Weil Mclain Egh 105 Users Manual 110 677.p65
EGH-105 to the manual bb634f67-2ef6-45c9-bfb3-4d45f22c7c04
2015-02-02
: Weil-Mclain Weil-Mclain-Egh-105-Users-Manual-454260 weil-mclain-egh-105-users-manual-454260 weil-mclain pdf
Open the PDF directly: View PDF .
Page Count: 36
Download | |
Open PDF In Browser | View PDF |
EGH Gas-Fired Boiler Control Supplement EGH-105 to EGH-125 Series 4 Natural gas‡ CSD-1 control system ‡ For propane boilers, install EGH propane conversion kit in addition to following the instructions in this Control Supplement. Part No. 550-110-677/0299 EGH-105 to EGH-125 Control Supplement Please read this page first Hazard definitions The following terms are used throughout this Control Supplement to bring attention to the presence of hazards of various risk levels or to important information concerning the life of the product. Indicates presence of hazards that will cause severe personal injury, death or substantial property damage. Indicates presence of hazards that can cause severe personal injury, death or substantial property damage. Indicates presence of hazards that will or can cause minor personal injury or property damage. Indicates special instructions on installation, operation or maintenance that are important but not related to personal injury or property damage. To the installer: This Control Supplement must only be used by a qualified installer/service technician. Read these instructions completely before beginning the installation. Failure to follow these instructions can cause severe personal injury, death or substantial property damage. This Control Supplement is for CSD-1 controls on EGH-105 to EGH-125 boilers only, specifically for: • Water boilers without tankless heater. (CSD-1 is not available for water boilers with tankless heater.) • Steam boilers with or without tankless heater. This document is only intended as a supplement to the EG, PEG and EGH (Series 4) Boiler Manual (referred to in this Supplement as the EGH Manual). Follow all instructions in the EGH Manual in addition to the instructions in this Control Supplement. The installation must conform to the requirements of the authority having jurisdiction, or, in the absence of such requirements, to the National Fuel Gas Code, ANSI Z-223.1/NFPA-54 (latest edition). Where required by the authority having jurisdiction the installation must conform to the American Society of Mechanical Engineers (ASME) Safety Code for Controls and Safety Devices for Automatically-Fired Boilers, Number CSD-1. Contents 2 I. ................. Installation .......................................................................... 4 II. ................ Piping connections ............................................................. 6 III. ............... Install boiler controls ......................................................... 6 IV. ............... Optional heaters ................................................................ 7 V. ................ Gas piping ........................................................................... 8 VI. .............. Wiring .................................................................................. 8 VII. ............. Final adjustments ............................................................. 22 VIII. ............ Check-out procedure ....................................................... 24 IX. .............. Service and maintenance ................................................ 31 X. ............... Replacement parts ........................................................... 32 Part Number 550-110-677/0299 CSD-1 control system — Natural gas Carton guide Table 1 Boiler cartons Verify that the correct cartons are available before beginning assembly. Note that the Base assembly and Trim & controls cartons for CSD-1 are special. The CSD-1 ignition control panel (in Base assembly carton) consists of ignition control module, impulse relay and lighted push-button switch mounted and wired on a panel base. Carton Comments EGH-105 EGH-115 EGH-125 With tankless opening 321-711-120 321-711-130 321-711-140 Without tankless opening 321-711-125 321-711-135 321-711-145 CSD-1 381-700-400 381-700-402 381-700-404 Base panels 381-700-250 381-700-255 381-700-260 Jacket 411-800-280 411-800-290 411-800-300 Collector hood 450-014-752 450-014-753 450-014-754 Draft hood 450-206-242 450-206-243 450-206-244 Gravity return (M&M #67W-1) 381-700-341 381-700-341 381-700-341 Pumped return (M&M #42-A) 511-114-531 511-114-531 511-114-531 381-800-446 381-800-447 381-800-447 Steam boilers only 386-700-350 386-700-350 386-700-350 Water, CSD-1 — or — 381-700-406 381-700-406 381-700-406 Steam, CSD-1, gravity return — or — 381-700-408 381-700-408 381-700-408 Steam, CSD-1, pumped return 381-700-410 381-700-410 381-700-410 Section assembly (a) Base assembly (b) Float low water cutoff (steam) Vent damper (optional) (c) Tankless heater (optional) Trim & controls (see below) Note a — CSD-1 water boilers cannot be equipped with a tankless heater. Note b — Base assembly includes burner tubes, gas train components, pilot assembly and control panel (with ignition control). Note c — EGH vent dampers meet ASME CSD-1 requirements (paragraph CF-210(c)) because they comply with ANSI Z21.13. Steam trim and control carton Gravity return Steam trim and control carton Pumped return Water trim carton Pressure limit control, automatic reset Pressure limit control, automatic reset Aquastat, automatic reset Pressure limit control, manual reset Pressure limit control, manual reset Aquastat, manual reset Probe low water cutoff, manual reset Probe low water cutoff, manual reset Probe low water cutoff, manual reset Transformer/relay Transformer/relay Transformer/relay Wire harness, steam gravity return Wire harness, steam pumped return Wire harness, water Crimp spade wire terminations Crimp spade wire terminations Crimp spade wire terminations ASME Relief valve ASME Relief valve ASME Relief valve Pressure gauge Pressure gauge Gauge glass and valves Gauge glass and valves Brass cross, brass nipple, bushings (3) and siphons (3) for mounting pressure controls and gauge Brass cross, brass nipple, bushings (3) and siphons (3) for mounting pressure controls and gauge Part Number 550-110-677/0299 Pressure/temperature gauge 3 EGH-105 to EGH-125 I Control Supplement Installation Place the boiler Refer to the EGH Manual. Read Section I and follow all of its guidelines. Complete the following steps of Section I of the EGH Manual: • Placing the boiler • Installation of optional water heaters, steam boilers only (including pages 13–14) • Hydrostatic pressure test • Installation of flue collector hood • Installation of (burner) drawer assembly and front access panel and back base channel • Jacket installation • Draft hood installation Install gas train Connect gas train assembly to burner manifold: • Apply pipe dope to 1" nipple for insertion into burner manifold coupling (Figure 1, item 1). Insert and tighten