18 02 1220Park 4B Preliminary%20Bid%20Set%20 Preliminary Bid Set

User Manual: 02-1220Park-4B Preliminary%20Bid%20Set%20 of /wp-content/uploads/fileuploads

Open the PDF directly: View PDF PDF.
Page Count: 30

Download18 02-1220Park-4B Preliminary%20Bid%20Set%20 Preliminary Bid Set
Open PDF In BrowserView PDF
ARTACHO / OH RESIDENCE

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER

LOT NO:

33

LAND USE:

RESIDENTIAL, MULTI-FAMILY ELEVATOR BUILDING

OCCUPANCY GROUP:

R2

ZONING USE GROUP:

R10, R8B

4.
5.

ZONING MAP:

6B

6.

NO. OF STORIES:

17

NO. OF UNITS:

56

NO. OF RESIDENTIAL UNITS:

56

3.

7.

SCOPE OF WORK
INTERIOR RENOVATION OF AN APARTMENT. RENOVATION WORK WILL INCLUDE A NEW INTERIOR
LAYOUT, FINISHES, RELOCATED PLUMBING FIXTURES, NEW ELECTRICAL AND A/C. NO CHANGE TO USE,
EGRESS OR OCCUPANCY.

ABBREVIATIONS
A/C
ACOUST
ADA
ADDL
ADJ
AE
AFF
ALT
ALUM
ANSI
APPROX
ARCH
ASHRAE

AIR CONDITIONING
ACOUSTICAL
AMERICANS WITH DISABILITIES ACT
ADDITIONAL
ADJACENT
APPROVED EQUAL
ABOVE FINISH FLOOR
ALTERNATE
ALUMINUM
AMERICAN NATIONAL STANDARDS INSTITUTE
APPROXIMATE
ARCHITECT
THE AMERICAN SOCIETY OF HEATING
REFRIGERATING AND AIR-CONDITIONING
ENGINEERS
ASTM
AMERICAN SOCIETY FOR TESTING AND
MATERIALS
BD
BOARD
BLDG
BUILDING
BLKG
BLOCKING
BM
BEAM
B.O.
BY OTHERS
B.O.C.
BOTTOM OF CURB
BOCA
BUILDING OFFICIALS AND CODE
ADMINISTRATORS INTERNATIONAL INC.
B.O.S.
BOTTOM OF SLAB
BOT
BOTTOM
BTWN
BETWEEN
CAB
CABINET
CCTV
CLOSED-CIRCUIT TELEVISION
CLG
CEILING
CLG. HT. CEILING HEIGHT
CLOS / CL CLOSET
CLR
CLEAR(ANCE)
CLS
CLOSURE
COL
COLUMN
CONC
CONCRETE (CAST IN PLACE)
CONST.JT. CONSTRUCTION JOINT
CONT
CONTINUOUS OR CONTINUE
COORD
COORDINATE
CORR
CORRIDOR
COV
COVER
CPT
CARPET
CT
CERAMIC TILE
CTR
CENTER
D
DEEP/DEPTH
DB
DECIBEL(S)
DBL
DOUBLE
DDC
DIRECT DIGITAL CONTROL
DEG / o
DEGREE
DEMO
DEMOLITION
DET
DETAIL
DIA / DIAM DIAMETER
DIF
DIFFUSER
DIM
DIMENSION
DN
DOWN
DR
DOOR
DWG
DRAWING
DWR
DRAWER
EA
EACH
EL
ELEVATION
ELEC
ELECTRIC(AL)
ELEV
ELEVATOR
EMER
EMERGENCY
EQ
EQUAL
EQUIP
EQUIPMENT
EXIST
EXISTING
EXP
EXPOSED
EXP. JT. EXPANSION JOINT
EXG
EXISTING
EXT
EXTERIOR
FAI
FRESH AIR INTAKE
FD
FLOOR DRAINS
FIN
FINISH(ED)
FLR
FLOOR(ING)
FLUOR
FLUORESCENT
F.O.
FACE OF
FT / '
FOOT
FTG
FOOTING
GA
GAUGE
GALV
GALVANIZED
GL
GLASS GLAZING
GSF
GROSS SQUARE FEET
GWB
GYPSUM WALL BOARD
GYP
GYPSUM
H
HEIGHT
HC
HANDICAPPED
HM
HOLLOW METAL
HORIZ
HORIZONTAL
HP
HIGH POINT
HR
HOUR
HVAC
HEATING/VENTILATING/AIR CONDITIONING
IN / "
INCH
INCL
INCLUDE (D) (ING)
INSUL
INSULATE (D) (TION)

8.

9.
10.

INT
INV
JAN
JT
LAM
LIN
LP
LT
LT. WT
LVL
MACH
MATL
MAX
MECH
MED
MEP
MFR
MIN
MISC
MO
MTL
MULL
N/A
N.F.P.A.
N.I.C.
NO./ #
NOM
NTS
O.C.
O.D.
OH
OPP
OSHA
P.LAM
P.E.
PERF
PL
P.L.
PLAS
PLMB
PNL
PSF
PSI
PT
PNT
PTD
PLYWD
QT
RAD
RD
REF
REINF
REQ
REV
RFI
RFP
RM
S.E.
SHR
ST. STL.
SF
SIM
SPEC
SQ
STC
STD
STL
STOR
STRUCT
SUSP
TD
T.O.W.
T&G
TECH
TEL
TEMP
TERR
THK
TO
T.O.C.
TV
TYP
TZ
UL
U.O.I.
U.O.N.
UV
VERT
VEST
VFY
V.I.F.
W/ , W/O
WD
WT

INTERIOR
INVERT
JANITOR
JOINT(D)
LAMINATE
LINEAR
LOW POINT
LIGHT
LIGHTWEIGHT
LEVEL
MACHINE
MATERIAL(S)
MAXIMUM
MECHANIC(AL)
MEDIUM
MECHANICAL, ELECTRICAL AND
PLUMBING
MANUFACTURE(R)
MINIMUM/ MINUTE
MISCELLANEOUS
MASONRY OPENING
METAL
MULLION
NOT APPLICABLE
NATIONAL FIRE PROTECTION
AGENCY
NOT IN CONTRACT
NUMBER
NOMINAL
NOT TO SCALE
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
OPPOSITE
OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
PLASTIC LAMINATE
PASSENGER ELEVATOR
PERFORATE(D)
PLATE
PROPERTY LINE
PLASTER
PLUMBING
PANEL
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
POINT
PAINT
PAINT(ED)
PLYWOOD
QUARRY TILE
RADIUS
ROOF DRAIN
REFERENCE
REINFORCE(D)
REQUIREMENTS
REVISION(S)
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM
SERVICE ELEVATOR
SHOWER
STAINLESS STEEL
SQUARE FEET
SIMILAR
SPECIFICATION(S)
SQUARE
SOUND TRANSMISSION
COEFFICIENT
STANDARD
STEEL
STORAGE
STRUCTURE/STRUCTURAL
SUSPENDED
TRENCH DRAIN
TOP OF WALL
TONGUE AND GROOVE
TECHNICAL
TELEPHONE
TEMPERED
TERRACE
THICK(NESS)
TOP OF
TOP OF CURB
TELEVISION
TYPICAL
TERRAZZO
UNDERWRITERS LABORATORY
UNLESS OTHERWISE INDICATED
UNLESS OTHERWISE NOTED
ULTRAVIOLET
VERTICAL
VESTIBULE
VERIFY
VERIFY IN FIELD
WITH , WITHOUT
WOOD
WEIGHT

11.

12.
13.

14.

15.
16.
17.
18.

19.
20.

21.

SHOP DRAWINGS
- MILLWORK
- DOORS
- WINDOWS
- SPECIALTIES
- STONE
2.

3.

TENANT PROTECTION PLAN 2014 NYC BUILDING
CODE AS PER 28-104.8.4
1.
2.
3.
4.
4.1.
4.2.
4.3.

5.
5.1.

5.2.

6.
6.1.
6.2.
6.3.
6.4.
6.5.

6.6.
6.7.

SPECIAL INSPECTIONS
7.
1.

THE FOLLOWING ITEMS OF WORK SHALL BE SUBJECT TO SPECIAL/PROGRESS CONTROLLED
INSPECTION, MADE AND WITNESSED BY OR UNDER THE DIRECT SUPERVISION OF AN
ARCHITECT OR ENGINEER RETAINED BY THE OWNER AND ACCEPTABLE TO THE ARCHITECT OF
RECORD. TEST REPORTS AND CERTIFICATES OF INSPECTION SHALL BE FILED WITH THE
DEPARTMENT OF BUILDINGS:
1.1.
FIRE RESISTANT PENETRATIONS AND JOINTS
BC 1704.27
1.2.
MECHANICAL SYSTEMS
BC 1704.16
1.3.
POST INSTALLED ANCHORS
BC 1704.32
1.4.
ENERGY CODE COMPLIANCE INSPECTIONS
TR8/BC 110.3.5
1.4.1
FENESTRATION U-FACTOR AND PRODUCT RATING
1.4.2
FENESTRATION AIR LEAKAGE
1.4.3
AIR SEALING AND INSULATION - VISUAL
1.4.4
LIGHTING IN DWELLING UNITS
1.4.5
INTERIOR LIGHTING POWER
1.5.
FINAL INSPECTION
DIRECTIVE 14

8.
9.
10.

1

DETECTORS (2014 BC)
1.

DETAIL CALLOUT
BUBBLE

A400
MATCH LINE
8'-0"
A.F.F.

DATUM LINE

8'-0"

ELEVATION MARKER

REVISION CLOUD

1

N
PROJECT NORTH
ARROW

ROOM NAME
101
1

1
A200

EXTERIOR ELEVATION
SYMBOL

1
4

A400

2

INTERIOR ELEVATION
SYMBOL

3
1

1

DETAIL SYMBOL

3.
ROOM TAG

KEYNOTE TAG
PARTITION TAG
4.

100

WINDOW TAG

101

DOOR TAG
5.

M-1
BUILDING SECTION
SYMBOL

A300

P1

S1
PT1

MILLWORK TAG

6.

FIXTURE TAG

7.

FINISH TAG

8.

A600
SIM

THE BUILDING CONTAINS 56 DWELLING UNITS THAT MAY BE OCCUPIED DURING CONSTRUCTION.
THE CONSTRUCTION IS CONFINED TO APT 4B.
THERE WILL BE NO OCCUPANCY OF THE PROPOSED CONSTRUCTION AREA TO BE RENOVATED
DURING THE COURSE OF CONSTRUCTION WORK.
EGRESS:
AT ALL TIMES IN THE COURSE OF CONSTRUCTION THE EGRESS FROM THE VARYING
FLOORS OF THE BUILDING WILL BE MAINTAINED.
REQUIRED EGRESS SHALL NOT BE OBSTRUCTED AT ANY TIME. EGRESS AT EXISTING
CORRIDORS, FIRE STAIRS, ETC. WILL BE MAINTAINED AT ALL TIMES.
ALL EXISTING MEANS OF EGRESS MAY NOT BE USED TO STORE MATERIALS, EQUIPMENT
AND DEBRIS. TRANSPORTATION OF ALL MATERIALS, EQUIPMENT AND DEBRIS MUST BE
COORDINATED WITH THE BUILDING SUPERINTENDENT.
FIRE SAFETY:
ALL PRECAUTIONS TO BE OBSERVED TO MAINTAIN EXISTING FIRE SAFETY FOR ALL
OCCUPIED DWELLING UNITS AS WELL AS ADDITIONAL SAFETY MEASURES NECESSITATED
BY THE CONSTRUCTION SHALL BE STRICTLY OBSERVED.
ALL BUILDING MATERIALS STORED AT CONSTRUCTION AREA AND/OR IN ANY AREA OF THE
BUILDING ARE TO BE SECURED IN A LOCKED AREA. ACCESS TO SUCH AREAS IS TO BE
CONTROLLED BY THE BUILDING OWNER AND/OR CONTRACTOR.
HEALTH REQUIREMENTS:
THE GENERAL CONTRACTOR WILL ENSURE THAT DUST IS CONTROLLED, KEPT TO A
MINIMUM AND REMOVED AT THE COMPLETION OF EACH WORK DAY.
DISPOSAL OF CONSTRUCTION DEBRIS MUST BE DONE IN THE SAME MANNER.
THE DISPOSAL OF DEBRIS WILL BE PERFORMED IN SUCH A MANNER AS TO NOT INTERFERE
WITH OCCUPIED DWELLINGS.
DEBRIS, DIRT AND DUST WILL BE KEPT TO A MINIMUM AND CONFINED TO THE IMMEDIATE
CONSTRUCTION AREA.
CONSTRUCTION NOISE WILL BE CEASED AFTER NORMAL WORKING HOURS. NOISE WILL BE
LIMITED TO ACCEPTABLE LEVELS IN ACCORDANCE WITH THE NEW YORK CITY NOISE
CONTROL CODE.
SANITARY FACILITIES ARE TO BE MADE AVAILABLE FOR CONSTRUCTION WORKERS AS
REQUIRED BY OSHA.
PRECAUTIONS SHALL BE TAKEN TO PROVIDE FOR PEST CONTROL WHERE NECESSARY AS
REQUIRED BY THE DEPT OF HEALTH AND METAL HYGIENE RULES AND REGULATIONS.
CONTRACTOR MUST COMPLY WITH ALL APPLICABLE LAWS RELATING TO LEAD AND ASBESTOS.
IF OBSERVED IMMEDIATELY CONTACT OWNER OR ARCHITECT.
ELECTRIC, GAS AND OTHER UTILITIES ARE NOT TO BE INTERRUPTED.
BUILDING SECURITY IS TO BE MAINTAINED AT ALL TIMES TO PREVENT UNAUTHORIZED PERSONS
FROM ENTERING THE BUILDING.
CONSTRUCTION OPERATIONS WILL BE CONFINED TO THE HOURS NOTED IN THE BUILDING'S
ALTERATION AGREEMENT, UNLESS AN AFTER HOURS VARIANCE PERMIT IS OBTAINED FROM
THE BUILDINGS DEPARTMENT.

SMOKE & CARBON MONOXIDE ALARMS /

2.

DRAWING SYMBOLS
BREAK LINE

THE ARCHITECT SHALL REVIEW SHOP DRAWINGS AS TO THEIR GENERAL CONFORMANCE
WITH THE DESIGN INTENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS,
QUANTITIES, TECHNIQUES OF CONSTRUCTION AND COORDINATION WITH OTHER TRADES.
MOCK-UPS SHALL BE REPRESENTATIVE SAMPLES OF THE SPECIFIED MATERIALS,
PREPARATIONS AND APPLICATION METHODS. AN APPROVED MOCK-UP CONSTITUTES THE
STANDARD FOR WORKMANSHIP. MOCK-UPS ARE TO BE LOCATED WHERE DIRECTED, IF TO BE
INCORPORATED INTO THE FINAL INSTALLATION.

9.

LISTED SINGLE AND MULTIPLE STATION SMOKE ALARMS COMPLYING WITH UL 217 SHALL BE
INSTALLED IN ACCORDANCE WITH BC 907.2.11.1 THROUGH 907.2.11.4 AND NFPA 72.
SINGLE OR MULTIPLE STATION SMOKE ALARMS AND CARBON MONOXIDE ALARMS OR
DETECTORS SHALL BE INSTALLED AND MAINTAINED, REGARDLESS OF OCCUPANT LOAD AT ALL
OF THE FOLLOWING LOCATIONS WITHIN ALL DWELLING UNITS:
2.1. ON THE CEILING OR WALL OUTSIDE OF EACH ROOM USED FOR SLEEPING PURPOSES
WITHIN 15' FROM THE DOOR TO SUCH ROOM.
2.2. IN EACH ROOM USED FOR SLEEPING PURPOSES.
2.3. IN EACH STORY WITHIN A DWELLING UNIT, INCLUDING BELOW-GRADE STORIES AND
PENTHOUSES OF ANY AREA, BUT NOT INCLUDING CRAWL SPACES AND UNINHABITABLE
ATTICS. IN DWELLINGS OR DWELLING UNITS WITH SPLIT LEVELS AND WITHOUT AN
INTERVENING DOOR BETWEEN THE ADJACENT LEVELS, A SMOKE ALARM INSTALLED ON THE
UPPER LEVEL SHALL SUFFICE FOR THE ADJACENT LOWER LEVEL PROVIDED THAT THE
LOWER LEVEL IS LESS THAN ONE FULL STORY BELOW THE UPPER LEVEL.
POWER SOURCE PER BC 907.2.11.2
3.1. REQUIRED SMOKE ALARMS SHALL RECEIVE THEIR PRIMARY POWER FROM A DEDICATED
BRANCH CIRCUIT OR THE UNSWITCHED PORTION OF A BRANCH CIRCUIT ALSO USED FOR
POWER AND LIGHTING, AND SHALL BE EQUIPPED WITH BATTERY BACKUP.
3.2. SMOKE ALARMS SHALL EMIT A SIGNAL WHEN THE BATTERIES ARE LOW.
3.3. WIRING SHALL BE PERMANENT AND WITHOUT A DISCONNECTING SWITCH OTHER THAN AS
REQUIRED FOR OVER-CURRENT PROTECTION.
INTERCONNECTION PER BC 907.2.11.3: WHERE MORE THAN ONE SMOKE ALARM OR DETECTOR
IS REQUIRED TO BE INSTALLED WITHIN AN INDIVIDUAL DWELLING UNIT, THE SMOKE ALARMS OR
DETECTORS SHALL BE INTERCONNECTED IN SUCH A MANNER THAT THE ACTIVATION OF ONE
ALARM OR DETECTOR WILL ACTIVATE ALL OF THE ALARMS OR DETECTORS IN THE INDIVIDUAL
UNIT.
SMOKE ALARMS OR DETECTORS SHALL BE CLEARLY AUDIBLE IN ALL BEDROOMS OVER
BACKGROUND NOISE LEVELS WITH ALL INTERVENING DOORS CLOSED.
SMOKE ALARMS SHALL BE PROVIDED WITH THE CAPABILITY TO SUPPORT VISIBLE ALARM
NOTIFICATION APPLIANCES IN ACCORDANCE WITH ICC/ANSI A117.1 BC 907.2.11.4.
CARBON MONOXIDE ALARMS AND DETECTORS SHALL BE PROVIDED AND INSTALLED IN
ACCORDANCE WITH BC 908.7.1 THROUGH 908.7.4.
CARBON MONOXIDE ALARMS OR DETECTORS SHALL COMPLY WITH THE POWER SOURCE,
INTERCONNECTION, AND ACCEPTANCE TESTING REQUIREMENTS AS REQUIRED FOR SMOKE
ALARMS IN ACCORDANCE WITH BC 907.2.11.2 THROUGH 907.2.11.3. BC 908.7.1.1.2.
CARBON MONOXIDE ALARMS AND DETECTORS SHALL BE LISTED IN ACCORDANCE WITH UL 2034
AND 2075. BC 908.7.4.

SHEET #

TITLE

SCALE
CODE CONSULTANT

GENERAL
G-000.00

COVER

NONE

X

G-001.00

ENERGY ANALYSIS, BUILDING NOTES

NONE

X

G-002.00

ANSI ACCESSIBILITY DIAGRAMS

NONE

X

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

ARCHITECTURAL
DM-100.00

DEMOLITION PLAN

1/4" = 1'-0"

X

A-100.00

CONSTRUCTION PLAN

1/4" = 1'-0"

X

A-110.00

FINISH FLOOR PLAN

1/4" = 1'-0"

X

A-120.00

REFLECTED CEILING PLAN

1/4" = 1'-0"

X

A-130.00

POWER, TELEPHONE, & DATA PLAN

1/4" = 1'-0"

A-400.00

INTERIOR ELEVATIONS 1

1/4" = 1'-0"

X

A-401.00

INTERIOR ELEVATIONS 2

1/4" = 1'-0"

X

A-402.00

INTERIOR ELEVATIONS 3

1/4" = 1'-0"

X

A-403.00

ENLARGED PLANS AND ELEVATIONS 1

1/2" = 1'-0"

X

A-404.00

ENLARGED PLANS AND ELEVATIONS 2

1/2" = 1'-0"

X

A-405.00

ENLARGED PLANS AND ELEVATIONS 3

1/2" = 1'-0"

X

A-600.00

DETAILS

AS NOTED

X

A-700.00

FINISH AND MILLWORK SCHEDULES

AS NOTED

X

A-701.00

FIXTURES, APPLIANCES AND LIGHTING SCHEDULES

AS NOTED

X

A-702.00

WINDOW AND DOOR SCHEDULES

AS NOTED

X

M-100.00

MECHANICAL PLAN

AS NOTED

X

M-200.00

MECHANICAL DETAILS

AS NOTED

X

PLUMBING AND ELECTRICAL ENGINEER
GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

AV

1507

RK

BLOCK NO:

E9

PA

NONE

SAMPLES
- MILLWORK FINISHES
- METAL FINISHES
- METAL FABRICATIONS
- TILE & STONE
- COUNTERTOPS
- GLASS & MIRRORS
- PAINTS & COATINGS
- HARDWARE

5T

HS

T

MECHANICAL

N
AREA OF WORK
1220 PARK AVE, APT 4B

ELECTRICAL
E-001.00

ELECTRICAL SYMBOLS, ABBREVS, NOTES & DWG LIST

AS NOTED

X
STAMP

E-002.00

ELECTRICAL SPECIFICATIONS

AS NOTED

X

E-003.00

ELECTRICAL SPECIFICATIONS

AS NOTED

X

E-100.00

ELECTRICAL LIGHTING PLAN

AS NOTED

X

E-200.00

ELECTRICAL POWER PLAN

AS NOTED

X

E-300.00

ELECTRIC RISER DIAGRAMS

AS NOTED

X

E-400.00

ELECTRICAL DETAILS

AS NOTED

X

P-001.00

PLUMBING LEGENDS, NOTES, DETAILS, & SPECS

AS NOTED

X

P-100.00

PLUMBING FLOOR PLAN - DEMOLITION

AS NOTED

X

P-200.00

PLUMBING FLOOR PLAN - NEW WORK

AS NOTED

X

P-300.00

PLUMBING RISER DIAGRAMS

AS NOTED

X

NOT FOR CONSTRUCTION

PLUMBING

E9

6T

HS
T

AREA OF WORK
1220 PARK AVE, APT 4B
BLOCK NO:
LOT NO:
LOT AREA:

1507
.
33
17,624 SF
(100.67' X 175')
LAND USE:
RESIDENTIAL,
MULTI-FAMILY
ELEVATOR
BUILDING
OCCUPANCY GROUP:
R2
ZONING USE GROUP:
R10, R8B
ZONING MAP:
6B
NO. OF STORIES:
17
BUILDING HEIGHT:
xxx
NO. OF UNITS:
56
NO. OF RESIDENTIAL UNITS: 56
BUILDING AREA:
231,050 SF
APT 4B AREA:
3000 SF
CONSTRUCTION CLASS:
1

06/12/2017

ISSUE

DATE

COVER

E9

5T

HS

T

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

N

1

PRELIMINARY BID

TITLE
E.

LANDMARK STATUS:

PRODUCT DATA
- APPLIANCES & EQUIPMENT
- LIGHTING FIXTURES & CONTROLS
- WINDOW(S)
- PAINTS & COATINGS

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

AV

E 95TH STREET

ARCHITECT

RK

CROSS STREET(S):

CONTRACTOR TO PROVIDE SUBMITTALS (PRODUCT DATA, SHOP DRAWINGS, AND SAMPLES)
OF ALL PRODUCTS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING, FOR THE ARCHITECT'S
REVIEW AND APPROVAL:

PA

2.

NEW YORK, NY 10128

PRELIMINARY
BID
06/12/2017

1220 PARK AVE, APT 4B

1.

E.

ADDRESS:

ALL WORK TO CONFORM WITH ALTERATION AGREEMENT SET FORTH BY 1220 PARK AVENUE
CORPORATION AND APPLICABLE CODES.
ALL WORK TO BE FILED WITH THE NYC DEPARTMENT OF BUILDINGS AND PERMITS TO BE
OBTAINED PRIOR TO THE START OF WORK. DURING CONSTRUCTION COPIES OF THE ORIGINAL
APPROVED PLAN AND PERMIT SHALL BE KEPT AT THE SITE AT ALL TIMES AND MADE AVAILABLE
TO ANY NYC DOB INSPECTOR. AT THE COMPLETION OF WORK, ALL SIGN-OFFS SHALL BE
OBTAINED AND A LETTER OF COMPLETION FROM THE NYC DOB ISSUED.
ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE CODES, ORDINANCES & REGULATIONS
HAVING JURISDICTION, INCLUDING THE NEW YORK CITY BUILDING CODE AND LOCAL LAW 58,
FIRE DEPARTMENT REGULATIONS, AND UTILITY COMPANY REQUIREMENTS. ALL WORK SHALL
CONFORM TO BEST TRADE PRACTICES.
CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS.
CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO THE START OF WORK AND REPORT
ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE ARCHITECT.
ALL PLUMBING AND ELECTRICAL WORK SHALL BE PERFORMED BY NYC LICENSED PLUMBERS
AND ELECTRICIANS. EMPLOYEES OF THE ACTUAL LICENSE HOLDERS SHALL DO THE WORK.
PERSONS LICENSED IN THEIR TRADES SHALL ARRANGE FOR AND OBTAIN INSPECTIONS AND
REQUIRED SIGN-OFFS.
PROVIDE OR MAINTAIN FIRE RATED CONSTRUCTION AS REQUIRED AT SHAFTS, STRUCTURAL
MEMBERS, ETC.
EXTREME CARE SHALL BE TAKEN WHEN WORK IS ADJACENT TO ANY PARTY WALLS, SHAFT
WALLS OR WALLS THAT SERVE AS FIREPROOFING OF BUILDING STEEL. THESE WALLS SHOULD
NOT BE REMOVED OR PENETRATED.
CARE SHOULD BE TAKEN IN REMOVAL OF ANY CONDUIT WHICH IS IN THE FLOOR AND CEILING
SLAB IN PARTITIONS THAT NEED TO BE REMOVED.
ANY HAZARDOUS MATERIALS INCLUDING LEAD AND ASBESTOS SHALL BE PROPERLY TREATED
AND/OR ABATED AS PER LOCAL REGULATIONS AND BUILDING REGULATIONS. NEW
REGULATIONS FOR LEAD ABATEMENT SHALL BE FOLLOWED. THE CONTRACTOR WILL NEED TO
SUBMIT CERTIFICATES SHOWING AUTHORIZATION TO REMOVE LEAD AND/OR ASBESTOS.
REMOVAL MUST BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE
FEDERAL TASK FORCE. DUST AND DEBRIS CONTAINING LEAD MUST BE REMOVED BY
SPECIALIZED CLEANING OF THE WORK AREA.
CONTRACTOR IS TO MAINTAIN A PROJECT SCHEDULE THROUGH OUT THE PROJECT. PROJECT
SCHEDULE SHALL BE PROVIDED TO THE OWNER AND ARCHITECT WITHIN 7 CALENDAR DAYS OF
NOTICE TO PROCEED.
REFER TO DEMOLITION NOTES ON DM-100 FOR ADDITIONAL REQUIREMENTS.
NO DECREASE IN SOUND TRANSFER BETWEEN FLOORS. IF SUB-FLOORING IS DISTURBED IT
SHOULD BE REPLACED IN KIND.
THE WORK SHALL NOT INTERFERE WITH THE BUILDING'S INTERCOM, GAS, ELECTRIC, HEATING,
A/C OR PLUMBING SYSTEM OR ANY OTHER BUILDING SYSTEM OR SERVICE. BUILDING RISERS,
INCLUDING PLUMBING AND ELECTRICAL MAY NOT BE RELOCATED. NO PENETRATIONS ALLOWED
IN THE EXTERIOR WALL.
FUNCTIONING FIRE EXTINGUISHERS AND SMOKE DETECTORS SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE WORK. NO FIRE EXITS MAY BE BLOCKED BY THE WORK.
IF A CHILD 10 YEARS OLD OR UNDER LIVES OR WILL LIVE IN THE APARTMENT WINDOW GUARDS
SHALL BE INSTALLED PURSUANT TO SECTION 131.1 OF THE NYC HEALTH CODE.
NO CHANGE PERMITTED TO THE OPERATION OF THE BUILDING'S SYSTEMS TO FACILITATE THE
FUNCTIONING OF ANY HEATING, A/C, PLUMBING OR ELECTRICAL APPLIANCES.
THE USE OF ELECTRIC HAMMERS, ELECTRIC SAWS OR OTHER ELECTRICAL POWER TOOLS
WHICH CAUSE UNDUE DISTURBANCE TO OTHER SHAREHOLDERS OR RESIDENTS OF THE
BUILDING ARE NOT PERMITTED AT ANY TIME UNLESS SPECIFICALLY APPROVED BY THE
CORPORATION IN WRITING. NO JACK HAMMERS OF ANY KIND MAY BE USED.
THE ALTERATIONS SHALL NOT ADVERSELY AFFECT THE STRUCTURAL INTEGRITY OF THE
BUILDING, ANY APARTMENTS CONTAINED THEREIN OR ANY OF THE BUILDING'S SYSTEMS.
USG SHEETROCK MOLD TOUGH GYPSUM PANELS OR A SUBSTANCE OF EQUAL QUALITY SHALL
BE PROVIDED WHEREVER WALLS OR CEILINGS ARE REPLACED IN WET/DAMP AREAS AND
DUROCK OR A SUBSTANCE OF EQUAL QUALITY IN TUB/SHOWER ENCLOSURES. CEMENT BOARD
MUST BE INSTALLED PER THE MANUFACTURER'S GUIDELINES.
ALL RENOVATED FLOORS, EXCEPT THOSE IN VERTICALLY STACKED BATHROOMS, MUST MEET
THE NYC BUILDING CODE REQUIREMENT FOR IMPACT NOISE REDUCTION (INR-0)

AV

1.

