pBS11004 Base Station Installation Guide   About This Document This  document  is  a  guidance  of  pBS11004  hardware  installation  for  installation personnel,  which  includes  the  preparation  of  installation  tools  and  supporting materials before installation, the demands of installation environment, installation of base station, connection of cable and power on. Accomplish  the  installation  of  the  device  according  to  this  guide,  the  installation personnel  can  avoid  potential  damage  to  the  device  during  the  installation procedure, which makes sure the subsequent good running of the device.    Copyright Notice Baicells copyrights this specification. No part of this specification may be reproduced in any form or means, without the prior written consent of Baicells.  Disclaimer This  specification  is  preliminary  and  is  subject  to  change  at any  time  without notice. Baicells assumes no responsibility for any errors contained herein. For more information, please consult our technical engineers.  Disposal of Electronic and Electrical Waste Pursuant to the WEEE EU Directive, electronic and electrical waste must not be  disposed  of  with  unsorted  waste.  Please  contact  your  local  recycling authority for disposal of this product.  Revision Record Date Version Description 20 July, 2017 01 Initial Released.     Contact Us Baicells Technologies Co., Ltd.North America   Address: 555 Republic Drive, Suite 200 Plano, TX 75074 E-mail: support_na@baicells.com Phone: +1-972-800-1157 Website: http://www.baicells.com/
 pBS11004 Base Station Installation Guide     Contents 1. Product Overview ......................................................................................................... 1  Introduction ............................................................................................................... 1 1.1 Features ...................................................................................................................... 1 1.2 Appearance ................................................................................................................ 2 1.3 Technical Specification ............................................................................................... 3 1.41.4.1 Hardware Specification....................................................................................... 3 1.4.2 Software Specification ........................................................................................ 4 1.4.3 Environment Specification .................................................................................. 4 2. Out-of-Box Audit ......................................................................................................... 5 3. Installation Preparation .............................................................................................. 6  Support Materials ..................................................................................................... 6 3.1 Installation Tools ...................................................................................................... 6 3.2 Installation Environment ............................................................................................ 7 3.33.3.1 Locational Requirements .................................................................................... 7 3.3.2 Environmental Requirements ............................................................................. 7  Personnel Requirements ............................................................................................ 7 3.4 Grounding Protection ................................................................................................. 7 3.5 Regulatory Compliance .............................................................................................. 8 3.64. Base Station Installation ............................................................................................. 10  Install on Pole ........................................................................................................... 10 4.1 Install on Wall ........................................................................................................... 11 4.2 Connect Cable .......................................................................................................... 11 4.34.3.1 Connect Ethernet Cable .................................................................................... 11 4.3.2 Connect Ground Cable ...................................................................................... 12 5. Power On ................................................................................................................... 13
 pBS11004 Base Station Installation Guide   1  1. Product Overview  Introduction 1.1Baicells  pBS11004  is  a  high  performance  outdoor  2496MHz-2690MHz  micro  base station based on TD-LTE technology, which is developed by Baicells. The pBS11004 supports wired backhaul connections to backbone networks, and provides LTE access to user terminals, implemented voice and data service transmissions. The pBS11004 makes use  of  the  current  transmission resources  to reduce the operator’s investment, implement the low-cost construction of LTE networks and enhance indoor coverage, thereby providing high-speed broadband access for users in assembly occupations. The  pBS11004  can  be  widely  used  by  telecom  operators,  broadband  operators, enterprises, and so on.  Features 1.2  Adopt the integration design of baseband and RF, flexible to deploy.   Based on 3GPP international standard TD-LTE technology; provide high speed data service; support a maximum transfer rate of DL: 110Mbit/s, UL: 20Mbit/s.   Support flexible uplink and downlink time slot ratio: 1(2:2), 2(1:3), and high speed data transmission.   Support 10MHz/20MHz operation bandwidth.   Support internal antenna and GPS.   Support PoE+ power supply, only one Ethernet cable realize data transmission and power supply.   Security  services to  provide  timely protection against potential  security risks  and illegal intrusion.   Support simple and convenient local and remote web management.   Integration  as  required,  easy  to  installation  and  deployment,  accurate coverage and improved network capacity.   Support  network  management  functions,  which  includes  the  management, monitoring and maintenance.
pBS11004 Base Station Installation Guide 2   Appearance 1.3The pBS11004 base station appearance is shown in Figure 1-1. Figure 1-1 pBS11004 Appearance   The pBS11004 interfaces and indicators are shown in Figure 1-2. Figure 1-2 pBS11004 Interfaces and Indicators   The pBS11004 interfaces are described in Table 1-1. Table 1-1 pBS11004 Interface Description Interface Name Description ETH/POE+ RJ-45  interface,  used  for  data  configuration  or  data backhaul, and PoE+ power supply.
