Freestanding Sectional Curved Playground Slide

PDF 902-293 6' indep. sectional slide
INSTALLATION DETAILS  Recommended crew (Adult): 2  Installation time: 4 (8 man hrs)  User age: 5-12  Use zone: 72 in from all sides of unit  Weight:
SURFACING: Use of safety surfacing in compliance with ASTM specification F1292 is required.
MAINTENANCE:  As the owner of the playground you are responsible for maintenance of the equipment and play area. A maintenance schedule must be developed, and the equipment inspected frequently. A maintenance section that includes component specific maintenance requirements is included at the end of this manual.  Be sure to inspect surfacing for foreign objects that could cause injury and that enough surfacing is in place in accordance with ASTM and CPSC standards.
June 11, 2020

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
1

PARTS LIST

ID

PART #

DESCRIPTION

QTY

1 435-640LR

6' Sectional Slide

1

435-640LR

Support Brace

1

435-640LR

Slide Hardware Bag

1

2

905-712

Step to 6' Deck

1

3

913-230

Transfer Point Inside Leg

2

4

913-712

Indep. Slide Post

1

5

913-714

Indep. Slide Handrail

2

6

913-721L Ind. Sec. Slide Left Guard Wall 1

7

913-721R Ind. Sec. Slide Right Guard Wall 1

8

913-720

Indep. Sec. Slide Deck

1

9

903-214

T Leg for DW Slide

2

10

316-601

3/8" Flat Washer SS

57

11

226-602

3/8" Nylon Insert Lock Nut

23

12

126-708

3/8"x 2 ¼" Button Pin SS

8

13

126-703

3/8"x 1" Button Pin SS

9

14

126-705

3/8"x 2" Button Pin SS

4

15 126-706BPS

3/8" x 1 ¾" Button Pin SS

3

16 126-701BPS

3/8" x 1 ¼" Button Pin SS

10

17

516-200

3/8" Zip Toggle

2

18 416-402BPK 7/32 Button Pin Key Short Arm 2

NOTE: Keep a copy of these instructions on file to assist you with maintenance and replacement parts.

June 11, 2020

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
2

FOOTING INFORMATION  Total footing depth is 40" less the height of the surfacing plus the height of the blocking material. If you are using 12" of surfacing the footing hole would need to be 28" plus the height of the blocking material (refer to both the side and front cutaway views to the right).  If the Play structure is installed on an unlevel grade you must adjust the footing depth to accommodate the grade. For instance, if the grade for this component is 1" higher than the surface grade of the main playground post you must dig your footing hole 1" deeper.  You must place the bottom of the support post or slide leg on a suitable flat blocking material to prevent it from sinking further into the soil. We recommend you use a brick, block of wood or several inches of gravel. The footing depth does not include this blocking material since materials used often vary.  It is the owner/installers responsibility to check local building codes and to comply with those codes. All footing depths listed here are recommendations and local soil types and frost lines may require a deeper and/or wider footing depth. If that is the case you must add more blocking material to accommodate the deeper footing, as the post length will still only be installed at the depth listed in this instruction manual.  Assemble the entire unit before adding the concrete unless instructed to do so in the individual component instruction sections.
June 11, 2020

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
3

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
ELEVATION AND FOOTING LAYOUT

June 11, 2020

4

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS

SPECIFICATIONS  Paint ­ Electrostatically applied & oven cured powder coat  Hardware ­ Stainless steel & tamper resistant
 Tube ­ FloCoat® Galvanized 1 3/8" O.D. and 1" O.D.  Curved Sectional Slide-Roto-Molded Plastic
SPECIAL SAFETY & ASTM COMPLIANCE NOTES  CRITICAL MEASUREMENT IT IS EXTREMILY IMPORTANT THAT YOU MAINTAIN A MAXIMUM OF 3 1/2" DISTANCE BETWEEN THE BOTTOM, OR SIDES OF THE BUMP WAVE SLIDE ENTRANCE WALL AND THE NEAREST EDGE OF THE DECK OR POSTS.

