18 02 1220Park 4B Preliminary%20Bid%20Set%20 Preliminary Bid Set
User Manual: 02-1220Park-4B Preliminary%20Bid%20Set%20 of /wp-content/uploads/fileuploads
Open the PDF directly: View PDF .
Page Count: 30
Download | |
Open PDF In Browser | View PDF |
ARTACHO / OH RESIDENCE Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER LOT NO: 33 LAND USE: RESIDENTIAL, MULTI-FAMILY ELEVATOR BUILDING OCCUPANCY GROUP: R2 ZONING USE GROUP: R10, R8B 4. 5. ZONING MAP: 6B 6. NO. OF STORIES: 17 NO. OF UNITS: 56 NO. OF RESIDENTIAL UNITS: 56 3. 7. SCOPE OF WORK INTERIOR RENOVATION OF AN APARTMENT. RENOVATION WORK WILL INCLUDE A NEW INTERIOR LAYOUT, FINISHES, RELOCATED PLUMBING FIXTURES, NEW ELECTRICAL AND A/C. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ABBREVIATIONS A/C ACOUST ADA ADDL ADJ AE AFF ALT ALUM ANSI APPROX ARCH ASHRAE AIR CONDITIONING ACOUSTICAL AMERICANS WITH DISABILITIES ACT ADDITIONAL ADJACENT APPROVED EQUAL ABOVE FINISH FLOOR ALTERNATE ALUMINUM AMERICAN NATIONAL STANDARDS INSTITUTE APPROXIMATE ARCHITECT THE AMERICAN SOCIETY OF HEATING REFRIGERATING AND AIR-CONDITIONING ENGINEERS ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS BD BOARD BLDG BUILDING BLKG BLOCKING BM BEAM B.O. BY OTHERS B.O.C. BOTTOM OF CURB BOCA BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL INC. B.O.S. BOTTOM OF SLAB BOT BOTTOM BTWN BETWEEN CAB CABINET CCTV CLOSED-CIRCUIT TELEVISION CLG CEILING CLG. HT. CEILING HEIGHT CLOS / CL CLOSET CLR CLEAR(ANCE) CLS CLOSURE COL COLUMN CONC CONCRETE (CAST IN PLACE) CONST.JT. CONSTRUCTION JOINT CONT CONTINUOUS OR CONTINUE COORD COORDINATE CORR CORRIDOR COV COVER CPT CARPET CT CERAMIC TILE CTR CENTER D DEEP/DEPTH DB DECIBEL(S) DBL DOUBLE DDC DIRECT DIGITAL CONTROL DEG / o DEGREE DEMO DEMOLITION DET DETAIL DIA / DIAM DIAMETER DIF DIFFUSER DIM DIMENSION DN DOWN DR DOOR DWG DRAWING DWR DRAWER EA EACH EL ELEVATION ELEC ELECTRIC(AL) ELEV ELEVATOR EMER EMERGENCY EQ EQUAL EQUIP EQUIPMENT EXIST EXISTING EXP EXPOSED EXP. JT. EXPANSION JOINT EXG EXISTING EXT EXTERIOR FAI FRESH AIR INTAKE FD FLOOR DRAINS FIN FINISH(ED) FLR FLOOR(ING) FLUOR FLUORESCENT F.O. FACE OF FT / ' FOOT FTG FOOTING GA GAUGE GALV GALVANIZED GL GLASS GLAZING GSF GROSS SQUARE FEET GWB GYPSUM WALL BOARD GYP GYPSUM H HEIGHT HC HANDICAPPED HM HOLLOW METAL HORIZ HORIZONTAL HP HIGH POINT HR HOUR HVAC HEATING/VENTILATING/AIR CONDITIONING IN / " INCH INCL INCLUDE (D) (ING) INSUL INSULATE (D) (TION) 8. 9. 10. INT INV JAN JT LAM LIN LP LT LT. WT LVL MACH MATL MAX MECH MED MEP MFR MIN MISC MO MTL MULL N/A N.F.P.A. N.I.C. NO./ # NOM NTS O.C. O.D. OH OPP OSHA P.LAM P.E. PERF PL P.L. PLAS PLMB PNL PSF PSI PT PNT PTD PLYWD QT RAD RD REF REINF REQ REV RFI RFP RM S.E. SHR ST. STL. SF SIM SPEC SQ STC STD STL STOR STRUCT SUSP TD T.O.W. T&G TECH TEL TEMP TERR THK TO T.O.C. TV TYP TZ UL U.O.I. U.O.N. UV VERT VEST VFY V.I.F. W/ , W/O WD WT INTERIOR INVERT JANITOR JOINT(D) LAMINATE LINEAR LOW POINT LIGHT LIGHTWEIGHT LEVEL MACHINE MATERIAL(S) MAXIMUM MECHANIC(AL) MEDIUM MECHANICAL, ELECTRICAL AND PLUMBING MANUFACTURE(R) MINIMUM/ MINUTE MISCELLANEOUS MASONRY OPENING METAL MULLION NOT APPLICABLE NATIONAL FIRE PROTECTION AGENCY NOT IN CONTRACT NUMBER NOMINAL NOT TO SCALE ON CENTER OUTSIDE DIAMETER OVERHEAD OPPOSITE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION PLASTIC LAMINATE PASSENGER ELEVATOR PERFORATE(D) PLATE PROPERTY LINE PLASTER PLUMBING PANEL POUNDS PER SQUARE FOOT POUNDS PER SQUARE INCH POINT PAINT PAINT(ED) PLYWOOD QUARRY TILE RADIUS ROOF DRAIN REFERENCE REINFORCE(D) REQUIREMENTS REVISION(S) REQUEST FOR INFORMATION REQUEST FOR PROPOSAL ROOM SERVICE ELEVATOR SHOWER STAINLESS STEEL SQUARE FEET SIMILAR SPECIFICATION(S) SQUARE SOUND TRANSMISSION COEFFICIENT STANDARD STEEL STORAGE STRUCTURE/STRUCTURAL SUSPENDED TRENCH DRAIN TOP OF WALL TONGUE AND GROOVE TECHNICAL TELEPHONE TEMPERED TERRACE THICK(NESS) TOP OF TOP OF CURB TELEVISION TYPICAL TERRAZZO UNDERWRITERS LABORATORY UNLESS OTHERWISE INDICATED UNLESS OTHERWISE NOTED ULTRAVIOLET VERTICAL VESTIBULE VERIFY VERIFY IN FIELD WITH , WITHOUT WOOD WEIGHT 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. SHOP DRAWINGS - MILLWORK - DOORS - WINDOWS - SPECIALTIES - STONE 2. 3. TENANT PROTECTION PLAN 2014 NYC BUILDING CODE AS PER 28-104.8.4 1. 2. 3. 4. 4.1. 4.2. 4.3. 5. 5.1. 5.2. 6. 6.1. 6.2. 6.3. 6.4. 6.5. 6.6. 6.7. SPECIAL INSPECTIONS 7. 1. THE FOLLOWING ITEMS OF WORK SHALL BE SUBJECT TO SPECIAL/PROGRESS CONTROLLED INSPECTION, MADE AND WITNESSED BY OR UNDER THE DIRECT SUPERVISION OF AN ARCHITECT OR ENGINEER RETAINED BY THE OWNER AND ACCEPTABLE TO THE ARCHITECT OF RECORD. TEST REPORTS AND CERTIFICATES OF INSPECTION SHALL BE FILED WITH THE DEPARTMENT OF BUILDINGS: 1.1. FIRE RESISTANT PENETRATIONS AND JOINTS BC 1704.27 1.2. MECHANICAL SYSTEMS BC 1704.16 1.3. POST INSTALLED ANCHORS BC 1704.32 1.4. ENERGY CODE COMPLIANCE INSPECTIONS TR8/BC 110.3.5 1.4.1 FENESTRATION U-FACTOR AND PRODUCT RATING 1.4.2 FENESTRATION AIR LEAKAGE 1.4.3 AIR SEALING AND INSULATION - VISUAL 1.4.4 LIGHTING IN DWELLING UNITS 1.4.5 INTERIOR LIGHTING POWER 1.5. FINAL INSPECTION DIRECTIVE 14 8. 9. 10. 1 DETECTORS (2014 BC) 1. DETAIL CALLOUT BUBBLE A400 MATCH LINE 8'-0" A.F.F. DATUM LINE 8'-0" ELEVATION MARKER REVISION CLOUD 1 N PROJECT NORTH ARROW ROOM NAME 101 1 1 A200 EXTERIOR ELEVATION SYMBOL 1 4 A400 2 INTERIOR ELEVATION SYMBOL 3 1 1 DETAIL SYMBOL 3. ROOM TAG KEYNOTE TAG PARTITION TAG 4. 100 WINDOW TAG 101 DOOR TAG 5. M-1 BUILDING SECTION SYMBOL A300 P1 S1 PT1 MILLWORK TAG 6. FIXTURE TAG 7. FINISH TAG 8. A600 SIM THE BUILDING CONTAINS 56 DWELLING UNITS THAT MAY BE OCCUPIED DURING CONSTRUCTION. THE CONSTRUCTION IS CONFINED TO APT 4B. THERE WILL BE NO OCCUPANCY OF THE PROPOSED CONSTRUCTION AREA TO BE RENOVATED DURING THE COURSE OF CONSTRUCTION WORK. EGRESS: AT ALL TIMES IN THE COURSE OF CONSTRUCTION THE EGRESS FROM THE VARYING FLOORS OF THE BUILDING WILL BE MAINTAINED. REQUIRED EGRESS SHALL NOT BE OBSTRUCTED AT ANY TIME. EGRESS AT EXISTING CORRIDORS, FIRE STAIRS, ETC. WILL BE MAINTAINED AT ALL TIMES. ALL EXISTING MEANS OF EGRESS MAY NOT BE USED TO STORE MATERIALS, EQUIPMENT AND DEBRIS. TRANSPORTATION OF ALL MATERIALS, EQUIPMENT AND DEBRIS MUST BE COORDINATED WITH THE BUILDING SUPERINTENDENT. FIRE SAFETY: ALL PRECAUTIONS TO BE OBSERVED TO MAINTAIN EXISTING FIRE SAFETY FOR ALL OCCUPIED DWELLING UNITS AS WELL AS ADDITIONAL SAFETY MEASURES NECESSITATED BY THE CONSTRUCTION SHALL BE STRICTLY OBSERVED. ALL BUILDING MATERIALS STORED AT CONSTRUCTION AREA AND/OR IN ANY AREA OF THE BUILDING ARE TO BE SECURED IN A LOCKED AREA. ACCESS TO SUCH AREAS IS TO BE CONTROLLED BY THE BUILDING OWNER AND/OR CONTRACTOR. HEALTH REQUIREMENTS: THE GENERAL CONTRACTOR WILL ENSURE THAT DUST IS CONTROLLED, KEPT TO A MINIMUM AND REMOVED AT THE COMPLETION OF EACH WORK DAY. DISPOSAL OF CONSTRUCTION DEBRIS MUST BE DONE IN THE SAME MANNER. THE DISPOSAL OF DEBRIS WILL BE PERFORMED IN SUCH A MANNER AS TO NOT INTERFERE WITH OCCUPIED DWELLINGS. DEBRIS, DIRT AND DUST WILL BE KEPT TO A MINIMUM AND CONFINED TO THE IMMEDIATE CONSTRUCTION AREA. CONSTRUCTION NOISE WILL BE CEASED AFTER NORMAL WORKING HOURS. NOISE WILL BE LIMITED TO ACCEPTABLE LEVELS IN ACCORDANCE WITH THE NEW YORK CITY NOISE CONTROL CODE. SANITARY FACILITIES ARE TO BE MADE AVAILABLE FOR CONSTRUCTION WORKERS AS REQUIRED BY OSHA. PRECAUTIONS SHALL BE TAKEN TO PROVIDE FOR PEST CONTROL WHERE NECESSARY AS REQUIRED BY THE DEPT OF HEALTH AND METAL HYGIENE RULES AND REGULATIONS. CONTRACTOR MUST COMPLY WITH ALL APPLICABLE LAWS RELATING TO LEAD AND ASBESTOS. IF OBSERVED IMMEDIATELY CONTACT OWNER OR ARCHITECT. ELECTRIC, GAS AND OTHER UTILITIES ARE NOT TO BE INTERRUPTED. BUILDING SECURITY IS TO BE MAINTAINED AT ALL TIMES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING THE BUILDING. CONSTRUCTION OPERATIONS WILL BE CONFINED TO THE HOURS NOTED IN THE BUILDING'S ALTERATION AGREEMENT, UNLESS AN AFTER HOURS VARIANCE PERMIT IS OBTAINED FROM THE BUILDINGS DEPARTMENT. SMOKE & CARBON MONOXIDE ALARMS / 2. DRAWING SYMBOLS BREAK LINE THE ARCHITECT SHALL REVIEW SHOP DRAWINGS AS TO THEIR GENERAL CONFORMANCE WITH THE DESIGN INTENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS, QUANTITIES, TECHNIQUES OF CONSTRUCTION AND COORDINATION WITH OTHER TRADES. MOCK-UPS SHALL BE REPRESENTATIVE SAMPLES OF THE SPECIFIED MATERIALS, PREPARATIONS AND APPLICATION METHODS. AN APPROVED MOCK-UP CONSTITUTES THE STANDARD FOR WORKMANSHIP. MOCK-UPS ARE TO BE LOCATED WHERE DIRECTED, IF TO BE INCORPORATED INTO THE FINAL INSTALLATION. 9. LISTED SINGLE AND MULTIPLE STATION SMOKE ALARMS COMPLYING WITH UL 217 SHALL BE INSTALLED IN ACCORDANCE WITH BC 907.2.11.1 THROUGH 907.2.11.4 AND NFPA 72. SINGLE OR MULTIPLE STATION SMOKE ALARMS AND CARBON MONOXIDE ALARMS OR DETECTORS SHALL BE INSTALLED AND MAINTAINED, REGARDLESS OF OCCUPANT LOAD AT ALL OF THE FOLLOWING LOCATIONS WITHIN ALL DWELLING UNITS: 2.1. ON THE CEILING OR WALL OUTSIDE OF EACH ROOM USED FOR SLEEPING PURPOSES WITHIN 15' FROM THE DOOR TO SUCH ROOM. 2.2. IN EACH ROOM USED FOR SLEEPING PURPOSES. 2.3. IN EACH STORY WITHIN A DWELLING UNIT, INCLUDING BELOW-GRADE STORIES AND PENTHOUSES OF ANY AREA, BUT NOT INCLUDING CRAWL SPACES AND UNINHABITABLE ATTICS. IN DWELLINGS OR DWELLING UNITS WITH SPLIT LEVELS AND WITHOUT AN INTERVENING DOOR BETWEEN THE ADJACENT LEVELS, A SMOKE ALARM INSTALLED ON THE UPPER LEVEL SHALL SUFFICE FOR THE ADJACENT LOWER LEVEL PROVIDED THAT THE LOWER LEVEL IS LESS THAN ONE FULL STORY BELOW THE UPPER LEVEL. POWER SOURCE PER BC 907.2.11.2 3.1. REQUIRED SMOKE ALARMS SHALL RECEIVE THEIR PRIMARY POWER FROM A DEDICATED BRANCH CIRCUIT OR THE UNSWITCHED PORTION OF A BRANCH CIRCUIT ALSO USED FOR POWER AND LIGHTING, AND SHALL BE EQUIPPED WITH BATTERY BACKUP. 