ZTE R8862AS2600 LTE Remote Radio Unit User Manual part 1

ZTE Corporation LTE Remote Radio Unit part 1

User manual part 1

Download: ZTE R8862AS2600 LTE Remote Radio Unit User Manual part 1
Mirror Download [FCC.gov]ZTE R8862AS2600 LTE Remote Radio Unit User Manual part 1
Document ID2924808
Application IDLigwnuauwUjSHmUwa13/sQ==
Document DescriptionUser manual part 1
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize320.75kB (4009352 bits)
Date Submitted2016-03-10 00:00:00
Date Available2016-03-10 00:00:00
Creation Date0000-00-00 00:00:00
Producing SoftwarePDF-XChange (PDFTools3.exe v3.60.0119) (Windows)
Document Lastmod0000-00-00 00:00:00
Document TitleUser manual part 1
Document CreatorTracker's PDF-Tools

Version: HV1.0
Serial Number: SJ-20130814154658-003
Publishing Date: 2015-03-20
Engineering Installation Guide
(ZXDSR R8862A)
ZTEqIfl ZTE CORPORATION NO 55. Hl-tech Road Soulh. ShanZhsn. P R Chlna
Tei: +86 755 26770301 URL‘ muzd/mwppmm com on
¢§¥ ZTE CORPORATION
Safety Information ———————————————————————————— 1
Safety Symbols —————————————————————————————— 1
Installation Precautions ----------------------- 2
RRU Installation Modes ------------------------ 2
Media Requirement --------------------------- 3
Space Requirement --------------------------- 3
Hoisting ------------------------------------- 4
Installation Procedures ------------------------ 5
Unpacking Inspection ————————————————————————— 5
Installing the RRU ————————————————————————————— 6
Single—RRU Pole—Mounted Installation —————————— 7
Two—RRU Pole—Mounted Installation ——————————— 9
Wall—Mounted Installation --------------------- 11
Simple Sheet Metal Part—Wall Mounting ———————— 12
Simple Installation Part—Wall Mounting ————————— 13
Small Gantry Installation —————————————————————— 15
L—Shape Support Installation —————————————————— 16
Cable List ------------------------------------ 17
ZXSDR RssszA Engineering Installation Guide -
Cable Connection Diagram ————————————————————— 17
Installing the Protective Grounding Cable ———————— 18
Installing the DC Power Cable —————————————————— 18
Installing the AC Power Cable —————————————————— 20
Installing the Optical Fiber ---------------------- 22
Installing the Feeder --------------------------- 23
Cable Waterproofing —————————————————————————— 24
Installing the AlSG/MON Interface Cable ————————— 25
Installation Check ----------------------------- 26
AC Lightning Protection Box (PIMAC) ——————————— 26
Installing the Lightning Protection Box —————————— 26
Installing Cables of the Lightning Protection Box—- 28
Installing the junction Box ————————————————————— 28
Cable Connection ----------------------------- 28
Power—on Flow ------------------------------- 30
Device Power—on ----------------------------- 30
Device Power—off ----------------------------- 30
ua'um'aiz uoddnsua/I duu :‘Ian 10901192 99; 99+ 1191 Bumo'a'e ‘ueuzueus ‘umos peoa Hoax-m ‘99 'ON I
ZTE¢3¥
The following describes the personal health and safety information when you work with
ZTE system products.To prevent accidents, read the safety information described in this
document carefully before using ZTE system products.
lLocal regulations override the information in this manual.Where applicable local regulations
are unavailable, the information herein prevails.
lAll personnel who operate ZTE system products must have the knowledge of safety instructions
mentioned in ZTE product manuals or other ZTE manuals. They must accept appropriate
technical trainings and are qualified for the operations. For some operations, they may need
special trainings or qualifications certified by ZTE CORPORATION.
Sa ty Symbols
A Electrical Hazard: There is a risk of electric shock.
A Laser Hazard: Beware of strong laser beam. Do not look directly at the laser beam.
A Heat Hazard: Beware of heat source or hot surface that may result in personal injury.
lPersonal Protection
> Remove items ofjewelry, such as rings, necklaces, and watches.These items may catch on
moving parts.Metal jewelry items are conductors that may result in electric shock.