ISSUE AND DATE

ON

PARCEL INFORMATION

DRAWING LIST

SUBMITTALS

DIS

GENERAL NOTES

MA

PROJECT INFO

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

G-000.00

LOCATION PLAN
NTS

PAGE 1 OF 18

PROFESSIONAL STATEMENT
"TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH
ENERGY CONSERVATION CODE OF NEW YORK CITY."

ENERGY ANALYSIS
2016 NYCECC, R501.1.1 ADDITIONS, ALTERATIONS, OR REPAIRS: GENERAL.
ADDITIONS, ALTERATIONS, OR REPAIRS TO AN EXISTING BUILDING, BUILDING SYSTEM OR PORTION THEREOF SHALL COMPLY WITH SECTION
R502, R503, OR R504. UNALTERED PORTIONS OF THE EXISTING BUILDING OR BUILDING SUPPLY SYSTEM SHALL NOT BE REQUIRED TO COMPLY
WITH THIS CODE.
2016 NYCECC, R501.4 COMPLIANCE.
ALTERATIONS, REPAIRS, ADDITIONS AND CHANGES OF OCCUPANCY TO, OR RELOCATION OF, OF EXISTING BUILDINGS AND STRUCTURES SHALL
COMPLY WITH (I) ALL APPLICABLE PROVISIONS OF THIS CODE, (II) THE PROVISIONS FOR ALTERATIONS, REPAIRS, ADDITIONS AND CHANGES OF
OCCUPANCY OR RELOCATION, RESPECTIVELY, IN THE NEW YORK CITY CONSTRUCTION CODES, (III) THE NEW YORK CITY FIRE CODE, AND (IV)
THE NEW YORK CITY ELECTRICAL CODE.

3.

4.

5.

2016 NYCECC, R501.5 NEW AND REPLACEMENT MATERIALS.
EXCEPT AS OTHERWISE REQUIRED OR PERMITTED BY THIS CODE, MATERIALS PERMITTED BY THE APPLICABLE CODE FOR NEW CONSTRUCTION
SHALL BE USED. LIKE MATERIALS SHALL BE PERMITTED FOR REPAIRS, PROVIDED HAZARDS TO LIFE, HEALTH OR PROPERTY ARE NOT CREATED.
HAZARDOUS MATERIALS SHALL NOT BE USED WHERE THE CODE FOR NEW CONSTRUCTION WOULD NOT PERMIT THEIR USE IN BUILDINGS OF
SIMILAR OCCUPANCY, PURPOSE AND LOCATION.
2016 NYCECC, R503.1 GENERAL.
ALTERATIONS TO ANY BUILDING OR STRUCTURE SHALL COMPLY WITH THE REQUIREMENTS OF THE CODE FOR NEW CONSTRUCTION.
ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE IS NO LESS CONFORMING TO THE PROVISIONS OF THIS CODE
THAN THE EXISTING BUILDING OR STRUCTURE WAS PRIOR TO THE ALTERATION.
ALTERATIONS TO AN EXISTING BUILDING, BUILDING SYSTEM OR PORTION THEREOF SHALL CONFORM TO THE PROVISIONS OF THIS CODE AS
THEY RELATE TO NEW CONSTRUCTION WITHOUT REQUIRING THE UNALTERED PORTIONS OF THE EXISTING BUILDING OR BUILDING SYSTEM TO
COMPLY WITH THIS CODE. ALTERATIONS SHALL NOT CREATE AN UNSAFE OR HAZARDOUS CONDITION OR OVERLOAD EXISTING BUILDING
SYSTEMS. ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE USES NO MORE ENERGY THAN THE EXISTING BUILDING
OR STRUCTURE PRIOR TO THE ALTERATION. ALTERATIONS TO EXISTING BUILDINGS SHALL COMPLY WITH SECTIONS R503.1.1 THROUGH R503.2.

6.

7.

8.

2016 NYCECC, R503.1.4 LIGHTING.
NEW LIGHTING SYSTEMS THAT ARE PART OF THE ALTERATION SHALL COMPLY WITH SECTION R404.1.

ENERGY ANALYSIS, ALTERATION TO AN EXSTG APT OF AN EXSTG
MULTIPLE DWELLING BUILDING, CLIMATE ZONE 4A, NYCECC 2016
NYCECC
ITEM #
402.3.5

404.4.2.2

402.4.4

404.1

CODE
PRESCRIPTIVE
VALUE

SUPPORTING
DOCS

BUILDING
U-FACTOR = 0.30
ENVELOPE-FENES
TRATION REQ'S NEW WINDOWS
TO REPLACE
EXSTG

U-FACTOR =
0.35 PER
NYCECC
TABLE 402.1.1

EXTERIOR
WINDOW
SCHEDULE,
SHEET G-001

AIR SEALING
AND
INSULATION

VISUAL
INSPECTION

NYCECC
404.4.2.2

FENESTRATION
AIR LEAKAGE

BUILDING
ENVELOPE FENESTRATION
PRODUCT
RATINGS FOR AIR
LEAKAGE

MAX 0.3 CFM PER SQUARE FOOT PER ASTM E283

ELECTRICAL LIGHTING IN
DWELLING UNITS

NOT LESS THAN 75% OF THE LAMPS IN PERMANENTLY
INSTALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICACY
LAMPS OR NOT LESS THAN 75 PERCENT OF THE
PERMANENTLY INSTALLED LIGHTING FIXTURES SHALL
CONTAIN ONLY HIGH-EFFICACY LAMPS.

ITEM
DESCRIPTION

PROVISION
REPLACEMENT
FENESTRATION

LIGHTING
EQUIPMENT

PROPOSED DESIGN VALUE

9.

10.

FIELD VERIFICATION REQ'D

SEE A-100
11.

NO MORE
THAN 0.3 CFM
PER SF

EXTERIOR
WINDOW
SCHEDULE,
SHEET G-001
12.

NYCECC 404.1

LIGHTING
FIXTURE
SCHEDULE,
SHEET G-001

13.

LIGHTING ANALYSIS
DESCRIPTION

14.
LAMP TYPE

CEILING RECESSED DOWNLIGHT
CEILING RECESSED DOWNLIGHT, WET-LISTED
SURFACE MOUNTED CEILING LIGHT
STRIP LIGHT
WALL SCONCE

QTY

LED
LED
FLUORESCENT
LED
TBD
TOTAL FIXTURE COUNT
TOTAL NO. FIXTURES W/ HIGH-EFFICACY LAMPS
PERCENTAGE W/ HIGH-EFFICACY LAMPS

TOTAL NO. OF HIGH-EFFICANCY LAMPS > 75% OF LAMPS IN PERMANENTLY INSTALLED FIXTURES

38
6
18
69 LF
30
161
131
81%
15.

A FINAL SCHEDULE BROKEN OUT BY TRADE MUST BE SUBMITTED FOR BUILDING APPROVAL.
ALL WORK SHALL BE PROVIDED BY LICENSED CONTRACTORS WHERE APPLICABLE: GENERAL
CONSTRUCTION SHALL BE PROVIDED BY CONTRACTORS WITH A HOME IMPROVEMENT
CONTRACTOR'S LICENSE AS ADMINISTERED BY THE NEW YORK CITY DEPARTMENT OF
CONSUMER AFFAIRS, AND PLUMBING AND ELECTRICAL WORK SHALL BE PROVIDED BY
CONTRACTORS LICENSED BY NEW YORK CITY. ALL PROJECTS ARE REQUIRED TO RENOVATE
UTILIZING LEAD SAFE PRACTICES INCLUDING THE USE OF CERTIFIED RENOVATORS. SUBMIT
COPIES OF THE LICENSES, AND NAMES AND ADDRESSES OF THE CONTRACTORS /
SUBCONTRACTORS FOR REVIEW. THESE INCLUDE HOME IMPROVEMENT CONTRACTOR'S
LICENSE, RENOVATOR'S CERTIFICATION FOR LEAD SAFE PRACTICES, MASTER PLUMBER'S
LICENSE AND MASTER ELECTRICIAN'S LICENSE. SUBMITTAL OF DOCUMENTS THAT SHOW
COMPLIANCE WITH THE ABOVE ARE REQUIRED FOR APPROVAL AND RECORD.
THE CONTRACTORS ARE TO PROVIDE CERTIFICATES OF LIABILITY INSURANCE AND PROOF OF
WORKMAN'S COMPENSATION AND DISABILITY COVERAGE AS PER THE ALTERATION
AGREEMENT.
NOTIFICATION LETTERS TO ADJACENT APARTMENTS ARE TO BE ISSUED AT LEAST 10 DAYS
PRIOR TO COMMENCEMENT OF WORK AS PER THE ALTERATION AGREEMENT. PICTORIAL
DOCUMENTATION OF EXISTING CONDITIONS IN NEIGHBORING APARTMENTS PRIOR TO THE
START OF CONSTRUCTION IS REQUIRED AND IS TO BE SCHEDULED WITH THE RESIDENT
MANAGER.
POWER-ACTUATED DEVICES MAY NOT BE UTILIZED WITHOUT PRIOR CONSENT FROM THE
BOARD, AS PER THE ALTERATION AGREEMENT.
PROVIDE FOR FIRE SAFETY AS PER THE ALTERATION AGREEMENT. A UL LISTED CLASS ABC FIRE
EXTINGUISHERS AND SMOKE/CO DETECTORS MUST BE ON SITE AT ALL TIMES DURING
CONSTRUCTION. THEY ARE TO BE LOCATED IN A CONSPICUOUS LOCATION AND MAINTAINED IN
WORKING ORDER IN ACCORDANCE WITH ALL APPLICABLE REQUIREMENTS OF THE NYC FIRE
CODE.
NOTE THAT BUILDING SYSTEMS MAY NOT BE RELOCATED. NO PLUMBING OR HEATING RISERS
MAY BE RELOCATED WITHOUT THE BUILDING'S SPECIFIC WRITTEN CONSENT. SIMILARLY,
RELOCATION OF ANY ELECTRIC RISER WILL NOT BE PERMITTED WITHOUT THE BUILDING'S
APPROVAL.
UPON COMPLETION OF DEMOLITION, THE CONDITION OF EXISTING BUILDING RISERS MUST BE
INSPECTED BY THE BUILDING. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE
RESIDENT MANAGER OR BUILDING MANAGEMENT FOR THIS INSPECTION AND OBTAINING THEIR
WRITTEN SIGN-OFF INDICATING THAT THE RISERS DO NOT REQUIRE REPAIR AND SCHEDULED
WORK MAY PROCEED. IF A RISER REPLACEMENT IS REQUIRED, THE SHAREHOLDER AND
CONTRACTOR ARE TO NOTE THAT THIS COULD AFFECT THE CONSTRUCTION SCHEDULE AS
WALLS CANNOT BE CLOSED WITHOUT COMPLETION OF THE REQUISITE INSPECTIONS. IN
ADDITION, IF THE BUILDING'S $25,000 ALLOTMENT FOR WORK UNDER LAA1 IS NOT AVAILABLE OR
THE COST OF THE WORK LEAVES THE BUILDING WITHOUT AVAILABLE FUNDS, THE
SHAREHOLDER MAY BE REQUIRED TO AMEND THE APARTMENT'S EXISTING DOB APPLICATION
OR FILE NEW TO INCLUDE THIS WORK.
ALL PROJECTS ARE REQUIRED TO RENOVATE UTILIZING LEAD SAFE PRACTICES INCLUDING THE
USE OF CERTIFIED RENOVATORS. THE SHAREHOLDER MUST BE MADE AWARE OF THESE
REQUIREMENTS AS THERE IS A $32,500 FINE PER DAY FOR NON-COMPLIANCE. IT WILL BE THE
SHAREHOLDER'S RESPONSIBILITY TO NOTIFY THE CONTRACTOR AS TO THE PRESENCE OF
LEAD-BASED PAINT ON THE SITE AND SHALL CAUSE THE CONTRACTORS AND WORKERS TO USE
SAFE WORK PRACTICES AS REQUIRED BY EPA LAW 40 CFR 745 SUBPART E, EFFECTIVE 04.22.10,
AND ANY APPLICABLE AGENCY REQUIREMENTS, TAKING ALL PRECAUTIONS TO PREVENT THE
SPREAD OF DUST AND DEBRIS THAT MAY CONTAIN LEAD. THE SHAREHOLDER HEREBY
ACKNOWLEDGES THAT THE BUILDING HAS NO LIABILITY OR OBLIGATION IN CONNECTION WITH
THIS NOTIFICATION REQUIREMENT OF THE PRE-ALTERATION TESTING FOR THE PRESENCE OF
LEAD MAY LIMIT THE AMOUNT OF AREA UNDER THE PURVIEW OF THE REGULATIONS.
IF ASBESTOS IS UNCOVERED DURING DEMOLITION, PROVIDE FOR REMOVAL OR CONTAINMENT
AS PER AGENCY REQUIREMENTS. RESIDENT MANAGER MUST BE GIVEN 24-HOURS NOTICE
PRIOR TO THE SCHEDULE FOR REMOVAL.
AS THE ALTERATION AGREEMENT GOVERNS THE CONTRACTOR IS TO PROVIDE PROTECTION AS
PER THE RESIDENT MANAGER'S REQUIREMENTS, ALL TOILET AND KITCHEN EXHAUSTS ARE TO
BE COVERED, HVAC UNITS PROTECTED OR REMOVED FROM THE SITE, THE HALLWAYS
PROTECTED WITH MASONITE AND STICKY MATS PROVIDED EACH DAY AT THE ELEVATORS AND
AT THE FRONT DOOR.
NEGATIVE AIR PRESSURE MACHINES SHALL BE UTILIZED PER MANUFACTURER'S GUIDELINES
AND AS DIRECTED BY MANAGEMENT, SPECIFICATIONS FOR WHICH MUST BE SUBMITTED PRIOR
TO IMPLEMENTATION. NEGATIVE AIR PRESSURE MACHINES REDUCE DUST INFILTRATION TO
ADJACENT UNITS AND PUBLIC SPACES OUTSIDE OF THE UNIT BEING ALTERED, PARTICULATE
DUST WITHIN THE WORK AREA, CLEANUP AND MAINTENANCE TIME, AND UNPLEASANT ODORS.
DEMOLITION SHALL BE MANAGED TO COINCIDE WITH THE AMOUNT OF DEBRIS THAT CAN BE
PROPERLY REMOVED ON THAT DAY. ALL DEBRIS IS TO BE PROPERLY SEALED IN BAGS OR
CONTAINERS THAT WILL NOT PERMIT DUST TO LEAVE THE VESTIBULE OR ENTER THE PUBLIC
HALLS.
ALL WORK IS TO BE IN COMPLIANCE WITH ALL SECTIONS OF THE ALTERATION AGREEMENT AND
HOUSE RULES.
CHOPPING, CUTTING, CHASING OR CHANNELING IS NOT PERMITTED FOR ANY REASON IN BRICK
OR BLOCK AT BUILDING EXTERIOR WALLS, APARTMENT DEMISING WALLS, BUILDING
STRUCTURE, STRUCTURAL SLABS, BEAMS, MASONRY COLUMNS OR THEIR ENCLOSURES. THIS
MUST BE ADEQUATELY COMMUNICATED TO YOUR GC. TYPICAL IN UNIT PARTITIONS MAY BE
COMPLETELY REMOVED IF DESIRED, ON CONDITION THEY ARE NOT STRUCTURAL AND THAT NO
RISERS ARE DISTURBED IN THE PROCESS. IF IN DOUBT, VERIFY WITH RESIDENT MANAGER
WHICH WALLS MAY BE AND MAY NOT BE REMOVED / CHOPPED, AND WHICH MAY BE CHASED.
CUTTING / CHASING IN DEMISING WALLS FOR ELECTRICAL OR ANY OTHER SERVICES IS
PERMITTED ONLY IN THE VERTICAL DIRECTION, AND ONLY TO THE DEPTH OF THE PLASTER
LAYER. ANY UNAPPROVED CHOPPING WILL RESULT IN STOPPAGE OF WORK AND REQUIRE AN
INSPECTION BY OUR OFFICE TO INDICATE A REMEDY. FIREPROOF / FIRESTOP AROUND ALL
ELECTRICAL BOXES. VERIFY WALL THICKNESS AND VIABILITY OF INSTALLATION OF ELECTRICAL
BOXES IN WALLS PRIOR TO CUTTING.
ALL BRANCH PIPING, SUPPLY, WASTE AND VENT, MUST BE REPLACED BACK TO THE BUILDING'S
RISERS AND STACKS. REPLACEMENT OF BRANCH PIPING IS TO INCLUDE PROVIDING NEW RISER
SHUT-OFF VALVES TO BE LOCATED IN CLOSE PROXIMITY TO THE RISER. A MINIMUM OF 3 ELBOW
SWINGS TO ALLOW FOR VERTICAL EXPANSION ARE REQUIRED BETWEEN THE HOT WATER
RISER T AND SHUT-OFF VALVE. PROVIDE DIELECTRIC UNIONS WITH APPROPRIATE END
CONNECTIONS FOR THE PIPE MATERIALS IN WHICH INSTALLED (SCREWED, SOLDERED, OR
FLANGED) TO ISOLATE DISSIMILAR METALS. SOFT-SEATED, SPRING LOADED CHECK VALVES
ARE TO BE PROVIDED ON HOT AND COLD WATER BRANCH LINES FOLLOWING THE SHUT-OFF
VALVES. ALL VALVES ARE TO BE MADE ACCESSIBLE FOR SERVICING. BRANCH PIPING IS TO BE
WRAPPED WITH DURABLE, CONDENSATE CONTROLLING, INSULATING MATERIAL AND
SUPPORTED WITH NON-REACTIVE MATERIALS. A MINIMUM CLEAR DISTANCE OF 2” IS REQUIRED
BETWEEN HOT AND COLD WATER PIPES AND THERE MUST BE NO METAL-TO-METAL CONTACT
BETWEEN PIPING, CONDUIT, BX, ETC. A WATER HAMMER ARRESTER IS TO BE PROVIDED AT ALL
BRANCH LINES THAT FEED SINKS, LAVATORIES AND WATER CLOSETS. ARRESTERS MUST BE
MADE ACCESSIBLE FOR SERVICING (UNLESS THE UNIT HAS A LIFETIME GUARANTEE I.E. SIOUX
CHIEF) AND ARE TO BE LOCATED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. NOTE: AIR
CHAMBERS ARE NOT TO BE USED.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

WP SYSTEMS BY LATICRETE (9235, HYDROBAN OR APPROVED EQUAL) WILL BE ACCEPTABLE.
SUBMIT PRODUCT SPECIFICATIONS AND DETAILS AS THEY RELATE TO THE FLOOR
CONSTRUCTION IN THIS BUILDING. INDICATE THE EXTENT OF WP LOCATIONS ON THE
CONSTRUCTION PLAN FOLLOW MANUFACTURER'S WP RECOMMENDATIONS WHERE NEW
FLOORING IS INSTALLED. PLUMBING LINES RUNNING IN WALLS OVER DRY AREAS BELOW MUST
BE WATERPROOFED. WP MUST TURN UP A MINIMUM OF 6” AT ALL WALL CONDITIONS. NEW
STONE SADDLES MUST BE INSTALLED AT ALL BATHROOMS. AT THE WALLS SURROUNDING BATH
TUBS AND SHOWERS, WATERPROOFING MUST EXTEND FLOOR TO CEILING. THE WP
INSTALLATION MUST BE INSPECTED BY OUR OFFICE UPON COMPLETION.
ALL RENOVATED FLOORS ARE TO INCLUDE A SOUNDPROOFING MEMBRANE THAT WILL PROVIDE
AN IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN 50 BASED UPON LABORATORY
MEASUREMENTS MADE IN ACCORDANCE WITH ASTM E 492, OR NOT LESS THAN 45 IF FIELD
TESTED IN ACCORDANCE WITH ASTM E 1007 IN COMPLETED CONSTRUCTION. WE HAVE
PREVIOUSLY REVIEWED AND APPROVED THE FOLLOWING SOUNDPROOFING PRODUCTS: GENIE
MAT RST10 (10MM); KINETICS SR FLOORBOARD 5/8” THICK; COLBOND
ENKASONIC 9110, 10 MM; INTERTEK QUIET CORK, 6MM; AND SIKA ACOUBOND (FOR WOOD
FLOORS ONLY). NOTE THAT THE EXISTING BUILDING'S FLOOR CONSTRUCTION AND THE SP'S
PERFORMANCE UNDER WET CONDITIONS MUST BE CONSIDERED IN THE SELECTION OF THE
APPROPRIATE SOUNDPROOFING PRODUCT FOR WHICH TEST DATA BASED ON REQUIREMENTS
PRESCRIBED BY THE NEW YORK CITY BUILDING CODE MUST BE PROVIDED.
PROVIDE AND/OR MAINTAIN FIRE RATED CONSTRUCTION AS REQUIRED AT SHAFTS,
STRUCTURAL MEMBERS, DEMISING WALLS, ETC. NOTE THAT WALLS MUST BE COMPLETELY
SHEATHED BEHIND CABINETS.
WHERE CHASES, SHAFTS, DEMISING WALLS AND STRUCTURAL ELEMENTS ARE OPENED DURING
CONSTRUCTION, PROVIDE A UL-LISTED FIRESTOPPING OR FIREPROOFING SYSTEM AS
REQUIRED BY CODE AT ALL EXISTING OR NEW OPENINGS. WHERE PIPE CHASES ARE ENCLOSED
IN MASONRY CONSTRUCTION, THE FIRE RATING MUST BE MAINTAINED AND WALLS THAT ARE
DEMOLISHED IN THE COURSE OF THE WORK MUST BE RESTORED WITH SIMILAR CONSTRUCTION
OR NEW CONSTRUCTION WITH THE SAME RATING. WHERE PIPING IS NOT LOCATED IN A RATED
ENCLOSURE PROVIDE FIRESTOPPING SYSTEMS AS MANUFACTURED BY STI, HILTI, USG OR
EQUAL UL LISTED PRODUCTS ARE ACCEPTABLE AND THEIR RATING MUST COINCIDE WITH THE
FIRE RATING OF THE EXISTING ASSEMBLY. ORDINARY CEMENT, INSULATION AND OTHER
NON-RATED SEALANTS AND PRODUCTS MAY NOT BE USED UNLESS PARTITIONS PROVIDE THE
REQUIRED FIRE RATING. NOTE THAT FIRESTOPPING AND FIREPROOFING MUST BE INSTALLED
UPON THE COMPLETION OF DEMOLITION AND PRIOR TO THE INSTALLATION OF ANY SHEATHING
OR OTHER WORK THAT WILL BLOCK ACCESS TO ANY OPENINGS THAT MUST BE FIRESTOPPED.
CONTRACTOR IS TO NOTIFY THE RESIDENT MANAGER ON THE FOLLOWING MILESTONES SO
THAT OBSERVATION VISITS MAY BE SCHEDULED OF THE WORK:
-COMPLETION OF DEMOLITION, WHICH INCLUDES THE INSTALLATION OF SHUT OFF VALVES.
-COMPLETION OF FIRESTOPPING AND FIREPROOFING IF REQUIRED.
-COMPLETION OF MECHANICAL, PLUMBING AND ELECTRICAL ROUGH IN.
-COMPLETION OF WATERPROOFING/SOUNDPROOFING.
-COMPLETION OF SHOWER PAN INSTALLATION.
-COMPLETION OF 24 HOUR WATER RETENTION TEST.
-COMPLETION OF CLOSURE AND SEALING OF WALLS PRIOR TO INSTALLATION OF
CABINETRY, APPLIANCES, ETC.
-COMPLETION OF PROJECT PRIOR TO DOB SIGN-OFF.
THE ARCHITECT IS RESPONSIBLE FOR MAINTAINING ADA REQUIREMENTS. WHERE WALLS ARE
REPLACED AT ALL BATHROOMS, INCLUDING FOR REPLACEMENT OF BRANCH PIPING TO THE
RISER, PLATES FOR THE LOCATION OF FUTURE GRAB BARS ARE TO BE INSTALLED AS PER ADA
REQUIREMENTS.
PROVIDE GFCI OUTLETS AND CIRCUITS PER CODE IN ALL WET AREAS. OUTLETS AND FIXTURES
LOCATED AT DEMISING WALL CONDITIONS MUST MAINTAIN THE EXISTING FIRE RATING. ALL
LIGHTING MUST BE UL RATED AND POWER OUTLETS AND SWITCHES LOCATED AS PER ADA
REQUIREMENTS.
NEW YORK ALONG WITH 5 OTHER NORTHEASTERN STATES, INCLUDING NEW JERSEY HAS
ADOPTED OTC (OZONE TRANSPORT COMMISSION) GUIDELINES CONCERNING VOC (VOLATILE
ORGANIC COMPOUND) REQUIREMENTS. THERE ARE STRINGENT REQUIREMENTS CONCERNING
THE USE OF OIL BASED MATERIALS. IT WOULD BE BEST BOTH IN TERMS OF QUALITY FINISH AND
ENVIRONMENTAL ISSUES TO SPRAY ANY LACQUER OFF SITE IN AN APPROPRIATE BOOTH. IF
THIS IS TO BE SPRAYED ON SITE, CONTRACTORS ARE TO BE LIMITED TO PURCHASING QUART
CANS ONLY. THE CONTRACTOR SHOULD BE USING A HIGH VOLUME, LOW PRESSURE SPRAY
DEVICE.
ANY CHANGES TO THE SCOPE OF WORK MUST BE SUBMITTED FOR OUR REVIEW AND
APPROVAL PRIOR TO THE COMMENCEMENT OF THAT WORK. ALL FUTURE SUBMITTED
DRAWINGS SHOULD HAVE CHANGES BUBBLED. WE WILL ONLY REVIEW BUBBLED CHANGES.
CONSEQUENCES FOR ANY NON-BUBBLED CHANGES WILL BE THE RESPONSIBILITY OF THE
SHAREHOLDER.
COPIES OF SIGNED AIA FORMS G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND
CLAIMS, AND G706A, CONTRACTOR'S RELEASE OF LIENS ARE TO BE SUBMITTED UPON
SUBSTANTIAL COMPLETION.
UPON COMPLETION OF CONSTRUCTION, PROVIDE AN 8.5X11 SKETCH OF THE ALTERATION
INDICATING LOCATIONS OF ALL VALVES AND ACCESS PANELS FOR PLUMBING AND ACCESS FOR
MECHANICAL EQUIPMENT.

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT
DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202
CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER
GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

AV

16.
1.
2.

Artacho / Oh
Residence

RK

PROPOSED WORK COMPLIES WITH THE REQUIREMENTS OF THE 2016 NYCECC.

BUILDING NOTES

E9

PA

2016 NEW YORK CITY ENERGY CONSERVATION CODE COMPLIANCE

5T

HS

T

N
AREA OF WORK
1220 PARK AVE, APT 4B

STAMP

NOT FOR CONSTRUCTION

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

BUILDING NOTES
ENERGY ANALYSIS

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

G-001.00
PAGE 2 OF 18

ANSI ACCESSIBILITY DIAGRAMS

4'-0"
2'-0" MAX

2'-8" CLR. MAX @
PASSAGE POINT

4'-0"

3'-0" CLR.
CONTINUOUS
PASSAGE
2'-6"

2'-6"

Artacho / Oh
Residence

2'-6"

4'-0"

WING WALLS
DOWN TO
FLOOR

4'-0"

PROTRUDING OBJECTS
HANGING ON WALL WITH
LEADING EDGES ABOVE 27"

4'-0"

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER

FIGURE 8F: WALL MOUNTED OBJECTS
AND MEASUREMENTS OF CLEAR WIDTHS
FORWARD APPROACH

CLEAR WIDTH (SEE FIGURE 8F)

4" MAX

PARALLEL APPROACH

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

CLEAR FLOOR SPACE

ANY AMOUNT

MINIMUM CLEAR FLOOR SPACE FOR WHEELCHAIRS

4

TWO HINGED DOORS IN A SERIES

1

ARCHITECT

2'-8" MIN
2'-8" MIN

1'-0" MIN

3'-0" MIN

5'-0" MIN

PROTRUDING OBJECTS WALKING
PARALLEL TO A WALL

2'-0" MAX

3'-0" MIN

5'-0" MIN
DASHED LINES INDICATE MINIMUM LENGTH OF CLEAR
SPACE REQUIRED ON EACH ARM OF THE T-SHAPED
SPACE IN ORDER TO COMPLETE THE TURN.
2'-3" MAX

WHEELCHAIR TURNING SPACE

MAXIMUM
DOORWAY DEPTH

2'-8" MIN

2'-8" MIN

SLIDING DOOR

FOLDING DOOR

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

CLEAR DOORWAY WIDTH AND DEPTH

2

PULL SIDE
2'-0" MAX
PASSAGE POINT

PUSH SIDE
1'-6" MIN

5'-0" MIN

X

PROTRUDING OBJECT REQUIREMENTS

4'-0"

2'-8" MIN

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

PLUMBING AND ELECTRICAL ENGINEER

WHEELCHAIR T-SHAPED TURNING SPACE

PROTRUDING OBJECTS WALKING
PERPENDICULAR TO A WALL

8

CODE CONSULTANT

HINGED DOOR
5'-0" MIN

1'-0" MIN

2'-3" OR LOWER

2'-3" OR HIGHER

6'-8" MIN

5'-0" MIN

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

KEY PLAN

5'-0" MIN

CLEAR SPACE REQUIREMENTS

5'-0" MIN. ROUGH DIM.

