.Thomcast will not be liable for any direct or consequential injury, loss or damage incurred through the use, or theinability to use, any Thomcast product.Thomcast reserves the right to make design changes to any Thomcast product without incurring any obligation tomake the same changes to previously purchased units.This warranty is the full extent of the obligation and liability assumed by Thomcast with respect to any and allThomcast products.  Thomcast neither makes, nor authorizes any person to make, any other guarantee or warrantyconcerning Thomcast products.
SECTION 1PREVIOUSPrint
1SDxxxxC Transmitter Series Top Level DescriptionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................1/30/00 CHECKED: PRC...............................................................1/31/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0178REV: JUN.09.00TOP LEVEL DESCRIPTIONThe high power (HPSC) transmission system, both single channel and agile versions generate a digitally modulatedaverage power signal on any one of the PCS, MDS, MMDS, ITFS, or WLL channels.  The SD1250C / SDA1250Cgenerates 1-12.5 watts average power while the SD2500C / SDA2500C generates 2-25 watts average power and theSD5000C / SDA5000C generates 5-50 watts average power1 using a QAM modulation scheme.  The systemarchitecture is based on advanced transistor technology, low loss power combining, and distributed control andpower conversion.  Some unique advantages of this new design are flexibility/scalability, lower downtime, andlower operating costs.  The modular structure of this system allows for quick and easy replacement ofmalfunctioning plug-in modules, which means less downtime and convenient scalability.  The high efficiency designand small size decreases operating expenses.The transmitting system consists of a sub-chassis, upconverter plug-in module, LO plug-in module and/or agilesynthesizer drawer, power supply plug-in module, a front-end power supply, and power amplifier segments.  Digitaltransmission techniques provide superior performance over analog methods, with reduced susceptibility to noise andco-channel interference.  Advanced quadrature amplitude modulation provides exceptional throughput and spectralefficiency.  The RF signal path of the system is shown below in Figure 1 and the system AC/DC power distributionis depicted in Figure 3.This upgradeable series of transmitters provides maximum space efficiency and a modular system architecture. Thisallows the transmitter to be easily upgraded from 2 watts, using from one to four power amplifier segments at 12.5watts each, to a total of 12.5, 25, or 50 watts average output power, depending on model.  Similarly, it may also bedowngraded; and, the power amplifier segments may be used elsewhere or kept as spares for hot replacement.  Asthe output power is modified, the model name and FCC identifier will change respectively. The FCC ID label willbe replaced with each upgrade, as needed; refer to Figure 2 for label location.One of the most prevalent user benefits of this series of transmitters is hot replacement, i.e. should a power amplifiersegment be operating below parameters and need replaced, hot replacement allows the transmitter to continueoperating with only slight power loss and little to no change in the noise floor.  Similarly, should a plug-in moduleneed replaced only a brief interruption will occur when it is removed and transmission will continue as soon as thereplacement is plugged-in.                                                          1 For modulation schemes other than QAM the output power may need to be derated to keep the spectral occupancy according the FCC rules.
2SDxxxxC Transmitter Series Top Level DescriptionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................1/30/00 CHECKED: PRC...............................................................1/31/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0178REV: JUN.09.00SPLITTERPOWERAMPLIFIERSEGMENTS[1 TO 4]COMBINERLOUPCONVERTERMODULEOUTPUTCOUPLERFigure 1: System RF signal path.SPLITTERPOWERAMPLIFIERSEGMENTS[1 TO 4]UPCONVERTERMODULECOMBINERAGILE SYNTHESIZER DRAWERIF to UHFUPCONVERTERMODULEOUTPUTCOUPLERFigure 2: Agile system RF signal path.
3SDxxxxC Transmitter Series Top Level DescriptionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................1/30/00 CHECKED: PRC...............................................................1/31/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0178REV: JUN.09.00FCC ID: CHP8BUSD2500CMODEL SD2500C2-25 WATTS AVG POWER TRANSMITTERFCC ID: CHP8BUSD5000CMODEL SD5000C5-50 WATTS AVG POWER TRANSMITTERFCC ID: CHP8BUSD5000CMODEL SD5000C5-50 WATTS AVG POWER TRANSMITTERNOTE: When labeling an agile system the FCC ID and Model will be SDA1250C, SDA2500C, or SDA5000C. Alsolabels will change to reflect the proper output power when various modulation schemes are utilized.FCC ID: CHP8BUSD1250CMODEL SD1250C1- 12.5 WATTS AVG POWER TRANSMITTERFigure 3: Location of FCC ID label.
4SDxxxxC Transmitter Series Top Level DescriptionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................1/30/00 CHECKED: PRC...............................................................1/31/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0178REV: JUN.09.00FANSECONDARYPOWER SUPPLY, 10 VDCVACDC POWERAC POWERFRONT ENDPOWER SUPPLY, 48 VDCPS LO UPCONVERTERAGILE SYNTHESIZER DRAWERFigure 4: AC and DC power distribution.
1SD1250C Transmitting System Specifications – 47266362.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: DMW..............................................................6/12/00 CHECKED: KAS ...............................................................6/12/00RELEASED: AAC............................................................. 6/12/00Document #: 47266362.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICESDA1250C TRANSMITTING SYSTEM SPECIFICATIONSParameter Specification Notes / Test ConditionsDIGITALAverage Output Power 1 - 12.5 Watts 223-1 PN data sequence (at transmitter output)IF Input Frequency 44 MHz Other frequency options availableImpedance/ConnectorInputOutput 75 Ω/BNC-female50 Ω/N-femaleAverage Input Power -15 dBm ± 0.5 dB 223-1 PN data sequence (at transmitter output)Output Frequency 1850 - 3600 MHz In select bandsFrequency Response1= ±0.25 dB FC ±2.6 MHzMeasured at channel combiner outputFrequency Stability = ±500 Hz= ±1 Hz (Optional GPS)Carrier to Noise (C/N) = 55 dBHum and Noise = -60 dBcGroup Delay2= ±15 ns FC ±2.6 MHzMeasured at channel combiner outputDigital ModulationError Vector Magnitude 2, 2 (EVM)= 2.0% 64-QAM/8-VSB @ 5.06 Msps RMS averageover 12,500 symbolsMeasured at channel combiner outputDigital ModulationSignal to Noise Ratio 2,3 (SNR)= 30 dB 64-QAM/8-VSB @ 5.06 Msps RMS averageover 12,500 symbolsMeasured at channel combiner outputMagnitude Linearity(AM-AM conversion)= ±0.125 dB Measured at channel combiner outputPhase Linearity(AM-PM conversion)= ±0.75°Measured at channel combiner outputAdjacent Channel Interference3, 4(FCC ATV Spectral Mask) Sidelobe power spectral density (PSD)= -38 dB at channel edge; decreasing to= -60dB at ±3 MHz from channel edgeRelative to in-band average PSD measured @100 KHz RBW at the channel combiner outputHarmonics5= -60 dBc Relative to unmodulated carrier powermeasured @ 100 KHz RBW at the channelcombiner outputSpurious Products6= -60 dBc Relative to unmodulated carrier powermeasured @ 100 KHz RBW at the channelcombiner outputRF Output Regulation =  ± .2 dB Measured at transmitter outputChannel to Channel RF OutputRegulation = ± 0.35 dB Worst case channel to channel output powervariation                                                          1 Upconverter amplifier drawer with optional group delay and frequency equalizer @ the output of the non-adjacent channel combiner.2 Or equivalent threshold BER measurement.3 Spectral occupancy per FCC ruling for both analog and digital4 Measured with a non-adjacent channel combiner, notch filter and optional IF equalizer module.5 Undesired signal power  2 dB higher than the nominal PSD of the adjacent spectral regions that is harmonically related to unmodulated carrier6 Undesired signal power  2 dB higher than the nominal PSD of the adjacent spectral regions that is harmonically related to internal systemsignals such as clock, LOs, etc.
2SD1250C Transmitting System Specifications – 47266362.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: DMW..............................................................6/12/00 CHECKED: KAS ...............................................................6/12/00RELEASED: AAC............................................................. 6/12/00Document #: 47266362.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEParameter Specification Notes / Test ConditionsSSB Phase NoiseDirect measurement of microwave LO=  -85 dBc/Hz @ 10 KHz offset= -110 dBc/Hz @ 10 KHz offset OptionalStandard (recommended for digitaltransmission)ANALOGVISUAL PERFORMANCEOutput Power 1 - 40 Watts Peak Sync Adjustable from 10 to 100% of peak syncpowerOutput Frequency Any 6, 7, or 8 MHz Channel 1850-3600 MHzIn select bandsEmission 5M75C3F or per CCIRImpedance/ConnectorInputOutput 75Ω/F female50Ω/N femaleInput Level Video 1 VP-P ± 6dBIF Input LevelImpedance/Connector -8 dBm peak ± 2 dB75Ω / female BNCFrequency Stability = ± 500 Hz= ± 1 Hz (Optional GPS)Frequency Response7, 8, 9= ± 1 dB FCC Multiburst video patternGroup Delay 8, 10 Per FCC 73.687(a)(3) or per CCIR Sin(x)/x video patternHarmonics = -60 dBc Measured in 30 KHz RBW at transmitteroutput relative to visual carrier (unmodulatedcarriers)Spurious Products8= -60 dBc (out of band) Measured in 30 KHz RBW at transmitteroutput relative to visual carrier using 75% colorbars video patternIntermodulation Distortion (IM3)10 = -60 dBc (in band) Measured in 100 KHz RBW at transmitteroutput relative to visual carrier using red fieldvideo patternDifferential Gain8, 10 = 3% NTC-7 composite video patternDifferential Phase8, 10 = 2°NTC-7 composite video patternSync Pulse Amplitude8, 10 = ±5% NTC-7 composite video patternLuminance Non-linearity8, 10 = 3% NTC-7 composite video patternWeighted SNR8, 10 = 55 dB Quiet Line - Line 12Hum and Noise8, 10 = 60 dBK Factor 2T8, 10 = 2% NTC-7 composite video patternIncidental Carrier Phase8, 10Modulation (I.C.P.M.)= 3°NTC-7 composite video patternRF Output Regulation = ± 0.2 dBSSB Phase NoiseDirect measurement of microwave LO=  -85 dBc/Hz @ 10 KHz offset= -110 dBc/Hz @ 10 KHz offset StandardOptional (recommended for digitaltransmission)                                                          7 Using TVM-102 modulator.8 Spectral occupancy per FCC ruling for both analog and digital9 Factory video/audio performance test limits may include up to 50% of the test demodulator measurement uncertainty.10 In band intermodulation specification is based on 15 dB visual to aural ratio.  Contact factory for specification change due to other ratios
3SD1250C Transmitting System Specifications – 47266362.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: DMW..............................................................6/12/00 CHECKED: KAS ...............................................................6/12/00RELEASED: AAC............................................................. 6/12/00Document #: 47266362.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEParameter Specification Notes / Test ConditionsAURAL PERFORMANCEOutput Power11 15 dB visual/aural ratio+0.5 dB to -2 dB Measured at transmitter outputOther ratios available upon requestIF Input LevelImpedance/Connector -23 dBm peak ± 2 dB75Ω / female BNCCombined visual and auralEmission 250KF3E or per CCIRInter Carrier Frequency Accuracy = ± 50 Hz relative to visual carrierFrequency Response12, 13MonoStereo= ± 1 dB   30 Hz to 15 KHz= ± 1 dB   50 Hz to 105 KHz w/o pre-emphasisPre-emphasis 50 or 75 microseconds (defeatable)Deviation ±25 KHz (System M/N) (±50 KHz Stereo)±50 KHz (System B/G/D/K/I) NICAMand IRT Stereo compatibleHarmonic Distortion13, 14 = 1%FM Noise13, 14 = -60 dBAudio Input Level13Mono @ ±25 KHz deviationMono @ ±50 KHz deviationStereo @ ±50 KHz deviation-10 to +10 dBm into 600Ω-10 to +10 dBm into 600Ω-10 to +10 dBmGENERALPower Requirement 117/230 VAC ±10%; 50/60 Hz; =40014 VAOperating Temperature 0°C to +50°CFrequency stability and equipmentfunctionality guaranteedSpecified Temperature Range 13° to +33°CAll Specified parameters guaranteedRelative Humidity 95% non-condensingVertical Rack Requirement 10.5” Does not include modulatorDimensions 10.5” H  x  19” W  x  29” D26.67cm H  x  48.26 cm W  x 73.66 cm DApproximate Shipping Weight 76 lb (34.4 kg) Fully loadedTO VIEW SPECIFICATIONS OF INDIVIDUAL SEGMENTS OF THIS SYSTEM CLICK BELOW:SUB-CHASSISPOWER SUPPLY PLUG-IN MODULEUPCONVERTER PLUG-IN MODULEAGILE SYNTHESIZER DRAWER                                                          11 In band intermodulation specification is based on 15 dB visual to aural ratio.  Contact factory for specification change due to other ratios12 Using TVM-102 modulator13 Factory video/audio performance test limits may include up to 50% of the test demodulator measurement uncertainty.14 Switching power supply is power factor corrected.
SECTION 2PREVIOUSPrint
1SDxxxxC Series of Transmitters Installation ProcedureCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW.............................................................2/10/00RELEASED: PRC............................................................. 2/10/00Document #: DOC17-0035REV: FEB.10.00INSTALLATIONUNPACKING INFORMATIONWhile unpacking, carefully compare packing list with the equipment, checking for in-transit damage at the same time.Should any damage be noted, notify the freight carrier at once to file a freight claim.  Do not discard any packing materialuntil told to do so by the carrier.  Also, notify Thomcast Communications Inc., Comwave Division of any damages or ofmissing materials from the shipment.Retain original boxes and internal packing materials to adequately protect equipment to be returned tothe factory for repairs, upgrades, or modifications.ENVIRONMENTAL CONSIDERATIONSThe equipment can be safely operated in ambient temperatures of -30 to +50 degrees Celsius (-22 to +122 degreesFahrenheit).  However, moderate temperatures generally extend equipment life.  Although the equipment may be operatedwith relative humidity of up to 95%, the equipment must be protected from conditions, which cause condensation within theequipment.If a rear door is used to secure the rack cabinet, forced ventilation through the cabinet is required (600 cfm minimum pertransmitter is recommended).  An air or temperature interlock should be incorporated for protection against interruption ofventilation.  The area should be kept dry and clean.There should be sufficient space in front of the transmitter cabinet for the serviceman and test equipment.  A minimum of36” behind the cabinet should be free for rear cabinet access and air movement.  Also, ample room must be available at thecabinet rear for cable placement.SAFETY CONSIDERATIONSThis equipment utilizes a grounding plug on all power cords.  For personal safety, do not defeatthis safety feature.  As with all similar types of equipment, high voltage can be accessed whenthe chassis cover is removed.  Special care should be given in areas of fuses, line switches, andpower supplies.Modern high power solid state equipment contains low output voltage power supplies with very high current capability.  Toprevent severe burns, avoid contact of rings, watches etc., with these circuits.  When servicing the transmission line andantenna, care must be taken to avoid exposure to high-energy microwave.PHYSICAL INSTALLATIONMount the sub-chassis into the rack with the provided front panel screws; be sure to properly align the rear support.  Slideeach plug-in module into its location until it’s fully seated.  Once plug-in is place, tighten the front panel thumb screws toassure that the plug-in remains securely in place and provide proper grounding.  After all plug-ins are in securely in place,connect the LO output connector of the LO plug-in to the LO input connector of the upconverter plug-in via the SMA cablepacked with the LO plug-in module.The transmitter requires 10.5 inches of vertical rack space (not including a modulator).  Generally, all equipment is mountedin close proximity in the same rack for the convenience of cabling.
