Baicells Technologies BRU3501 LTE-TDD Base Station User Manual Nova 243 Outdoor LTE TDD Base Station
Baicells Technologies Co., Ltd. LTE-TDD Base Station Nova 243 Outdoor LTE TDD Base Station
User manual
Nova-243 Outdoor LTE TDD Base Station Installation Guide 03 All rights reserved © Baicells Technologies Co., Ltd. Nova-243 Outdoor LTE TDD Base Station Installation Guide About This Document This document is a guidance of Nova-243 hardware installation for installation personnel, including the preparation of installation tools and supporting materials, the demands for installation environment, installation procedure, cable connection and power on. Accomplish the installation of the device according to this guide, the installation personnel can avoid potential damage to the device during the installation procedure, which makes sure the subsequent good running of the device. This document suit for the models of BRU35xx series base station. Copyright Notice Baicells copyrights this specification. No part of this specification may be reproduced in any form or means, without the prior written consent of Baicells. Disclaimer This specification is preliminary and is subject to change at any time without notice. Baicells assumes no responsibility for any errors contained herein. For more information, please consult our technical engineers. Disposal of Electronic and Electrical Waste Pursuant to the WEEE EU Directive, electronic and electrical waste must not be disposed of with unsorted waste. Please contact your local recycling authority for disposal of this product. Exclamation Mark According to Article 10 (10) of Directive 2014/53/EU, the packaging shows that this radio equipment will be subject to some restrictions when placed on the market Nova-243 Outdoor LTE TDD Base Station Installation Guide Revision Record Date Version Description 10 Aug, 2016 01 Initial Released. 16 Jan, 2018 02 Optimize descriptions and fix some bugs. 4 Apr, 2018 03 Fix bugs. Contact Us Baicells Technologies Co., Ltd. Address: 3F, Bldg A, No.1 Kai Tuo Rd., Haidian Dist., Beijing, PR China, 100085 E-mail: support_cn@baicells.com/support_na@baicells.com Tel: 400-612-0167 Fax: +86-10-62607100 Website: http://www.baicells.com/ Nova-243 Outdoor LTE TDD Base Station Installation Guide Table of Contents 1. 2. 3. Product Overview ......................................................................................................... 1 1.1 Introduction ........................................................................................................... 1 1.2 Features ................................................................................................................. 1 1.3 Appearance ............................................................................................................ 2 1.4 Technical Specification ........................................................................................... 3 1.4.1 Hardware Specification ................................................................................... 3 1.4.2 Software Specification ..................................................................................... 4 1.4.3 Environment Specification............................................................................... 5 Installation Preparation .............................................................................................. 6 2.1 Supporting Materials ............................................................................................ 6 2.2 Installation Tools .................................................................................................. 6 2.3 Installation Environment ........................................................................................ 7 2.3.1 Locational Requirements ................................................................................. 7 2.3.2 Environmental Requirements .......................................................................... 7 2.3.3 Power Requirements ....................................................................................... 7 2.4 Personnel Requirements......................................................................................... 7 2.5 Against Lightening and Grounding Protection ......................................................... 8 2.6 Weatherproof Protection ....................................................................................... 8 Install the Base Station .............................................................................................. 9 3.1 Unpacking ............................................................................................................. 9 3.2 Installation Procedure .......................................................................................... 9 3.3 Install GPS Antenna ................................................................................................ 9 3.4 Install on Pole ....................................................................................................... 