5

X=12IN. IF THE DOOR HAS BOTH
A CLOSER AND A LATCH
E9

5T

FRONT APPROACHES: SWINGING DOORS

HS

T

PUSH SIDE
4'-6" MIN

4'-0"

4'-0"

FORWARD REACH LIMIT FOR
WHEELCHAIRS

MINIMUM CLEAR SPACE FOR
FORWARD REACH

7'-3" MIN. ROUGH DIM.

3'-0"

N

3'-8" MIN

5'-0"

1'-3" MIN

2'-6"

4'-0" MAX

PULL SIDE

32" MIN.

AREA OF WORK
1220 PARK AVE, APT 4B

1'-10" MIN
STAMP

X=20" MAX
4'-0"
48IN. MIN IF THE DOOR HAS BOTH
A CLOSER AND A LATCH

X=25" MAX

2'-1" MAX

NOT FOR CONSTRUCTION

44" MAX

2'-6"

48" MAX

HINGE-SIDE APPROACHES: SWINGING DOORS
32" MIN.

5'-0" MIN. ROUGH DIM.

AV

30"

33" MIN.

MINIMUM CLEAR WIDTH FOR
SINGLE WHEELCHAIR

RK

30" MIN.

MINIMUM CLEAR WIDTH FOR TWO
WHEELCHAIRS

PA

7'-3" MIN. ROUGH DIM.

3'-0" MIN

PULL SIDE

2'-0" MIN

PUSH SIDE

2'-0" MIN

9

CLEAR FLOOR OR GROUND SPACE SHALL
EXTEND NO MORE THAN 25 IN. UNDER
THE OBSTRUCTION.

MINIMUM SIZED ADAPTABLE BATHROOMS

Z=X OR GREATER
X= REACH DISTANCE, Z= CLEAR KNEE
SPACE BELOW THE OBSTRUCTION,
WHICH SHALL BE AT LEAST AS DEEP AS
THE REACH DISTANCE, X.

ADAPTABLE KITCHEN
MAXIMUM FORWARD REACH OVER AN
OBSTRUCTION

3'-6" MIN

12

ACCESSIBLE : COUNTER HEIGHT
LOWERED, BASE CABINETS ADJUSTED
ACCORDINGLY

6'-0"

PROPOSED KITCHEN

2'-0"

1/4" MAX

2'-6"

GRAB BAR REINFORCING REQUIREMENTS

CLEAR FLOOR SPACE - PARALLEL
APPROACH
10" MAX

MAXIMUM SIDE REACH OVER AN
OBSTRUCTION

4'-6" MIN

GRAB BAR DETAIL

HIGH AND LOW SIDE REACH LIMITS

THRESHOLD DETAILS

7

SIDE REACH REQUIREMENTS

MAXIMUM SIDE REACH FOR
SHELVES AND CLOSETS

SLIDE SIDE APPROACH: SLIDING AND
FOLDING DOORS

ISSUE

DATE

LATCH SIDE APPROACH: SLIDING AND
FOLDING DOORS

ANSI ACCESSIBILITY
DIAGRAMS

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

9" MIN

1

THRESHOLD DETAIL - ANGLE

11

4'-6" MAX

4'-6" MAX
9"

4'-6"

1/4" TO 1/2"

12" MIN.
1 1/2" MIN.

14

2

06/12/2017

TITLE

2'-0" MIN

1'-9" MAX

2'-6"

THRESHOLD DETAIL - PERPENDICULAR
1 1/4" - 2" 1 1/2"

PRELIMINARY BID

FRONT APPROACH: SLIDING AND FOLDING DOORS

1'-3" MAX

3'-6" MIN

HANDRAIL REQUIREMENTS

3'-6" MIN

1'-0" MIN.

4'-0" MIN

1 1/2"
2'-10" MAX

1 1/4" - 1 1/2"

4'-0"

2'-0" MIN.

10
13

48IN. MIN IF THE DOOR HAS A CLOSER

2'-6"

LATCH-SIDE APPROACHES: SWINGING DOORS

3'-10"

3'-6" MIN.

FORWARD REACH REQUIREMENTS

6

2'-0" MIN.

CL

PROVIDE REINFORCEMENT
AS REQ'D FOR FUTURE
INSTALLMENT OF GRAB BARS
AT BATHTUB

1'-0" MIN.

1'-0" MIN. 2'-0" MIN.

PROVIDE REINFORCEMENT
AS REQ'D FOR FUTURE
INSTALLMENT OF GRAB BARS
AT WATER CLOSET

3'-0" MIN.

MAXIMUM FORWARD REACH TO SHELVES

NOTE: ALL DOORS AT ALCOVES SHALL COMPLY WITH
THE CLEARANCES FOR FRONT APPROACHES.

3

MANEUVERING CLEARANCES AT DOORS

G-002.00
PAGE 3 OF 18

Artacho / Oh
Residence

DEMOLITION NOTES

2.
3.
4.

5.

6.
7.
8.

9.

10.

11.

ALL DEMOLITION WORK TO CONFIRM WITH ALTERATION AGREEMENT
SET FORTH BY 1220 PARK AVE CORPORATION APPLICATION
AGREEMENT AND APPLICABLE CODES.
CONTRACTOR TO CONSULT WITH BUILDING MANAGEMENT &
ENGINEER PRIOR TO REMOVAL OF ANY WORKS.
THE CONTRACTOR MUST PROVIDE REQ'D PROTECTION TO ALL
SURROUNDING AREAS THROUGHOUT COURSE OF DEMOLITION.
THE CONTRACTOR IS RESPONSIBLE TO THOROUGHLY CLEAN UP AND
REMOVE FROM THE PREMISES DAILY ALL WASTE MATERIALS AND
RUBBISH AS GENERATED BY THE DEMOLITION. DO NOT ALLOW
DEMOLISHED MATERIALS TO ACCUMULATE INSIDE OR OUTSIDE OF
THE BUILDING.
DEMOLITION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH
THE TERMS AND CONDITIONS OF THE CONTRACT DOCUMENTS AS
WELL AS WITH ALL RULES, REGULATIONS, CODES, AND LOCAL,
STATE, AND FEDERAL LAWS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND
METHODS NECESSARY TO ACCOMPLISH THE DEMOLITION WORK.
THE CONTRACTOR SHALL SECURELY CAP AND/OR VALVE OFF
PLUMBING LINES AS REQUIRED.
THE CONTRACTOR SHALL SUBMIT PROPOSED METHODS AND
OPERATIONS OF THE DEMOLITION TO THE OWNER OR BUILDING
MANAGER PRIOR TO THE START OF WORK. INCLUDE A SCHEDULE
FOR COORDINATION OF SHUT-OFFS, SERVICE INTERRUPTIONS,
CAPPING, ETC.
OWNER OR ARCHITECT ASSUMES NO RESPONSIBILITY FOR ACTUAL
CONDITIONS OF WORK TO BE DEMOLISHED. ALL EXISTING
CONDITIONS FOR PURPOSES OF BIDDING SHALL BE EXAMINED AND
VERIFIED DURING THE SITE WALK-THROUGH.
CONDUCT DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS TO
INSURE MINIMUM INTERFERENCE WITH OTHER ADJACENT
OCCUPANCIES OR OCCUPIED FACILITIES.
INSURE SAFE PASSAGE OF PERSONS AROUND AREA OF DEMOLITION.
CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT
OCCUPANCIES.

12.

KEEP ALL CORRIDORS, EGRESS ROUTES, AND EMERGENCY EXITS
CLEAR OF DEBRIS, DEMOLITION MATERIALS, TOOLS, ETC.
PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY
DEMOLITION OPERATIONS AT NO COST TO OWNER.
MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN. KEEP IN
SERVICE AND PROTECT DURING DEMOLITION OPERATIONS.
DEMOLITION WORK IS NOT TO INTERRUPT EXISTING UTILITIES
SERVICE OCCUPIED OR USED FACILITIES, EXCEPT WHEN
AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION.
PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO
EXISTING UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES.
PRIOR TO ALL WORK OF THIS SECTION, CAREFULLY INSPECT THE
EXISTING CONDITIONS AND VERIFY THAT MATERIALS AND SURFACES
TO BE ALTERED OR REMOVED ARE THE SAME AS NOTED ON THE
DRAWINGS. IN THE EVENT OF DISCREPANCY, IMMEDIATELY NOTIFY
THE ARCHITECT. DO NOT PROCEED WITH DEMOLITION IN AREAS OF
DISCREPANCY UNTIL ALL SUCH DISCREPANCIES HAVE BEEN FULLY
RESOLVED.
DO NOT BURN MATERIALS OR DEBRIS ON PREMISES.
BREAK DEMOLISHED PLASTER OR MASONRY MATERIALS INTO SMALL
PIECES AND SET DOWN TO AVOID ANNOYANCE FROM DUST. DO NOT
DROP OR THROW MATERIALS FROM ANY HEIGHT.
CUT OUT EMBEDDED ANCHORAGE AND ATTACHMENT ITEMS AS
REQUIRED TO PROPERLY PROVIDE FOR PATCHING AND REPAIR OF
THE RESPECTIVE FINISHES.
POLLUTION CONTROLS: USE TEMPORARY ENCLOSURES, AND OTHER
SUITABLE METHODS TO LIMIT DUST AND DIRT.
CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT,
AND DEBRIS CAUSED BY DEMOLITION OPERATIONS, AS DIRECTED BY
ARCHITECT OR BUILDING MANAGEMENT. RETURN ADJACENT AREAS
TO CONDITION EXISTING PRIOR TO START OF WORK.
AT CONTRACTOR'S OWN EXPENSE, CONTRACTOR SHALL
IMMEDIATELY RESTORE TO SERVICE AND REPAIR ANY DAMAGE
CAUSED BY CONTRACTOR'S WORKMEN TO EXISTING PIPING AND
CONDUITS, WIRES, CABLES, ETC, OF UTILITY SERVICES OR OF FIRE

13.
14.
15.

16.

17.
18.

19.

20.
21.

22.

23.

24.
25.

26.
27.
28.

PROTECTION SYSTEMS AND COMMUNICATIONS SYSTEMS WHICH ARE
INDICATED ON THE DRAWINGS AND WHICH ARE NOT SCHEDULED
FOR DISCONTINUATION OR ABANDONMENT.
SCHEDULE DUMPSTERS AND/OR FREIGHT ELEVATOR USE WITH
BUILDING MANAGEMENT. THE APPROPRIATE FORMS MUST BE USED
AND SIGNED BY A DESIGNATED REPRESENTATIVE.
SEAL ALL PENETRATIONS OF FIRE RATED PARTITIONS AND FLOORS
USING APPROVED METHODS AND MATERIALS.
USE ONLY A CERTIFIED ASBESTOS ABATEMENT CONTRACTOR TO
REMOVE V.A.T. TILE AND CARPET. DO NOT CONTINUE ANY
DEMOLITION THAT WOULD CAUSE ASBESTOS TO BE AIRBORNE.
CONTACT BUILDING MANAGEMENT TO OBTAIN A CERTIFIED
ASBESTOS ABATEMENT CONTRACTOR, ACCORDING TO PORT
AUTHORITY'S DIRECTIVE.
ALL LIFE SAFETY SYSTEMS SHALL BE MAINTAINED IN FULL WORKING
ORDER DURING DURATION OF WORK.
NO STRUCTURAL ELEMENTS SHALL BE REMOVED OR ALTERED.
THE CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER
PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING THE
COURSE OF WORK. ALL OPENING IN ANY WALL, WINDOW OR ROOF
SHALL BE PROTECTED FROM ALL FORMS OF WEATHER OR WATER
PENETRATION.

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT
DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202
CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER

LEGEND

EXISTING WD FLOOR TO BE
REMOVED IN AREA INDICATED
PREPARE AS REQD FOR NEW
WD FLOOR

13

13

15

BATH

EXSTG
SINK TO
REMAIN

1

5

13

13

15

13

13

8

OFFICE
1

BEDROOM

1

EXISTING STOVE
AND D/W TO BE
10
REUSED,
PROTECT AND
STORE FOR
REINSTALL.

10

9

1.
2.
EXISTING
EXIT TO
REMAIN

1
2

8

3.

9

8

9

3

10

11

HALL
2

8

4

REMOVE EXSTG ELECT.
PANELS AND PREPARE FOR
NEW UPGRADED SERVICE AT
NEW LOCATION, SEE A-100

9

9

10
EXISTING SINK
TO BE REUSED,
PROTECT AND
STORE FOR
REINSTALL.

5

2

1

LIMIT OF WORK

BUTLER'S
PANTRY
1

10

9
4
14

8
10

13

9

2
CLOSET

2

CLOSET
2

1

4

ENTRY

4

2

DINING

3'-0"

8

2'-10"

HALL

REMOVE EXISTING PARTITIONS OR FURRING
AS INDICATED.

3

REMOVE EXISTING INTERIOR DOORS AND
DOOR FRAMES AS INDICATED.

4

EXISTING INTERIOR DOOR TO BE SALVAGED
FOR REUSE, PROTECT AND STORE AS REQ'D.

5

EXISTING EQUIPMENT TO BE SALVAGED FOR
REUSE, PROTECT AND STORE AS REQ'D.

6

REMOVE EXISTING CEILING FINISH AND
NON-STRUCTURAL CEILING FRAMING AS
INDICATED. PREPARE FOR NEW CEILING FINISH
AS REQ'D, VIF.

7

REMOVE EXISTING MOLDING, BASEBOARD,
TRIM AND CASING AS INDICATED.

8

REMOVE EXISTING LIGHTING FIXTURES
THROUGHOUT.

9

REMOVE EXISTING CABINETRY AND BUILT-IN
SHELVING THROUGHOUT.

10

REMOVE EXISTING COUNTERS THROUGHOUT.

11

REMOVE EXISTING PLUMBING FIXTURES AS
INDICATED, CAP AND REMOVE EXISTING
PLUMBING AS REQ'D.

12

OMIT

13

REMOVE EXISTING WINDOW(S) AND WINDOW
A/C/ UNITS. PREPARE OPENING FOR NEW
WINDOW AS REQ'D, VIF.

14

EXISTING RADIATOR TO REMAIN, EXISTING
ENCLOSURE TO BE REMOVED, CONTRACTOR
TO V.I.F.

8
4
EXISTING
ENTRY TO
REMAIN

2
CLOSET

CLOSET

HALL

FOYER
8

4

3

13

EXISTING
DOOR TO
REMAIN

1

2

14

4

4
3

2

REMOVE EXISTING FLOOR FINISH. PREPARE
FOR NEW FLOORING, LEVEL AS REQ'D, VIF.
PERLITE, PUMICE, LAVA ROCK, OR NORLITE,
AGGREGATE SIZE 4-16MM, MAY BE USED TO
REPLACE CINDERFILL SUBLOOR IF REQD. ALL
CHANGES TO BE VERIFIED WITH BUILDING'S
STRUCTURAL ENGINEER. VERMICULITE IS NOT
ALLOWED.

2

4

1

5T

HS

11

CLOSET

4

E9

T

1

2

EXISTING
DOOR TO
REMAIN

KEY PLAN

DEMOLITION KEYNOTES

KITCHEN

NO WORK

8

SEE G-000 FOR ADDITIONAL NOTES AND
GENERAL REQUIREMENTS.
NO CUTTING OR CHANNELING OF BUILDING
STRUCTURE PERMITTED.
SALVAGE ALL EXISTING DOORS FOR REUSE,
U.O.N.

AV

10

BATH

OFFICE

8

GENERAL NOTES

13

15

9

REMOVE
EXSTG
RADIATOR

EXISTING
DOOR TO
REMAIN

8

EXISTING CONSTRUCTION TO BE REMOVED

LIMIT OF WORK

9

REMOVE
EXSTG
RADIATOR

EXISTING CONSTRUCTION TO REMAIN

RK

EXISTING
TOILET TO
REMAIN

EXISTING
TOILET TO
BE REUSED

EXISTING
EXIT TO
REMAIN

2'-8"

NO WORK

2'-8"

LIMIT OF WORK

NO WORK

EXISTING BUILDING, NOT IN SCOPE

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

PA

1.

N
AREA OF WORK
1220 PARK AVE, APT 4B

STAMP

NOT FOR CONSTRUCTION

4
CL.

9

CLOSET

4

9

3

1

14

3

2

CLOSET

8

2
4

CLOSET
2

1

BEDROOM

BEDROOM

11

14
2

4
4

BATH
1

8

11

13

LIMIT OF WORK

NO WORK

10

13

13
EXISTING
TOILET TO
BE REUSED

14

13

14

REMOVE
EXSTG
RADIATOR

13

13

EXISTING RADIATOR TO BE REMOVED.
PREPARE FOR NEW RADIATOR AT NEW
LOCATION PER MECHANICAL

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

DEMOLITION PLAN

8

14

13

15

3
9

14

LIVING

EXISTING
TOILET TO
BE REUSED

BATH
8

9

LIBRARY

8

REMOVE
EXSTG
RADIATOR

1

EXISTING WD FLOOR
TO BE REMOVED IN
AREA INDICATED
PREPARE AS REQD
FOR NEW WD FLOOR

13

14

13

14

13

14

13
PROJECT NO:

1701

SCALE:

1/4"=1'-0"

SHEET NUMBER
N

DEMOLITION PLAN
1/4" = 1'-0"

DM-100.00
PAGE 4 OF 18

GENERAL NOTES
1.

SEE G-000 FOR ADDITIONAL NOTES AND
GENERAL REQUIREMENTS.
FINAL DIMENSIONS AND LOCATIONS TO BE
CONFIRMED WITH ARCHITECT IN FIELD.
NO CUTTING OR CHANNELING OF
BUILDING STRUCTURE IS PERMITTED.
MAINTAIN ALL EXISTING FIRESTOPPING.
PROVIDE NEW FIRESTOPPING AS
REQUIRED PER NYC BUILDING CODE. GC
TO VERIFY FIELD CONDITIONS PRIOR TO
DEMOLITION AND CONSTRUCTION.
ALL RADIATORS TO HAVE REMOVABLE
COVERS / ENCLOSURES
LOW VOC PAINT AND FLOOR FINISHES TO
BE USED THROUGHOUT.
REINFORCEMENT FOR THE FUTURE
PLACEMENT OF GRAB BARS TO BE
INSTALLED AT ALL BATHROOMS PER ADA
REQUIREMENTS.
ALL WOOD USED FOR BLOCKING OR
SUPPORT TO BE FIRE-TREATED.
TREATMENT METHOD MUST BE
COMPOSED OF NON-TOXIC MATERIALS.
ALL WALLS MUST BE COMPLETELY
SHEATHED AND ALL OPENINGS IN BLOCK
WALLS MUST BE PATCHED OR PLASTERED
PRIOR TO THE INSTALLATION OF
CABINETRY.
UPON REMOVAL OF BASEBOARDS, ALL
WALLS TO BE CHECKED TO ASSURE
SURFACES ARE COMPLETELY SHEATHED
OR PLASTERED PRIOR TO INSTALLATION
OF NEW BASEBOARDS. THE INTEGRITY OF
THE FIRE RATING OF ALL DEMISING
WALLS MUST BE MAINTAINED TO ASSURE
PETS ARE CONTROLLED AND SOUND
RATINGS BETWEEN PARTITIONS ARE
MAINTAINED.
ALL COLUMNS TO BE MAINTAINED AT 4 HR
FIRE RATING, ALL FLOOR BEAMS TO BE
MAINTAINED AT 3HR FIRE RATING. ANY
ALTERATION TO FIRE RATED
ENCLOSURES MUST BE RESTORED IN
KIND. BUILDING SHAFTS ARE 2HR RATED
OR MORE. EXISTING FIRE RATING OF ALL
CONDITIONS IS TO BE MAINTAINED IN THE
SAME MATERIALS ORIGINALLY USED. ANY
UNCOVERED UNSAFE CONDITIONS ARE
TO BE REPAIRED PRIOR TO CLOSURE

2.
3.
4.

5.
6.
7.

8.

9.

10.

NEW THRU-WALL CONDENSING
UNIT AND RELOCATED RADIATOR
BELOW WINDOW, SEE M-100
NEW ELECTRIC
RADIANT FLOOR

NEW ELECTRIC RADIANT FLOOR

NO WORK

2'-8"

LIMIT OF WORK
NEW THRU-WALL CONDENSING
UNIT AND RELOCATED RADIATOR
BELOW WINDOW, SEE M-100

NEW THRU-WALL CONDENSING
UNIT AND RELOCATED RADIATOR
BELOW WINDOW, SEE M-100

104a

20
A405

NEW
SINK

120
122

119A

119B

104A

NEW CABINETRY AND
COUNTERTOPS, TYP.

M-01
M-25

123

30

A

32

LAUNDRY
118

20

A402

M-03

NEW
REF.

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

10

HALL
113

A401

17

M-26

14

WIC
116

A402

20

A401

HALL
110

22

X-XX

MILLWORK TAG, SEE A-700

N
AREA OF WORK
1220 PARK AVE, APT 4B

106A

M-07

DINING ROOM
106

A404

30

FOYER
102
EXISTING ENTRY
DOOR TO REMAIN

42

DOOR TAG, SEE A-700

STAMP

33

101

23
40

101

T

105

10
103

11

M-20

WINDOW TAG, SEE G-001

HS

12

A400

43

52

BUTLER'S PANTRY
105

A

CLO

ENTRY
101
13

C

A

26

A402

M-19

16

102

25

A

A400

22

27
24

LIMIT OF WORK

101

M-06
14

5T

PARTITION TAG, SEE A-600
NO WORK

LINE OF NEW
15 MILLWORK, TYP.

118

E9

M-08

A

119a

M-23

HALL
121

124

51

M-03

NEW
REF.

21

CLO

M-24
CLO

122

A402

PLUMBING AND ELECTRICAL ENGINEER

A

HALL
103
17

M-27

121

50

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

NEW CONSTRUCTION

EXISTING SINK AT
NEW LOCATION
NEW STONE TILE
FLOOR

M-03

A

NEW
W/D

23

M-21

119b

A

WIC
124

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

EXISTING CONSTRUCTION TO REMAIN

EXISTING EXIT TO
REMAIN

M-02

NEW IN-WALL
COFFEE MAKER

NEW TILE
FLOOR
LINE OF NEW
MILLWORK, TYP.

42

41

53

CODE CONSULTANT

AV

104b

M-05

31

43
A402

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

EXISTING BUILDING, OUT OF SCOPE

NEW 200 AMP ELECT.
PANEL AT NEW LOCATION,
SEE ATTACHED LOAD
LETTER AND PROPOSAL
OF ROUTE

5'-0"

A402

KITCHEN
104
M-04

7'-3"

120

30
BEDROOM 3
122

LINE OF NEW
MILLWORK,
TYP.

BATH 2
120

33

40

ARCHITECT

RK

LINE OF NEW MILLWORK
RADIATOR COVER, TYP.
BEDROOM 2
119

A405

LEGEND

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

M-22

LINE OF NEW MILLWORK
RADIATOR COVER, TYP.
BATH 3
123

RELOCATE
EXSTG. D/W

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

PA

123

EXISTING RANGE W/
NEW HOOD @ NEW
LOCATION

104B

2'-8"

LIMIT OF WORK

A403

NEW TUB W/ SHOWER, SINK AT
NEW LOCATIONS. EXISTING
TOILET RELOCATED

NEW TUB W/ SHOWER, SINK AND
TOILET AT EXISTING LOCATIONS

EXISTING EXIT TO
REMAIN

10

NEW FLOOR AND
WALL TILE

NEW FLOOR AND
WALL TILE

NO WORK

11.

Artacho / Oh
Residence

A400

106

NOT FOR CONSTRUCTION
31

24

110

21

32

A400

106B

23

41

16

A

22

21

15
13
10

A402

PATCH EXSTG.
WD FLOOR AS
REQ'D.

B

12

11

117

WIC
117

114

B

111a

C

108a

BEDROOM 1
111
33

53
50

A401

30

52

A401

POWDER ROOM
109
80 CFM

LINE OF NEW SOFFIT
ABOVE, TYP.
20
A404

112
LINE OF NEW MILLWORK
RADIATOR COVER, TYP.

A

A404

5'-4 1/2"

5'-6"

LIMIT OF WORK

NO WORK

A401

40
M-12

B

A400

42

41

12
108b

11

PRELIMINARY BID

06/12/2017

ISSUE

DATE

107B

EXSTG. WD. FLOOR

TITLE

CONSTRUCTION PLAN

A
M-13

M-18

10

10
30

7'-3"

8'-4"

115

C

NEW WINDOWS AT EXISTING
LOCATIONS TO REPLACE
EXISTING WINDOWS, TYP. SEE
WINDOW SCHEDULE G-001

M-09

BATH 1
112

LINE OF NEW MILLWORK
RADIATOR COVER, TYP.

107A

50

C

STUDY
108
13

M-14

MASTER BATH
115

NEW NON-COMBUSTIBLE
FIRE PLACE SURROUND
AND MANTLE - SEE
ELEVATION A-400

REPAIR FIREBOX AND
COMPLETE ALL REPAIRS
PER CHIMNEY INSPECTION
LETTER
LIVING ROOM
107

NEW TILE FLOOR
NEW SINK AND TOILET AT
EXSTG WET FOOTPRINT
NEW EXHUAST FAN

NEW SHOWER AT
EXISTING LOCATION

M-11

109

32

31

51

LINE OF NEW
MILLWORK, TYP.
B

10
A405

M-17
CLO

M-09

MASTER BEDROOM
114

A

CONSTRUCTION PLAN

107b

A

116
111b

115

107a

M-10

M-15

114B

NEW TUB W/ SHOWER, SINK AT NEW
LOCATIONS. EXISTING TOILET
RELOCATED
NEW FLOOR AND WALL TILE
NEW ELECTRIC
RADIANT FLOOR

M-16

114A

111
NEW TUB W/ SHOWER,
SINK AT NEW LOCATIONS.
EXISTING TOILET
RELOCATED
NEW FLOOR AND WALL TILE

112

108

M-09

M-09

M-09

107E

107D

107C

N

NEW ELECTRIC RADIANT FLOOR

1/4" = 1'-0"

NOTE: EXISTING WINDOW A/C
UNITS TO BE REMOVED
THROUGHOUT, NEW CENTRAL A/C
SYSTEM TO BE INSTALLED PER
MECHANICAL

PROJECT NO:

1701

SCALE:

1/4"=1'-0"

SHEET NUMBER

A-100.00
PAGE 5 OF 18

3.
4.

5.

6.

7.

8.

LIMIT OF WORK

NO WORK

NO WORK
NEW FLOOR TILE
WITH ELECTRIC
RADIANT MAT, SEE
DETAIL 21/A600

LIMIT OF WORK

NEW FLOOR TILE
WITH ELECTRIC
RADIANT MAT,
SEE DETAIL
21/A600

DASHED LINE INDICATES
EXTENT OF NEW WOOD FLOOR
W/ SOUND PROOFING, SEE
DETAIL 20/A600

9.

10.

BATH 3
123
ST-03

A600 BATH 2
120
ST-03

21
BEDROOM 2
119
WD-3

A600
WATERPROOFING
BELOW TUB PER
22/A600

KITCHEN
104
ST-1
ST-2

21

22

A600

NEW TILE FLOOR

21

NO WORK

A600

NEW WD FLOOR TO
MATCH EXSTG

BEDROOM 3
122
WD-1

NEW STONE TILE
FLOOR

22

WATERPROOFING
BELOW TUB PER
22/A600

A600

ST-1
ST-2

11.

HALL
103
ST-1
ST-2

21
A600

21

20
LAUNDRY
118
ST-03

A600
EXSTG. WD. FLOOR

A600
WD-2

THRESHOLD AT
EXISTING WET
AREA PER 21/A600,

LIMIT OF WORK

WIC
117
WD-2

WIC
124
WD-2
PATCH EXSTG. WD
FLOOR AS REQ'D.

A600
HALL
113
WD-3
NEW WD
FLOOR

ARCHITECT
DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202
CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER
GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

E9

5T

HS

T

A600

AREA OF WORK
1220 PARK AVE, APT 4B
NEW STONE TILE
FLOOR

LEGEND

STAMP

DINING ROOM
106
WD-1

21
ENTRY
101
ST-1
ST-2

20

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

N
BUTLER'S PANTRY
105
ST-1
ST-2
21

A600
20
HALL
A600
121
WD-3 NEW WD FLOOR

12.