2SDxxxxC Series of Transmitters Installation ProcedureCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW.............................................................2/10/00RELEASED: PRC............................................................. 2/10/00Document #: DOC17-0035REV: FEB.10.00INSTALLATION OF THE POWER AMPLIFIER SEGMENTSThe power amplifier segments slide into the sub-chassis on nylon slides and connect to the motherboard via floatingconnectors.  The key-lock switch, located on the segment’s front panel, must be in the OFF position in order to plug thesegment in.  This is to ensure that there is no arcing between connections before the segment is fully engaged.  Once thesegment is slid into place, thumbscrews on the segment’s front panel are provided to secure it to the sub-chassis and toprovide ground connection.  The key-lock switch may now be turned to the ON position to apply power to the segment.Once the key-lock switch is turned on, the segment will automatically set the gain and currents of the amplifier.SYSTEM GROUNDINGFor proper system operation, it is imperative that the system be adequately grounded.  Each individual equipment rackrequires grounding to the main building ground.  When bolting ground wires to racks, sand finish to remove paint ensuring agood bond.
1Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00This is an unpublished work protected by United States copyright laws and is proprietary to Thomcast Communications, Inc.Disclosure, copying, reproduction, merger, translation, modification, enhancement or use by anyone other than authorizedemployees or licensees of Thomcast Communications, Inc. without the prior written consent of Thomcast Communications, Inc. isprohibited.Copyright (c) 1999 Thomcast Communications, Inc.  All rights reservedThis copyright notice should not be construed as evidence of publication.PROCEDUREDOC26-0031Safety Practices and GuidelinesFor Equipment Use and HandlingCOMWAVE DIVISIONPREVIOUSPrint
2Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00TABLE OF CONTENTSPURPOSE......................................................................................................................................................................3APPLICABILITY .........................................................................................................................................................3REFERENCES ..............................................................................................................................................................3RESPONSIBILITIES ....................................................................................................................................................3SYMBOLIC CONVENTIONS .....................................................................................................................................3GENERAL INFORMATION........................................................................................................................................4ELECTRICAL HAZARDS...........................................................................................................................................4EMERGENCY PROCEDURES....................................................................................................................................5ELECTRICAL SAFETY FEATURES AND PRACTICES..........................................................................................6PROCEDURES .........................................................................................................................................................6HIGH TEMPERATURES.............................................................................................................................................7FIRE SAFETY...........................................................................................................................................................7SAFETY PRACTICES..............................................................................................................................................7FIRE REPORTING ...................................................................................................................................................7FIRE SAFETY DEVICES.........................................................................................................................................7USE OF FIRE EXTINGUISHERS........................................................................................................................8USE OF FIRE BLANKETS ..................................................................................................................................8RF RADIATION ...........................................................................................................................................................8BERYLLIUM OXIDE...................................................................................................................................................8HANDLING BERYLLIUM OXIDE.........................................................................................................................8DISPOSAL OF BERYLLIUM OXIDE COMPONENTS.........................................................................................8UNDAMAGED COMPONENTS .........................................................................................................................9DAMAGED COMPONENTS...............................................................................................................................9TABLE OF TABLESTable 1: Fire classifications and extinguishing agents...................................................................................................7
3Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00PURPOSEThe purpose of this procedure is to supply Comwave customers with safety information for working with andhandling equipment in order to avoid any catastrophic occurrences.APPLICABILITYThis procedure is applicable to most high power transmission devices.REFERENCESDOC20-0001 Customer Support DocumentationDOC26-0052 CPR and First Aid TechniquesTransmitter specific technical manual, document number variesRESPONSIBILITIESIt is the responsibility of each individual to use this information to it’s full potential.SYMBOLIC CONVENTIONSThe following headings may be found throughout this manual:WARNING WARNING THIS HEADING BEFORE A PARAGRAPH WARNSTHEOPERATOR OR TECHNICIAN THAT EXTREME CAUTIONSHOULDBE USED TO PREVENT DEATH OR SERIOUS INJURY.CAUTION THIS HEADING BEFORE A PARAGRAPH CAUTIONS THEOPERATOR OR TECHNICIAN TO USE CARE TO PREVENT INJURY ORDAMAGE TO THE EQUIPMENT.•NOTE: This heading is used after a paragraph to highlight important information orprocedures that must be obeyed for correct transmitter operation.
4Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00SYMBOLIC CONVENTIONS CONT’D.There are some sections of the transmitting system that contain hazards during transmitter operation. The followingsymbols mark these potentially hazardous areas:Dangerous electrical voltages may be present.• This symbol is representative of the one found on your equipment; it may not be exact.High heat may be present, be wary of burns and/or fires.• This symbol is representative of the one found on your equipment; it may not be exact.Radiation may be present.• This symbol is representative of the one found on your equipment; it may not be exact.GENERAL INFORMATIONComwave transmitters are designed and manufactured to protect their operators and technicians from high voltage,heat, RF radiation, and other dangers. Generally, warning labels are attached to enclosures and/or assemblies toidentify possible dangerous conditions. Comwave recommends that only skilled personnel be permitted to operatethe transmitter; unskilled personnel must receive training that includes familiarization with safety practices andprocedures before being permitted to operate the transmitter. Correct operation of this transmitter will not expose theoperator to any danger.ELECTRICAL HAZARDSOne of the most dangerous and common hazards when working with electricity is electrical shock. Electrical shockoccurs when the body becomes part of the path of electrical current. Electricity takes the path of least resistance anddepending on what your are wearing, where you are standing, and your size you may get a shock.Shock can occur when working with both AC and DC voltages. DC currents up to .5 amps do not present a dangerto human life however; the voltage can cause severe burns. Current more than .6 amps can cause severe shock,bums, and even death.Even when working with AC voltage at standard frequencies (50-60 Hz) and intermediate voltages (72-600 VAC)lethal current can flow through the body; voltages as low as 24 VAC can be lethal under certain circumstances. Athigher frequencies the danger of shock is less but Radio Frequency (RF) burns are possible.As stated above, current flow follows the path of least resistance; there are many factors that determine if anelectrical shock will be received and the severity of the injuries incurred. Below are some issues to consider whenworking with electricity:
5Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00WARNINGWARNING: THE PATH CURRENT TAKES IS CRITICAL.  IF IT PASSESFROM HAND TO HAND OR HAND TO FOOT (ACROSS THE BODY) THEHEART, LUNGS, BRAIN, OR SPINAL CORD MAY BE AFFECTED, WHICHMAKES SERIOUS INJURY OR DEATH MORE LIKELY.1) BODY RESISTANCE: The resistance of the body and the amount of insulation between the body and grounddetermine the amount of current that passes through the body. The skin provides the most natural resistance tocurrent flow, however, skin resistance decreases with voltage.2) LENGTH OF TIME EXPOSED TO ELECTRICAL CURRENT: If you are in the current path for any length oftime, burning will occur; the longer your body is in contact with the current the more severe the injury. Burnsbreak down the skin and lower its resistance making the body more vulnerable and more likely to receive severeshock.The duration of contact is critical when current flow through the body cause loss of muscle control, chestcontraction (breathing is impaired), and ventricular fibrillation of the heart. During fibrillation the heart cannotpump sufficient quantities of blood.3) MAGNITUDE: The size and/or quantity of an electrical shock is a major factor in determining the extent of lossof muscle control, effect on the heart, and severity of burns.4) CURRENT PATH THROUGH THE BODY: As stated above, if the current flows from hand to hand or hand tofoot, across the body, there is a high possibility that a vital organ will be affected. Wearing the proper clothing,as indicated below, will help prevent this.5) AGE AND CONDITION OF VICTIM: The age and physical and emotional condition of the victim can alsoaffect the severity of electrical shock. Elderly victims, or those with existing medical problems, are moresusceptible to injury caused by electrical shock.6) CLOTHING: Rubber has a very high resistance, thus, when working around electricity, rubber shoes and glovesshould always be worn. Modern high power solid state equipment contain low output voltage power supplies withvery high current capability.  To prevent severe burns, avoid contact of rings, watch bands, etc., with these circuits.When servicing the transmission line and antenna, care must be taken to avoid exposure to high energy microwave.7) ENVIRONMENT: Water is a very good conductor of electricity, therefore if you have wet hands or arestanding in a puddle the chances of getting an electrical shock are EXTREMELY high, so, ALWAYS be sure toavoid water when working with electricity.EMERGENCY PROCEDURESIf you hear “popping”, see sparks, or observe any other noticeable electrical defects that could result in electricalshock, report the conditions to your supervisor immediately.If you receive any shock, immediately report it to your supervisor. Even though you may not feel that it hurt you,some problems, such as damage to the heart, can become evident several hours after the incident.Personnel who operate and/or repair electrical equipment must be able to carry out the following:1) Cut off the power to all sections of the work area.2) Free a person from a live circuit; act quickly to minimize the danger.a) If a person is “frozen” to a live circuit, shut off the power, if you can get to it quickly. It is important to getthe person away from the current as quickly as possible.
6Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00WARNING WARNING NEVER DIRECTLY TOUCH A PERSON THAT IS FROZEN TO ANELECTRICAL CIRCUIT OR YOU MAY BECOME PART OF THE CIRCUIT TOO.b) If you can not turn off the power, knock the person off the circuit using boards, sticks, or any other non-conductive material. You can also use a belt, dry rope, or some other article of clothing that is non-conductive.c) Take care not to get pulled into or touch the person as you could easily become part of the current path.3) Administer cardio-pulmonary resuscitation (CPR) as needed1.  Always make sure the scene is safe for you tohelp before proceeding.• In order to be properly prepared and able to respond correctly is it highly recommended that a CPRtraining course be completed.ELECTRICAL SAFETY FEATURES AND PRACTICESComwave equipment makes and uses voltages that can be lethal. Any area that has dangerous voltage present shouldbe marked with an electrical warning label, as discussed earlier.WARNINGWARNING: USE APPROPRIATE PROCEDURES AND PRACTICES WHEN WORKINGNEAR ELECTRICAL CIRCUITS.WHEN OPENING A PANEL WITH A WARNING LABEL AND WORKING IN THATAREA, BE EXTREMELY CAUTIOUS. HIGH MAIN POWER VOLTAGE IS PRESENTWHICH CAN CAUSE SERIOUS INJURY AND DEATH.Transmitter assemblies are fully enclosed to protect you from high voltages, for further protection all equipmentmust be grounded. The installation guide for your equipment discusses grounding in more detail.PROCEDURESTo further ensure protection while operating or performing maintenance on Comwave transmitters the followingprocedures must be adhered to:1) Operate and maintain the transmitter in accordance with the appropriate manual(s). Observe and heed allwarnings.2) Permit only trained skilled personnel to operate the transmitter.3) Ensure that power is not applied to the transmitter before trying to access areas that have electrical warninglabels.4) Use safety ground hooks to shunt any residual stored voltages to ground. Keep a safety-grounding hookattached to a ground point whenever your work on the transmitter.5) Work in pairs when performing maintenance on electrical circuits.6) Train all personnel in first aid1 and CPR procedures.• In order to be properly prepared and able to respond correctly is it highly recommended that a first aidtraining course be completed.                                                          1 If you have access to the Internet the following sites offer information about first aid and CPR: http://www.amherst.edu/~jaloduca/cpr.html andhttp://www.amherst.edu/~cdsulliv/bruss/emer/menu.html.  If you do not have Internet access, contact Comwave for DOC26-0052, which outlinesthe first aid and CPR steps found at the above mentioned sites.
7Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00HIGH TEMPERATURESWhen high voltages are produced, some components generate high temperatures. If personnelcome in contact with these areas they could receive severe burns, also, if flammable material isnear a fire could break out.FIRE SAFETYBefore a fire, learn the locations of the nearest fire alarm boxes, fire exits, alternate escape routes and fireextinguishers.As with any hazard the best way to prevent damage, injury, or death is with solid safety practices. The table belowlists the different fire classes and recommended extinguishing agent.Table 1: Fire classifications and extinguishing agents.MATERIAL INVOLVED FIRE CLASS APPLICABLE FIRE EXTINGUISHERWood, paper, textiles, other ordinarycombustible material APressurized water, small fire hose, multipurposedry chemicalFlammable liquids, oils, solvents, grease,paint, etc. BDry chemicals, carbon dioxideEnergized electrical or electronic equipment CDry chemicals, carbon dioxide. NEVER USE ASOLID STREAM OF WATER ONELECTRICAL FIRES.Metals such as metal-organics, magnesium,aluminum, sodium, potassium, titanium, etc. DSpecial powder extinguishersSAFETY PRACTICES1) Always keep flammable material away from open flames or areas with high temperatures.• Even if there is no flame, flammable material can ignite when exposed to high temperatures.2) Locate all fire alarm boxes, fire exits, fire extinguishers, and alternate fire exits and post their locations inseveral spots near the transmitter.3) Equip each area with a fire blanket for personnel safety.4) Contact the proper authorities AS SOON AS fire is detected, even before trying to extinguish it.FIRE REPORTING1) Report a fire as soon as it starts, call for help before trying to extinguish a fire.a) It’s better to have the fire taken care of when the fire department arrives then to find that you cannot controlthe fire and should’ve called for help.2) Send someone to direct the fire department to the scene.FIRE SAFETY DEVICESWhen a fire erupts, the fire extinguisher is your first line of defense. It is imperative that an extinguisher be locatedin the area of the transmitter and that it is the correct type for the possible fire(s) that could erupt, see the tableabove.In addition to the fire extinguisher a fire blanket should be near each work area; this is indispensable when clothingcatches fire.
8Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00USE OF FIRE EXTINGUISHERSUse the extinguisher to put out small fires before they begin to spread. Learn how to use the fire extinguishers inyour area before a fire breaks out.Fire extinguishers must be kept fully charged and should be inspected monthly to ensure proper operation. If you usean extinguisher, return it to its designated location and notify the appropriate authority to have it recharged.Always place the extinguisher where it is easily accessible along normal paths of travel. Do not allow anything toblock access to or obstruct the visibility of the extinguisher. Use signs or other methods to identify the locations offire extinguishers not easily seen.USE OF FIRE BLANKETSWrap the blanket around the person and roll them on the floor until the flames are smothered.RF RADIATIONRF Radiation can cause severe burns and death; however, when correctly maintained and operatedthe transmitter does not produce enough non-ionizing (RF) Radiation to be a danger to personnel.RF radiation levels at all accessible locations in the transmitter will be less than 1mW/cm2. Do notoperate the transmitter if the RF radiation is measured at or suspected to be greater than lmW/cm2.Ensure that the transmitter is connected to the correct load or antenna and that all transmission lines and componentsare correctly installed with sufficient mechanical support and all covers and shields are in place.Radiation detectors are available commercially for sensing hi RF levels.  Comwave highly recommends the use ofthese devices around all transmission equipment; without a detector there is no way of knowing if RF radiation ispresent.If RF radiation is detected cease operation immediately, shut down power, and inspect the above mentioned parts.BERYLLIUM OXIDEThe RF transistors and RF terminations used in this equipment may contain wafers with Beryllium Oxide.Components that contain beryllium oxide can be handled without risk if they do not have any physical damage.If the component is damaged, beryllium oxide dust can be produced, which is toxic. The dust particles can beinhaled or become implanted in exposed skin.WARNINGIF YOU TRY TO TAKE APART A COMPONENT THAT CONTAINSBERYLLIUM OXIDE YOU CAN RELEASE BERYLLIUM OXIDE DUST,WHICH IS TOXIC.HANDLING BERYLLIUM OXIDEWear disposable gloves when handling damaged components. Use dressings to cover cuts or abrasions to the skinswhere the dust might enter. If beryllium oxide dust gets on your skin, immediately wash the affected area then seekmedical attention.DISPOSAL OF BERYLLIUM OXIDE COMPONENTSObey the local disposal procedures, if there are none follow these procedures:
9Safety Practices and Guidelines for Equipment Use and HandlingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................12/8/99 CHECKED: PRC...............................................................12/10/99RELEASED: DMW........................................................... 01/03/00Document #: DOC26-0031REV: FEB.22.00UNDAMAGED COMPONENTS1) Put components in a polyethylene bag.2) Seal the bag.3) Put it in the beryllium oxide scrap box.• A beryllium oxide scrap box is a sealed metal container with a warning label on it.DAMAGED COMPONENTS1) Put disposable gloves on.2) Use tweezers to put all visible pieces in a polyethylene bag.3) Seal the bag.4) Put it in the beryllium oxide scrap box.5) Clean the area with a damp cloth.6) Put the cloth and gloves in another polyethylene bag and seal it.7) Put that bag in the scrap box too.8) THOROUGHLY wash your hands.
1SDxxxxC Series CablingCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW.............................................................2/14/00RELEASED: PRC............................................................. 2/14/00Document #: DOC17-0036REV: FEB.10.00SDxxxxC SERIES CABLINGThis section explains cabling and interconnects for this series of transmitters.  Refer to document # DOC30-0043 forpictorial.SUB-CHASSIS REAR PANEL (TRANSMITTER):♦ IF INPUT:An input signal is required for operation.  Connect the IF INPUT of the transmitter to the IF OUTPUT ofthe modulator or other source.  Use RG59/U 75 O cable.♦ RF OUT:Cable the RF OUTPUT signal from the transmitter to the spectral shaping assembly, channel combiner, ornotch filter.  In an agile transmitter the RF OUTPUT is cabled to the spectral shaping assembly or thebroadband input of the channel combiner network. Use ½-inch super flex cable.♦ FREQ REF IN:An externally applied frequency reference signal is an option.  This signal can originate from an optionalreference drawer or from another transmitter that contains an internal reference oscillator, which can driveup to three additional transmitters.  Use RG59/U 75 O cable.FRONT PANELS:Connect the LO output of the LO plug-inmodule to the LO input of the upconverter/ amplifier plug-in module.Figure 1: Cabling the LO signal.COMVIEW INTERCONNECTIONSComView interconnections are achieved through six-conductor telephone cables with RJ-11 connectors at each end.The first cabling harness exits the PC and enters the ComView port on the rear of the transmitter, refer to DOC30-0043 for connector location.In systems with multiple transmitters another harness is cabled from the net output of the first transmitter to the netinput of the second transmitter.  This daisy chain effect continues to the last transmitter in the rack.  At the lasttransmitter in the rack the termination switch is put in the “term” position.  Refer to the system interconnectdiagram, document # DOC30-0005, for more detail on daisy chain cabling.
EXTERNAL INTERCONNECTIONS, SDxxxxC SeriesCOMWAVE DIVISION External Interconnections for the SDxxxxC SeriesAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS 2/10/00 CHECKED: DMW 2/14/00 RELEASED: PRC 2/14/00Document #: DOC30-0043 REV: FEB.10.00 1SUB-CHASSIS REAR PANELIF Input SignalRF OutputSuper-flex cableIn from ComViewaOut to ComViewaTermination SwitchOPTIONAL AgileControllerLocal RS-485communicationFreq Ref InNOTES: a) These are interchangeable.
COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS 1/18/99 CHECKED: DMW 1/18/99 RELEASED: PRC 1/18/99Document #: DOC30-0005 REV: NOV.11.99 ECO #: 98-116 1COMVIEW STATUS MONITORING INTERCONNECTIONSCOMWAVESTATUSMONITORINGSYSTEMNOTE: Positionswitch to TERM for lastdrawer in the seriesLAST DRAWER INSERIESTO FINALDRAWER IN THESERIESTERMOUTNETWORK ENDTERMINATION NET NETTERMOUTNETWORK ENDTERMINATION NET NETTERMOUTNETWORK ENDTERMINATION NET NETTERMOUTNETWORK ENDTERMINATION NET NETComView Status Monitoring Interconnections
1Turn-On Procedure for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED:  PRC...............................................................2/10/00 RELEASED: DMW............................................................ 2/14/00Document #: DOC26-0050REV: FEB.10.00TURN-ON PROCEDUREINITIAL TURN-ON PROCEDURE1. Plug the AC line in.2. Ensure all external interconnections are appropriately connected.3. Turn the power switch on the rear of the transmitter to the “ON” position.4. All modules perform an automatic start up program.♦ Upconverter Plug-in ModuleA lamp test operation is performed. All chassis front panel LED’s are illuminated for approximately 1second then darkened. The lamp test allows a quick verification that all front panel LED’s are functioning.In addition, the lamp test is a clear outward sign that the MCU board is receiving power, is executing thefirmware program, and has recovered from RESET. Shortly after the lamp test, the LED’s will displaychassis status as determined by firmware tests. Document # DOC13-0188 discusses the firmware in moredetail.♦ LO Plug-in ModuleWhen the LO module is turned on, the code executes an initialization process.  This process provides alamp test, and displays the channel number on the front panel eight-segment LED display.  An internalreference is adjusted to operational frequency, and the synthesizer chip is programmed with theoperational frequency that was previously set into the microprocessor’s non-volatile memory.Additionally, the working arrays and structures of the application are set into RAM. After the initializationprogram completes, the code enters a simple state machine to judge and operate the LO module.Document # DOC13-0184 discusses the firmware in more detail.♦ Power Supply Plug-in ModuleWhen power is initially supplied to the power supply module a lamp test is performed.  The two frontpanel LED’s will flash on then off, after which the LED’s remain lit, verifying operation.5. Once the start up program is complete the equipment is functional.NORMAL OPERATIONThe following LED’s confirm normal operation:LO plug-in moduleë DC POWER – continuously illuminated greenë LO Ø LOCK - unlitPower supply plug-in moduleë POWER - continuously illuminated greenë DC POWER - continuously illuminated greenRefer to the troubleshooting section of this manual for more information about the above LED’s.
2Turn-On Procedure for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED:  PRC...............................................................2/10/00 RELEASED: DMW............................................................ 2/14/00Document #: DOC26-0050REV: FEB.10.00Power Amplifier SegmentOperation is accomplished by turning the key-lock switch to the  “ON/LOCKED” position.• The locks are an added safety feature; however, the keys are interchangeable.The POWER/FAULT LED should continuously illuminate GREEN.  If the LED flashes RED, the power amplifiersegment has faulted.  After three faults, a failure will occur and the segment will shut down.  Turning the key-lockswitch to the “OFF/UNLOCKED” position and then back to the “ON/LOCKED” position will reset it.  Should failureoccur again, hot replacement is necessary.  Turn the key-lock switch to the “OFF/UNLOCKED” position and pull thefailed segment out of the rack by the handle.  Slide a new power amplifier segment into the vacant space, see theinstallation procedure for assistance, set the correct node address, see DOC22-0019, and turn the key-lock switch to the“ON/LOCKED” position.
SECTION 3PREVIOUSPrint
1Recommended Test EquipmentCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................11/18/99 CHECKED: DP .................................................................2/7/00RELEASED: PC................................................................ 3/5/00Document #: DOC25-0007REV: APR.05.00RECOMMENDED TEST EQUIPMENTThe following test equipment can be substituted with other models in most cases; Comwave suggests that you useequipment that will produce equivalent or better results. An asterisk (*) represents the minimum equipmentnecessary; these items are required during the initial MMDS system set up and should be available at all times.The remaining test equipment is useful for a variety of test and performance checks including verification ofcompliance with FCC rules and troubleshooting suspected problem areas or failures when used by qualifiedpersonnel.Due to the many variables in maintenance and system requirements of television transmission systems, this listshould only be used as a guide in your test equipment selection.Table 1: Suggested test equipment.MODEL EQUIPMENT TYPICAL USESTektronixTSG-100 *Video generatorCan be substituted for the normal program video to help determine aproblem with the incoming video from either the satellite receiver orfrom off-air demodulation.  Useful when comparing channels or whenan unchanging video signal is required. May also be used to setmodulation levels for the transmitter and the encoding system.Fluke 87 *Digital voltmeter, 3 ½ digitHP 435B 10 MHz to 3 GHz powermeterUsed in conjunction with various attenuators to measure power atvarious points throughout the transmitter when troubleshootingproblems. Also verifies an MMDS transmitter is operating at theproper output power.HP 8482H Sensor for power meterUsed in conjunction with various attenuators to measure power atvarious points throughout the transmitter when troubleshootingproblems. Also verifies an MMDS transmitter is operating at theproper output power.HP 8594AOption 010Option 301Spectrum analyzer (withoptions)Tracking generatorTV Sync triggerUseful in measuring power, troubleshooting problems, comparinglevels and setting modulation depths. In conjunction with a separate orbuilt in sweep generator, it can measure VSWR ofantenna/transmission line system. The ultimate piece of test equipment.*13” or larger color TVmonitor/receiverA cable ready TV receiver is required to insure that a good qualitypicture is being transmitted. A video monitor is essential in observingthe quality of the signal received by either the satellite receivers or off-air demodulators prior to processing, scrambling, and converting to anMMDS channel for transmitting.*Oscilloscope, 10 MHzRequired along with a 75 Ω termination to properly set up the 1 voltP/P video required by the MMDS transmitter.  Also a mandatory itemwhen setting the encoder system.  Very useful when troubleshootingsystem problems.*MMDS block downconverter Converts a sample of the MMDS signal that is being transmitted to aVHF signal required by the TV receiver of decoder.PREVIOUSPrint
2Recommended Test EquipmentCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................11/18/99 CHECKED: DP .................................................................2/7/00RELEASED: PC................................................................ 3/5/00Document #: DOC25-0007REV: APR.05.00MODEL EQUIPMENT TYPICAL USES*Decoder (type and modeldetermined by type ofencoding or scramblingsystem used)Required between the block down converter and TV receiver tounscramble a scrambled signal.Narda 3003-20 *20 dB “S” band directionalcoupler Provides a reduced sample of the transmitted MMDS signal to varioustest instruments.Narda 771-20 *20 dB microwave attenuator Provides a reduced sample of the transmitted MMDS signal to varioustest instruments.Narda 771-60 *60 dB microwave attenuator Provides a reduced sample of the transmitted MMDS signal to varioustest instruments.Narda 771-10 *10 dB microwave attenuator Provides a reduced sample of the transmitted MMDS signal to varioustest instruments.*75 Ω terminations*50 and 75 Ω cables*Assorted BNC, N, RCA,and F type adapters
1Troubleshooting for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED:  AAC .............................................................. 2/15/00RELEASED: PRC .............................................................. 2/16/00Document #: DOC18-0073REV: FEB.16.00SDxxxxC SERIES TROUBLESHOOTINGThis series of transmitters is equipped with comprehensive diagnostic circuitry that monitors the status of each plugin module and power amplifier segments so failures can be readily detected.  Observing the front panel LEDdiagnostic display, and ComView interface will inform you of the complete operational status.  The following listsexplain various failure mode displays and possible solutions.A 14-pin computer type diagnostic interface connector, labeled J1, is located on the rear of the transmitter to assistin troubleshooting.  Critical power supply, module, and motherboard voltage test points can be accessed/monitoredat this location.  Should a failure occur, the combination of diagnostic LED status lights, diagnostic interface voltagetest points, and ComView should help identify the failure.• Repair of internal modules is not recommended or advised.  Contact1 COMWAVE customer support should afailure occur.LO PLUG-IN MODULE:The LED’s listed below continuously illuminate GREEN during normal operation.  Absence of a green LEDindicates a missing signal or parameter that results in a controlled automatic shutdownDC POWER(No power present)CAUSES: CHECK FOR: REMEDY:Plug-in module not seatedproperly If LO plug-in module LED’s are unlit,while the power supply plug-in LED’sare litRemove LO plug-in and push firmly backin placePower supply plug-inmodule malfunctioning If LO AND power supply plug-inLED’s are unlit Remove the panel covering the front endpower supply and check the LED’sFront end power supplymalfunctioning If the LED’s indicate a problem, referto Table 1If no problem is indicatedIf the fuse is badIf the fuse is okContact1 Comwave customer support fora replacementCheck the rear panel AC fuseReplace itContact1 Comwave customer supportTable 1: Front end power supply alarm indicators & control signals.Description Signal LED IndicatorOutput OK Yes GreenSupply Standby Yes AmberSupply Fail Yes RedCurrent Limit Yes AmberOvervoltage Yes RedOvertemp Yes Amber (same as Fan Fail LED indicator)AC Undervoltage Yes NAFan Fail Yes Amber (same as Overtemp LED indicator)                                                          1 DOC20-0001 provides detailed contact information. International phone 001-570-474-6751, USA & Canada phone 1-800-266-9283.
2Troubleshooting for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED:  AAC .............................................................. 2/15/00RELEASED: PRC .............................................................. 2/16/00Document #: DOC18-0073REV: FEB.16.00The following LED’s remain unlit until a malfunction is detected then they continuously illuminate RED.  Loss ofphase lock results in controlled automatic transmitter shut down.LO Ø LOCK(Loss of phase lock)CAUSES: REMEDY:Reference Level Measure the reference level at the rear of thetransmitterIf the level is low:Check and tighten all external cables andharnesses associated with the LOIf the level is OK or still low after checking thecables:Contact2 Comwave customer support for areplacementPOWER SUPPLY PLUG-IN MODULE:The LED’s listed below continuously operate GREEN during normal operation.  Absence of a green LED indicatesa missing signal or parameter that results in a controlled automatic shutdownPOWER(No power present from the front end power supply)CAUSES: REMEDY:Blown fuse, F1, in plug-in module Replace fuseNo DC input from front end power supple Check OEM power supplyFailure in plug-in module Contact2 Comwave customer support for a replacementDC POWER(No output power)CAUSES: REMEDY:Short circuit or current overload Test 48 pin connector on back plane for short circuitsFind plug-in module that is causing overload byswapping with like plug-in modulesFailure in plug-in module Contact2 Comwave customer support for a replacementThe upconverter / amplifier plug-in module LCD display provides operating information about each plug-in module,i.e. ‘PASS’ / ‘FAIL’, as well as a series of measurements, and user adjustments.To view the status of each plug-in module perform the following steps:1. Use the keypad on the upconverter / amplifier plug-in, choose select, when Status is displayed in LCDhit enter.2. At this point you will be able to “select” the plug-in module of your choice.3. When you’ve chosen the appropriate module the LCD will display either ‘PASS’ or ‘FAIL’.4. If it indicates the plug-in has failed, contact2 Comwave for a replacement plug-in, there are no usertroubleshooting steps for the plug-in modules.                                                          2 DOC20-0001 provides detailed contact information. International phone 001-570-474-6751, USA & Canada phone 1-800-266-9283.