10 3.5 Install on Wall....................................................................................................... 12 3.6 Connect Cable ...................................................................................................... 13 3.6.1 Requirement for Cable Laying ....................................................................... 13 3.6.2 Connect GPS Antenna ................................................................................... 14 Nova-243 Outdoor LTE TDD Base Station Installation Guide 3.6.3 Connect RF Cable .......................................................................................... 14 3.6.4 Connect Ethernet Cable................................................................................. 14 3.6.5 Connect Power Connector ............................................................................. 14 3.6.6 Connect Ground Cable .................................................................................. 16 3.7 Install Antenna Feeder System.............................................................................. 17 3.7.1 Install Omnidirectional Antennas................................................................... 17 3.7.2 Install Directional Antennas........................................................................... 18 4. Power On ................................................................................................................... 20 Appendix A Additional Information............................................................................... 21 A.1 Antenna Information ............................................................................................ 21 A.2 Regulatory Compliance ........................................................................................ 21 Nova-243 Outdoor LTE TDD Base Station Installation Guide List of Figures Figure 1-1 Nova-243 Appearance ................................................................................ 2 Figure 1-2 Nova-243 Interfaces and Indicators............................................................ 2 Figure 3-1 Installation Procedure of Nova-243 ............................................................ 9 Figure 3-2 Install the GPS Antenna ............................................................................ 10 Figure 3-3 Pre-assembled bracket ............................................................................. 10 Figure 3-4 Location of Grounding Screws ................................................................. 16 Figure 3-5 Omnidirectional Antenna Installation (1) ................................................... 17 Figure 3-6 Omnidirectional Antenna Installation (2) ................................................... 18 Figure 3-7 Assembling Procedure of Directional Antennas ....................................... 18 Figure 3-8 Transportation the Antennas in the Height ............................................... 19 Figure 3-9 Directional Antenna Installation ................................................................ 19 Figure 4-1 LED Indicators .......................................................................................... 20 List of Tables Table 1-1 Nova-243 Interface Description .................................................................... 3 Table 1-2 Nova-243 Interface Indicators ...................................................................... 3 Table 2-1 Support Materials ......................................................................................... 6 Table 2-2 Environmental Requirements of the Base Station ....................................... 7 Table 4-1 Nova-243 Indicator Description .................................................................. 20 Nova-243 Outdoor LTE TDD Base Station Installation Guide 1. Product Overview 1.1 Introduction Baicells Nova-243 is high performance outdoor micro base station based on LTE TDD technology, which is developed by Baicells. The Nova-243 supports wired backhaul connections to backbone networks, and provides LTE access to user terminals, implemented voice and data service transmissions. The Nova-243 makes use of the current transmission resources to reduce the operator’s investment, and implement the low-cost construction of LTE networks, providing high-speed broadband access for subscribers. The Nova-243 can be widely used by telecom operators, broadband operators, enterprises, government, police security, and so on. 1.2 Features Adopt the integration design of baseband and RF. Based on 3GPP international standard LTE-TDD technology; provide high speed data service; support peak rate of DL: 110Mbit/s, UL: 14Mbit/s with 20MHz spectrum. Support flexible uplink and downlink time slot ratio: 1(2:2), 2(1:3), and high speed data transmission. Support 5MHz/10MHz/15MHz/20MHz operation bandwidth. Support copper (RJ-45) and optical port backhaul, flexible to deploy. Security services to provide timely protection against potential security risks and illegal intrusion. Support simple and convenient local and remote web management. Integration as required, easy to installation and deployment, accurate coverage and improved