pBS11004 Base Station Installation Guide 3  The pBS11004 interface indicators are described in Table 1-2. Table 1-2 pBS11004 Interface Indicators Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply ACT Green Steady On The cell is activated. OFF The cell is not activeated. RUN Green Fast flash: 0.125s on,0.125s off The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault ALM Red Steady On Hardware alarm, e.g. VSWR alarm  OFF No alarm   Technical Specification 1.41.4.1 Hardware Specification Item Description LTE Mode LTE TDD LTE Frequency 2496MHz-2690MHz Channel Bandwidth 10 MHz, 20 MHz   Output Power 24 dBm±2dB Receiving sensitivity -101 dBm   Synchronization Mode GPS synchronization Backhaul Mode RJ-45 Ethernet backhaul MIMO 2*2MIMO Dimension 248mm (L) * 248mm (W) * 80mm (H)   Installation Method Pole mounted, wall mounted Antenna Internal high gain antenna(9 dBi) Overall Power < 20 W Weight About 2.0kg  Note: The test method of receiving sensitivity is proposed by the 3GPP TS 36.104, which is based on 5MHz bandwidth, FRC A1-3 in Annex A.1 (QPSK,R=1/3,25RB) standard.
pBS11004 Base Station Installation Guide 4  1.4.2 Software Specification Item Description LTE Standard LTE TDD 3GPP Release 9 Maximum Throughput   20MHz: DL 110Mbps, UL 20Mbps   10MHz: DL 55Mbps, UL 9Mbps Business Capacity 32 concurrent users (support software upgrading the users to 96) Modulation Mode QPSK, 16QAM, 64QAM Traffic Offload Support LIPA/SIPTO, which is Local IP Access and Selected IP Traffic Offload for short SON Self-organizing network: support plug and play, automatic start, optimization and configuration RAN Sharing Support Network Management Interface Support TR069 interface protocol Northbound Interface Support Web service, Socket, FTP and other interface modes MTBF ≥ 50000 hours MTTR ≤ 1 hour Maintenance Support remote/local maintenance, based on SSH protocol Support remote maintenance Support online status management Support performance statistics Support failure management Support configuration management Support local or remote software upgrading and loading Support log Support connectivity diagnosis Support automatic start and configuration Support alarm reporting 1.4.3 Environment Specification Item Description Operating Temperature -40°C ~ 55°C Humidity 5% ~ 95%   Atmospheric Pressure 70kPa ~ 106kPa IP Protection Grade IP65
 pBS11004 Base Station Installation Guide   5  2. Out-of-Box Audit Before opening the box, make sure the package is in good condition, undamaged and not wet. During the unpacking, avoid potential damaging impacts from hits or excessive force. Once unpacked, check the contents to see if they are consistent with that in the shipping list shown in Table 2-1. Table 2-1 Shipping List No. Item Quantity Description 1 pBS11004 base station 1 Check whether the base station’s tag is consistent with the requirement 2 Base station mounting bracket 1 Fixed with base station 3 Integrated bracket for on pole or on wall   1 Used for fix on pole or on wall 4 U shape clamp 1 Used for fix on pole 5 Omega  Used for fix on pole 6 Screw package 1 M6*12 combined screw * 8 M8 hex nut * 2 7 PoE power adaptor 1 - 8 Power cable 1 The length is 1m. 9 Ground terminal 1 Used for making ground cable. 10 Warranty 1 - 11 Certification 1 - 12 User guide 1 -  Note: During the unpacking, if the outer package is damaged  or  wet, stop unpacking and find the cause. Report the issue to the vendor. For any shortage or damage that is identified, report the local vendor within 10 days.