3Troubleshooting for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED:  AAC .............................................................. 2/15/00RELEASED: PRC .............................................................. 2/16/00Document #: DOC18-0073REV: FEB.16.00If the Reflected Power measurement is high, check the following:1. Output cable2. Output Notch Filter (present at the output of the system)3. Cable between Notch Filter and Channel Combiner (if present at the output of the system)4. Connections to the antennaIf after ensuring the above are properly connected the problem persists, contact3 Comwave customer support.If the Forward Power measurement is low, check the following:1. Check the power amplifier segment LED’s; they should be green.2. Check the status of each of the plug-in module via the keypad on the upconverter / amplifier plug-in front panel,see above for steps. They should all present a PASS condition.3. If no amplifier segment or plug-in modules indicate a FAIL condition, use the keypad and LCD to display theIN-SIGNAL condition.4. If the IN-SIGNAL status indicates a NO IN-SIGNAL condition, check the signal source.5. If any power amplifiers segments and / or plug-ins have a FAIL condition, contact Comwave customer supportto report the failure and receive a replacement.POWER AMPLIFIER SEGMENTHot replacement of the power amplifier segment may be required if a failure occurs.  To remove a segment, turn thekey-lock switch to the OFF position, loosen the thumbscrews on the segment’s front panel and slide the failedsegment out of the sub-rack.  Before the replacement segment can be installed, the node address must be set, refer todocument # DOC22-0019.  A set of DIP switches is accessible through the cover of each segment directly behindthe key-lock switch.  Set the DIP switches of the replacement segment to the same positions as the failed segment’sDIP switches.  Refer to the installation procedure for assistance when replacing power amplifier segments.                                                          3 DOC20-0001 provides detailed contact information. International phone 001-570-474-6751, USA & Canada phone 1-800-266-9283.
COMWAVE DIVISION Power Amplifier Segment Node AddressesAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS 9/16/98 CHECKED: DMW 10/20/98 RELEASED: PRC 10/20/98Document #: DOC22-0019 REV: DEC.01.99 ECO #: 98-116 1NODE ADDRESSES1 to 16 ChannelsNOTE: Do not changenode switch Settings 6, 7,and 8.  They shouldremain as set by thefactory.MODULE POSITION NODE ADDRESS NODE SWITCH SETTING1ONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFFONOFF223443655 6789789 101415161712131110131415161112
1SDxxxC Series Transmitter Troubleshooting Worksheet– 47266066 Rear Panel InterfaceCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AB ..................................................................2/4/00 CHECKED: KAS ...............................................................2/9/00RELEASED: PRC............................................................. 2/11/00Document #: DOC18-0072REV: FEB.09.00TROUBLESHOOTING WORKSHEETThis troubleshooting worksheet identifies each interface pin, the associated internal test point, nominal value, andthe expected voltage range.  Please fill in all blank spaces completelyJ1: Rear PanelDiagnostic Pin Function Checked Measured Voltage1Ground2LO / Front-End Fault3PS Fault4Upconv Fault5Sys Pwr6REFL Pwr7+48V Fault Input8+10V Fault Input9P.A.S. Reset10 P.A.S. Standby11 Amp Seg Fault12 +12V Output13 Insignal for Booster14 GroundFILL IN ALL THE ABOVE BLANK SPACES COMPLETELYCOMPANY NAME: ________________________ CUSTOMER’S NAME: ________________________PHONE NUMBER: ________________________ FAX NUMBER:             ________________________MODEL: __________ CHANNEL: ____________ SERIAL NUMBER (REAR PANEL): _____________SEND RESULTS TO:  THOMCAST COMMUNICATIONS, COMWAVE DIVISIONATTENTION TECHNICAL SUPPORTTOLL FREE PHONE (U.S.A. & Canada): 1-800-COMWAVE  (1-800-266-9283)International and U.S.A. 1-570-474-67511FAX 1-570-474-5469                                                          1 International calls must dial the country code before the phone number, i.e. 001-570-474-6751.
1SDxxxxC Series Transmitter Fusing & ProtectionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW.............................................................2/14/00RELEASED: PRC............................................................. 2/16/00Document #: DOC18-0075REV: FEB.16.00SDxxxxC SERIES TRANSMITTER FUSING AND PROTECTIONResettable and replaceable fuses1 are found in this system.  Refer to the tables below for fuse locations and values.Table 1: Transmitter fuse locations.LOCATION REFERENCE VALUERear Panel Interface Board - 47266066 F1 .5 ampere resettableRear Panel AC Input 8 amperes @ 230 VACTable 2: Power amplifier segment fuse locations.LOCATION REFERENCE VALUEMicrocontroller board F1, F2 .75 amperes resettableMicrocontroller board F3 .30 amperes resettableMicrocontroller board F4 .35 amperes resettableDC - DC converter board F1 10 amperesThermal Protection: Thermal protection is accomplished using temperature sensors within individual plug-inmodules.  The LO module does not have a temperature sensor. When the temperature exceeds 140° Fahrenheit (60°Celsius), the sensors inform the microcontroller which then takes the appropriate action, until the unit is sufficientlycooled.Interlocks: Interlocks are performed via software applications, see individual plug-in modules firmware descriptionfor more information.The OEM front end power supply offers the following:Table 3: Front end power supply alarm indicators & control signals.Description Signal LED IndicatorOutput OK Yes GreenSupply Standby Yes AmberSupply Fail Yes RedCurrent Limit Yes AmberOvervoltage Yes RedOvertemp Yes Amber (same as Fan Fail LED indicator)AC Undervoltage Yes NAFan Fail Yes Amber (same as Overtemp LED indicator)                                                          1 Replace only with the same type and rating.
1Power Supply Plug-In - Fusing and ProtectionCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................1/26/00 CHECKED: KAS ...............................................................1/27/00RELEASED: CTS.............................................................. 2/14/00Document #: DOC18-0071REV: JAN.27.00POWER SUPPLY PLUG-IN FUSING AND PROTECTIONThis module contains one replaceable fuse1, refer to the table below for fuse location and value.Table 1: Transmitter fuse locations.LOCATION REFERENCE VALUEDC converter board F1 6 amperes @ 117/230 VACCURRENT AND VOLTAGE MONITORINGCurrent sampling is accomplished by measuring the voltage drop across a resistor in series of the load.  The voltagesfrom both sides of the resistor are scaled down in order to keep the measured voltages from the supply voltages ofthe operational amplifiers.  The voltage differences are first buffered, and then applied to an operational amplifierconfigured to measure the difference of the two input voltages.The output of the differential amplifier is then applied to a non-inverting amplifier to increase the voltage near themiddle of the system controller’s 5 volt analog to digital converter’s range.  An integrated circuit containing Zenerand Shottkey diodes protect the inputs of the system controller.  The system controller compares this value againstpreviously calibrated values to determine if the power supply is operating outside of specified parameters.The input buffers for the current sampling also provide the voltage samples; the buffer’s output is scaled down bydividing resistors.   This provides a sample voltage to the analog to digital converters that is mid-rage between zeroand five volts.All of the power supply sections operate in a similar manner.  The –12 VDC power supply section uses invertingamplifiers (instead of buffers) with unity gain to convert the sample values to positive representations of the sampledvoltages.The current and voltage sample outputs are applied to an analog multiplexer integrated circuit.  This chip selects thegroup of signals that are applied to the microprocessor from a control provided from the microprocessor.TEMPERATURE SENSINGTemperature sensing is accomplished by a thermal sensing integrated circuit.  This integrated circuit outputs ananalog voltage between 0 and 5 volts that corresponds to the relative air temperature.This analog signal is applied to the analog to digital converter built into the embedded controller.  The controllerprocesses this value and compares it against pre-determined values to control the sequence of events needed whenan over temperature condition arises                                                          1 Replace only with the same type and rating.
1Maintenance for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW ............................................................. 2/11/00 RELEASED: PRC .............................................................. 2/11/00Document #: DOC18-0074REV: FEB.10.00MAINTENANCECOMWAVE products have been carefully designed to be maintenance free.  Only periodic inspection and cleaningis necessary.INSPECTIONS1. Periodically inspect cooling fans on the rear door of the rack and the heatsinks of the power amplifier segmentsfor heavy accumulations of dirt and/or insects.  Heavy accumulation of foreign debris impedes coolingeffectiveness and could lead to premature failure.  Should any debris be detected, shut down the transmitter andfollow the cleaning instructions to remove debris from transmitter.• The agile transmitter will automatically recover the channel of the transmitter that is being cleaned.2. After performing routine maintenance, be sure to check the tightness of all cable connections and especially theintegrity of crimp type connectors.CLEANINGPOWER SUPPLY PLUG-IN MODULE:1. Pull the plug-in out of the sub-chassis and vacuumthe heatsink.2. Remove the side “snap-on” cover and clean thefront panel fan.3. Replace the cover.4. Plug the segment back in.• Be sure not to bend or damage the fins of theheatsink during cleaning.• Keep in mind that when the plug-in module isremoved there will be an interruption in service,which will be restored immediately upon its return tothe sub-chassis.HEATSINKCOVERFANFigure 1: Power supply plug-in module.
2Maintenance for the SDxxxxC Series of TransmittersCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................2/10/00 CHECKED: DMW ............................................................. 2/11/00 RELEASED: PRC .............................................................. 2/11/00Document #: DOC18-0074REV: FEB.10.00HEATSINKFigure 2: Power amplifier segment heatsink.POWER AMPLIFIER SEGMENTS:Pull each power amplifier segment one at a time from the frontof the rack and vacuum the heatsinks.  Due to the hotreplacement feature, if one segment is removed at a time, thetransmitter does not need to be turned off.  Plug the segmentback in after cleaning.• Be sure not to bend or damage the fins of the heatsinksduring cleaning.FAN:Clean the fan on the rear of the sub-chassis,removing the fan guard if necessary.1. Power connection; remove the powerprior to cleaning.2. To remove the fan guard remove thesescrews. 122Figure 3: Rear panel fan.
1Calibrations for the SDxxxxC Transmitter SeriesCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/14/00 CHECKED: KAS ...............................................................2/14/00RELEASED: PRC............................................................. 2/16/00Document #: DOC16-0057REV: FEB.16.00CALIBRATIONS FOR THE SDxxxxC TRANSMITTER SERIESThis series of transmitters is designed to perform auto-calibration upon turn-on.  Once this is complete if the outputpower is incorrect or missing proceed as follows.FORWARD POWER – UPCONVERTER / AMPLIFIER PLUG-IN MODULE:1) Make connections as depicted in Figure 1 note 1.2) Connect a PC with the application file DRIVER_PLUG_IN_CAL_&_ADJUS to the RS-232 port on the frontpanel.3) Initialize DRIVER_PLUG_IN_CAL_&_ADJUS application.4) Through the program application, specifically in the POWER CONTROL BOX, set the POWER MODE toMANUAL.5) With the MANUAL POWER CONTROL sliding button, set power in order to have a reading of 20 dBm(100mW) at the external power meter. Account for the directional coupler factor.6) Enter the number 20 in the DRIVER FORWARD POWER SET VALUE field.7) Press the DRIVER FORWARD POWER CALIBRATE button.8) On the upconverter plug-in, display the Forward Power measurement by:a) (Considering the LCD display is in its default state): SELECT (to make the STATUS option of theSTATUS / CALIBRATE screen to flash)b) ENTER (to display PS / LO / DRIVER status screen)c) SELECT, SELECT (to highlight the DRIVER STATUS option)d) ENTER (to display options INSIGNAL / SYSTEM FORWARD POWER / SYSTEM REFLECTEDPOWER / DRIVER FORWARD POWER under the DRIVER STATUS menu)e) SELECT, SELECT and SELECT (to highlight the DRIVER FORWARD POWER)f) Enter to display the measurement9) Verify that the reading on the LCD display is consistent with the reading on the external power meter.  Outputpower of the upconverter plug-in is now calibrated.10) Close DRIVER_PLUG_IN_CAL_&_ADJUS application and disconnect PC.11) Return the system to its original interconnections.
2Calibrations for the SDxxxxC Transmitter SeriesCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/14/00 CHECKED: KAS ...............................................................2/14/00RELEASED: PRC............................................................. 2/16/00Document #: DOC16-0057REV: FEB.16.00Open sub-chassis rear panelFWDREFL* This item should be an N-N male extension PN UG-57B/U or equiv.  Substitution of this adapter requires that its insertion loss be known for accurate power measurements.- 30 dBDirectionalCouplerTO SPECTRUMANALYZER OR TO POWERMETER50 OHMTERMINATIONUpconverter / Amplifier Plug-in Front panelcable1- 30 dBDirectionalCouplerTO SPECTRUMANALYZER OR TO POWERMETER50 OHMTERMINATION2NOTES:1) Connection for upconverter plug-incalibration.2) Connection for system calibration.Figure 1: Calibration interconnections.FORWARD POWER – SYSTEM:1) Make connections as depicted in Figure 1 note 2.2) Connect a PC with the application file DRIVER_PLUG_IN_CAL_&_ADJUS to the RS-232 port on the frontpanel.3) Initialize DRIVER_PLUG_IN_CAL_&_ADJUS application.4) Through the program application, specifically in the POWER CONTROL BOX, set the POWER MODE toMANUAL.5) With the MANUAL POWER CONTROL sliding button set power in order to have a reading of 44 dBm (25W)for the SD2500C and 47 dBm (50W) for the SD5000C at the external power meter. Account for the directionalcoupler factor.6) Enter the same number as above in the SYSTEM FORWARD POWER SET VALUE field.7) Press the SYSTEM FORWARD POWER CALIBRATE button.8) On the upconverter plug-in, display the Forward Power measurement by:a) (Considering the LCD display is in its default state): SELECT (to make the STATUS option of theSTATUS / CALIBRATE screen to flash)b) ENTER (to display PS / LO / DRIVER status screen)c) SELECT, SELECT (to highlight the DRIVER STATUS option)
3Calibrations for the SDxxxxC Transmitter SeriesCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/14/00 CHECKED: KAS ...............................................................2/14/00RELEASED: PRC............................................................. 2/16/00Document #: DOC16-0057REV: FEB.16.00d) ENTER (to display options INSIGNAL / SYSTEM FORWARD POWER / SYSTEM REFLECTEDPOWER / DRIVER FORWARD POWER under the DRIVER STATUS menu)e) SELECT, SELECT and SELECT (to highlight the DRIVER FORWARD POWER)f) Enter to display the measurement9) Verify that the reading on the LCD display is consistent with the reading on the external power meter.  Outputpower of the System is now calibrated.10) Set POWER MODE to AUTO11) Slide AUTO POWER CONTROL to recover power to the value previously read at the external power meter (ifnecessary).12) Re-check the upconverter plug-in LCD reading.13) Close DRIVER_PLUG_IN_CAL_&_ADJUS application and disconnect PC.14) Return the system to its original interconnections.SYSTEM REFLECTED POWER CALIBRATION:1) If you haven’t already performed the system forward power calibrations do so now, as described above,omitting steps 13 and 14.2) Put the system in stand-by with the program application.3) On the upconverter plug-in, display the Forward Power measurement by:a) (Considering the LCD display is in its default state): SELECT (to make the STATUS option of theSTATUS / CALIBRATE screen to flash)b) ENTER (to display PS / LO / DRIVER status screen)c) SELECT, SELECT (to highlight the DRIVER STATUS option)d) ENTER (to display options INSIGNAL / SYSTEM FORWARD POWER / SYSTEM REFLECTEDPOWER / DRIVER FORWARD POWER under the DRIVER STATUS menu)e) SELECT, SELECT and SELECT (to highlight the DRIVER FORWARD POWER)f) Enter to display the measurement4) Swap FORWARD and REFLECTED POWER cables coming out of the output coupler.5) Enter the number 44 for an SD2500C system and 47 for an SD5000C system in the SYSTEM REFLECTEDPOWER SET VALUE field.6) Put the system in TRANSMIT MODE.a) While performing steps 7 and 8 the system will shut down due to the high-reflected power simulatedmeasurement, this is necessary; if these steps are completed within 5 seconds this will not occur.7) Press the SYSTEM REFLECTED POWER CALIBRATE button.8) Verify that the reading on the LCD display is consistent with the reading on the external power meter.Reflected power of the System is now calibrated.9) Once the system shuts down because of the high reflected power simulated measurement.  Put it in STAND-BYmode.10) Put the FORWARD and REFLECTED POWER cables back to their original positions.11) Set the system mode to TRANSMIT12) Close DRIVER_PLUG_IN_CAL_&_ADJUS application and disconnect PC.13) Return the system to its original interconnections.