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

AV

2.

WATERPROOFING TO BE PROVIDED AT ALL
WET LOCATIONS, SOUNDPROOFING IS
REQ'D BELOW ALL RENOVATED FLOORS
AND ADDITIONAL WATERPROOFING /
SOUNDPROOFING MEASURES MUST BE
MADE FOR WET OVER DRY AREAS AS IF
REQ'D. PROVIDE FULL WATERPROOFING
(WP) AND SOUNDPROOFING (SP) IN ORDER
TO PROTECT THE AREA BELOW.
ALL WET ROOMS TO RECEIVE STANDARD
WP AND SP DETAILS. WP SYSTEM BY
LATICRETE (9235 OR APPROVED EQUAL) IS
RECOMMENDED FOR WP. GENIEMAT RST-10
IS RECOMMENDED FOR SP.
MODIFICATIONS TO ENTRY DOOR AND
SADDLE NOT PERMITTED
NAILS / FASTENERS MAY NOT PENETRATE
WP OR SP PRODUCTS ON AN SURFACE.
REFER TO MANUF. INSTALLATION
INSTRUCTIONS.
FOR PADDING BELOW AREA RUGS AND
CARPETING REQUIRING SOUND
PROTECTION, INSTALL 1/4" THICK
"TRED-MOR" MODEL #2580 UNDERLAYMENT
ALL WP AND SP INSTALLATION TO BE
INSPECTED BY BUILDING ARCH. UPON
COMPLETION.
AT ALL NEW TUB / SHOWER ENCLOSURES,
INSTALL WP WALLBOARD, DUROCK OR
EQUIV., PER MANUF.'S GUIDELINES. IN ALL
OTHER BATHROOM AREAS TO BE
REPLACES PROVIDE SHEETROCK MOLD
TOUGH GYPSUM PANELS BY USG OR EQUIV.
SHOWER PAN TO BE CLAMPED AND
SEALED, OR SOLDERED, INTO NEW DRAIN
COLLAR AND MUST CAP OVER THE CURB
EXTENDING A MIN. OF 4" UP THE WALL
ABOVE T.O. CURB WHICH WILL DETERMINE
HEIGHT AT THE PERIMETER SHOWER
WALLS. THE DRAIN MUST HAVE WEEP
HOLES. AFTER PASSING A 24 HR WATER
RETENTION TEST, WITNESSED BY THE
RESIDENT MANAGER, THE ENTIRE LEAD
PAN MUST BE COATED WITH A SUITABLE
WP MASTIC MEMBRANE PRIOR TO
INSTALLATION OF THE MORTAR BED.
AVOID DIRECT CONTACT OF LEAD PAN AND
PORTLAND CEMENT TO PREVENT
CORROSION. LEAD PAN TO BE PROTECTED
UNDERNEATH WITH TAR PAPER OR EQUIV.
OVER SAND BED TO PREVENT CORROSION.
LEAD PAN TO BE COATED WITH WP MASTIC
MEMBRANE PRIOR TO INSTALLATION OF
THE MORTAR BED. DO NOT APPLY
LATICRETE 9235 TO LEAD PAN, USE MASTIC
ONLY, MASTERSEAL HLM 5000 OR EQUIV.
IF NICHES ARE TO BE PROVIDED AT TUB OR
SHOWER ENCLOSURES, PROVIDE WP
THROUGHOUT ENTIRE NICHE, AND
EXTENDING AROUND ALL SIDES OF THE
NICHE FACE TO FORM A CONT. MEMBRANE
W/ THE WP AT THE SHOWER ENCLOSURE.
SLOPE BOTTOM OF NICHE TO DRAIN.
ONLY WATER BASED PRODUCTS
PERMITTED FOR FINISHING

RK

1.

Artacho / Oh
Residence

PA

GENERAL NOTES

EXISTING BUILDING, OUT OF SCOPE

NEW TILE FLOOR

EXISTING CONSTRUCTION TO REMAIN
FOYER
102
WD-1

HALL
110
WD-1

NOT FOR CONSTRUCTION

EXSTG. WD. FLOOR

NEW CONSTRUCTION
ST-1

FLOOR FINISH TAG, SEE SCHEDULE A-700

EXSTG. WD. FLOOR

EXSTG. WD. FLOOR

WIC
116
WD-2

PATCH EXSTG. WD
FLOOR AS REQ'D.
21

NEW TILE FLOOR

EXSTG. WD. FLOOR
ST-05

A600

MASTER BEDROOM
114
WD-1

WATERPROOFING
BELOW TUB PER
22/A600

A600

LIMIT OF WORK

NO WORK

21

A600

22

21

A600

A600

NEW FLOOR TILE, WITH ELECTRICAL
RADIANT MAT, SEE DETAIL 21/A600

THRESHOLD AT EXISTING
WET AREA PER 21/A600.

A600

22

21

10

ST-01
LINE OF EXISTING
BATHROOM
NEW STONE FLOOR
NEW SINK AND TOILET AT
EXSTG WET FOOTPRINT

MASTER BATH
115
ST-05

WATERPROOFING
BELOW TUB PER
22/A600

NEW STONE HEARTH,
20" EXTENSION.

POWDER ROOM
109

EXSTG. WD. FLOOR
BEDROOM 1
111
WD-1

ST-05
30

WD-2

WD-2

A600
NEW SHOWER CURB AND
DOOR PER 30/A600 NO
EXTENSION OF WET
FOOTPRINT.

ST-06

STUDY
108
WD-1
EXSTG. WD. FLOOR

LIVING ROOM
107
WD-1
PRELIMINARY BID

06/12/2017

ISSUE

DATE

EXSTG. WD. FLOOR
TITLE

BATH 1
112
ST-03

FINISH FLOOR PLAN

NEW FLOOR TILE WITH ELECTRIC
RADIANT MAT, SEE DETAIL 22/A600

PROJECT NO:

1701

SCALE:

1/4"=1'-0"

SHEET NUMBER
N

FINISH FLOOR PLAN
1/4" = 1'-0"

A-110.00
PAGE 6 OF 18

3.
4.

5.

6.
7.
8.

9.
10.
11.

12.

13.

14.
15.

LIMIT OF WORK

LIMIT OF WORK

DL

DL

16.

17.
WS

SD

WS
RL
S

A

WS

BEDROOM 2
119

WS

WS

S

$D$D$D

S

A

BATH 2
120

WS

DL

WS

WS

DL

A

LAUNDRY
118

WS
HALL
103

$D$D

$D$D

RL

ST

LF-02

RL

$D$D

WIC
116

ST

RL

S

ST
S

B

S

RL

RL

ST DA

S

A
S

RL

RL

LF-01

LF-01

B

WS

MASTER BEDROOM
114

WS

S

RL

$D$D$D

LIMIT OF WORK

NO WORK

10

STRIP LIGHT, DOOR ACTIVATED

ST SS

STRIP LIGHT, SELF SWITCH

WS

WALL SCONCE

ONE-WAY SWITCH, DIMMABLE

SD

SMOKE & CARBON MONOXIDE DETECTOR

CF

RL

RL

A
B

CEILING FAN
SPEAKER
SPEAKER, CONCEALED

RL

WS

LIVING ROOM
107

WS
WS
RL

RL

S

RL

B

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

WS

A

$D$D

RL

WS

$D$D

RL

S

LF-01

SUBWOOFER SPEAKER TO BE
CONCEALED IN MILLWORK
BELOW TV, ACOUSTICALLY
ISOLATED TO PREVENT THE
TRANSMISSION OF NOISE TO
ADJACENT APARTMENTS

WS

BATH 1
112
A

ST DA

$D

S

LF-01

STUDY
108

WS

WS MASTER BATH
115

RECESSED DOWNLIGHT

STAMP

DL

ONE-WAY SWITCH

B

RL

RL

RL

RL

S

AREA OF WORK
1220 PARK AVE, APT 4B

EXHAUST VENT, SEE MECH

B

ST

$D$ $D
POWDER ROOM
109
WS

RL

HS

ST
BEDROOM 1
111

WS

E9

DL

$

S

RL

RL

B

RL

RL

SURFACE MOUNTED DOWNLIGHT

ST

RL

RL

DL

$D $D $D
ST

A

WS

CEILING HEIGHT A.F.F.

B

WS
SD

RL

KEY PLAN

NOT FOR CONSTRUCTION

FOYER
102

$D$D$D

DL

WIC
117

S

S

DL

B

X'-X"

RL

RL

$D
$D$D$D WS

SD

HALL
110

ST

$$$

RL

SD

RL
ST

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

EXISTING CONSTRUCTION TO REMAIN

DINING ROOM
106
S

$D$D

WS

ST

WIC
124

RL

DL

$D

ENTRY
101

$D

ST DA

HALL
113

PLUMBING AND ELECTRICAL ENGINEER

EXISTING BUILDING, NOT IN SCOPE

DL

$D
$D

DL

$D

RL

ST DA

WS

SD

HALL
121

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

N

NEW CONSTRUCTION

$D$D

A

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

LEGEND

BUTLER'S PANTRY
105

DL
AUDIO RACK
LOCATED
ABOVE W/D ON
DEDICATED 15A
CIRCUIT

LIMIT OF WORK

WS

RL

DL

ST DA

$D$D

S

RL

ST DA

CODE CONSULTANT

T

SD

WS

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

DL

DL
RL

ARCHITECT

5T

A

$D

RL

DL

18.

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

NO WORK
S

RL

DL

DL

RL

A
WS

BEDROOM 3
122

DL
KITCHEN
104

S

RL
RL

DL

$D$D

BATH 3
123

DL

WS

$D$D$D

$D$D

RL

WS

DL

$D

NO WORK

NO WORK

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

AV

2.

ALL HEIGHTS MEASURED FROM FINISHED
FLOOR. FINAL DIMENSIONS, HEIGHTS AND
LOCATIONS TO BE CONFIRMED WITH
ARCHITECT IN FIELD
SEE 32 / A600 FOR TYPICAL SUSPENDED
CEILING DETAIL.
NO CUTTING OR CHANNELING OF BUILDING
STRUCTURE IS PERMITTED
FINAL LOCATIONS OF ALL LIGHTING, ACCESS
PANELS, SUPPLY AND RETURN GRILLES, AND
OTHER CEILING ITEMS TO BE COORDINATED
WITH ARCHITECT IN FIELD
AFTER ROUGH-IN, PRIOR TO INSTALLATION, GC
TO CONFIRM ALL FINAL SWITCH LOCATIONS
WITH ARCHITECT IN FIELD
ALL OUTLETS TO BE GANGED INTO A SINGLE
FACE PLATE WHEREVER POSSIBLE, U.O.N.
ALL RECEPTACLE COVERS TO BE LUTRON
WHITE OR APPROVED EQUAL
COORDINATE W/ MECH PLAN FOR NEW DUCT /
PIPING LOCATIONS -- COORDINATE AS REQ'D W/
NEW SOFFITS, V.I.F.
COORDINATE RUNS AS REQ'D W/ NEW CEILING
LOCATIONS & BEAM FURRING AS REQ'D
PROVIDE BLOCKING AT ALL CEILING PENDANT
FIXTURES.
WHERE DUCTWORK IS CONCEALED IN CELINGS
OR WALLS, ACCESS DOORS ARE TO BE
PROVIDED TO CLEANOUTS, MIN. 12IN. X 12IN. IN
SIZE.
ANY PROPOSED ADDITIONAL ELECTRICAL
FIXTURES WILL BE WIRED AND CIRCUITED SO
THAT THERE IS NO OVERLOADING OF THE MAIN
CIRCUIT OF THE APARTMENT OR BUILDING.
DURING CONSTRUCTION, THERE IS TO BE NO
INTERFERENCE WITH THE BUILDINGS
INTERCOM. SYSTEMS, INTERCOM LINES SHALL
BE MODIFIED ONLY BY THE BUILDING.
COMMUNICATION SYSTEMS ARE THE
RESPONSIBILITY OF THE SHAREHOLDER.
SEE ELECTRICAL DRAWINGS FOR OUTLET AND
SWITCH LOCATIONS. FIREPROOFING AND
FIRESTOPPING MUST BE PROVIDED AT ALL
OUTLETS AT DEMISING WALLS, CHOPPING INTO
FLUE WALLS OR ANY BLOCK/BRICK IS NOT
ALLOWED. CONFIRM WALL THICKNESS PRIOR
TO INSTALLATION. FIRE RATINGS OF WALLS
ARE TO BE MAINTAINED AT ALL TIMES. NO SLAB
PENETRATIONS PERMITTED
NEW ELECTRICAL PANEL LOCATION TO COMPLY
WITH NEC 110.26, SEE A100, TOP BREAKER
CANNOT BE ABOVE 6'-7" AFF.
LIGHT FIXTURES AT SHOWER STALLS TO BE
WATERPROOF AND/OR GASKETED AND
SUITABLE FOR INSTALLATION IN A WET
LOCATION. PROVIDE GFCI CIRCUIT BREAKER
FOR BRANCH CIRCUIT.
SEE ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION

RK

1.

Artacho / Oh
Residence

PA

GENERAL NOTES

S

S

B
WS

REFLECTED CEILING PLAN

B

WS

PROJECT NO:

1701

SCALE:

1/4"=1'-0"

SHEET NUMBER
N

REFLECTED CEILING PLAN
1/4" = 1'-0"

A-120.00
PAGE 7 OF 18

LEGEND
M-1

MILLWORK TAG,
SEE A700 FOR SCHEDULE

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

TR-01
typ.

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
TR-01

TR-02

107A

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

107B
BT-02

ST-06

ARCHITECT
TR-02

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

typ.

CODE CONSULTANT

[107] LIVING ROOM - NORTH

50

1/4"=1'-0"

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

107A

107B

107D

107C

PLUMBING AND ELECTRICAL ENGINEER

107E

TR-02

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

108B

M-09

42

M-09

M-09

[107] LIVING ROOM - EAST

M-09

[107] LIVING ROOM - SOUTH

41

1/4"=1'-0"

M-09

40

1/4"=1'-0"

[107] LIVING ROOM - WEST
1/4"=1'-0"

KEY PLAN

AV

TR-03

E9

PA

RK

typ.

5T

HS

T

M1-02
M1-02

M1-02

106A

M1-02

M1-02

TR-04

106B

typ.
107B

ST-06

ST-06

ST-06

ST-06

ST-06

ST-06

105

ST-06

ST-06

ST-06

ST-06

ST-06

ST-06

N
AREA OF WORK
1220 PARK AVE, APT 4B

M-08

STAMP

33

[106] DINING ROOM - NORTH

32

1/4"=1'-0"

[106] DINING ROOM - EAST

[106] DINING ROOM - SOUTH

31

1/4"=1'-0"

[106] DINING ROOM - WEST

30

1/4"=1'-0"

1/4"=1'-0"
NOT FOR CONSTRUCTION

TR-03
typ.

102

103

107A

108A

TR-04
typ.

110

101

TR-05
typ.

23

[102] FOYER - NORTH

22

1/4"=1'-0"

[102] FOYER - EAST
1/4"=1'-0"

21

[102] FOYER - SOUTH

20

1/4"=1'-0"

[102] FOYER - WEST
1/4"=1'-0"

TR-03

TR-03

TR-04
typ.

ISSUE

DATE

INTERIOR ELEVATIONS 1
[101] ENTRY, [102] FOYER
[103] HALL
[106] DINING ROOM
[107] LIVING ROOM

TR-04
typ.
101

103

06/12/2017

TITLE

typ.

typ.

PRELIMINARY BID

PROJECT NO:
TR-05

17

[103] HALL - NORTH
1/4"=1'-0"

16

[103] HALL - EAST
1/4"=1'-0"

15

[103] HALL - SOUTH
1/4"=1'-0"

14

SCALE:

1/4" = 1'-0"

SHEET NUMBER

TR-05
typ.

1701

typ.

[103] HALL - WEST
1/4"=1'-0"

13

[101] ENTRY - NORTH
1/4"=1'-0"

12

[101] ENTRY - EAST
1/4"=1'-0"

11

[101] ENTRY - SOUTH
1/4"=1'-0"

10

[101] ENTRY - WEST

A-400.00

1/4"=1'-0"
PAGE 9 OF 18

LEGEND
M-1

MILLWORK TAG,
SEE A700 FOR SCHEDULE

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

TR-01
typ.

114A
117

114B

M-18

116

M-18

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

typ.

52

1/4"=1'-0"

51

1/4"=1'-0"

[114] MASTER BEDROOM - SOUTH

50

1/4"=1'-0"

CODE CONSULTANT

[114] MASTER BEDROOM - WEST
1/4"=1'-0"

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER
119A

118

114
TR-02
typ.

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

TR-02
typ.

[113] HALL - NORTH

42

1/4"=1'-0"

[113] HALL - EAST

[113] HALL - SOUTH

41

1/4"=1'-0"

40

1/4"=1'-0"

[113] HALL - WEST
1/4"=1'-0"

KEY PLAN

AV

43

RK

TR-01
typ.

E9

PA

53

[114] MASTER BEDROOM - EAST

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT
TR-02

[114] MASTER BEDROOM - NORTH

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER

TR-02
typ.
115

114

Artacho / Oh
Residence

5T

HS

T

111A

111

TR-01
typ.

111B

112
N
AREA OF WORK
1220 PARK AVE, APT 4B

M-16
TR-02
typ.

33

[111] BEDROOM 1 - NORTH
1/4"=1'-0"

32

STAMP

[111] BEDROOM 1 - EAST
1/4"=1'-0"

[111] BEDROOM 1 - SOUTH

31

[111] BEDROOM 1 - WEST

30

1/4"=1'-0"

1/4"=1'-0"
NOT FOR CONSTRUCTION

12x8 D U C T

12x8 D U C T

12x8 D U C T

12x8 D U C T

TR-02
typ.

110

111A

TR-02
typ.

TR-02
typ.

23

22

1/4"=1'-0"

[110] HALL - EAST
1/4"=1'-0"

21

[110] HALL - SOUTH

20

1/4"=1'-0"

1/4"=1'-0"

28x8 D U C T

M-11

108
108B

108A

M-15

M-10

M-11

M-14
M-12

[108] STUDY - NORTH
1/4"=1'-0"

12

1/4"=1'-0"

11

06/12/2017

ISSUE

DATE

TITLE

PROJECT NO:

M-13

[108] STUDY - EAST

PRELIMINARY BID

INTERIOR ELEVATIONS 2
[108] STUDY, [110] HALL
[111] BEDROOM 1
[113] HALL
[114] MASTER BEDROOM

M-11

M1-01

13

[110] HALL - WEST

28x8 D U C T

28x8 D U C T

28x8 D U C T

[110] HALL - NORTH

1701

SCALE:

1/4" = 1'-0"

SHEET NUMBER

[108] STUDY -SOUTH
1/4"=1'-0"

10

A-401.00

[108] STUDY - WEST
1/4"=1'-0"

PAGE 10 OF 18

LEGEND

TR-01

M-1

MILLWORK TAG,
SEE A700 FOR SCHEDULE

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

typ.

TR-01
typ.

124

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

M1-01

TR-02

ARCHITECT

typ.

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

53

[124] W.I.C. - NORTH

52

1/4"=1'-0"

[124] W.I.C. - EAST

51

1/4"=1'-0"

[124] W.I.C. - SOUTH

50

1/4"=1'-0"

[124] W.I.C. - WEST
1/4"=1'-0"

CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

TR-01
typ.

TR-01
typ.

122
122

124

PLUMBING AND ELECTRICAL ENGINEER
GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

123

M-25
TR-02
typ.

[122] BEDROOM 3 - NORTH

42

1/4"=1'-0"

[122] BEDROOM 3 - EAST

[122] BEDROOM 3 - SOUTH

41

1/4"=1'-0"

40

1/4"=1'-0"

[122] BEDROOM 3 - WEST
1/4"=1'-0"

KEY PLAN

AV

43

RK

TR-01

E9

PA

typ.

5T

HS

T

119A

119B
120

TR-01
typ.

119A

119B
N
AREA OF WORK
1220 PARK AVE, APT 4B

M-22
TR-02
typ.

33

[119] BEDROOM 2 - NORTH

32

1/4"=1'-0"

STAMP

[119] BEDROOM 2 - EAST

31

1/4"=1'-0"

[119] BEDROOM 2 - SOUTH

30

1/4"=1'-0"

[119] BEDROOM 2 - WEST
1/4"=1'-0"
NOT FOR CONSTRUCTION

AHU-1

TR-01

AHU-1

AHU-1

AHU-1

typ.

M-21

TR-02
typ.
121

122

TR-01
typ.

118

CT-01

CT-01

M-21

TR-02
typ.

27

[121] HALL - NORTH

26

1/4"=1'-0"

[121] HALL - EAST
1/4"=1'-0"

25

[121] HALL - SOUTH

24

1/4"=1'-0"

[121] HALL - WEST

23

1/4"=1'-0"

[118] LAUNDRY - NORTH

22

1/4"=1'-0"

[118] LAUNDRY - EAST

21

1/4"=1'-0"

[118] LAUNDRY - SOUTH

20

1/4"=1'-0"

[118] LAUNDRY - WEST
1/4"=1'-0"

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

M1-01

M1-01
117

M-20

M-20

TR-02
typ.
119

M-19

INTERIOR ELEVATIONS 3
[116] W.I.C., [117] W.I.C.
[118] LAUNDRY
[119] BEDRM 2, [121] HALL
[122] BEDRM 3, [124] W.I.C.

M1-01

M1-01

SD-01

M1-01

M1-01
M-19

M-20

M-20

M-19

M-19

PROJECT NO:

1701

SCALE:

1/4" = 1'-0"

SHEET NUMBER

17

[117] W.I.C. - NORTH
1/4"=1'-0"

16

[117] W.I.C. - EAST
1/4"=1'-0"

15

[117] W.I.C. - SOUTH
1/4"=1'-0"

14

[117] W.I.C. - WEST
1/4"=1'-0"

13

[116] W.I.C. - NORTH
1/4"=1'-0"

12

[116] WALK-IN-CLOSET - EAST
1/4"=1'-0"

11

[116] W.I.C. - SOUTH
1/4"=1'-0"

10

[116] WALK-IN-CLOSET - WEST

A-402.00

1/4"=1'-0"
PAGE 11 OF 18

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

28x8 D U C T

28x8 D U C T

M-04

M-01
BT-01

M-04

BT-01

GL-01
OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128
104B
TCT-01
104A

GL-01
SEE 32/A-406 FOR
ELEVATION BEYOND

TCT-01

TCT-01

43

KITCHEN ISLAND - NORTH

42

1/2"=1'-0"

[104] KITCHEN - EAST
1/2"=1'-0"

ARCHITECT
DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202
CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

M-01
M-04

M-05

M-05

M-04

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER

32

[104] KITCHEN - EAST

31

1/2"=1'-0"

[104] KITCHEN - NORTH

30

1/2"=1'-0"

[104] KITCHEN - WEST

41

1/2"=1'-0"

KITCHEN ISLAND - SOUTH

40

1/2"=1'-0"

KITCHEN ISLAND - WEST
1/2"=1'-0"

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

LEGEND
BT-01

GL-01

GL-01

GL-01

M-1

MILLWORK TAG,
SEE A700 FOR SCHEDULE

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

BT-01

GL-01

GL-01

M-02

KEY PLAN

GL-01

TCT-01
104A

GL-01

E9

PA

RK

AV

BT-01

5T

HS

T

M-02
TCT-01

N
AREA OF WORK
1220 PARK AVE, APT 4B

104A
NEW
SINK & FAUCET

M-01
M-02

104B

104A

RELOCATE
EXISTING
DISHWASHER

STAMP

ST-03

M-01

43
A406

ST-03

RELOCATE
EXISTING RANGE
NOT FOR CONSTRUCTION

21

[104] KITCHEN - NORTH

20

1/2"=1'-0"

[104] KITCHEN - EAST
1/2"=1'-0"
NEW HOOD
(ABOVE)

NEW
ICE MAKER

M-01
BT-01

BT-01

BT-01

BT-01

BT-01

ST-03

NEW KITCHEN
ISLAND

28x8 D U C T

40
A406

M-04

42
A406
M-02

M-05

NEW STONE TILE
FLOOR
31
A406

21

BT-01
32

A406

20

41
A406

11
M-03

M-03
PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE
NEW
COFFEE
MAKER

M-03
ST-03

M-03

M-03

NEW
REF. & FREEZER

NEW
WINE REF.

ENLARGED PLANS AND
INTERIOR ELEVATIONS 1
[104] KITCHEN

M-03

BT-01

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

11

[104] KITCHEN - SOUTH
1/2"=1'-0"

10

[104] KITCHEN ENLARGED PLAN
1/2"=1'-0"

A-403.00
PAGE 12 OF 18

LEGEND
M-1

MILLWORK TAG,
SEE A700 FOR SCHEDULE

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT

MC-01
CT-01

112

CT-01

112

CT-01

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

CT-01
34
112

SD-01

22

A403

33

CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

32
ST-03

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710
112
PLUMBING AND ELECTRICAL ENGINEER

34

[112] BATH 1 - NORTH

33

1/2"=1'-0"

[112] BATH 1 - EAST

[112] BATH 1 - SOUTH

32

1/2"=1'-0"

[112] BATH 1 - WEST

31

1/2"=1'-0"

30

1/2"=1'-0"

[112] BATH 1 - ENLARGED PLAN
1/2"=1'-0"

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

AHU-3

AHU-3

AHU-3

typ.

E9

PA

RK

TR-03

AV

AHU-3

5T

HS

T

109
MC-01

109

MT-01

MT-01

MT-01

MT-01

24

N

ST-02
21

A403

AREA OF WORK
1220 PARK AVE, APT 4B

23

22
STAMP

TR-05

typ.
NOT FOR CONSTRUCTION

24

[109] POWDER ROOM - NORTH
1/2"=1'-0"

23

[109] POWDER RM - EAST
1/2"=1'-0"

28x8 D U C T

28x8 D U C T

GL-02

GL-02

[109] POWDER ROOM - SOUTH
1/2"=1'-0"

21

[109] POWDER RM - WEST

20

1/2"=1'-0"

[109] POWDER ROOM - ENLARGED PLAN
1/2"=1'-0"

28x8 D U C T

28x8 D U C T

M-07
GL-02

22

M-06
GL-02

GL-02

GL-02

GL-02

GL-02

GL-02

GL-02

GL-02

GL-02
M-06

PRELIMINARY BID

06/12/2017

ISSUE

DATE

105
TITLE

TR-04
typ.

TCT-01
TCT-01

14
ST-01
ST-02

105
11

A403

13

12

M-07

M-06

ST-06

ENLARGED PLANS AND
INTERIOR ELEVATIONS 1
[105] BUTLER'S PANTRY
[109] POWDER ROOM
[111] BATH 1
PROJECT NO:

M-07

1701

SCALE:

AS NOTED

SHEET NUMBER

14

[105] BUTLER'S PANTRY - NORTH
1/2"=1'-0"

13

[105] BUTLER'S PANTRY - EAST
1/2"=1'-0"

12

[105] BUTLER'S PANTRY - SOUTH
1/2"=1'-0"

11

[105] BUTLER'S PANTRY - WEST
1/2"=1'-0"

10

A-404.00

[105] BUTLER'S PANTRY - ENLARGED PLAN
1/2"=1'-0"

PAGE 13 OF 18

LEGEND

123

34
31
123

CT-01

A404

101

DOOR TAG,
SEE A702 FOR SCHEDULE

101

WINDOW TAG,
SEE A702 FOR SCHEDULE

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
33

123

MC-01

CT-01

MILLWORK TAG,
SEE A700 FOR SCHEDULE

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

32

CT-01

123

M-1

ARCHITECT

CT-01

ST-03

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

SD-01

CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427
MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

34

[123] BATH 3 - NORTH

33

1/2"=1'-0"

[123] BATH 3 - EAST

32

1/2"=1'-0"

[123] BATH 3 - SOUTH

31

1/2"=1'-0"

[123] BATH 3 - WEST
1/2"=1'-0"

30

[123] BATH 3 - ENLARGED PLAN

PLUMBING AND ELECTRICAL ENGINEER

1/2"=1'-0"

120

AHU-2

AHU-2

AHU-2

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

AHU-2

120

KEY PLAN

ST-03
24
120

CT-01

MC-01
CT-01

120

CT-01

21

A404

23

AV

CT-01

E9

PA

RK

22
SD-01

5T

HS

T

N
AREA OF WORK
1220 PARK AVE, APT 4B

STAMP

24

[120] BATH 2 - NORTH

23

1/2"=1'-0"

[120] BATH 2 - EAST

22

1/2"=1'-0"

[120] BATH 2 - SOUTH

21

1/2"=1'-0"

[120] BATH 2 - WEST
1/2"=1'-0"

20

[120] BATH 2 - PLAN
1/2"=1'-0"
NOT FOR CONSTRUCTION

ST-05

ST-05

14
11

MC-02

MC-02

MC-02

115

ST-05

A404

13

12

115
ST-05

115

PRELIMINARY BID

06/12/2017

ISSUE

DATE

ST-05

ST-05

TITLE
SD-01

ENLARGED PLANS AND
INTERIOR ELEVATIONS 2
[115] MASTER BATH
[120] BATH 2, [123] BATH 3

ST-05
ST-05

ST-05

ST-05

ST-05

ST-05

PROJECT NO:

ST-05

[115] MBA - NORTH
1/2"=1'-0"

13

[115] MASTER BATH - EAST
1/2"=1'-0"

12

[115] MBA - SOUTH
1/2"=1'-0"

11

[115] MASTER BATH - WEST

10
1/2"=1'-0"

SCALE:

AS NOTED

SHEET NUMBER

115

14

1701

[115] MASTER BATH - ENLARGED PLAN
1/2"=1'-0"

A-405.00
PAGE 14 OF 18

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT
DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202
CODE CONSULTANT

PIPE
CEMENT BOARD AT SHOWER OR
BATHTUB. MOLD RESISTANT BOARD
AT ALL OTHER BATHROOM WALLS.