nipple. • Pipe lower half of ground joint union to the 1” nipple (Figure 1, item 2). • Knock out the jacket gas valve opening on the desired side of the boiler (may be routed through either right or left side). • Place gas train in position (either routed to the left, as shown, or to the right) and tighten the ground joint union loosely. Position the gas train assembly and tighten the union. • Connect vent lines (routed to outside per code requirements) to ¼" tubing vent connections on main gas valve and pilot gas pressure regulator (Figure 3, item 3). • Connect pilot gas tubing (1/8" aluminum) to adapter in pilot gas valve outlet (Figure 1, item 4). • Crimp connect two ¼" spade terminals (provided) to ends of pilot gas valve wires (Figure 1, item 5). Install vent/breeching Install vent system and breeching per EGH Manual Section I. If optional vent damper is used, install vent damper (using Section I of this Supplement) before installing breeching. Figure 1 Gas train assembly 5 2 3 1 4 3 677-09 4 Part Number 550-110-677/0299 CSD-1 control system — Natural gas Install optional vent damper (if supplied) If not installing a vent damper, proceed to next section (Piping connections). and actuator wiring openings. Insert wires and secure strain relief clamps. See Figure 6, 8, or 10 as applies. Once a vent damper has been operated on an EGH boiler, the boiler will no longer operate without a damper installed. Keep wiring harnesses clear of all hot surfaces. WARNING Only dampers listed in the Replacement parts list in this Supplement are certified for use with EGH Series 4 boilers. Any other damper installed could cause severe personal injury or death. LINE UP KEYWAY WHEN CONNECTING PLUGS. FORCING A MISMATCH CAN CAUSE A HAZARDOUS CONDITION. Minimum clearances — Provide a minimum of 6" between the damper and any combustible material. (Provide a minimum of 46" between EGH jacket top and a combustible ceiling.) Damper must be installed directly on top of draft hood so that it serves only that boiler. DO NOT modify draft hood or damper, or make another connection between draft hood and damper or boiler. This will void AGA/CGA certification and will not be covered by Weil-McLain warranty. Any changes will cause severe personal injury, death or substantial property damage. Read and apply the harness plug warning label (above) so that it is visible after installation. Install damper directly on top of draft hood, with arrow pointing straight up. Install so the damper blade indicator is visible to the user. See Figure 2. By-passing (jumpering) damper will cause flue products such as carbon monoxide to escape into the house. This will cause severe personal injury or death. Keyway After boiler has operated once, if either end of harness is disconnected, the system will shut down. The boiler will not operate until the harness is reconnected. Install damper harness between damper actuator and knockout in right top of boiler jacket. Knock out opening in jacket top and install strain relief bushings in jacket Vent damper assemblies Effikal damper Johnson Controls damper Damper blade indicator Hold-open switch (Effikal only) — Install damper so that switch is visible and accessible to user. Part Number 550-110-677/0299 677-10 Remove dummy plug from damper connector in boiler wiring harness. Plug damper harness receptacle into damper harness plug. See Figure 6, 8, or 10 as applies. Screws or rivets used to secure the damper to the vent pipe and the draft hood must not interfere with rotation of the damper blade. Figure 2 Key 677-05 5 EGH-105 to EGH-125 II Control Supplement Piping connections Connect steam (water) piping to the boiler per EGH Manual Section II. Water boilers — make provision for mounting probe low water cutoff in the supply or return piping, above the top of the boiler. The low water cutoff must be between the boiler and any isolation valve(s). III Install boiler controls — water boilers The controls may be mounted on either end of the boiler. Mount all controls on the same end. The junction box (electrical entrance) must also be mounted on the same end as the controls. Install the probe low water cutoff in the supply or return piping, above the top of the boiler. The low water cutoff must be mounted between the boiler and any isolation valve(s) installed in the piping. Install water trim components as required by ASME CSD-1, latest edition. See Figure 3 and Table 2 for controls required and tapping usage. See Figure 6 for finished assembly. Plug all unused tappings. All piping and control connections must also comply with the EGH Manual. Figure 3 Table 2 Water boiler connections 11¾" Water boiler connections 27 /8" 5 Tapping Application W-M Part No. 163/16" E Supply G L S 32¾" Not used H V D 165/8" 13½" 211/16" 6 Boiler drain connection — E ASME relief valve (per EGH manual) — G Pipe to air vent or compression tank — H Honeywell L4006E-1000 M/R limit 510-312-041 L Pressure/temperature gauge 510-218-097 S Temperature limit control, auto reset 510-312-209 V Gas supply connection (right or left) — McDonnell & Miller PS852M-24 M/R Not shown probe LWCO (Mount in supply or return piping, above top of boiler) Return 24" D 511-114-530 Plug all tappings not used. 677-08 Part Number 550-110-677/0299 CSD-1 control system — Natural gas III Install boiler controls — steam boilers All water level controls must mount on the left end of the boiler. Failure to do so could result in nuisance shutdowns and possible lockout on the manual reset control due to water level variations from end to end. Substantial property damage could result from freezing due to loss of heat. All controls must mount on left end of the boiler. The correct tappings are available only on the left end section. Install steam trim components as required by CSD-1, latest edition. See Figure 4 and Table 3. See also Figure 8 or Figure 10 for finished assembly. • • CSD-1 requires two low water cutoffs (one manual reset) and two limit controls (one manual reset) as shown in the illustration. For float type (automatic reset only) low water cutoffs other than those shown in this Supplement, refer to EGH Manual for mounting and piping instructions. Install a blowdown valve on any float type low water cutoff as described in the EGH Manual, Section III. Plug all unused tappings. All piping and control connections must also comply with the EGH Manual. IV Optional heaters — steam boilers only Install optional tankless heater, if used, (steam boiler only) per EGH Manual Section IV. Figure 4 Table 3 Steam boiler connections 11¾" Steam boiler connections 27 /8" 5 Tapping 163/16" T E Supply risers G C D E G L S 32¾" C 2313/16 " (Water line) T V H 165/8" L H D 13½" Return S V 211/16" 24" Part Number 550-110-677/0299 677-07 Application McDonnell & Miller PS852M-24 M/R probe LWCO Not used — plug tapping Drain connection (per EGH manual) ASME relief valve (per EGH manual) Not used - plug tapping Float LWCO, automatic reset — Gravity