SECTION 4PREVIOUSPrint
1Sub-Chassis Theory of Operation - 47266170COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AB ..................................................................2/01/00 CHECKED: KAS ...............................................................2/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0037REV: FEB.02.00SUB-CHASSIS THEORY OF OPERATIONThe sub-chassis contains guide rails and houses the following components. Refer to Figure 1 for numericalreferences.1) One driver assembly, which is made up of three plug-in modulesa) LO plug-inb) Power supply plug-inc) Upconverter plug-inThe plug-in modules slide into the chassis on nylon card guides and connect to the driver backplane board using a guide pin and a 48-position DIN connector.The power supply plug-in module connects using a guide pin, 48-position DIN connector, and a 6-position header. The header uses a DPDT push button switch to turn on the feed power only afterthe plug-in module is fully inserted; this is to ensure that there is no arcing between connectionsbefore the plug-in module is fully engaged.  It also certifies that the module is properly groundedbefore any voltage is applied.2) A front-end DC power supplyThis power supply is an OEM product and is hot swappable.3) Up to four power amplifier segmentsEach amplifier segment slides into the chassis on nylon slides and connects to the amplifiermotherboard via floating connectors10. The key-lock switch, located on the segments front panel,must be in the OFF position in order to plug it in.  This assures that all connections, mechanicaland electrical, are made before the amplifier is turned on.Once the plug-in modules are in place, thumbscrews on the front panels are fastened to the sub-chassis to securethem and provide a reliable ground connection. The key-lock switch on the amplifier segment is turned to the ONposition to apply power to the segment.Floating OSP connectors9,10 mounted on the back plane board, the back panel of the chassis, the back of the plug-inmodules, and the back of the power amplifier segments, provide the interface for RF input and output.  Seerespective plug-in module theory of operation documentation for the location of the connectors.4) Three communications boardsa) 47266064 - driver back plane boardSee DOC13-0176 for more information about this boardb) 47266145 - amplifier motherboard and back planeSee DOC13-0183 for more information about this boardc) 47266165 - power supply back planeSee DOC13-0186 for more information about this board
2Sub-Chassis Theory of Operation - 47266170COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AB ..................................................................2/01/00 CHECKED: KAS ...............................................................2/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0037REV: FEB.02.00SD2500C system shown47266170 Sub-Chassis24a31b11c1aNOTE: Boards 4b & 4c arenot visible in these photos.9(up to 4)9(up to 4)10(up to 4)Figure 1: 47266170 sub-chassis.Refer to Figure 2 for numerical references.5) RF SplitterThis component divides the microwave signal of the driver in, up to 4, outputs to the poweramplifier segments.  It can be used as a divider by 2, 3, or 4, depending on the total output powerof the equipment.6) Power CombinerThe power combiner merges the output signal from the power amplifier segments into onemicrowave output.7) Directional CouplerThis piece of the equipment is used to measure forward and reflected power.8) Power DetectorThe power detector transforms the forward and reflected power signals from the directionalcoupler into DC voltage to be processed in the upconverter / amplifier module.
3Sub-Chassis Theory of Operation - 47266170COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AB ..................................................................2/01/00 CHECKED: KAS ...............................................................2/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0037REV: FEB.02.00Open sub-chassis rear panel567Figure 2: Sub-chassis, inside rear.FRONT AND REAR PANEL DESCRIPTIONFront panelThe sub-chassis has no front panel; see respective plug-in module theory of operation documentation for adiscussion of front panel features.Rear panelRefer to Figure 3 for numerical references.1) FAN: A rear mounted 48VDC fan provides system cooling.  AC fan is optional.2) RF OUT: RF output connector (Female N type).3) COMMUNICATION PORTS: RJ11 phone jack connectors and a termination switch from the RS-485 board usedfor communication to ComView.4) J1: Female 14 pin header for diagnostics monitoring.5) J2: RJ11 phone jack connector for OPTIONAL Agile controller.6) J3: RJ11 phone jack connector for Local RS-485 communication.7) FUSE: Main line fuse - 8amperes (used for 220V system only).8) POWER SWITCH: Turn system on and off.9) AC INPUT: AC Line input power cord connector.10) FREQ REF IN: 75ohm Female F connector, external 10 MHz reference signal input.11) FCC ID LABEL: Federal Communications Commission identification label.12) IF INPUT: 75ohm Female BNC connector, input signal from an external source.13) Not applicable in this model.
4Sub-Chassis Theory of Operation - 47266170COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AB ..................................................................2/01/00 CHECKED: KAS ...............................................................2/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0037REV: FEB.02.0014) Not applicable in this model.12345678910FCC ID: CHP8BUSD5000CMODEL SD5000C5-50 WATTS AVG POWER TRANSMITTER11121314Figure 3: Sub-chassis rear panel.
1Microcontroller Board (MCU) Description - 47266058COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CPU................................................................12/10/99 CHECKED: KAS ...............................................................1/27/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0175REV: JAN.27.00MICROCONTROLLER BOARD (MCU) DESCRIPTIONAn MCU (microcontroller unit) circuit board assembly is contained within each plug-in module. The MCUassembly hardware consists of a microcontroller IC and associated memory, a CPLD IC, and various analog andlogic support circuitry; the MCU operates under the control of a firmware program executed by the microcontroller.Each plug-in module has it’s own firmware which is discussed in separate documents that can be found in therespective modules section of the manual.A variety of on-chip utilities and interfaces are integrated in the MCU, easing the support circuitry requirements andsimplifying the interfacing of the MCU to other circuit board resources.  See Figure 1 for a block diagram of theboard.The MCU is operated in an expanded mode, with program and data memory external to the MCU IC. The MCUuses a 16 bit external data bus for interfacing to the memories.  The firmware operating program is stored in IC U3,a FLASH ROM memory. The storage is arranged and accessed in word (2 byte) mode. An address bus is providedby the MCU to access the FLASH memory. The MCU and CPLD ICs provide additional control signals.Two RAM ICs provide run-time data storage. U6 and U8 are 512 Kbyte static RAMs. The RAMs are served by theMCU address bus and various support signals provided by the MCU and CPLD. Each RAM provides an 8 bit databus for reads and writes. By joining the two RAM data busses as low and high bytes on the 16 bit data bus, full 16bit accesses are achieved.Various glue logic, I/O, and register support functions are provided by IC U4, an in-circuit programmable CPLD.The CPLD contains I/O registers that allow writes to and reads from MCU board signals such as AUX_OUT_Athrough AUX_OUT_F, and ANALOG_ALARM_1 through ANALOG_ALARM_3. The CPLD registers are withinthe MCU memory map and are accessed by the MCU through interfaces to the MCU address and data busses.The CPLD register signals are used for accessing various on and off-board devices see Table 1.Table 1: CPLD register signals.Signal name Type (I/O) ApplicationUpconverter Local Oscillator System ControllerCS_A through CS_F ODAC address, AGC &ALC module control SPI user enable N/AAUX_OUT_A throughAUX_OUT_F OPS and ALC modulecontrol; user interface User Interface; faultalarm N/ALogic_in_6, 9, 10, 11 I/O IF detect, fault alarm,remote and reflectedshutdownPhase Lock Agile Controllerinterface; back planeinterfaceMUX_0, 1, 2 OAnalog mux address Analog mux address Analog mux addressAnalog_alarm_0, 1, 2 IVgs testing N/A N/ACPLD input signals Analog_alarm 0, 1, and 2 are sourced from the outputs of analog comparators IC U11A, B, andC. The comparators test three analog signals from board connector J103 against reference voltages provided by ICU1, a bank of multiple digital potentiometers. This system provides for the monitoring of negative voltages.
2Microcontroller Board (MCU) Description - 47266058COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CPU................................................................12/10/99 CHECKED: KAS ...............................................................1/27/00RELEASED: PRC............................................................. 2/10/00Document #: DOC13-0175REV: JAN.27.00Positive analog voltages applied to connector J103 are conditioned and fed to the MCU A/D converter. Single endedvoltages from J103 are amplified and band-limited by op amps contained in U9 and supporting circuitry. Theoutputs of these single-ended circuits are fed to A/D inputs. Differential analog voltages are amplified with fixedgain and band-limited with op amp ICs U10, U14, U17, and supporting circuitry. These op amp circuits convert thedifferential input signals to single ended signals. The single ended signals are selected for monitoring through analogmultiplexers. As each signal is selected for monitoring, it is passed to a buffer and finally to an A/D input. All A/Dinputs are protected through voltage and current limiting circuits.The MCU assembly provides two serial communication ports. Depending on application, either two RS-232 ports orone RS-232 and one RS-485 port may be required. Jumper JK101 is used to select the function of Port 2. WhenJK101 is placed in the 1-2 position, Port 2 is an RS-232 port; in the 2-3 position, it is an RS-485 port.Table 2: Communication Ports.ApplicationUpconverter Local Oscillator System ControllerPort 1- RS-485Port 2- RS-232 Port 1- RS-485Port 2- RS-232 Port 1- RS-485Port 2- RS-485DRAWN:RELEASED:CHECKED:DWG. NUMBER:TITLE:REV: AA-47266058-034BLOCK DIAGRAM,MICRONCONTROLLER BOARDCPU / 12/99CPU / 2/9/00REV Description KAS / 2/9/00 Scale:none Sheet1of 1COMWAVE DIVISION ECO#NAME/DATEMCU - 68HC812A4CPLDRAM FLASHROMTo Front PanelTo localbackplanenetworkSerialSerialaddressData (16)SignalConditioningBufferingRS-2321RS-485To serialperipheralsAnalog InputsA/D inLogic inputs/ outputsLogic InRS-485System Controller OnlyTo ComViewNOTES:1. When used as system controller, no RS-232board is used, two RS-485 boards are used.Figure 1: MCU block diagram.
1Upconverter Plug-In Module Theory of Operation - 47266116COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/4/00 CHECKED: KAS ...............................................................2/7/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0039REV: FEB.07.00UPCONVERTER PLUG-IN MODULE THEORY OF OPERATIONThis plug in module is joined to the main chassis viathree slide rails and two thumbscrews. Several modulesmake up this plug-in and are accessible through its twodetachable covers. The covers, together with the rearpanel fan, are part of the forced-convection coolingsystem.The basic function of this plug-in is to convert an IFinput signal to the microwave frequency range,containing the proper spectrum content and properpower level to excite subsequent stages of amplification.To accomplish this, the appropriate level IF signal, localoscillator signal and power supply voltages must bedelivered to this plug-in. For detailed descriptions oneach of the plug-in modules, see respective moduledocumentation.Refer to the block diagram, 47266116-034, for afunctional layout of the modules contained within theplug-in; refer to Figure 2 and/or Figure 3 for the actuallocation of referenced connectors and user accessibleinterfaces.IF and RF signals to and from the plug-in module aresent through coaxial connectors and cables on the frontand back panels, while signals in a lower frequencyrange go through a 48-pin connector located on theback-panel. IF and RF signals are sent between moduleswithin the plug-in similarly, via coaxial cables. Signaltraffic other than IF/RF, such as, power supply voltages,detected power voltages, and serial data from the MCUboard, are distributed between the modules using thedistribution board.Figure 1: Upconverter plug-in module.The IF signal enters the plug in and is routed to the IF linear processor where delay and frequency response areadjusted, as needed.  The processed IF signal is then delivered to the microwave converter module, where frequencyconversion takes place; filtering  and power amplification follow the conversion inside this module. Embeddedbetween amplifier stages of the microwave converter module, the microwave pre-corrector  generatesintermodulation products with opposite characteristics of those generated in the last amplifiers of the system,minimizing the overall third and fifth order products of the system RF output. The IPA module provides a finalamplifier stage that boosts the signal before it leaves the plug-in.Two major level closed loop controls are present in this plug-in module; one is to keep the constant 0dBm totalpower at the microwave precorrector module. In this case, a power-sensing device is installed inside the module,right before the J5 connector, the resultant proportional voltage is then fed to the distribution module where anintegrated circuit (U18) compares with a reference and driver PIN attenuators inside the IF linear processorsaccordingly.The second closed loop control is to compensate the gain variation of the amplifier chain up to the transmitteroutput. Both integrators and PIN attenuators are found inside the µW precorrector module and the voltageproportional to the power level is fed from an external detector module.
2Upconverter Plug-In Module Theory of Operation - 47266116COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/4/00 CHECKED: KAS ...............................................................2/7/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0039REV: FEB.07.00The distribution board also receives the voltage proportional to the temperature that is generated by a temperaturesensor module; this module is usually placed on the last power amplification stage.The interface board  is responsible for providing +24, +12, -12, and +8V to the plug-in, as well as voltages offorward and reflected detected power for further processing. This board is also the channel through which serial datais exchanged between this, other plug-ins, and the rest of the system.The front panel PCB  has a serial port, which can be used for testing, adjusting or controlling most of the plug-infunctions with the help of a personal computer. Together the front panel overlay keyboard and the display boardprovide a user interface capable of controlling a limited number of functions inside the upconverter plug-in module;they also allow for the presentation of a series of measurements in the LCD display.FRONT AND REAR PANEL DESCRIPTIONSFront PanelRefer to Figure 2 for numerical references.1) THUMB SCREWS: Secure module to thesub-chassis and provide a reliable groundconnection; loosen to remove module forreplacement or repair.2) LCD DISPLAY: Displays a series ofmeasurements, user adjustments, andgeneral status information.3) LO INPUT: Female SMA 50O connectorused to input the LO signal from the LOplug-in module. LO level must be 13 dBm±1 dB.4) UHF/IF SAMPLE: Female SMA 50Oconnector used to test the signal level afterexiting the IF linear processor module.5) RF SAMPLE: Female SMA 50Oconnector used to test the output level.6) COMM PORT: RS-232 Communicationsport for communication to a PC.7) KEYPAD: User’s selection keys:a) SEL – select, provides user withscrolling capabilities.b) ENT – enter, allows user to choose anoption.c) ESC – escape, allows user to go backto previous screen.d) SAVE – allows user to store new3195621487Figure 2: Upconverter plug-in front panel.