3.2. SMOKE ALARMS SHALL EMIT A SIGNAL WHEN THE BATTERIES ARE LOW. 3.3. WIRING SHALL BE PERMANENT AND WITHOUT A DISCONNECTING SWITCH OTHER THAN AS REQUIRED FOR OVER-CURRENT PROTECTION. INTERCONNECTION PER BC 907.2.11.3: WHERE MORE THAN ONE SMOKE ALARM OR DETECTOR IS REQUIRED TO BE INSTALLED WITHIN AN INDIVIDUAL DWELLING UNIT, THE SMOKE ALARMS OR DETECTORS SHALL BE INTERCONNECTED IN SUCH A MANNER THAT THE ACTIVATION OF ONE ALARM OR DETECTOR WILL ACTIVATE ALL OF THE ALARMS OR DETECTORS IN THE INDIVIDUAL UNIT. SMOKE ALARMS OR DETECTORS SHALL BE CLEARLY AUDIBLE IN ALL BEDROOMS OVER BACKGROUND NOISE LEVELS WITH ALL INTERVENING DOORS CLOSED. SMOKE ALARMS SHALL BE PROVIDED WITH THE CAPABILITY TO SUPPORT VISIBLE ALARM NOTIFICATION APPLIANCES IN ACCORDANCE WITH ICC/ANSI A117.1 BC 907.2.11.4. CARBON MONOXIDE ALARMS AND DETECTORS SHALL BE PROVIDED AND INSTALLED IN ACCORDANCE WITH BC 908.7.1 THROUGH 908.7.4. CARBON MONOXIDE ALARMS OR DETECTORS SHALL COMPLY WITH THE POWER SOURCE, INTERCONNECTION, AND ACCEPTANCE TESTING REQUIREMENTS AS REQUIRED FOR SMOKE ALARMS IN ACCORDANCE WITH BC 907.2.11.2 THROUGH 907.2.11.3. BC 908.7.1.1.2. CARBON MONOXIDE ALARMS AND DETECTORS SHALL BE LISTED IN ACCORDANCE WITH UL 2034 AND 2075. BC 908.7.4. SHEET # TITLE SCALE CODE CONSULTANT GENERAL G-000.00 COVER NONE X G-001.00 ENERGY ANALYSIS, BUILDING NOTES NONE X G-002.00 ANSI ACCESSIBILITY DIAGRAMS NONE X JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 ARCHITECTURAL DM-100.00 DEMOLITION PLAN 1/4" = 1'-0" X A-100.00 CONSTRUCTION PLAN 1/4" = 1'-0" X A-110.00 FINISH FLOOR PLAN 1/4" = 1'-0" X A-120.00 REFLECTED CEILING PLAN 1/4" = 1'-0" X A-130.00 POWER, TELEPHONE, & DATA PLAN 1/4" = 1'-0" A-400.00 INTERIOR ELEVATIONS 1 1/4" = 1'-0" X A-401.00 INTERIOR ELEVATIONS 2 1/4" = 1'-0" X A-402.00 INTERIOR ELEVATIONS 3 1/4" = 1'-0" X A-403.00 ENLARGED PLANS AND ELEVATIONS 1 1/2" = 1'-0" X A-404.00 ENLARGED PLANS AND ELEVATIONS 2 1/2" = 1'-0" X A-405.00 ENLARGED PLANS AND ELEVATIONS 3 1/2" = 1'-0" X A-600.00 DETAILS AS NOTED X A-700.00 FINISH AND MILLWORK SCHEDULES AS NOTED X A-701.00 FIXTURES, APPLIANCES AND LIGHTING SCHEDULES AS NOTED X A-702.00 WINDOW AND DOOR SCHEDULES AS NOTED X M-100.00 MECHANICAL PLAN AS NOTED X M-200.00 MECHANICAL DETAILS AS NOTED X PLUMBING AND ELECTRICAL ENGINEER GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN AV 1507 RK BLOCK NO: E9 PA NONE SAMPLES - MILLWORK FINISHES - METAL FINISHES - METAL FABRICATIONS - TILE & STONE - COUNTERTOPS - GLASS & MIRRORS - PAINTS & COATINGS - HARDWARE 5T HS T MECHANICAL N AREA OF WORK 1220 PARK AVE, APT 4B ELECTRICAL E-001.00 ELECTRICAL SYMBOLS, ABBREVS, NOTES & DWG LIST AS NOTED X STAMP E-002.00 ELECTRICAL SPECIFICATIONS AS NOTED X E-003.00 ELECTRICAL SPECIFICATIONS AS NOTED X E-100.00 ELECTRICAL LIGHTING PLAN AS NOTED X E-200.00 ELECTRICAL POWER PLAN AS NOTED X E-300.00 ELECTRIC RISER DIAGRAMS AS NOTED X E-400.00 ELECTRICAL DETAILS AS NOTED X P-001.00 PLUMBING LEGENDS, NOTES, DETAILS, & SPECS AS NOTED X P-100.00 PLUMBING FLOOR PLAN - DEMOLITION AS NOTED X P-200.00 PLUMBING FLOOR PLAN - NEW WORK AS NOTED X P-300.00 PLUMBING RISER DIAGRAMS AS NOTED X NOT FOR CONSTRUCTION PLUMBING E9 6T HS T AREA OF WORK 1220 PARK AVE, APT 4B BLOCK NO: LOT NO: LOT AREA: 1507 . 33 17,624 SF (100.67' X 175') LAND USE: RESIDENTIAL, MULTI-FAMILY ELEVATOR BUILDING OCCUPANCY GROUP: R2 ZONING USE GROUP: R10, R8B ZONING MAP: 6B NO. OF STORIES: 17 BUILDING HEIGHT: xxx NO. OF UNITS: 56 NO. OF RESIDENTIAL UNITS: 56 BUILDING AREA: 231,050 SF APT 4B AREA: 3000 SF CONSTRUCTION CLASS: 1 06/12/2017 ISSUE DATE COVER E9 5T HS T PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER N 1 PRELIMINARY BID TITLE E. LANDMARK STATUS: PRODUCT DATA - APPLIANCES & EQUIPMENT - LIGHTING FIXTURES & CONTROLS - WINDOW(S) - PAINTS & COATINGS DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 AV E 95TH STREET ARCHITECT RK CROSS STREET(S): CONTRACTOR TO PROVIDE SUBMITTALS (PRODUCT DATA, SHOP DRAWINGS, AND SAMPLES) OF ALL PRODUCTS, INCLUDING BUT NOT LIMITED TO THE FOLLOWING, FOR THE ARCHITECT'S REVIEW AND APPROVAL: PA 2. NEW YORK, NY 10128 PRELIMINARY BID 06/12/2017 1220 PARK AVE, APT 4B 1. E. ADDRESS: ALL WORK TO CONFORM WITH ALTERATION AGREEMENT SET FORTH BY 1220 PARK AVENUE CORPORATION AND APPLICABLE CODES. ALL WORK TO BE FILED WITH THE NYC DEPARTMENT OF BUILDINGS AND PERMITS TO BE OBTAINED PRIOR TO THE START OF WORK. DURING CONSTRUCTION COPIES OF THE ORIGINAL APPROVED PLAN AND PERMIT SHALL BE KEPT AT THE SITE AT ALL TIMES AND MADE AVAILABLE TO ANY NYC DOB INSPECTOR. AT THE COMPLETION OF WORK, ALL SIGN-OFFS SHALL BE OBTAINED AND A LETTER OF COMPLETION FROM THE NYC DOB ISSUED. ALL WORK SHALL BE IN COMPLIANCE WITH APPLICABLE CODES, ORDINANCES & REGULATIONS HAVING JURISDICTION, INCLUDING THE NEW YORK CITY BUILDING CODE AND LOCAL LAW 58, FIRE DEPARTMENT REGULATIONS, AND UTILITY COMPANY REQUIREMENTS. ALL WORK SHALL CONFORM TO BEST TRADE PRACTICES. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS. CONTRACTOR SHALL VERIFY ALL CONDITIONS PRIOR TO THE START OF WORK AND REPORT ANY DISCREPANCIES BETWEEN DRAWINGS AND FIELD CONDITIONS TO THE ARCHITECT. ALL PLUMBING AND ELECTRICAL WORK SHALL BE PERFORMED BY NYC LICENSED PLUMBERS AND ELECTRICIANS. EMPLOYEES OF THE ACTUAL LICENSE HOLDERS SHALL DO THE WORK. PERSONS LICENSED IN THEIR TRADES SHALL ARRANGE FOR AND OBTAIN INSPECTIONS AND REQUIRED SIGN-OFFS. PROVIDE OR MAINTAIN FIRE RATED CONSTRUCTION AS REQUIRED AT SHAFTS, STRUCTURAL MEMBERS, ETC. EXTREME CARE SHALL BE TAKEN WHEN WORK IS ADJACENT TO ANY PARTY WALLS, SHAFT WALLS OR WALLS THAT SERVE AS FIREPROOFING OF BUILDING STEEL. THESE WALLS SHOULD NOT BE REMOVED OR PENETRATED. CARE SHOULD BE TAKEN IN REMOVAL OF ANY CONDUIT WHICH IS IN THE FLOOR AND CEILING SLAB IN PARTITIONS THAT NEED TO BE REMOVED. ANY HAZARDOUS MATERIALS INCLUDING LEAD AND ASBESTOS SHALL BE PROPERLY TREATED AND/OR ABATED AS PER LOCAL REGULATIONS AND BUILDING REGULATIONS. NEW REGULATIONS FOR LEAD ABATEMENT SHALL BE FOLLOWED. THE CONTRACTOR WILL NEED TO SUBMIT CERTIFICATES SHOWING AUTHORIZATION TO REMOVE LEAD AND/OR ASBESTOS. REMOVAL MUST BE PERFORMED IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE FEDERAL TASK FORCE. DUST AND DEBRIS CONTAINING LEAD MUST BE REMOVED BY SPECIALIZED CLEANING OF THE WORK AREA. CONTRACTOR IS TO MAINTAIN A PROJECT SCHEDULE THROUGH OUT THE PROJECT. PROJECT SCHEDULE SHALL BE PROVIDED TO THE OWNER AND ARCHITECT WITHIN 7 CALENDAR DAYS OF NOTICE TO PROCEED. REFER TO DEMOLITION NOTES ON DM-100 FOR ADDITIONAL REQUIREMENTS. NO DECREASE IN SOUND TRANSFER BETWEEN FLOORS. IF SUB-FLOORING IS DISTURBED IT SHOULD BE REPLACED IN KIND. THE WORK SHALL NOT INTERFERE WITH THE BUILDING'S INTERCOM, GAS, ELECTRIC, HEATING, A/C OR PLUMBING SYSTEM OR ANY OTHER BUILDING SYSTEM OR SERVICE. BUILDING RISERS, INCLUDING PLUMBING AND ELECTRICAL MAY NOT BE RELOCATED. NO PENETRATIONS ALLOWED IN THE EXTERIOR WALL. FUNCTIONING FIRE EXTINGUISHERS AND SMOKE DETECTORS SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE WORK. NO FIRE EXITS MAY BE BLOCKED BY THE WORK. IF A CHILD 10 YEARS OLD OR UNDER LIVES OR WILL LIVE IN THE APARTMENT WINDOW GUARDS SHALL BE INSTALLED PURSUANT TO SECTION 131.1 OF THE NYC HEALTH CODE. NO CHANGE PERMITTED TO THE OPERATION OF THE BUILDING'S SYSTEMS TO FACILITATE THE FUNCTIONING OF ANY HEATING, A/C, PLUMBING OR ELECTRICAL APPLIANCES. THE USE OF ELECTRIC HAMMERS, ELECTRIC SAWS OR OTHER ELECTRICAL POWER TOOLS WHICH CAUSE UNDUE DISTURBANCE TO OTHER SHAREHOLDERS OR RESIDENTS OF THE BUILDING ARE NOT PERMITTED AT ANY TIME UNLESS SPECIFICALLY APPROVED BY THE CORPORATION IN WRITING. NO JACK HAMMERS OF ANY KIND MAY BE USED. THE ALTERATIONS SHALL NOT ADVERSELY AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, ANY APARTMENTS CONTAINED THEREIN OR ANY OF THE BUILDING'S SYSTEMS. USG SHEETROCK MOLD TOUGH GYPSUM PANELS OR A SUBSTANCE OF EQUAL QUALITY SHALL BE PROVIDED WHEREVER WALLS OR CEILINGS ARE REPLACED IN WET/DAMP AREAS AND DUROCK OR A SUBSTANCE OF EQUAL QUALITY IN TUB/SHOWER ENCLOSURES. CEMENT BOARD MUST BE INSTALLED PER THE MANUFACTURER'S GUIDELINES. ALL RENOVATED FLOORS, EXCEPT THOSE IN VERTICALLY STACKED BATHROOMS, MUST MEET THE NYC BUILDING CODE REQUIREMENT FOR IMPACT NOISE REDUCTION (INR-0) AV 1. ISSUE AND DATE ON PARCEL INFORMATION DRAWING LIST SUBMITTALS DIS GENERAL NOTES MA PROJECT INFO CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 G-000.00 LOCATION PLAN NTS PAGE 1 OF 18 PROFESSIONAL STATEMENT "TO THE BEST OF MY KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THESE PLANS AND SPECIFICATIONS ARE IN COMPLIANCE WITH ENERGY CONSERVATION CODE OF NEW YORK CITY." ENERGY ANALYSIS 2016 NYCECC, R501.1.1 ADDITIONS, ALTERATIONS, OR REPAIRS: GENERAL. ADDITIONS, ALTERATIONS, OR REPAIRS TO AN EXISTING BUILDING, BUILDING SYSTEM OR PORTION THEREOF SHALL COMPLY WITH SECTION R502, R503, OR R504. UNALTERED PORTIONS OF THE EXISTING BUILDING OR BUILDING SUPPLY SYSTEM SHALL NOT BE REQUIRED TO COMPLY WITH THIS CODE. 2016 NYCECC, R501.4 COMPLIANCE. ALTERATIONS, REPAIRS, ADDITIONS AND CHANGES OF OCCUPANCY TO, OR RELOCATION OF, OF EXISTING BUILDINGS AND STRUCTURES SHALL COMPLY WITH (I) ALL APPLICABLE PROVISIONS OF THIS CODE, (II) THE PROVISIONS FOR ALTERATIONS, REPAIRS, ADDITIONS AND CHANGES OF OCCUPANCY OR RELOCATION, RESPECTIVELY, IN THE NEW YORK CITY CONSTRUCTION CODES, (III) THE NEW YORK CITY FIRE CODE, AND (IV) THE NEW YORK CITY ELECTRICAL CODE. 3. 4. 5. 2016 NYCECC, R501.5 NEW AND REPLACEMENT MATERIALS. EXCEPT AS OTHERWISE REQUIRED OR PERMITTED BY THIS CODE, MATERIALS PERMITTED BY THE APPLICABLE CODE FOR NEW CONSTRUCTION SHALL BE USED. LIKE MATERIALS SHALL BE PERMITTED FOR REPAIRS, PROVIDED HAZARDS TO LIFE, HEALTH OR PROPERTY ARE NOT CREATED. HAZARDOUS MATERIALS SHALL NOT BE USED WHERE THE CODE FOR NEW CONSTRUCTION WOULD NOT PERMIT THEIR USE IN BUILDINGS OF SIMILAR OCCUPANCY, PURPOSE AND LOCATION. 2016 NYCECC, R503.1 GENERAL. ALTERATIONS TO ANY BUILDING OR STRUCTURE SHALL COMPLY WITH THE REQUIREMENTS OF THE CODE FOR NEW CONSTRUCTION. ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE IS NO LESS CONFORMING TO THE PROVISIONS OF THIS CODE THAN THE EXISTING BUILDING OR STRUCTURE WAS PRIOR TO THE ALTERATION. ALTERATIONS TO AN EXISTING BUILDING, BUILDING SYSTEM OR PORTION THEREOF SHALL CONFORM TO THE PROVISIONS OF THIS CODE AS THEY RELATE TO NEW CONSTRUCTION WITHOUT REQUIRING THE UNALTERED PORTIONS OF THE EXISTING BUILDING OR BUILDING SYSTEM TO COMPLY WITH THIS CODE. ALTERATIONS SHALL NOT CREATE AN UNSAFE OR HAZARDOUS CONDITION OR OVERLOAD EXISTING BUILDING SYSTEMS. ALTERATIONS SHALL BE SUCH THAT THE EXISTING BUILDING OR STRUCTURE USES NO MORE ENERGY THAN THE EXISTING BUILDING OR STRUCTURE PRIOR TO THE ALTERATION. ALTERATIONS TO EXISTING BUILDINGS SHALL COMPLY WITH SECTIONS R503.1.1 THROUGH R503.2. 6. 7. 8. 2016 NYCECC, R503.1.4 LIGHTING. NEW LIGHTING SYSTEMS THAT ARE PART OF THE ALTERATION SHALL COMPLY WITH SECTION R404.1. ENERGY ANALYSIS, ALTERATION TO AN EXSTG APT OF AN EXSTG MULTIPLE DWELLING BUILDING, CLIMATE ZONE 4A, NYCECC 2016 NYCECC ITEM # 402.3.5 404.4.2.2 402.4.4 404.1 CODE PRESCRIPTIVE VALUE SUPPORTING DOCS BUILDING U-FACTOR = 0.30 ENVELOPE-FENES TRATION REQ'S NEW WINDOWS TO REPLACE EXSTG U-FACTOR = 0.35 PER NYCECC TABLE 402.1.1 EXTERIOR WINDOW SCHEDULE, SHEET G-001 AIR SEALING AND INSULATION VISUAL INSPECTION NYCECC 404.4.2.2 FENESTRATION AIR LEAKAGE BUILDING ENVELOPE FENESTRATION PRODUCT RATINGS FOR AIR LEAKAGE MAX 0.3 CFM PER SQUARE FOOT PER ASTM E283 ELECTRICAL LIGHTING IN DWELLING UNITS NOT LESS THAN 75% OF THE LAMPS IN PERMANENTLY INSTALLED LIGHTING FIXTURES SHALL BE HIGH-EFFICACY LAMPS OR NOT LESS THAN 75 PERCENT OF THE PERMANENTLY INSTALLED LIGHTING FIXTURES SHALL CONTAIN ONLY HIGH-EFFICACY LAMPS. ITEM DESCRIPTION PROVISION REPLACEMENT FENESTRATION LIGHTING EQUIPMENT PROPOSED DESIGN VALUE 9. 