return — McD-M 67W-1 Pumped return — McD-M 42-A Pressure gauge Pressure limit, automatic reset Honeywell L404C-1147 M/R limit Skim tapping (per EGH manual) Gas supply connection (right or left) Plug all tappings not used. W-M Part No. 511-114-530 — — — — — 511-114-494 511-114-531 510-218-045 510-312-135 510-312-060 510-312-209 — 7 EGH-105 to EGH-125 V Gas piping Size and connect gas supply piping per EGH Manual, Section V. The gas supply can enter from either the right or left side of the jacket. Be sure the gas train is directed to the correct side. VI Support gas line securely. Do not support weight of gas line off of boiler gas train. Purge air from gas piping and perform gas line and gas connection leak test per Section V of the EGH Manual. Wiring For your safety, turn off electrical power supply before making any electrical connections to avoid possible shock hazard. Use 105 °C thermoplastic wire, or equivalent, if any original wire must be replaced (except for pilot spark and sense wires). A strain relief bushing and adapter must be used at each point where wiring passes through the boiler jacket or control cases to protect wiring insulation. Wiring procedure Assembly illustrations and wiring diagrams This Supplement contains three wiring diagrams and associated assembly illustrations. Refer to the following, as applicable: • Water boilers —Figures 5 and 6 • Steam boilers, gravity return — Figures 7 and 8 • Steam boilers, pumped return — Figures 9 and 10 General Refer to EGH Manual, Section VI for further information. All wiring must be installed in accordance with the requirements of the National Electrical Code and any additional national, state or local code requirements having jurisdiction. All line voltage wiring external to boiler jacket must be N.E.C. class 1. Provide a separate electrical circuit with a fused disconnect switch (15 amp recommended) to supply the boiler. Wiring to the boiler must be No. 14 gauge or heavier, installed in conduit. The boiler must be electrically grounded in accordance with the National Electrical Code, ANSI/NFPA No. 70, latest edition. 8 Control Supplement 1. Mount all controls as directed in Section III of this Supplement. Refer to the assembly illustration for the type of boiler installed (Figure 6, 8 or 10). 2. Mount the junction box supplied with the boiler on the inside left (or right) side of the jacket as shown in the assembly illustration (using screws and nuts provided). Mount the junction box on the same end of the boiler as the controls will be mounted. 3. Attach the transformer/relay to the junction box. 4. Mount the CSD-1 control panel on the jacket interior panel as shown in the appropriate assembly illustration (Figure 6, 8 or 10), using screws and nuts provided. 5. Crimp connect ¹⁄₄" spade terminals (provided) to the pilot gas valve wires if not already done in Section I of this Supplement. 6. If optional vent damper is installed, make sure damper harness has been routed through a strain relief bushing in the jacket and damper actuator as directed in Section I of this Supplement. Secure damper harness conduit to top of jacket with clamps provided. 7. The main gas valve wires are pre-attached to the CSD-1 control panel. The spark and sense wires from the pilot are factory installed to the pilot. Connect these wires as shown in the wiring diagram. 8. Use the wiring harness provided with the boiler to complete wiring of the remaining components according to the appropriate wiring diagram and assembly illustration. Part Number 550-110-677/0299 CSD-1 control system — Natural gas VI Wiring — sequence of operation General The following sequence of operation applies to all wiring diagrams in this Supplement — both water and steam. Call for heat On a call for heat (from thermostat or operating control): 1. Limit control and water level control contacts are assumed closed. 2. Vent damper (if provided) will open. 3. Ignition control checks for signal at pilot. (No signal should be present.) If no signal is sensed (normal condition): a. b. c. d. Pilot solenoid opens. Pilot ignition spark begins. Pilot ignites. Pilot proves. If a signal is sensed (abnormal condition) by the ignition control, the control will lockout. On failure to establish pilot flame signal within 15 seconds, the ignition control will turn off the pilot gas valve. It will wait 5 minutes, then retry for ignition. If the second ignition attempt fails, the ignition control will lockout and illuminate the red lockout light. This will activate the alarm contact of the impulse relay, providing an isolated contact closure across terminals A1 and A2 of the CSD-1 control panel terminal strip. The contact rating is 15 amps at 250VAC. To reset the boiler, push the red reset button on the CSD-1 control panel. 4. Once pilot is proved the ignition control activates main gas valve. Main burners will ignite and boiler will continue to fire until terminated by limit action or no call for heat. Lockout modes In addition to lockout on flame-sense failure, the boiler may also experience lockout due to shutdown of a manual reset control. The boiler is equipped with a manual reset limit control and a manual reset low water cutoff. Should the limit control lockout, it can only be reset by pressing the reset button on the control. The manual reset probe low water cutoff can be reset after lockout by pressing the reset button on the control or by interrupting power momentarily. Steam boilers — Do not substitute another manual reset low water cutoff for the one specified and supplied with the boiler. Other controls may not operate as intended and could cause serious operating problems or failures. Troubleshooting Refer to Section VIII, Check-out procedure — troubleshooting, of this Supplement and to component manufacturer’s literature supplied in the boiler manual envelope for further information on operating conditions. Part Number 550-110-677/0299 9 10 VI LADDER WIRING DIAGRAM Wiring — water boilers EQUIPMENT 120 V.A.C. SERVICE SWITCH GROUND (NOTE 7) CIRCULATOR 1K2 Figure 5 C R TRANSFORMER Water boiler wiring — ladder and schematic diagrams RELAY COIL 1K THERMOSTAT G MANUAL RESET HIGH LIMIT 1K1 MANUAL RESET PROBE LWCO HIGH LIMIT Y CABLE TO DAMPER FUSE 3 3 5 5 4 4 2 2 6 6 1 1 2K ELECTRICAL SHOCK HAZARD, CAN CAUSE SEVERE INJURY OR DEATH. DISCONNECT POWER BEFORE INSTALLING AND/OR SERVICING. NOTES: A1 1. ALL WIRING MUST BE INSTALLED IN ACCORDANCE WITH: A. U.S.A. - NATIONAL ELECTRICAL CODE AND ANY OTHER NATIONAL, STATE OR LOCAL CODE REQUIREMENTS. B. CANADA - C.S.A. C22.1 CANADIAN ELECTRICAL CODE PART 1 AND ANY OTHER NATIONAL, PROVINCIAL OR LOCAL CODE REQUIREMENTS. SEE NOTE 10 2K4 A2 N/A R 2K3 2K2 1 2. ALL CONTACTS SHOWN WITHOUT POWER APPLIED-OFF SHELF CONDITION. 