network capacity. Support network management functions, which includes the management, monitoring and maintenance. Nova-243 Outdoor LTE TDD Base Station Installation Guide 1.3 Appearance The Nova-243 base station appearance is shown in Figure 1-1. Figure 1-1 Nova-243 Appearance The Nova-243 interfaces and indicators are shown in Figure 1-2. Figure 1-2 Nova-243 Interfaces and Indicators Nova-243 Outdoor LTE TDD Base Station Installation Guide The Nova-243 interfaces are described in Table 1-1. Table 1-1 Nova-243 Interface Description Interface Name Description ETH0 RJ-45 electronic interface, support 10M/100M/1000M self-adaptation, external transmission network. ETH1 RJ-45 electric interface, used for debugging. SNF External Sniffer, Type N interface ANT0 External antenna 1,Type N interface ANT1 External antenna 2,Type N interface GPS External GPS antenna, Type N interface PWR Power interface: -48V DC (-36V~-60V) The Nova-243 interface indicators are described in Table 1-2. Table 1-2 Nova-243 Interface Indicators Identity Color Status Description Fast flash: 0.125s on,0.125s off RUN Green ALM Red ACT Green VSWR 1.4 Red The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault Steady On Hardware alarm, e.g. VSWR alarm OFF No alarm Steady On The cell has been activated. OFF The cell has not been activated. OFF The standing wave is normal. Steady On The standing wave is large than normal. Technical Specification 1.4.1 Hardware Specification Item Description LTE Mode LTE TDD LTE Bands BRU3501: 3650MHz~3700MHz for FCC application 3550MHz~3700MHz for IC application BRU3508: 2300MHz~2370MHz BRU3509: 2300MHz~2320MHz Nova-243 Outdoor LTE TDD Base Station Installation Guide Item Description BRU3510: BRU3511: BRU3516: BRU3524: BRU3527: BRU3528: 2496MHz~2690MHz / 2570MHz~2620MHz 3400MHz~3600MHz 2575MHz~2640MHz 2300MHz~2400MHz 3439.5MHz~3539.5MHz 2570MHz~2620MHz Channel Bandwidth* 5/10/15/20 MHz MAX Output Power 40dBm/Ant Receive Sensitivity -101 dBm @band42/48 -102 dBm @band38/40/41 Synchronization GPS, 1588 V2 Backhaul 1 RJ-45 Ethernet interface (1 GE) MIMO DL 2 x 2 Dimension 440mm (H) x 240mm (W) x 140mm (D) Installation Type Pole, wall Antenna External high gain antenna Overall Power < 160 W Power 48V DC, AC adaptor (multi-national standards) Weight About 12 kg Note: The test method of receiving sensitivity is proposed by the 3GPP TS 36.104, which is based on 5MHz bandwidth, FRC A1-3 in Annex A.1 (QPSK,R=1/3,25RB) standard. 1.4.2 Software Specification Item LTE Standard Description 3GPP Release 9 Maximum Throughput 20 MHz: SA1: DL 80 Mbps, UL 28 Mbps SA2: DL 110 Mbps, UL 14 Mbps 10MHz: SA1: DL 40 Mbps, UL 14 Mbps SA2: DL 55 Mbps, UL 7 Mbps Business Capacity 96 concurrent users Qos Control 3GPP standard QCI Modulation Mode UL: QPSK, 16QAM, 64QAM DL: QPSK, 16QAM, 64QAM Voice Solution CSFB, VoLTE, eSRVCC Traffic Offload LIPA (Local IP Access) Nova-243 Outdoor LTE TDD Base Station Installation Guide Item Description SIPTO (Selected IP Traffic Offload) SON Automatic setup ANR (Automatic Neighbor Relation) PCI confliction detection Spectrum Scanning Supported UL Interference Detection Supported RAN Sharing Supported Network Management Interface TR069 MTBF ≥ 150000 hours MTTR ≤ 1 hour Support remote/local maintenance, based on SSH protocol Support remote maintenance Support online status management Support performance statistics Support failure management Support configuration management Support local or remote software upgrading and loading Maintenance Support log Support connectivity diagnosis Support automatic start and configuration Support alarm reporting Support KPI Recording Support user information tracing Support signaling trace 1.4.3 Environment Specification Item Description Operating Temperature -40°C to 55°C Storage Temperature -45°C to 70°C Humidity 5% to 95% Atmospheric Pressure 70kPa to 106kPa Ingress Protection Rating IP66 Power interface Lightning Protection Differential mode: ±10 KA Common mode: ±20 KA Nova-243 Outdoor LTE TDD Base Station Installation Guide 2. Installation Preparation 2.1 Supporting Materials Prepare the following support materials accordingly, as given in Table 2-1. Table 2-1 Support Materials Item Description Power cable < AWG16 e.g. AWG14 Shorter than 100m Power plug The power plug connecting to the electricity supply. Antenna RF cable 50 ohm feeder Ethernet cable Outdoor CAT6 Shorter than 100m Antenna Omnidirectional, or directional antenna Ground cable 16mm²yellow-green wire 2.2 Installation Tools The following tools are needed during the installation. Level bar Marking pen Percussion drill and some drill heads hammer 5mm L-shape allen wrench Ladder Knife Cross screwdriver Vise Wrench Cable vise Tape measure Nova-243 Outdoor LTE TDD Base Station Installation Guide 2.3 Installation Environment 2.3.1 Locational Requirements Environments with high-temperatures, harmful gases, unstable voltages, volatile vibrations, loud noises, flames, explosives, and electromagnetic interference (large radar stations, transmitting stations, transformer substations) are not suitable for the operation of Nova-243, and thus should be avoided. Places prone to have impounded water, soaking, leakage, or condensation, should also be avoided. Factors like climate, hydrology, geology, earthquake, electric power, and transportation should be taken into consideration in the construction process so that a proper location can be chosen to meet the communication engineering environmental requirements, as well as the technical requirements of network planning and communication equipment. 