CARRIER Air Conditioner Room (42) Manual L0709366

User Manual: CARRIER CARRIER Air Conditioner Room (42) Manual CARRIER Air Conditioner Room (42) Owner's Manual, CARRIER Air Conditioner Room (42) installation guides

Open the PDF directly: View PDF PDF.
Page Count: 2

1. Things to do before starting installation
(a) Check window opening size The mounting parts
furnished with this quick mounting kit are designed to
provide a satisfactory installation for a wooden sill
double-hung window. The standard parts are for a
window opening of 28" minimum to 40" maximum
width. The sash must open to a minimum of 15-1/2".
NOTE: Removal of either of the side extensions on the
side of the unit wrapper permits installation into a
minimum opening of 24 inches width.
(b) Check condition of window All wood parts of the
window must be sound and capable of holding the
necessary screws securely. If not, make repairs
before attempting installation.
(c) Remove your storm windows Any obstruction on
the window sill must be removed. Remove storm
window for the period the air conditioner is to
be installed.
WiNOOW
SASH
15v2" MIN
OPENING
REMOVE i _
STORM WINDOW /n _--
OR _ STOOL
OBSTRUCTION
(d) Check for other obstructions Also check area both
outside the window for any other obstructions such
as shrubs, trees, or awnings; and inside, be sure
furniture, drapes, or blinds will not interfere with proper
air flow.
(e) Check your available electrical service The power
supply available must be the same as that shown on
the unit nameplate. (The nameplate is found behind
the removable front grill of the air conditioner).
Be sure you have an outlet within convenient reach.
The use of extension cords is not recommended.
All models are equipped with the appropriate 3-prong
service plug to provide proper service and safe
positive grounding. Do not alter or change
the plug. If your present wall outlet does not match
your plug, call a qualified electrician to make the
necessary corrections.
(f) Assemble necessary tools You will need the
following ...
Large flat blade screwdriver, Phillips screwdriver;
Tape measure; Adjustable wrench or pliers; Level.
(g) Unpack room air conditioner Carefully complete
the unpacking of your unit. Remove all packing
material. Precaution should be taken to protect your
floor or carpeting from damage. Two people are
normally required to move and install the unit.
TOP ANGLE
AND SEAL
BOTTOM
SIDE RETAINERS ANGLE
AND SEAL
Caution: Place the unit on the floor, a bench or table. Do
not perform this operation while the unit is in the
window.
Attach foam gaskets to top angle and side retainer (shown
above). Install the top angle, with longer vertical leg to front,
using (4) #8 - 3/8" Phillips Screws. Tighten screws securely.
Install the bottom angle, using (3) #8 - 3/8" Phillips Screws.
Install the bottom angle, with flat section nearest front. Use
(3) #8 - 3/8" Phillips Screws. Install the side retainers
using (4) #8 - 3/8" Phillips Screws. Either side retainer may
be used on left or right side interchangeably.
1. With air conditioner on the floor, a bench, or table.
2. Slide the "T" section of the window filler panel into the
panel retainer on the side of the cabinet (see Figures 1,
2 and 3). Do both sides.
PLASTIC FRAME
\
FIG. 1
WINDOW FILLED
RETAINER
BOTTOM RAIL
FIG. 2
\
AIR CONDITICJNFR
CABINET
\\
WINDOW
"Y' SECTION FILLER
PANEL
_.E_ FIG. 3
RETAINER
3. insert top and bottom legs of the window filler panel frame
into the channel in the top support angle and bottom rail.
Do both sides.
4. Insert washer head locking screws (2) into holes in the
top leg of the filler panel frame (see step number 5). Don't
tighten, so leg slides freely.
1. View the unit from the rear.
2. Remove ONE screw from the left and right sides, closet
to the rear of the unit. Save the screws for reuse.
3. Remove two screws from the bottom flange at the rear
of the unit. Save the screws for reuse.
4. Slide the Iouvered panel up behind the side flanges of
the wrapper. The panel will slide up under the top flange of
the wrapper.
5. Replace two screws in the bottom of the Iouvered panel
in to the unite.
6. Replace two screws in to the wrapper. One screw on
each side.
REAR VIEW OF UNI]
SIDE FLANGES
HHIH a!_ /
SCREWSTOB_ _MOVED _NO REUSEr) /
LOUVL D PANEL
[PLACE _-H LOUVERS FAC_N_OU)
1. Open window and make a mark on the window sill (outer sloping surface), 3 inches to the left of the centerline and 1-1/2 inches
back from the stool edge, as you face the window from the room side (see Fig. 4)
2. Assemble 1/4 - 20 x 1-3/8" screw into Clevis, then assemble Clevis into the 1st pair of holes in the support bracket using
(2) #10 x 3/8" Phillips head screws (see Fig. 5).
3. Attach support bracket to window sill by centering end of bracket at the mark (Fig. 4) and using (2) #10 - 1-3/8" screw thru the
bracket into the sill (see Figures 5 and 6). Make sure the 1-1/2 inch space is maintained between the end of the bracket and the
stool.
4. Adjust the leveling screw so end of the support bracket is 1t8" below the top surface of the window stool (see Figure 6).
#10 X 3/8"
SCREW --
FIG. 5
\
FIG. 4
\
\
CENTERLINE
_----#10 X 1-3/8"
SCREW
--SUPPORT BRACKET
-- CLEVIS
#1/4 - 20 X 1-3/8" SCREW
CLEVIS M;G SCREW
MOUNTED IN _ST PAIR OF HOLES
1/_,, _EVEL /(2 REQD) WINDOW
=-- .... 2._CC,_----_ - _ _._t
I ARK ON Sfb
LEV_ING SCREW BRACKET M_G
ADJUST LEVELING
SCREW SO THAT
EXTERiO_ fNTEF_I_R
FIG. 6
1. Carefully lift room air conditioner and slide it into the center of the open window, on the support bracket, until the bottom rail of the
unit drops into the space between stool and bracket (Figure 7).
\
SUPPORT BRACKET
AIR CONDITIONER
STOOL
_ BOTTOM RAIL
FIG. 7
2. While steadying unit, carefully bring window down behind top angle of air conditioner.
3. Center unit left to right in the window opening.
4. It may be necessary to adjust the leveling screw so the air conditioner fits properly in front of window on top, and on bracket at rear.
If so, remove air conditioner from the window and readjust the support bracket levelling screw up or down as required. Adjustment
should provide the proper downward slope so condensate water runs to rear (outside) of unit for disposal•
1. Carefully raise window to expose filler panel locking
screws and loosen screws so that filler panels slide easily•
2. Extend panels to fill window opening completely and
tighten locking screws on top.
3. Close window behind top rail.
1. Trim sash seal to fit window width and insert into space
between upper and lower sashes•
FIG. 9
#10 X 3/4"
HEX HEAD SCREW
FIG. 10
2. Attach right angle safety lock as shown.
Attach foam gasket to top angle
and side retainers as shown.
ITEM
#8 - 3/8"
_ Phillips
Head-Top
Angle
#8 - 3/8"
_ hillips
Head-Screw
Side Retainers
#8 - 3/8"
_ PhillipsHead-Screw
Bottom Angle
_ Clevis
_ % # 10- 3/4"
Hex-Head
_- Screw
309000912 (852-104)
ITEM
_ 1/4 - 20 x 1-3/8"
Leveling Screw
#10- 1-3/8"
,Bracket
_ Mounting
_ Screw
_, Safety Lock
#10 - 3/8"
_) PhillipsHead-Screw
Clevis/Support
i
QTY.
1
2
1
2
2

Navigation menu