Wayne Dalton 9100 Users Manual 305214 NEW.pmd
9100 to the manual e6f41684-27ef-41d8-98e3-8897c7fc8fad
2015-01-05
: Wayne-Dalton Wayne-Dalton-9100-Users-Manual-204284 wayne-dalton-9100-users-manual-204284 wayne-dalton pdf
Open the PDF directly: View PDF .
Page Count: 9
Download | |
Open PDF In Browser | View PDF |
Windload Post 9100/9600/9900 www.wayne-dalton.com Installation Instructions See garage door owner’s manual for warranty information. © Copyright 2002 Wayne-Dalton Corp. 305214 New 1/6/2002 Packaged Parts NOTE: The quantities below represent a single post for a single car garage. Double car doors require (2) posts. The quantities for the parts below (with the exception of SLIDE LOCKS) are doubled for double car doors. (1) HALF HINGE # 130352 (2) HEADER LOCK BRACKETS # 141092 (1) TOP PLATE EXTENSION # 305205 (1) TOP STRAP BRACKET # 305206 (8) STRAPS (8’ kit supplies (10) straps) # 305209 (5) J-STRUTS (8’ kit supplies (6) J-struts) 1) 9100 # 305208 2) 9600 # 305324 3) 9900 # 305331 (4) WING NUTS (8’ kit supplies (5) wing nuts) # 305211 (5) STRAP BRACKETS (8’ kit supplies (6) strap brackets) # 305225 (4) CARRIAGE BOLTS (8’ kit supplies (5) carriage bolts) # 305210 9100/9600 SLIDE LOCK # 292857 (1) WINDLOAD POST 7’ # 305207 8’ # 305332 9900 SLIDE LOCK KIT # 245773 (1) BOTTOM BRACKET ASSEMBLY # 305327 (1) POST INSTALLATION DECAL # 305213 (1) PLASTIC PLUG # 305226 (1) POST TAG # 161384 (8) 5/16” X 1-5/8” LAG SCREW # 100292 (18) 1/4-20 X 11/16” SELFDRILLING SCREW # 300723 (12) 1/4-14 X 5/8” UNDERCUT SELF-TAPPING SCREW # 236565 (18) 1/4-20 X 7/8” SELFDRILLING SCREW # 100507 2 Required Tools (1) 3/16” DRILL BIT PENCIL SAFETY GLASSES (1) 7/16” DRILL BIT DRILL TAPE MEASURE (1) 5/8” X 4” MASONRY DRILL BIT STEP LADDER LEVEL Windload Post Installation J-Strut Installation NOTE: J-STRUT MUST FIT ONTO THE RIB AS SHOWN IMPORTANT! Refer to the option code drawing (supplied) for windload post location(s). (2) 1/4-14 X 5/8” UNDERCUT SELF-TAPPING SCREWS Place the 12” J-struts onto the lower rib of each door panel and center over the required position per the option code drawing. Secure J-struts using (2) 1/4-14 x 5/8” undercut self-tapping screws. (see Fig. 1) IMPORTANT! Specific J-struts are required for different door models. Be sure to install the correct J-struts required for your door. J-STRUT (MODEL SPECIFIC) J-STRUT IS FLUSH AGAINST PANEL FIG. 1 NOTE: J-struts are stamped for identification. WARNING: DO NOT INSTALL THE WRONG J-STRUTS ONTO A GARAGE DOOR, OR WINDLOAD FAILURE WILL OCCUR. 3 Header Lock Bracket Installation CENTER LINE OF J-STRUT LOCATION Mark a vertical line on the header, aligned with the center of the J-struts. Measure up 2” above the top of the door and mark a horizontal line. Center the header lock bracket with the vertical line and align the bottom of the header lock bracket with the horizontal line. HEADER LOCK BRACKET HEADER 2” 2” Secure the header lock bracket to the header using (4) 5/16” x 1-5/8” lag screws. (see Fig. 2) NOTE: It is recommended that lag screws be pilot drilled using a 3/16” drill bit prior to fastening. (4) 5/16” X 1-5/8” LAG SCREWS FIG. 2 IMPORTANT! IF THERE IS DRYWALL OR OTHER MATERIALS COVERING THE HEADER IT IS REQUIRED THAT SUCH MATERIALS BE REMOVED FROM THE HEADER LOCK BRACKET LOCATION(S) AND REPLACED WITH THE SAME THICKNESS OF WOOD BEFORE INSTALLING THE HEADER LOCK BRACKET(S). IF THIS PROCESS MUST BE DONE, THE LENGTH OF THE LAG SCREWS MUST BE INCREASED TO INCLUDE THE THICKNESS OF WOOD MATERIALS SO THAT A MINIMUM OF 1-1/2” PENETRATION INTO THE EXISTING HEADER IS OBTAINED. Bottom Bracket Installation Locate the bottom bracket assembly and align it to the