10. FIELD VERIFICATION REQ'D SEE A-100 11. NO MORE THAN 0.3 CFM PER SF EXTERIOR WINDOW SCHEDULE, SHEET G-001 12. NYCECC 404.1 LIGHTING FIXTURE SCHEDULE, SHEET G-001 13. LIGHTING ANALYSIS DESCRIPTION 14. LAMP TYPE CEILING RECESSED DOWNLIGHT CEILING RECESSED DOWNLIGHT, WET-LISTED SURFACE MOUNTED CEILING LIGHT STRIP LIGHT WALL SCONCE QTY LED LED FLUORESCENT LED TBD TOTAL FIXTURE COUNT TOTAL NO. FIXTURES W/ HIGH-EFFICACY LAMPS PERCENTAGE W/ HIGH-EFFICACY LAMPS TOTAL NO. OF HIGH-EFFICANCY LAMPS > 75% OF LAMPS IN PERMANENTLY INSTALLED FIXTURES 38 6 18 69 LF 30 161 131 81% 15. A FINAL SCHEDULE BROKEN OUT BY TRADE MUST BE SUBMITTED FOR BUILDING APPROVAL. ALL WORK SHALL BE PROVIDED BY LICENSED CONTRACTORS WHERE APPLICABLE: GENERAL CONSTRUCTION SHALL BE PROVIDED BY CONTRACTORS WITH A HOME IMPROVEMENT CONTRACTOR'S LICENSE AS ADMINISTERED BY THE NEW YORK CITY DEPARTMENT OF CONSUMER AFFAIRS, AND PLUMBING AND ELECTRICAL WORK SHALL BE PROVIDED BY CONTRACTORS LICENSED BY NEW YORK CITY. ALL PROJECTS ARE REQUIRED TO RENOVATE UTILIZING LEAD SAFE PRACTICES INCLUDING THE USE OF CERTIFIED RENOVATORS. SUBMIT COPIES OF THE LICENSES, AND NAMES AND ADDRESSES OF THE CONTRACTORS / SUBCONTRACTORS FOR REVIEW. THESE INCLUDE HOME IMPROVEMENT CONTRACTOR'S LICENSE, RENOVATOR'S CERTIFICATION FOR LEAD SAFE PRACTICES, MASTER PLUMBER'S LICENSE AND MASTER ELECTRICIAN'S LICENSE. SUBMITTAL OF DOCUMENTS THAT SHOW COMPLIANCE WITH THE ABOVE ARE REQUIRED FOR APPROVAL AND RECORD. THE CONTRACTORS ARE TO PROVIDE CERTIFICATES OF LIABILITY INSURANCE AND PROOF OF WORKMAN'S COMPENSATION AND DISABILITY COVERAGE AS PER THE ALTERATION AGREEMENT. NOTIFICATION LETTERS TO ADJACENT APARTMENTS ARE TO BE ISSUED AT LEAST 10 DAYS PRIOR TO COMMENCEMENT OF WORK AS PER THE ALTERATION AGREEMENT. PICTORIAL DOCUMENTATION OF EXISTING CONDITIONS IN NEIGHBORING APARTMENTS PRIOR TO THE START OF CONSTRUCTION IS REQUIRED AND IS TO BE SCHEDULED WITH THE RESIDENT MANAGER. POWER-ACTUATED DEVICES MAY NOT BE UTILIZED WITHOUT PRIOR CONSENT FROM THE BOARD, AS PER THE ALTERATION AGREEMENT. PROVIDE FOR FIRE SAFETY AS PER THE ALTERATION AGREEMENT. A UL LISTED CLASS ABC FIRE EXTINGUISHERS AND SMOKE/CO DETECTORS MUST BE ON SITE AT ALL TIMES DURING CONSTRUCTION. THEY ARE TO BE LOCATED IN A CONSPICUOUS LOCATION AND MAINTAINED IN WORKING ORDER IN ACCORDANCE WITH ALL APPLICABLE REQUIREMENTS OF THE NYC FIRE CODE. NOTE THAT BUILDING SYSTEMS MAY NOT BE RELOCATED. NO PLUMBING OR HEATING RISERS MAY BE RELOCATED WITHOUT THE BUILDING'S SPECIFIC WRITTEN CONSENT. SIMILARLY, RELOCATION OF ANY ELECTRIC RISER WILL NOT BE PERMITTED WITHOUT THE BUILDING'S APPROVAL. UPON COMPLETION OF DEMOLITION, THE CONDITION OF EXISTING BUILDING RISERS MUST BE INSPECTED BY THE BUILDING. THE CONTRACTOR WILL BE RESPONSIBLE FOR NOTIFYING THE RESIDENT MANAGER OR BUILDING MANAGEMENT FOR THIS INSPECTION AND OBTAINING THEIR WRITTEN SIGN-OFF INDICATING THAT THE RISERS DO NOT REQUIRE REPAIR AND SCHEDULED WORK MAY PROCEED. IF A RISER REPLACEMENT IS REQUIRED, THE SHAREHOLDER AND CONTRACTOR ARE TO NOTE THAT THIS COULD AFFECT THE CONSTRUCTION SCHEDULE AS WALLS CANNOT BE CLOSED WITHOUT COMPLETION OF THE REQUISITE INSPECTIONS. IN ADDITION, IF THE BUILDING'S $25,000 ALLOTMENT FOR WORK UNDER LAA1 IS NOT AVAILABLE OR THE COST OF THE WORK LEAVES THE BUILDING WITHOUT AVAILABLE FUNDS, THE SHAREHOLDER MAY BE REQUIRED TO AMEND THE APARTMENT'S EXISTING DOB APPLICATION OR FILE NEW TO INCLUDE THIS WORK. ALL PROJECTS ARE REQUIRED TO RENOVATE UTILIZING LEAD SAFE PRACTICES INCLUDING THE USE OF CERTIFIED RENOVATORS. THE SHAREHOLDER MUST BE MADE AWARE OF THESE REQUIREMENTS AS THERE IS A $32,500 FINE PER DAY FOR NON-COMPLIANCE. IT WILL BE THE SHAREHOLDER'S RESPONSIBILITY TO NOTIFY THE CONTRACTOR AS TO THE PRESENCE OF LEAD-BASED PAINT ON THE SITE AND SHALL CAUSE THE CONTRACTORS AND WORKERS TO USE SAFE WORK PRACTICES AS REQUIRED BY EPA LAW 40 CFR 745 SUBPART E, EFFECTIVE 04.22.10, AND ANY APPLICABLE AGENCY REQUIREMENTS, TAKING ALL PRECAUTIONS TO PREVENT THE SPREAD OF DUST AND DEBRIS THAT MAY CONTAIN LEAD. THE SHAREHOLDER HEREBY ACKNOWLEDGES THAT THE BUILDING HAS NO LIABILITY OR OBLIGATION IN CONNECTION WITH THIS NOTIFICATION REQUIREMENT OF THE PRE-ALTERATION TESTING FOR THE PRESENCE OF LEAD MAY LIMIT THE AMOUNT OF AREA UNDER THE PURVIEW OF THE REGULATIONS. IF ASBESTOS IS UNCOVERED DURING DEMOLITION, PROVIDE FOR REMOVAL OR CONTAINMENT AS PER AGENCY REQUIREMENTS. RESIDENT MANAGER MUST BE GIVEN 24-HOURS NOTICE PRIOR TO THE SCHEDULE FOR REMOVAL. AS THE ALTERATION AGREEMENT GOVERNS THE CONTRACTOR IS TO PROVIDE PROTECTION AS PER THE RESIDENT MANAGER'S REQUIREMENTS, ALL TOILET AND KITCHEN EXHAUSTS ARE TO BE COVERED, HVAC UNITS PROTECTED OR REMOVED FROM THE SITE, THE HALLWAYS PROTECTED WITH MASONITE AND STICKY MATS PROVIDED EACH DAY AT THE ELEVATORS AND AT THE FRONT DOOR. NEGATIVE AIR PRESSURE MACHINES SHALL BE UTILIZED PER MANUFACTURER'S GUIDELINES AND AS DIRECTED BY MANAGEMENT, SPECIFICATIONS FOR WHICH MUST BE SUBMITTED PRIOR TO IMPLEMENTATION. NEGATIVE AIR PRESSURE MACHINES REDUCE DUST INFILTRATION TO ADJACENT UNITS AND PUBLIC SPACES OUTSIDE OF THE UNIT BEING ALTERED, PARTICULATE DUST WITHIN THE WORK AREA, CLEANUP AND MAINTENANCE TIME, AND UNPLEASANT ODORS. DEMOLITION SHALL BE MANAGED TO COINCIDE WITH THE AMOUNT OF DEBRIS THAT CAN BE PROPERLY REMOVED ON THAT DAY. ALL DEBRIS IS TO BE PROPERLY SEALED IN BAGS OR CONTAINERS THAT WILL NOT PERMIT DUST TO LEAVE THE VESTIBULE OR ENTER THE PUBLIC HALLS. ALL WORK IS TO BE IN COMPLIANCE WITH ALL SECTIONS OF THE ALTERATION AGREEMENT AND HOUSE RULES. CHOPPING, CUTTING, CHASING OR CHANNELING IS NOT PERMITTED FOR ANY REASON IN BRICK OR BLOCK AT BUILDING EXTERIOR WALLS, APARTMENT DEMISING WALLS, BUILDING STRUCTURE, STRUCTURAL SLABS, BEAMS, MASONRY COLUMNS OR THEIR ENCLOSURES. THIS MUST BE ADEQUATELY COMMUNICATED TO YOUR GC. TYPICAL IN UNIT PARTITIONS MAY BE COMPLETELY REMOVED IF DESIRED, ON CONDITION THEY ARE NOT STRUCTURAL AND THAT NO RISERS ARE DISTURBED IN THE PROCESS. IF IN DOUBT, VERIFY WITH RESIDENT MANAGER WHICH WALLS MAY BE AND MAY NOT BE REMOVED / CHOPPED, AND WHICH MAY BE CHASED. CUTTING / CHASING IN DEMISING WALLS FOR ELECTRICAL OR ANY OTHER SERVICES IS PERMITTED ONLY IN THE VERTICAL DIRECTION, AND ONLY TO THE DEPTH OF THE PLASTER LAYER. ANY UNAPPROVED CHOPPING WILL RESULT IN STOPPAGE OF WORK AND REQUIRE AN INSPECTION BY OUR OFFICE TO INDICATE A REMEDY. FIREPROOF / FIRESTOP AROUND ALL ELECTRICAL BOXES. VERIFY WALL THICKNESS AND VIABILITY OF INSTALLATION OF ELECTRICAL BOXES IN WALLS PRIOR TO CUTTING. ALL BRANCH PIPING, SUPPLY, WASTE AND VENT, MUST BE REPLACED BACK TO THE BUILDING'S RISERS AND STACKS. REPLACEMENT OF BRANCH PIPING IS TO INCLUDE PROVIDING NEW RISER SHUT-OFF VALVES TO BE LOCATED IN CLOSE PROXIMITY TO THE RISER. A MINIMUM OF 3 ELBOW SWINGS TO ALLOW FOR VERTICAL EXPANSION ARE REQUIRED BETWEEN THE HOT WATER RISER T AND SHUT-OFF VALVE. PROVIDE DIELECTRIC UNIONS WITH APPROPRIATE END CONNECTIONS FOR THE PIPE MATERIALS IN WHICH INSTALLED (SCREWED, SOLDERED, OR FLANGED) TO ISOLATE DISSIMILAR METALS. SOFT-SEATED, SPRING LOADED CHECK VALVES ARE TO BE PROVIDED ON HOT AND COLD WATER BRANCH LINES FOLLOWING THE SHUT-OFF VALVES. ALL VALVES ARE TO BE MADE ACCESSIBLE FOR SERVICING. BRANCH PIPING IS TO BE WRAPPED WITH DURABLE, CONDENSATE CONTROLLING, INSULATING MATERIAL AND SUPPORTED WITH NON-REACTIVE MATERIALS. A MINIMUM CLEAR DISTANCE OF 2” IS REQUIRED BETWEEN HOT AND COLD WATER PIPES AND THERE MUST BE NO METAL-TO-METAL CONTACT BETWEEN PIPING, CONDUIT, BX, ETC. A WATER HAMMER ARRESTER IS TO BE PROVIDED AT ALL BRANCH LINES THAT FEED SINKS, LAVATORIES AND WATER CLOSETS. ARRESTERS MUST BE MADE ACCESSIBLE FOR SERVICING (UNLESS THE UNIT HAS A LIFETIME GUARANTEE I.E. SIOUX CHIEF) AND ARE TO BE LOCATED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. NOTE: AIR CHAMBERS ARE NOT TO BE USED. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. WP SYSTEMS BY LATICRETE (9235, HYDROBAN OR APPROVED EQUAL) WILL BE ACCEPTABLE. SUBMIT PRODUCT SPECIFICATIONS AND DETAILS AS THEY RELATE TO THE FLOOR CONSTRUCTION IN THIS BUILDING. INDICATE THE EXTENT OF WP LOCATIONS ON THE CONSTRUCTION PLAN FOLLOW MANUFACTURER'S WP RECOMMENDATIONS WHERE NEW FLOORING IS INSTALLED. PLUMBING LINES RUNNING IN WALLS OVER DRY AREAS BELOW MUST BE WATERPROOFED. WP MUST TURN UP A MINIMUM OF 6” AT ALL WALL CONDITIONS. NEW STONE SADDLES MUST BE INSTALLED AT ALL BATHROOMS. AT THE WALLS SURROUNDING BATH TUBS AND SHOWERS, WATERPROOFING MUST EXTEND FLOOR TO CEILING. THE WP INSTALLATION MUST BE INSPECTED BY OUR OFFICE UPON COMPLETION. ALL RENOVATED FLOORS ARE TO INCLUDE A SOUNDPROOFING MEMBRANE THAT WILL PROVIDE AN IMPACT INSULATION CLASS (IIC) RATING OF NOT LESS THAN 50 BASED UPON LABORATORY MEASUREMENTS MADE IN ACCORDANCE WITH ASTM E 492, OR NOT LESS THAN 45 IF FIELD TESTED IN ACCORDANCE WITH ASTM E 1007 IN COMPLETED CONSTRUCTION. WE HAVE PREVIOUSLY REVIEWED AND APPROVED THE FOLLOWING SOUNDPROOFING PRODUCTS: GENIE MAT RST10 (10MM); KINETICS SR FLOORBOARD 5/8” THICK; COLBOND ENKASONIC 9110, 10 MM; INTERTEK QUIET CORK, 6MM; AND SIKA ACOUBOND (FOR WOOD FLOORS ONLY). NOTE THAT THE EXISTING BUILDING'S FLOOR CONSTRUCTION AND THE SP'S PERFORMANCE UNDER WET CONDITIONS MUST BE CONSIDERED IN THE SELECTION OF THE APPROPRIATE SOUNDPROOFING PRODUCT FOR WHICH TEST DATA BASED ON REQUIREMENTS PRESCRIBED BY THE NEW YORK CITY BUILDING CODE MUST BE PROVIDED. PROVIDE AND/OR MAINTAIN FIRE RATED CONSTRUCTION AS REQUIRED AT SHAFTS, STRUCTURAL MEMBERS, DEMISING WALLS, ETC. NOTE THAT WALLS MUST BE COMPLETELY SHEATHED BEHIND CABINETS. WHERE CHASES, SHAFTS, DEMISING WALLS AND STRUCTURAL ELEMENTS ARE OPENED DURING CONSTRUCTION, PROVIDE A UL-LISTED FIRESTOPPING OR FIREPROOFING SYSTEM AS REQUIRED BY CODE AT ALL EXISTING OR NEW OPENINGS. WHERE PIPE CHASES ARE ENCLOSED IN MASONRY CONSTRUCTION, THE FIRE RATING MUST BE MAINTAINED AND WALLS THAT ARE DEMOLISHED IN THE COURSE OF THE WORK MUST BE RESTORED WITH SIMILAR CONSTRUCTION OR NEW CONSTRUCTION WITH THE SAME RATING. WHERE PIPING IS NOT LOCATED IN A RATED ENCLOSURE PROVIDE FIRESTOPPING SYSTEMS AS MANUFACTURED BY STI, HILTI, USG OR EQUAL UL LISTED PRODUCTS ARE ACCEPTABLE AND THEIR RATING MUST COINCIDE WITH THE FIRE RATING OF THE EXISTING ASSEMBLY. ORDINARY CEMENT, INSULATION AND OTHER NON-RATED SEALANTS AND PRODUCTS MAY NOT BE USED UNLESS PARTITIONS PROVIDE THE REQUIRED FIRE RATING. NOTE THAT FIRESTOPPING AND FIREPROOFING MUST BE INSTALLED UPON THE COMPLETION OF DEMOLITION AND PRIOR TO THE INSTALLATION OF ANY SHEATHING OR OTHER WORK THAT WILL BLOCK ACCESS TO ANY OPENINGS THAT MUST BE FIRESTOPPED. CONTRACTOR