2.3.2 Environmental Requirements Table 2-2 gives the base station’s environmental requirements on temperature, humidity, and voltage. Table 2-2 Environmental Requirements of the Base Station Item Range Typical value Temperature -40°C to 55°C 25°C Relative humidity (no condensation) 0% to 100% 5% to 95% Safety voltage 42 V to 58 V 48 V 2.3.3 Power Requirements Nova-243 TDD base station adopts -48V DC power supply. For the safety and reliability of device, we have the following suggestions. Remote DC power supply, in general, AC power supply is 100V ~ 270V, the distance of AC power supply to the device is less than 30 meters. If the static exceeds a certain range, it will lead to great damage to the circuit and the whole device. 2.4 Personnel Requirements The installation personnel must master the basic safe operation knowledge, through the Nova-243 Outdoor LTE TDD Base Station Installation Guide training, and having the corresponding qualifications. 2.5 Against Lightening and Grounding Protection CAUTION: It is unlikely to happen but since the LTE base station is very sophisticated equipment so we would recommend you to test it on the ground to make sure everything is functioning before install on the tower. The operator must prepare external against lightning protector to protect the GPS, external antenna and RJ-45 port. Grounding Notes: The ground wire adopts yellow-green wire that is no smaller than 16 mm². Grounding principle: as near as possible. The base station connects to the reliable outdoor grounding point (earth) through one ground screw. The connection of the grounding points and the ground bar need to be tight and reliable. Rustproofing the terminals is required. This can be done with rust preventing paint, anti-oxidation coatings, grease, etc. 2.6 Weatherproof Protection The Nova-243 adopts cold shrink tube for weatherproof protection. Before installing the cold shrink tube, clean up the interface first. The weatherproof protection steps are as follows: 1. Insert cable into cold shrink tube. 2. Tighten the connector. 3. Push the cold shrink tube to the top joint and pull out the strip. 4. Check whether the cold shrink tube tight connect with the connection. Nova-243 Outdoor LTE TDD Base Station Installation Guide 3. Install the Base Station 3.1 Unpacking Before opening the box, make sure the package is in good condition, undamaged and not wet. During the unpacking, avoid potential damaging impacts from hits or excessive force. Once unpacked, check whether the quantity are consistent with the packing list. 3.2 Installation Procedure The installation procedure of Nova-243 is given in Figure 3-1. Figure 3-1 Installation Procedure of Nova-243 3.3 Install GPS Antenna Installation requirements on the GPS antenna: No major blocking from buildings in the vicinity. Keep the rooftop buildings a distance away from the GPS. Make sure the space atop within 90 degrees (at least 45 degrees) is not blocked by any buildings. Avoid installing the GPS in the vicinity of any other transmitting and receiving devices. Avoid interference from other transmitting antennas to the GPS antennas. Should be installed within 45 degrees to the lightning rod. Nova-243 Outdoor LTE TDD Base Station Installation Guide The GPS cable should be as shorter as possible to reduce the influence to signal strength. The GPS has been assembled before packing, the only installation step is to fix the GPS mounting bracket on the base station using the M4 x 14 screws, as shown in Figure 3-2. Figure 3-2 Install the GPS Antenna 3.4 Install on Pole Required diameter of the pole: 30mm ~ 100mm and suggest the installation height higher than 120cm. The mount bracket has been assembled before packing, as shown in Figure 3-3. The installation personnel only need to fix the assembled base station on the pole. Figure 3-3 Pre-assembled bracket 1. Take down the two outer omegas. 10 Nova-243 Outdoor LTE TDD Base Station Installation Guide 2. Make sure the base station’s installation height, fit the thread rod of the assembled bracket to the pole, and then pass the two omegas through the threaded rods, and fasten the four flat gaskets, four spring gaskets, and four nuts. 3. Mount the base station vertically on the bracket and tighten M6 screw on the top of bracket using cross screwdriver to complete the installation. 11 Nova-243 Outdoor LTE TDD Base Station Installation Guide 3.5 Install on Wall The wall must bear four times of the base station’s weight. 1. Take apart the assembled bracket. 2. Install three mounting hooks on the base station with M6 x 16 screws. 3. Fit the base station with hooks on the wall, and mark the drilling locations. 