CARRIER Air Conditioner Room (42) Manual L0709366
User Manual: CARRIER CARRIER Air Conditioner Room (42) Manual CARRIER Air Conditioner Room (42) Owner's Manual, CARRIER Air Conditioner Room (42) installation guides
Open the PDF directly: View PDF .
Page Count: 2
Download | |
Open PDF In Browser | View PDF |
FIG. 2 1. View the unit from the rear. 1. Things to do before (a) Check window furnished starting installation opening size The with this quick mounting provide a satisfactory mounting parts kit are designed to for a wooden sill installation \ TOP ANGLE AND SEAL 2. Remove ONE screw from the left and right sides, to the rear of the unit. Save the screws for reuse. 3. Remove two screws from the bottom of the unit. Save the screws for reuse. double-hung window. The standard parts are for a window opening of 28" minimum to 40" maximum 4. Slide the Iouvered the wrapper. width. The sash must open to a minimum of 15-1/2". NOTE: Removal of either of the side extensions on the side of the unit wrapper minimum opening permits installation of 24 inches before screws attempting into a width. securely. If not, make repairs installation. (c) Remove your storm the window sill must windows Any obstruction on be removed. Remove storm window for the period be installed. the air conditioner Caution: Place SASH REMOVE i n a bench or table. this operation while the unit "Y' SECTION foam gaskets to top angle and side retainer Install the bottom angle, Install the bottom angle, with flat section Phillips using (3) #8 - 3/8" Phillips Screws. (4) #8 - 3/8" Phillips Screws. Install nearest the Screws. front. Use side outside obstructions the window may your available electrical obstructions such service your (f) plug, Large Do not present alter or change wall outlet call a qualified necessary Assemble following (g) If your corrections. necessary 3. insert top and bottom Adjustable Unpack room the unpacking air conditioner of your unit. floor Precaution or carpeting normally You Phillips Tape measure; required wrench should from 4. Insert washer head to move locking a!_ / filler panel frame angle and bottom screws (2) into holes (see step number rail. in the 5). Don't SCREWS TO B_ _MOVED _NO REUSEr) / LOUVL D PANEL [PLACE _-H and make a mark edge, LOUVERS FAC_N_OU) to make will the need 4. Adjust 1. With air conditioner 2. Slide the "T" section on the floor, a bench, of the window screw head screws into Clevis, from the room then assemble surface), 3 inches to the left of the centerline and 1-1/2 inches side (see Fig. 4) Clevis into the 1st pair of holes in the support bracket using (see Fig. 5). the leveling screw so end of the support bracket is 1t8" below the top surface of the window stool (see Figure 6). or table. filler panel panel retainer on the side of the cabinet 2 and 3). Do both sides. into the (see Figures 1, CLEVIS M;G MOUNTED =-- \ are / PAIR OF HOLES (2 REQD) WINDOW 2._CC,_----_ - _ _._t ARK ON Sfb \ LEV_ING \ CENTERLINE Level. Two people .... I #10 X 3/8" SCREW -- _----#10 X 1-3/8" SCREW your _EVEL SCREW IN _ST WINDOW FILLED screwdriver; the unit. 1/_,, FIG. 4 FIG. 1 the to protect and install sill (outer sloping 3. Attach support bracket to window sill by centering end of bracket at the mark (Fig. 4) and using (2) #10 - 1-3/8" screw thru the bracket into the sill (see Figures 5 and 6). Make sure the 1-1/2 inch space is maintained between the end of the bracket and the stool. PLASTIC FRAME not match or pliers; be taken on the window as you face the window 1/4 - 20 x 1-3/8" Carefully complete Remove all packing damage. UNI] SIDE FLANGES legs of the window in the top support \ screwdriver, OF FIG. 3 into the channel Do both sides. ... flat blade material. does electrician tools VIEW The power front grill of the air conditioner). grounding. on PANEL (2) #10 x 3/8" Phillips All models are equipped with the appropriate 3-prong service plug to provide proper service and safe the plug. One screw STOOL Be sure you have an outlet within convenient reach. The use of extension cords is not recommended. positive in to the wrapper. panel _ supply available must be the same as that shown on the unit nameplate. (The nameplate is found behind the removable of the Iouvered FILLER top leg of the filler panel frame tighten, so leg slides freely. interchangeably. as shrubs, trees, or awnings; and inside, be sure furniture, drapes, or blinds will not interfere with proper air flow. (e) Check of retainers Either side retainer Also check area both for any other in the bottom screws HHIH 2. Assemble for other two (shown back from the stool Check of WINDOW is in the 1. Open window (d) 6. Replace each side. \\ Do _.E_ be used on left or right side _ _-- CONDITICJNFR CABINET RETAINER using 15v2" MIN OPENING the side flanges The panel will slide up under the top flange 5. Replace two screws in to the unite. REAR not perform window. (3) #8 - 3/8" / the unit on the floor, AIR above). Install the top angle, with longer vertical leg to front, using (4) #8 - 3/8" Phillips Screws. Tighten screws securely. WiNOOW STORM OR WINDOW OBSTRUCTION BOTTOM ANGLE SIDE RETAINERS AND SEAL Attach is to up behind at the rear the wrapper. (b) Check condition of window All wood parts of the window must be sound and capable of holding the necessary panel flange closet --SUPPORT -- BRACKET SCREW ADJUST LEVELING SCREW SO THAT EXTERiO_ BRACKET M_G fNTEF_I_R CLEVIS FIG. 6 RETAINER FIG. 5 BOTTOM RAIL #1/4 - 20 X 1-3/8" SCREW 1. Carefully lift room unit drops air conditioner into the space and slide it into the center between stool and bracket of the open window, (Figure on the support bracket, until the bottom rail of the 7). Attach foam gasket to top angle and side retainers as shown. AIR CONDITIONER STOOL \ _ SUPPORT BOTTOM RAIL BRACKET FIG. 7 2. While steadying 3. Center unit, carefully 4. It may be necessary If so, remove should bring window unit left to right in the window to adjust air conditioner provide the proper down behind top angle of air conditioner. opening. the leveling screw so the air conditioner from the window downward slope and readjust so condensate the support water fits properly bracket in front of window levelling runs to rear (outside) on top, and on bracket screw up or down as required. at rear. i Adjustment of unit for disposal• ITEM ITEM QTY. #8 - 3/8" 1. Carefully screws raise window to expose filler panel and loosen screws so that filler panels locking slide easily• 1. Trim sash between seal to fit window upper and lower width and insert into space 1 _ sashes• Phillips Head-Top Angle Leveling 1/4 - 20 xScrew 1-3/8" _ #8 - 3/8" , Head-Screw hillips Side Retainers _ SCREW FIG. 9 Phillips Head-Screw Bottom Angle _ FIG. 10 _ Clevis _ % 2. Extend panels to fill window tighten locking screws 3. Close window behind on top. opening completely and 2. Attach right angle safety Mounting Screw 2 #8 - 3/8" #10 X 3/4" HEX HEAD _ _ #101-3/8" Bracket lock as shown. _- top rail. 309000912 (852-104) # 10- 3/4" Hex-Head Screw _, Safety Lock 1 #10 - 3/8" _) Phillips Head-Screw Clevis/Support 2 2
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 2 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 3, 2, 1, 4 Create Date : Sat Oct 20 09:06:44 2007 Author : Title : Subject :EXIF Metadata provided by EXIF.tools