3. IF ORIGINALWIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED, o TYPE 105 C OR IT’S EQUIVALENT MUST BE USED. 2K1 4. REFER TO CONTROL COMPONENT INSTRUCTIONS PACKED WITH BOILER FOR APPLICATION INFORMATION. Part Number 550-110-677/0299 5. THERMOSTAT - FOR SINGLE ZONE SYSTEMS, THERMOSTAT ANTICIPATOR SETTING IS 0.40 AMPS. FOR MULTIPLE ZONE SYSTEMS USING ZONE VALVES OR CIRCULATORS, REFER TO COMPONENT MANUFACTURER’S INSTRUCTIONS FOR APPLICATION WIRING AND THERMOSTAT ANTICIPATOR SETTING. EMCS - FOR EMCS CONNECTION IN PLACE OF THERMOSTAT, REFER TO EMCS INSTALLATION/OPERATING MANUAL. PILOT SOLENOID VALVE LOW VOLTAGE FIELD HIGH VOLTAGE FIELD LOW VOLTAGE FACTORY MV TH HIGH VOLTAGE FACTORY MV/PV TR IGNITION CABLE PV D+ ALARM 6. L.W.C.O., HIGH LIMITS, WIRED IN SERIES. D ALARM 7. IGNITION CONTROL MODULE TERMINAL. DENOTES FIELD INSTALLED CHASSIS GROUND. IGNITION CONTROL PANEL TERMINAL 8. PILOT LEADWIRES ARE NOT FIELD REPLACEABLE. REPLACE PILOT ASSEMBLY IF NECESSARY. 24V 24V (G) 2 SENSE TRANSFORMER TERMINAL. 9. CIRCULATOR NOT USED WITH GRAVITY HOT WATER. 10. ALARM CONTACT RATINGS: 15 AMP @ 250 VAC. ROBERTSHAW GAS VALVE 550-225-026/0199 R IGNITION CONTROL PANEL LAMP SPARK SENSOR IGNITOR Part Number 550-110-677/0299 SCHEMATIC WIRING DIAGRAM R W MOMENTARY SWITCH R R D+ BK PILOT SOLENOID VALVE D TH TR R W ROBERTSHAW GAS VALVE IMPULSE RELAY W BK R W R UNIVERSAL SPARK IGNITION CONTROL R MV G (NOTE 6) MV/PV EQUIPMENT HIGH LIMIT GROUND (NOTE 7) MANUAL MANUAL RESET RESET HIGH LIMIT PROBE LWCO BK BK BK G PV R R ALARM Y BK BK THERMOSTAT OR EMCS (NOTE 5) BK R ALARM Y R 24V Y G G SERVICE SWITCH (BY OTHERS) Y G G H C BK BK R G G R TRANSFORMER 120/24 V.A.C. SENSE R G BK 1 2 A1 A2 TERMINAL BLOCK SPARK G N PRE-WIRED PANEL W Y CIRCULATOR (NOTE 9) JUNCTION BOX WIRE NUTS (3) W Y DAMPER CONNECTOR PLUG-IN DPST RELAY Y W 24V (GND) W O NOTE 10 PILOT (NOTE 8) CABLE TO DAMPER EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 11 12 VI Wiring — water boilers 10 7 Figure 6 Control assembly — water boiler (CSD-1 is not availabe for water boilers with tankless heaters.) 25 MV V /P MV PV M AR AL M AR AL V 4 2 ) ND V (G 24 E NS SE RK A SP 19 3 18 9 2 1 20 8 21 4 21 24 6 15 5 15 12 Part Number 550-110-677/0299 11 22 17 13 16 13a Install strain relief bushings wherever electrical wiring passes through jacket. 677-02 14 23 Vent connections — Connect with ¼" tubing and run vent line outside building per code requirements. Part Number 550-110-677/0299 1 CSD-1 control panel 14 Pilot shutoff valve 2 Ignition control 15 Leak test valves with plugs 3 Impulse relay and lighted push-button alarm silencing switch 16 Gas supply connection 17 Burner manifold 5 Transformer/relay 18 Limit control, auto reset 6 Junction box 19 Limit control, manual reset 7 Damper (optional) 20 Pressure/temperature gauge 8 Damper connector 21 Wire harness 9 Dummy plug 22 Pilot spark & sense wires 10 Damper harness 23 Pilot gas tubing 11 Main gas valve 24 Circulator, by others 12 Manual gas valve 13 Pilot gas valve Probe LWCO, Manual reset (Mount in sup25 ply or return piping above top of boiler between boiler and any isolation valve(s).) 13a Pilot gas pressure regulator EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 13 14 VI LADDER WIRING DIAGRAM Wiring — steam EQUIPMENT 120 V.A.C. GROUND (NOTE 7) SERVICE SWITCH gravity return C R TRANSFORMER Figure 7 RELAY COIL 1K THERMOSTAT G Water boiler wiring — ladder and schematic diagrams OPERATING CONTROL 1K1 PRESSURETROL MANUAL RESET PRESSURETROL FLOAT LWCO MANUAL RESET PROBE LWCO Y CABLE TO DAMPER FUSE 3 3 5 5 4 4 2 2 6 6 1 1 2K ELECTRICAL SHOCK HAZARD, CAN CAUSE SEVERE INJURY OR DEATH. DISCONNECT POWER BEFORE INSTALLING AND/OR SERVICING. A1 SEE NOTE 10 2K4 A2 N/A NOTES: R 2K3 1. ALL WIRING MUST BE INSTALLED IN ACCORDANCE WITH: A. U.S.A. - NATIONAL ELECTRICAL CODE AND ANY OTHER NATIONAL, STATE OR LOCAL CODE REQUIREMENTS. B. CANADA - C.S.A. C22.1 CANADIAN ELECTRICAL CODE PART 1 AND ANY OTHER NATIONAL, PROVINCIAL OR LOCAL CODE REQUIREMENTS. 2K2 1 2K1 2. ALL CONTACTS SHOWN WITHOUT POWER APPLIED-OFF SHELF CONDITION. PILOT SOLENOID VALVE 3. IF ORIGINAL WIRE AS SUPPLIED WITH THE APLIANCE MUST BE REPLACED, o TYPE 105 C OR IT’S EQUIVALENT MUST BE USED. Part Number 550-110-677/0299 4. REFER TO CONTROL COMPONENT INSTRUCTIONS PACKED WITH BOILER FOR APPLICATION INFORMATION. LOW VOLTAGE FIELD 5. THERMOSTAT - FOR SINGLE ZONE SYSTEMS, THERMOSTAT ANTICIPATOR SETTING IS 0.40 AMPS. FOR MULTIPLE ZONE SYSTEMS USING ZONE VALVES OR CIRCULATORS, REFER TO COMPONENT MANUFACTURER’S INSTRUCTIONS FOR APPLICATION WIRING AND THERMOSTAT ANTICIPATOR SETTING. EMCS - FOR EMCS CONNECTION IN PLACE OF THERMOSTAT, REFER TO EMCS INSTALLATION/OPERATING MANUAL. MV TH MV/PV TR HIGH VOLTAGE FIELD LOW VOLTAGE FACTORY HIGH VOLTAGE FACTORY PV IGNITION CABLE D 6. L.W.C.O., PRESSURE CONTROLS, WIRED IN SERIES. 7. D ALARM ALARM 24V IGNITION CONTROL MODULE TERMINAL. DENOTES FIELD INSTALLED CHASSIS GROUND. 24V (G) IGNITION CONTROL PANEL TERMINAL. 8. PILOT LEADWIRES ARE NOT FIELD REPLACEABLE. REPLACE PILOT ASSEMBLY IF NECESSARY. TRANSFORMER TERMINAL. ROBERTSHAW GAS VALVE 2 SENSE SPARK SENSOR 9. OPERATING CONTROL REQUIRED WITH TANKLESS HEATER. 10. ALARM CONTACT RATINGS: 15 AMP @ 250 VAC. 550-225-027/0199 R IGNITION CONTROL PANEL LAMP IGNITOR Part Number 550-110-677/0299 SCHEMATIC WIRING DIAGRAM R W MOMENTARY SWITCH R R D BK PILOT SOLENOID VALVE D R TH TR (NOTE 6) PRESSURETROL BK IMPULSE RELAY MANUAL RESET PROBE LWCO MANUAL RESET PRESSURETROL FLOAT LWCO BK BK W W ROBERTSHAW GAS VALVE BK W R R UNIVERSAL SPARK IGNITION CONTROL R BK MV G MV/PV OPERATING CONTROL (NOTE 9) Y Y EQUIPMENT GROUND (NOTE 7) G R ALARM Y THERMOSTAT OR EMCS (NOTE 5) BK BK BK PV R R ALARM Y 24V Y G R G SERVICE SWITCH (BY OTHERS) Y 24V (GND) W G G R G R SENSE TERMINAL BLOCK SPARK G G H C BK R BK TRANSFORMER 120/24 V.A.C. 1 2 A1 A2 G N PRE-WIRED PANEL W PLUG-IN DPST RELAY JUNCTION BOX W Y DAMPER CONNECTOR WIRE NUTS (2) O NOTE 10 PILOT (NOTE 8) CABLE TO DAMPER EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 15 16 VI Wiring — steam gravity return 10 7 Figure 8 Control assembly — steam, gravity return 19 MV V /P MV PV M AR AL M AR AL V 24 18 20 ) ND V (G 24 E NS SE K AR SP 3 1 21 8 22 25 When using a tankless heater, knockout the opening in the inner panel. Locate the controls to allow room for the tankless heater piping. The tankless heater temperature control (not shown) installs in the heater tapping. 9 2 4 25 23 24 6 15 5 15 12 Part Number 550-110-677/0299 11 26 17 13 16 27 13a Install strain relief bushings wherever electrical wiring passes through jacket. 