INSTALLATION TIPS & TROUBLE SHOOTING
 SportsPlay Equipment Inc. recommends pre-drilling the holes in the post when attaching a four-hole bracket with a number #7 drill bit. This will make the attachment of the four-hole bracket with the self-tapping screws easier and it will prevent damage to the screw head during installation.
 Apply locktite to all bolts during assembly prior to completely tightening them.
 Stainless Steel hardware can occasionally be difficult to use particularly if you need to take them out to make an adjustment. It is recommended that you add a drop of oil to bolts that may have to be removed before you install them.
 Do not tighten bolts all the way until the unit is completely assembled and all components are square and level.
 Identify and separate all parts by referencing the detail drawings and the parts list.
 As you unpack and separate the components use the cardboard sheets that were used for packing and shipping to prevent damage to the components. This is particularly true all Powder Coated and Thermoplastic coated components, by setting the components on top of the cardboard.

June 11, 2020

5

BEFORE YOU BEGIN In addition to the components on the packing list you will need a drill with a ½" drill bit, tape measure, post hole digger, blocking material, level, and a dry erase marker. INSTALLATION STEPS __1) Review all instructions before beginning: __2) Unpack, organize, and identify all components: Be sure to place all painted components on a protective surface (cardboard, cloth, etc...) to prevent damage. __3) Locate placement of the Independent Sectional Slide: See top down view of your instruction booklet. __4) Layout the Footing holes for the Independent Sectional Slide: Locate your footing drawing and mark your holes as shown. Dig your footing holes to the proper depth. __5) Attach the Independent Sectional Slide Deck to the post: Attach the Independent Sectional Slide Deck (8) to the post (4). See Detail A. Align the deck to the posts. Attach with four 1-1/4" bolts (16), eight 3/8" flat washers (10), and four 3/8" lock nuts (11). Tighten. Slide post into the designated hole. Make sure the slide side of the deck and the stair side of the deck are facing the correct directions. Brace in position.
June 11, 2020

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS Detail A
6

INSTALLATION STEPS CONTINUED
__6) Attach the Steps to 6' Deck to Independent Sectional Slide Deck: Attach the Steps to 6' Dec (2) to the Independent Sectional Slide Deck (8) using three 1" bolts (13), six 3/8" flat washers (10), and three 3/8" lock nuts (11). Hand tighten only. See Detail B.
__7) Attach Transfer Point Inside Legs to Steps: With the steps in place, place the transfer point inside legs into their designated holes. Attach the legs to the steps with two 1-¼" bolts (16), four 3/8" flat washers (10), and two 3/8" lock nuts (11). Tighten. See Detail C.

Detail B

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS

June 11, 2020

Detail C 7

INSTALLATION STEPS CONTINUED
__8) Attaching the Steps to 6' Deck to Independent Sectional Slide Deck: There is a left-side (6) and a right-side guard wall (7). The tabs will attach to the slide and will be parallel to each other. Attach the Independent Sectional Slide Guard Wall (6,7) to the Independent Sectional Slide Deck (8) with six 1" bolts (13), twelve 3/8" flat washers (10), and six 3/8" lock nuts (11). Hand tighten only. See Detail D.

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
Detail D

June 11, 2020

8

INSTALLATION STEPS CONTINUED
__9) Attaching the Handrails to the Structure:
With help, insert the end of the handrail with the threads welded into it into the stub of the guard wall. Attach the handrails to the guard wall using a 2" bolt (14) and a flat washer (10). Hand tighten only. See Detail E.
Attach the Independent Slide Handrails (5) to the steps (2) using four 2-¼" bolts (12), eight 3/8" flat washers, and four 3/8" lock nuts (11). Hand tighten only. See Detail F.
Repeat on the other side.

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
Detail E

Detail F

June 11, 2020

9

INSTALLATION STEPS CONTINUED
__10) Assemble the slide: The two components of the slide need to be assembled. An additional hardware kit is attached to the slide entrance. Bolt the pieces of the slide together with the bolt heads on the slide entrance side. Hand tighten only. Once the slide is in place, the nuts will need to be removed to attach the support brace.
__11) Attach the Slide to the Deck: Hoist the slide to the deck and attach using three 1-¾" bolts (15) and three flat washers (10). Hand tighten only. See Detail G.
__12) Attach T Legs to the Slide: Place the T legs (9) into the designated holes. Attach the legs to the exit of the slide with four 1¼" bolts (16) and four 3/8" flat washers (10). Tighten. See Detail H.