12 Nova-243 Outdoor LTE TDD Base Station Installation Guide 4. Drill three 12mm diameter holes in the wall on the marked locations, and insert the expansion pipes. 5. Fix base station to the wall with M8 x 80 expansion bolts. 3.6 Connect Cable 3.6.1 Requirement for Cable Laying General requirements: Bending radius requirement of feeder cable: 7/8” > 250mm, 4/5” > 380mm. Bending radius requirement of jumper cable: 1/4” > 35mm,1/2” (super soft) > 50mm, 1/2” (ordinary)>127mm. Bending radius requirement of power cable and grounding cable: > tripled of the diameter of cable. Binding the cables according the type of the cable, the intertwining and crossing is forbidden. The label should be paste after the cable laying. Grounding laying requirement: The grounding cable must connect to the grounding point. The grounding cable must be separate with the signal cables, remaining a certain distance to avoid the interruption of signal. 13 Nova-243 Outdoor LTE TDD Base Station Installation Guide 3.6.2 Connect GPS Antenna 1. Insert GPS jumper into cold shrink tube. 2. Connect one end of the GPS jumper to the GPS antenna. 3. Push the cold shrink tube to the top joint and pull out the strip. 4. Connect the other end of the GPS jumper to GPS interface of the base station, which also need weatherproof protection. 3.6.3 Connect RF Cable 1. Open the dust cap of ANT0 and ANT1 interface. 2. Insert RF cables into cold shrink tube. 3. Connect one end of the two RF cables to ANT0 and ANT1 interface of the base station and tighten them with wrench. 4. Push the cold shrink tube to the top joint and pull out the strip. 5. Connect the other end of the RF cables to the external antenna, which also need weatherproof protection. 3.6.4 Connect Ethernet Cable 1. Connect the Ethernet cable to ETH0 interface in the wiring cavity. 2. Lay Ethernet cable along the wire groove, and stretch out the wiring cavity from ETH0 hole. 3.6.5 Connect Power Connector Because it is not sure that the distance between the installation site and the power supply device, the two ends of power adapter are bare terminal end. The operators need to make power cable according to the actual conditions on installation site, and assemble power plug and power terminal on two ends of power adapter. Strip 12mm insulating layer with wire stripper, which is used for connection to connector. It is recommended that the power cord length is kept below 100m (330 feet). The connection steps of power cable is as follows. 1. Assemble power plug. The power plug will be installed on the end of input direction. Refer to the identification on power plug, connect live wire, neutral wire, and ground wire to 14 Nova-243 Outdoor LTE TDD Base Station Installation Guide corresponding terminals separately, and tighten screws. 2. Assemble power terminal. The power terminal will be installed on the end of output direction. Refer to the following figure to connect live wire and neutral wire. 3. Connect the power cable to PWR interface in the wiring cavity. 4. The power cable lays along the lint slot, and stretch out the wiring cavity from PWR hole. 5. 6. The input of the power adaptor connects to the outlet. If the outlet is indoors, place the power adaptor indoors. If the outlet is outdoors, place the power adaptor in a water proof box. Connect the grounding point of AC adaptor to the grounding point on installation site. 15 Nova-243 Outdoor LTE TDD Base Station Installation Guide 7. After the cable connection is complete in the wiring cavity, tighten the screws on the cover to close the wiring cavity using M4 cross screwdriver. 3.6.6 Connect Ground Cable Make the grounding cable according the actual situation of the installation site. The Nova-243 provides two grounding screws, which is located on the bottom of the base station, as shown in Figure 3-4. Figure 3-4 Location of Grounding Screws 1. Unscrew one grounding screw, connect one end of the grounding cable to the grounding screw, and fasten it again. 2. The other end of the ground cable needs to connect to a good grounding point. The connection point can be done with rust preventing paint, anti-oxidation coatings, grease, etc. 16 Nova-243 Outdoor LTE TDD Base Station Installation Guide 3.7 Install Antenna Feeder System There are two kinds of outdoor antennas, omnidirectional outdoor antennas and directional outdoor antennas, whose installation will be introduced in the following, respectively. 