Craftsman Axs 706 59669 Users Manual

706596680 706596680 CRAFTSMAN 6-DRAWER CHEST - Manuals and Guides L0709286 View the owners manual for your CRAFTSMAN 6-DRAWER CHEST #706596680. Home:Tool Parts:Craftsman Parts:Craftsman 6-DRAWER CHEST Manual

CRAFTSMAN Tool Chest Manual L0709286 CRAFTSMAN Tool Chest Owner's Manual, CRAFTSMAN Tool Chest installation guides

2015-01-05

: Craftsman Craftsman-Axs-706-59669-Users-Manual-161221 craftsman-axs-706-59669-users-manual-161221 craftsman pdf

Open the PDF directly: View PDF PDF.
Page Count: 18

DownloadCraftsman Craftsman-Axs-706-59669-Users-Manual-  Craftsman-axs-706-59669-users-manual
Open PDF In BrowserView PDF
706.596680

6-Drawer

Chest

706.596690

7-Drawer

Roll-A-Way

Craftsman

7-Drawer

AXS

TM

Roll-Away

Section
1612
1613
1614
1615
1616
1617
1618
1623
1624
1625

Owners
Manual

Craftsman

6-Drawer AXS

TM

Description
Chest Top and Facia
Drawer and Work Surface
Bottom Replacement
Top, Wiring Harness, Harness Grommet
Chest Top without Task Light
Task Light Replacement
Locking System
Lock Replacement
Striker Replacement
Drawer Front Replacement

Chest

CHEST

TOP INSTALLATION

AND REMOVAL

(With task light)

i CRAFTSMAN°i

Tools Required:
3/8" Wrench
Chest

CHEST TOP AND FACIA

Top

• Disconnect

PARTS REPLACEMENT

Removal

Chest

power from

unit.

• Remove enough drawers to reach the
top back inside of the unit. (See

actuator

• Push

holding

top in

• Disconnect
• Remove

Chest

wiring

harness

to top.

actuator

rod toward

rod

back of unit

and line up with lock. Insert the
actuator rod into the back of the lock.

place.
• Lift top off of unit enough
wiring harness.

harness

rod is inserted into the actuator
holder in the back of the unit.

rod for access.
(4) screws

Installation
wiring

• Position top on unit.
• Attach using (4) screws.
• Make sure the back of the actuator

Drawer installation
and removal.)
• Push actuator rod to back of unit to
disconnect
from back of lock. Move
• Remove

Top

• Connect

to reach the

• Test lock operation.
• Reinstall drawers.

from unit.

• Reconnect

power to the unit.

top from unit.

Top with light

S

Press to
release

Facia
Disconnect
actuator

Information

Sears,

Roebuck

and Co., Hoffman

Estates,

IL 60179,

Center

USA

F1612

2

rod

INFORMATION
CENTER INSTALLATION
AND REMOVAL

FAClA INSTALLATION
Tools Required:
3/8" Wrench
drill
5/32" drill bit
Rivet gun
Pliers

Tools Required:
Screwdriver, Crosstip
Tape
Removal

Installation

• Disconnect
• Remove

power from
enough

the unit.

drawers

retaining screw under
center. (See removing

• Plug in information
• Position information

to reach the

the information
and installing

• Pull the information
to remove.

center

straight

Note: Tape wire to unit before
unplugging
the information
center.

• Unplug

in unit.

not overtighten.

• Loosen (do not remove) the retaining
screw under the information
center.

will prevent
the unit.

center.
center

• Tighten retaining screw enough to
hold information
center in place. Do

drawers.)

the wire from
the information

retracting

• Reinstall

drawers.

(See Removing

and installing drawers.)
• Reconnect
power to unit.
• Set information
center as desired.

out

(See

AND REMOVAL

information

center

operation.)

This

Rivet

To remove

facia

• Remove

enough

drawers

to reach the

top back inside of the chest.
• Remove lock. (See lock installation

Connector

and removal.)
• Remove chest top. See chest
installation
and removal.
• Carefully drill out (2) rivets
facia to chest.
• Remove

top

holding

facia.
Front

into

To reinstall
• Position

center.

facia

connector

Tape wire in
place before
disconnectin(

Press to
release

facia
on unit. Make sure

is on top of chest.