IS TO NOTIFY THE RESIDENT MANAGER ON THE FOLLOWING MILESTONES SO THAT OBSERVATION VISITS MAY BE SCHEDULED OF THE WORK: -COMPLETION OF DEMOLITION, WHICH INCLUDES THE INSTALLATION OF SHUT OFF VALVES. -COMPLETION OF FIRESTOPPING AND FIREPROOFING IF REQUIRED. -COMPLETION OF MECHANICAL, PLUMBING AND ELECTRICAL ROUGH IN. -COMPLETION OF WATERPROOFING/SOUNDPROOFING. -COMPLETION OF SHOWER PAN INSTALLATION. -COMPLETION OF 24 HOUR WATER RETENTION TEST. -COMPLETION OF CLOSURE AND SEALING OF WALLS PRIOR TO INSTALLATION OF CABINETRY, APPLIANCES, ETC. -COMPLETION OF PROJECT PRIOR TO DOB SIGN-OFF. THE ARCHITECT IS RESPONSIBLE FOR MAINTAINING ADA REQUIREMENTS. WHERE WALLS ARE REPLACED AT ALL BATHROOMS, INCLUDING FOR REPLACEMENT OF BRANCH PIPING TO THE RISER, PLATES FOR THE LOCATION OF FUTURE GRAB BARS ARE TO BE INSTALLED AS PER ADA REQUIREMENTS. PROVIDE GFCI OUTLETS AND CIRCUITS PER CODE IN ALL WET AREAS. OUTLETS AND FIXTURES LOCATED AT DEMISING WALL CONDITIONS MUST MAINTAIN THE EXISTING FIRE RATING. ALL LIGHTING MUST BE UL RATED AND POWER OUTLETS AND SWITCHES LOCATED AS PER ADA REQUIREMENTS. NEW YORK ALONG WITH 5 OTHER NORTHEASTERN STATES, INCLUDING NEW JERSEY HAS ADOPTED OTC (OZONE TRANSPORT COMMISSION) GUIDELINES CONCERNING VOC (VOLATILE ORGANIC COMPOUND) REQUIREMENTS. THERE ARE STRINGENT REQUIREMENTS CONCERNING THE USE OF OIL BASED MATERIALS. IT WOULD BE BEST BOTH IN TERMS OF QUALITY FINISH AND ENVIRONMENTAL ISSUES TO SPRAY ANY LACQUER OFF SITE IN AN APPROPRIATE BOOTH. IF THIS IS TO BE SPRAYED ON SITE, CONTRACTORS ARE TO BE LIMITED TO PURCHASING QUART CANS ONLY. THE CONTRACTOR SHOULD BE USING A HIGH VOLUME, LOW PRESSURE SPRAY DEVICE. ANY CHANGES TO THE SCOPE OF WORK MUST BE SUBMITTED FOR OUR REVIEW AND APPROVAL PRIOR TO THE COMMENCEMENT OF THAT WORK. ALL FUTURE SUBMITTED DRAWINGS SHOULD HAVE CHANGES BUBBLED. WE WILL ONLY REVIEW BUBBLED CHANGES. CONSEQUENCES FOR ANY NON-BUBBLED CHANGES WILL BE THE RESPONSIBILITY OF THE SHAREHOLDER. COPIES OF SIGNED AIA FORMS G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, AND G706A, CONTRACTOR'S RELEASE OF LIENS ARE TO BE SUBMITTED UPON SUBSTANTIAL COMPLETION. UPON COMPLETION OF CONSTRUCTION, PROVIDE AN 8.5X11 SKETCH OF THE ALTERATION INDICATING LOCATIONS OF ALL VALVES AND ACCESS PANELS FOR PLUMBING AND ACCESS FOR MECHANICAL EQUIPMENT. 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN AV 16. 1. 2. Artacho / Oh Residence RK PROPOSED WORK COMPLIES WITH THE REQUIREMENTS OF THE 2016 NYCECC. BUILDING NOTES E9 PA 2016 NEW YORK CITY ENERGY CONSERVATION CODE COMPLIANCE 5T HS T N AREA OF WORK 1220 PARK AVE, APT 4B STAMP NOT FOR CONSTRUCTION PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE BUILDING NOTES ENERGY ANALYSIS PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER G-001.00 PAGE 2 OF 18 ANSI ACCESSIBILITY DIAGRAMS 4'-0" 2'-0" MAX 2'-8" CLR. MAX @ PASSAGE POINT 4'-0" 3'-0" CLR. CONTINUOUS PASSAGE 2'-6" 2'-6" Artacho / Oh Residence 2'-6" 4'-0" WING WALLS DOWN TO FLOOR 4'-0" PROTRUDING OBJECTS HANGING ON WALL WITH LEADING EDGES ABOVE 27" 4'-0" 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER FIGURE 8F: WALL MOUNTED OBJECTS AND MEASUREMENTS OF CLEAR WIDTHS FORWARD APPROACH CLEAR WIDTH (SEE FIGURE 8F) 4" MAX PARALLEL APPROACH CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 CLEAR FLOOR SPACE ANY AMOUNT MINIMUM CLEAR FLOOR SPACE FOR WHEELCHAIRS 4 TWO HINGED DOORS IN A SERIES 1 ARCHITECT 2'-8" MIN 2'-8" MIN 1'-0" MIN 3'-0" MIN 5'-0" MIN PROTRUDING OBJECTS WALKING PARALLEL TO A WALL 2'-0" MAX 3'-0" MIN 5'-0" MIN DASHED LINES INDICATE MINIMUM LENGTH OF CLEAR SPACE REQUIRED ON EACH ARM OF THE T-SHAPED SPACE IN ORDER TO COMPLETE THE TURN. 2'-3" MAX WHEELCHAIR TURNING SPACE MAXIMUM DOORWAY DEPTH 2'-8" MIN 2'-8" MIN SLIDING DOOR FOLDING DOOR MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 CLEAR DOORWAY WIDTH AND DEPTH 2 PULL SIDE 2'-0" MAX PASSAGE POINT PUSH SIDE 1'-6" MIN 5'-0" MIN X PROTRUDING OBJECT REQUIREMENTS 4'-0" 2'-8" MIN JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 PLUMBING AND ELECTRICAL ENGINEER WHEELCHAIR T-SHAPED TURNING SPACE PROTRUDING OBJECTS WALKING PERPENDICULAR TO A WALL 8 CODE CONSULTANT HINGED DOOR 5'-0" MIN 1'-0" MIN 2'-3" OR LOWER 2'-3" OR HIGHER 6'-8" MIN 5'-0" MIN DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 KEY PLAN 5'-0" MIN CLEAR SPACE REQUIREMENTS 5'-0" MIN. ROUGH DIM. 5 X=12IN. IF THE DOOR HAS BOTH A CLOSER AND A LATCH E9 5T FRONT APPROACHES: SWINGING DOORS HS T PUSH SIDE 4'-6" MIN 4'-0" 4'-0" FORWARD REACH LIMIT FOR WHEELCHAIRS MINIMUM CLEAR SPACE FOR FORWARD REACH 7'-3" MIN. ROUGH DIM. 3'-0" N 3'-8" MIN 5'-0" 1'-3" MIN 2'-6" 4'-0" MAX PULL SIDE 32" MIN. AREA OF WORK 1220 PARK AVE, APT 4B 1'-10" MIN STAMP X=20" MAX 4'-0" 48IN. MIN IF THE DOOR HAS BOTH A CLOSER AND A LATCH X=25" MAX 2'-1" MAX NOT FOR CONSTRUCTION 44" MAX 2'-6" 48" MAX HINGE-SIDE APPROACHES: SWINGING DOORS 32" MIN. 5'-0" MIN. ROUGH DIM. AV 30" 33" MIN. MINIMUM CLEAR WIDTH FOR SINGLE WHEELCHAIR RK 30" MIN. MINIMUM CLEAR WIDTH FOR TWO WHEELCHAIRS PA 7'-3" MIN. ROUGH DIM. 3'-0" MIN PULL SIDE 2'-0" MIN PUSH SIDE 2'-0" MIN 9 CLEAR FLOOR OR GROUND SPACE SHALL EXTEND NO MORE THAN 25 IN. UNDER THE OBSTRUCTION. MINIMUM SIZED ADAPTABLE BATHROOMS Z=X OR GREATER X= REACH DISTANCE, Z= CLEAR KNEE SPACE BELOW THE OBSTRUCTION, WHICH SHALL BE AT LEAST AS DEEP AS THE REACH DISTANCE, X. ADAPTABLE KITCHEN MAXIMUM FORWARD REACH OVER AN OBSTRUCTION 3'-6" MIN 12 ACCESSIBLE : COUNTER HEIGHT LOWERED, BASE CABINETS ADJUSTED ACCORDINGLY 6'-0" PROPOSED KITCHEN 2'-0" 1/4" MAX 2'-6" GRAB BAR REINFORCING REQUIREMENTS CLEAR FLOOR SPACE - PARALLEL APPROACH 10" MAX MAXIMUM SIDE REACH OVER AN OBSTRUCTION 4'-6" MIN GRAB BAR DETAIL HIGH AND LOW SIDE REACH LIMITS THRESHOLD DETAILS 7 SIDE REACH REQUIREMENTS MAXIMUM SIDE REACH FOR SHELVES AND CLOSETS SLIDE SIDE APPROACH: SLIDING AND FOLDING DOORS ISSUE DATE LATCH SIDE APPROACH: SLIDING AND FOLDING DOORS ANSI ACCESSIBILITY DIAGRAMS PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER 9" MIN 1 THRESHOLD DETAIL - ANGLE 11 4'-6" MAX 4'-6" MAX 9" 4'-6" 1/4" TO 1/2" 12" MIN. 1 1/2" MIN. 14 2 06/12/2017 TITLE 2'-0" MIN 1'-9" MAX 2'-6" THRESHOLD DETAIL - PERPENDICULAR 1 1/4" - 2" 1 1/2" PRELIMINARY BID FRONT APPROACH: SLIDING AND FOLDING DOORS 1'-3" MAX 3'-6" MIN HANDRAIL REQUIREMENTS 3'-6" MIN 1'-0" MIN. 4'-0" MIN 1 1/2" 2'-10" MAX 1 1/4" - 1 1/2" 4'-0" 2'-0" MIN. 10 13 48IN. MIN IF THE DOOR HAS A CLOSER 2'-6" LATCH-SIDE APPROACHES: SWINGING DOORS 3'-10" 3'-6" MIN. FORWARD REACH REQUIREMENTS 6 2'-0" MIN. CL PROVIDE REINFORCEMENT AS REQ'D FOR FUTURE INSTALLMENT OF GRAB BARS AT BATHTUB 1'-0" MIN. 1'-0" MIN. 2'-0" MIN. PROVIDE REINFORCEMENT AS REQ'D FOR FUTURE INSTALLMENT OF GRAB BARS AT WATER CLOSET 3'-0" MIN. MAXIMUM FORWARD REACH TO SHELVES NOTE: ALL DOORS AT ALCOVES SHALL COMPLY WITH THE CLEARANCES FOR FRONT APPROACHES. 3 MANEUVERING CLEARANCES AT DOORS G-002.00 PAGE 3 OF 18 Artacho / Oh Residence DEMOLITION NOTES 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. ALL DEMOLITION WORK TO CONFIRM WITH ALTERATION AGREEMENT SET FORTH BY 1220 PARK AVE CORPORATION APPLICATION AGREEMENT AND APPLICABLE CODES. CONTRACTOR TO CONSULT WITH BUILDING MANAGEMENT & ENGINEER PRIOR TO REMOVAL OF ANY WORKS. THE CONTRACTOR MUST PROVIDE REQ'D PROTECTION TO ALL SURROUNDING AREAS THROUGHOUT COURSE OF DEMOLITION. THE CONTRACTOR IS RESPONSIBLE TO THOROUGHLY CLEAN UP AND REMOVE FROM THE PREMISES DAILY ALL WASTE MATERIALS AND RUBBISH AS GENERATED BY THE DEMOLITION. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE INSIDE OR OUTSIDE OF THE BUILDING. DEMOLITION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS OF THE CONTRACT DOCUMENTS AS WELL AS WITH ALL RULES, REGULATIONS, CODES, AND LOCAL, STATE, AND FEDERAL LAWS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS NECESSARY TO ACCOMPLISH THE DEMOLITION WORK. THE CONTRACTOR SHALL SECURELY CAP AND/OR VALVE OFF PLUMBING LINES AS REQUIRED. THE CONTRACTOR SHALL SUBMIT PROPOSED METHODS AND OPERATIONS OF THE DEMOLITION TO THE OWNER OR BUILDING MANAGER PRIOR TO THE START OF WORK. INCLUDE A SCHEDULE FOR COORDINATION OF SHUT-OFFS, SERVICE INTERRUPTIONS, CAPPING, ETC. OWNER OR ARCHITECT ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITIONS OF WORK TO BE DEMOLISHED. ALL EXISTING CONDITIONS FOR PURPOSES OF BIDDING SHALL BE EXAMINED AND VERIFIED DURING THE SITE WALK-THROUGH. CONDUCT DEMOLITION OPERATIONS AND REMOVAL OF DEBRIS TO INSURE MINIMUM INTERFERENCE WITH OTHER ADJACENT OCCUPANCIES OR OCCUPIED FACILITIES. INSURE SAFE PASSAGE OF PERSONS AROUND AREA OF DEMOLITION. CONDUCT OPERATIONS TO PREVENT INJURY TO ADJACENT OCCUPANCIES. 12. KEEP ALL CORRIDORS, EGRESS ROUTES, AND EMERGENCY EXITS CLEAR OF DEBRIS, DEMOLITION MATERIALS, TOOLS, ETC. PROMPTLY REPAIR DAMAGES CAUSED TO ADJACENT FACILITIES BY DEMOLITION OPERATIONS AT NO COST TO OWNER. MAINTAIN EXISTING UTILITIES INDICATED TO REMAIN. KEEP IN SERVICE AND PROTECT DURING DEMOLITION OPERATIONS. DEMOLITION WORK IS NOT TO INTERRUPT EXISTING UTILITIES SERVICE OCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIES HAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TO EXISTING UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES. PRIOR TO ALL WORK OF THIS SECTION, CAREFULLY INSPECT THE EXISTING CONDITIONS AND VERIFY THAT MATERIALS AND SURFACES TO BE ALTERED OR REMOVED ARE THE SAME AS NOTED ON THE DRAWINGS. IN THE EVENT OF DISCREPANCY, IMMEDIATELY NOTIFY THE ARCHITECT. DO NOT PROCEED WITH DEMOLITION IN AREAS OF DISCREPANCY UNTIL ALL SUCH DISCREPANCIES HAVE BEEN FULLY RESOLVED. DO NOT BURN MATERIALS OR DEBRIS ON PREMISES. BREAK DEMOLISHED PLASTER OR MASONRY MATERIALS INTO SMALL PIECES AND SET DOWN TO AVOID ANNOYANCE FROM DUST. DO NOT DROP OR THROW MATERIALS FROM ANY HEIGHT. CUT OUT EMBEDDED ANCHORAGE AND ATTACHMENT ITEMS AS REQUIRED TO PROPERLY PROVIDE FOR PATCHING AND REPAIR OF THE RESPECTIVE FINISHES. POLLUTION CONTROLS: USE TEMPORARY ENCLOSURES, AND OTHER SUITABLE METHODS TO LIMIT DUST AND DIRT. CLEAN ADJACENT STRUCTURES AND IMPROVEMENTS OF DUST, DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS, AS DIRECTED BY ARCHITECT OR BUILDING MANAGEMENT. RETURN ADJACENT AREAS TO CONDITION EXISTING PRIOR TO START OF WORK. AT CONTRACTOR'S OWN EXPENSE, CONTRACTOR SHALL IMMEDIATELY RESTORE TO SERVICE AND REPAIR ANY DAMAGE CAUSED BY CONTRACTOR'S WORKMEN TO EXISTING PIPING AND CONDUITS, WIRES, CABLES, ETC, OF UTILITY SERVICES OR OF FIRE 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. PROTECTION SYSTEMS AND COMMUNICATIONS SYSTEMS WHICH ARE INDICATED ON THE DRAWINGS AND WHICH ARE NOT SCHEDULED FOR DISCONTINUATION OR ABANDONMENT. SCHEDULE DUMPSTERS AND/OR FREIGHT ELEVATOR USE WITH BUILDING MANAGEMENT. THE APPROPRIATE FORMS MUST BE USED AND SIGNED BY A DESIGNATED REPRESENTATIVE. SEAL ALL PENETRATIONS OF FIRE RATED PARTITIONS AND FLOORS USING APPROVED METHODS AND MATERIALS. USE ONLY A CERTIFIED ASBESTOS ABATEMENT CONTRACTOR TO REMOVE V.A.T. TILE AND CARPET. DO NOT CONTINUE ANY DEMOLITION THAT WOULD CAUSE ASBESTOS TO BE AIRBORNE. CONTACT BUILDING MANAGEMENT TO OBTAIN A CERTIFIED ASBESTOS ABATEMENT CONTRACTOR, ACCORDING TO PORT AUTHORITY'S DIRECTIVE. ALL LIFE SAFETY SYSTEMS SHALL BE MAINTAINED IN FULL WORKING ORDER DURING DURATION OF WORK. NO STRUCTURAL ELEMENTS SHALL BE REMOVED OR ALTERED. THE CONTRACTOR SHALL PROVIDE ADEQUATE WEATHER PROTECTION FOR THE BUILDING AND ITS CONTENTS DURING THE COURSE OF WORK. ALL OPENING IN ANY WALL, WINDOW OR ROOF SHALL BE PROTECTED FROM ALL FORMS OF WEATHER OR WATER PENETRATION. 