SEALANT

3/8" DIA. STEEL GALV. ROD
SPACED @ 4'-0" O.C. MAX.

RUNNER

STEEL CHANNEL AT 4'-0" O.C. MAX

STUDS

DRY AREA

WET AREA

STUD CLIPPED TO
CREATE NOTCH FOR
SENSOR.

3" MIN.
THICKNESS
HILTI
HY200
EPOXY SOUND
ANCHOR OR APPROVED EQ.
ATTENUATION BLANKET
RSIC-1.5 CRC SOUND ISOLATION CLIP
OR APPROVED EQUIV.

TAPE AND SPACKLE
FURRING ANGLE

FFL.

KEY PLAN

EXISTING DROPPED STRUCTURAL
SLAB. TYP. @ ORIGINAL BLDG WET
AREAS. VERIFY EXISTING CONDITIONS

CINDER FILL

EXISTING BEAM

32

TYPICAL SUSPENDED CEILING DETAIL

31

SCALE: 1 1/2" = 1'-0"

EXISTING CONCRETE SLAB

FLOOR DETAIL ADJACENT TO WET AREA - AS REQUIRED

30

SCALE: 1 1/2" = 1'-0"

SHOWER CURB DETAIL
SCALE: 1 1/2" = 1'-0"

ALL CEILING SUSPENSION SYSTEMS TO CONFORM TO
NYC BUILDING CODE - REFERENCE STANDARD RS5-16

5T

SCHEDULED BASE OR WALL TILE
ACOUSTICAL SEALANT
TILE OR STONE ON MIN. 38" THINSET

N

WARMUP STICKYMAT ELECTRIC
RADIANT FLOOR @ BATHROOMS. SEE
A-110. REFER TO MANUF. SPEC. AND
INSTALLATION REQ'S.

VINYL TILING-IN BEAD
TUB AS SCHEDULED SEE A700
TILE OR STONE ON
MIN. 38" THINSET
5
8"

CEMENT BOARD / DUROCK

SCHEDULED BASE
ACOUSTIC SEALANT
NAIL DOWN WOOD FLOOR

GENIE MAT RST-10, ENKASONIC, SR
FLOORBOARD SOUNDPROOFING OR
APPROVED EQ.
CEMENT LEVELING BED AS REQ'D

EXSTG OR NEW SADDLE / FLOOR

ACOUSTICAL SEALANT
EXSTG OR NEW
SADDLE / FLOOR

PERIMETER ISOLATION PER MANUF.

SEALANT

SLAB OR CEILING ABOVE

SLAB OR CEILING ABOVE

CONTINUOUS SEALANT AT
PERIMETER, 2 BEADS AT GWB
EDGE, TYP

CONTINUOUS SEALANT AT
PERIMETER, 2 BEADS AT GWB
EDGE, TYP
METAL J-BEAD, TYP

METAL J-BEAD, TYP

HEAD

SOUNDPROOFING / WATERPROOFING DETAIL

21

SCALE: 1 1/2" = 1'-0"

1" GWB PANELS (SOLID /
LAMINATED) WITH LAMINATING
COMPOUND OVER ENTIRE
CONTACT SURFACE.

VARIES

PLAN

PLAN

SHAFT OR CAVITY SPACE,
COORD. W/ MEP & PLAN
ALIGNMENTS, VIF

(2)LAYERS 5/8" MOLD RESISTANT
GWB EA. SIDE, CEMENT BOARD,
MOLD TOUGH OR EQ. AT WET /
DAMP LOCATIONS. INSTALL PER
MANUF. GUIDELINES. PROVIDE
BLOCKING AS REQ'D, SEE INT
ELEVATIONS
7/8" METAL FURRING CHANNELS
@ 16" O.C., LAMINATE DIRECTLY
TO EXISTING WALL IF PLUMB
SURFACE EXISTS, COORD. W/
MEP

BOTTOM RUNNER. SECURE TO
SUBFLOOR @ 24" O.C. MAX.
BASE

BASE

SLAB OR SUBFLOOR

SLAB OR CEILING ABOVE
CONTINUOUS SEALANT AT
PERIMETER, 2 BEADS AT GWB
EDGE, TYP

METAL J-BEAD, TYP
METAL J-BEAD, TYP

8 1/4"

2 1/2"

PLAN

HEAD

TOP RUNNER. SECURE TO U.O.
STRUCT ABV @ 24" O.C. MAX.
STOP TRACK SHORT OF SLAB OR
PROVIDE ISOLATED HEADER PAD,
KINETICS WALLMAT OR EQUIV.
(2)LAYERS 5/8" MOLD RESISTANT
GWB EA. SIDE, CEMENT BOARD,
MOLD TOUGH OR EQ. AT WET /
DAMP LOCATIONS. INSTALL PER
MANUF. GUIDELINES. PROVIDE
BLOCKING AS REQ'D, SEE INT
ELEVATIONS

PLAN

1-5/8" 20 GA. MTL STUDS @ 16" O.C.
CAVITY FOR POCKET DOOR

(2) LAYERS 5/8" MOLD RESISTANT
GWB EA. SIDE, CEMENT BOARD,
MOLD TOUGH OR EQ. AT WET /
DAMP LOCATIONS. INSTALL PER
MANUF. GUIDELINES. PROVIDE
BLOCKING AS REQ'D, SEE INT
ELEVATIONS

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

DETAILS

20 GA. MTL STUDS @ 16" O.C.

BASE AS SCHEDULED

3" MINERAL WOOL BATT
INSULATION
BASE AS SCHEDULED

BOTTOM RUNNER. SECURE TO
SUBFLOOR @ 24" O.C. MAX.

BOTTOM RUNNER, SECURE TO
SUBFLOOR @ 24" O.C. MAX.

BASE

SLAB OR SUBFLOOR

TOP RUNNER, SECURE TO U.O.
STRUCT ABV @ 24" O.C. MAX.
STOP TRACK SHORT OF SLAB OR
PROVIDE ISOLATED HEADER PAD,
KINETICS WALLMAT OR EQUIV.

6 1/8" TYP

RIGID INSULATION

SHIM SPACE AS REQ'D FOR
PLUMB SURFACE AND/OR PLAN
ALIGNMENTS
BASE AS SCHEDULED

BASE AS SCHEDULED

SCALE: 1 1/2" = 1'-0"

CONTINUOUS SEALANT AT
PERIMETER, 2 BEADS AT GWB
EDGE, TYP

FACE OF EXISTING
CONSTRUCTIOIN

(1) LAYER 5/8" MOISTURE
RESISTANT TYPE 'X' FIRE RATED
GWB EACH SIDE, TO U.O. SLAB
ABOVE

NEW WOOD FLOOR DETAIL

20

SLAB OR CEILING ABOVE

HEAD

TOP RUNNER. SECURE TO U.O.
STRUCT ABV @ 24" O.C. MAX

NOT FOR CONSTRUCTION

TOP OF EXSTG SUBFL. (VIF)

SEE 30/A110 FOR TYPICAL
TILE FLOOR ASSEMBLY

SCALE: 1 1/2" = 1'-0"

STAMP

(2) LAYERS 38" MIN. PLYWD SECURED W/
COUNTER SUNK FLAT HEAD SCREWS.
NOTE: ALTERNATE BOARDS @ 90 DEG.

LATICRETE 9235 WP
CONTINUOUS BELOW TUB TO
WALL

BATHTUB WATERPROOFING DETAIL

AREA OF WORK
1220 PARK AVE, APT 4B

EXISTING OR NEW WALL

GENIEMAT RST-10 SOUNDPROOFING
OR APPROVED EQUAL
LATICRETE 9235 WATERPROOFING OR
APPROVED EQUAL
CEMENT LEVELING BED AS REQ'D
TOP OF EXSTG. SUBFLOOR, VIF

FIRE AND ROT RESISTANT
BLOCKING AS REQ'D

22

HS

T

EXISTING OR NEW WALL

LATICRETE 9235 WP, EXTEND
FROM FLOOR TO CEILING

2 1/4"

LIGHTWEIGHT
CINDER FILL

E9

SEE 30/A110 FOR TYPICAL
TILE WALL ASSEMBLY

HEAD

CONCRETE CURB

EXISTING CINDER FILL (STORED
ON SITE AND REUSED)

DRY AREA BELOW

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

4" +/-

EXISTING
STRUCTURAL
SLAB

1/4" PER FT.
SLOPE

PLUMBING AND ELECTRICAL ENGINEER

LIGHT WEIGHT
CONCRETE
TOPPING SLAB

2" MIN

NEW
DRAIN

4" MIN

5/8" GYP. BRD. CEILING. PROVIDE
CEMENT BOARD, MOLD TOUGH OR
APPROVED EQUAL AT ALL WET AREAS.

BITUTHENE MEMBRANE, KEMPER
ROOFING OR APPROVED EQUAL.
PROTECT TOP AND BOTTOM OF THE
MEMBRANE FROM PUNTURE.

TOP OF CURB

LATICRETE 9235 WATERPROOFING
TURNED UP AT WALLS
2" THICK TOPPING SLAB. LIGHT
WEIGHT CONCRETE. NOT TO
EXCEED 110LBS/PCF.
POLYSHEET TO PREVENT CEMENT
FROM BONDING TO CINDER FILL.

WATER SENSOR
WITH SHUT-OFF AND
ALARM
T.O. FIN. FLR.,
VERIFY
EXISTING
CONDITIONS.

7/8" FURRING CHANNEL @ 2'-0" O.C. MAX.

SETTING BED OR THINSET
QTscu OR GENIE MAT SOUNDPROOFING. SEE
MANUFACTURER'S INSTRUCTIONS. SOLVENTFREE ADHESIVE REQ'D WITH LATICRETE 9235.

AV

METAL STUD
PARTITION

GYP. BRD. PARTITION

EXISTING
PARTITION VIF

STONE OR TILE FINISH FLOOR AND WALL

RK

GYPSUM BOARD

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PA

EMBED DIM. MANUF

BITUTHENE MEMBRANE
1'-0" MIN. ABOVE
HIGHEST BRANCH PIPE.

CONCRETE SLAB

STONE OR TILE FINISH
5
8" DUROCK AT SHOWER WALLS
LATICRETE 9235 TO CLNG. ABOVE IN SHOWER,
LAP UP AT LEAST 6" AT OTHER BATHROOM WALLS
LEAD PAN BEYOND WITH END DAMS, EXTEND MIN. 4"
UP WALL, ABOVE T.O. CURB. NO WALLBOARD NAILS
WITHIN 2" ABOVE LINE OF PAN. SEE NOTES 8, 9
STONE OR TILE FINISH
LATICRETE 9235 WP MEMBRANE, CONT. ACROSS
BATHRM FLOOR, SHOWER FLOOR AND WALLS
NEW REINFORCED MORTAR BED; SLOPE TO DRAIN
MIN. 41" PER FOOT
NEW LEAD PAN WITH MASTIC, OVER WP OR BLDG
FELT, CLAMP PAN TO DRAIN COLLAR AND WRAP
OVER TOP OF CURB, PROVIDE END DAMS, APPLY
LATICRETE 9235 TO CONC. WALLS, CURB &
FLOORS BELOW PAN (TYP). SEE NOTE 10
NEW CRUSHED STONE (PEA GRAVEL), WEEP
HOLES AROUND DRAIN

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

BASE

SLAB OR SUBFLOOR

SLAB OR SUBFLOOR

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

D

PARTITION TYPE D: TWO-HOUR RATED WALL (AS REQ'D)
SCALE: 1-1/2" = 1'-0"

C

PARTITION TYPE C: FURRING WALL
SCALE: 1-1/2" = 1'-0"

B

PARTITION TYPE B: POCKET DOOR WALL
SCALE: 1-1/2" = 1'-0"

A

PARTITION TYPE A: 2-SIDED STUD WALL
SCALE: 1-1/2" = 1'-0"

A-600.00
PAGE 15 OF 18

FINISH/PAINT SCHEDULE

STONE / TILE SCHEDULE
TYPE

MATERIAL

MANUFACTURER

SPECIFICATION

SIZE

ST-01

NERO MARQUINO

COMPLETE TILE

3/8" STONE TILE

12" x 12"

V.I.F., SEALANT PER MANUF.

ST-02

STATUARY WHITE MARBLE

COMPLETE TILE

3/8" STONE TILE

12" x 12"

V.I.F., SEALANT PER MANUF.

ARTISTIC TILE

SBDOLPHX

1 1/4" HEXAGON TILE

POLISHED

ST-04

STATUARY WHITE MARBLE

STONE SOURCE

1 1/4" STONE SLAB

VIF

HIGH HONED

ST-05

MARBLE

STONE SOURCE

3/4" STONE SLAB

VIF

MING GREEN

ST-06

PIETRA CARDOZA

STONE SOURCE

3/4" STONE SLAB

VIF

TCT-01

TERRACOTTA TILE

MOSAIC HOUSE

MDV 26

2" x 2"

PORCELAIN WHITE

MT-01

ALUMINUM TILE

COMPLETE TILE

230-A1-704-029

3" x 6" NOMINAL

MIRROR

CT-01

CLAY TILE

FIRECLAY TILE

WHITE WASH

4" x 4"

WHITE / GLOSS

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

NOTES

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

106 / DINING ROOM

108 / STUDY

BENDHEIM

SEE ELEV.'S

GL-02

REEDED GLASS

BENDHEIM

SEE ELEV.'S

MI-01

CLEAR MIRROR

ZECCA

SEE ELEV.'S

MI-02

ANTIQUE MIRROR

ZECCA

SEE ELEV.'S

BT-01

BRASS TRIM

SEE ELEV.'S

LACQUERED BRASS

BT-02

BRASS TRIM

SEE ELEV.'S

UNLACQUERED BRASS

AT FIREPLACE IN [107] LIVING ROOM

LF-01

METAL LEAF

SEE ELEV.'S/RCP

SILVER

AT CEILING IN [108] STUDY

LF-02

METAL LEAF

SEE ELEV.'S/RCP

GOLD

AT DOME IN [113] HALL

SEE ELEV.'S

PER PLUMBING
SCHEDULE

NOTES

109 / POWDER ROOM

110 / HALL

111 / BEDROOM 1

IN [115] MASTER BATH
112 / BATH 1

PER PLUMBING
SCHEDULE

113 / HALL

MILLWORK SCHEDULE
SIZE

FINISH

V.I.F.

SATIN
LACQUER

V.I.F.

SATIN
LACQUER

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & BRASS
/ MILLWORK BY GC VERTICAL TRIM

V.I.F.

SATIN
LACQUER

KITCHEN ISLAND

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & BRASS
/ MILLWORK BY GC LEGS

V.I.F.

SATIN
LACQUER

M-05

EAT-IN KITCHEN BANQUETTE

BLUM HARDWARE
SHOP PTD. LACQUER
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

M-06

LOWER AND UPPER CAB'S,
NORTH WALL

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & GLASS
/ MILLWORK BY GC PANEL

V.I.F.

GLOSS
LACQUER

M-07

LOWER AND UPPER CAB'S,
SOUTH WALL

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & GLASS
/ MILLWORK BY GC PANEL

V.I.F.

GLOSS
LACQUER

M-08

RADIATOR COVER AND WOOD
PANELLING

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

104 / LIVING ROOM

M-09

RADIATOR COVERS AT 5
WINDOWS

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

108 / STUDY

M-10

WALL STORAGE W/ SLIDING
PANELS

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-11

OPEN SHELVING

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-12

BUILT-IN SEATING AT EAST
WALL

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-13

BUILT-IN SEATING AT SOUTH
WALL

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-14

SHELVING WALL AT TV
CONSOLE

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-15

STORAGE AND MIRROR
OUTSIDE OF POWDER RM

BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD
/ MILLWORK BY GC DETAIL

V.I.F.

FRENCH
POLISH

M-16

RADIATOR COVER BELOW
WINDOW

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

M-17

CLOSET STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

114 / MAST ER
BEDROOM

M-18

RADIATOR COVER BELOW
WINDOW

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

116 / WALK-IN CLOSET

M-19

CLOSET STORAGE

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & WOVEN
/ MILLWORK BY GC PANEL INSERT

V.I.F.

SATIN
LACQUER

V.I.F.

SATIN
LACQUER

111 / BEDROOM 1

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

CLEAR RESTORATION GLASS

106 / DINING ROOM

TBD

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

GL-01

105 / BUTLER'S PANTRY

TBD

USE FARROW & BALL PRIMER AS REQ'D.

MANUFACTURER

M-04

FARROW & BALL

TBD

MATERIAL

M-03

OIL PAINT

TBD

TYPE

SOUTH WALL CAB'S AT REF.,
INCLUDING DESK

TRIM

LATEX PAINT FARROW & BALL

SPECIALTIES SCHEDULE

EAST WALL CAB'S AT STOVE

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

107 / LIVING ROOM

M-02

TBD

ARCHITECT

MATCH EXISTING

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL, GLASS
/ MILLWORK BY GC PANEL& BRASS VERTICAL TRIM

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WHITE OAK

BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL, GLASS
/ MILLWORK BY GC PANEL& BRASS VERTICAL TRIM

LATEX PAINT FARROW & BALL

TBD

NEW WOOD FLOOR

LOWER AND UPPER CAB'S AT
SINK AND D/W

CEILING

TBD

WD-03

M-01

USE FARROW & BALL PRIMER AS REQ'D.

LATEX PAINT FARROW & BALL

PATCH AS REQ'D

104 / KITCHEN

TBD

WALLS

N/A - STRIP FLOORING

SPECIFICATION

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WHITE OAK

MANUF.

LATEX PAINT FARROW & BALL

TBD

N/A

DESCRIPTION

WALLS

TBD

EXISTING WOOD FLOOR

ITEM

USE FARROW & BALL PRIMER AS REQ'D.

FARROW & BALL

WD-02

ROOM # / NAME

TBD

OIL PAINT

EXISTING FLOOR TO REMAIN

SEE ELEV.'S

TBD

TRIM

N/A - HERRINGBONE

MR. SHOWER DOOR

FARROW & BALL

USE FARROW & BALL PRIMER AS REQ'D.

WHITE OAK

SHOWER DOOR

OIL PAINT

TBD

N/A

SD-01

TRIM

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

TBD

EXISTING WOOD FLOOR

SEE ELEV.'S

USE FARROW & BALL PRIMER AS REQ'D.

LATEX PAINT FARROW & BALL

WD-01

CUSTOM

TBD

CEILING

SIZE

MEDICINE CABINET

TBD

USE FARROW & BALL PRIMER AS REQ'D.

SPECIFICATION

MC-02

LATEX PAINT FARROW & BALL

TBD

MANUFACTURER

MEDICINE CABINET

CEILING

TBD

MATERIAL

MC-01

USE FARROW & BALL PRIMER AS REQ'D.

LATEX PAINT FARROW & BALL

TYPE

URBAN
ARCHAEOLOGY

TBD

MANUFACTURER

WALLS

103 / HALL

105 / BUTLER PANTRY

COLOR/FINISH

TBD

WALLS

102 / FOYER

WOOD FLOOR SCHEDULE

SIZE

LATEX PAINT FARROW & BALL

101 / ENTRY

104 / KITCHEN

SPECIFICATION

NOTES

MATERIAL

V.I.F., SEALANT PER MANUF.

COLOR/FINISH

COLOR/
FINISH

LOCATION

117 / WALK-IN CLOSET

M-20

CLOSET STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

118 / LAUNDRY

M-21

LAUNDRY ROOM STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

119 / BEDROOM 2

M-22

RADIATOR COVER BELOW
WINDOW

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

M-23

CLOSET STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

121 / BEDROOM 2

M-24

CLOSET STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

122 / BEDROOM 3

M-25

RADIATOR COVER BELOW
WINDOW

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

M-26

CLOSET STORAGE

BLUM HARDWARE
SHOP PTD. LACQUER WITH BEAD DETAIL
/ MILLWORK BY GC

V.I.F.

SATIN
LACQUER

NOTES
114/ MASTER BEDROOM

115 / MASTER BATH

116 / WALK-IN-CLOSET

117 / WALK-IN-CLOSET

118 / LAUNDRY

119 / BEDROOM 2

120 / BATH 2

121 / HALL

122 / BEDROOM 3

123 / BATH 3

124 / WALK-IN-CLOSET

119 / BEDROOM 2

CODE CONSULTANT
JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

OIL PAINT

FARROW & BALL

TBD

LACQUER USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LF-01

SEE SPECIALTIES

SEE SPECIALTIES

SILVER

TRIM

OIL PAINT

FARROW & BALL

TBD

LACQUER USE FARROW & BALL PRIMER AS REQ'D.

PLUMBING AND ELECTRICAL ENGINEER

WALLS

MT-01

SEE STONE/TILE

SEE STONE/TILE

TBD

SEE STONE/TILE

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LF-02

SEE SPECIALTIES

SEE SPECIALTIES GOLD

SEE SPECIALTIES

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

TRIM

OIL PAINT

FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

WALLS

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

PRELIMINARY BID

06/12/2017

CEILING

LATEX PAINT FARROW & BALL

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

ISSUE

DATE

TRIM

OIL PAINT

TBD

TBD

USE FARROW & BALL PRIMER AS REQ'D.

FARROW & BALL

SEE SPECIALTIES

KEY PLAN

AV

BIANCO DOLOMITI

SPECIFICATION

ROOM # / NAME

RK

ST-03

NOTES

E9

PA

COLOR/FINISH

Artacho / Oh
Residence

5T

HS

T

N
AREA OF WORK
1220 PARK AVE, APT 4B

STAMP

NOT FOR CONSTRUCTION

TITLE

FINISH & MILLWORK
SCHEDULES

TRIM SCHEDULE
ROOM # / NAME

TYPE

SPECIFICATION

MANUFACTURER

NOTES

TR-01

EXISTING TO REMAIN

N/A

N/A

PATCH/REPAIR AS REQ'D

TR-02

NEW TO MATCH EXSTG.

N/A

N/A

V.I.F.

TR-03

PLASTER CROWN

TBD

BALMER

TR-04

SOLID WOOD DOOR CASING

CUSTOM OGEE

TR-05

SOLID WOOD BASE

CUSTOM FLAT/OGEE

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

A-700.00
PAGE 16 OF 18

ITEM

KITCHEN / 104

E-2
E-3

MANUFACTURER
GARLAND

N/A - EXISTING, VIF

HOOD

PRESTIGE

UIB58-1200

SUB-ZERO

WINE REF.

SUB-ZERO

E-5

DISHWASHER

E-6

IN-WALL COFFEE
MAKER

MIELE

ICE MAKER

HOSHIZAKI

E-7
E-8

E-10

MICROWAVE
LAUNDRY / 118

WASHER

E-11

DRYER

E-12

DRIP PAN

BI-48S/S
IW-30R, LEFT HAND
HINGE
EXISTING, VIF

MIELE

ICE MAKER PUMP

E-9

DESCRIPTION

RANGE

REFRIGERATOR

E-4

MODEL NUMBER

PANASONIC

INSERT POWERPACK EXHAUST HOOD,
1200 CFM

58"X14"X18"
COORD. W/SPEC.

ST STEEL
INSERT

COORDINATE INSTALLATION W/MILLWORK
SURROUND

BUILT-IN SIDE-BY-SIDE
REFRIGERATOR/FREEZER

48"X84"X24"
COORD. W/SPEC.

ST STEEL

TUBULAR HANDLE BY SUB-ZERO

30"X84"X24"
COORD. W/SPEC.

CUSTOM
DOOR &
HANDLES
BY G.C.

CUSTOM SOLID OVERLAY DOOR

ST STEEL

EXSTG D/W TO BE RELOCATED

30" INTEGRATED WINE STORAGE
W/REFRIGERATOR DRAWERS
UNDERCOUNTER DISHWASHER

HS-5061

PUMP FOR UNDERCOUNTER
ICEMAKER

W3048

ASKO

EXSTG RANGE TO BE RELOCATED

UNDERCOUNTER ICEMAKER

MIELE

VIF

WASHING MACHINE
TUMBLE DRYER-AIR VENTED DRYER

N/A

CUSTOM 18 GAUGE STAINLESS STEEL
DRIP PAN LOCATED UNDER W/D

ST STEEL

LOCATION
P-1

P-2
P-3

BUTLER'S
PANTRY / 105

P-4
P-5

COORDINATE INSTALLATION W/MILLWORK
SURROUND
GC TO PROVIDE DRIP PAN WITH SENSOR
SHUT OFF AND VIBRATION ISOLATORS (BY
MASON INDUSTRIES OR EQUIV.)

KITCHEN / 104

POWDER RM /
109

P-6

E-13

POWDER RM /
109

E-14

MASTER BATH /
115

E-15

BATH 1 / 112

E-16

BATH 2 / 120

E-17

BATH 3 / 123

E-18

E-19

GENERAL

SPEAKERS

MANUFACTURER

EXHAUST FAN
ELECTRIC
RADIANT HEAT
FLOORING
ELECTRIC
RADIANT HEAT
FLOORING
ELECTRIC
RADIANT HEAT
FLOORING
ELECTRIC
RADIANT HEAT
FLOORING
SMOKE / CO
DETECTOR

MODEL NUMBER

DESCRIPTION

VIF
23 1/2"x 33 31/2"x 23
7/8"
23 1/2"x 33 3/8"x 23
7/8"

ST STEEL

COORD. INSTALL W/ADJACENT MILLWORK

WHITE

STACKED, ORDER INSTALLATION KIT AS
REQ'D

WHITE

(CUSTOM)

ST STEEL

SIZE

COLOR /
FINISH

WARMUP STICKY MAT

G.C. TO COORDINATE ELECTRICAL
REQUIREMENTS

WARMUP

NADWM

WARMUP STICKY MAT

G.C. TO COORDINATE ELECTRICAL
REQUIREMENTS

WARMUP

NADWM

WARMUP STICKY MAT

G.C. TO COORDINATE ELECTRICAL
REQUIREMENTS

WARMUP

NADWM

WARMUP STICKY MAT

G.C. TO COORDINATE ELECTRICAL
REQUIREMENTS

KN-COSM-1B

HARDWIRED COMBINATION SMOKE
AND CARBON MONOXIDE DETECTOR

RL-01

RL-02

WS-01

DL-01

ST DA
ST SS

LUCIFER

LUCIFER

N/A, BY OWNER

N/A, BY OWNER

WAC

32

11

32

19

16

2RP-AD-1 RECESSED
DOWNLIGHT ROUND
ADJUSTABLE
2RP-FD-2 RECESSED
DOWNLIGHT, WET
LOCATION

N/A, BY OWNER

N/A, BY OWNER

INVISILED PRO 2

2RP-AD-1

2RP-FD-2,
WET
LOCATION

N/A

N/A

LED-TX24

DESCRIPTION / NOTES
RECESSED DOWNLIGHT ROUND ADJUSTABLE GEAR-DRIVEN, 80 CRI,
3000, 133 LUMENS

ROUND PINHOLE APERTURE FIXTURE DEEP REGRESS WET LOCATION,
80 CRI, 3000, 133 LUMENS

SURFACE MOUNTED WALL SCONCE

SURFACE MOUNTED PENDANT LIGHT

HIGH OUTPUT LED TAPE LIGHT

FAUCET

BARBER WILSON

2020

TOILET

LEFROY BROOKS

LW600/LW601

TOILET
ACCESSORIES

LEFROY BROOKS

TB 6009/CB5471/L1-6025

WALL MOUNTED W/CROSS HANDLES

NICKEL/
WHITE

VIF

ZINC

COORDINATE INSTALLATION W/MILLWORK
BELOW

SEE
SPECIFICATION

NICKEL/
WHITE

WALL MOUNTED

CLASSIC TOILET W/BLACK HANDLE &
SEAT
CLASSIC BLACK TOILET SEAT/BLACK
LEVER CISTERN HANDLE/CLASSIC
FLOOR BOLTS

WHITE
WHITE/
NICKEL/
BLACK

MASTERCRAFT LAVATORY, 5.5" SPOUT

TOILET

N/A EXISTING

N/A EXISTING, VIF

FLUSHOMETER TOILET

VIF

WHITE

P-10

FLUSHOMETER
VALVE

SLOAN

'ROYAL'

G.C. TO COORDINATE WITH EXISTING
TOILET

VIF

NICKEL

P-11

SINK

LEFROY BROOKS

LB 7203

CHARTERHOUSE

P-12

FAUCET

LEFROY BROOKS

M1-1101

LEVER HANDLE 3-HOLE BASIN MIXER
W/P.U.W.

