ChargePoint CT500 CT500 Electric Vehicle Charging Station User Manual CT500 Installation Guide

ChargePoint, Inc. CT500 Electric Vehicle Charging Station CT500 Installation Guide

Users Manual

CT500 ChargePoint® Networked Charging StationInstallationGuidePart Number: 75-001024-01  Revision: 1.0Coulomb Technologies Inc.1692 Dell Ave.Campbell, CA 95008-6901 USAUS toll free: +1-877-370-3802www.coulombtech.comwww.mychargepoint.netby Coulomb Technologies®
Safety and complianceThis document provides instructions to install the ChargePoint® Charging Station and should not be used for any other product. Before installing the ChargePoint® Charging Station, you should review this manual carefully and consult with a licensed contractor, licensed electrician and trained installation expert to ensure compliance with local building practices, climate conditions, safety standards, and state and local codes.The ChargePoint® Charging Station should be installed only by a licensed contractor and a licensed electrician and in accordance with all local and national codes and standards. The ChargePoint® Charging Station should be inspected by a qualified installer prior to the initial use. Under no circumstances will compliance with the information in this manual relieve the user of his/her responsibility to comply with all applicable codes or safety standards. This document describes the most commonly-used installation and mounting scenarios. If situations arise in which it is not possible to perform an installation following the procedures provided in this document, contact Coulomb Technologies. Coulomb Technologies is not responsible for any damages that may occur resulting from custom installations that are not described in this document. No accuracy guaranteeReasonable effort was made to ensure that the specifications and other information in this manual are accurate and complete at the time of its publication. However, the specifications and other information in this manual are subject to change at any time without prior notice.Warranty information and disclaimerYour use of, or modification to, the ChargePoint® Charging Station in a manner in which the ChargePoint® Charging Station is not intended to be used or modified will void the limited warranty. Other than any such limited warranty, the Coulomb products are provided “AS IS,” and Coulomb and its distributors expressly disclaim all implied warranties, including any warranty of design, merchantability, fitness for a particular purposes and non-infringement, to the maximum extent permitted by law.Limitation of liabilityIN NO EVENT SHALL COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS BE LIABLE FOR ANY INDIRECT, INCIDENTAL, SPECIAL, PUNITIVE, OR CONSEQUENTIAL DAMAGES, INCLUDING WITHOUT LIMITATION, LOST PROFITS, LOST DATA, LOSS OF USE, COST OF COVER, OR LOSS OR DAMAGE TO THE CHARGEPOINT® CHARGING STATION, ARISING OUT OF OR RELATING TO THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF COULOMB TECHNOLOGIES, INC. OR ITS AUTHORIZED DISTRIBUTORS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.Copyright and Trademarks©2010 Coulomb Technologies, Inc. All rights reserved. This material is protected by the copyright laws of the United States and other countries. It may not be modified, reproduced or distributed without the prior, express written consent of Coulomb Technologies, Inc. CHARGEPOINT is a U.S. registered trademark and service mark of Coulomb Technologies, Inc. All other products or services mentioned are the trademarks, service marks, registered trademarks or registered service marks of their respective owners. Coulomb Technologies has filed several patent applications.
IMPORTANT SAFETY INSTRUCTIONSThis Installation Guide contains important instructions that must be followed during installation of the CT500.Warnings:• The CT500 must be connected to a grounded, metal, permanent wiring system; or an equipment grounding conductor must be run with the circuit conductors and connected to the CT500’s grounding terminal or lead.• The CT500 must be installed by a qualified electrician and in accordance with all local electrical codes and ordinances.• Read all instructions before installing the CT500.• Adult supervision is required when using the CT500 near children.• Do not operate a CT500 with a visibly damaged cable. Contact Coulomb Technologies immediately.• Do not operate a CT500 if the enclosure or the EV connector is broken, cracked, open, or shows any other signs of damage. Contact Coulomb Technologies immediately.• Do not put fingers into the EV connector• Do not install the CT500 near flammable, explosive, or combustible materials.• Do not operate the CT500 in temperatures outside its operating range of  -22°F to 122°F (-30°C to +50°C). • The CT500 contains no user-serviceable parts. Do not attempt to repair or service the CT500 yourself. If the CT500 requires servicing, contact Coulomb Technologies.• Ensure that the CT500’s charging cable is positioned so it will not be stepped on, tripped over, or subjected to damage or stress.SAVE THESE INSTRUCTIONSCleaning the CT500Do not use cleaning solvents to clean any of the CT500’s components. The outside of the CT500, the charging cable, and the connector end of the charging cable should be regularly wiped with a clean dry cloth to remove any accumulation of dust and dirt.FCC Declaration of ConformityThis device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Radio and Television InterferenceThe equipment described in this manual has been designed to protect against Radio Frequency Interference (RFI). However, there are some instances where high powered radio signals or nearby RF-producing equipment (such as digital phones, RF communications equipment, etc.) could affect operations.If interference to your CT500 is suspected, relocate or turn off nearby electrical appliances during charging, before contacting Coulomb Technologies for assistance.Important!Changes or modifications to this product not authorized by Coulomb Technologies could void the FCC compliance.At the end of its service life, this product should be recycled according to local laws and regulations. Contact Coulomb Technologies for recycling information.