3Upconverter Plug-In Module Theory of Operation - 47266116COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................2/4/00 CHECKED: KAS ...............................................................2/7/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0039REV: FEB.07.00settings or adjustments.8) POTENTIOMETER: Used in conjunction with the LCD display and keypad this allows the following useradjustments:a) Power Levelb) Output Powerc) Frequency Response 1d) Frequency Response 2e) Precorrectioni) Distribution Generationii) Cancellation 1iii) Cancellation 2iv) Phase9) HANDLE: Assists in removing module from sub chassis.Rear PanelRefer to Figure 3 for numerical references.1) FAN: 18 CFM DC for plug-in modulecooling only.2) 48 PIN DIN: Interface to the back plane,(all power, control and diagnostics)3) GROUND / ALIGNMENT STUD:Ensures that proper ground is made priorto engaging the 48 pin DIN; also aids inthe alignment of the module within thesub-chassis.4) IF INPUT: Male 50O blind mateprovides interface to the back plane andallows passage for the IF input signal.5) Not applicable in this model.6) Not applicable in this model.7) RF OUTPUT: Male 50O blind matesupplies the RF output signal to thetransmitting system of amplifier cage,depending on model type.3572146Figure 3: Upconverter plug-in rear panel.
1Upconverter Plug-In Module Specifications – 47266117.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................3/19/99 CHECKED: KAS ...............................................................2/7/00RELEASED: AAC............................................................. 2/8/00Document #: 47266117.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEUPCONVERTER PLUG-IN MODULE SPECIFICATIONSParameter Specification Notes/Test ConditionsIF INPUTDigitalAverage Input Power -15 dBm ± 2 dB 223-1 PN data sequence (at transmitter output)IF Input Frequency 44 MHz (center) Other frequency options availableConnector / Impedance Blind Mate / 75 O Mates with floating back-plane connectorAnalog  (Combined visual and aural)IF Input Level -8 dBm peak ± 2 dB (VisualCarrier)-23 dBm peak ± 2 dB (AuralCarrier)Combined visual and auralIF Input FrequencyAural CarrierVisual Carrier 41.25MHz45.75MHzOther frequency options availableConnector / Impedance Blind Mate / 75 O Mates with floating back-plane connectorRF OUTPUTDigitalAverage Output Power 20mW to 200mW Function of A.L.C. settings - 223-1 PN data sequence (atdriver output)Output Frequency 1850 - 3600 MHz In select bandsFrequency Response ≤ ±0.25 dB FC ±2.6 MHzMeasured at Sub-rack outputIM3 (dBc) < 50 16dBm RF Output Power (64QAM) Relative to in-bandaverage PSD measured @ 100 KHz RBWCarrier to Noise (C/N) ≥ 55 dBHum and Noise ≤ -60 dBcGroup Delay ≤ ±15 ns FC ±2.6 MHzRF Output ConnectorDigital ModulationError Vector Magnitude (EVM) ≤ 2.0% 64-QAM/8-VSB @ 5.06 Msps RMS average over 12,500symbolsMeasured at Sub-rack outputDigital ModulationSignal to Noise Ratio (SNR) ≥ 30 dB 64-QAM/8-VSB @ 5.06 Msps RMS average over 12,500symbolsMeasured at Sub-rack outputMagnitude Linearity(AM-AM conversion) ≤ ±0.125 dB Measured at Sub-rack outputPhase Linearity(AM-PM conversion) ≤ ±0.75°Measured at Sub-rack outputRF Output Regulation ≤  ± .2 dB Measured at Sub-rack outputConnector / Impedance Blind Mate / 50 O Mates with floating back-plane connectorAnalog PerformanceOutput Power 100mW - 1 Watt Peak Sync Adjustable from 10 to 100% of peak sync powerOutput Frequency Any 6, 7, or 8 MHz Channel1850 - 3600 MHz In select bandsEmission 5M75C3F or per CCIR
2Upconverter Plug-In Module Specifications – 47266117.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................3/19/99 CHECKED: KAS ...............................................................2/7/00RELEASED: AAC............................................................. 2/8/00Document #: 47266117.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEParameter Specification Notes/Test ConditionsIM3 (dBc) < 50 Two Tones @ 13dBm/c (∆f = 6MHz) – RF OutputConnectorRF Output Regulation = ± 0.2 dBDC POWER REQUIREMENTSVoltages / Currents +12 VDC ±.5 @ 2.5A max+8 VDC ±.5 @ 1.2A max-12 VDC ±.5 @ 150ma maxConnector 48 conductor, 3amps / circuitminimum Interfaces to back-planeENVIRONMENTALCooling Forced air-cooled, minimum of 18CFM required Forced air-cooled drawing ambient air through the intakeon the front of the Up-Converter Plug-In. and exhaustingout the rear.Operating Temperature 0°C to 50°CRelative Humidity 0 to 95% non-condensingALARMS / INDICATORS / AJUSTMENTS / CONTROLSRF Output Failure Alarm DRIVER FAILURE Low (TTLLow)  = RF Output Failure Signal available at back-planeOver- Temperature Alarm DRIVER FAILURE Low (TTLLow)  = Over Temperature Signal available at back-plane andVisible via LCD Display (Software/pending)In-Signal Indicator PRESENT or NOT PRESENT Visible via LCD Display (Software/pending)Transmit Indicator ON AIR or OUT OF AIR Visible via LCD Display (Software/pending)Power Supply Status /Measurements PASS or FAIL / V  scale Visible via LCD Display (Software/pending)RF Power Measurements % Scale (dBm scale option) Visible via LCD Display (option is Software/pending)Temperature Indicator °C scale Visible via LCD Display (Software/pending)Frequency Response (low side)Adjustment Potentiometer allows adjustment oflow side IF frequency response Access via front panelFrequency Response (high side)Adjustment Potentiometer allows adjustment ofhigh side IF frequency response Access via front panelDistortion Level Adjustment Potentiometer allows adjustment ofpre-distortion level Access via front panelALC Level Adjustment Potentiometer allows adjustment ofALC. Access via front panelDetector Threshold Control RS-232 interface Set via laptop computer with VB application, Access viafront panelInput Level Control RS-232 interface Set via laptop computer with VB application, Access viafront panelFrequency Response (low side)Control RS-232 interface Set via laptop computer with VB application, Access viafront panelFrequency Response (high side)Control RS-232 interface Set via laptop computer with VB application, Access viafront panelDistortion Level Control RS-232 interface Set via laptop computer with VB application, Access viafront panelLinearity Cancellation 1 Control Potentiometer allows adjustment oflinearity cancellation Access via front panelLinearity Cancellation 2 Control RS-232 interface Set via laptop computer with VB application, Access viafront panel
3Upconverter Plug-In Module Specifications – 47266117.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................3/19/99 CHECKED: KAS ...............................................................2/7/00RELEASED: AAC............................................................. 2/8/00Document #: 47266117.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEParameter Specification Notes/Test ConditionsDistortion Phase Control RS-232 interface Set via laptop computer with VB application, Access viafront panelALC Level Control RS-232 interface Set via laptop computer with VB application, Access viafront panelStand-by Control RS-232 interface Set via laptop computer with VB application, Access viafront panelReset Control Momentary switch to reset on-board Microprocessor Access via front panelFunction SwitchStand-byMeter Off+11V P.S.FWD PWRREFL PWR.Places system in stand-by modeNo indication on analog meterDisplays proper DC voltage of themain switching power supplyDisplays forward power on analogmeterDisplays reflected power on analogmeterAccess via front panelAnalog Meter+11V P.S.FWD PWRREFL PWRIndicates proper DC voltage of themain switching power supplyIndicates forward powertransmittedIndicates reflected powertransmittedVisible via front panelPHYSICALMechanical Dimensions 4.75”H x 4.2”W x 17.5”D112.07 cm H x 10.67 cm W x 44.45 cm DWeight 6 lbs. (3Kg)Front Panel Color Matches Sherwin William’s PaintNo.Light Gray ……..F63TXA2555Medium Gray ….F63TXA4841Paint mix number 4303 identifies store location whenadded to Paint No.Lexan overlay color matched as indicated                                                          1 Measured without ground pin on rear panel and front panel handle; add approximately 2” for these.
Microwave Precorrector - 47266073Front Panel Board - 47266086Distribution board - 47266084AGNDAGNDAGNDVGS_MON_2VGS_MON_3-12VIPA_DETECTED_PWRDRIV_FIN_AMP_CURRGNDAGNDDRIVER_RF_MEASURENCNC+12V123456712345678910+12v LCD Display board - 750063DIGITIAL GND+5VDIGITALVDCD5RSR/WED0D1D2D3D4D6D7LED +LED -123456789101112131415161234567891011121314151612345671234567891012345678910MicrowaveConverter47266075.00VGS_MON_1MIX_AMP_CURR-12VAGNDUW_CONVERTER_PWROUT_AMP_CURRRF_CORR_DET_INAGND12345678910OUT_AMP_CURRINTER_AMP_CURRDRAWN:RELEASED:CHECKED:DWG. NUMBER:TITLE:REV: P1A-47266117-050INTERCONNECT, AGILE U/C PLUG-IN MODULEAAC 02/14/00Name / date???????? Scale:none Sheet1 of 2COMWAVE DIVISIONREV Description ECO#NAME/DATE123DIGITAL GND+5V DIGITALNC123P1P112345678910 USERPOTSELECTRS232_TXDRS232_RXCENA_RS232CHENSAVEESCENTER12345678910J2 P212345DIGITAL GNDSELECTENTERESCSAVE12345P3Front PanelOverlay -47266003P1P1P2P2J6J5P1DRIV_FIN_AMP_CURRDRIV_FIN_AMP_CURR1234567891012345678910P1J8IPA - 47266077.00ADAPT_CANCELALC_INT_EXT_CTRLPWR_LIMITALC_MAN_CTRLPHASECANC2DIST_GENCANC1ALC_ON_OFFALC_AUTO_CTRL
Distribution board - 47266084ENCODER_GAIN_CTL+12VNCGNDRS485_LOCAL_T-FWDPWR_1REMOTE_SHDNGNDBOOSTER_INSIGNAL+8V+12V+24VRS485_LOCAL_R-RS485_LOCAL_T+RFLTDPWR_1+8V+12VIF Linear Processor -47266082.00AGNDAGNDIF_THRESHOLDIF_ATTNCFREQ_RESP#2+12VAAUX_ATT_2FREQ_RESP#1+12VADRAWN:RELEASED:CHECKED:DWG. NUMBER:TITLE:REV: P1A-47266117-050AAC 02/14/00Name / date???????? Scale:none Sheet2 of 2COMWAVE DIVISIONREV Description ECO#NAME/DATEGND+5VATEMPERATURE123123Temperature Sensor- 4726620312Fan1234567891012345678910J4P112345678910111213141516171819202122232425261234567891011121314151617181920212223242526J2J1IN_SIGNAL-12VRS485_LOCAL_R+GNDGNDAGC_LEVELDRIVER_FAULTNCNC1234513141617181920212229323334353641444548GNDInterface Board - 47266149J1DRIV_FIN_AMP_CURR [3,4]1234567891011121314151617181920GNDSYS_FWD_DET_PWR [4]SYS_RFL_DET_PWR [2,4]USER_POT [5]ADAPT_CORR [5]VDD_IO [3]OUT_AMP_CURR [3,4]DRIVER_RF_MEAS [4]+8v [3.5]MIX_AMP_CURR [3,4]INTER_AMP_CURR [3,4]AGC_LEVEL [4,5]ADAPT_CANCEL [4]TEMP [3]VGS_MON_1 [4]VGS_MON_2 [4]VGS_MON_3 [4]8VSW [3]1234567891011121314151617181920DAC_2_CS [1]1234567891011121314151617181920GNDDO [5]D1 [5]D2 [5]D3 [5]DAC_1_CS [1]D7 [5]DAC_3_CS [1]D4 [5]D5 [5]D6 [5]AGC_ON_OFF [2]ALC_ON_OFF [2]AGC_INT_EXT_CTRL [2]ALC_INT_EXT_CTRL [2]EN [5]RS [5]R/W [5]1234567891011121314151617181920 E [5]J102J103Microcontroller Board - 47266058.00DRIVER_FAULT [5]1234567891011121314151617181920GNDENTER [5]ESC [5]CH [5]ENA_RS232 [5]ENCODER_GAIN_CTRL [5]REMOTE_SHDN [5]SAVE [5]SELECT [5]IN_SIGNAL [4,5]FST_RLCTD_SHTD [2]SS [1]LC_DAC [1]MOSI [1]CLOCK [1]SUPPLIES_EN [3]1234567891011121314151617181920 ALC_LOOP_SELECT_2 [2,4]J1011234567891011121314151617181920GNDRS485_LOCAL_R- [5]RS485_LOCAL_T+ [5]RS485_LOCAL_T- [5]RS485_LOCAL_R+ [5]RS232_TXD [5]RS232_RXD [5]-12V [3,4,5]+12VA [2,3,4,5]1234567891011121314151617181920 +12VA [2,3,4,5]J100Microcontroller Board - 47266058.00INTERCONNECT, AGILE U/C PLUG-IN MODULE
1Microwave Precorrector Module – 47266073COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................01/31/00 CHECKED: KAS ...............................................................02/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC13-0177REV: FEB.02.00MICROWAVE PRECORRECTOR MODULEBuilt in a 3” X 6” housing, this module consists of two compartments: a RF and DC & Control section; they areplaced in opposite sides of the housing. Two harnesses, a seven and ten conductor, reach the interior of the moduleon the control side.RF Section:This section is implemented essentially by microwave broadband amplifiers (U1-U4 and U6-U7) andhybrids (HYB1-HYB7). All amplifiers are biased through resistors from the only power supply voltage anduse quarter-wavelength transformers and a capacitor for de-coupling.DC and Control Section:A variety of electronic components are used to control the RF signal processing that takes place in the RFsection. Externally accessible potentiometers and switches allow adjustments and changes in the modulemodes of operation.Correction is performed by subtraction of a pre-generated distortion from the one present at the output of the system.A RF input signal at about 0dBm-power level is applied to J1. This signal is amplified and split two ways; one goesthrough a linear path while the other goes through the circuitry that generates the desired pre-distortion. Both signalsare combined and amplified to recover the losses of their processing. Finally, the signal goes through the broadbandattenuator that performs the ALC and is routed out the module through J2. Table 1 summarizes each controlaccessible from the top of the module. Module control through external voltages delivered via connector P2 is alsopossible.Table 1: Microwave precorrector adjustment controls.NUMERICALREFERENCE NAME FUNCTION1J1 RF Input2J2 RF Output3AUTO / MAN Switch Sets the power control mode4D.G. Control for pre-distortion signal amplitude5CANC1 Module internal cancellation adjustments6CANC2 Module internal cancellation adjustments7PH. ADJ Adjust the phase of the pre-distortion8AUTO Adjust output power in ALC mode9MAN Adjust output power in manual mode10 PWR LMTR Adjust maximum output power achievable by the system11 PC ON / OFF Sets pre-correction On or Off12 P1 +12V, ALC voltage (connector)13 P2 External voltages for adjustments (connector)
2Microwave Precorrector Module – 47266073COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: AAC................................................................01/31/00 CHECKED: KAS ...............................................................02/02/00RELEASED: PRC............................................................. 2/11/00Document #: DOC13-0177REV: FEB.02.009 3 8 102 113 1211 5 6 7 4Figure 1: 47266073 microwave precorrector.Table 2: Specifications.Parameter Specification Notes/Test ConditionsRFGain -8 dB min / 3 dB max 1.8 to 3.6 GHz (function of ALC)Input Return Loss < -10 dB 1.8 to 3.6 GHzTotal Flatness ± 3 dB 1.8 to 3.6 GHzPower Limiter Pmax = nominal power +1dB ALC on or offDistortion Generation -60 dBc to -32 dBc 1.8 to 3.6  GHz1 carrier, 64 QAM, spectrum analyzer @ 100 KHz RBWCancellation >25 dBc 1.8 to 3.6 GHz1 carrier, 64 QAM, spectrum analyzer @ 100 KHz RBWPhase Range >45º adjustment 1.8 to 3.6 GHzDCPower Supply 12  ± 0.5 VCurrent .6 A S21 = 2dB; Maximum pre-distortionGENERALImpedance / ConnectorInputOutput 50 Ω / Female SMA50 Ω / Female SMAOperating Temperature 0° C to 50° C• SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.