677-01 14 Vent connections — Connect with ¼" tubing and run vent line outside building per code requirements. Part Number 550-110-677/0299 1 CSD-1 control panel 14 Pilot shutoff valve 2 Ignition control 15 Leak test valves with plugs 3 Impulse relay and lighted push-button alarm silencing switch 16 Gas supply connection 4 Terminal strip 17 Burner manifold 5 Transformer/relay 18 Limit control, automatic reset 6 Junction box 19 Limit control, manual reset 7 Damper (optional) 20 Pressure gauge 8 Damper connector 21 Siphons 9 Dummy plug 22 Gauge glass & valves 10 Damper harness 23 Probe LWCO, manual reset 11 Main gas valve 24 Float LWCO control, automatic reset 12 Manual gas valve 25 Wire harness 13 Pilot gas valve 26 Pilot spark & sense wires 13a Pilot gas pressure regulator 27 Pilot gas tubing EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 17 18 VI LADDER WIRING DIAGRAM Wiring — steam EQUIPMENT 120 V.A.C. GROUND (NOTE 7) SERVICE SWITCH pumped return C R Figure 9 TRANSFORMER RELAY COIL 1K THERMOSTAT Water boiler wiring — ladder and schematic diagrams G OPERATING CONTROL FLOAT LWCO & PUMP MANUAL RESET PRESSURETROL PRESSURETROL CONTROL 1K1 N H CWB MANUAL RESET PROBE LWCO (NOTE 11) Y CABLE TO DAMPER FUSE 3 3 5 5 4 4 2 2 6 6 1 1 2K ELECTRICAL SHOCK HAZARD, CAN CAUSE SEVERE INJURY OR DEATH. DISCONNECT POWER BEFORE INSTALLING AND/OR SERVICING. A1 SEE NOTE 10 2K4 A2 NOTES: N/A 1. ALL WIRING MUST BE INSTALLED IN ACCORDANCE WITH: A. U.S.A. - NATIONAL ELECTRICAL CODE AND ANY OTHER NATIONAL, STATE OR LOCAL CODE REQUIREMENTS. B. CANADA - C.S.A. C22.1 CANADIAN ELECTRICAL CODE PART 1 AND ANY OTHER NATIONAL, PROVINCIAL OR LOCAL CODE REQUIREMENTS. R 2K3 2K2 1 2. ALL CONTACTS SHOWN WITHOUT POWER APPLIED-OFF SHELF CONDITION. 2K1 3. IF ORIGINAL WIRE AS SUPPLIED WITH THE APPLIANCE MUST BE REPLACED, o TYPE 150 C OR IT’S EQUIVALENT MUST BE USED. PILOT SOLENOID VALVE 4. REFER TO CONTROL COMPONENT INSTRUCTIONS PACKED WITH BOILER FOR APPLICATION INFORMATION. Part Number 550-110-677/0299 5. THERMOSTAT - FOR SINGLE ZONE SYSTEMS, THERMOSTAT ANTICIPATOR SETTING IS 0.40 AMPS. FOR MULTIPLE ZONE SYSTEMS USING ZONE VALVES OR CIRCULATORS, REFER TO COMPONENT MANUFACTURER’S INSTRUCTIONS FOR APPLICATION WIRING AND THERMOSTAT ANTICIPATOR SETTING. EMCS - FOR EMCS CONNECTION IN PLACE OF THERMOSTAT, REFER TO EMCS INSTALLATION/OPERATING MANUAL. LOW VOLTAGE FIELD 6. L.W.C.O., PRESSURE CONTROLS, WIRED IN SERIES. IGNITION CABLE MV TH MV/PV TR HIGH VOLTAGE FIELD LOW VOLTAGE FACTORY HIGH VOLTAGE FACTORY PV D ALARM D ALARM 7. DENOTES FIELD INSTALLED CHASSIS GROUND. 24V IGNITION CONTROL MODULE TERMINAL. 24V (G) 8. PILOT LEADWIRES ARE NOT FIELD REPLACEABLE. REPLACE PILOT ASSEMBLY IF NECESSARY. IGNITION CONTROL PANEL TERMINAL. 9. OPERATING CONTROL REQUIRED WITH TANKLESS HEATER. TRANSFORMER TERMINAL. ROBERTSHAW GAS VALVE 2 SENSE SPARK SENSOR 10. ALARM CONTACT RATINGS: 15 AMP @ 250 VAC. 11. REMOVE JUMPER BAR BETWEEN TERMINAL "H" AND TERMINAL "C". 550-225-028/0399 R IGNITION CONTROL PANEL LAMP IGNITOR Part Number 550-110-677/0299 SCHEMATIC WIRING DIAGRAM R MOMENTARY SWITCH R R W D BK D TH R TR (NOTE 6) FLOAT LWCO & PUMP CONTROL BK PRESSURETROL BK BK IMPULSE RELAY MANUAL RESET PROBE LWCO MANUAL RESET PRESSURETROL PILOT SOLENOID VALVE W W R W R ROBERTSHAW GAS VALVE UNIVERSAL SPARK IGNITION CONTROL R BK MV G MV/PV EQUIPMENT OPERATING CONTROL (NOTE 9) Y Y GROUND (NOTE 7) BK BK G BK PV R R ALARM Y THERMOSTAT OR EMCS (NOTE 5) BK R ALARM Y 24V Y G R G SERVICE SWITCH (BY OTHERS) Y G G C BK R G R SENSE TERMINAL BLOCK SPARK G G H 24V (GND) W R BK TRANSFORMER 120/24 V.A.C. 1 2 A1 A2 G N PRE-WIRED PANEL W PLUG-IN DPST RELAY JUNCTION BOX Y DAMPER CONNECTOR WIRE NUTS (2) W O NOTE 10 PILOT (NOTE 8) CABLE TO DAMPER EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 19 20 VI Wiring — steam pumped return 10 7 Figure 10 Control assembly — steam, pumped return 19 MV V /P MV PV M AR AL M AR AL V 24 18 20 ) ND 3 1 21 8 22 25 When using a tankless heater, knockout the opening in the inner panel. Locate the controls to allow room for the tankless heater piping. The tankless heater temperature control (not shown) installs in the heater tapping. 23 9 2 V (G 24 E NS SE RK A SP 4 25 24 6 15 5 15 12 Part Number 550-110-677/0299 11 26 17 13 16 27 13a Install strain relief bushings wherever electrical wiring passes through jacket. 677-01-p 14 Vent connections — Connect with ¼" tubing and run vent line outside building per code requirements. Part Number 550-110-677/0299 1 CSD-1 control panel 14 Pilot shutoff valve 2 Ignition control 15 Leak test valves with plugs 3 Impulse relay and lighted push-button alarm silencing switch 16 Gas supply connection 4 Terminal strip 17 Burner manifold 5 Transformer/relay 18 Limit control, auto reset 6 Junction box 19 Limit control, manual reset 7 Damper (optional) 20 Pressure gauge 8 Damper connector 21 Siphons 9 Dummy plug 22 Gauge glass & valves 10 Damper harness 23 Probe LWCO, manual reset 11 Main gas valve 24 Float LWCO/pump control, auto reset 12 Manual gas valve 25 Wire harness 13 Pilot gas valve 26 Pilot spark & sense wires 13a Pilot gas pressure regulator 27 Pilot gas tubing EGH-105 to EGH-125 Control Supplement CSD-1 control system — Natural gas 21 EGH-105 to EGH-125 VII Before proceeding: Control Supplement Final adjustments 1. Follow EGH Manual instructions for Final Adjustments, Section VII, including filling the boiler and skimming steam boilers. Skimming the boiler as described in Section VII of the EGH Manual requires firing the boiler. Always follow boiler Operating instructions, Figure 11, when starting the boiler. Failure to do so could result in severe personal injury, death or substantial property damage. 2. Inspect base insulation as instructed in Section VII of the EGH Manual. To place boiler in operation: 1. Follow Operating instructions, Figure 11, to start boiler. 2. If boiler starts correctly, proceed with Check-out procedure, Section VIII of this Supplement. 3. If boiler fails to start, check: ❏ Loose connection or blown fuse? ❏ Limit setting below boiler water temperature or steam pressure? ❏ Thermostat below room temperature? ❏ Manual reset device needs to be reset? ❏ Gas not turned on at meter and boiler? ❏ Incoming natural gas pressure less than 5" W. C.? 4. If above fails to eliminate the trouble, refer to Check-out procedure — troubleshooting in this Supplement, Section VIII. 22 Part Number 550-110-677/0299 CSD-1 control system — Natural gas VII Final adjustments — operating instructions Figure 11 Operating instructions Part Number 550-110-677/0299 23 EGH-105 to EGH-125 VIII Control Supplement Check-out procedure — operation Always follow boiler Operating instructions, Figure 11, when starting the boiler. Failure to do so could result in severe personal injury, death or substantial property damage. 1. Increase setting of room thermostat (or operating control) to call for heat. 2. Vent damper (if provided) will slowly open. When damper is fully open, the ignition control will open pilot gas valve and start spark. Vent damper must be in open position when appliance main burners are operating. If damper is not in open position, flue products will spill into the building, causing severe personal injury or death. 3. If pilot lights and proves within 15 seconds, the ignition control turns off the spark and opens the main gas valve (dual valves in single body). Main burners ignite. If pilot does not light and prove within 15 seconds, the ignition control shuts off pilot gas and spark and waits 5 minutes. It then will retry. If the second ignition attempt fails, the ignition control will lockout and close the alarm contact of the impulse relay. 