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS Detail G
Detail H

June 11, 2020

10

INSTALLATION STEPS CONTINUED
__13) Attach the Support Brace to the Slide: Place the support brace into its designated hole. Remove the nuts one at a time to attach the support brace then reattach the nut. Tighten. See Detail J.
__14) Attach the Guard Walls to the Slide: Using the holes in the tabs n the guard walls, mark and drill a ½" hole for each tab and insert a 3/8" Zip toggler (17) in each hole. To secure the tabs to the slide, use two 2" bolts (14) and two 3/8" flat washers (10). Hand tighten only. See Detail K.
__15) Once full installation of all components is complete, square, and level the entire structure. Tighten all bolts. Fill all footing holes with concrete. Check area for any remaining tools or hardware and secure the area with caution tape, etc. After the concrete has been allowed to cure for 24 hours, backfill with dirt.
__16) Inspect the components: If sharp edges are found, file and apply touch up paint.

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS Detail J
Detail K

June 11, 2020

11

902-293 6' IND. SECTIONAL SLIDE (VL) INSTALLATION INSTRUCTIONS
THIS PAGE INTENTIONALLY LEFT BLANK.

June 11, 2020

12

902-293 6' INDEPENDENT SECTIONAL STRAIGHT (VL) SLIDE EQUIPMENT MAINTENANCE

Brackets  Inspect all four-hole clamps and panel clamps.  Ensure the setscrews are tight and in place.  Ensure all Torx Screws are in place and that the bracket is firmly attached to post.  Inspect the clamps for cracks and sharp edges. Smooth any sharp edges and fix the finish. Replace brackets if cracked.
Hardware  Inspect for loose or missing hardware. Tighten all loose hardware and replace all missing hardware. Block off access to equipment if necessary.
Plastic Components  Inspect for any sharp edges or deformities. Minor deformities and sharp edges can be repaired using a utility knife. Block off access until repairs are made. Contact distributor for replacement parts.

Welds  Inspect all welds for cracks. If a crack is found block access to the playground and contact your distributor for replacement parts immediately.
Finish  Inspect all metal components for coating damage. If powder coating needs to be repaired sand surface and mask off area. Coat with primer and once the primer has dried paint with color matching touch up paint. Contact distributor of color matching paint. Contact Distributor for Thermoplastic repair kit.

Surfacing - Refer to the surfacing maintenance sheet.

Slide 


Refer to "Plastic Components" section. Inspect run-out section of the slide for standing water. Adjust the slide by digging up existing footing and install it slightly lower to increase the slope of the slide.

Footings  Inspect all footings to ensure equipment is secure. You must block access to prevent access until repair is made.
Replacement Parts  Reference the parts list on page 2 of the instruction set for this component to identify the part/s correctly.  Contact your distributor to order parts.

June 12, 2020

1

902-293 6' INDEPENDENT SECTIONAL STRAIGHT (VL) SLIDE EQUIPMENT MAINTENANCE

INSPECTION FORM  MAKE COPIES OF THIS FORM TO USE FOR INSPECTION  REVIEW THE "MAINTENANCE GUIDE" IN THE APPENDIX TO BETTER UNDERSTAND THE IMPORTANCE OF
MAINTENANCE AND HOW TO DEVELOP A MAINTENANCE SCHEDULE.  DOCUMENT ALL MAINTENANCE ACTIONS ON THE LIST AS WELL AS ANY NOT LISTED.  INCLUDE DATES AND SIGNATURES

Inspection Checklist
Inspect Brackets Inspect Hardware Inspect Plastic Components Inspect Finish Inspect Slide Surface and for standing water Inspect Footing Inspect Surfacing

Recommended Frequency
Weekly Weekly Weekly Monthly Monthly Yearly Daily

Grade (Pass/Fail/NA)

Date Inspected

Date Repairs Completed

Inspector: _______________________ Signature: ___________________________________ Date: ___________________________

Maintenance Record

Part

Problem

Corrective Action

Date

June 12, 2020