 pBS11004 Base Station Installation Guide   6  3. Installation Preparation  Support Materials 3.1Prepare the following support materials accordingly, as given in Table 3-1. Table 3-1 Support Materials for Installing Base Station Item Description Ethernet cable Outdoor CAT6 Shorter than 100m (330 feet) Ground cable 16mm² yellow-green wire   Installation Tools 3.2The following tools are needed during the installation.              Level bar Marking pen Knife Vise Wrench            Percussion drill and some drill heads hammer Cross screw driver Cable vice Tape measure      5mm L-shape allen wrench T7 screwdriver head Ladder
pBS11004 Base Station Installation Guide 7   Installation Environment 3.33.3.1 Locational Requirements Environments  with  high-temperatures,  harmful  gases,  unstable  voltages,  volatile vibrations, loud noises, flames, explosives, and electromagnetic interference (large radar stations, transmitting stations, transformer substations) are not suitable for the operation of pBS11004, and thus should be avoided.   Places prone to have impounded water, soaking, leakage, or condensation, should also be avoided.   Factors like climate, hydrology, geology, earthquake, electric power, and transportation should be taken into consideration in the construction process so that a proper location can be chosen to meet the communication engineering environmental requirements, as well as the technical requirements of network planning and communication equipment. 3.3.2 Environmental Requirements Table  3-2  gives  the  base  station’s  environmental  requirements  with  regards  to temperature, humidity, and voltage.   Table 3-2 Environmental Requirements of the Base Station Item Range Humidity -40°C  ~ 55°C Relative humidity (no condensation) 5% ~ 95%   Personnel Requirements 3.4The installation personnel must master the basic safe operation knowledge, through the training, and having the corresponding qualifications.  Grounding Protection 3.5CAUTION: It is unlikely to happen but since the LTE eNodeB is very sophisticated equipment so we would recommend you to test it on the ground to make sure everything is functioning before install on the tower. Grounding Notes:
pBS11004 Base Station Installation Guide 8    The ground wire adopts yellow-green wire that is no smaller than 16 mm².   Grounding principle: as near as possible.   The eNodeB connects to the reliable outdoor grounding point (earth) through one ground screw.  The connection of the grounding points and the ground bar need to be tight and reliable.  Rustproofing  the  terminals  is  required.  This  can  be  done  with  rust preventing paint, anti-oxidation coatings, grease, and so on.  Regulatory Compliance 3.6FCC Compliance This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Any Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with  the  instruction  manual,  may  cause  harmful  interference  to  radio communications.  Operation  of  this  equipment  in  a  residential  area  is  likely  to cause harmful interference in which case the user will be required to correct the interference at his own expense. Warning This  equipment  complies  with  FCC  radiation  exposure  limits  set  forth  for  an uncontrolled environment. This equipment should be installed and operated with minimum distance 30 cm between the radiator & your body.  ISEDC Compliance This device complies with Innovation,  Science,  and  Economic  Development Canada licence-exempt RSS standard(s).  Operation is subject to the following two conditions: (1) This device may not
pBS11004 Base Station Installation Guide 9  cause interference, and (2) This device must accept any interference, including interference that may cause undesired operation of the device.  Le présent appareil est conforme aux CNR d' Innovation, Science et Développement économique Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée  aux deux conditions  suivantes:   (1) l'appareil ne doit pas produire de brouillage, et  (2) l'utilisateur de l'appareil doit accepter tout brouillage radioélectrique subi,  même si le brouillage est susceptible d'en compromettre le fonctionnement.  The antenna(s) used for this transmitter must be installed to provide a separation distance  of  at  least  30  cm  from  all  persons  and  must  not  be  collocated  or operating in conjunction with any other antenna or transmitter, End-Users must be  provided  with  transmitter  operation  conditions  for  satisfying  RF  exposure compliance.
 pBS11004 Base Station Installation Guide   10  4. Base Station Installation  Install on Pole 4.1Required diameter of the pole: 40mm ~ 100mm. 1.  As  the  following  figure,  assemble  the  bracket  for  pole  installation,  and  fasten screws.    2.  Mounting bracket installs is complete as shown in the following figure.    3.  Fit the base station assembled bracket to the  pole, pass  the omega through the threaded rods, and then fasten the two nuts.
pBS11004 Base Station Installation Guide 11  4.  Adjust base station to proper angle and fasten the screws.  Install on Wall 4.2The wall must bear four times of the base station weight. 1.  Fit the base station on the wall, and mark the drilling locations.  2.  Drill four 12mm diameter and 80mm depth holes in the wall by following the marked locations. 3.  Check  the  up/down  direction of  the  installation rack,  and  then  fix  the base station to the wall using M8*80 expansion screws.   4.  When install on wall, the U shape clamp is not needed. 5.  Fix the base station on the bracket and adjust to proper angle.   Connect Cable 4.34.3.1 Connect Ethernet Cable 1.  Unscrew three screws on the cover of wiring cavity using M4 cross screwdriver and
pBS11004 Base Station Installation Guide 12  open the wiring cavity. 2.  Connect the Ethernet cable to ETH interface in the wiring cavity. 3.  Lay Ethernet cable along the wire groove, and stretch out the wiring cavity from ETH hole. 4.  The other end of the Ethernet cable connects to the PoE power adaptor. 4.3.2 Connect Ground Cable Make the grounding cable according the actual situation of the installation site. The grounding screws of pBS11004 located on the bottom of the base station, as shown in Figure 4-1. Figure 4-1 Location of Grounding Screws   1.  Unscrew  the  grounding  screw,  connect  one  end  of  the  grounding  cable  to  the grounding screw, and fasten it again. 2.  The other end of the ground cable needs to connect to a good grounding point.
 pBS11004 Base Station Installation Guide   13  5. Power On Power on the pBS11004, and the indicators will light up, as shown in Figure 5-1.   Figure 5-1 LED Indicators   The explanation of the indicator signal is given in Table 5-1. Table 5-1 pBS11004 Indicator Description Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply ACT Green Steady On The cell is activated. OFF The cell is not activated. RUN Green Fast flash: 0.125s on,0.125s off The board is loading. Slow flash: 1s on,1s off The board is normal. OFF No power input or board fault ALM Red Steady On Hardware alarm, e.g. VSWR alarm  OFF No alarm