1Upconverter Plug-In Module, MCU State MachineFirmware Description – 47266058.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CPU................................................................1/10/00 CHECKED: KAS ...............................................................2/9/00RELEASED: PRC............................................................. 2/11/00Document #: DOC13-0187REV: FEB.09.00UPCONVERTER PLUG-IN MCU STATE MACHINE,FIRMWARE DESCRIPTIONThe MCU assembly and its firmware monitor various parameters, conditions, and commands in the plug-in module.The firmware uses the pass/fail states of the parameters to determine the operating state of the plug-in.In the normal AUTO mode of operation, the operating state of the plug-in is used to determine the control settingsfor the plug-in. Following a RESET, the firmware enters an INIT (initialization) state, in which the initialization ofregisters and network operations is performed, DOC13-0188 discusses this in more detail. Following INIT, the plug-in enters the STANDBY state. In STANDBY, the RF power output of the upconverter plug-in is disabled, andsettings for the various internal modules are set for minimum gain.Unless commanded to remain in STANDBY, the plug-in will enter the STABILIZE state, allowing the unit to comeup to desired operating power without transient failures. After a short stabilization period, the plug-in enters theOPERATE state. In this state, full output power is produced, and pre-correction and gain controls are operational.As the conditions of the measured parameters change, the state is modified accordingly. For example, if signalpresence is lost, the plug-in will enter the STANDBY state and will remain in that state until the signal returns. Oncesignal returns, if no other failure conditions exist, the plug-in will transition through STABILIZE to the OPERATEstate. If a reflected power sample is found outside of the passing range while the plug-in is in OPERATE, the state ischanged to LIMP to attempt to provide reduced output power, thereby reducing the reflected power.Other failures that may result in unsafe operation or damage to the plug-in or system cause the plug-in to enter theFAILED state. The firmware may perform multiple tests of a failing parameter before deciding to enter FAILED toreduce the effects of transients. In the FAILED state, RF output power and DC supply to the plug-in outputamplifiers are disabled. The firmware cannot exit the FAILED state without user intervention.During factory calibration or customer site installation, the plug-in may be operated in MANUAL mode. InMANUAL mode, the operating state is continually updated, but the state is not used to determine the control settingsof the plug-in. The control settings remain set as they were when the MANUAL mode was entered until overriddenby user commands. The user may adjust key plug-in settings to optimize plug-in performance and modify behavior,and the settings may be stored in non-volatile memory or discarded.
1Upconverter Plug-In Firmware Description – 47266116.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CPU................................................................1/10/00 CHECKED: KAS ...............................................................2/9/00RELEASED: PRC............................................................. 2/11/00Document #: DOC13-0188REV: FEB.09.00UPCONVERTER PLUG-IN FIRMWARE DESCRIPTIONThe microcontroller (MCU) assembly and its operating program (firmware) handle internal monitoring functions inthe plug-in. The flow of execution of the program used in this chassis is described below.  The firmware program iscontained in non-volatile memory on the MCU board.The firmware begins execution after a RESET or power-up. The firmware instructs the MCU to initialize variousMCU registers and hardware ports, including the A/D converter. Following this, a lamp test operation is performed.All chassis front panel LED’s are illuminated for approximately 1 second then darkened. The lamp test allows aquick verification that all front panel LED’s are functioning. In addition, the lamp test is a clear outward sign thatthe MCU board is receiving power, is executing the firmware program, and has recovered from RESET. Shortlyafter the lamp test, the LED’s will display chassis status as determined by firmware tests.Following the lamp test, program variables and measurement records are initialized. The initialization assuresintegrity of records used to hold test data and communication messages. Following the initialization, the firmwarestarts the MCU network functions. This process configures the MCU communication port, and instructs the MCUhow handle incoming messages. The firmware also checks an internal memory register to determine whether an RS-485 network node address for this MCU assembly has been set. The network node address will either be the valuefound in this register, or if no value has been set, a default value.All aforementioned tasks are performed once after RESET. Following these tasks, a program loop is entered thathandles monitoring and communications tasks, as described below. The loop may be temporarily interrupted byincoming communication messages. RESET ends the loop and restarts program execution.The firmware determines the condition of key parameters such as reflected power and signal presence by takingsamples of signals of interest applied to the MCU board. Analog signals are measured using the MCU A/Dconverter, while logic inputs are monitored with either the MCU or CPLD  . The samples are tested againstnumerical limits, and a pass/fail status is determined for each monitored signal. The firmware uses the pass/failstates of the parameters to determine the operating state of the plug-in. The operating state of the plug-in is used todetermine the control settings for the plug-in. See documents DOC13-0187 and DOC21-0021 for a description ofthe firmware state machine and its effect on the control of the plug-in.The measurements of parameters and other operating information (status) are compiled by the firmware in amemory table. This status table may be sent as a communication message to the System Controller or to a PC-baseduser interface application. The System Controller or the user application sends a status query message to the plug-inand receives the status table in response.At any time during firmware execution, a communication message may be received by the MCU. This results in aninterruption of program execution, allowing the firmware to quickly collect and store the incoming message.Firmware execution then returns to the point following the interruption. After a complete message has beencollected by the firmware, a response is constructed by the firmware and sent by the MCU under firmwarecommand.In addition to the status query, other commands may be issued to the plug-in:• STANDBY command - causes output power to be disabled• ON AIR command - re-enables the plug-in output power• RESET command - causes the firmware to restart executionAdditional commands are used during factory alignment and customer site installation to optimize equipmentperformance. The commands provide calibration settings that are stored by the MCU in non-volatile memory. Thecalibration settings are accessed during firmware operation to set the various plug-in systems into the calibratedoperating condition after a RESET.
1LO Plug-In Module Theory of OperationCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: DMW..............................................................3/8/00 CHECKED: KAS ...............................................................3/8/00RELEASED: DMW........................................................... 3/8/00Document #: DOC14-0038AREV: MAR.08.00LO PLUG-IN MODULE THEORY OF OPERATIONThe LO plug-in module is superceded by theAgile Synthesizer Drawer in the application.Please refer to the manual for the AgileSynthesizer Drawer, DOC33-0037 for adiscussion of the LO. Figure 1: Agile Synthesizer Drawer.
1Power Supply Module Theory of Operation - 47266099COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................1/26/00 CHECKED: KAS ...............................................................1/27/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0036REV: JAN.27.00POWER SUPPLY MODULE THEORY OF OPERATIONThe power supply module uses the latest technology andis equipped with the following features:• Single-chip embedded microcontrollermonitoring and control.• RS-232 front panel connector for quickinterface to desktop computer.• Modular, hot swap assembly.The above features offer quick and simple monitoringfunctions and provide expedient assembly and repairtime.Figure 1: Plug-in power supply module.The DC power supply module receives 48 VDC from an external front end power supply and converts it into theworking voltage and power requirements necessary to operate the driver.  Additionally, the power supply houses thesystem controller CPU card that organizes network messages between the driver modules, power amplifiersegments, and the ComView monitor and control system.  See DOC13-0175 for a more detailed discussion of thesystem controller card, DOC13-0185 for a discussion of the system controller cards firmware, and DOC13-0173 fora discussion of the embedded controller.The power supply module contains a single chip embedded controller, it constantly monitors the performance of thepower supply and external controls.  The embedded controller processes this information and decides the operationalcontrol of the module then informs the system controller of the power supply's operational status.The power supply is cooled by a single fan, and is mounted in an extrusion designed to dissipate the heat generatedfrom the components within.  The fans of the sub-chassis also ventilate the power supply plug-in module; foradditional protection, the embedded controller monitors the temperature of the plug-in.  If the plug-in module isoperating over temperature, controlled shut down of the power supplies within will occur.The plug-in module consists of three circuit boards, the converter board with the embedded controller, systemcontroller board, and display board, which needs no further explanation.  A brief discussion of each board's task(s)follows:The core of the module is the DC converter PCB.  The DC converter board mounts overtop a DC to DCconverter module, which transforms the 48VDC input voltage into +12VDC.  The DC converter PCBproduces the remaining voltages needed to operate the driver from the 12 VDC.The embedded controller mounted on the DC converter PCB, monitors the voltages and currents from thepower supply and controls the output based upon voltage and current measurements.  It will switch off the
2Power Supply Module Theory of Operation - 47266099COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................1/26/00 CHECKED: KAS ...............................................................1/27/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0036REV: JAN.27.00positive voltages to the driver when a loss of negative voltage is detected in order to protect amplifierdevices that are located within the upconverter / amplifier plug-in.Mounted directly above the DC converter PCB is the system controller PCB.  It receives its operatingpower directly from the DC converter PCB.  Additionally, the DC converter PCB routes the RS-485communication networks between the system controller to the back plane connector in the rear of thechassis and eventually to other modules within the driver, as well as the ComView monitoring system.The power supply module can be divided into the following five major categories:1. The power supplies provide the operating voltages needed to power the driver.2. The power supply enables turn the power supply voltages on and off when commanded by the embeddedcontroller.3. The current and voltage monitoring circuit samples the operating parameters of each power supply andconditions them into the required voltage range within the analog to digital converters of the embeddedcontroller.4. A temperature sensor provides input to the microcontroller proportional to the ambient temperature of themodule.5. The embedded controller controls and monitors the performance of the module.More detailed discussions of the above categories can be found in subsequent documents.FRONT AND REAR PANEL DESCRIPTIONSFront PanelRefer to Figure 2 for numerical references.1) COMM PORT: RS-232 Communicationsport for communication to a PC.2) LED's: Status monitoring LED's whichprovide visual indication of operatingparameters.a) Poweri) GREEN = receiving power fromthe front end power supplyii) UNLIT = no power from the frontend power supplyb) DC Poweri) GREEN = output power is presentii) UNLIT = no output power3) FAN: 18-CFM DC for plug-in modulecooling only.4) THUMB SCREWS: Secure module to thesub-chassis and provide a reliable groundconnection; loosen to remove module forreplacement or repair.5) HANDLE: Assists in removing modulefrom sub chassis.132544Figure 2: Power supply module front panel.
3Power Supply Module Theory of Operation - 47266099COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................1/26/00 CHECKED: KAS ...............................................................1/27/00RELEASED: PRC............................................................. 2/11/00Document #: DOC14-0036REV: JAN.27.00Rear PanelRefer to Figure 2 for numerical references.1. 48 PIN DIN: Interface to the back plane, (allpower, control and diagnostics)2. POWER CONNECTOR: 6-pin header, forpower from the front-end power supply.3. HEATSINK: Aids in dissipation of heatgenerated within the plug-in module.4. GROUND / ALIGNMENT STUD: Ensuresthat proper ground is made prior to engagingthe 48 pin DIN; also aids in the alignment ofthe module within the sub-chassis.1324Figure 3: Power supply module rear panel.