iContents1IntroductionBefore installing the CT500 ...................................................................................................................................... 1-1Specifications............................................................................................................................................................. 1-2Wiring information  .................................................................................................................................................... 1-32 Installation InstructionsOverview of steps....................................................................................................................................................... 2-1Step 1 - Check box for correct contents ................................................................................................................... 2-2Step 2 - Attach holster............................................................................................................................................... 2-3Step 3 - Remove front panel ..................................................................................................................................... 2-4Step 4 - Mount to wall................................................................................................................................................ 2-5Step 5 - Install conduit............................................................................................................................................... 2-7Step 6 - Connect wires to wiring terminals............................................................................................................... 2-8Step 7 - Replace front panel ..................................................................................................................................... 2-9Step 8 - Attach antennas.........................................................................................................................................2-10
1-1Introduction1This document provides step-by-step instructions on how to install any CT500 ChargePoint® Charging Station. Before installing the CT500• Ensure that the appropriate wiring, circuit protection, and metering is in place at the installation location. For details, refer to the specifications (page 1-2) and wiring diagrams (page 1-3).• Ensure that the type of modem in the CT500 station that you are installing is compatible with the type of modem coverage available at the installation site (CDMA or GPRS).• Disconnect power.• Determine the appropriate mounting location for the CT500. The CT500 is designed to be secured to a masonry wall or a hollow wall with wood studs 16” apart. If this is not the case, prepare an appropriate mounting surface. • Familiarize yourself with the installation procedure by thoroughly reviewing Chapter 2 “Installation Instructions.”
ChargePoint® Charging Stations1-2SpecificationsElectrical inputInput Power: 7.2 kWInput Voltage: 208/240 VACInput Current: 30 AInput Power Connections: Line 1, Line 2, EarthRequired Service Panel Breaker: Dual 40 A double pole breaker (non-GFCI type) on dedicated circuitStandby Power: 5 W typicalElectrical outputOutput Charging Power: 7.2 kWOutput Voltage: 208/240 VACOutput Current: 30 AOutput Charging Connector: SAE J1772TM EV connector on 18’ (5m) cableFunctional interfacesCard Reader: ISO 15693, 14443Ground Fault Detection: 20 mA CCID with auto retry (15 minute delay, 3 tries)Plug-Out Detection: Power terminated per SAE J1772TM specificationPower Measurement: 2% at 15 minute intervalsLocal Area Network: 2.4 GHz 802.15.4 dynamic mesh networkWide Area Network: Commercial CDMA or GPRS cellular data networkSafety and operational ratingsSafety Compliance: UL Listed for USA and cUL certified for Canada; Complies with UL 2594, UL 2231-1, UL 2231-2, UL 1998, UL 991, NEC Article 625Surge Protection: 6 kV @ 3000 A. In geographic areas subject to frequent thunder storms, supplemental surge protection is recommended.EMC Compliance: FCC Part 15 Class BOperating Temperature: -22°F to 122°F (-30°C to +50°C)Operating Humidity: Up to 95% non-condensingEnclosure: NEMA 3RTerminal Block Temperature Rating: 212°F (100°C)Maximum Charging Stations per 802.15.4 Radio Group: 100. Each station must be within 150 feet “line of sight” of at least one other station.