> Always wear appropriate personal protective equipment while working.
> Pay attention to the hazard labels and caution or warning information on products.Never cover
or remove the hazard labels and caution or warning information.
> Only use the tools described in instructions.
> Do not operate or maintain the RRU if the ambinent temperature exceeds 40 degrees Celsius.
llnstallation Security
> All personnel working at height must be specially-trained and certificated. Working at height
must comply with local laws, regulations, and guidelines.
> The equipment is heavy. Lifting the equipment without using a lifting device may result in serious
personal injury.
> Do not work at height or on the tower in bad weather such as in rainy or frog days.
> Falling objects may result in serious or even fatal injury. Always wear a safety helmet.Never
stand under a heavy object.
y Improper electrical installation may result in fire, electric shock, or explosion that is likely to be
fatal.Only qualified electricians are allowed to install or modify electrical equipment.
> It is recommended to install optical fibers in a temperature higher than -20‘C.
> Switch off transmitting antennas, or reduce their output power to a safe level when working with,
or staying near, these antennas. n
ZXSDR RssszA Engineering Installation Guide -
Installation Precautions
1 It is prohibited to open
the hermetic seal before
and after the installation. :
The RRU body is applied with antirust coating. Make sure that the coating
is not damaged during transportation and installation.
3 Do not install the device with 4 Do not install the device horizontally.
the interfaces facing upwards.
--r;
6 The manufacture declares that
base stations antennas is the
source of the radiation, are usually
mounted on wall—mount or on
pole—mount.This equipment
should be installed and operated
with minimum distance 4.72m
between the radiator & your body.
5The R8862A can be installed
with either side on the
mounting place. However, it
is still recommended to install
it with the heat—sink side
outwards.
RRU lnstalla
Single-RRU pole-
mounted installation
n Modes
Two—RRU pole—
mounted installation
Wall—mounted
installation
LOQOLLQZ SSA 98+ ilaJ. EU‘HD'H'd ‘UWZUSLIS ‘HWJS 9908 Noel-m ‘99 'ON I
uci'uioo'ajz uoddnsuau duu :‘mn
ZTE¢3¥
Wall—mounted installation
(Simple Sheet Metal Part)
L—Shape Support
Installation
Small Pantry
Installation
Media Requirement
RRU Pole Installation
a: 40mm~120mm
Metal Pole
Space Requirement
Device dimensions Recommended mounting Minimum mounting
"" '""" clearance (in mm) clearance (in mm)
2300 2200
‘3 Note: For mounting multiple RRUs on a pole or centralized mounting, the spacing
between RRUs depends on the mounting components.
ZXSDR RssszA Engineering Installation Guide -
Note: The information provided on this page is used for reference
when it is necessary to hoist the RRU.
Operation Tool
Safety helmet
To hoist Life belt
the RRU Fixed pulley
Hoisting rope
Hauling cable
1 Installer A on the tower
secures the fixed pulley
to the tower, and passes
the hoisting rope through
the fixed pulley down to
the ground.
2 Installer c on the ground
binds the RRU tightly in
both vertical and horizontal
directions. The rope must
go through the handle and
hoisting hole on the side.
3lnstaller B on the ground drags the hoisting rope downwards. At the same
time, installer C pulls the
hauling cable outwards to
protect the device from
colliding with the tower
when the device reaches
the mounting platform.
Fixed pulley
Hoisling
4Lift the properly-packed mp9
engineering materials used
for tower mounting onto
the tower in the manner
mentioned above. Never
lift the engineering materials
by binding them directly
to the hoisting rope.
ua'um'au uoddnsue/Izduu :‘Ian Losouez 55/. 99+ ilei BUND'H'd ‘ueuzueus ‘umos peoa HOSI'IH ‘99 'ON I
Hauling cable
—>
new
Unpacking
inspection Contact ZTE
Passed
V V V
Pole-mounted Wall-mounted Small Pantry L-shape support
installation installation installation installation
Cable installation
Installation chech
Device power-on
Unpacking Inspection
IChecking Goods
It is the responsibility of the technical engineers from both ZTE and the operator to check the
goods together.