1Power Supply Plug-In Module Specifications – 47266099.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................3/19/99 CHECKED: KAS ...............................................................2/7/00RELEASED: CTS.............................................................. 2/8/00Document #: 47266099.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEPOWER SUPPLY PLUG-IN MODULE SPECIFICATIONSParameter Specification Notes/Test ConditionsINPUTInput Voltage 48 VDCInput Current 4 amps maximum @ low line, full rated powerPeak Inrush Current ≤ 6 ampsEfficiency 85% typical @ full loadOUTPUTOutput Voltage Main Output12VDC ±.5+8VDC ±.5+24VDC ±.5-12VDC ±.5All voltages are fixed.Output Current Main Output+12V @ 4amps+8V @ 3.0 amps-12V @ .4amps+24V @ .3ampsPower from the supplies is interrupted whenthe power supplies are overloaded.Output Power Main Output+12V @ 60Watts+ 8V @ 24 Watts-12V @ 5Watts+24V @ 7WattsPower from the supplies is interrupted whenthe power supplies are overloaded.Ripple & Noise ≤200mv pp 20MHz BWLine Regulation .4% over entire AC input rangeLoad Regulation .4% no load to full loadPROTECTIONOver Voltage The power supply will shut off if thevoltage exceeds the nominal voltage by20%.Over Current The power supply will shut off if the currentexceeds the maximum value.Over Temperature The power supply will shut of if thetemperature exceeds 70°C. Restart isautomatic when power supply returns tonormal operating temperature.Power Input Interlock Interlock system assures power disconnectsduring module insertion or extraction.ENVIRONMENTALCooling Forced air-cooled, minimum of 15 CFMrequired Forced air-cooled drawing ambient airthrough the intake on the front of the powersupply and exhausting out the rear.Operating Temperature 0°C to 50°CRelative Humidity 0 to 95% non-condensing
2Power Supply Plug-In Module Specifications – 47266099.00COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................3/19/99 CHECKED: KAS ...............................................................2/7/00RELEASED: CTS.............................................................. 2/8/00Document #: 47266099.00-306REV: P1SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICEParameter Specification Notes/Test ConditionsALARMS / INDICATORS / AJUSTMENTS / CONTROLSDC Output Failure Alarm TTL Low = DC Output Failure Signal available at back-planeDC-OK Indicator Green LED, ON= DC OK Visible via front panelAGENCY COMPLIANCESafety Meets UL and CSA approvals (pending)PHYSICALWeight 4 lbs. (1.81Kg)Front Panel Color Matches Sherwin William’s Paint No.Light Gray ……..F63TXA2555Medium Gray ….F63TXA4841Paint mix number 4303 identifies storelocation when added to Paint No.Lexan overlay color matched as indicatedMechanical Dimensions 4.75”H x 3.0”W x 17.5”D12.07 cm H x 7.62 cm W x 44.45 cm D
COMWAVE DIVISIONPower Supply Plug In Module Block DiagramAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS 1/26/00 CHECKED: KAS 1/27/00 RELEASED: PRC 2/11/00Document #:47266099-034 REV: A 1DC to DCconverter, 12Volts outputDC inverter, -12 VoltsoutputPositiveVoltageSwitchNegativeVoltageSwitch24 VoltSupply8 VoltSupplyLocal Micro ControllerOutput Voltage and Current MonitoringMaster Micro ControllerDriver Back Plane connector 48V DCinputpower5 VoltSupplyPOWER SUPPLY PLUG-IN MODULE BLOCK DIAGRAM
DRAWN:RELEASED:CHECKED:DWG. NUMBER:TITLE:REV: AB-47266099.02-050CTS / 8-24-99PRC / 2-11-00REV Description KAS / 1-27-00 Scale:none Sheet1 of 2COMWAVE DIVISION ECO#NAME/DATEGlobal MCUDisplayInterfaceFan123456J3 J11 221GND+12 VGNDPowerDC OKRS-232 RRS232 ENABLERS-232 TInterconnection, Power Supply Modulew/ DC Font end.Front PanelOverlay123456123123GNDPowerDC OKPurchased partDC converter board7+12 Volts7
1Power Supply Module - Embedded MicrocontrollerCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS ................................................................1/26/00 CHECKED: KAS ...............................................................1/27/00RELEASED: CTS.............................................................. 2/14/00Document #: DOC13-0173REV: JAN.27.00POWER SUPPLY MODULE EMBEDDED CONTROLLERReset CircuitryTwo integrated circuits monitor the condition of the 5VDC power source; additionally they monitor the closure of thereset jumper.  When the jumper is shorted, or the 5VDC power supply falls below a preset threshold, a reset line goeslow.The reset line is tied directly to the reset input of the controller.  When this voltage transitions from TTL high, toTTL low, and returns high, the embedded controller will reset and begin executing instructions from the designedinitial turn on procedures.Node Address SwitchesNode address switches located on the DC converter PCB apply TTL high and low signals into the embeddedcontroller’s input port C.  The controller reads the settings of the switches to determine the node address that themodule will report to as a node device within the RS-485 network.Alternately, the node address can be directly programmed into the firmware or EEPROM of the embeddedcontroller, and the node address switches can be used to set operational characteristics of the module for diagnosticaids.RS-485 CommunicationsCommunications between the embedded controller and the RS-485 network are handled via a UniversalAsynchronous Receiver-Transmitter (UART).  The UART communicates with the microcontroller via the SerialPeripheral Interface (SPI) built into both devices.  When a byte from the message arrives on the RS-485, the UARTstores the information in memory, and generates an interrupt to the embedded controller. The embedded controllerservices the interrupt by transferring the byte from the UART to the microprocessor.  The microprocessor assemblesthe message, byte by byte within its own memory.To send a message to the RS-485 network, the microprocessor sends a byte of the message to the UART through theSPI.  The UART sends the byte onto the network.  This process is completed, byte by byte, until the entire messageis sent across the RS-485 network.RS-232 CommunicationsThe communication from and to the RS-232 port is handle via the Serial Communications Interface (SCI) of themicrocontroller, and an RS-232 line driver.  The RS-232 line driver conditions the SCI signals for output onto theRS-232 network, and in turn returns an RS-232 logic signal to the TTL logic required for the SCI to process themessage. The SCI within the microcontroller assembles the byte and generates an internal interrupt within themicroprocessor.  The microprocessor then stores the byte with memory to assemble the message.To send a message to the RS-232 network, the message is written byte by byte onto the RS-232 register, and thissends the messages onto the network.Front and Rear Panel indicatorsThe embedded controller writes status information into a latching line driver.  The outputs of this latching line driverdrive the positive and negative power supply enables.  Additional outputs from the line driver supply the power toilluminate the LED’s installed within the front panel overlay, also a rear-panel fault alarm is provided to the rearpanel.
1System Controller Firmware Description - 47266099COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: CTS.................................................................1/24/00 CHECKED: KAS ...............................................................2/02/00 RELEASED: PRC .............................................................. 2/16/00Document #: DOC13-0185REV: FEB.16.00SYSTEM CONTROLLER FIRMWAREThe system controller firmware is responsible for monitoring the operational parameters of the chassis with thenetwork. The system controller routinely services each module within the driver, and the status of the module isdetermined.  A table of information is kept for the status of each device within the driver, and an overall status isdetermined for the driver chassis as an entity.  When the ComView remote monitoring program queries the status ofthe driver, the system controller returns the status of the operational parameters to ComViewMODES OF OPERATIONScan modeThe normal mode of operation for the system controller is the scan mode.  The controller takes charge ofthe local RS-485 bus, and operates network messaging.When the firmware is in the scan mode, the system controller sends out a status request to each modulesequentially, each module then responds with its current status; the system controller stores and processesthis information.  This cycle repeats until all of the modules in the network are serviced, the scanningprocess is then repeated.When ComView requests the status of the driver chassis, the controller provides the information that wasgathered and determined from each module.Service modeThis mode of operation applies when the ComView application is suspended, and a calibration program islaunched from a desktop PC.The calibration application works with one module at a time within the driver.  When this mode ofoperation is active, the system controller stops the scanning process.  Messages from the calibrationprogram are received from the remote RS-485 network, and relayed onto the local RS-485 network; thesystem controller does not modify this message.  When the module processes the message routed throughthe system controller, it replies to the controller through the local RS-485 network.  The system controllerthen relays this message to the remote RS-485 network, which, in turn relays it back to the desktop PCrunning the calibration application.In this mode of operation the system controller appears transparent to both the module and the Desktop PC.Local RS-485The local RS-485 bus is the network that all of the modules within a system controller connect to andutilize for intercommunication during normal operation.Remote RS-485The remote RS-485 bus is the network that the driver provides to the outside world.This network is primarily used for the remote monitoring and control provided by ComView.  This port canalso be used for calibrations and system settings that mirror each module’s front panel RS-232 connector.
1Power Amplifier Segment Theory of Operation - 04-294, 04-333COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS...................................................................9/15/98CHECKED: DMW................................................................9/18/98 RELEASED: PRC.................................................................10/20/98Document #: DOC14-0008REV: DEC.08.99 ECO #: 98-116POWER AMPLIFIER SEGMENT THEORY OF OPERATIONThe power amplifier segments of the highpower single channel transmitter series orbroadband booster series use the latesttechnology in power FET’s.  The transistorsprovide high output power, as well as morelinearity and higher efficiency.Mechanically, the power amplifier segmentshave a plug-in architecture that allows hotreplacement.  In addition to hotreplacement, the architecture of theamplifier enables flexibility to tailor thesystem to higher output power levels andcan be easily upgraded.The power amplifier segment consists of amicrowave amplifier2, control board1, DC toDC converter3, and a front panel.  Amicrocontroller system, located on thecontrol board, supervises and controls thepower amplifier segment in each of itsfunctions.  The DC to DC converter reduces48 VDC front-end power supply input to thenominal amplifier voltage of 10.5 V.  Thefront panel displays the status of theamplifier segment and interfaces the controlboard to a computer by means of a serialRS-232 port4.  See Figure for numericalreferences.123FRONT VIEWSIDE VIEW4Figure 1: Power amplifier segment.OPERATIONThe amplifier segment is equipped with akey lock switch on the front panel to retainit in place.  When pushing-in or pulling-outthe Segment, turn the key lock switch to theOFF position.  After plugging the amplifiersegment into the sub-rack and tighteningthe front panel thumbscrews, turn the key-lock switch to the ON position.  The 10VDC secondary power supply will start upthe control board, which applies a negativevoltage to the gates of the FET’s and turnsthe DC to DC converter on.  It also adjuststhe transistor’s current and releases theinput signal to the microwave amplifier.The airflow passes through the heatsinkfrom the front to the rear of the sub-rack.The airflow loss to the other poweramplifier segments during hot replacementis negligible.POWER AMPLIFIER SEGMENT BLOCK DIAGRAMMicrowave AmplifierRear PanelConnectorDC to DC ConverterControl PanelFront PanelConnector & KeyLock SwitchDocument #: DOC15-0013  REV: C, ECO #: 98-116Created by: KAS 9/15/98Checked by: DMW 9/18/98Released by: PRC 10/29/98Figure 2 : DOC15-0013 power amplifier segment block diagram.
2Power Amplifier Segment Theory of Operation - 04-294, 04-333COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS...................................................................9/15/98CHECKED: DMW................................................................9/18/98 RELEASED: PRC.................................................................10/20/98Document #: DOC14-0008REV: DEC.08.99 ECO #: 98-116POWER AMPLIFIER SEGMENT SPECIFICATIONSTable 1: DOC19-0014, REV D.PARAMETER SPECIFICATIONPrimary Voltage 48 VDCPrimary Current 4.9 ASecondary Voltage 10 ±0.5 VDCSecondary Current 400 mACommunication Port RS-232 and RS-485Input PowerDigitalAnalog 12.0 dBm17.5 dBm (@ POut1dB)Output PowerDigitalAnalog41.5 dBm47.0 dBm  (@ POut1dB)DC Connector Floating Molex p/n 15-06-0141Impedance / RF Connector 50 O / BlindmateOperating Temperature 0° to 50° CDimensions 10.3” H x 2.1” W x 17.1” D26.16 cm H x 5.33 cm W x 43.43 cm DApproximate Weight110 lbs (4 Kg)• SPECIFICATIONS ARE SUBJECT TO CHANGE WITHOUT NOTICE.                                                                1 Weight doesn’t include shipping material.
AMPLIFIER SEGMENT STATE FLOW DIAGRAMAmplifier Segment State Flow DiagramDocument #: DOC21-0006REV: ACreated by: Kimberly Simeone 11/23/98 Released by: Donald Wike 11/23/98Checked by: Christian Smith 11/23/98All information contained in this document is confidentialand proprietary to COMWAVE and shall not be disclosedwithout the prior written permission of COMWAVE.RESETCOLD STANDBYFAILED0TRANSMITRAMPUPFront panelswitch ondriver placedout ofstandbyCompletion oframp up delayloop.  Transistorsat nominal current.Established AGC atnominal powerNormal State ProgressionStandby control activeModule failureArrow KeyCOMWAVE DIVISION
COMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS 11/20/98 CHECKED: CTS 11/23/98 RELEASED: DMW 11/23/98Document #: DOC21-0005 REV: DEC.08.99 1FIRMWARE FLOWCHARTSTARTInitialize module, network andoperational modeBegin main loopUpdate the operationalparameters of the moduleTest the operational parametersagainst programmed limits to ensurevalid operation of the moduleDetermine the operationalstate of the moduleRecord invalid operationalparameters into EEPROM forlater analysisControl gate and ALC functions ofthe module based on current state.Check for andcommunicate over theRS-485 networkFirmware Flowchart Power Amplifier Segment
SECTION 5PREVIOUSPrint
1Customer ServiceCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ............5/6/99 ECO #: 99-035, 3/25/99 CHECKED: DMW..............................................................1/18/99 RELEASED: PRC .............................................................. 1/18/99Document #: DOC20-0001REV: FEB.09.00CUSTOMER SERVICECONTACT INFORMATIONDURING BUSINESS HOURSInquiries may be directed to Thomcast Communications, Comwave Division during business hours, 8 am to 5pm Monday through Friday.  When the automated attendant answers you will be given the option of dialingyour party direct or speaking with the operator.AFTER BUSINESS HOURSIf you need emergency assistance due to equipment shutdown or malfunction, customer support personnel areavailable 24 hours a day.  Call Comwave at one of the numbers listed below; when the automated attendantanswers press 6, leave your name, company name, phone number, equipment model number(s), and a briefdescription of the problem you’re encountering.  When you hang up the system will automatically page the on-call technician who will then return your call in a timely manner.  You can listen to the message prompt forother options as well, however, for emergency assistance you MUST use option 6.Thomcast Communications, Comwave DivisionCrestwood Industrial Park, 395 Oakhill RoadMountaintop, PA  187071-800-266-9283 USA & Canada1-570-474-6751 International1 & USA(Please note, as of 12/98, our area code changed from 717 to 570)1-570-474-5469 FAX(Please note, as of 12/98, our area code changed from 717 to 570)COMMENTS/SUGGESTIONSPlease forward comments regarding documentation content and/or layout, or suggestions to improve Comwavepublications to ksimeone@thomcastcom.com.EQUIPMENT RETURNSIf the equipment requires return for factory service, please follow the guidelines listed.  Thomcast cannot beheld responsible for damaged equipment received due to improper packing; contact Thomcast with anyquestions or concerns.1.  Contact Comwave: Call Comwave to report the problem and to obtain a “Return Authorization”number2 (RA).  This enables accurate tracking and identity of returned equipment for prompt and efficientservice.2.  Obtain packaging materials: Use original boxes and packing materials when returning any equipment.This will safeguard against most in-transit damages.  If original boxes and packing materials are not available,contact Thomcast to obtain replacement materials prior to shipping, they are provided at a nominal cost.3. Pack equipment: Use original packing materials and directions provided.  Most equipment is packed in abox within another box; this varies with each product.  Double boxing provides maximum protection.Caution:  Do not pack equipment using “PEANUTS” as filler it does NOT provide sufficient protectionduring shipping.  Rough handling by the carrier may cause permanent damage to the equipment.Thomcast cannot be held responsible for damaged equipment received due to improper packing.                                                          1 International calls must dial the country code before the phone number, i.e. 001-570-474-6751.2 If you do not obtain an RA number prior to returning equipment Thomcast cannot be held responsible for delays in repair and returntime.
1Return Packaging of the Power Amplifier SegmentCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................10/21/98 CHECKED: SB..................................................................10/22/98RELEASED: DMW........................................................... 10/22/98Document #: DOC20-0003REV: DEC.06.99 ECO #: 98-116RETURN PACKAGING OF THE POWER AMPLIFER SEGMENT1. Start with an empty power amplifiersegment box, shown in Figure 1.  Ifyou don’t have one please informComwave customer service when youcontact them for a return authorization(RA) number, which you MUST doprior to returning ANY equipment.2. Place the power amplifier segment intothe box, as shown in Figure 2.  Theheatsink should always face up and theconnectors on the rear of the poweramp segment rest against the soft grayfoam for protection.Figure 1: Empty power amplifier segment box.HEATSINKREARFigure 2: Boxed power amplifier segment.3. Fold the edges of the inner box in andclose.4. Place the inner box into the 4-packmaster (outer box), being sure toinclude three empty power amplifierboxes for a secure fit, as shown inFigure 3.  The power amplifiersegments are generally packed 4 permaster box and shipped.  Whenreturning segment(s) please pack themthe same way, ALL boxes will bereturned to you.  If you need toassemble a master box, use 2” clearbox tape over the bottom seam, usingthree layers to assure strength.  Thenput 4 pieces of fiberglass strappingtape over the edges.
2Return Packaging of the Power Amplifier SegmentCOMWAVE DIVISIONAll information contained in this document is confidential and proprietary to THOMCAST and shall not be disclosed without the prior written permission of THOMCAST.CREATED: KAS ................................................................10/21/98 CHECKED: SB..................................................................10/22/98RELEASED: DMW........................................................... 10/22/98Document #: DOC20-0003REV: DEC.06.99 ECO #: 98-1165. Close the 4-pack master box and sealthe top seam with 2” clear box tape,using three layers to assure strength.Then put 4 pieces of fiberglassstrapping tape over the edges.  Clearlymark the RA number on the outside ofthe box before shipping.Figure 3: Power amplifier segments ready to ship.

Navigation menu