4. During main burner operation: • The ignition control monitors pilot flame current. If signal is lost, main valve is closed, spark is activated, and the operating sequence returns to step 3. • If power is interrupted, the control system shuts off pilot and main gas valves and restarts at Step 1 when power is restored. 5. Stop the call for heat (lower thermostat or operating control). • Pilot and main gas valves will close. • Damper (if provided) will close. 6. Boiler is now in the off cycle. 7. Repeat steps 1 through 6 several times to verify operation. 8. Return thermostat or operating control to normal setting. 24 Part Number 550-110-677/0299 CSD-1 control system — Natural gas VIII Check-out procedure — leak test For your safety, turn off electrical power supply before making any electrical connections to avoid possible shock hazard. 1. Turn off power to the boiler and remove the (RED) wire from terminal TH of the main gas valve (Figure 12, item 1). Tape off terminal end of removed wire and restore power to the boiler. 2. Close manual gas valve (Figure 12, item 2). 3. Check that both leak test valves (Figure 12, items 3 and 4) are closed. Then remove plugs and insert 1/8" NPT hose barb fittings as shown in Figure 12. 9. Open second leak test valve (Figure 12, item 4) and check for pressure. See NOTICE below. 10. Close second leak test valve and remove manometer. 11. Remove call for heat to boiler. Turn off power to the boiler. 12. Remove hose barbs from leak test valves and replace plugs. 13. Replace (RED) wire to terminal TH of gas valve. 14. Open manual gas valve (Figure 12, item 2) and restore power to boiler. 4. Attach a U-tube manometer to first leak test valve (Figure 12, item 3). When checking for pressure at the leak test valves, it is normal to find a small pressure reading. If the pressure continues to rise after opening the leak test valve, the main valve seat is leaking and should be replaced. 5. Open first leak test valve (Figure 12, item 3) and check for pressure. See NOTICE at right. 6. Close first leak test valve (Figure 12, item 3) and remove manometer. 7. Attach manometer to second leak test valve (Figure 12, item 4 ). 8. Apply call for heat to boiler and check that electronic pilot proves. l ne pa l o ntr co To 4 3 Figure 12 Leak test procedure 2 1 677-11 Part Number 550-110-677/0299 25 EGH-105 to EGH-125 VIII Control Supplement Check-out procedure — troubleshooting Verify proper operation after servicing Never jumper (bypass) any device except for momentary testing as outlined in Troubleshooting Charts. Substantial property damage and/or severe personal injury could occur. Burner access panel must be in position during boiler operation to prevent momentary flame rollout on ignition of main flame. Severe personal injury or substantial property damage will result. Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. 2. If Step 1 does not open damper, manually rotate damper blade to open position using wrench or pliers on flat shaft between damper and actuator (Figure 13). Boiler will fire. Verify that damper service switch is in "HOLD DAMPER OPEN" position. 3. Do not leave damper permanently in this position. Replace actuator immediately. If damper is left in open position, boiler will not operate at published efficiencies. See damper manufacturer's instructions packed with damper for additional information. Johnson damper: If troubleshooting chart recommends replacing actuator and actuator is not immediately available, damper blade can be fixed in an open position to allow boiler operation. Follow these instructions only in case of no heat or damper actuator malfunction. See Figure 13. 1. Turn off power to boiler. Before troubleshooting: a. Have a voltmeter that can check 120VAC, 24VAC, a microammeter with minimum scale range of 0–25, and continuity tester. b. Check for 120VAC (minimum 102 – maximum 132) to boiler. c. Check for 24VAC at secondary side of transformer. d. Make sure thermostat is calling for heat and contacts (including appropriate zone controls) are closed. Check for 24VAC between thermostat wire nuts and ground. 2. In event of actuator failure: 3. 4. Effikal damper: If troubleshooting chart recommends replacing actuator and actuator is not immediately available, damper blade can be fixed in an open position to allow boiler operation. Manually turning blade can cause actuator damage. Follow these instructions only in case of no heat or damper actuator malfunction. See Figure 13. 1. Move damper service switch to "HOLD DAMPER OPEN" position. Apply call for heat to boiler. Damper blade should then rotate to open position and boiler will fire. Open 5. Failure to turn off power to boiler can result in severe personal injury, death or substantial property damage. Refer to damper manufacturer’s instructions for procedure to fix damper in open position. Turn on power to boiler. Using wrench or pliers on flat shaft section, manually rotate damper blade until green light turns on. Boiler will fire. Do not leave damper permanently in this position. Replace actuator immediately. If damper is left in open position, boiler will not operate at published efficiencies. See damper manufacturer's instructions packed with damper for additional information. 677-14 Closed Damper blade indicator Figure 13 Temporary manual opening of vent damper — refer also to vent damper manufacturer’s instructions. Wrench or pliers Effikal damper 26 Johnson Controls damper Part Number 550-110-677/0299 CSD-1 control system — Natural gas VIII Check-out procedure — troubleshooting TS-1: No Spark — System (boiler without vent damper) does not work VISUALLY CHECK — Is ground wire connected from GND (Burner) to ignition control mounting screw, and ground wire connected from transformer terminal C to case ground? Correct by making connections. Check for open thermostat, circulator relay, operating control, limit control or LWCO. Check the CSD-1 control panel, impulse relay and push-button switch. If limit controls or water level controls lockout on manual reset, determine cause and correct condition. Failure to do so could result in severe personal injury, death or substantial property damage. Replace ignition control. Retest. No Yes Is 24VAC present across terminals 24V and 24V(GND)? No Yes Open thermostat (or operating control) contacts for 15 seconds. Close thermostat contacts. Is 24VAC across terminals PV & MV/PV? No Yes Turn OFF supply voltage. Electrical shock hazard. Failure to turn off power before proceeding could cause severe personal injury or death. Securely connect spark wire. Then turn ON supply voltage. Retest. Check spark wire. Is it securely connected to spark transformer? No Yes Is condition of spark wire good (not cut, brittle, burned or cracked)? Replace pilot assembly. Retest. Is spark gap 0.125" and isolated in pilot gas stream? No Yes Replace pilot assembly, turn ON supply voltage. Operate system several complete heat cycles. Part Number 550-110-677/0299 Replace ignition control. Retest. No Yes Is spark electrode ceramic cracked? No Yes Replace pilot assembly, turn ON supply voltage, operate system several complete heat cycles. 