P-13

BATHTUB

KALDEWEI

683

PURO

BATH 1 / 112

TUB FILL

3 HOLE W/ BALL JOINTED STAND LB 3225
NICKEL

4" DIAMETER
TRIM

4" DIAMETER
TRIM

N/A

N/A

VIF

FINISH

NOTES

WHITE

COORDINATE
MOUNTING AND
INSTALLATION AS
REQ'D.

NICKEL

MECHANICAL ENGINEER

LEFROY BROOKS

M1-4302

CROSS HANDLE PRESSURE BALANCE
W/LEVER 2-WAY DIVERTER TRIM

NICKEL

LEFROY BROOKS

M1-4101

TWO HANDLE PRESSURE BALANCE
ROUGH W/ 2-WAY DIVERTER

NICKEL

LEFROY BROOKS

M1-4610/YI-4612

5" WALL SHOWER ROSE W/ ANGLES
SHOWER PROJECTION ARM

NICKEL

TOILET

N/A EXISTING

N/A EXISTING, VIF

FLUSHOMETER TOILET

VIF

WHITE

P-19

FLUSHOMETER
VALVE

SLOAN

'ROYAL'

G.C. TO COORDINATE WITH EXISTING
TOILET

VIF

CHROME

P-20

SINK

LEFROY BROOKS

LB 7703

LA CHAPPELLE

WHITE

W/ BALL JOINTED STAND LB 3227

P-21

FAUCET

LEFROY BROOKS

CH 1224 HANDLE

CROSS HANDLE CONNAUGHT 3-HOLE
BASIN MIXER

CHROME

1920'S HANDLE

P-22

BATHTUB

KALDEWEI

VIF

SANIFORM

P-23

TUB FILL

LEFROY BROOKS

C1-1031

WALL BATH SPOUT

P-24

SHOWER / TUB
CONTROLS

LEFROY BROOKS

CW-4055 / CH1224
HANDLE

P-25

SHOWER / TUB
CONTROLS
ROUGH

LEFROY BROOKS

MI-4101 / CH 1224
HANDLE

P-26

SHOWERHEAD /
ARM

LEFROY BROOKS

LB-1728/YI-4612

TOILET

N/A EXISTING

N/A EXISTING, VIF

P-28

FLUSHOMETER
VALVE

SLOAN

'ROYAL'

P-29

SINK

N/A EXISTING

N/A EXISTING, VIF

P-30

FAUCET

N/A EXISTING

N/A EXISTING, VIF

P-31

BATHTUB

KALDEWEI

VIF

SANIFORM

P-32

TUB FILL

LEFROY BROOKS

C1-1031

WALL BATH SPOUT

CHROME

P-33

SHOWER / TUB
CONTROLS

LEFROY BROOKS

CW 4050 / CH 1224
HANDLE

WHITE LEVER CONCEALED
GODOLPHIN THERMOSTATIC MIXING
VALVE TRIM ONLY

CHROME

P-34

SHOWER / TUB
CONTROLS
ROUGH

LEFROY BROOKS

M1-4201

TWO HANDLE THERMOSTATIC ROUGH
W/FLOW CONTROL

P-35

DIVERTER

LEFROY BROOKS

CW-1015

P-36

DIVERTER ROUGH

LEFROY BROOKS

R1-4002

P-37

SHOWERHEAD /
ARM

LEFROY BROOKS

LB-1728/YI-4612

TOILET

N/A EXISTING

N/A EXISTING, VIF

FLUSHOMETER TOILET

VIF

WHITE

VIF

NICKEL

BATH 3 / 123

PLUMBING AND ELECTRICAL ENGINEER

VIF

G.C. TO COORDINATE WITH EXISTING
TOILET
G.C. TO VERIFY OPERABILITY, USE
SALVAGE AS REQ'D FOR REPAIRS
G.C. TO VERIFY OPERABILITY, USE
SALVAGE AS REQ'D FOR REPAIRS

WHITE

CHROME/
WHITE

1920'S HANDLE

CHROME

1920'S HANDLE

VIF

WHITE

VIF

CHROME

VIF

WHITE
PORCELAIN

VIF

WHITE WALL LEVER FLOW CONTROL
TRIM ONLY
3/4" RECESSED FLOW CONTROL
ROUGH
EIGHT JET BRUNSWICK ADJUSTABLE
ROSE/ANGLES SHOWER PROJECTION
ARM

'ROYAL'

N/A

COORDINATE
MOUNTING AND
INSTALLATION AS
REQ'D.

G.C. TO COORDINATE WITH EXISTING
TOILET

P-40

SINK

WATERWORKS

MRLVCU

"MANCHESTER" UNDERMOUNT WHITE
PORCELAIN SINK

P-41

FAUCET

LEFROY BROOKS

M1-1100

MACKINTOSH CROSS HANDLE 3-HOLE
BASIN MIXER

N/A

COORDINATE
MOUNTING AND
INSTALLATION AS
REQ'D.

P-42

BATHTUB

KALDEWEI

VIF

CAYONO

P-43

TUB CONTROLS

LEFROY BROOKS

M1-2400

N/A

COORDINATE
MOUNTING AND
INSTALLATION
W/MILLWORK AS
REQ'D.

P-44

TUB ROUGH

LEFROY BROOKS

R1-4035

P-45

DIVERTER FOR
HAND HELD
SHOWER @ TUB

LEFROY BROOKS

M1-1011

LEVER 2-WAY WALL DIVERTER TRIM

NICKEL

P-46

DIVERTER ROUGH

LEFROY BROOKS

R1-4000

2-WAY WALL DIVERTER ROUGH

N/A

LEFROY BROOKS

M1-1021

HANDSHOWER W/METALISED HANDLE

NICKEL

LEFROY BROOKS

Y1-1069/Y1-1004/
M1-5462

DOUBLE INTERLOCK SHOWER
HOSE/WALL OUTLET/ADJUSTABLE
HANDHELD SHOWER BRACKET

NICKEL

P-48

P-49

LEFROY BROOKS

M1-4405

CROSS HANDLE THERMOSTATIC W/
LEVER FLOW CONTROL TRIM ONLY
TWO HANDLE THERMOSTATIC ROUGH
W/FLOW CONTROL

VIF

NOT FOR CONSTRUCTION
RELOCATE EXISTING TOILET, GC TO SUPPLY
AND INSTALL NEW FLUSH VALVE

N/A

NICKEL

M1-4201

P-51

DIVERTER

LEFROY BROOKS

M1-1011

LEVER 2-WAY WALL DIVERTER TRIM

NICKEL

P-52

DIVERTER ROUGH

LEFROY BROOKS

R1-4000

2-WAY WALL DIVERTER ROUGH

N/A

LEFROY BROOKS

M1-4600/Y1-4500

8" SHOWER ROSE/CEILING SHOWER
PROJECTION ARM

NICKEL

LEFROY BROOKS

M1-1021

HANDSHOWER W/METALISED HANDLE

NICKEL

LEFROY BROOKS

Y1-1069/Y1-1004/
M1-5462

DOUBLE INTERLOCK SHOWER
HOSE/WALL OUTLET/ADJUSTABLE
HANDHELD SHOWER BRACKET

NICKEL

P-55

STAMP

NICKEL

LEFROY BROOKS

P-54

1920'S HANDLE

WHITE

SHOWER ROUGH

SHOWERHEAD /
ARM
HAND HELD
SHOWER
HAND HELD
SHOWER
ACCESSORIES

AREA OF WORK
1220 PARK AVE, APT 4B

CUSTOM MARBLE TOP W/ URBAN
ARCHAELOGY CRYSTAL LEGS W/ "DECO"
FINNIALS IN NICKEL

P-50

P-53

HS

N

CHROME

SLOAN

HAND HELD
SHOWER @TUB
HAND HELD
SHOWER
ACCESSORIES @
TUB
SHOWER
CONTROLS

5T

CHROME

FLUSHOMETER
VALVE

P-47

E9

T

WHITE

P-39

CROSS HANDLE WALL-MOUNTED
3-HOLE BATH FILLER TRIM ONLY
CROSS WALL-MOUNTED 3-HOLE BATH
FILLER ROUGH

RELOCATE EXISTING TOILET, GC TO SUPPLY
AND INSTALL NEW FLUSH VALVE

VIF

P-38

MASTER BATH /
115

KEY PLAN

CHROME

COORDINATE
MOUNTING AND
INSTALLATION AS
REQ'D.

WHITE

RELOCATE EXISTING TOILET, GC TO SUPPLY
AND INSTALL NEW FLUSH VALVE

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

CHROME

CONCEALED GODOLPHIN PRESSURE
BALANCE MIXING VALVE W/WHITE
LEVER 2-WAY DIVERTER TRIM
TWO HANDLE PRESSURE BALANCE
ROUGH W/ 2-WAY DIVERTER & 1920'S
CONNAUGHT KNOB
EIGHT JET BRUNSWICK ADJUSTABLE
ROSE/ANGLES SHOWER PROJECTION
ARM
FLUSHOMETER TOILET

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

NICKEL

BATH 2 / 120

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

WHITE

WALL BATH SPOUT

SHOWER / TUB
CONTROLS
SHOWER / TUB
CONTROLS
ROUGH
SHOWERHEAD /
ARM

OWNER
CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

CODE CONSULTANT

M1-1031

SEE A-120 FOR LOCATIONS

SIZE

RELOCATE EXISTING TOILET, GC TO SUPPLY
AND INSTALL NEW FLUSH VALVE

3-HOLE W/ BALL JOINTED STAND LB 3225

VIF

1220 PARK AVE, APT 4B
NEW YORK, NY 10128

ARCHITECT

LEFROY BROOKS

G.C. TO COORDINATE INSTALLATION

MODEL

N/A

SEE
SPECIFICATION

MC-6455

P-17

NADWM

SPECIFICATION

N/A - EXISTING

UNDERMOUNT INSTALLATION, PROVIDE
BLOCKING AS REQ'D. PROVIDE UNDERSIDE
DEADENING AT SINK

WHITE

BARBER WILSON

NOTES

WARMUP

BY OWNER

QTY

SINK

MIXER AND HANDSPRAY W/ WHITE
HANDLE & PORCELAIN LEVER
HANDLES
ZINC COUNTER WITH INTEGRATED
DOUBLE SINK & DRAINBOARD

NOTES

31 5/8"x11"x19 5/8"

FAUCET

P-16

LIGHTING FIXTURE SCHEDULE
MANUFACTURER

1030

G.C. TO COORDINATE

ALL PLUMBING FIXTURES TO BE ADEQUATELY SEALED TO THE
WALL ASSEMBLY WITH MILDEW RESISTANT SILICONE SEALANTS
FOR STAND-ALONE ICE MAKER, GC TO MAKE PROVISION TO FLUSH
THE SUPPLY PIPING, IN ORDER TO PREVENT CLOGS AND ALLOW
FOR FLUSHING OUT THE LINE IF NECESSARY

TYPE

BARBER WILSON

STACKED, COORDINATE VENTING AS REQ'D

FIXTURE AND APPLIANCE NOTES
2.

FAUCET

ALLIA SINGLE BOWL UNDERMOUNT
FIRECLAY SINK

P-8

P-27

1.

6307

CHARTERHOUSE

P-18

KIDDE

ROHL

COLOR /
FINISH

SIZE

LB 7203

WHISPERCEILING FAN, 80 CFM

FV-08VQ5

PANASONIC

SINK

DESCRIPTION

LEFROY BROOKS

P-9

MISC. EQUIPMENT SCHEDULE
ITEM

MODEL NUMBER

SINK

P-15

LOCATION

MANUFACTURER

P-7

P-14

EQUIP ID #

ITEM

SEE NOTE 2

BY OWNER

T754 W/T

(CUSTOM)

ID #

ST STEEL

AM-50BAE

BY OWNER

NOTES

VIF

BUILT-IN COFFEE MACHINE WITH BEAN
23 1/2"x17 7/8"x19"
TO CUP SYSTEM

CVA 6401

HOSHIZAKI

COLOR /
FINISH

SIZE

AV

E-1

LOCATION

RK

EQUIP ID #

Artacho / Oh
Residence

PLUMBING SCHEDULE

PA

APPLIANCE SCHEDULE

PRELIMINARY BID

06/12/2017

ISSUE

DATE

N/A
TITLE

FIXTURES, APPLIANCES
AND LIGHTING
SCHEDULES

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

A-701.00
PAGE 17 OF 18

Artacho / Oh
Residence
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

DOOR SCHEDULE
OWNER
NO.

LOCATION

TYPE

MATERIAL

WIDTH
(VIF)

101

ENTRY

SINGLE LEAF, 6 PANEL,
EXSTG.

WOOD

VIF

102

FOYER CLOSET

PAIR, 6 PANEL, EXSTG.

WOOD

VIF

105

HARDWARE

NOTES

VIF

EXSTG.

N/A

EXSTG./ENTRY

REPAIR/REFINISH AS REQ'D.

VIF

EXSTG.

N/A

CLOSET

REPAIR/REFINISH AS REQ'D/RE-USE (2) EXSTG.
DOORS, SALVAGE DURING DEMOLITION

N/A

PASSAGE

WOOD

VIF

VIF

PTD. METAL

VIF

VIF

PTD.

N/A

EXSTG./ENTRY

REPAIR/REFINISH AS REQ'D., APPLY NEW FLUSH
METAL FACE TO CONCEAL PANEL

PTD. METAL

VIF

VIF

PTD.

N/A

EXSTG./ENTRY

REPAIR/REFINISH AS REQ'D.

CODE CONSULTANT

WOOD

VIF

VIF

EXSTG.

N/A

EXSTG./ENTRY

REPAIR/REFINISH AS REQ'D.

VIF

VIF

N/A

N/A

N/A

N/A

JAM CONSULTANTS, INC.
104 WEST 29TH STREET, 9TH FLOOR
NEW YORK, NY 10001
TEL. (212) 244-4427

DINING ROOM

N/A FRAMED OPENING

107A

LIVING ROOM

PAIR, 3 PANEL, EXSTG.

WOOD

VIF

VIF

EXSTG.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

107B

LIVING ROOM

PAIR, 3 PANEL, EXSTG.

WOOD

VIF

VIF

EXSTG.

N/A

EXSTG.

RE-USE FROM FORMER D.R. LOCATION,
REPAIR/REFINISH AS REQ'D.

108A

STUDY

SINGLE LEAF, 6 PANEL,
EXSTG.

WOOD

VIF

VIF

EXSTG.

N/A

EXSTG./ENTRY

REPAIR/REFINISH AS REQ'D.

WOOD/LACQUER

VIF

VIF

TO MATCH
EXSTG.

N/A

POCKET

TRACK BY HAFELE, HAWA, PULLS BY RAJACK

109
110
111A
111B
112
114
115
116

117
118
119A
119B
120
121
122
123
124

N/A

POCKET/SINGLE LEAF, 6
PANEL, NEW TO MATCH
EXSTG.
POCKET/SINGLE LEAF, 6
POWDER ROOM
PANEL, NEW TO MATCH
EXSTG.
SINGLE LEAF, 6 PANEL,
HALL
EXSTG.
SINGLE LEAF, PANEL,
BEDROOM 1
EXSTG.
PAIR, SINGLE PANEL,
BEDROOM 1 CLST
EXSTG.
SINGLE LEAF, PANEL,
BATH 1
EXSTG.
POCKET/SINGLE LEAF,
MASTER BEDROOM SINGLE PANEL, NEW TO
MATCH EXSTG.
SINGLE LEAF, PANEL,
MASTER BATH
EXSTG.
STUDY

WALK-IN-CLOSET

SINGLE LEAF, PANEL,
NEW TO MATCH EXSTG.

POCKET/SINGLE LEAF,
SINGLE PANEL, NEW TO
MATCH EXSTG.
SINGLE LEAF, PANEL,
LAUNDRY
NEW TO MATCH EXSTG.
SINGLE LEAF, PANEL,
BEDROOM 2
EXSTG.
PAIR, SINGLE PANEL,
BEDROOM 2 CLST
NEW TO MATCH EXSTG.
SINGLE LEAF, PANEL,
BATH 2
EXSTG.
SINGLE LEAF, PANEL,
HALL CLOSET
NEW TO MATCH EXSTG.
SINGLE LEAF, PANEL,
BEDROOM 3
EXSTG.
SINGLE LEAF, PANEL,
BATH 3
EXSTG.
SINGLE LEAF, PANEL,
BEDROOM 3 W.I.C.
EXSTG.
WALK-IN-CLOSET

DAVIES TOEWS ARCHITECTURE
448 E. 13TH STREET, STOREFRONT
NEW YORK, NY 10009
TEL: (718) 222-1202

TO MATCH
EXSTG.

106

108B

ARCHITECT

MECHANICAL ENGINEER
HAMILTON AIR.
262 WEST 38TH STREET #301
NEW YORK, NY 1018-5808
TEL. (212) 682-2710

PLUMBING AND ELECTRICAL ENGINEER

WOOD/LACQUER

VIF

VIF

TO MATCH
EXSTG.

N/A

POCKET

TRACK BY HAFELE, HAWA, PULLS BY RAJACK

WOOD

VIF

VIF

EXSTG.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD

VIF

VIF

EXSTG.

N/A

CLOSET

REPAIR/REFINISH AS REQ'D/RE-USE (2) EXSTG.
DOORS, SALVAGE DURING DEMOLITION

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/LACQUER

VIF

VIF

PTD.

N/A

POCKET

TRACK BY HAFELE, HAWA, PULLS BY RAJACK

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/LACQUER

VIF

VIF

PTD.

N/A

POCKET

TRACK BY HAFELE, HAWA, PULLS BY RAJACK

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

WOOD/MIRROR

VIF

VIF

PTD.

N/A

EXSTG.

REPAIR/REFINISH AS REQ'D.

GREEN SOLUTIONS
ENGINEERING AND ENERGY MANAGEMENT
CONSULTING ENGINEERS, PC
104-15 95TH AVE
OZONE PARK, NY 11416
TEL. (917) 362-6719

KEY PLAN

AV

104B

MANUF.

RK

104A

FINISH

E9

PA

103

SINGLE LEAF, 6 PANEL,
HALL
NEW TO MATCH EXSTG.
SINGLE LEAF, PANEL,
KITCHEN
EXSTG.
SINGLE LEAF, PANEL,
KITCHEN
EXSTG.
SINGLE LEAF, 6 PANEL,
BUTLER'S PANTRY
EXSTG.

HT
(VIF)

CECILIA ARTACHO OH & KENNEY OH
1220 PARK AVE, APT 4B
NEW YORK, NY 10128

5T

HS

T

N
AREA OF WORK
1220 PARK AVE, APT 4B

STAMP

NOT FOR CONSTRUCTION

GLAZING NOTES

WINDOW SCHEDULE
NO.

104A
104B
106A
106B
107A
107B
107C
107D
107E
108
111
112
114A
114B
115
119A
119B
120
122
123

LOCATION

TYPE

CLAD MAGNUM
TILT/TURN
CLAD MAGNUM
KITCHEN
TILT/TURN
CLAD ULTIMATE
DINING ROOM
DOUBLE HUNG
CLAD ULTIMATE
DINING ROOM
DOUBLE HUNG
CLAD ULTIMATE
LIVING ROOM
DOUBLE HUNG
CLAD ULTIMATE
LIVING ROOM
DOUBLE HUNG
CLAD ULTIMATE
LIVING ROOM
DOUBLE HUNG
CLAD ULTIMATE
LIVING ROOM
DOUBLE HUNG
CLAD ULTIMATE
LIVING ROOM
DOUBLE HUNG
CLAD ULTIMATE
STUDY
DOUBLE HUNG
CLAD ULTIMATE
BEDROOM 1
DOUBLE HUNG
CLAD ULTIMATE
BATH 1
DOUBLE HUNG
CLAD ULTIMATE
MASTER BEDRM
DOUBLE HUNG
CLAD ULTIMATE
MASTER BEDRM
DOUBLE HUNG
CLAD ULTIMATE
MASTER BATH
DOUBLE HUNG
CLAD MAGNUM
BEDROOM 2
TILT/TURN
CLAD MAGNUM
BEDROOM 2
TILT/TURN
CLAD MAGNUM
BATH 2
TILT/TURN
CLAD MAGNUM
BEDROOM 3
TILT/TURN
CLAD MAGNUM
BATH 3
TILT/TURN
KITCHEN

OPER.

MANUF.

RH

MARVIN

LH

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

N/A

MARVIN

LH

MARVIN

RH

MARVIN

RH

MARVIN

LH/RH

MARVIN

RH

MARVIN

R.O.
WIDTH
4'-4",
VIF
4'-0",
VIF
4'-4",
VIF
4'-4",
VIF
4'-0",
VIF
4'-0",
VIF
4'-0",
VIF
4'-0",
VIF
4'-0",
VIF
6'-4",
VIF
6'-4",
VIF
3'-10",
VIF
3'-10",
VIF
3'-10",
VIF
3'-10",
VIF
4'-4",
VIF
4'-4",
VIF
2'-0",
VIF
6'-4",
VIF
2'-0",
VIF

R.O.
HT
5'-2",
VIF
5'-2",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
6'-0",
VIF
5'-2",
VIF
5'-2",
VIF
4'-2",
VIF
6'-0",
VIF
5'-2",
VIF

GLAZING
TYPE
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON
LOW E1
W/ ARGON

U
FACTOR

EXT FINISH

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

.30

SEE NOTE 2

INTERIOR
FINISH

AIR
LEAKAGE

PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED
PINE /
PRIMED

MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283
MEETS
ASTM E283

1.
2.

3.

4.

5.

6.

7.

8.
9.

10.

ALL EXTERIOR WINDOWS TO REPLACE EXISTING
GC TO COORDINATE EXTERIOR FINISH WITH BUILDING MANAGEMENT
FOR BUILDING STANDARD, ALL REPLACEMENT WINDOWS MUST FOLLOW
THE BUILDING'S WINDOW MASTER PLAN AND CONFORM IN COLOR,
STYLE AND DIMENSIONS TO THE ORIGINAL WINDOW CONFIGURATION
OF THE BUILDING. WINDOW / FRAME EXTERIOR FINISH AND PANNING OF
THE MASTER WINDOW FRAME AND THE MULLIONS AT GANGED
WINDOWS ARE TO BE BUILDING STANDARD. PERIMETER SEALANT TO BE
HIGH QUALITY URETHANE SEALANT, COLOR TO MATCH THE WINDOW
FRAME.
ROUGH OPENINGS PROVIDED ARE FOR REFERENCE ONLY, GC TO
VERIFY ALL DIMENSIONS IN THE FIELD. WINDOW MASONRY OPENINGS
MAY NOT BE MODIFIED. INSPECT SILL AND LINTEL INTEGRITY AND
REPORT ANY IRREGULARITIES TO BUILDING MANAGEMENT
IMMEDIATELY.
INSTALL NEW FRAMES IN MASONRY OPENINGS SET TRUE AND PLUMB
AND ANCHOR TO MASONRY. INSTALLER IS RESPONSIBLE FOR THE
STRUCTURAL INTEGRITY OF THE WINDOW INSTALLATION AND IS TO
ASSURE THAT THE QUANTITY AND SPACING OF ANCHORS IS BASED
UPON THE EXISTING CONDITIONS, EXPOSURE, AND HEIGHT OF THE
WINDOW INSTALLATION WITHIN THE BUILDING.
CAULK EXTERIOR PERIMETER BETWEEN NEW FRAMES AND MASONRY
WITH BUTYL TAPE COMPOUND APPLIED WITH HAND PRESSURE GUN
AND TROWEL OFF NEATLY.
REPAIR AROUND WINDOWS BROKEN PLASTER, TO A TROWELLED HARD
SMOOTH FINISH, THAT OCCURRED DURING PERFORMANCE OF THE
WORK.
ONLY BUILDING-APPROVED SIX OVER SIX DOUBLE HUNG WINDOWS MAY
BE INSTALLED WITH EXTERIOR TO MATCH EXISTING WINDOWS IN FRONT
ELEVATIONS.
WINDOW INSTALLATIONS MUST BE COORDINATED WITH THE RESIDENT
MANAGER AT LEAST FIVE (5) DAYS PRIOR TO THE DESIRED DATE.
PRIOR TO THE INSTALLATION OF THE REPLACEMENT WINDOWS,
PROVIDE A SAMPLE TO THE BUILDING TO ASSURE THAT SUCH WINDOW
REPLACEMENTS CONFORM IN COLOR, STYLE AND DIMENSIONS TO THE
EXISTING WINDOWS IN THE BUILDING.
THE CONTRACTOR IS TO MAINTAIN A SAFE SITE AND IS FULLY
RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CITY
REGULATIONS REGARDING SITE SAFETY.

PRELIMINARY BID

06/12/2017

ISSUE

DATE

TITLE

WINDOW AND DOOR
SCHEDULES

PROJECT NO:

1701

SCALE:

AS NOTED

SHEET NUMBER

A-702.00
PAGE 18 OF 18

HVAC ABBREVIATIONS

HVAC SYMBOL LEGEND
24 x 12

NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN

24 x 12

EXISTING DUCTWORK TO BE REMOVED
24 x 12

DOWN

AC
ACD
AD
AHU
AP
ATC
BS
BOD
BTU
BTUH
CFM
CH

DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST
DIMENSION INDICATES SIDE TO WHICH ARROW IS
POINTING

UP W/ IN FL

Air Conditioning
Automatic Control Damper
Access Door
Air Handling Unit
Access Panel
Automatic Temperature Control
Building Supply
Bottom of Duct
British Thermal Unit
BTU per Hour
Cubic Feet per Minute
Chilled or Chiller

CHW
CHWR
CHWS
CUH
CWR
CWS
D
EXH or EX
FA
FC
FCU
FD

PROJECT NAME:

HVAC EQUIPMENT SCHEDULE
Chilled Water
Chilled Water Return
Chilled Water Supply
Cabinet Unit Heater
Condenser Water Return
Condenser Water Supply
Drain
Exhaust
Free Area or Fire Alarm
Flexible Connection
Fan Coil Unit
Floor Drain or Fire Damper

CEILING DIFFUSER, ROUND NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)

FLA
FLEX
FS
FT
FTR
LSD
R
RET
RH
RPM
RTU
SA
SD

Full Load Amps
Flexible
Flow Switch
Feet
Fin Tube Radiation
Linear Slot Diffuser
Radius
Return Air
Relative Humidity
Revolutions per Minute
Roof-Top Unit
Supply Air
Smoke Detector or Smoke Damper

SE
SFD
SHC
SP
SF
SS
SUP
TEFC
TEMP
TTW
TYP
V
VD

Smoke Exhaust
Combination Smoke / Fire Damper
Sensible Heat Capacity
Static Pressure
Square Feet
Stainless Steel
Supply
Totally Enclosed Fan Cooled
Temperature
Thru-the-wall
Typical
Volts
Volume Damper

NUMBER

MANUFACTURER

MODEL

SPECIFICATION

VOLTS

MCA

COOLING
MBH

CFM

GPM

POUNDS

WIDTH

HEIGHT

DEPTH

AHU-1, 2 & 3

FIRST COMPANY

30HXC

HORIZONTAL
CONCEALED FAN COIL

208V

5.4A

30,000

---

---

103

393 4"

11"

237 8"

ACCU-1, 2 & 3

AEROSYS

THDC-30PGLX

THRU-WALL
CONDENSING UNIT

208V

18.8A

28,200

---

---

195

36"

19"

1812"

RESIDENCE
1220 Park Avenue
Apt. #4B

CEILING RETURN

CEILING EXHAUST

New York, NY

CEILING DIFFUSER, RECTANGULAR OR SQUARE NECK
(CEILING DIFFUSERS ARE 4-WAY THROW UNO)

SUPPLY REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)

RETURN/EXHAUST REGISTER OR GRILLE
(VERTICAL MOUNT, SIDEWALL)
T

THERMOSTAT/TEMPERATURE SENSOR
MOTORIZED DAMPER

262 WEST 38TH STREET #301
NEW YORK , NY 10018-5808
35 MT. VERNON ST.
RIDGEFIELD PARK, NJ 07660
PH: 212-682-2710
FX: 201-440-6981
rvogel@hamiltonair.com

FIRE DAMPER

CONFLICTS:
BATHROOM

FIXTURES
ON EXSTG
ROUGHING

BATHROOM

BEDROOM

KITCHEN

BEDROOM

LAUNDRY

BUTLER'S
PANTRY

COMMENTS:

DINING
ROOM

ENTRY

HALL

BEDROOM

FOYER

BEDROOM

POWDER
ROOM

STUDY

LIVING
ROOM

DRAWING NAME:

BATHROOM

BATHROOM

Mechanical Plan
HVAC Symbol Legend &
HVAC Schedule

SEAL & SIGNATURE:

1
M-100

Mechanical Plan - Apt. #4B

DATE:

05/16/17

REVISIONS:
#1
#2

06/02/17
06/08/17

Scale:1/4" = 1'-0"
M-100.00
1 OF 2

PROJECT NAME:

RESIDENCE
1220 Park Avenue
DUCT

DUCT MOUNTED
SUPPLY
DIFFUSER

LINING

UNIT WILL BE HELD 2"
FROM CEILING

SEPARATE SPEED
CLIP WASHER

HILTI TWO PART EPOXY

MAX C
L
16" TYP.