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER LEGEND EXISTING WD FLOOR TO BE REMOVED IN AREA INDICATED PREPARE AS REQD FOR NEW WD FLOOR 13 13 15 BATH EXSTG SINK TO REMAIN 1 5 13 13 15 13 13 8 OFFICE 1 BEDROOM 1 EXISTING STOVE AND D/W TO BE 10 REUSED, PROTECT AND STORE FOR REINSTALL. 10 9 1. 2. EXISTING EXIT TO REMAIN 1 2 8 3. 9 8 9 3 10 11 HALL 2 8 4 REMOVE EXSTG ELECT. PANELS AND PREPARE FOR NEW UPGRADED SERVICE AT NEW LOCATION, SEE A-100 9 9 10 EXISTING SINK TO BE REUSED, PROTECT AND STORE FOR REINSTALL. 5 2 1 LIMIT OF WORK BUTLER'S PANTRY 1 10 9 4 14 8 10 13 9 2 CLOSET 2 CLOSET 2 1 4 ENTRY 4 2 DINING 3'-0" 8 2'-10" HALL REMOVE EXISTING PARTITIONS OR FURRING AS INDICATED. 3 REMOVE EXISTING INTERIOR DOORS AND DOOR FRAMES AS INDICATED. 4 EXISTING INTERIOR DOOR TO BE SALVAGED FOR REUSE, PROTECT AND STORE AS REQ'D. 5 EXISTING EQUIPMENT TO BE SALVAGED FOR REUSE, PROTECT AND STORE AS REQ'D. 6 REMOVE EXISTING CEILING FINISH AND NON-STRUCTURAL CEILING FRAMING AS INDICATED. PREPARE FOR NEW CEILING FINISH AS REQ'D, VIF. 7 REMOVE EXISTING MOLDING, BASEBOARD, TRIM AND CASING AS INDICATED. 8 REMOVE EXISTING LIGHTING FIXTURES THROUGHOUT. 9 REMOVE EXISTING CABINETRY AND BUILT-IN SHELVING THROUGHOUT. 10 REMOVE EXISTING COUNTERS THROUGHOUT. 11 REMOVE EXISTING PLUMBING FIXTURES AS INDICATED, CAP AND REMOVE EXISTING PLUMBING AS REQ'D. 12 OMIT 13 REMOVE EXISTING WINDOW(S) AND WINDOW A/C/ UNITS. PREPARE OPENING FOR NEW WINDOW AS REQ'D, VIF. 14 EXISTING RADIATOR TO REMAIN, EXISTING ENCLOSURE TO BE REMOVED, CONTRACTOR TO V.I.F. 8 4 EXISTING ENTRY TO REMAIN 2 CLOSET CLOSET HALL FOYER 8 4 3 13 EXISTING DOOR TO REMAIN 1 2 14 4 4 3 2 REMOVE EXISTING FLOOR FINISH. PREPARE FOR NEW FLOORING, LEVEL AS REQ'D, VIF. PERLITE, PUMICE, LAVA ROCK, OR NORLITE, AGGREGATE SIZE 4-16MM, MAY BE USED TO REPLACE CINDERFILL SUBLOOR IF REQD. ALL CHANGES TO BE VERIFIED WITH BUILDING'S STRUCTURAL ENGINEER. VERMICULITE IS NOT ALLOWED. 2 4 1 5T HS 11 CLOSET 4 E9 T 1 2 EXISTING DOOR TO REMAIN KEY PLAN DEMOLITION KEYNOTES KITCHEN NO WORK 8 SEE G-000 FOR ADDITIONAL NOTES AND GENERAL REQUIREMENTS. NO CUTTING OR CHANNELING OF BUILDING STRUCTURE PERMITTED. SALVAGE ALL EXISTING DOORS FOR REUSE, U.O.N. AV 10 BATH OFFICE 8 GENERAL NOTES 13 15 9 REMOVE EXSTG RADIATOR EXISTING DOOR TO REMAIN 8 EXISTING CONSTRUCTION TO BE REMOVED LIMIT OF WORK 9 REMOVE EXSTG RADIATOR EXISTING CONSTRUCTION TO REMAIN RK EXISTING TOILET TO REMAIN EXISTING TOILET TO BE REUSED EXISTING EXIT TO REMAIN 2'-8" NO WORK 2'-8" LIMIT OF WORK NO WORK EXISTING BUILDING, NOT IN SCOPE GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 PA 1. N AREA OF WORK 1220 PARK AVE, APT 4B STAMP NOT FOR CONSTRUCTION 4 CL. 9 CLOSET 4 9 3 1 14 3 2 CLOSET 8 2 4 CLOSET 2 1 BEDROOM BEDROOM 11 14 2 4 4 BATH 1 8 11 13 LIMIT OF WORK NO WORK 10 13 13 EXISTING TOILET TO BE REUSED 14 13 14 REMOVE EXSTG RADIATOR 13 13 EXISTING RADIATOR TO BE REMOVED. PREPARE FOR NEW RADIATOR AT NEW LOCATION PER MECHANICAL PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE DEMOLITION PLAN 8 14 13 15 3 9 14 LIVING EXISTING TOILET TO BE REUSED BATH 8 9 LIBRARY 8 REMOVE EXSTG RADIATOR 1 EXISTING WD FLOOR TO BE REMOVED IN AREA INDICATED PREPARE AS REQD FOR NEW WD FLOOR 13 14 13 14 13 14 13 PROJECT NO: 1701 SCALE: 1/4"=1'-0" SHEET NUMBER N DEMOLITION PLAN 1/4" = 1'-0" DM-100.00 PAGE 4 OF 18 GENERAL NOTES 1. SEE G-000 FOR ADDITIONAL NOTES AND GENERAL REQUIREMENTS. FINAL DIMENSIONS AND LOCATIONS TO BE CONFIRMED WITH ARCHITECT IN FIELD. NO CUTTING OR CHANNELING OF BUILDING STRUCTURE IS PERMITTED. MAINTAIN ALL EXISTING FIRESTOPPING. PROVIDE NEW FIRESTOPPING AS REQUIRED PER NYC BUILDING CODE. GC TO VERIFY FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. ALL RADIATORS TO HAVE REMOVABLE COVERS / ENCLOSURES LOW VOC PAINT AND FLOOR FINISHES TO BE USED THROUGHOUT. REINFORCEMENT FOR THE FUTURE PLACEMENT OF GRAB BARS TO BE INSTALLED AT ALL BATHROOMS PER ADA REQUIREMENTS. ALL WOOD USED FOR BLOCKING OR SUPPORT TO BE FIRE-TREATED. TREATMENT METHOD MUST BE COMPOSED OF NON-TOXIC MATERIALS. ALL WALLS MUST BE COMPLETELY SHEATHED AND ALL OPENINGS IN BLOCK WALLS MUST BE PATCHED OR PLASTERED PRIOR TO THE INSTALLATION OF CABINETRY. UPON REMOVAL OF BASEBOARDS, ALL WALLS TO BE CHECKED TO ASSURE SURFACES ARE COMPLETELY SHEATHED OR PLASTERED PRIOR TO INSTALLATION OF NEW BASEBOARDS. THE INTEGRITY OF THE FIRE RATING OF ALL DEMISING WALLS MUST BE MAINTAINED TO ASSURE PETS ARE CONTROLLED AND SOUND RATINGS BETWEEN PARTITIONS ARE MAINTAINED. ALL COLUMNS TO BE MAINTAINED AT 4 HR FIRE RATING, ALL FLOOR BEAMS TO BE MAINTAINED AT 3HR FIRE RATING. ANY ALTERATION TO FIRE RATED ENCLOSURES MUST BE RESTORED IN KIND. BUILDING SHAFTS ARE 2HR RATED OR MORE. EXISTING FIRE RATING OF ALL CONDITIONS IS TO BE MAINTAINED IN THE SAME MATERIALS ORIGINALLY USED. ANY UNCOVERED UNSAFE CONDITIONS ARE TO BE REPAIRED PRIOR TO CLOSURE 2. 3. 4. 5. 6. 7. 8. 9. 10. NEW THRU-WALL CONDENSING UNIT AND RELOCATED RADIATOR BELOW WINDOW, SEE M-100 NEW ELECTRIC RADIANT FLOOR NEW ELECTRIC RADIANT FLOOR NO WORK 2'-8" LIMIT OF WORK NEW THRU-WALL CONDENSING UNIT AND RELOCATED RADIATOR BELOW WINDOW, SEE M-100 NEW THRU-WALL CONDENSING UNIT AND RELOCATED RADIATOR BELOW WINDOW, SEE M-100 104a 20 A405 NEW SINK 120 122 119A 119B 104A NEW CABINETRY AND COUNTERTOPS, TYP. M-01 M-25 123 30 A 32 LAUNDRY 118 20 A402 M-03 NEW REF. GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN 10 HALL 113 A401 17 M-26 14 WIC 116 A402 20 A401 HALL 110 22 X-XX MILLWORK TAG, SEE A-700 N AREA OF WORK 1220 PARK AVE, APT 4B 106A M-07 DINING ROOM 106 A404 30 FOYER 102 EXISTING ENTRY DOOR TO REMAIN 42 DOOR TAG, SEE A-700 STAMP 33 101 23 40 101 T 105 10 103 11 M-20 WINDOW TAG, SEE G-001 HS 12 A400 43 52 BUTLER'S PANTRY 105 A CLO ENTRY 101 13 C A 26 A402 M-19 16 102 25 A A400 22 27 24 LIMIT OF WORK 101 M-06 14 5T PARTITION TAG, SEE A-600 NO WORK LINE OF NEW 15 MILLWORK, TYP. 118 E9 M-08 A 119a M-23 HALL 121 124 51 M-03 NEW REF. 21 CLO M-24 CLO 122 A402 PLUMBING AND ELECTRICAL ENGINEER A HALL 103 17 M-27 121 50 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 NEW CONSTRUCTION EXISTING SINK AT NEW LOCATION NEW STONE TILE FLOOR M-03 A NEW W/D 23 M-21 119b A WIC 124 JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 EXISTING CONSTRUCTION TO REMAIN EXISTING EXIT TO REMAIN M-02 NEW IN-WALL COFFEE MAKER NEW TILE FLOOR LINE OF NEW MILLWORK, TYP. 42 41 53 CODE CONSULTANT AV 104b M-05 31 43 A402 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 EXISTING BUILDING, OUT OF SCOPE NEW 200 AMP ELECT. PANEL AT NEW LOCATION, SEE ATTACHED LOAD LETTER AND PROPOSAL OF ROUTE 5'-0" A402 KITCHEN 104 M-04 7'-3" 120 30 BEDROOM 3 122 LINE OF NEW MILLWORK, TYP. BATH 2 120 33 40 ARCHITECT RK LINE OF NEW MILLWORK RADIATOR COVER, TYP. BEDROOM 2 119 A405 LEGEND OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 M-22 LINE OF NEW MILLWORK RADIATOR COVER, TYP. BATH 3 123 RELOCATE EXSTG. D/W 1220 PARK AVE, APT 4B NEW YORK, NY 10128 PA 123 EXISTING RANGE W/ NEW HOOD @ NEW LOCATION 104B 2'-8" LIMIT OF WORK A403 NEW TUB W/ SHOWER, SINK AT NEW LOCATIONS. EXISTING TOILET RELOCATED NEW TUB W/ SHOWER, SINK AND TOILET AT EXISTING LOCATIONS EXISTING EXIT TO REMAIN 10 NEW FLOOR AND WALL TILE NEW FLOOR AND WALL TILE NO WORK 11. Artacho / Oh Residence A400 106 NOT FOR CONSTRUCTION 31 24 110 21 32 A400 106B 23 41 16 A 22 21 15 13 10 A402 PATCH EXSTG. WD FLOOR AS REQ'D. B 12 11 117 WIC 117 114 B 111a C 108a BEDROOM 1 111 33 53 50 A401 30 52 A401 POWDER ROOM 109 80 CFM LINE OF NEW SOFFIT ABOVE, TYP. 20 A404 112 LINE OF NEW MILLWORK RADIATOR COVER, TYP. A A404 5'-4 1/2" 5'-6" LIMIT OF WORK NO WORK A401 40 M-12 B A400 42 41 12 108b 11 PRELIMINARY BID 06/12/2017 ISSUE DATE 107B EXSTG. WD. FLOOR TITLE CONSTRUCTION PLAN A M-13 M-18 10 10 30 7'-3" 8'-4" 115 C NEW WINDOWS AT EXISTING LOCATIONS TO REPLACE EXISTING WINDOWS, TYP. SEE WINDOW SCHEDULE G-001 M-09 BATH 1 112 LINE OF NEW MILLWORK RADIATOR COVER, TYP. 107A 50 C STUDY 108 13 M-14 MASTER BATH 115 NEW NON-COMBUSTIBLE FIRE PLACE SURROUND AND MANTLE - SEE ELEVATION A-400 REPAIR FIREBOX AND COMPLETE ALL REPAIRS PER CHIMNEY INSPECTION LETTER LIVING ROOM 107 NEW TILE FLOOR NEW SINK AND TOILET AT EXSTG WET FOOTPRINT NEW EXHUAST FAN NEW SHOWER AT EXISTING LOCATION M-11 109 32 31 51 LINE OF NEW MILLWORK, TYP. B 10 A405 M-17 CLO M-09 MASTER BEDROOM 114 A CONSTRUCTION PLAN 107b A 116 111b 115 107a M-10 M-15 114B NEW TUB W/ SHOWER, SINK AT NEW LOCATIONS. EXISTING TOILET RELOCATED NEW FLOOR AND WALL TILE NEW ELECTRIC RADIANT FLOOR M-16 114A 111 NEW TUB W/ SHOWER, SINK AT NEW LOCATIONS. EXISTING TOILET RELOCATED NEW FLOOR AND WALL TILE 112 108 M-09 M-09 M-09 107E 107D 107C N NEW ELECTRIC RADIANT FLOOR 1/4" = 1'-0" NOTE: EXISTING WINDOW A/C UNITS TO BE REMOVED THROUGHOUT, NEW CENTRAL A/C SYSTEM TO BE INSTALLED PER MECHANICAL PROJECT NO: 1701 SCALE: 1/4"=1'-0" SHEET NUMBER A-100.00 PAGE 5 OF 18 3. 4. 5. 6. 7. 8. LIMIT OF WORK NO WORK NO WORK NEW FLOOR TILE WITH ELECTRIC RADIANT MAT, SEE DETAIL 21/A600 LIMIT OF WORK NEW FLOOR TILE WITH ELECTRIC RADIANT MAT, SEE DETAIL 21/A600 DASHED LINE INDICATES EXTENT OF NEW WOOD FLOOR W/ SOUND PROOFING, SEE DETAIL 20/A600 9. 10. BATH 3 123 ST-03 A600 BATH 2 120 ST-03 21 BEDROOM 2 119 WD-3 A600 WATERPROOFING BELOW TUB PER 22/A600 KITCHEN 104 ST-1 ST-2 21 22 A600 NEW TILE FLOOR 21 NO WORK A600 NEW WD FLOOR TO MATCH EXSTG BEDROOM 3 122 WD-1 NEW STONE TILE FLOOR 22 WATERPROOFING BELOW TUB PER 22/A600 A600 ST-1 ST-2 11. HALL 103 ST-1 ST-2 21 A600 21 20 LAUNDRY 118 ST-03 A600 EXSTG. WD. FLOOR A600 WD-2 THRESHOLD AT EXISTING WET AREA PER 21/A600, LIMIT OF WORK WIC 117 WD-2 WIC 124 WD-2 PATCH EXSTG. WD FLOOR AS REQ'D. A600 HALL 113 WD-3 NEW WD FLOOR ARCHITECT DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN E9 5T HS T A600 AREA OF WORK 1220 PARK AVE, APT 4B NEW STONE TILE FLOOR LEGEND STAMP DINING ROOM 106 WD-1 21 ENTRY 101 ST-1 ST-2 20 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 N BUTLER'S PANTRY 105 ST-1 ST-2 21 A600 20 HALL A600 121 WD-3 NEW WD FLOOR 12. 