• Attach using (2) rivets supplied.
• Reinstall lock, chest top, and drawers.

LOCK

INSTALLATION

AND

LOCK INSTALLATION
AND
REMOVAL
To remove lock
• Remove enough drawers to reach the
lock retaining clip behind the lock.
• Remove lock retaining clip. Pull lock
out to remove.
To reinstall
• Position

Lock
Actuator
rod
holder

lock
lock in unit. Install

retaining

'Lock

clip to hold lock in place.
• Make sure the back of the actuator
rod is inserted into the actuator rod
Loosen

holder

retaining screw

• Push

retaining
clip

in the back of the unit.
actuator

rod toward

back of unit

and line up with lock. insert the
actuator rod into the back of the lock.
• Test lock operation.
• Reinstall drawers.

3

REMOVAL

4

CONNECTING

POWER

To reinstall,

• Ensure that the unit and power
are clean and dry.

carefully

push the drawer
drawer stops.

cord

align the slides

and

into the unit until the

Temperature

• insert the round end of the power cord
connector
into the jack in the back of
the unit.

MAX (Maximum
temperature
Jack

INFORMATION
CENTER
OPERATION
The information center is equipped with a
battery backup to maintain memory only.
The display will not function while power
is disconnected from the unit.

Cord

AND

INSTALLING

Outside
optional

DRAWERS:
• Empty the drawer.
• Fully extend the drawer.

Display

temperature
display
outside temperature

Setting

the current

and hour begins

for at least
resets to zero

to flash.)

• Press _
to set am/pm or 24 hour
mode as desired. Note: The am/pm
indicator is not shown in 24 hour

Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride

temperatures.
• An audible beep will sound when

• Pressing @
• Repeat to adjust

Setting

function

shows

for at least two

O0:O0:O0 and hour

begins to flash.
• Adjust hour using @

is reset.

and @.

toggles to next field.
minute and second.

• Toggling past second exits set mode.
Note: To set timer to 24 hours, toggle

the alarm

display

• Press and hold _
two seconds. (Second

for at least
resets to zero

toggles
minute.

past minute

to 00:00:0O.

• Press _

to start count down.

• Each time _
or stops timer.
• Alarm sounds when

is pressed
timer

hour using (_

reaches

• Press

any button

to silence

the alarm.

exits set mode.

Turning
alarm on or off
When the alarm is activated,
will show the indicator _,.
• Press _
the alarm.

to activate

• Press _
ringing.

to silence

When
the display

in Timer

or Count

mode, press _
time. Press _
count down timer.

or deactivate
alarm

down

timer

to display current
to return to timer or

when

and (_.

• Pressing _
toggles to next field.
Note: To toggle to minute without
changing hour, press _) then (_ then

over the stops.) Pull out
to remove.

Time

•
Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

• Adjust

minute

using (_

and (_.

Month,

Day, and Year.

\

jTimer

\\
Start/Stop
Clock

Clock Set
Alarm
to

Alarm Set-_

\

\

\

(+)

Temp Inside

Date

(-)

5

Alarm
Activated

AM/PM

D

oF_eoCP_

• Press _
to toggle to next field.
• Repeat to adjust Month, Day, and
Year.
• Toggling past year exits set mode.
• Day of week is displayed according

starts

0O:00:OO.

to next field.

mode.
• Adjust

starts

Clock

time

• Press and hold _
two seconds. (Second

timer

• Display

• Toggling

_
turns the display
on for 15 seconds.

down

• Press and hold _
seconds.

since last reset)

• Pressing _
• Repeat to adjust

backlight

• Pressing
backlight

Release

Count

recorded

• Press and hold _
for at least two
seconds to clear inside and outside
minimum and maximum recorded

temperature

mode.

to start timer.
is pressed

• Press and hold _
for at least
two seconds to reset timer to zero.

and hour begins to flash.)
• Adjust hour using (_ and (_).

requires
sensor.

to enter timer

• Press _
• Each time _
or stops timer.

