Trane Signature 20 To 110 Tons Installation And Maintenance Manual SCXF SVX01K EN (07/2014)
2015-04-02
: Trane Trane-Signature-20-To-110-Tons-Installation-And-Maintenance-Manual-684233 trane-signature-20-to-110-tons-installation-and-maintenance-manual-684233 trane pdf
Open the PDF directly: View PDF
Page Count: 104 [warning: Documents this large are best viewed by clicking the View PDF Link!]
- Introduction
- Model Number Descriptions
- General Data
- Pre-Installation
- Dimensions & Weights
- Installation - Mechanical
- Installation - Electrical
- Unit Wiring Diagrams
- Supply Power Wiring
- Selection Procedures
- Static Pressure Transducer Installation (VAV units only)
- Zone Sensor Options for IntelliPak™ Control Units
- Integrated Comfort™ Systems Sensors for CV and VAV Applications
- Zone Sensor Installation
- Programmable Zone Sensors
- Time Clock Option
- Remote Human Interface Panel Installation
- Mounting the Remote Human Interface (RHI) Panel
- Wiring the Remote Human Interface
- Connecting to Tracer Summit
- Programming the Time Clock Option
- Operating
- Controls
- Points List
- Tracer /LCI-I option
- BCI-I option
- Phase Monitor
- Unit Control Components
- RTM Module Board - Standard on all Units
- Compressor Module (MCM) - Standard on all Units
- Human Interface Module - Standard on all Units
- Remote Human Interface Module Option
- Waterside Module - Standard on all water- cooled units
- Heat Module
- Ventilation Override Module (VOM) Option
- LonTalk® Communications Interface (LCI-I) Module
- BACnet® Communications Interface (BCI-I) Module
- Exhaust/Comparative Enthalpy (ECEM) Module
- Ventilation Control Module (VCM)
- Generic Building Automation System Module Option
- Input Devices and System Functions
- Pre-Start
- Start-Up
- Maintenance
- Diagnostics
- Wiring Diagrams