1220 PARK AVE, APT 4B NEW YORK, NY 10128 AV 2. WATERPROOFING TO BE PROVIDED AT ALL WET LOCATIONS, SOUNDPROOFING IS REQ'D BELOW ALL RENOVATED FLOORS AND ADDITIONAL WATERPROOFING / SOUNDPROOFING MEASURES MUST BE MADE FOR WET OVER DRY AREAS AS IF REQ'D. PROVIDE FULL WATERPROOFING (WP) AND SOUNDPROOFING (SP) IN ORDER TO PROTECT THE AREA BELOW. ALL WET ROOMS TO RECEIVE STANDARD WP AND SP DETAILS. WP SYSTEM BY LATICRETE (9235 OR APPROVED EQUAL) IS RECOMMENDED FOR WP. GENIEMAT RST-10 IS RECOMMENDED FOR SP. MODIFICATIONS TO ENTRY DOOR AND SADDLE NOT PERMITTED NAILS / FASTENERS MAY NOT PENETRATE WP OR SP PRODUCTS ON AN SURFACE. REFER TO MANUF. INSTALLATION INSTRUCTIONS. FOR PADDING BELOW AREA RUGS AND CARPETING REQUIRING SOUND PROTECTION, INSTALL 1/4" THICK "TRED-MOR" MODEL #2580 UNDERLAYMENT ALL WP AND SP INSTALLATION TO BE INSPECTED BY BUILDING ARCH. UPON COMPLETION. AT ALL NEW TUB / SHOWER ENCLOSURES, INSTALL WP WALLBOARD, DUROCK OR EQUIV., PER MANUF.'S GUIDELINES. IN ALL OTHER BATHROOM AREAS TO BE REPLACES PROVIDE SHEETROCK MOLD TOUGH GYPSUM PANELS BY USG OR EQUIV. SHOWER PAN TO BE CLAMPED AND SEALED, OR SOLDERED, INTO NEW DRAIN COLLAR AND MUST CAP OVER THE CURB EXTENDING A MIN. OF 4" UP THE WALL ABOVE T.O. CURB WHICH WILL DETERMINE HEIGHT AT THE PERIMETER SHOWER WALLS. THE DRAIN MUST HAVE WEEP HOLES. AFTER PASSING A 24 HR WATER RETENTION TEST, WITNESSED BY THE RESIDENT MANAGER, THE ENTIRE LEAD PAN MUST BE COATED WITH A SUITABLE WP MASTIC MEMBRANE PRIOR TO INSTALLATION OF THE MORTAR BED. AVOID DIRECT CONTACT OF LEAD PAN AND PORTLAND CEMENT TO PREVENT CORROSION. LEAD PAN TO BE PROTECTED UNDERNEATH WITH TAR PAPER OR EQUIV. OVER SAND BED TO PREVENT CORROSION. LEAD PAN TO BE COATED WITH WP MASTIC MEMBRANE PRIOR TO INSTALLATION OF THE MORTAR BED. DO NOT APPLY LATICRETE 9235 TO LEAD PAN, USE MASTIC ONLY, MASTERSEAL HLM 5000 OR EQUIV. IF NICHES ARE TO BE PROVIDED AT TUB OR SHOWER ENCLOSURES, PROVIDE WP THROUGHOUT ENTIRE NICHE, AND EXTENDING AROUND ALL SIDES OF THE NICHE FACE TO FORM A CONT. MEMBRANE W/ THE WP AT THE SHOWER ENCLOSURE. SLOPE BOTTOM OF NICHE TO DRAIN. ONLY WATER BASED PRODUCTS PERMITTED FOR FINISHING RK 1. Artacho / Oh Residence PA GENERAL NOTES EXISTING BUILDING, OUT OF SCOPE NEW TILE FLOOR EXISTING CONSTRUCTION TO REMAIN FOYER 102 WD-1 HALL 110 WD-1 NOT FOR CONSTRUCTION EXSTG. WD. FLOOR NEW CONSTRUCTION ST-1 FLOOR FINISH TAG, SEE SCHEDULE A-700 EXSTG. WD. FLOOR EXSTG. WD. FLOOR WIC 116 WD-2 PATCH EXSTG. WD FLOOR AS REQ'D. 21 NEW TILE FLOOR EXSTG. WD. FLOOR ST-05 A600 MASTER BEDROOM 114 WD-1 WATERPROOFING BELOW TUB PER 22/A600 A600 LIMIT OF WORK NO WORK 21 A600 22 21 A600 A600 NEW FLOOR TILE, WITH ELECTRICAL RADIANT MAT, SEE DETAIL 21/A600 THRESHOLD AT EXISTING WET AREA PER 21/A600. A600 22 21 10 ST-01 LINE OF EXISTING BATHROOM NEW STONE FLOOR NEW SINK AND TOILET AT EXSTG WET FOOTPRINT MASTER BATH 115 ST-05 WATERPROOFING BELOW TUB PER 22/A600 NEW STONE HEARTH, 20" EXTENSION. POWDER ROOM 109 EXSTG. WD. FLOOR BEDROOM 1 111 WD-1 ST-05 30 WD-2 WD-2 A600 NEW SHOWER CURB AND DOOR PER 30/A600 NO EXTENSION OF WET FOOTPRINT. ST-06 STUDY 108 WD-1 EXSTG. WD. FLOOR LIVING ROOM 107 WD-1 PRELIMINARY BID 06/12/2017 ISSUE DATE EXSTG. WD. FLOOR TITLE BATH 1 112 ST-03 FINISH FLOOR PLAN NEW FLOOR TILE WITH ELECTRIC RADIANT MAT, SEE DETAIL 22/A600 PROJECT NO: 1701 SCALE: 1/4"=1'-0" SHEET NUMBER N FINISH FLOOR PLAN 1/4" = 1'-0" A-110.00 PAGE 6 OF 18 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. LIMIT OF WORK LIMIT OF WORK DL DL 16. 17. WS SD WS RL S A WS BEDROOM 2 119 WS WS S $D$D$D S A BATH 2 120 WS DL WS WS DL A LAUNDRY 118 WS HALL 103 $D$D $D$D RL ST LF-02 RL $D$D WIC 116 ST RL S ST S B S RL RL ST DA S A S RL RL LF-01 LF-01 B WS MASTER BEDROOM 114 WS S RL $D$D$D LIMIT OF WORK NO WORK 10 STRIP LIGHT, DOOR ACTIVATED ST SS STRIP LIGHT, SELF SWITCH WS WALL SCONCE ONE-WAY SWITCH, DIMMABLE SD SMOKE & CARBON MONOXIDE DETECTOR CF RL RL A B CEILING FAN SPEAKER SPEAKER, CONCEALED RL WS LIVING ROOM 107 WS WS RL RL S RL B PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE WS A $D$D RL WS $D$D RL S LF-01 SUBWOOFER SPEAKER TO BE CONCEALED IN MILLWORK BELOW TV, ACOUSTICALLY ISOLATED TO PREVENT THE TRANSMISSION OF NOISE TO ADJACENT APARTMENTS WS BATH 1 112 A ST DA $D S LF-01 STUDY 108 WS WS MASTER BATH 115 RECESSED DOWNLIGHT STAMP DL ONE-WAY SWITCH B RL RL RL RL S AREA OF WORK 1220 PARK AVE, APT 4B EXHAUST VENT, SEE MECH B ST $D$ $D POWDER ROOM 109 WS RL HS ST BEDROOM 1 111 WS E9 DL $ S RL RL B RL RL SURFACE MOUNTED DOWNLIGHT ST RL RL DL $D $D $D ST A WS CEILING HEIGHT A.F.F. B WS SD RL KEY PLAN NOT FOR CONSTRUCTION FOYER 102 $D$D$D DL WIC 117 S S DL B X'-X" RL RL $D $D$D$D WS SD HALL 110 ST $$$ RL SD RL ST GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 EXISTING CONSTRUCTION TO REMAIN DINING ROOM 106 S $D$D WS ST WIC 124 RL DL $D ENTRY 101 $D ST DA HALL 113 PLUMBING AND ELECTRICAL ENGINEER EXISTING BUILDING, NOT IN SCOPE DL $D $D DL $D RL ST DA WS SD HALL 121 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 N NEW CONSTRUCTION $D$D A JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 LEGEND BUTLER'S PANTRY 105 DL AUDIO RACK LOCATED ABOVE W/D ON DEDICATED 15A CIRCUIT LIMIT OF WORK WS RL DL ST DA $D$D S RL ST DA CODE CONSULTANT T SD WS DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 DL DL RL ARCHITECT 5T A $D RL DL 18. OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 NO WORK S RL DL DL RL A WS BEDROOM 3 122 DL KITCHEN 104 S RL RL DL $D$D BATH 3 123 DL WS $D$D$D $D$D RL WS DL $D NO WORK NO WORK 1220 PARK AVE, APT 4B NEW YORK, NY 10128 AV 2. ALL HEIGHTS MEASURED FROM FINISHED FLOOR. FINAL DIMENSIONS, HEIGHTS AND LOCATIONS TO BE CONFIRMED WITH ARCHITECT IN FIELD SEE 32 / A600 FOR TYPICAL SUSPENDED CEILING DETAIL. NO CUTTING OR CHANNELING OF BUILDING STRUCTURE IS PERMITTED FINAL LOCATIONS OF ALL LIGHTING, ACCESS PANELS, SUPPLY AND RETURN GRILLES, AND OTHER CEILING ITEMS TO BE COORDINATED WITH ARCHITECT IN FIELD AFTER ROUGH-IN, PRIOR TO INSTALLATION, GC TO CONFIRM ALL FINAL SWITCH LOCATIONS WITH ARCHITECT IN FIELD ALL OUTLETS TO BE GANGED INTO A SINGLE FACE PLATE WHEREVER POSSIBLE, U.O.N. ALL RECEPTACLE COVERS TO BE LUTRON WHITE OR APPROVED EQUAL COORDINATE W/ MECH PLAN FOR NEW DUCT / PIPING LOCATIONS -- COORDINATE AS REQ'D W/ NEW SOFFITS, V.I.F. COORDINATE RUNS AS REQ'D W/ NEW CEILING LOCATIONS & BEAM FURRING AS REQ'D PROVIDE BLOCKING AT ALL CEILING PENDANT FIXTURES. WHERE DUCTWORK IS CONCEALED IN CELINGS OR WALLS, ACCESS DOORS ARE TO BE PROVIDED TO CLEANOUTS, MIN. 12IN. X 12IN. IN SIZE. ANY PROPOSED ADDITIONAL ELECTRICAL FIXTURES WILL BE WIRED AND CIRCUITED SO THAT THERE IS NO OVERLOADING OF THE MAIN CIRCUIT OF THE APARTMENT OR BUILDING. DURING CONSTRUCTION, THERE IS TO BE NO INTERFERENCE WITH THE BUILDINGS INTERCOM. SYSTEMS, INTERCOM LINES SHALL BE MODIFIED ONLY BY THE BUILDING. COMMUNICATION SYSTEMS ARE THE RESPONSIBILITY OF THE SHAREHOLDER. SEE ELECTRICAL DRAWINGS FOR OUTLET AND SWITCH LOCATIONS. FIREPROOFING AND FIRESTOPPING MUST BE PROVIDED AT ALL OUTLETS AT DEMISING WALLS, CHOPPING INTO FLUE WALLS OR ANY BLOCK/BRICK IS NOT ALLOWED. CONFIRM WALL THICKNESS PRIOR TO INSTALLATION. FIRE RATINGS OF WALLS ARE TO BE MAINTAINED AT ALL TIMES. NO SLAB PENETRATIONS PERMITTED NEW ELECTRICAL PANEL LOCATION TO COMPLY WITH NEC 110.26, SEE A100, TOP BREAKER CANNOT BE ABOVE 6'-7" AFF. LIGHT FIXTURES AT SHOWER STALLS TO BE WATERPROOF AND/OR GASKETED AND SUITABLE FOR INSTALLATION IN A WET LOCATION. PROVIDE GFCI CIRCUIT BREAKER FOR BRANCH CIRCUIT. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RK 1. Artacho / Oh Residence PA GENERAL NOTES S S B WS REFLECTED CEILING PLAN B WS PROJECT NO: 1701 SCALE: 1/4"=1'-0" SHEET NUMBER N REFLECTED CEILING PLAN 1/4" = 1'-0" A-120.00 PAGE 7 OF 18 LEGEND M-1 MILLWORK TAG, SEE A700 FOR SCHEDULE 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE TR-01 typ. Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER TR-01 TR-02 107A CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 107B BT-02 ST-06 ARCHITECT TR-02 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 typ. CODE CONSULTANT [107] LIVING ROOM - NORTH 50 1/4"=1'-0" JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 107A 107B 107D 107C PLUMBING AND ELECTRICAL ENGINEER 107E TR-02 GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 108B M-09 42 M-09 M-09 [107] LIVING ROOM - EAST M-09 [107] LIVING ROOM - SOUTH 41 1/4"=1'-0" M-09 40 1/4"=1'-0" [107] LIVING ROOM - WEST 1/4"=1'-0" KEY PLAN AV TR-03 E9 PA RK typ. 5T HS T M1-02 M1-02 M1-02 106A M1-02 M1-02 TR-04 106B typ. 107B ST-06 ST-06 ST-06 ST-06 ST-06 ST-06 105 ST-06 ST-06 ST-06 ST-06 ST-06 ST-06 N AREA OF WORK 1220 PARK AVE, APT 4B M-08 STAMP 33 [106] DINING ROOM - NORTH 32 1/4"=1'-0" [106] DINING ROOM - EAST [106] DINING ROOM - SOUTH 31 1/4"=1'-0" [106] DINING ROOM - WEST 30 1/4"=1'-0" 1/4"=1'-0" NOT FOR CONSTRUCTION TR-03 typ. 102 103 107A 108A TR-04 typ. 110 101 TR-05 typ. 23 [102] FOYER - NORTH 22 1/4"=1'-0" [102] FOYER - EAST 1/4"=1'-0" 21 [102] FOYER - SOUTH 20 1/4"=1'-0" [102] FOYER - WEST 1/4"=1'-0" TR-03 TR-03 TR-04 typ. ISSUE DATE INTERIOR ELEVATIONS 1 [101] ENTRY, [102] FOYER [103] HALL [106] DINING ROOM [107] LIVING ROOM TR-04 typ. 101 103 06/12/2017 TITLE typ. typ. PRELIMINARY BID PROJECT NO: TR-05 17 [103] HALL - NORTH 1/4"=1'-0" 16 [103] HALL - EAST 1/4"=1'-0" 15 [103] HALL - SOUTH 1/4"=1'-0" 14 SCALE: 1/4" = 1'-0" SHEET NUMBER TR-05 typ. 1701 typ. [103] HALL - WEST 1/4"=1'-0" 13 [101] ENTRY - NORTH 1/4"=1'-0" 12 [101] ENTRY - EAST 1/4"=1'-0" 11 [101] ENTRY - SOUTH 1/4"=1'-0" 10 [101] ENTRY - WEST A-400.00 1/4"=1'-0" PAGE 9 OF 18 LEGEND M-1 MILLWORK TAG, SEE A700 FOR SCHEDULE 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE TR-01 typ. 114A 117 114B M-18 116 M-18 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 typ. 52 1/4"=1'-0" 51 1/4"=1'-0" [114] MASTER BEDROOM - SOUTH 50 1/4"=1'-0" CODE CONSULTANT [114] MASTER BEDROOM - WEST 1/4"=1'-0" JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER 119A 118 114 TR-02 typ. GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 TR-02 typ. [113] HALL - NORTH 42 1/4"=1'-0" [113] HALL - EAST [113] HALL - SOUTH 41 1/4"=1'-0" 40 1/4"=1'-0" [113] HALL - WEST 1/4"=1'-0" KEY PLAN AV 43 RK TR-01 typ. E9 PA 53 [114] MASTER BEDROOM - EAST CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT TR-02 [114] MASTER BEDROOM - NORTH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER TR-02 typ. 115 114 Artacho / Oh Residence 5T HS T 111A 111 TR-01 typ. 111B 112 N AREA OF WORK 1220 PARK AVE, APT 4B M-16 TR-02 typ. 33 [111] BEDROOM 1 - NORTH 1/4"=1'-0" 32 