27 EGH-105 to EGH-125 VIII Control Supplement Check-out procedure — troubleshooting TS-2: No Spark — System (boiler with vent damper) does not work Secure connections. Is damper harness securely plugged in at both ends? No Check for loose wire connections or bad relay on transformer. Yes Is 24VAC present across transformer terminals C & Y? No Check for open thermostat, circulator relay, operating control, limit control or LWCO. Check the CSD-1 control panel, impulse relay and push-button switch. Yes Is 24VAC present across terminal C and yellow wire on damper connector? If limit controls or water level controls lockout on manual reset, determine cause and correct condition. Failure to do so could result in severe personal injury, death or substantial property damage. No Yes Is damper rotated open? Yes No Check for out of round stack section. Does motor rotate open? No Is 24VAC present across terminals PV and MV/PV? Yes No Replace actuator. Retest. Yes Is spark present now? No Open thermostat contacts for 30 seconds. Damper will rotate to closed position. Close thermostat contacts. Damper will rotate to open position. Is 24VAC present across terminals PV and MV/PV? Check continuity of each wire in wiring harness to damper. Does continuity exist for each wire? Yes No Replace damper wiring harness. Retest. Replace ignition control. Retest. Remove damper harness from boiler wiring harness. TEMPORARILY install jumper between terminal 2 and terminal 5 on damper plug in boiler wiring harness. See figure below. Does boiler fire? No 1 2 3 4 5 6 28 Retest. Turn OFF supply voltage. Electrical shock hazard. Failure to turn off power before proceeding could cause severe personal injury or death. Yes No Yes Replace damper actuator. Retest. Check spark wire. Is it securely connected to ignition control? Securely connect and turn ON supply voltage. Retest. No No Is spark gap 0.125" and located in pilot gas stream? No Yes Is condition of spark wire good (not brittle, burned or cracked)? Replace pilot assembly. Retest. Yes Replace pilot assembly. Temporary jumper Yes Yes Is spark electrode ceramic cracked? No Replace ignition control. Retest. Yes Replace pilot assembly. Turn ON supply voltage and operate system several complete cycles. Part Number 550-110-677/0299 CSD-1 control system — Natural gas VIII Check-out procedure — troubleshooting TS-3: Pilot lights — Main valve will not come on (boiler with or without damper) Does spark stay on for more than a few seconds after pilot is established? No Yes Turn OFF supply voltage. Is 24VAC between terminals MV and MV/PV on ignition control? No Yes Replace ignition control. Retest. Make sure sense wire is not wrapped around any pipe or accessories. Is inlet gas pressure at least 5.0" W.C. and not over 14" W.C.? No Electrical shock hazard. Failure to turn off power before proceeding could cause severe personal injury or death. Yes Is sense wire securely attached to sense terminal and pilot assembly? No Yes Correct and retest. Contact gas supplier to correct. Is sensing probe ceramic cracked? No Is main valve wiring secure at terminals? No Yes Correct wiring. Retest. Replace valve. Retest. Replace pilot assembly. Retest. Check for continuity of sense wire and condition of insulation. NOT OK Is sense wire or sensing probe shorted out to metal surface? No Yes Correct and retest. OK Replace pilot assembly. Retest. Replace ignition control. Retest. Yes Does system have proper flame signal? Set up microammeter to measure output current in flame sensor circuit as follows. a. Detach sense lead from ignition control. Attach negative lead from microammeter to sense terminal on ignition control. b. Attach positive lead to sense wire from pilot assembly. c. Disconnect main valve lead from terminal MV on ignition control. d. Energize the system. Spark should ignite the pilot. As soon as pilot is burning, microammeter should read at least 0.5 microamp for U.T. # 1003-615. e. Is flame current signal less than the minimum specified in d above? No Yes Check for proper gas pressure, clean pilot assembly, tight mechanical and electrical connections. Also check for proper system grounding per following page. Part Number 550-110-677/0299 29 EGH-105 to EGH-125 VIII Control Supplement Check-out procedure — troubleshooting TS-3: Pilot lights — Main valve will not come on - continued from previous page Turn OFF supply voltage. Electrical shock hazard. Failure to turn off power before proceeding could cause severe personal injury or death. To check ignition system grounding (instruction for continuation of TS-3) Pilot assembly and ignition control must share common ground with main burner. Nuisance shutdowns are often caused by poor or erratic ground. ❏ Check for good metal-to-metal contact between pilot burner bracket and main burner and between main burner and burner rest. ❏ Check ground lead from GND (Burner) terminal on ignition control to ignition control mounting screw and from C on transformer to transformer case ground. Make sure connections are clean and tight. If wire is damaged or deteriorated, replace with No. 18 gauge moisture-resistant, thermoplastic insulated wire with 105 °C minimum rating. TS-4: Spark is present - pilot will not light (boiler with or without damper) Are pilot valve wiring connections CORRECT and securely fastened? No Connect securely to terminal PV on ignition control and terminal TR on main gas valve. Yes Is inlet gas pressure at least 5.0" W.C. and not over 14" W.C.? No Yes Is pilot shutoff valve open? No Yes Open pilot shutoff valve. Contact gas supplier to correct gas pressure. Is gas present at pilot burner assembly? Remove MV wire from ignition control. Use a match taped to a long screwdriver or pilot lighter rod and manually light pilot. No Make sure pilot shutoff valve is open, 24VAC is present to pilot valve and pilot line is not kinked or obstructed. Check for clean pilot orifice. If OK, replace pilot gas valve. Replace pilot assembly. 