MIN (Minimum
recorded
temperature
since last reset)

Fuse block

function

• Press _

• Pressing _
toggles inside and
outside temperature
displays between
ACT (Actual temperature)

• Plug the cord into an appropriate
electrical outlet.

REMOVING

Timer

Display

Pressing _
toggles inside and
outside temperature
displays between
Celsius and Fahrenheit.

6

\
Light
Temp outside
(Accessory required)

SLIDE REPLACEMENT
Tools Required:
Drill
5/32" Drill bit
Rivet gun

I CRAFTSMAN°I
DRAWER

AND WORK SURFACE

Removal
• Remove

PARTS REPLACEMENT

Installation
drawer

unit. (See
installation

drawer

or work surface

from

• Separate
slide drawer member from
unit member. (See drawer and work

and work surface

and removal.)

surface

• Carefully drill out rivet holding slide
drawer member to drawer or work
surface.
• Rotate

• Rivet
front of slide drawer

down and out.
• Pull slide forward
• Carefully

member

• install

unit member in place.
• Pull slide unit member

and removal.)

unit member
drawer

in place

member.

(Install

as shown.

(Install

back

hanger first.)
• install rivet to hold slide drawer

to remove.

drill out rivet holding

installation

• install new slide unit member.
back hanger first.)

slide

forward

member
• Reinstall

to

in place.
drawer or work

unit. (See drawer

remove.

installation

surface

into

and work surface

and removal.)

Back hanger
Work

Surface

place

Hanger
pointed up

%,

Drawer

Left side
Slide

Slide

Drawer
Rivet

Sears,

Roebuck

and Co., Hoffman

Estates,

IL 60179,

USA

F1613

2

DRAWER

AND WORK

SURFACE

REPLACEMENT

DRAWER

Tools Required:
Drill
5/32" Drill bit

Tools Required:
Crosstip screwdriver

Rivet

Removal

gun

Crosstip

screwdriver

• Remove
Installation

• Remove

drawer

unit. (See

Drawer

or work surface
and Work

front of slide down

• Pull slide forward
Drawers
• Remove

• Install

surface

installation
and removal.)
• Carefully drill out rivets holding
to drawer.
• Rotate

from

surface.

slides

drawer

(install
rivets
only

• Install

striker.

back

or work

hangers

to hold slides

AND REMOVAL

front assembly

indicated to unhook
• Pull out to remove.

• Position

screw(s).
mounting

as

drawer

front on drawer

assembly.

tabs.

• insert mounting
drawer.
• Slide drawer

first.)

in place.

tabs into notches

front over to attach.

• install retaining screw(s)
drawer front in place.

to hold

(See striker

replacement.)

to remove.
(See striker

• Install drawer front. (See drawer
replacement.)
Drawers and work surface

front.

• Install drawer or work surface
See drawer and work surface

replacement.)
• Remove

on new drawer

• Install
Drawers

and out.

only
striker.

slides

INSTALLATION

Installation
retaining

• Slide drawer
Removal

FRONT

(See drawer

installation

front replacement.)

front
Mounting
tab

in unit.

Notch

and removal.
Retaining
screws

Right side
Siide
Bottom

Hanger
pointed up

Striker

\

drawer only

Drawers (4)inches
deep or more only

Drawer

Left side
Slide

front
o

dJ

,

Rivet
Drawer

3

4

on

DRAWER AND WORK SURFACE
INSTALLATION AND REMOVAL
Note: For pull out work surface without
task light, follow drawer removal
instructions.

• Unplug

work

surface

cord from back of

roll-away.
• Remove and save back retaining clip.
• Disconnect
chain inside back of rollaway. (Move

chain

toward

large round

part of slot. Pull out to remove.)
• Remove the work surface. (See

DRAWER
• Empty the drawer.
• Fully extend the drawer.

drawer

removal

instructions.)
Retaining
clip

Release

Chain
Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride
over the stops.) Pull out
to remove.
Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

Installation

• To reinstall, carefully
and push the drawer
the drawer

align the slides
into the unit until

• To reinstall, carefully align the slides
and push the work surface into the unit
until the work surface stops.
• Depress release tabs in back corners
of the extendable
work surface.

stops.