I Procedures
1.Count the number of the packing boxes. Verify that the packing boxes are intact and the
packing boxes arrive at the correct place. Unpack the boxes and inspect the goods if all the
information is correct.
2.The Device Inspection List and Unpacking Inspection Report are kept in Box #1. Unpack
Box #1. Take out the Unpacking Inspection Report. Verify that the items match the inspection
list, and keep the report properly.
3.In case of components shortage or damage, or wrong delivery, find out the cause. Fill in the
Unpacking Inspection Feedback Form and send it to ZTE immediately.
lUnpacking the Wooden Case
The tools for unpacking the wooden case include a claw hammer, a pair of pliers, a straight
screwdriver, and a crowbar.
l Procedures
1.|nsert the straight screwdriver or the claw hammer into the metal lock on the cover of the
wooden case. Rotate the screwdriver or the claw hammer to loosen the iron sheet. Then,
open the iron sheet with the crow bar and pliers.
2.0pen all other metal locks on the top of the wooden case and remove the top cover.
3.Take out all cartons from the wooden case.
ZXSDR RssszA Engineering Installation Guide -
lUnpacking the Cartons
Generally, cartons are used for packing the spare parts of electrical devices, terminal devices,
and auxiliary materials. The spare parts of electrical devices are delivered in antistatic bags.
Antistatic measures therefore must be taken when cartons are unpacked.
The tools for unpacking a carton include a pair of diagonal piers and a knife.
Pay attention to the following when unpacking a carton:
1.Do not damage the antistatic bags because they are later used to keep the spare parts or
send faulty parts back for repair.
2.Desiccant in the carton should be properly disposed and be kept away from kids.
I Procedures
1.Cut off the packing straps with the diagonal pliers.
2.Cut open the tape along the edges of the cover. Make sure to operate gently and carefully
to avoid damaging the items inside.
3.0pen the carton and take out the foam pads.
4.Check the items inside according to the checklist.
5.Take out the device.
lAcceptance and Handover
l Procedures
1.Acceptance
Check the names, models, and quantity of goods according to the shipping list and verify carefully that:
>There are no dents, bumps, peeling, scratches, foaming, paint stripping, or blots on the
external surface of the chassis.
>AI| the captive screws are tightened without dislocation.
>The mounting accessories are correct and complete.
2.Handover
After the inspection, the representatives from ZTE and the customer should sign the Unpacking
Inspection Report. If the contract specifies that goods are kept by the customer after the
inspection, the goods are handed over to the customer after both parties have signed the
Unpacking Inspection Report.
lnstallin the RRU
Accessories for Wall—Mounted Installation
Name External View Function
Fixing clamp for wall- > u .. Used to mount the ZXSDR
mounted installation -‘ n R8862A on a wall.
LOROLLSZ SSA 99+ 1I9J. EUILID'H'd ‘UWZUSLIS ‘IIWJS 9908 Noel-m ‘99 'ON I
ua'uioo'aiz uoddnsua” duu :‘mn
ZTEI|13¥
Accessories for Pole—Mounted Installation
Function
Name External View
a 3 °
. 7‘
Pole component /. 'i Ni: “-
Used to mount the ZXSDR
R8862A on a pole.
| Used to fix a support to the
RRU support l g RRU and works together with
‘ 3,. a fixture for wall mounting.
Accessories for Gantry-Mounted Installation
Name External View Function
Used to fix the pole fixing clamps
Small Pantry and installed in indoor floor
standing mode.
L-shape support
Used to mount a pole fixture. The
L-shape support shall be installed
on the indoor ground.
Pole fixture
Used to mount the ZXSDR
R8862A on the gantry.
Patch board
Used to fix the pole fixing clamps
to the gantry.
Single-RRU Pole-Mounted Installation
Installation Tools
Operation
Tool
Install an RRU support.
M6 internal hexagonal wrench
Fix the screws of pole components.
Adjustable wrench
Steps
1Follow the installation
diagram to make an M10
screw 90 through the 4
pole fixture's installation,,\{ "5
hole and follow the correct ’/V /
sequence to flnlSh the"Flatgasket
Installation.
will?