Introduction1-3Wiring information L3L2NEUL1GND MAIN BREAKERNEU BUSGND BUS40 AGNDL1L2240 VMETERNEU L2 L1 GND  MAIN BREAKER NEU BUS GND BUS 40 A GND L1 L2 240 V METER 208 V, 3Ø240 V, 1Ø LOCALSERVICEPANELLOCAL SERVICE PANEL 40A, 2 POLE BREAKER MAY BE CONNECTED TO ANY TWO PHASES.L1 NEU L2 L1NEU L2 L3CT500 TERMINAL BLOCK CT500TERMINALBLOCK
2-1Installation Instructions2After the appropriate wiring is in place at the installation site (see “Wiring information” on page 1-3), you are ready to install the CT500. You will need:• CT500 ChargePoint® Charging Station components (see page 2-2)• ¾” (19 mm) conduit• #2 Phillips screwdriver•3/8” socket wrench• ¼” (6 mm) x 2” (50 mm) hex flange lag bolts (4)Overview of stepsInstalling the CT500 ChargePoint® Charging Station involves a few simple steps:1. Check box for correct contents (see page 2-2)2. Attach holster (see page 2-3)3. Remove front panel (see page 2-4)4. Mount to wall (see page 2-5)5. Install conduit (see page 2-7) 6. Connect wires to wiring terminals (see page 2-8)7. Replace front panel (see page 2-9)8. Attach antennas (see page 2-10)These steps are detailed in the remainder of this chapter.
ChargePoint® Charging Stations2-2Step 1 - Check box for correct contentsThe CT500 ChargePoint® Charging Station ships in a box containing:• Main assembly•Holster• Holster bolts (3)• Antenna(s)*• Mounting template• Installation Guide*The CT500 ships with either one or two antennas, depending on the specific model that was ordered.ININININXINDIA#4ENCLOSUREENVELOPE#47ALL-OUNTING(OLE0ATTERN4/0CT500 ChargePoint® Networked Charging StationInstallationGuidePart Number: 75-00XXXX  Revision: 1.0Coulomb Technologies Inc.1692 Dell Ave.Campbell, CA 95008-6901 USAUS toll free: +1-877-370-3802www.coulombtech.comwww.mychargepoint.netby Coulomb Technologies®
Installation Instructions2-3Step 2 - Attach holsterUsing a #2 Phillips screwdriver, attach the holster to the main assembly using the three supplied Holster bolts.
ChargePoint® Charging Stations2-4Step 3 - Remove front panelUsing a #2 Phillips screwdriver, loosen the 2 captive screws located on each side of the front panel. Pull the front panel downward to remove.
Installation Instructions2-5Step 4 - Mount to wallDrill four 3/16” holes in the wall, as illustrated. Use the supplied template to ensure correct alignment.IMPORTANT: The top of the CT500 must be mounted no higher than a maximum height of 48” above the surface to comply with the Americans with Disabilities Act (ADA).MasonrySheetrockBare studs
ChargePoint® Charging Stations2-6Step 4 - Cont’dAlign the CT500 to the mounting surface, and fasten to the wall using a 3/8” socket wrench to fasten the four ¼” x 2” lag bolts, fasten it to the wall.
Installation Instructions2-7Step 5 - Install conduitChoose the appropriate conduit opening and, if necessary, remove its cover.NOTE: The CT500 has four conduit openings, three of which are covered. If you remove a cover, use it to cover the remaining unused conduit opening.After running the wiring through ¾” (19 mm) conduit, insert the conduit into the selected opening.The CT500 has four conduit openings—two openings from the back and two from the bottom1234
ChargePoint® Charging Stations2-8Step 6 - Connect wires to wiring terminalsPull the 240V L1 and L2 wires, and the Ground wire, into body assembly and connect to wiring terminals. Strip wires ¼” (6 mm), insert in terminal block, and tighten screws to 18 ½ inch-lbs (2.1 Nm).IMPORTANT:• Requires dedicated 40A breaker.• Use copper conductors only.• Do NOT provide GFCI protection at panel. The CT500 has built-in GFCI protection.• In areas with frequent thunder storms, add surge protection at the service panel for all circuits.Before proceeding with the next step, test the unit by restoring power. When the circuit is live, you should see a sequence of power-up message on the CT500’s display. If this is not the case, turn off power and check the wiring connections.
Installation Instructions2-9Step 7 - Replace front panelAlign the front panel with the main assembly and push upwards into place until the edges meet.Using a #2 Phillips screwdriver, tighten the two captive screws located on each side of the front panel.Insert the connector into the holster.
ChargePoint® Charging Stations2-10Step 8 - Attach antennasAttach the antennas to the top of the main assembly as shown. Turn the antenna clockwise to hand-tighten.NOTE: The CT500 ships with either one or two antennas, depending on the specific model that was ordered.Follow these rules when installing the antenna(s):• Always install the antenna WITH the yellow band on the right side.• Always install the antenna WITHOUT the yellow band on the left side.You have now finished installing the CT500 ChargePoint® Charging Station.Always install the antenna with the yellow band on the right sideright sideleft side
Coulomb Technologies Inc.1692 Dell Ave.Campbell, CA 95008-6901 USAUS toll free: +1-877-370-3802www.coulombtech.comwww.mychargepoint.net

Navigation menu