Centrak IT104 Clear Router IT-104 User Manual Installation
Centrak, Inc. Clear Router IT-104 Installation
Centrak >
Contents
- 1. Installation User Manual
- 2. User Manual
Installation User Manual
826 Newtown-Yardley Road Newtown, PA 18940 Phone 215.860.2928 Fax 215.359.0659 www.centrak.com
© CenTrak 2016. All Rights Reserved • CenTrak is a trademark of CenTrak, Inc. Proprietary and Confidential Information
Installing the Clear Router – IT-104
Overview
Clear Routers, CenTrak part number IT-104, create the Clear Network and are required for ever Clear
Network installation. The Clear Router will retransmit any valid CenTrak transmission, and receive direct
transmissions from the Clear Repeater Network. Installation of Clear Router must be on the same
subnet as the CenTrak Application Server, and recommended to be plugged directly into the Application
Server or on the same network Switch.
Locations for Clear Router are determined during the initial survey of a building. Locations for Clear
Routers are included on the CenTrak-supplied design documents. In most cases, Clear Routers are
installed in corridors or closets that do not contain machinery or high voltage transformers.
CAUTION!
Do not perform any wiring or connection work while the circuit is live.
The Clear Router must be installed such that the minimum distance between any portion of the antenna and nearby
persons is 20cm.
Installing the Clear Router Below the Grid
Follow this procedure to install a Clear Router below the grid.
A
B
C
D
E
F
G
826 Newtown-Yardley Road Newtown, PA 18940 Phone 215.860.2928 Fax 215.359.0659 www.centrak.com
© CenTrak 2016. All Rights Reserved • CenTrak is a trademark of CenTrak, Inc. Proprietary and Confidential Information
1. Attach a Star Ceiling mounting attachment to the drop-ceiling track at the designated location.
For information on how to attach a Star Ceiling mounting attachment, see Installing the Star
Ceiling Attachment.
2. Connect the Clear Router to the included Ethernet Cable and Transformer power supply. Do not
plug in the transformer to a power source, or the Ethernet to a PoE source until the final step.
3. Remove the cover of the Clear Router.
4. Remove the cover of the Clear Router by following Steps A through C.
5. Life the Clear Router up to the Star Ceiling Attachment and align the slots, as seen in D and E.
6. Place the cover on the Clear Router as seen in figure F, and reinstall the Screw.
7. Unfold the antennas on the Clear Router to a 90° angle, as shown in Figure G.
8. Power the Clear Router.
Installing the Star Ceiling Attachment
Follow this procedure to install the Star Ceiling Attachment on the drop-ceiling grid. CenTrak supplies
four different Star Ceiling Attachments. Use the following table to select the appropriate Star Ceiling
Attachment. The Star Ceiling Attachments are listed in order of grid width.
Part Number
Ceiling Grid Width
Panel Type
ITA-633
5/16 Inch
Recessed
ITA-361
9/16 Inch
Recessed
ITA-353
15/16 Inch
Flush
ITA-362
15/16 Inch
Recessed
1. Separate the two parts of the Star Ceiling Attachment.
2. Lift up the ceiling panel and insert one half of the plastic Star Ceiling Attachment on the ceiling
track.
3. Lift up the ceiling panel on the other side of the Grid and insert the other half of the Plastic Star
Ceiling Attachment on the ceiling track.
4. Snap the two halves on the plastic Star Ceiling Attachment together. This requires lifting the
ceiling panels up slightly to slide the halves of the Star Ceiling Attachment into place.