6 Spring washer
0 M10 screw
9 Simple installation part
9 Single-pole installation part
6 Nut
ZXSDR RssszA Engineering Installation Guide -
3 Use the adjustable wrench to
securely fix the screws.
2Make another M10 screw 90
through the installation hole on
the other side and push it into
the latch's
U—shape slot.
6Follow the installation diagram to 7 Use the M6 internal hexagonal
install the RRU to the pole wrench to fix the spring screws
component from top down along on the top of RRU
the pole fixture's guide rail. support.
LOQOLL9Z 55/. 99+ ilei BUND'H'd 'UWZUSHS 'HINOS 9908 |INHH '99 'ON I
ua'uioa'azz uoddnsua/(zduu nan
ZTE¢3¥ ZXSDR RssszA Engineering Installation Guide -
TWO-RRU Pole-Mounted InStaIIatlon 5Install the RRU support. 6Install the two RRUs to the
Installation Tools assembled pole component.
Operation Tool
Install an RRU support. M6 internal hexagonal wrench
Fix the screws of pole components. Adjustable wrench
Steps
1 Follow the installation diagram 2|nstall the assembled component
to assemble the front sides of onto the pole.
the two pole components.
0 9 06
» 3‘ 7Use the M6 hexagonal wrench 8Finish the pole installation of
(4 a ,eoa‘fi to fix the spring screws on the dual RRUs.
0 M10 screw 0 Simple inslaHalion part
9 Flatgasket 0 Spring washer 9 Nut
3 Fix the two screws clockwise 4 Finish the 1+2 pole component
by using adjustable wrenches. installation.
ua'um'au uoddnsue/rzduu :‘Izrn Losouez 55/. 99+ :rei euruo'a'd ‘ueuzueus ‘umos Dena user-m ‘99 'ON I
2mm
Installation Tools
Operation Tool
Mask
Tape measure
Long ruler
Marking pen
Level ruler
Electric impact drill
Vacuum cleaner
Adapter
Socket wrench
Claw hammer
M6 internal hexagonal wrench
Adjustable wrench
Adjustable wrench
To fix fastening bolts
Install an RRU support.
Fix the simple installation parts onto the wall.
Fix sheet metal parts onto the wall.
Steps for Installing Expansion Bolts
1 Follow the installation diagram to mark the drilling position on the wall.
Simple Sheet Metal Part Simple Installation Part
2 Follow the correct sequence to install the expansion bolts.
ZXSDR RssazA Engineering Installation Guide -
8 Use the (D12 percussion drill to make a hole at the marked position
a n d u s e t h e
vacuum cleaner
to clean the dust. :
b Use the claw hamper to knock
an expansion bolt into the hole
and fix the nut clockwise to
make the bolt sufficiently
!:Nut gm" I
Spring Gasket "'"e V
Flat Gasket ‘)
—M10x80 II
Expansion
Bolt
Expansion Tube
c Unscrew the nut counter—
clockwise and remove the
nut, spring gasket, and flat
gasket. The expansion bolt
functions inside the wall. installation is completed.
20mm~30mm
ll. ghettefl-i ll.
Simple Sheet Metal Part—Wall Mounting
Steps
unseen-cc II» i
1 Use eight 6xM6 screws to fix the simple sheet metal part for wall
mounting onto the filter's side shell.
(g Note:
‘- ,, Hole A is used for
installing R8862]
R8862A while hole
(Wit: B is used for
installing R8863.
LOQOLL9Z 55/. 99+ ilei BUND'H'd 'UWZUSHS 'HWOS 9908 |Pal-m '99 'ON I
ua'uioo'ezz uoddnsue/(zduu nan

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : No
Encryption                      : Standard V2.3 (128-bit)
User Access                     : (none)
Title                           : 
Author                          : 
Creator                         : Tracker's PDF-Tools
Subject                         : 
Producer                        : PDF-XChange (PDFTools3.exe v3.60.0119) (Windows)
Page Count                      : 8
Page Mode                       : UseNone
Page Layout                     : OneColumn
EXIF Metadata provided by EXIF.tools
FCC ID Filing: Q78-R8862AS2600

Navigation menu