• Push the work surface

into the unit to

the fully retracted position.
• Extend work surface far enough

to

gain access to connections
in back.
• Connect chain inside back of roll
away. (Insert
PULL

OUT WORK

SURFACE

WITH

• Insert retaining
place.

TASK LIGHT
Removal
• Disconnect

chain

the power from the unit.

• Remove enough drawers to gain
access to connections
in the back of
the roll-away
surface.(Follow
instructions.)

behind

the work

drawer

removal

into the large

round part of the slot. Slide chain
small end of slot.)
clip to hold chain

• Plug work surface
roll-away.
• Reconnect

to
in

cord into back of

power to the unit. (See:

Connecting
power.)
• Check work surface
for proper operation.
• Reinstall drawers.

and task lighting

I CRAFTSMAN°I
BOTTOM

REPLACEMENT

Tools Required:
Socket Wrench
5/16" Socket
Removal

Installation

• Disconnect
power from the unit.
• Remove contents from drawers.

• Install counterweight
bottom.

• Carefully

lay the chest

Take care to prevent
damage to the unit.
• Remove
unit.
• Remove

(5) screws

• Remove
bottom.

counterweight

• Position

on its back.
scratches

holding

or

bottom

new chest

• Attach using
screws.
on

• Return

in new plastic
bottom

on chest.

(5) new mounting

the chest

to its upright

position.
bottom

from

unit.
from

• Reconnect

power to the unit,

plastic

Counterweight

F1614

WIRING HARNESS REPLACEMENT
HARNESS GROMMET REPLACEMENT

I CRAFTSMAN°I
TOP, WIRING

HARNESS,

HARNESS

Tools Required:
3/8" Wrench

GROMMET

Parts Replacement

WIRING HARNESS
AND HARNESS
GROMMET
REMOVAL

WIRING HARNESS
AND HARNESS
GROMMET
INSTALLATION

• Disconnect

• Insert

• Remove

power from
pull out work

unit.
surface

and

enough drawers to reach the top back
inside of the unit. (See drawer and
work surface installation
and

bottom
• Install

• Remove lock and top from roll-away.
(See roll-away top removal and

away.
WIRING

• Reinstall
grommet

HARNESS

roll-away,
disconnect
Roll-away

top

• Remove

remove
accent
wiring

in roll-away

from roll-

lighting

harness

through

and

• Reconnect

hole

top.

grommet

Insert assembly
into track in unit.

Sears,

Roebuck

harness

and Co., Hoffman

Estates,

IL 60179,

USA

F1615

lighting,

reconnect

power to the unit.

Grommet

Wiring

over

into hole in top of

top and lock

Harness

Harness

hole in top

• Test lock operation.
• Reinstall drawers.

under

bottom drawer
lighting.

grommet

Insert

• If unit has accent
accent lighting.

REMOVAL

• For units with accent

assembly

of roll-away.
harness

connector.
roll-away.

installation.)
harness

harness

track through

of roll-away (connector
should be on
top.) Slide wiring harness assembly to

removal.)

• Remove

new wiring

into mounting

2

TOP INSTALLATION

DRAWER AND WORK SURFACE
INSTALLATION
AND REMOVAL

AND REMOVAL

Roll-away
top removal
• Disconnect
power from

Roll-away
• Connect

unit.

• Remove pull out work surface. (See
drawer and work surface installation
drawers

Position
screws.

• Remove

(4) screws

holding

wiring

• Push

top in

• Remove

top from

from

chain

toward

large round

removal

instructions.)

the drawer.
Retaining

Release

in the

the back of

Chain

• Test lock operation.
• Reinstall drawers.

to reach the

harness

drawer

the drawer.

• Fully extend

the lock rod toward

• Reinstall

wiring

(4)

• Empty

cord from back of

unit the and line up with lock. Insert
the lock rod into the back of the lock.

harness.