bottom of the post. Secure the bottom bracket to the bottom of the windload post using (4) 1/4-20 x 11/16” self-drilling screws. (see Fig. 3) NOTE: The bottom of the windload post is flush while the top is offset. (4) 1/4-20 X 11/16” SELF-DRILLING SCREWS Post Hole Placement BOTTOM BRACKET ASSEMBLY At each windload post location, mark a center line on FIG. 3 the floor that is aligned with the center of J-struts. Measure out from the back of the door (see Fig. 4) 6” for 9100 doors and 6-1/2” for 9600/9900 doors and make a second mark as shown in Fig. 5. Using a masonry bit, drill (1) 5/8” x 4” deep hole into the concrete. Clean out the hole. IMPORTANT! FOR PROPER OPERATION OF THE WINDLOAD POST, IT IS IMPORTANT THAT THE DIMENSION “X” BE HELD TO ASSURE DIM. X = DOOR MODEL THE POST IS INSTALLED PLUMB. CENTER LINE OF J-STRUT 6” = 9100 6-1/2” = 9600 6-1/2” = 9900 DIM. X = DOOR MODEL 6” = 9100 6-1/2” = 9600 6-1/2” = 9900 5/8” X 4” DEEP HOLE DIM. X DI DO NOT MEASURE FROM BOTTOM SEAL (SEE FIG.4) FIG. 4 FIG. 5 4 M. X Top Plate Extension Installation Locate the top plate extension and top strap bracket. Place the top strap bracket onto the top plate extension and adjust so that the holes in the top strap bracket align with the corresponding door model holes in the top plate extension. Hold position and secure using (4) 1/4-20 x 7/8” self-drilling screws. (see Fig. 6) Slide the top plate extension assembly into the header bracket. Now, install the windload post into the post hole in the TOP PLATE floor and align the top of the windload post with the top EXTENSION plate extension assembly. Ensure that the post is level 9100 and plumb. Using (2) 1/4-20 x 7/8” self-drilling screws, secure the windload post to the top plate extension assembly. 9600/9900 (see Fig. 7) (4) 1/4-20 X 7/8” SELF-DRILLING SCREWS TOP PLATE EXTENSION ASSEMBLY (2) 1/4-20 X 7/8” SELF-DRILLING SCREWS TOP STRAP BRACKET FIG. 6 FIG. 7 Strap Bracket Installation Loosely attach (2) straps to each strap bracket using (1) carriage bolt and wing nut (see Fig. 8). Position the strap bracket assembly at each J-strut location and wrap the straps around the windload post. WING NUT STRAP BRACKET BOLT Ensure that the windload post is plumb while locked into the header lock bracket and hole in floor. Secure strap bracket assemblies to the J-struts using (2) 1/4-20 x 7/8” self-drilling screws (see Fig. 9). Now, secure each strap to the windload post using (1) 1/4-20 x 11/16” self-drilling screw. NOTE: Keep straps parallel and level. (see Fig. 10) (2) STRAP Finish hand tightening the carriage bolts and wing nuts. FIG. 8 NOTE: Doors without a 3” U-bar on the top section will require an extra J-strut and strap bracket (strap bracket without straps) on the top rib of the top section. (see Fig. 11) 5 (2) 1/4-20 X 7/8” SELFDRILLING SCREWS WINDLOAD POST STRAP BRACKET J-STRUT (2) 1/4-20 X 11/16” SELFDRILLING SCREWS STRAP BRACKET STRAP J-STRUT FIG. 9 STRAP FIG. 10 (2) 1/4-20 X 7/8” SELFDRILLING SCREWS J-STRUT STRAP BRACKET (WITHOUT STRAPS) FIG. 11 Slide Lock Installation ALIGN WITH HOLE IN VERTICAL TRACK Install slide lock on the second section of the door. Secure the lock to the section with (4) 1/4-20 x 11/16” self drilling screws. Square lock assembly with door section and hole in vertical track. The slide lock should be spaced approximately 1/8” from the section edge. 1/8” SLIDE LOCK (4) 1/4-20 X 11/16” SELF DRILLING SCREWS IMPORTANT! SLIDE LOCKS AND OPERATORS SHOULD NOT BE ENGAGED AT THE SAME TIME. IF AN OPERATOR IS INSTALLED ON THE DOOR AND ENGAGED, BE SURE SLIDE LOCKS ARE DISENGAGED. FIG. 12 ONLY USE SLIDE LOCKS WHEN OPERATOR IS DISENGAGED FROM THE GARAGE