STAMP [111] BEDROOM 1 - EAST 1/4"=1'-0" [111] BEDROOM 1 - SOUTH 31 [111] BEDROOM 1 - WEST 30 1/4"=1'-0" 1/4"=1'-0" NOT FOR CONSTRUCTION 12x8 D U C T 12x8 D U C T 12x8 D U C T 12x8 D U C T TR-02 typ. 110 111A TR-02 typ. TR-02 typ. 23 22 1/4"=1'-0" [110] HALL - EAST 1/4"=1'-0" 21 [110] HALL - SOUTH 20 1/4"=1'-0" 1/4"=1'-0" 28x8 D U C T M-11 108 108B 108A M-15 M-10 M-11 M-14 M-12 [108] STUDY - NORTH 1/4"=1'-0" 12 1/4"=1'-0" 11 06/12/2017 ISSUE DATE TITLE PROJECT NO: M-13 [108] STUDY - EAST PRELIMINARY BID INTERIOR ELEVATIONS 2 [108] STUDY, [110] HALL [111] BEDROOM 1 [113] HALL [114] MASTER BEDROOM M-11 M1-01 13 [110] HALL - WEST 28x8 D U C T 28x8 D U C T 28x8 D U C T [110] HALL - NORTH 1701 SCALE: 1/4" = 1'-0" SHEET NUMBER [108] STUDY -SOUTH 1/4"=1'-0" 10 A-401.00 [108] STUDY - WEST 1/4"=1'-0" PAGE 10 OF 18 LEGEND TR-01 M-1 MILLWORK TAG, SEE A700 FOR SCHEDULE 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE typ. TR-01 typ. 124 Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 M1-01 TR-02 ARCHITECT typ. DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 53 [124] W.I.C. - NORTH 52 1/4"=1'-0" [124] W.I.C. - EAST 51 1/4"=1'-0" [124] W.I.C. - SOUTH 50 1/4"=1'-0" [124] W.I.C. - WEST 1/4"=1'-0" CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 TR-01 typ. TR-01 typ. 122 122 124 PLUMBING AND ELECTRICAL ENGINEER GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 123 M-25 TR-02 typ. [122] BEDROOM 3 - NORTH 42 1/4"=1'-0" [122] BEDROOM 3 - EAST [122] BEDROOM 3 - SOUTH 41 1/4"=1'-0" 40 1/4"=1'-0" [122] BEDROOM 3 - WEST 1/4"=1'-0" KEY PLAN AV 43 RK TR-01 E9 PA typ. 5T HS T 119A 119B 120 TR-01 typ. 119A 119B N AREA OF WORK 1220 PARK AVE, APT 4B M-22 TR-02 typ. 33 [119] BEDROOM 2 - NORTH 32 1/4"=1'-0" STAMP [119] BEDROOM 2 - EAST 31 1/4"=1'-0" [119] BEDROOM 2 - SOUTH 30 1/4"=1'-0" [119] BEDROOM 2 - WEST 1/4"=1'-0" NOT FOR CONSTRUCTION AHU-1 TR-01 AHU-1 AHU-1 AHU-1 typ. M-21 TR-02 typ. 121 122 TR-01 typ. 118 CT-01 CT-01 M-21 TR-02 typ. 27 [121] HALL - NORTH 26 1/4"=1'-0" [121] HALL - EAST 1/4"=1'-0" 25 [121] HALL - SOUTH 24 1/4"=1'-0" [121] HALL - WEST 23 1/4"=1'-0" [118] LAUNDRY - NORTH 22 1/4"=1'-0" [118] LAUNDRY - EAST 21 1/4"=1'-0" [118] LAUNDRY - SOUTH 20 1/4"=1'-0" [118] LAUNDRY - WEST 1/4"=1'-0" PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE M1-01 M1-01 117 M-20 M-20 TR-02 typ. 119 M-19 INTERIOR ELEVATIONS 3 [116] W.I.C., [117] W.I.C. [118] LAUNDRY [119] BEDRM 2, [121] HALL [122] BEDRM 3, [124] W.I.C. M1-01 M1-01 SD-01 M1-01 M1-01 M-19 M-20 M-20 M-19 M-19 PROJECT NO: 1701 SCALE: 1/4" = 1'-0" SHEET NUMBER 17 [117] W.I.C. - NORTH 1/4"=1'-0" 16 [117] W.I.C. - EAST 1/4"=1'-0" 15 [117] W.I.C. - SOUTH 1/4"=1'-0" 14 [117] W.I.C. - WEST 1/4"=1'-0" 13 [116] W.I.C. - NORTH 1/4"=1'-0" 12 [116] WALK-IN-CLOSET - EAST 1/4"=1'-0" 11 [116] W.I.C. - SOUTH 1/4"=1'-0" 10 [116] WALK-IN-CLOSET - WEST A-402.00 1/4"=1'-0" PAGE 11 OF 18 Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 28x8 D U C T 28x8 D U C T M-04 M-01 BT-01 M-04 BT-01 GL-01 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 104B TCT-01 104A GL-01 SEE 32/A-406 FOR ELEVATION BEYOND TCT-01 TCT-01 43 KITCHEN ISLAND - NORTH 42 1/2"=1'-0" [104] KITCHEN - EAST 1/2"=1'-0" ARCHITECT DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 M-01 M-04 M-05 M-05 M-04 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER 32 [104] KITCHEN - EAST 31 1/2"=1'-0" [104] KITCHEN - NORTH 30 1/2"=1'-0" [104] KITCHEN - WEST 41 1/2"=1'-0" KITCHEN ISLAND - SOUTH 40 1/2"=1'-0" KITCHEN ISLAND - WEST 1/2"=1'-0" GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 LEGEND BT-01 GL-01 GL-01 GL-01 M-1 MILLWORK TAG, SEE A700 FOR SCHEDULE 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE BT-01 GL-01 GL-01 M-02 KEY PLAN GL-01 TCT-01 104A GL-01 E9 PA RK AV BT-01 5T HS T M-02 TCT-01 N AREA OF WORK 1220 PARK AVE, APT 4B 104A NEW SINK & FAUCET M-01 M-02 104B 104A RELOCATE EXISTING DISHWASHER STAMP ST-03 M-01 43 A406 ST-03 RELOCATE EXISTING RANGE NOT FOR CONSTRUCTION 21 [104] KITCHEN - NORTH 20 1/2"=1'-0" [104] KITCHEN - EAST 1/2"=1'-0" NEW HOOD (ABOVE) NEW ICE MAKER M-01 BT-01 BT-01 BT-01 BT-01 BT-01 ST-03 NEW KITCHEN ISLAND 28x8 D U C T 40 A406 M-04 42 A406 M-02 M-05 NEW STONE TILE FLOOR 31 A406 21 BT-01 32 A406 20 41 A406 11 M-03 M-03 PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE NEW COFFEE MAKER M-03 ST-03 M-03 M-03 NEW REF. & FREEZER NEW WINE REF. ENLARGED PLANS AND INTERIOR ELEVATIONS 1 [104] KITCHEN M-03 BT-01 PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER 11 [104] KITCHEN - SOUTH 1/2"=1'-0" 10 [104] KITCHEN ENLARGED PLAN 1/2"=1'-0" A-403.00 PAGE 12 OF 18 LEGEND M-1 MILLWORK TAG, SEE A700 FOR SCHEDULE 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT MC-01 CT-01 112 CT-01 112 CT-01 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CT-01 34 112 SD-01 22 A403 33 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 32 ST-03 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 112 PLUMBING AND ELECTRICAL ENGINEER 34 [112] BATH 1 - NORTH 33 1/2"=1'-0" [112] BATH 1 - EAST [112] BATH 1 - SOUTH 32 1/2"=1'-0" [112] BATH 1 - WEST 31 1/2"=1'-0" 30 1/2"=1'-0" [112] BATH 1 - ENLARGED PLAN 1/2"=1'-0" GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN AHU-3 AHU-3 AHU-3 typ. E9 PA RK TR-03 AV AHU-3 5T HS T 109 MC-01 109 MT-01 MT-01 MT-01 MT-01 24 N ST-02 21 A403 AREA OF WORK 1220 PARK AVE, APT 4B 23 22 STAMP TR-05 typ. NOT FOR CONSTRUCTION 24 [109] POWDER ROOM - NORTH 1/2"=1'-0" 23 [109] POWDER RM - EAST 1/2"=1'-0" 28x8 D U C T 28x8 D U C T GL-02 GL-02 [109] POWDER ROOM - SOUTH 1/2"=1'-0" 21 [109] POWDER RM - WEST 20 1/2"=1'-0" [109] POWDER ROOM - ENLARGED PLAN 1/2"=1'-0" 28x8 D U C T 28x8 D U C T M-07 GL-02 22 M-06 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 GL-02 M-06 PRELIMINARY BID 06/12/2017 ISSUE DATE 105 TITLE TR-04 typ. TCT-01 TCT-01 14 ST-01 ST-02 105 11 A403 13 12 M-07 M-06 ST-06 ENLARGED PLANS AND INTERIOR ELEVATIONS 1 [105] BUTLER'S PANTRY [109] POWDER ROOM [111] BATH 1 PROJECT NO: M-07 1701 SCALE: AS NOTED SHEET NUMBER 14 [105] BUTLER'S PANTRY - NORTH 1/2"=1'-0" 13 [105] BUTLER'S PANTRY - EAST 1/2"=1'-0" 12 [105] BUTLER'S PANTRY - SOUTH 1/2"=1'-0" 11 [105] BUTLER'S PANTRY - WEST 1/2"=1'-0" 10 A-404.00 [105] BUTLER'S PANTRY - ENLARGED PLAN 1/2"=1'-0" PAGE 13 OF 18 LEGEND 123 34 31 123 CT-01 A404 101 DOOR TAG, SEE A702 FOR SCHEDULE 101 WINDOW TAG, SEE A702 FOR SCHEDULE Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER 33 123 MC-01 CT-01 MILLWORK TAG, SEE A700 FOR SCHEDULE CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 32 CT-01 123 M-1 ARCHITECT CT-01 ST-03 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 SD-01 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 34 [123] BATH 3 - NORTH 33 1/2"=1'-0" [123] BATH 3 - EAST 32 1/2"=1'-0" [123] BATH 3 - SOUTH 31 1/2"=1'-0" [123] BATH 3 - WEST 1/2"=1'-0" 30 [123] BATH 3 - ENLARGED PLAN PLUMBING AND ELECTRICAL ENGINEER 1/2"=1'-0" 120 AHU-2 AHU-2 AHU-2 GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 AHU-2 120 KEY PLAN ST-03 24 120 CT-01 MC-01 CT-01 120 CT-01 21 A404 23 AV CT-01 E9 PA RK 22 SD-01 5T HS T N AREA OF WORK 1220 PARK AVE, APT 4B STAMP 24 [120] BATH 2 - NORTH 23 1/2"=1'-0" [120] BATH 2 - EAST 22 1/2"=1'-0" [120] BATH 2 - SOUTH 21 1/2"=1'-0" [120] BATH 2 - WEST 1/2"=1'-0" 20 [120] BATH 2 - PLAN 1/2"=1'-0" NOT FOR CONSTRUCTION ST-05 ST-05 14 11 MC-02 MC-02 MC-02 115 ST-05 A404 13 12 115 ST-05 115 PRELIMINARY BID 06/12/2017 ISSUE DATE ST-05 ST-05 TITLE SD-01 ENLARGED PLANS AND INTERIOR ELEVATIONS 2 [115] MASTER BATH [120] BATH 2, [123] BATH 3 ST-05 ST-05 ST-05 ST-05 ST-05 ST-05 PROJECT NO: ST-05 [115] MBA - NORTH 1/2"=1'-0" 13 [115] MASTER BATH - EAST 1/2"=1'-0" 12 [115] MBA - SOUTH 1/2"=1'-0" 11 [115] MASTER BATH - WEST 10 1/2"=1'-0" SCALE: AS NOTED SHEET NUMBER 115 14 1701 [115] MASTER BATH - ENLARGED PLAN 1/2"=1'-0" A-405.00 PAGE 14 OF 18 Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 CODE CONSULTANT PIPE CEMENT BOARD AT SHOWER OR BATHTUB. MOLD RESISTANT BOARD AT ALL OTHER BATHROOM WALLS. SEALANT 3/8" DIA. STEEL GALV. ROD SPACED @ 4'-0" O.C. MAX. RUNNER STEEL CHANNEL AT 4'-0" O.C. MAX STUDS DRY AREA WET AREA STUD CLIPPED TO CREATE NOTCH FOR SENSOR. 3" MIN. THICKNESS HILTI HY200 EPOXY SOUND ANCHOR OR APPROVED EQ. ATTENUATION BLANKET RSIC-1.5 CRC SOUND ISOLATION CLIP OR APPROVED EQUIV. TAPE AND SPACKLE FURRING ANGLE FFL. KEY PLAN EXISTING DROPPED STRUCTURAL SLAB. TYP. @ ORIGINAL BLDG WET AREAS. VERIFY EXISTING CONDITIONS CINDER FILL EXISTING BEAM 32 TYPICAL SUSPENDED CEILING DETAIL 31 SCALE: 1 1/2" = 1'-0" EXISTING CONCRETE SLAB FLOOR DETAIL ADJACENT TO WET AREA - AS REQUIRED 30 SCALE: 1 1/2" = 1'-0" SHOWER CURB DETAIL SCALE: 1 1/2" = 1'-0" ALL CEILING SUSPENSION SYSTEMS TO CONFORM TO NYC BUILDING CODE - REFERENCE STANDARD RS5-16 5T SCHEDULED BASE OR WALL TILE ACOUSTICAL SEALANT TILE OR STONE ON MIN. 38" THINSET N WARMUP STICKYMAT ELECTRIC RADIANT FLOOR @ BATHROOMS. SEE A-110. REFER TO MANUF. SPEC. AND INSTALLATION REQ'S. VINYL TILING-IN BEAD TUB AS SCHEDULED SEE A700 TILE OR STONE ON MIN. 38" THINSET 5 8" CEMENT BOARD / DUROCK SCHEDULED BASE ACOUSTIC SEALANT NAIL DOWN WOOD FLOOR GENIE MAT RST-10, ENKASONIC, SR FLOORBOARD SOUNDPROOFING OR APPROVED EQ. CEMENT LEVELING BED AS REQ'D EXSTG OR NEW SADDLE / FLOOR ACOUSTICAL SEALANT EXSTG OR NEW SADDLE / FLOOR PERIMETER ISOLATION PER MANUF. SEALANT SLAB OR CEILING ABOVE SLAB OR CEILING ABOVE CONTINUOUS SEALANT AT PERIMETER, 2 BEADS AT GWB EDGE, TYP CONTINUOUS SEALANT AT PERIMETER, 2 BEADS AT GWB EDGE, TYP METAL J-BEAD, TYP METAL J-BEAD, TYP HEAD SOUNDPROOFING / WATERPROOFING DETAIL 21 SCALE: 1 1/2" = 1'-0" 1" GWB PANELS (SOLID / LAMINATED) WITH LAMINATING COMPOUND OVER ENTIRE CONTACT SURFACE. VARIES PLAN PLAN SHAFT OR CAVITY SPACE, COORD. W/ MEP & PLAN ALIGNMENTS, VIF (2)LAYERS 5/8" MOLD RESISTANT GWB EA. SIDE, CEMENT BOARD, MOLD TOUGH OR EQ. AT WET / DAMP LOCATIONS. INSTALL PER MANUF. GUIDELINES. PROVIDE BLOCKING AS REQ'D, SEE INT ELEVATIONS 7/8" METAL FURRING CHANNELS @ 16" O.C., LAMINATE DIRECTLY TO EXISTING WALL IF PLUMB SURFACE EXISTS, COORD. W/ MEP BOTTOM RUNNER. SECURE TO SUBFLOOR @ 24" O.C. MAX. BASE BASE SLAB OR SUBFLOOR SLAB OR CEILING ABOVE CONTINUOUS SEALANT AT PERIMETER, 2 BEADS AT GWB EDGE, TYP METAL J-BEAD, TYP METAL J-BEAD, TYP 8 1/4" 2 1/2" PLAN HEAD TOP RUNNER. SECURE TO U.O. STRUCT ABV @ 24" O.C. MAX. STOP TRACK SHORT OF SLAB OR PROVIDE ISOLATED HEADER PAD, KINETICS WALLMAT OR EQUIV. (2)LAYERS 5/8" MOLD RESISTANT GWB EA. SIDE, CEMENT BOARD, MOLD TOUGH OR EQ. AT WET / DAMP LOCATIONS. INSTALL PER MANUF. GUIDELINES. PROVIDE BLOCKING AS REQ'D, SEE INT ELEVATIONS PLAN 1-5/8" 20 GA. MTL STUDS @ 16" O.C. CAVITY FOR POCKET DOOR (2) LAYERS 5/8" MOLD RESISTANT GWB EA. SIDE, CEMENT BOARD, MOLD TOUGH OR EQ. AT WET / DAMP LOCATIONS. INSTALL PER MANUF. GUIDELINES. PROVIDE BLOCKING AS REQ'D, SEE INT ELEVATIONS PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE DETAILS 20 GA. MTL STUDS @ 16" O.C. BASE AS SCHEDULED 3" MINERAL WOOL BATT INSULATION BASE AS SCHEDULED BOTTOM RUNNER. SECURE TO SUBFLOOR @ 24" O.C. MAX. BOTTOM RUNNER, SECURE TO SUBFLOOR @ 24" O.C. MAX. BASE SLAB OR SUBFLOOR TOP RUNNER, SECURE TO U.O. STRUCT ABV @ 24" O.C. MAX. STOP TRACK SHORT OF SLAB OR PROVIDE ISOLATED HEADER PAD, KINETICS WALLMAT OR EQUIV. 