• Disconnect

using

inserted into the lock rod holder
back of the unit.

clip. Pull lock

place.
• Lift top off of unit enough

top on unit. Attach

away. (Move

DRAWER

to top.

surface

part of slot. Pull out to remove.)
• Remove the work surface. (See

• Position lock in unit. Install retaining
clip to hold lock in place.
• Make sure the back of the lock rod is

to reach the

top back inside of the unit. (See
Drawer and Work surface installation
and removal.)
• Remove lock retaining
out to remove.

top installation
wiring harness

work

roll-away.
• Remove and save back retaining clip.
• Disconnect
chain inside back of roll-

Note: For pull out work surface without
task light, follow drawer removal
instructions.

Tools Required:
Screwdriver, Crosstip

and removal.)
• Remove enough

• Unplug

unit.

• Reconnect

Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride

work surface.
power to the unit.

unit.

over the stops.) Pull out
to remove.
Tab Style - Depress the
release tabs on both
Lock
Press

to

release

sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

Installation

• To reinstall, carefully
and push the drawer
the drawer

• To reinstall, carefully align the slides
and push the work surface into the unit

align the slides
into the unit until

until the work surface stops.
• Depress release tabs in back corners
of the extendable
work surface.

stops.

• Push the work surface

into the unit to

the fully retracted position.
• Extend work surface far enough

to

gain access to connections
in back.
• Connect chain inside back of roll

retaining
clip

away. (insert

chain

into the large

round part of the slot. Slide chain
small end of slot.)
Lock rod
holder

• insert retaining
place.

Remove

Lock rod

screws

PULL OUT WORK
TASK LIGHT

SURFACE

WITH

• Plug work surface
roll-away.

Removal

• Reconnect

• Disconnect
the power from the unit.
• Remove enough drawers to gain
access to connections
in the back of
the roll-away

3

behind

clip to hold chain

for proper operation.
• Reinstall drawers.

4

in

cord into back of

power to the unit. (See:

Connecting
power.)
• Check work surface

the work surface.

to

and task lighting

DRAWERINSTALLATION
REMOVAL

I CRAFTSMAN°I

• Empty

AND

the drawer.

• Fully extend

the drawer.
Release

CHEST TOP WITHOUT

TASK LIGHT

Tools Required:
Screwdriver, Crosstip
Chest

top

removal

Chest

• Disconnect
power from unit.
• Remove pull out work surface.
drawer
• Remove

installation
enough

(See

and removal.)
drawers

to reach the

• Remove
place.

(4) screws

• Remove

top from

using

• Position

lock in unit. Install

retaining

inserted

(4)

Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride

into the lock rod holder

in the

over the stops.) Pull out
to remove.

back of the unit.

clip. Pull lock

• Push

holding

installation
top on unit. Attach

clip to hold lock in place.
• Make sure the back of the lock rod is

top back inside of the unit. (See
Drawer installation
and removal.)
• Remove lock retaining
out to remove.

top

• Position
screws.

top in

the lock rod toward

the back of

unit the and line up with lock. Insert
the lock rod into the back of the lock.

unit.

• Test lock operation.
• Reinstall drawers.
• Reconnect

Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

power to the unit.

• To reinstall, carefully
and push the drawer
the drawer

align the slides
into the unit until

stops.

Lock

Lock
retaining
clip

Lock
holder

Sears,

Roebuck

and Co., Hoffman

Remove

Lock rod

Estates,

IL 60179,

screws

USA

F1616

2

I CRAFTSMAN°I
TASK LIGHT REPLACEMENT
Tools Required:
Screwdriver, Crosstip
Removal

Installation

• Disconnect
power from the unit.
• Fully extend task light assembly.

• Plug in new light.
• Position new light in unit in same

• Make

note of light orientation.

• Remove
remove
• Unplug

(6) mounting
light.
light.

screws

orientation
to

• Fasten

as original

light.

new light in place

with (6) new

mounting screws.
• Reconnect
power to unit.