PINS SPOT WELDED
TO DUCTWORK

Apt. #4B
New York, NY

VD

MAX CL 16" TYP.

THREADED ROD

COATED SURFACE OF
INSULATION EXPOSED
TO AIR STREAM

REFRIGERANT LINES TO
CONDENSING UNIT

18" MIN.
REQUIRED

PLAN VIEW

DISCONNECT SWITCH

SUPPLY DUCT

3"
3"

TYPICAL STUD-WELDED PINS
AND SPEED CLIP WASHER
(SEE DETAIL "A")

AIR HANDLER

ALL ENDS OF LINER
COATED WITH ADHESIVE

NOT MORE THAN 3"
FROM EDGE OF LINER

SPEED CLIP WASHER PRESSED
DOWN OVER PIN TO LINING

FLEXIBLE CONNECTION
WATER BUG

SAFETY PAN

ADHESIVE OVER
COMPLETE SURFACE
OF DUCT

CONDENSATE DRAIN WILL BE RUN TO
AN EXISTING INDIRECT FUNNEL WITH
PRIMER AND ACCESS DOOR PROVIDED
BY LICENSED PLUMBER.

VIBRATION ISOLATOR SPRINGS
MASON INDUSTRIES
MODEL# 30N-X-X54 OR EQUAL

LINING (THICKNESS AS
SPECIFIED) PRESSED
DOWN OVER GRIP-PIN

DUCT
WELD-PIN STUD WELDED
TO DUCT (PINS FASTENED TO
DUCT WITH ASHESIVE NOT
APPROVED)

CONDENSATE LINE WILL BE SUPPORTED
WITH 1 18" COPPER CLAMP TO SUPPORT
LINE TO INDIRECT FUNNEL.

VOLUME
DAMPER (VD)

DETAIL 'A'
AIR HANDLER HANGING - DETAIL

1
M-200

ISOMETRIC VIEW

SOUND LINING INSTALLATION DETAIL

2
M-200

NOT TO SCALE

262 WEST 38TH STREET #301
NEW YORK , NY 10018-5808
35 MT. VERNON ST.
RIDGEFIELD PARK, NJ 07660
PH: 212-682-2710
FX: 201-440-6981
rvogel@hamiltonair.com

3
M-200

NOT TO SCALE

METHOD OF HANGING DUCTWORK

4
M-200

NOT TO SCALE

TYPICAL SUPPLY OUTLET DETAIL
NOT TO SCALE

CONFLICTS:

MECHANICAL NOTES

COMMENTS:

PATCH AND FINISH TO MATCH EXISTING
EXISTING WINDOW AND SILL
FABRIC FLASHING

DOES NOT INCLUDE LOUVER

1

"

FLASHING AT METAL ANGLE LINTEL

20

2

1

STEEL ANGLE 2" x4" LINTEL WITH 6"
BEARING BOTH SIDES PROVIDE LINTEL
AT OPENINGS OVER 30" WIDE

1/2"

OVERSIZED SLEEVE

CHASSIS

SEALANT W/ BACKER ROD W/ WEEP
HOLES @ QUARTER POINTS

W
H

THRU-THE-WALL SOUND SLEEVE

STEEL RAIL

MINIMUM 3/4" CLEAREANCE BETWEEN CHASSIS AND
SLEEVE. INSERT CLOSED CELL NEOPRENE FOAM
TO PROVIDE A WEATHETIGHT SEAL ALL AROUND
CHASSIS

EXTRUDED BLADED ANODIZED
ALUMINUM ARCH. GRILLE LOUVER WILL
BE CAULKED ON ALL SIDES AND
ATTACHED TO SLEEVE NOT BUILDING.
LOUVER WILL BE PAINTED, COLOR
PROVIDED BY BUILDING

RADIATOR SHUT-OFF VALVE

ALLOW FOR THICKNESS OF NEOPRENE
PAD (1") AND STEEL RAIL

MASON TYPE SUPER W NEOPRENE PAD
(1") AT EACH CORNER OF UNIT

PITCH UNIT 12" TO EXTERIOR

UNION (TYPICAL)

AUTOMATIC VENT

16X CUSTOM VIBRATION ISOLATOR
PADS MASON TYPE SUPER (W)

SOUND SLEEVE OVERSIZED
TO ACCOMODATE FIRE DAMPERS.
CONDESING UNIT WILL BE WRAPPED
ON EXTERIOR WITH KINETICS TYPE
KDD3553 SOUND INSULATION.

DETAIL OF RAIL

CEMENT BED SLOPED 12" TO EXTERIOR

THERMOSTATIC STEAM TRAP
ESCUTCHEON PLATE (TYPICAL)

SEALANT W/ BACKER ROD W/ WEEP
HOLES @ QUARTER POINTS

1

4"

STEEL ANGLE (2"X2")

CUSTOM STAINLESS STEEL DRIP EDGE

3

4"RUNOUT

SLEEVE
FIRESTOPPING
L.P.S

CONDENSING UNIT SOUND SLEEVE

COPPER FLASHING FINISH FLUSH W/
EXTERIOR SLEEVE TURN UP AND CONT.
UP BOTH SIDES OF UNIT

SLEEVE
1" TH. MASON SUPER W PADS

W
31"

H

D

THDC R UNIT

2521"

2021"

THDC P UNIT

37"

21"

THDC T UNIT

2521"

34"

2021"
2021"

L.P.R

DRAWING NAME:

EXISTING BRICK WALL
BLOCKING AS REQUIRED

5
M-200

DETAIL AT CONDENSER WALL PENETRATION
NOT TO SCALE

6
M-200

TYPICAL CONDENSER SOUND SLEEVE DETAIL
NOT TO SCALE

7
M-200

CAST IRON STEAM RADIATOR DETAILS
NOT TO SCALE

BUILDING NOTES

Mechanical Plan
DETAILS

SEAL & SIGNATURE:

DATE:

05/16/17

REVISIONS:
#1
#1

06/02/17
06/08/17

M-200.00
2 OF 2

OWNER:

GENERAL NOTES

ABBREVIATIONS

E9

PA
RK
AV

ELECTRICAL DEMOLITION NOTES

5T

HS

T

N

AREA OF WORK

ELECTRICAL SYMBOLS

MEP:

SUBMISSIONS:

DL
RL
ST DA
ST SS
WS

PROJECT TITLE:

DRAWING TITLE:

ELECTRICAL SYMBOLS,
ABBREVIATIONS,
NOTES &
DRAWINGS LIST

MSB
B.B.

Seal & Signature

E-001.00
1

E9

PA
R

KA
V

OWNER:

5T

HS

T

N

AREA OF WORK

MEP:

SUBMISSIONS:

PROJECT TITLE:

DRAWING TITLE:

ELECTRICAL
SPECIFICATIONS

MSB
B.B.

Seal & Signature

E-002.00
2

E9

PA
R

KA
V

OWNER:

5T

HS

T

N

AREA OF WORK

MEP:

SUBMISSIONS:

PROJECT TITLE:

DRAWING TITLE:

ELECTRICAL
SPECIFICATIONS

MSB
B.B.

Seal & Signature

E-003.00
3

OWNER:

LIMIT OF WORK

AV

LIMIT OF WORK

DL

DL
E9

PA
RK

DL

5T

HS

T

N

$D$D

RL

SD

WS
WS

RL

BATH 3
123

$D$D

DL

DL

$D$D$WS
D

RL

DL

RL

DL

KITCHEN
104

BATH 2
120

BEDROOM 2
119

WS

WS

DL

AREA OF WORK

DL

DL

RL

NO WORK

WS

RL

WS
RL

$D$D

ST DA

WS
ST DA

$$$

ST

$D$D

$D$D$D

SD

RL

WS

RL
RL

SD

DL

WIC
117

RL

FOYER
102

RL

RL

RL

WS

$D$D$D
SD

WS

$D $D $D
ST DA

$D$D

ST

HALL
110

$D

RL

DL

$D

RL

RL

WIC
116

DINING ROOM
106

ENTRY
101

HALL
113

ST
ST

$D

$D $D

RL

WS

ST

WIC
124

DL

DL

HALL
121

SD

$D

DL

RL

$D

$D$D

$D$D

RL

ST

RL

ST

ST
RL

RL

RL

RL

RL
WS

WS

ST
BEDROOM 1
111

RL

RL

MASTER BEDROOM
114

$D$ $D ROOM
POWDER
109
RL

RL

RL

ST

RL

WS
WS

WS
RL
RL

WS
RL

WS

BATH 1
RL
112

RL

RL

SUBMISSIONS:

WS

$D$D

RL

$D$D$D

WS MASTER BATH
115
WS

WS

LIVING ROOM
107

WS
STUDY
108

$D$D

ST DA

ST DA

WS

MEP:

BUTLER'S PANTRY
105

DL

DL

LIMIT OF WORK

WS

RL

DL
LAUNDRY
118

SD

RL

RL

HALL
103

WS

WS

$D

BEDROOM 3
122

WS

$D

RL

$D

WS

$D$D

WS

WS

DL

RL

WS

WS

NO WORK

NO WORK

NO WORK

PROJECT TITLE:

LIGHTING NOTES

DRAWING TITLE:

ELECTRICAL
LIGHTING PLAN

MSB
B.B.

Seal & Signature

E-100.00
4

OWNER:

POWER NOTES
LIMIT OF WORK

E9

5T

APP: RANGE
APP: HOOD

GFCI

PA
RK

AV

APP: DW

GFCI

GFCI

LIMIT OF WORK

HS

T

N

GFCI
SD

TEL

GFCI

AREA OF WORK

TV

GFCI

GFCI

TEL

NO WORK

APP: WINE REF

APP: REF

TV

APP: DRYER
APP: WASHER

APP: COFFEE

GFCI

GFCI

TEL

GFCI

LIMIT OF WORK

MEP:

TV

SD

SD

SD

TEL

SD

GFCI

TV

TV

TEL

TEL

SD

TV

SUBMISSIONS:

GFCI

GFCI

GFCI

NO WORK

NO WORK

NO WORK

PROJECT TITLE:

DRAWING TITLE:

ELECTRICAL
POWER PLAN

MSB
B.B.

Seal & Signature

E-200.00
5

E9

PA
RK

AV

OWNER:

5T

HS

T

N

AREA OF WORK

MEP:

SUBMISSIONS:

PROJECT TITLE:

SHEET NOTES
DRAWING TITLE:

ELECTRICAL
RISER DIAGRAM

3-27-15

MSB
B.B.

Seal & Signature

E-300.00
6

E9

PA
RK

AV

OWNER:

5T

HS

T

N

AREA OF WORK

MEP:

A

B

SUBMISSIONS:

C

D
PROJECT TITLE:

DRAWING TITLE:

ELECTRICAL
DETAILS

3-27-15

MSB

E

F

B.B.

Seal & Signature

E-400.00

OWNER:

SYMBOL

ABBREV.

THE PLUMBING SYSTEMS (SANITARY, WASTE, VENT AND WATER DISTRIBUTION ) AND ALL ASSOCIATED
EQUIPMENT WILL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE FULL REQUIREMENTS OF
THE NEW YORK CITY 2014 PLUMBING CODE. COMPLIANCE WITH THE FULL PROVISIONS OF ALL NEW
YORK CITY BUILDING AND PLUMBING CODE ACCESSIBILITY REQUIREMENTS AND PLUMBING FIXTURE
FLOW REQUIREMENTS OF THE N.Y.C. 2014 PLUMBING CODE.

1.THE SANITARY SYSTEM SHALL BE PROVIDED IN FULL ACCORDANCE WITH THE GENERAL
PROVISIONS OF SECTION PC3O1.

DESCRIPTION

3.EQUIPMENT HOOK-UP AND THE JOINING WILL BE FULL COMPLIANCE WITH SECTIONS PC605 AND
PC705.

V

VENT PIPING

CW

COLD WATER PIPING

HW

HOT WATER PIPING

C.T.E.

CONNECT TO EXISTING

WASHER AND
JAM NUT

DROP

THREADED HANGER
ROD

SHUT-OFF VALVE

TYPICAL EXPANSION SHIELD

4.THE INSTALLATION OF FIXTURES WILL BE IN FULL ACCORDANCE WITH PC CHAPTER 4.
RISER

6.VERTICAL AND HORIZONTAL PIPING WILL BE HUNG AND SUPPORTED AS DIRECTED IN
SPECIFICATIONS AND WITH THE FULL COMPLIANCE WITH SECTION PC3O8.

CLEANOUT

SA

SHOCK ARRESTOR

7.THE WATER SUPPLY SYSTEMS OF THE SUBJECT BUILDING SHALL BE INSTALLED AND MAINTAINED
IN FULL COMPLIANCE WITH PC CHAPTER 6.

DRAWING LIST

8.THE SANITARY DRAINAGE SYSTEM WILL BE SIZED AND INSTALLED IN FULL COMPLIANCE WITH PC DRAWING NUMBER
CHAPTER 7.
9.THE VENT PIPING FOR THE SANITARY DRAINAGE SYSTEM OF THE SUBJECT BUILDING WILL BE
INSTALLED IN FULL COMPLIANCE WITH SECTION PC702 & PC CHAPTER 9.
10. THE STORM DRAINAGE SYSTEM AND PIPING WILL BE INSTALLED IN FULL COMPLIANCE WITH PC
CHAPTER 11.
11. GAS PIPING AND EQUIPMENT WILL BE INSTALLED IN FULL COMPLIANCE WITH THE NEW YORK
CITY FUEL GAS CODE.

PLUMBING LEGENDS, NOTES, ABBREVIATIONS, DETAILS AND SPECIFICATIONS

P-100.00

PLUMBING FLOOR PLAN - DEMOLITION

P-200.00

PLUMBING FLOOR PLAN - NEW WORK

P-300.00

PLUMBING RISER DIAGRAMS

VENT

3. CONTRACTORSHALLCOORDN
I ATEWORKWTIHALLOTHERTRADESANDEXS
I TN
I GCONDTIO
I NSON
THEJOBSTIEANDMAN
I TAN
I REQUR
I EDCELIN
I GHEG
I HTSANDCONDTIO
I NS.

A1.4..

HANGERSANDSUPPORTS.

A1.5..

REMOVALSASNOTED.

A1.6..

FURNSI HANDN
I STALLACOMPLETEFUELGASDSI TRBI UTO
I NSYSTEMFROMTHEGASMETERSTOALL
GASFR
I EDEQUPI MENTASN
I DC
I ATEDONTHEDRAWN
I GS.

D4.1..

CONDUCTTESTSN
I ACCORDANCEWTIHTHESPECFIC
I ATO
I NSORASDR
I ECTEDBYBULIDN
IG
MANAGEMENT.

A1.7..

PROVD
I EALLNECESSARYPPI EF,TITN
I GSV, ALVESE, TCA. NDMAKEALLFN
I ALFUELGASPPI N
IG
CONNECTO
I NSTOALLEQUPI MENT.

D4.2..

PPI N
I GTESTSARETOBECONDUCTEDPRO
I RTOPAN
I TN
I GN
I, SULATN
I GO
, RCONCEALN
I GWTIHN
I THE
BULIDN
I G.

A1.8..

ALLREQUR
I EMENTSFORN
I STALLATO
I NOFGASPPI N
I GSHALLBEN
I ACCORDANCEWTIH
USAS-IZ21-1964N
I',STALLATO
I NOFGASAPPLAI NCESANDGASPPI N
I G.'

D4.3..

ALLMATERAI LSE, QUPI MENTANDCOSTSN
I VOLVEDN
I TESTN
I GTHEPPI N
I GSYSTEMSSHALLBE
N
I CLUDEDN
I THEWORK.

A1.9..

EACHPEI CEOFEQUPI MENTSHALLBEPROVD
I EDWTIHANN
I DVI D
I UALSHUT-OFFVALVE.

D4.4..

SANTIARYPPI N
I GSHALLBETESTEDWTIHWATERFORTWOHOURSATAPRESSUREOFFVI EPSG
I OR
TENFOOTWATERCOLUMNU
, NLESSOTHERWSI EDR
I ECTED.

D4.5..

TESTWATERPPI N
I GAT1-12/"TM
I ESTHESTATC
I WATERPRESSUREFOR2HOURS.

COLD
WTR

HOT
WTR
1/2"

DESCRIPTION

SK

SINK

2"

2"

1/2"

WC

WATER CLOSET

4"

2"

3/4"

LAV

LAVATORY

2"

2"

1/2"

1/2"

WM

WASHING MACHINE

2"

2"

3/4"

3/4"

DW

DISHWASHER

2"

2"

-

1/2"

BT

BATH TUB

2"

2"

1/2"

1/2"

SH

SHOWER

2"

2"

1/2"

1/2"

PIPE

16 GAUGE GALV. STEEL
SHIELD TYP. FOR PIPE
HANGERS

D4..

UPONCOMPLETO
I NOFALLPPI N
I GSYSTEMSN
, OTFIYTHEBULIDN
I GMANAGEMENTN
I, WRTIN
I GF,VI EDAYSN
I
ADVANCEOFTHETM
I ELEAKTESTSARETOBEMADE.

AFTERCAREFULLYSTUDYN
I GTHEDRAWN
I GSANDSPECFIC
I ATO
I NSA, NDBEFORESUBMTITN
I GTHER
I
PROPOSALE, ACHBD
I DERSHALLVSI TITHESTIETOASCERTAN
I CONDTIO
I NSOFTHESTIEA, NDTHE
NATUREANDEXACTQUANTTIYOFWORKTOBEPERFORMEDN
. OEXTRAWLILBEALLOWEDFITHE
CONTRACTORFALISTOEXAMN
I ETHESTIEO
, RHAVN
I GEXAMN
I EDTHESTIET,HECONTRACTORFALIS
TONOTFIYTHEOWNERN
I WRTIN
I GOFANYDSI CREPANCEI STHATHEMAYHAVENOTEDBETWEENTHE
EXSI TN
I GCONDTIO
I NSA, NDDRAWN
I GSANDSPECFIC
I ATO
I NS.

B1.2..

THECONTRACTORSHALLVERFIYALLMEASUREMENTSOFHSI OWNOROTHERSATTHESTIEA, ND
SHALLBERESPONSBI LEFORCORRECTNESSOFSAMEASRELATEDTOHSI WORK.

B1.3..

CONTRACTORSHALLCOOPERATEWTIHALLOTHERCONTRACTORSWHOFURNSI HANDN
I STALLWORK
N
I CONNECTO
I NWTIHTHEWORKOFTHSI PROJECTG
. VI ETHEMCOMPLETEDATAASTOHSI
REQUR
I EMENTSA, NDNOTFIYBULIDN
I GMANAGEMENTOFANYCONDTIO
I NTHATWLILN
I TERFEREWTIH
PROPERCOMPLETO
I NOFTHSI WORKC
. OOPERATEN
I THESCHEDULN
I GOFTHSI WORKWTIHTHE
WORKOFOTHERCONTRACTSSOASNOTTODELAYJOBPROGRESS.

E2..

HOTANDCOLDWATERPPI N
I GTOBETYPELCOPPERWTIHBRAZEDFTITN
I GSP. ROVD
I ETYPEKCOPPERFOR
PPI N
I GN
I THEGROUND.

E3..

N
I SULATO
I NONHOTANDCOLDWATERPPI N
I GSHALLBEFBI ERGLASSN
I SULATO
I NWTIHKRAFTPAPER
BACKN
I GV, APORBARREI RONCOLDWATERF,R
I EANDSMOKERESSI TANTR
. EFERTOPLUMBN
I GN
I SULATO
IN
SCHEDULEFORN
I SULATO
I NTHC
I KNESS.

E4..

FORGASPPI N
I G2,"SZIEANDSMALLERA, TOPENTRYBALLVALVEC
, RANEA' CCESSOW
' TIHBUENAN'S' EATN
I
ACARBONSTEELBODYWTIHFXI EDHANDLE.

E5..

VALVESSHALLBECASTBRONZEBALLTYPEA, POLLOOREQUAL.

E6..

FTITN
I GSSHALLBE125LBG
. ALVANZIEDMALLEABLER
I ONS, TEAMPATTERNANDSHALLBEFEI LDWRAPPED
ANDCOATEDTOMATCHMLILWRAPPEDPPI E.

B2.1..

ALLWORKSHALLCOMPLYWTIHTHEREQUR
I EMENTSOFTHENEWYORKCTIYBULIDN
I GCODENFPA,
ALLAPPLC
I ABLEFEDERALA, NDLOCALCODESANDANYOTHERAGENCEI SHAVN
I GJURSI DC
I TO
I N.

E7..

ALLFUELGASPPI EABOVEGROUNDN
I, SD
I EOFTHESHALLBESCHEDULE40S, TEELPPI EB. ETHLEHEMSTEEL
COO
. RAPPROVEDOTHER.

B2.2..

THECONTRACTORSHALLN
I CLUDEN
I HSI BD
I THECOSTOFALLREQUR
I EDPERMTISF,EES,
N
I SPECTO
I NST,ESTSANDCERTFIC
I ATESOFAPPROVAL.

E8..

ALLDOMESTC
I WATERVALVESSHALLBELEADFREE.

B3..

2

3

3

1

PIPE

2016 NYCECC COMPLIANCE STATEMENT
ALLHOTWATERHEATERSANDHOTWATERSUPPLYPP
IN
I GSHALLMEETREQUR
I EMENTSOFTHE2016NEW
YORKCTIYENERGYCONSERVATO
I NCODE(NYCECC2016A
)NDMUSTBEVERFIE
I DTHROUGHDATABYTHE
MANUFACTURERORTHROUGHCERTFIC
I ATO
I NUNDERANAPPROVEDCERTFIC
I ATO
I NPROGRAM.

INSULATED PIPE

2

SLEEVE

3

ESCUTCHEON ON BOTH SIDES

4

PARTITION, WALL OR FLOOR (SEE
ARCHITECTURAL DRAWINGS FOR FIRE RATING)

5

5

B4..

OBEYALLSECURTIYREGULATO
I NSESTABLSI HEDBYTHEBULIDN
I GMANAGEMENTA, NDABD
I EBYALL
BULIDN
I GRULESANDREGULATO
I NSB. ULIDN
I GMANAGEMENTS' APPROVALSHALLBEOBTAN
I ED
BEFOREENTERN
I GSECUREDAREASOFTHEBULIDN
I GSOFTHEBULIDN
I G.

MAN
I TAN
I ALLAREASU
, NDERCONTRACTORS' CONTROLF,REEOFEXTRANEOUSDEBRSI .

B4.2..

SCHEDULEREGULARCOLLECTO
I NANDDSI POSALOFDEBRSI DALIYANDMOREFREQUENTLYFI
NECESSARY.

RATED PARTITION, WALL OR FLOOR ONLY)
THRU SLEEVE. USE CONTINUOUS INSULATION
(ITEM 5) AT NON-RATED PARTITION, WALL OR WALL

B5.1.1..

ALLCUTTN
I GD
, RLILN
I GA, NDROUGHPATCHN
I GREQUR
I EDFORTHEWORKSHALLBEPROVD
I ED
BYTHECONTRACTORC
. ONTRACTORREFERTOBULIDN
I GALTERATO
I NAGREEMENT.

B5.1.2..

ALLCUTTN
I GD
, RLILN
I GOROTHERCONSTRUCTO
I NOPERATO
I NSWHC
I HCREATEEXCESSVI E
NOSI EORVBI RATO
I NSHALLBESCHEDULEDWTIHTHEOWNERC
. ONTRACTORSHALLPAYFOR
ANYOVERTM
I EWORKREQUR
I ED.

B5.1.3..

B5.2..

0.21 - 0.28

100

1.0

1.0

1.5

1.5

40 - 60

0.21 - 0.27

75

0.5

0.5

1.0

1.0

<40

0.20 - 0.26

75

0.5

1.0

1.0

1.0

HANGER ROD

THECHLORN
I ATN
I GMATERAI LSHALLBELQ
I UD
I CHLORN
I EGAS-WATERMXI TUREC
, ALCU
IM
HYPOCHLORTIES, ODU
I MHYPOCHLORTIEO
, RCHLORN
I ATEDLM
I EANDWATERMXI TURE
CONFORMN
I GTOTHESTANDARDSOFTHEAWWAANDSHALLBEN
I TRODUCEDN
I TOTHESYSTEM
N
I ANAPPROVEDMANNER.

TESTN
IG

F3.1..

TAKESAMPLESOFWATERFORBACTERO
I LOGC
I ALTESTN
I GASPRESCRBI EDBYTHEDEPARTMENTOF
HEALTH.

F3.2..

SHOULDTHESAMPLESFALITOMEETTHEMN
IM
I UMSTANDARDSASSETFORTHBYTHEDEPARTMENT
OFHEALTHR
, EPEATTHEDSI N
I FECTN
I GPROCEDUREANDSUBMTINEWSAMPLESFORTESTN
I G.

PROVD
I EALLDRLILN
I GANDPATCHN
I GFOREXPANSO
I NBOLTSH
, ANGERSANDOTHERSUPPORTS
FORPROPERANDSAFEN
I STALLATO
I NOFTHEWORK.

F3.3..

CONTRACTORSHALLTESTFUELGASDSI TRBI UTO
I NSYSTEMASHEREN
I SPECFIEI DANDTOTHE
SATSI FACTO
I NOFTHELOCALBULIDN
I GDEPARTMENTL,OCALUTLITIYCOA,. NDNFPA-56T.HE
CONTRACTORSHALLGVI ENOTLESSTHAN3DAYSNOTC
I ETOALLPARTEI SPRO
I RTOTHETESTA. LL
LABORM
, ATERAI LE, TCR
. EQUR
I EDTOPERFORMTHETESTSSHALLBEFURNSI HEDBYTHSI
CONTRACTORA. LLTESTSMUSTBECOMPLETEDBEFOREPPI N
I GSI CONCEALED.

TESTPPI N
I GANDSYSTEMSFOLLOWN
I GTHEPROCEDURESSPECFIEI DHEREN
IR
, EQUR
I EDBY
CODEORASDR
I ECTEDBYTHEBULIDN
I GMANAGEMENT.

B5.2.2..

TESTN
I GSHALLCOMPLYWTIHNEWYORKCTIYPLUMBN
I GCODESECTO
I N312.

THEBULIDN
I GWLILBEOCCUPEI DANDN
I OPERATO
I NDURN
I GTHEPROGRESSOFTHEWORKW
. HEN
NECESSARYTOTEMPORARLIYHALTBULIDN
I GEGRESSORFLOWOFPERSONNELTRAFFC
IC
, ONFER
WTIHTHEBULIDN
I GMANAGEMENTSREPRESENTATVI EANDARRANGETHEPERO
I DOFN
I TERRUPTO
IN
FORATM
I EMUTUALLYAGREEDUPONTI.SI REQUR
I EDTHATTHEWORKN
I DC
I ATEDANDO
/ RSPECFIEI D
SHALLESTABLSI HEDROUTN
I EOFTHEBULIDN
I G.

B6.2..

ATNOTM
I ESHALLEXSI TN
I GSERVC
I ESBECUTOFFORSTOPPEDWTIHOUTTHEBULIDN
IG
MANAGEMENTS' WRTITENPERMSI SO
I NP. RO
I RTOSTOPPN
I GSERVC
I ESCONTRACTORSHALL
N
I VESTG
I ATEAREASTOBEAFFECTEDANDNOTFIYTHEBULIDN
I GMANAGEMENTASTOTHETM
IE
REQUR
I EDTOPERFORMHSI WORKANDACTVI ATESERVC
I ESC
. ONTRACTORSHALLPERFORMALL
PREPARATORYWORKPRO
I RTOSHUTDOWNN
I ORDERTOMN
IM
I ZIEN
I CONVENEI NCESFI.THE
BULIDN
I GMANAGEMENTREQUR
I ESS, HUTDOWNSSHALLBEPERFORMEDONANOVERTM
I EBASSI AT
NOADDTIO
I NALCOSTTOTHEBULIDN
I GMANAGEMENT.

CONCRETE ANCHOR
HILTI-KWICK BOLT, SERIES HDI,
OR APPROVED EQUAL.
WASHER & NUT
B6.3..

NOWORKSHALLBELEFTN
I COMPLETENORANYHAZARDOUSSTIUATO
I NSCREATEDWHC
I HWLIL
AFFECTTHELFIEORSAFETYOFTHEPUBLC
I ANDO
/ RBULIDN
I GOCCUPANTSA. TNOTM
I ESHALLTHE
WORKN
I TERFEREWTIHORCUTOFFANYOFTHEEXSI TN
I GSERVC
I ESWTIHOUTTHEBULIDN
IG
MANAGEMENTS' WRTITENPERMSI SO
I N.

UNINSULATED
PIPE

TYPE 'A' ATTACHMENT TO SLAB

B6.4..

NOWORKSHALLBELEFTN
I SUCHAMANNERASTOCREATELEAKAGEW
, ATERDAMAGEOROTHER
DETRM
I ENTALSTIUATO
I NS.

NOT TO SCALE

C.

SUBMTITALS
C1..
C1.1..

AS-BULITDRAWN
I GS
PROVD
I ETWO(2)COMPLETESETSOFFULLSZIEAS-BULITDRAWN
I GSCOVERN
I GEVERYASPECTOF
THEWORKC
. OMPLETESETSHALLN
I CLUDEVALVETAGSANDVALVESCHEDULE.