30 Yes Is spark gap 0.125" and located in pilot gas stream? No Yes Block any draft around boiler. Check for clean pilot orifice. Part Number 550-110-677/0299 CSD-1 control system — Natural gas IX Service and maintenance Complete Installation and Service Certificate in EGH Manual, Section IX. Follow EGH Manual, Section IX, for service and maintenance of boiler. Part Number 550-110-677/0299 31 EGH-105 to EGH-125 X Control Supplement Replacement parts — water boilers Figure 14 Water boiler assembly 17 18 19 22 MV V /P MV PV M AR AL M AR AL V 24 13 14 15 21 20 11 ) ND V (G 24 E NS SE K AR SP 12 23 16 16 7 7 24 6 1 5 8 10 2 8a 9 677-12 32 Part Number 550-110-677/0299 CSD-1 control system — Natural gas Table 5 Water boiler replacement parts Before replacing any parts on the boiler — Turn off power to boiler and shut off gas supply. Failure to comply could result in severe personal injury, death or substantial property damage. Item Part description 1 2 3 Boiler models Vendor Vendor part number Weil-McLain part number Main burner Main burner with pilot bracket Pilot burner bracket (not shown) EGH-105 – 125 Weil-McLain — See EGH Manual — EGH-105 – 125 Weil-McLain — See EGH Manual — EGH-105 – 125 Weil-McLain — See EGH Manual — Beckett Gas E48A-1 4 Pilot burner (not shown) EGH-105 – 125 511-330-166 Johnson Controls Q90GE-1 5 Main gas valve EGH-105 – 125 Robertshaw 7000DERHC-S7C 511-044-287 6 Manual gas valve, 1" NPT EGH-105 – 125 Watts FBV3-06 511-246-290 7 Leak test valve EGH-105 – 125 Key Gas 511-246-339 Honeywell V8046C-1014 8 Pilot gas valve EGH-105 – 125 511-044-039 Johnson Controls H91ABG 8a Pilot gas pressure regulator EGH-105 – 125 Maxitrol RV20VL 510-933-195 9 Pilot shutoff valve EGH-105 – 125 Conbraco 53-300-01 511-246-345 10 Pilot tubing, alum. 1/8" O.D. x 34" long EGH-105 – 125 Available at local supply house 11 Ignition control EGH-105 – 125 United Technologies 1003-615 511-330-086 12 Impulse relay EGH-105 – 125 Potter-Brumfield S89R-11ABD1-24 510-350-226 Honeywell AML21CBA2AA 13 Push-button switch EGH-105 – 125 511-624-580 Eaton Controls 221K11810 Honeywell AML51-C10R 14 Lens cover EGH-105 – 125 511-624-581 Eaton Controls 220PM02A 15 Light bulb EGH-105 – 125 TI-¾ (available at local supply house) 16 Wiring harness, water boilers EGH-105 – 125 Weil-McLain 591-391-886 Effikal RVGP-KS-10BF EGH-105 381-800-446 Johnson Controls Q35GP-2 (note 1) Vent damper assembly — optional 17 (not for use in Canada) Effikal RVGP-KS-12BF EGH-115 – 125 381-800-447 Johnson Controls Q35GR-2 (note 1) Effikal only RVGP 510-512-337 18 Vent damper actuator EGH-105 – 125 Johnson only M35BE-1C 510-312-255 19 Vent damper harness EGH-105 – 125 Weil-McLain 10C321 591-391-795 Honeywell L4080B-1311 20 Limit control, automatic reset EGH-105 – 125 510-312-209 White-Rodgers 11B83-16 21 Limit control, manual reset EGH-105 – 125 Honeywell L4006E-1000 510-312-041 22 Probe LWCO, manual reset EGH-105 – 125 McDonnell & Miller PS852M-24 511-114-530 Ametek 19998 23 Pressure/temperature gauge EGH-105 – 125 510-218-097 ENFM-USA 4104-2-1/2-1/4CBM 24 Transformer/relay EGH-105 – 125 Honeywell R8285D-5001 510-312-169 Note 1 — Johnson damper assembly consists of M35BC actuator and Y15 vent pipe. Replacement parts must be purchased through a local Weil-McLain distributor. When ordering, specify boiler model and series and include description and number of replacement part. Results from using modified or other manufactured parts will not be covered by warranty and may damage boiler or impair operation. Refer to boiler manual for parts not listed above. Part Number 550-110-677/0299 33 EGH-105 to EGH-125 X Control Supplement Replacement parts — steam boilers Figure 15 Steam boiler assembly 17 18 19 21 MV V /P MV PV 20 24 M AR AL M AR AL V 24 13 14 15 11 ) ND V (G 24 E NS SE K AR SP 12 16 22 16 23a 7 7 25 6 23b 1 5 8 10 2 8a 9 677-13 34 Part Number 550-110-677/0299 CSD-1 control system — Natural gas Table 6 Steam boiler replacement parts Before replacing any parts on the boiler — Turn off power to boiler and shut off gas supply. Failure to comply could result in severe personal injury, death or substantial property damage. Item Part description 1 2 3 Boiler models Vendor Vendor part number Weil-McLain part number Main burner Main burner with pilot bracket Pilot burner bracket (not shown) EGH-105 – 125 Weil-McLain — See EGH Manual — EGH-105 – 125 Weil-McLain — See EGH Manual — EGH-105 – 125 Weil-McLain — See EGH Manual — Beckett Gas E48A-1 4 Pilot burner (not shown) EGH-105 – 125 511-330-166 Johnson Controls Q90GE-1 5 Main gas valve EGH-105 – 125 Robertshaw 7000DERHC-S7C 511-044-287 6 Manual gas valve, 1" NPT EGH-105 – 125 Watts FBV3-06 511-246-290 7 Leak test valve EGH-105 – 125 Key Gas 511-246-339 Honeywell V8046C-1014 8 Pilot gas valve EGH-105 – 125 511-044-039 Johnson Controls H91ABG 8a Pilot gas pressure regulator EGH-105 – 125 Maxitrol RV20VL 510-933-195 9 Pilot shutoff valve EGH-105 – 125 Conbraco 53-300-01 511-246-345 10 Pilot tubing, alum. 1/8" O.D. x 34" long EGH-105 – 125 Available at local supply house 11 Ignition control EGH-105 – 125 United Technologies 1003-615 511-330-086 12 Impulse relay EGH-105 – 125 Potter-Brumfield S89R-11ABD1-24 510-350-226 Honeywell AML21CBA2AA 13 Push-button switch EGH-105 – 125 511-624-580 Eaton Controls 221K11810 Honeywell AML51-C10R 14 Lens cover EGH-105 – 125 511-624-581 Eaton Controls 220PM02A 15 Light bulb EGH-105 – 125 TI-¾ (available at local supply house) Wiring harness, pumped return steam EGH-105 – 125 Weil-McLain 591-391-888 16 Wiring harness, gravity return steam EGH-105 – 125 Weil-McLain 591-391-887 Effikal RVGP-KS-10BF EGH-105 381-800-446 Johnson Controls Q35GP-2 (note 1) Vent damper assembly — optional 17 (not for use in Canada) Effikal RVGP-KS-12BF EGH-115 – 125 381-800-447 Johnson Controls Q35GR-2 (note 1) Effikal only RVGP 510-512-337 18 Vent damper actuator EGH-105 – 125 Johnson only M35BE-1C 510-312-255 19 Vent damper harness EGH-105 – 125 Weil-McLain 10C321 591-391-795 Honeywell PA-404-A 510-312-135 20 Limit control, automatic reset EGH-105 – 125 White-Rodgers P47EA-3 510-311-023 21 Limit control, manual reset EGH-105 – 125 Honeywell L404C-1147 510-312-060 22 Probe LWCO, manual reset EGH-105 – 125 McDonnell & Miller PS852M-24 511-114-530 23a Float LWCO, automatic reset EGH-105 – 125 McDonnell & Miller 67W-1 511-114-494 23b Float LWCO/pump control, auto reset EGH-105 – 125 McDonnell & Miller 42-A 511-114-531 Ametek P505K 24 Pressure gauge EGH-105 – 125 510-218-045 Winter E1437 25 Transformer/relay EGH-105 – 125 Honeywell R8285D-5001 510-312-169 Note 1 — Johnson damper assembly consists of M35BC actuator and Y15 vent pipe. Replacement parts must be purchased through a local Weil-McLain distributor. When ordering, specify boiler model and series and include description and number of replacement part. Results from using modified or other manufactured parts will not be covered by warranty and may damage boiler or impair operation. Refer to boiler manual for parts not listed above. Part Number 550-110-677/0299 35 EGH-105 to EGH-125 Control Supplement Weil-McLain 500 Blaine Street Michigan City, IN 46360-2388 http://www.weil-mclain.com 36 Part Number 550-110-677/0299
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No XMP Toolkit : Adobe XMP Core 4.0-c316 44.253921, Sun Oct 01 2006 17:14:39 Create Date : 1999:04:28 13:57:54Z Creator Tool : PageMaker 6.5 Modify Date : 2009:03:23 11:18:02-05:00 Metadata Date : 2009:03:23 11:18:02-05:00 Format : application/pdf Creator : Vanita Title : 110-677.p65 Producer : Acrobat Distiller 3.01 for Windows Document ID : uuid:4def3127-6460-4429-b9d4-fe7946f74f2f Instance ID : uuid:9cf929d3-836f-49c0-8205-883419d044d4 Page Count : 36 Author : VanitaEXIF Metadata provided by EXIF.tools