Press to

Mounting screws

F1617

ACTUATOR
ACTUATOR

I CRAFTSMAN°I

ROD AND ACTUATOR

ROD AND ACTUATOR

CHANNEL

ACTUATOR

REMOVAL

• Disconnect
power from the unit.
• Remove work surface (Roll-away

SYSTEM

pull out work

• Install slot in actuator channel over pin
on lock bar. Move actuator channel

surface

(Roll-

• Insert

away only.) See drawer and work
surface installation
and removal.)
• Remove

enough

drawers

and removal.)
• Push actuator

ACTUATOR

to reach the

disconnect

ACTUATOR

• Insert

CHANNEL

right to remove
flanges.
Channel

Actuator

channel

channel

on inside top of

ROD INSTALLATION

back of actuator

rod into

actuator rod holder in top back of unit.
• Push actuator rod toward back of unit

from back of lock.

• Move actuator

on actuator

flanges

• Insert actuator rod into hole in
actuator channel as shown.

rod to back of unit to

• Rotate actuator rod straight
• Pull out to remove.

top flanges

into mounting
unit.

top back inside of the unit, (See
drawer and work surface installation

Actuator

CHANNEL

fully to the right.

• Remove

Parts Replacement

REPLACEMENT

INSTALLATION.

only).

LOCKING

CHANNEL

down.

and line up with lock. Insert
rod into back of lock.

REMOVAL

actuator

• Test lock operation.
• Reinstall drawers.

fully to the

from mounting

• Reconnect

power to the unit.

Rod Bracket

Remove
through

lock bar
top of unit

Actuator

rod to

actuator

channel
Flexible
front

Move actuator
channel

fully to

right to remove

Actuator

rod

Lockbar

Sears,

Roebuck

and Co., Hoffman

Estates,

IL 60179,

USA

F1618

2

tab

ACTUATOR
ROD
INSTALLATION

BRACKET
AND

LOCK

REMOVAL

Removal

INSTALLATION

power from

• For roll-aways,

unit.

remove

• Disconnect

work

surface.

AND REMOVAL

ROLL-AWAYS, CHESTS WITHOUT TASK LIGHT

enough

drawers

remove

work

surface.

(See drawer and work surface
installation
and removal.

to reach the

top back inside of the unit. (See
Drawer and Work surface installation
and removal.)
• Remove top from

power from the unit.

• For roll-aways,

(See drawer and work surface
installation
and removal.

• Remove

all drawers.

• Remove

actuator

channel.
actuator

unit. (See top

• Remove

rod and actuator

for your unit.
hole in top of

rod bracket
The flexible

Removal

snaps into place. Note:
tab should be in front.

• Reinstall top in unit.
• insert back of actuator

• Slide lock bar down
guide.
• Reinstall
• Reinstall

rod into

actuator rod holder in top back of unit.
• Push actuator rod toward back of unit
and line up with lock. Insert
rod into back of lock.

actuator

actuator

through

lock bar

drawers

to reach the

top on unit. Attach

using

holding

top in

• Position

lock in unit. install

retaining

harness

into the actuator

• Reconnect

lock.
• Test lock operation.
• Reinstall drawers.

from unit.

• Reinstall

top from unit.

and

• Reconnect

work surface.
power to the unit.

rod.

power to the unit.
Lock

to the unit.

Press

to

release

retaining
clip
• JL;

Actuator rod
holder

3

rod

of unit the and line up with lock. Insert
the actuator rod into the back of the

• For roll-aways,
lift top off of unit
enough to access the wiring harness.
wiring

(4)

holder in the back of the unit.
• Push the actuator rod toward the back

clip. Pull lock

place.

• Remove

• Position
screws.

rod is inserted

(4) screws

the wiring

clip to hold lock in place.
• Make sure the back of the actuator

and removal.)

Disconnect
top on unit.
actuator channel

• For roll-aways,
connect
harness to unit.

• Test lock operation.
• Reinstall drawers.

• Test lock operation.
• Reinstall drawers.
power

enough

• Remove
hole in top of

unit.

top back inside of the unit. (See
Drawer and Work surface installation
• Remove lock retaining
out to remove.

Installation
lock bar through

power from

• For roll-aways,
remove work surface.
(See drawer and work surface
installation
and removal.
• Remove

top from unit.

• Lift lock bar out through
unit.

• Insert
unit.