ARTACHO/OH RESIDENCE
1220 PARK AVE, APT. 4B
NY, NY 10128

FABRC
I ATEANDN
I STALLHANGERSANDSUPPORTSN
I COMPLAI NCEWTIHTHELATESTEDTIO
I NOFTHE
FOLLOWN
I G:

MAN
I TENANCEOFEXSI TN
I GFACLITIEI SANDCONDUCTOFTHEWORK

B6.1..

PROJECT TITLE:

PPI EHANGERSANDSUPPORTS
G1..

HANGER ROD

ALLOWTHEDSI N
I FECTN
I GSOLUTO
I NTOREMAN
IN
I THESYSTEMFORAMN
IM
I UMPERO
I DOF24
HOURSF.OLLOWN
I GTHEDSI N
I FECTN
I GPERO
I DF,LUSHALLPPI N
I GV, ALVESANDOUTLETSWTIH
CLEANWATERUNTLIRESD
I UALCHLORN
I ECONTENTSI NOTGREATERTHAN02.PARTSPER
MLILO
I NU
, NLESSOTHERWSI EDR
I ECTED.

CUTTN
I GOFWALLSSHALLBEDONEASAPPROVEDBYTHEBULIDN
I GMANAGEMENTN
I ACAREFUL
MANNERSOASNOTTOSERO
I USLYM
I PAR
I THEAPPEARANCEORSTRENGTHOFTHE
STRUCTURE.

B5.2.1..

B6..

PIPE

NOT TO SCALE

F3..

G.

INSTALLATION SHALL BE IN
ACCORDANCE WITH
MANUFACTURER'S
RECOMMENDATION.

TYPICAL CLEVIS HANGER
PIPE SUPPORT DETAIL

F2.0.1.1..

TESTN
IG

CONCRETE PAN CONSTRUCTION

105 - 140

DSI N
I FECTTHEWATERPPI N
I GSYSTEMSWTIHASOLUTO
I NCONTAN
IN
I GNOTLESSTHAN50
PARTSPERMLILO
I NOFAVALIABLECHLORN
I E.

CUTTN
I GANDPATCHN
IG

B5.1.4..

1 TO <1 1/2 1 1/2 TO <4 4 TO <8

F2.0.1..

F2.0.2..

CALCIUM SILICATE INSULATION (AT FIRE

SUBMISSIONS:

DSI N
I FECTN
IG

SPECAI LREQUR
I EMENTS

B5.1..

NOT TO SCALE

INSULATION CONDUCTIVITY
FLUID OPERATION
TEMPERATURE RANGE CONDUCTIVITY MEAN RATING
AND USAGE (°4)
TEMPERATURE, °F <1
Btu. in (h.ft.°F

FLUSHALLNEWANDO
/ RREPAR
I EDPOTABLEWATERPPI N
I GSYSTEMSWTIHCLEANP, OTABLEWATER
UNTLINODR
I TYWATERFLOWSFROMTHEOUTLETS.

F2..

B4.1..

B5..

FLUSHN
IG

F1.1..

CLEANN
IG

PIPE PENETRATION THRU FIRE WALL

TABLE C403.2.10 MINIMUM PIPE INSULATION THICKNESS (INCHES)

DSI N
I FECTN
I GANDBACTERO
I LOGC
I ALTESTN
IG

SECURTIY
F1..

FILL VOID BETWEEN SLEEVE AND PIPE
(OR INSULATION) TO FULL DEPTH WITH
INTUMESCENT FIRE STOPPING MATERIAL
(AT FIRE RATED WALL).
MAXIMUM VOID 1/2-INCH

MEP:

ABOVEGROUNDSANTIARYANDVENTPPI N
I GANDFTITN
I GSSHALLBETYLERPPI ECON
. O-HUBSERVC
IE
WEG
I HTCASTR
I ONPPI N
I GCONFORMN
I GTOCSI P3I01WTIHNEOPRENEGASKETSCONFORMN
I GTO
ASTMC564ANDSTAN
I LESSSTEELMD
I RANGE(4BAND)CLAMPSCONFORMN
I GTOASTMC1540AS
MANUFACTUREDBYHUSKYNO2.000ORMSI SO
I NTYPE“HW”(.2)BANDCLAMPSARENOTPERMTITED.

CODESR
, EGULATO
I NSANDSTANDARDS

B3.1..

1

AREA OF WORK

CASTR
I ONSOLIPPI EANDFTITN
I GSSHALLBEMARKEDWTIHTHECOLLECTVI ETRADEMARKOFTHECAST
R
I ONSOLIPPI EN
I STTIUTE(CSI P)IANDBELSI TEDBYNSFN
I TERNATO
I NAL

E1.1..

F.

4

T

N

MATERAI LS
E1..

THEWORKSHALLBECAREFULLYLAD
I OUTN
I ADVANCETOAVOD
I UNNECESSARYCUTTN
I G,
CHANNELN
I GC
, HASN
I GORDRLILN
I GOFFLOORSW
, ALLSP, ARTTIO
I NSC
, ELIN
I GSOROTHERSURFACES.
WHERESUCHWORKSI NECESSARYH
, OWEVERT,HEWORKSHALLBECAREFULLYDONEA. NYDAMAGE
TOTHEBULIDN
I GOREQUPI MENTSHALLBEPATCHEDANDO
/ RREPAR
I EDN
I ANAPPROVEDMANNERBY
SKLILEDMECHANC
I SATNOADDTIO
I NALCOSTTOTHEOWNER.

NOT TO SCALE

NOTES:

HS

GENERAL

B2..

TYPICAL PIPE HANGER DETAIL

8. ALLWORKSHALLCONFORMTOWTIHALTERATO
I NAGREEMENTSETFORTHBYARTOCHOO
/H
RESD
I ENCE1220PARKAVENUEAPPLC
I ATO
I NAGREEMENTANDALLAPPLC
I ABLECODESA.LL
RENOVATO
I NWORKSHALLBECOMPLETEDN
I COMPLA
I NCEWTIHTHETERMSC
, ONDTIO
I NS,
REGULATO
I NSANDREQUR
I EMENTSOFTHEBULIDN
I GSOWNERANDMANAGERA.NYAGREEMENT
WHC
I HDR
I ECTLYADDRESSTHES
I SUEOFCONSTRUCTO
I NANDONSTIEPROCEDUREMUSTBE
N
I CORPORATEDN
I TOTHEC
, ONTRACTORSCONSTRUCTO
I NCONTRACTANDDOCUMENTS.

WATERR-HEATN
I GEQUP
I MENTNOTSUPPLE
I DWTIHN
I TEGRALHEATTRAPSANDSERVN
I GNON-CR
I CULATN
IG
SYSTEMSSHALLBEPROVD
I EDWTIHHEATTRAPSONTHESUPPLYANDDS
I CHARGEPP
IN
I GASSOCA
I TEDWTIH
THEEQUP
I MENTN
I ACCORDANCEWTIHNYCECC2016REQUR
I EMENTS.

MODFIYPPI N
I GARRANGEMENTSASNECESSARYTOSUTICONDTIO
I NSN
I THEBULIDN
I GA, NDTOPERMTI
ACCESSTOEQUPI MENTANDACCESSOREI S.

E9
5T

GENERALREQUR
I EMENTS

B1.4..

7. ALLVALVESSHALLBELEADFREEANDACCESSB
I LE

3.

D3..

E.

TAG

6. PLUMBN
I GCONTRACTORSHALLBERESPONSB
I LETOREPAR
I ANDREPLACEANYEXS
I TN
IG
SUSPENDEDCELIN
I GSANDO
/ RFN
IS
I HESDAMAGEDBYN
I STALLATO
I NOFPP
IN
I GUNDERPLUMBN
IG
CONTRACT.

SERVC
I EWATERHEATN
I GEQUP
I MENTSHALLBEPROVD
I EDWTIHCONTROLSTOALLOWSETPON
I TOF100FFOR
EQUP
I MENTSERVN
I GDWELLN
I GUNTISAND90FFOREQUP
I MENTSERVN
I GOTHEROCCUPANCE
I SN
I
ACCORDANCEWTIHNYCECC2016REQUR
I EMENTS.

PROMPTLYN
I STALLPPI N
I GREQUR
I EDTOBECONCEALEDN
I FLOORW
, ALLORCELIN
I GCONSTRUCTO
I NTO
NOTCAUSEDELAYTOOTHERWORKA, NDTOALLOWAMPLETM
I EFORNECESSARYTASKSANDAPPROVALS.

PLUMBN
I GFXI TURES.

B1.1..

5. MATERA
I LSE,QUP
I MENTANDSYSTEMSN
I STALLEDSHALLMEETALLPERTN
I ENTREQUR
I EMENTSOF
NEWYORKCTIYBULIDN
I GCODESN
, ATO
I NALFR
I EPROTECTO
I NASSOCA
I TO
I NF,EDERAL
REGULATO
I NSO
, CCUPATO
I NALSAFETYANDHEALTHACT(OSHAA
)NDANYNATO
I NALLY
RECOGNZIEDAPPROVALAGENCE
I SASWELLASAPPLC
I ABLELOCALCODESANDREGULATO
I NS.

2.

D2..
A1.3..

B1..

4. PLUMBN
I GCONTRACTORSHALLPROVD
I EALLMATERA
I LSE,QUP
I MENTS,ERVC
I ESL,ABORAND
TESTSNECESSARYFORCOMPLETEEXECUTO
I NOFALLPLUMBN
I GWORK.

1.

N
I STALLALLEQUPI MENTANDPPI N
I GSYSTEMSUSN
I GTHEBESTSTANDARDPRACTC
I ESOFTHETRADEAND
LEAVESYSTEMCOMPONENTSCOMPLETEANDREADYFOROPERATO
I NU
. NLESSOTHERWSI ENOTED,
SPECFIEI DORN
I DC
I ATEDA, LLPPI N
I GANDEQUPI MENTSHALLBECONNECTEDN
I ACCORDANCEWTIH
MANUFACTURERS' RECOMMENDEDDETALISANDASAPPROVEDBYTHEOWNER.

PPI N
I GV, ALVESANDACCESSOREI S.

1. CONTRACTORSHALLVERFIYEXS
I TN
I GCONDTIO
I NSN
I FE
I LDPRO
I RTOCOMMENCEMENTOFWORK.
2. EXS
I TN
I GPP
IN
I GARRANGEMENTSAREAPPROXM
I ATEANDARESHOWNFORESTM
I ATN
IG
PURPOSESONLYC
. ONTRACTORMUSTVERFIYEXACTLOCATO
I NSANDROUTN
I GPRO
I RTO
N
I STALLATO
I NOFNEWWORK.

D1..

A1.2..

B.

FIXTURE CONNECTION SCHEDULE
SOIL/WASTE

PPI N
I GSYSTEMSA, CCESSOREI SS, UPPORTSS, LEEVEST,ESTN
IG

ALTERATO
I NSANDADDTIO
I NTOTHEEXSI TN
I GSANTIARYDRAN
I AGEANDVENTSYSTEMH
, OTANDCOLD
WATERSUPPLYSYSTEM.

HANGER

14. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR WORKMAN AS PER SECTION PC311.

GENERAL PLUMBING NOTES:

FOR PLUMBING FIXTURE MANUFACTURER AND MODEL
NUMBERS REFER TO ARCHITECTURAL DRAWING A-700

DRAWING LIST

P-001.00

12. ALL TRENCHING SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION
PC306.
13. RAT PROOFING SHALL BE IN ACCORDANCE WITH SECTION PC304.

NOT TO SCALE

CO

WORKUNDERTHSI CONTRACTSHALLN
I CLUDEALLLABORM
, ATERAI LE, QUPI MENTP, LANTSERVC
I ESAND
ADMN
I SI TRATVI ETASKSREQUR
I EDTOCOMPLETEANDMAKEOPERABLETHEPLUMBN
I GWORKSHOWNON
THEDRAWN
I GSANDSPECFIEI DHEREN
IN
I, CLUDN
I G:

A1.1..

BREAK

5.TRAPS FOR FIXTURES AND DRAIN LINES WILL BE PROVIDED AND CLEANOUTS INSTALLED IN FULL
COMPLIANCE WITH SECTIONS PC412, PC708 AND PC CHAPTER 10.

A1..

EXPANSION
SHIELD

SOIL, WASTE PIPING BELOW FLOOR

BA

WORKN
I CLUDED
D.

S,W

2.THE MATERIALS USED IN THE PLUMBING SYSTEMS WILL BE PROVIDED IN FULL ACCORDANCE WITH
SECTIONS PC3O2 AND PC303.

A.

V

PLUMBING LEGEND

NEW YORK CITY BUILDING DEPARTMENT
PLUMBING NOTES:

PLUMBING SPECIFICATIONS:

PA
RK
A

CONCRETE
FLOOR

ARTACHO/OH RESIDENCE
1220 PARK AVE, ATP 4B
NY, NY 10128

G1.1..

MSSMANUALSP-89P, PI EHANGERSANDSUPPORTSF,ABRC
I ATO
I NANDN
I STALLATO
I NPRACTC
I ES.

G1.2..

HANGN
I GMATERAI LSSHALLHAVEASAFETYFACTOROF5BULIT-N
I ANDBEDESG
I NEDANDARRANGED
TOMN
IM
I ZIEVBI RATO
I N.

G1.3..

DESG
I NANDN
I STALLPPI ESUPPORTSTOAVOD
IN
I TERFERENCEWTIHOTHERPPI N
I GD
, UCTSC
, ONDUTI
ANDSUPPORTS.

G1.4..

PROVD
I ESEPARATESUPPORTSFORALLBRANCHESN
. OBRANCHTWOFEETN
I LENGTHOROVER
SHALLBEN
I STALLEDWTIHOUTANAPPROVEDHANGERP. ROVD
I EHANGERSATALLJON
IT
CONNECTO
I NS.

G1.5..

PROVD
I EALLAUXLIAI RYSTRUCTURALSTEELMEMBERSNECESSARYTOSUPPORTALLPPI N
I GAND
EQUPI MENT.

H.

DRAWING TITLE:

PLUMBING
LEGENDS, NOTES,
DETAILS AND
SPECIFICATIONS

GUARANTEES
H1..

ALLN
I STALLATO
I NSM
, ATERAI LE, QUPI MENTANDWORKFURNSI HEDANDPERFORMEDUNDERTHESE
SPECFIC
I ATO
I NSSHALLBEGUARANTEEDFORONEYEARFROMTHEDATEOFTHEFN
I ALACCEPTANCE.

H2..

ALLSYSTEMSFOUNDDEFECTVI EATSUCHTESTN
I GORDURN
I GTHEGUARANTEEPERO
I DSHALLBE
REPLACEDORREPAR
I EDBYTHSI CONTRACTORWTIHOUTANYADDTIO
I NALCHARGEA. NYLABORM
, ATERAI L,
EQUPI MENTORN
I STRUMENTNECESSARYFORSUCHREPAR
I ORREPLACEMENTSHALLBEN
I CLUDEDAND
FREEOFCHARGE.

AO
JV
NTS

Seal & Signature

P001.00
SHEET 1 OF 3

OWNER:

DISCONNECT KITCHEN SINK, DISHWASHER AND WASHING
MACHINE. CUT AND CAP 2" WASTE, 2" VENT BRANCH
1 " H&CW BRANCH PIPING BACK
PIPING BACK TO STACKS,
2
TO RISERS. MODIFY EXISTING PIPING FOR CONNECTION
TO NEW. FOR MORE INFORMATION REFER TO DRAWING
P200.

2.

3 " GAS PIPING
DISCONNECT GAS RANGE. CUT AND CAP
4
BACK TO RISER. MODIFY EXISTING PIPING FOR
CONNECTION TO NEW. FOR MORE INFORMATION REFER
TO DRAWING P200.

5.

6.

7.

8.

9.

HS

T

N

DISCONNECT FLOOR MOUNTED WATER CLOSET. MODIFY
3 " CW BRANCH PIPING
AND CAP EXISTING 4" SAN. AND
4
FOR CONNECTION TO NEW. FOR MORE INFORMATION
REFER TO DRAWING P200.

AREA OF WORK

DISCONNECT FLOOR MOUNTED WATER CLOSET. CUT AND
3 " CW PIPING BACK
CAP 4" SAN. PIPING BACK TO STACK,
4
TO RISER. MODIFY EXISTING PIPING FOR CONNECTION TO
NEW. FOR MORE INFORMATION REFER TO DRAWING P200.
DISCONNECT BATHTUB. MODIFY AND CAP EXISTING 2"
WASTE. AND12" H&CW BRANCH PIPING FOR CONNECTION
TO NEW. FOR MORE INFORMATION REFER TO DRAWING
P200.
DISCONNECT BATHTUB. CUT AND CAP 2" WASTE, 2" VENT
1 " H&CW BRANCH
BRANCH PIPING BACK TO STACKS,
2
PIPING BACK TO RISERS. MODIFY EXISTING PIPING FOR
CONNECTION TO NEW. FOR MORE INFORMATION REFER
TO DRAWING P200.

LIMIT OF WORK

4.

CONTRACTOR SHALL CAREFULLY REMOVE EXISTING
WATER CLOSETS AND PREP FOR REUSE. FOR MORE
INFORMATION REFERENCE ARCHITECTURAL
CONSTRUCTION PLAN AND PLUMBING DRAWING P-200.

E9
5T

NO WORK

3.

1.

V

1.

GENERAL NOTE

NO WORK
EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

4

LIMIT OF WORK
EXISTING UP&DN
2" GAS RISER
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

MEP:

2

1

3

DISCONNECT LAVATORY. MODIFY AND CAP 2" WASTE AND
1 " H&CW BRANCH PIPING. FOR MORE INFORMATION
2
REFER TO DRAWING P200.
DISCONNECT LAVATORY. CUT AND CAP 2" WASTE, 2" VENT
1 " H&CW BRANCH
BRANCH PIPING BACK TO STACKS,
2
PIPING BACK TO RISERS. MODIFY EXISTING PIPING FOR
CONNECTION TO NEW. FOR MORE INFORMATION REFER
TO DRAWING P200.

PA
RK
A

KEYNOTES

ARTACHO/OH RESIDENCE
1220 PARK AVE, ATP 4B
NY, NY 10128

7
BATH 3
123

BEDROOM 2
119
5

KITCHEN
104

BATH 2
120

6

8

DISCONNECT STALL SHOWER. MODIFY AND CAP 2" WASTE
AND12" H&CW BRANCH PIPING. FOR MORE INFORMATION
REFER TO DRAWING P200. .

NO WORK
LIMIT OF WORK
HALL
103

BEDROOM 3
122

10. DISCONNECT SINK. CUT AND CAP 2" WASTE, 2" VENT
1 " H&CW BRANCH
BRANCH PIPING BACK TO STACKS,
2
PIPING BACK TO RISERS. MODIFY EXISTING CW PIPING
FOR CONNECTION TO NEW. FOR MORE INFORMATION
REFER TO DRAWING P200.

LAUNDRY
118

BUTLER'S PANTRY
105

10
DINING ROOM
106

HALL
121

ENTRY
101
HALL
113

WIC
124

FOYER
102
HALL
110

SUBMISSIONS:

WIC
116
WIC
117

BEDROOM 1
111

9

8

MASTER BEDROOM
114

POWDER ROOM
109
LIVING ROOM
107

6

MASTER BATH
115

6

STUDY
108

BATH 1
112

4

4
8

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

PROJECT TITLE:

ARTACHO/OH RESIDENCE
1220 PARK AVE, APT. 4B
NY, NY 10128

DRAWING TITLE:

PLUMBING FLOOR
PLAN - DEMOLITION

PLUMBING FLOOR PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"

AO
JV
NTS

Seal & Signature

P100.00
SHEET 2 OF 4

OWNER:

2.

3 " GAS PIPING. FOR
GAS RANGE. FURNISH AND INSTALL
4
MORE INFORMATION REFER TO DRAWING P300.

3.

WATER CLOSET. CONNECT TO EXISTING 4" SAN, 2" VENT.
AND 1" CW BRANCH PIPING.

1.

ALL FLUSHOMETERS ARE TO BE REUSED EXCEPT IN
BATHROOM #3.

2.

ALL WATER CLOSETS ARE TO BE REUSED EXCEPT IN
BATHROOM #3

V

KITCHEN SINK AND DISHWASHER. FURNISH AND INSTALL
1 " H&CW BRANCH PIPING. FOR MORE
2" WASTE, 2" VENT,
2
INFORMATION REFER TO DRAWING P300.

PA
RK
A

GENERAL NOTES

KEYNOTES
1.

ARTACHO/OH RESIDENCE
1220 PARK AVE, ATP 4B
NY, NY 10128

E9
5T

HS

T

N

5.

1"
BATHTUB. CONNECT TO EXISTING 2" WASTE, 2" VENT,
2
H&CW BRANCH PIPING.

6.

1"
BATHTUB. FURNISH AND INSTALL 2" WASTE, 2" VENT,
2
H&CW BRANCH PIPING. FOR MORE INFORMATION REFER
TO DRAWING P300.

7.
8.

9.

LIMIT OF WORK

WATER CLOSET WITH FLUSH VALVE. FURNISH AND
INSTALL 4" SAN, 2" VENT. AND 1" CW PIPING. FOR MORE
INFORMATION REFER TO DRAWING P300.

NO WORK

4.

NO WORK

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

1"
LAVATORY. CONNECT TO EXISTING 2" WASTE, 2" VENT,
2
H&CW CAPPED OUTLETS.

STALL SHOWER. CONNECT TO EXISTING 2" WASTE, 2"
VENT12" H&CW BRANCH PIPING.

1 " CW BRANCH
10. REFRIGERATOR. FURNISH AND INSTALL
2
PIPING WITH CHECK VALVE AND SHUT OFF VALVE. FOR
MORE INFORMATION REFER TO DRAWING P300.

1

MEP:
2" W. PIPING WITHIN
FLOOR FILL

3

2

7

BATH 3
123

2" W. PIPING
WITHIN FLOOR
FILL

4

4" S. PIPING WITHIN
FLOOR FILL

5

KITCHEN
104

8

BEDROOM 2
119

6

2" W. PIPING WITHIN
FLOOR FILL

11. CLOTHES WASHER IS TO BE LOCATED WITHIN A CURBED
WATERPROOF COPPER, STAINLESS STEEL, FIBERGLASS
OR PREFAB WASHING MACHINE DRIP PAN RECESSED INTO
THE FLOOR FOR EASE OF MAINTENANCE. THE WASHER
MUST BE CONNECTED TO AN AUTOMATIC SHUT-OFF AND
LEAK DETECTION SYSTEM SIMILAR TO FLOODSTOP FS3
4H-90 BY ONSITE PRO INC. MANUAL SHUT OFF VALVES
ARE TO BE PROVIDED IN ADDITION TO THE AUTOMATIC
SHUT-OFF SYSTEM AND ARE TO BE ACCESSIBLE WHEN
THE APPLIANCE IS IN PLACE. SOFT-SEATED, SPRING
LOADED CHECK VALVES AND VACUUM BREAKERS AT
BOTH HOT AND COLD WATER SUPPLY ARE ALSO
REQUIRED ADJACENT TO THE SHUT OFF VALVES. THE
WASHER IS TO BE EQUIPPED WITH A 200 PSI RATED HIGH
TEMPERATURE WASHER HOSES WITH 200 PSI BRASS OR
EQUIVALENT ENDS.
1 " H&CW
12. SINK. FURNISH AND INSTALL 2" WASTE, 2" VENT,
2
BRANCH PIPING. FOR MORE INFORMATION REFER TO
DRAWING P300.

1" GAS DROP

BATH 2
120

RADIATOR /
WINDOW AC

RADIATOR /
WINDOW AC

1"
LAVATORY. FURNISH AND INSTALL 2" WASTE, 2" VENT,
2
H&CW BRANCH PIPING. FOR MORE INFORMATION REFER
TO DRAWING P300.

AREA OF WORK

LIMIT OF WORK
EXISTING UP&DN
114" GAS RISER
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

NO WORK
11

BVA

LIMIT OF WORK
HALL
103

BEDROOM 3
122

12
LAUNDRY
118

10

BUTLER'S PANTRY
105

RADIATOR
WINDOW AC

DINING ROOM
106
HALL
121

ENTRY
101
HALL
113

WIC
124

FOYER
102
HALL
110

RADIATOR

WIC
116
WIC
117

SUBMISSIONS:
9

4

RADIATOR /
WINDOW AC

MASTER BEDROOM
114

BEDROOM 1
111

POWDER ROOM
109

2" W. PIPING WITHIN
FLOOR FILL
4" S. PIPING WITHIN
FLOOR FILL

5
LIVING ROOM
107

6
STUDY
108

3

8

8
4" S. PIPING WITHIN
FLOOR FILL

6
MASTER BATH
115

RADIATOR

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

RADIATOR

RADIATOR /
WINDOW AC

RADIATOR
4

BATH 1
112

EXISTING UP&DN
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

RADIATOR /
WINDOW AC

PROJECT TITLE:
RADIATOR

RADIATOR

RADIATOR

ARTACHO/OH RESIDENCE
1220 PARK AVE, APT. 4B
NY, NY 10128

4" S. PIPING WITHIN
FLOOR FILL

PLUMBING FLOOR PLAN - NEW WORK

DRAWING TITLE:

SCALE: 1/4" = 1'-0"

PLUMBING FLOOR
PLAN - NEW WORK

AO
JV
NTS

Seal & Signature

P200.00
SHEET 2 OF 4

OWNER:

E9

PA

RK

AV

ARTACHO/OH RESIDENCE
1220 PARK AVE, ATP 4B
NY, NY 10128

5T

HS

T

N

FLOOR
FLOOR

1"
2"

CEILING

KITCHEN
104

3

4"

3

4"

2"
112"

112"
3

G/1
EXISTING
114" G RISER UP&DN

COOKTOP

AREA OF WORK

112"
3

4"

4"

MASTER BATH
115
2"
1

1"

2"

1

2"

2"

1

2"

2"

CEILING

EXISTING
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

2"

FLOOR
3

2"

MEP:

LAV
BT

ST

4" SHUT-OFF VALVE

WC

COOKTOP
(65 CFH)

FLOOR

2"

GAS RISER DIAGRAM

2"

2"

4"

2"

4"

SCALE: N.T.S.
BALL VALVE ASSEMBLY
1

2"
3
3

2"

SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM

FLOOR

2"
3

4"

4"
3

4"

SCALE: N.T.S.
3

3

4"

4"

4"

CEILING
FLOOR

2"

2"

PANTRY
105

1

1

KITCHEN
104

2"

2"

3

3

2"

SINK

DW

SK
1

EXISTING
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

3

BATH 1
112

112"
3

4"

114"

11

FLOOR
2"

2" CHECK
VALVE

2"

114"

WC

VALVE AND DRAIN VALVE

4"

1

2"

4"

LAV

2" VACUUM BREAKER, CHECK

CEILING

BATH 1
112

2"
2"

2"

4"

4"

2"
1

1

112"

114"

4"

2"

EXISTING
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

2"

LAV
1

BT
2"

WC
4"

2"

2"

FLOOR
2"

4"

4"

SUBMISSIONS:

SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM
SCALE: N.T.S.

SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM
SCALE: N.T.S.
FLOOR
2"

3

2"
3

4"

3

4"

3

4"

3

4"

2"

112"
3

LAUNDRY
118

4"

112"
4"

BATH 2
120

WASHING MACHINE
VALVE BOX
1"
2
SHOCK
ARRESTOR

1"

2"

2"

1

2"

EXISTING
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

2"

LAV
WM

FLOOR

CEILING

CEILING

PROJECT TITLE:
BATH 3
123
EX. 2"

EX. 2"

EX. 2"

BT

WC
DRIP PAN

4"

2"
2"

FLOOR

2"

4"

2"

4"

EX 12"

EX.12"

EX. 1"
LAV

BT
WC

FLOOR
4"

SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM

EXISTING
4" V. STACK
2" CW RISER
2" HW RISER
1" HWR RISER

ARTACHO/OH RESIDENCE
1220 PARK AVE, APT. 4B
NY, NY 10128

2"

4"

2"

4"

SCALE: N.T.S.

SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM

DRAWING TITLE:

PLUMBING RISER
DIAGRAMS

SCALE: N.T.S.

AO
JV
NTS

Seal & Signature

P300.00
SHEET 4 OF 4



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Create Date                     : 2017:06:12 16:26:08Z
Creator                         : AutoCAD LT 2017 - English 2017 (21.0s (LMS Tech))
Modify Date                     : 2017:06:12 16:49:38-04:00
XMP Toolkit                     : Adobe XMP Core 5.6-c015 84.159810, 2016/09/10-02:41:30
Creator Tool                    : AutoCAD LT 2017 - English 2017 (21.0s (LMS Tech))
Metadata Date                   : 2017:06:12 16:49:38-04:00
Producer                        : pdfplot13.hdi 13.00.052.000
Format                          : application/pdf
Title                           : 18
Document ID                     : uuid:06719c9f-5e7b-4e84-884a-ad7d0e8a744a
Instance ID                     : uuid:b9d238d7-c52a-4f19-9fb9-a464670cd6e8
Page Layout                     : SinglePage
Page Mode                       : UseOutlines
Page Count                      : 30
EXIF Metadata provided by EXIF.tools

Navigation menu