3.7.1 Install Omnidirectional Antennas One should pay attention to the followings while installing the omnidirectional outdoor antenna: The diameter of the pole for omnidirectional outdoor antennas is required to be 35mm ~ 50mm. A typical case is to use the 50mm-diameter round-steel-made pole (with details depending on the specific antenna type). Make sure that the top of pole and the clamp beneath the antenna are at the same level, after installing the omnidirectional outdoor antenna on the pole. Make sure that the antenna is high enough to meet the coverage requirement, and that the antenna top falls within the 45 degrees safety angle towards the lightening rod, as shown in Figure 3-5. In principle, no lightening rod can be welded to pole (no metal object is allowed within 1m of the horizontal direction of the omnidirectional antennas), when installing the omnidirectional antennas. Instead, an independent lightening rod should be settled between the two poles, where the lightening rod must be high enough to keep all antennas under its protection cover. Figure 3-5 Omnidirectional Antenna Installation (1) In case is impossible to install an independent lightning rod due to environmental limitations, the installation method shown in Figure 3-6can be used. Be aware that the pole supporting the lightening rod should be kept at least 1m away from the omnidirectional outdoor antennas. 17 Nova-243 Outdoor LTE TDD Base Station Installation Guide Figure 3-6 Omnidirectional Antenna Installation (2) 3.7.2 Install Directional Antennas 1. First, assemble the antennas, as shown in Figure 3-7. Figure 3-7 Assembling Procedure of Directional Antennas 2. To install it on the iron tower, use a pulley to transport the antenna assembled to the platform on the iron tower, as shown in Figure 3-8. Following the safety rules when working at these heights. 18 Nova-243 Outdoor LTE TDD Base Station Installation Guide Figure 3-8 Transportation the Antennas in the Height 3. Fix the pole vertically to the ground or concrete pillars on the rooftop using expansion screws, and fasten it with steel wires. Then, mount the directional outdoor antenna onto the pole using the installation rack, as shown in Figure 3-9. Figure 3-9 Directional Antenna Installation 4. When the base station has been installed in a proper position, connect all the cables and wires. 5. Run tests, then seal and weatherproof all the connections after the testing has successfully completed. Refer to 2.6 Weatherproof Protection. 19 Nova-243 Outdoor LTE TDD Base Station Installation Guide 4. Power On Power on the Nova-243, and the indicators will light up, as shown in Figure 4-1. Figure 4-1 LED Indicators The explanation of the indicator signal is given in Table 4-1. Table 4-1 Nova-243 Indicator Description Identity Color Status Description Fast flash: 0.125s on,0.125s off RUN ALM ACT VSWR Green Red The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault Steady On Hardware alarm, e.g. VSWR alarm OFF No alarm Steady On The transmitting channel works normally OFF The transmitting channel works abnormally OFF The standing wave is normal. Steady On The standing wave is large than normal. Green Red 20 Nova-243 Outdoor LTE TDD Base Station Installation Guide Appendix A Additional Information Only apply to model BRU3510. A.1 Antenna Information Following are the list of antennas certified for use. Customers can choose according to use environment of different antenna. The antenna list is given as follows. Antenna Type Manufacturer Model Number Antenna Max Gain(dBi) External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G17-R-65EDT0 17 External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G15-R-65EDT0 15 External Planar Antenna Dual Pole Baicells Technologies Co., Ltd ANT-2G13-R-65EDT0 13 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G12-R-65EDT0 10 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G10-R-65EDT0 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G8-R-65-E DT0 External Omnidirectional Antenna Single Pole Baicells Technologies Co., Ltd ANT-2G0-R-65-E DT0 A.2 Regulatory Compliance FCC Compliance This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. 21 Nova-243 Outdoor LTE TDD Base Station Installation Guide Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Warning: This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 30cm between the radiator & your body. ISEDC Compliance This device complies with Innovation, Science, and Economic Development Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions: (1) This device may not cause in terference, and (2) This device must accept any interference, including interference t hat may cause undesired operation of the device. Le présent appareil est conforme aux CNR d' Innovation, Science et Développement économique Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée aux deux conditions suivantes: (1) l'appareil ne doit pas produire de brouillage, et (2) l'utilisateur de l'appareil doit accepter tout brouillage radioélectrique subi, 22 Nova-243 Outdoor LTE TDD Base Station Installation Guide même si le brouillage est susceptible d'en compromettre le fonctionnement. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 4.5m from all persons and must not be collocated or operating in conjunction with any other antenna or transmitter, End-Users must be provided with transmitter operation conditions for satisfying RF exposure compliance. 23
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : No Page Count : 29 Language : zh-CN Tagged PDF : Yes Title : Nova-243 Outdoor LTE TDD Base Station Author : admin Subject : V1.0 Creator : Microsoft® Word 2010 Create Date : 2018:12:11 10:23:56+08:00 Modify Date : 2018:12:11 10:23:56+08:00 Producer : Microsoft® Word 2010EXIF Metadata provided by EXIF.tools