Installation

• Disconnect

(See actuator rod and
channel installation
and

• See top removal

• insert actuator rod bracket into hole in
back corner of unit. Ensure actuator

Tools Required:
Screwdriver, Crosstip
Removal

removal.)

installation
and removal for your unit.)
• Pull actuator
rod bracket forward. Lift
out to remove.

• Reconnect

TOP INSTALLATION

AND

Removal

• Disconnect

• Remove

BAR

REMOVAL

Remove
Actuator

rod

4

screws

CHEST

TOP INSTALLATION

DRAWER AND WORK SURFACE
INSTALLATION
AND REMOVAL

AND REMOVAL

(With task light)

Top

• Disconnect

Removal

Chest

power from

unit.

• Connect

• Remove enough drawers to reach the
top back inside of the unit. (See

actuator

• Push

holding

top in

• Disconnect
• Remove

wiring
top from

harness

to reach the
from

to top.

actuator

rod toward

cord from back of

chain

toward

large round

part of slot. Pull out to remove.)
• Remove the work surface. (See
drawer

the drawer.

• Fully extend

removal

instructions.)

the drawer.
Retaining

Release

rod

back of unit

and line up with lock. Insert the
actuator rod into the back of the lock.

place.
• Lift top off of unit enough
wiring harness.

harness

rod is inserted into the actuator
holder in the back of the unit.

rod for access.
(4) screws

wiring

• Empty

surface

away. (Move

DRAWER

Installation

• Position top on unit.
• Attach using (4) screws.
• Make sure the back of the actuator

Drawer installation
and removal.)
• Push actuator rod to back of unit to
disconnect
from back of lock. Move
• Remove

Top

work

roll-away.
• Remove and save back retaining clip.
• Disconnect
chain inside back of roll-

Note: For pull out work surface without
task light, follow drawer removal
instructions.

Tools Required:
3/8" Wrench
Chest

• Unplug

• Test lock operation.
• Reinstall drawers.

unit.

• Reconnect

Chain
Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride

power to the unit.

unit.

over the stops.) Pull out
to remove.

Top

Tab Style - Depress the
release tabs on both
Press to
release

sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

Installation

• To reinstall, carefully
and push the drawer
the drawer

• To reinstall, carefully align the slides
and push the work surface into the unit

align the slides
into the unit until

until the work surface stops.
• Depress release tabs in back corners
of the extendable
work surface.

stops.

• Push the work surface
Disconnect
actuator

into the unit to

the fully retracted position.
• Extend work surface far enough

rod

to

gain access to connections
in back.
• Connect chain inside back of roll
away. (Insert

chain

into the large

round part of the slot. Slide chain
small end of slot.)

Actuator

PULL OUT WORK
TASK LIGHT

rod

holder

Remove
screws

• Insert retaining
place.

WITH

• Reconnect

• Disconnect
the power from the unit.
• Remove enough drawers to gain
access to connections
in the back of
behind

clip to hold chain

• Plug work surface
roll-away.

Removal

the roll-away

5

SURFACE

for proper operation.
• Reinstall drawers.

6

in

cord into back of

power to the unit. (See:

Connecting
power.)
• Check work surface

the work surface.

to

and task lighting

DRAWER AND WORK SURFACE
INSTALLATION
AND REMOVAL

• Unplug

Note: For pull out work surface without
task light, follow drawer removal
instructions.

I CRAFTSMAN°I
LOCK REPLACEMENT
• Disconnect

power from

• For roll-aways,

unit.

remove

work

surface.

(See drawer and work surface
installation
and removal
• Remove

enough

lock retaining

drawers

clip behind

• Remove lock retaining
out to remove.

to reach the
the lock.

clip. Pull lock

Installation
• Position

lock in unit. Install

retaining

clip to hold lock in place.
• Make sure the back of the actuator
rod is inserted

into the actuator

rod

holder in the back of the unit.
• Push actuator rod toward back of unit
and line up with lock. Insert the
actuator rod into the back of the lock.
• Test lock operation.
• Reinstall drawers.
Lock
Actuator
rod
holder

drawer

the drawer.

chain

toward

large round

removal

instructions.)

the drawer.