DOOR. 6 Securing Post for Storage Locate a convenient place to store the windload post(s). Measure and cut (2) 2 x 6” wood mounting blocks a minimum of 10” long for each windload post. Locate the mounting blocks horizontally on the wall as shown in Fig. 13. Secure them adequately to the wall at the top and bottom of the post storage location, with masonry anchors (concrete or const.), or 12-16 penny nails (wood const.). Measure a minimum of 6” above door as illustrated, and mount the extra header lock bracket(s) to the top mounting block(s) using (2) 5/16” x 1-5/8” lag screws as shown in Fig. 13. (2) 5/16” X 1-1/2” LAG SCREWS Measure the distance from the top of the windload post to the center of the bottom strap (see Fig. 14). Use that measurement for the displacement between the center of the extra header lock bracket and half-hinge tube. Position the half-hinge on the bottom mounting block and secure the half-hinge using (2) 5/16” x 1-5/8” lag screws. Repeat this step for remaining windload posts if necessary. (see Fig. 13) Slide the windload post(s) into storage header bracket(s) and secure the bottom strap(s) to the half hinge(s) using the wing nut and carriage bolt. Place all remaining wing nuts and carriage bolts into the remaining straps for storage. Insert plastic plug into hole in floor. 6” MIN. TOP OF WINDLOAD POST HEADER LOCK BRACKET DISTANCE BETWEEN TOP OF WINDLOAD POST AND CENTER OF BOTTOM STRAP MEASURE THE DISTANCE FROM THE TOP OF THE WINDLOAD POST TO THE CENTER OF THE BOTTOM STRAP (2) 5/16” X 1-1/2” LAG SCREWS BOTTOM STRAP TUBE HALF-HINGE BOTTOM OF WINDLOAD POST FIG. 14 FIG. 13 Rebalance The Door Now that the windload post is NOT installed onto the door, check the door’s balance, by manually opening and closing the door. The door may be heavy because of the extra hardware added. To accommodate the extra weight, tension must be added to the counterbalance springs. See chart for adding spring tension. NOTE: Refer to the garage door’s main installation instructions and owner’s manual for instructions on adding/removing spring tension. 7 Counterbalance System Number of Turns Added to Counterbalance System TorqueMaster™ 1/2 turn Torsion Spring 1/2 turn Extension Spring Relocate "S" hook placement Attaching the Installation Decals After the installation is complete, locate an easily visible location on the inside of the garage door and the post(s) and place the provided installation decals onto the door and post(s) for future reference. IMPORTANT! DECALS MUST BE ATTACHED TO BOTH DOOR AND POST(S). MAKE SURE A DECAL LIKE THE FIGURE ABOVE IS INSTALLED ON THE DOOR! CONTACT WAYNE-DALTON CORPORATION FOR A REPLACEMENT DECAL. 8 Windload Label Locations 2 1 3 1 2 3 Applied by Installer - One (1) Emergency High Wind Situations Tags (161384) per post -Tags are to be applied to post(s) when stored on wall for constant reminder to consumer. Applied by Installer - One (1) Windload PSF Label per post, based on the required design PSF load. Label is to be applied to windload post for reference. Applied by Installer - One (1) Florida Windload Installation Label (305213) -Only on doors specified with one or more posts. To be applied next to endcap of second section on side of opening where Post no. 1 is stored. 9
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : Yes Create Date : 2003:04:02 05:46:04-05:00 Modify Date : 2003:04:02 05:46:04-05:00 Page Count : 9 Creation Date : 2003:04:02 10:46:04Z Mod Date : 2003:04:02 10:46:04Z Producer : Acrobat Distiller 5.0.5 (Windows) Author : sleech Metadata Date : 2003:04:02 10:46:04Z Creator : sleech Title : 305214 NEW.pmdEXIF Metadata provided by EXIF.tools