Rekeying MASTERLOCK ® ONEKEY TM lock
The MASTERLOCK ® ONE_KEyTM
learning lock system allows the
chest and cabinet to be keyed alike.
The lock can also be keyed to most
house keys.
• Insert current key and turn lock to
the right until access notch
appears at top of lock.
• Depress and hold catch through
access notch using re-keying tool
provided.
• Remove key.
• Insert new key.
• Release catch
• Turn lock to center position.
• Remove key
Note: Catch must be depressed to
insert or remove key in right hand
position. Catch may be released
between keys.

cord from back of

part of slot. Pull out to remove.)
• Remove the work surface. (See

• Fully extend
Removal

surface

away. (Move

DRAWER
• Empty

work

roll-away.
• Remove and save back retaining clip.
• Disconnect
chain inside back of roll-

Retaining

Release

Chain
Lever Style - Lift or
lower (depending on the
slide) the release lever
on both sides, (this
allows the slides to ride
over the stops.) Pull out
to remove.
Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the
stops.) Pull out to
remove.

Installation

• To reinstall, carefully
and push the drawer
the drawer

• To reinstall, carefully align the slides
and push the work surface into the unit

align the slides
into the unit until

until the work surface stops.
• Depress release tabs in back corners
of the extendable
work surface.

stops.

• Push the work surface

Access

into the unit to

the fully retracted position.
• Extend work surface far enough

to

gain access to connections
in back.
• Connect chain inside back of roll
Lock

away. (Insert

retaining
clip

round part of the slot. Slide chain
small end of slot.)

keying
PULL OUT WORK
TASK LIGHT

SURFACE

• Insert retaining
place.

WITH

• Reconnect

• Disconnect
the power from the unit.
• Remove enough drawers to gain
access to connections
in the back of

Sears,

Roebuck

and Co., Hoffman

Estates,

IL 60179,

USA

F1623

behind

for proper operation.
• Reinstall drawers.

2

to
in

cord into back of

power to the unit. (See:

Connecting
power.)
• Check work surface

the work surface.

into the large

clip to hold chain

• Plug work surface
roll-away.

Removal

the roll-away

chain

and task lighting

I CRRFT.TMRN°J
STRIKER

REPLACEMENT

Tools Required:
Screwdriver
Removal
• Remove

drawer

• Turn drawer
• Depress
remove.

from

upside

(2) detents.

Drawer installation
• Emptythe
drawer.

unit.
down.
Push

•
striker

Fully extend

and removal

the drawer.

in to

Release

Depress
detents

Lever Style - Lift or
lower (depending on the
slide) th_ rel_a.£e laver
on both sides, (this
allows the slides to ride
over the stops.) Pull out
to remove.
Tab Style - Depress the
release tabs on both
sides, (this allows the
slides to ride over the

Installation
• Turn drawer right side up.
• Position striker in drawer.
• Push
•

striker toward

until striker snaps
Reinstall drawer.

back of drawer
into place.

stops.) Pull out to
remove.
• To reinstall, carefully
and push the drawer
the drawer

Sears, Roebuck and Co., Hoffman Estates, IL 60179, USA

align the slides
into the unit until

stops.

F1624

I CRAFTSMAN°I
DRAWER

FRONT REPLACEMENT

Tools Required:
Crosstip screwdriver
Removal

Installation

• Remove retaining screw(s).
• Slide drawer front assembly
indicated to unhook
• Pull out to remove.

mounting

• Position
as

drawer

front on drawer

assembly.

tabs.

• Insert mounting tabs into notches
drawer.
• Slide drawer front over to attach.
• Install
drawer

retaining

screw(s)

on

to hold

front in place.

Mounting
tab
Notch

Retaining
screws

Bottom
drawer only

Drawers (4)inches
deep or more only

Sears,

Roebuck

and Co., Hoffman

Estates,

IL 60179,

USA

F1625



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.2
Linearized                      : No
Page Count                      : 18
Page Layout                     : SinglePage
Page Mode                       : UseNone
Producer                        : Goby Monitor Application version 3, 2, 1, 4
Create Date                     : Sat Oct 20 12:03:25 2007
Author                          : 
Title                           : 
Subject                         : 
EXIF Metadata provided by EXIF.tools

Navigation menu