6 1/8" TYP RIGID INSULATION SHIM SPACE AS REQ'D FOR PLUMB SURFACE AND/OR PLAN ALIGNMENTS BASE AS SCHEDULED BASE AS SCHEDULED SCALE: 1 1/2" = 1'-0" CONTINUOUS SEALANT AT PERIMETER, 2 BEADS AT GWB EDGE, TYP FACE OF EXISTING CONSTRUCTIOIN (1) LAYER 5/8" MOISTURE RESISTANT TYPE 'X' FIRE RATED GWB EACH SIDE, TO U.O. SLAB ABOVE NEW WOOD FLOOR DETAIL 20 SLAB OR CEILING ABOVE HEAD TOP RUNNER. SECURE TO U.O. STRUCT ABV @ 24" O.C. MAX NOT FOR CONSTRUCTION TOP OF EXSTG SUBFL. (VIF) SEE 30/A110 FOR TYPICAL TILE FLOOR ASSEMBLY SCALE: 1 1/2" = 1'-0" STAMP (2) LAYERS 38" MIN. PLYWD SECURED W/ COUNTER SUNK FLAT HEAD SCREWS. NOTE: ALTERNATE BOARDS @ 90 DEG. LATICRETE 9235 WP CONTINUOUS BELOW TUB TO WALL BATHTUB WATERPROOFING DETAIL AREA OF WORK 1220 PARK AVE, APT 4B EXISTING OR NEW WALL GENIEMAT RST-10 SOUNDPROOFING OR APPROVED EQUAL LATICRETE 9235 WATERPROOFING OR APPROVED EQUAL CEMENT LEVELING BED AS REQ'D TOP OF EXSTG. SUBFLOOR, VIF FIRE AND ROT RESISTANT BLOCKING AS REQ'D 22 HS T EXISTING OR NEW WALL LATICRETE 9235 WP, EXTEND FROM FLOOR TO CEILING 2 1/4" LIGHTWEIGHT CINDER FILL E9 SEE 30/A110 FOR TYPICAL TILE WALL ASSEMBLY HEAD CONCRETE CURB EXISTING CINDER FILL (STORED ON SITE AND REUSED) DRY AREA BELOW GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 4" +/- EXISTING STRUCTURAL SLAB 1/4" PER FT. SLOPE PLUMBING AND ELECTRICAL ENGINEER LIGHT WEIGHT CONCRETE TOPPING SLAB 2" MIN NEW DRAIN 4" MIN 5/8" GYP. BRD. CEILING. PROVIDE CEMENT BOARD, MOLD TOUGH OR APPROVED EQUAL AT ALL WET AREAS. BITUTHENE MEMBRANE, KEMPER ROOFING OR APPROVED EQUAL. PROTECT TOP AND BOTTOM OF THE MEMBRANE FROM PUNTURE. TOP OF CURB LATICRETE 9235 WATERPROOFING TURNED UP AT WALLS 2" THICK TOPPING SLAB. LIGHT WEIGHT CONCRETE. NOT TO EXCEED 110LBS/PCF. POLYSHEET TO PREVENT CEMENT FROM BONDING TO CINDER FILL. WATER SENSOR WITH SHUT-OFF AND ALARM T.O. FIN. FLR., VERIFY EXISTING CONDITIONS. 7/8" FURRING CHANNEL @ 2'-0" O.C. MAX. SETTING BED OR THINSET QTscu OR GENIE MAT SOUNDPROOFING. SEE MANUFACTURER'S INSTRUCTIONS. SOLVENTFREE ADHESIVE REQ'D WITH LATICRETE 9235. AV METAL STUD PARTITION GYP. BRD. PARTITION EXISTING PARTITION VIF STONE OR TILE FINISH FLOOR AND WALL RK GYPSUM BOARD MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PA EMBED DIM. MANUF BITUTHENE MEMBRANE 1'-0" MIN. ABOVE HIGHEST BRANCH PIPE. CONCRETE SLAB STONE OR TILE FINISH 5 8" DUROCK AT SHOWER WALLS LATICRETE 9235 TO CLNG. ABOVE IN SHOWER, LAP UP AT LEAST 6" AT OTHER BATHROOM WALLS LEAD PAN BEYOND WITH END DAMS, EXTEND MIN. 4" UP WALL, ABOVE T.O. CURB. NO WALLBOARD NAILS WITHIN 2" ABOVE LINE OF PAN. SEE NOTES 8, 9 STONE OR TILE FINISH LATICRETE 9235 WP MEMBRANE, CONT. ACROSS BATHRM FLOOR, SHOWER FLOOR AND WALLS NEW REINFORCED MORTAR BED; SLOPE TO DRAIN MIN. 41" PER FOOT NEW LEAD PAN WITH MASTIC, OVER WP OR BLDG FELT, CLAMP PAN TO DRAIN COLLAR AND WRAP OVER TOP OF CURB, PROVIDE END DAMS, APPLY LATICRETE 9235 TO CONC. WALLS, CURB & FLOORS BELOW PAN (TYP). SEE NOTE 10 NEW CRUSHED STONE (PEA GRAVEL), WEEP HOLES AROUND DRAIN JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 BASE SLAB OR SUBFLOOR SLAB OR SUBFLOOR PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER D PARTITION TYPE D: TWO-HOUR RATED WALL (AS REQ'D) SCALE: 1-1/2" = 1'-0" C PARTITION TYPE C: FURRING WALL SCALE: 1-1/2" = 1'-0" B PARTITION TYPE B: POCKET DOOR WALL SCALE: 1-1/2" = 1'-0" A PARTITION TYPE A: 2-SIDED STUD WALL SCALE: 1-1/2" = 1'-0" A-600.00 PAGE 15 OF 18 FINISH/PAINT SCHEDULE STONE / TILE SCHEDULE TYPE MATERIAL MANUFACTURER SPECIFICATION SIZE ST-01 NERO MARQUINO COMPLETE TILE 3/8" STONE TILE 12" x 12" V.I.F., SEALANT PER MANUF. ST-02 STATUARY WHITE MARBLE COMPLETE TILE 3/8" STONE TILE 12" x 12" V.I.F., SEALANT PER MANUF. ARTISTIC TILE SBDOLPHX 1 1/4" HEXAGON TILE POLISHED ST-04 STATUARY WHITE MARBLE STONE SOURCE 1 1/4" STONE SLAB VIF HIGH HONED ST-05 MARBLE STONE SOURCE 3/4" STONE SLAB VIF MING GREEN ST-06 PIETRA CARDOZA STONE SOURCE 3/4" STONE SLAB VIF TCT-01 TERRACOTTA TILE MOSAIC HOUSE MDV 26 2" x 2" PORCELAIN WHITE MT-01 ALUMINUM TILE COMPLETE TILE 230-A1-704-029 3" x 6" NOMINAL MIRROR CT-01 CLAY TILE FIRECLAY TILE WHITE WASH 4" x 4" WHITE / GLOSS OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. NOTES CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 106 / DINING ROOM 108 / STUDY BENDHEIM SEE ELEV.'S GL-02 REEDED GLASS BENDHEIM SEE ELEV.'S MI-01 CLEAR MIRROR ZECCA SEE ELEV.'S MI-02 ANTIQUE MIRROR ZECCA SEE ELEV.'S BT-01 BRASS TRIM SEE ELEV.'S LACQUERED BRASS BT-02 BRASS TRIM SEE ELEV.'S UNLACQUERED BRASS AT FIREPLACE IN [107] LIVING ROOM LF-01 METAL LEAF SEE ELEV.'S/RCP SILVER AT CEILING IN [108] STUDY LF-02 METAL LEAF SEE ELEV.'S/RCP GOLD AT DOME IN [113] HALL SEE ELEV.'S PER PLUMBING SCHEDULE NOTES 109 / POWDER ROOM 110 / HALL 111 / BEDROOM 1 IN [115] MASTER BATH 112 / BATH 1 PER PLUMBING SCHEDULE 113 / HALL MILLWORK SCHEDULE SIZE FINISH V.I.F. SATIN LACQUER V.I.F. SATIN LACQUER BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & BRASS / MILLWORK BY GC VERTICAL TRIM V.I.F. SATIN LACQUER KITCHEN ISLAND BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & BRASS / MILLWORK BY GC LEGS V.I.F. SATIN LACQUER M-05 EAT-IN KITCHEN BANQUETTE BLUM HARDWARE SHOP PTD. LACQUER / MILLWORK BY GC V.I.F. SATIN LACQUER M-06 LOWER AND UPPER CAB'S, NORTH WALL BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & GLASS / MILLWORK BY GC PANEL V.I.F. GLOSS LACQUER M-07 LOWER AND UPPER CAB'S, SOUTH WALL BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & GLASS / MILLWORK BY GC PANEL V.I.F. GLOSS LACQUER M-08 RADIATOR COVER AND WOOD PANELLING BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 104 / LIVING ROOM M-09 RADIATOR COVERS AT 5 WINDOWS BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 108 / STUDY M-10 WALL STORAGE W/ SLIDING PANELS BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-11 OPEN SHELVING BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-12 BUILT-IN SEATING AT EAST WALL BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-13 BUILT-IN SEATING AT SOUTH WALL BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-14 SHELVING WALL AT TV CONSOLE BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-15 STORAGE AND MIRROR OUTSIDE OF POWDER RM BLUM HARDWARE FRENCH POLISH PAINTED LACQUER WITH BEAD / MILLWORK BY GC DETAIL V.I.F. FRENCH POLISH M-16 RADIATOR COVER BELOW WINDOW BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER M-17 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 114 / MAST ER BEDROOM M-18 RADIATOR COVER BELOW WINDOW BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 116 / WALK-IN CLOSET M-19 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL & WOVEN / MILLWORK BY GC PANEL INSERT V.I.F. SATIN LACQUER V.I.F. SATIN LACQUER 111 / BEDROOM 1 USE FARROW & BALL PRIMER AS REQ'D. TRIM CLEAR RESTORATION GLASS 106 / DINING ROOM TBD DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 GL-01 105 / BUTLER'S PANTRY TBD USE FARROW & BALL PRIMER AS REQ'D. MANUFACTURER M-04 FARROW & BALL TBD MATERIAL M-03 OIL PAINT TBD TYPE SOUTH WALL CAB'S AT REF., INCLUDING DESK TRIM LATEX PAINT FARROW & BALL SPECIALTIES SCHEDULE EAST WALL CAB'S AT STOVE USE FARROW & BALL PRIMER AS REQ'D. CEILING 107 / LIVING ROOM M-02 TBD ARCHITECT MATCH EXISTING BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL, GLASS / MILLWORK BY GC PANEL& BRASS VERTICAL TRIM TBD USE FARROW & BALL PRIMER AS REQ'D. WHITE OAK BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL, GLASS / MILLWORK BY GC PANEL& BRASS VERTICAL TRIM LATEX PAINT FARROW & BALL TBD NEW WOOD FLOOR LOWER AND UPPER CAB'S AT SINK AND D/W CEILING TBD WD-03 M-01 USE FARROW & BALL PRIMER AS REQ'D. LATEX PAINT FARROW & BALL PATCH AS REQ'D 104 / KITCHEN TBD WALLS N/A - STRIP FLOORING SPECIFICATION TBD USE FARROW & BALL PRIMER AS REQ'D. WHITE OAK MANUF. LATEX PAINT FARROW & BALL TBD N/A DESCRIPTION WALLS TBD EXISTING WOOD FLOOR ITEM USE FARROW & BALL PRIMER AS REQ'D. FARROW & BALL WD-02 ROOM # / NAME TBD OIL PAINT EXISTING FLOOR TO REMAIN SEE ELEV.'S TBD TRIM N/A - HERRINGBONE MR. SHOWER DOOR FARROW & BALL USE FARROW & BALL PRIMER AS REQ'D. WHITE OAK SHOWER DOOR OIL PAINT TBD N/A SD-01 TRIM 1220 PARK AVE, APT 4B NEW YORK, NY 10128 TBD EXISTING WOOD FLOOR SEE ELEV.'S USE FARROW & BALL PRIMER AS REQ'D. LATEX PAINT FARROW & BALL WD-01 CUSTOM TBD CEILING SIZE MEDICINE CABINET TBD USE FARROW & BALL PRIMER AS REQ'D. SPECIFICATION MC-02 LATEX PAINT FARROW & BALL TBD MANUFACTURER MEDICINE CABINET CEILING TBD MATERIAL MC-01 USE FARROW & BALL PRIMER AS REQ'D. LATEX PAINT FARROW & BALL TYPE URBAN ARCHAEOLOGY TBD MANUFACTURER WALLS 103 / HALL 105 / BUTLER PANTRY COLOR/FINISH TBD WALLS 102 / FOYER WOOD FLOOR SCHEDULE SIZE LATEX PAINT FARROW & BALL 101 / ENTRY 104 / KITCHEN SPECIFICATION NOTES MATERIAL V.I.F., SEALANT PER MANUF. COLOR/FINISH COLOR/ FINISH LOCATION 117 / WALK-IN CLOSET M-20 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC 118 / LAUNDRY M-21 LAUNDRY ROOM STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 119 / BEDROOM 2 M-22 RADIATOR COVER BELOW WINDOW BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER M-23 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 121 / BEDROOM 2 M-24 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER 122 / BEDROOM 3 M-25 RADIATOR COVER BELOW WINDOW BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER M-26 CLOSET STORAGE BLUM HARDWARE SHOP PTD. LACQUER WITH BEAD DETAIL / MILLWORK BY GC V.I.F. SATIN LACQUER NOTES 114/ MASTER BEDROOM 115 / MASTER BATH 116 / WALK-IN-CLOSET 117 / WALK-IN-CLOSET 118 / LAUNDRY 119 / BEDROOM 2 120 / BATH 2 121 / HALL 122 / BEDROOM 3 123 / BATH 3 124 / WALK-IN-CLOSET 119 / BEDROOM 2 CODE CONSULTANT JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS OIL PAINT FARROW & BALL TBD LACQUER USE FARROW & BALL PRIMER AS REQ'D. CEILING LF-01 SEE SPECIALTIES SEE SPECIALTIES SILVER TRIM OIL PAINT FARROW & BALL TBD LACQUER USE FARROW & BALL PRIMER AS REQ'D. PLUMBING AND ELECTRICAL ENGINEER WALLS MT-01 SEE STONE/TILE SEE STONE/TILE TBD SEE STONE/TILE CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LF-02 SEE SPECIALTIES SEE SPECIALTIES GOLD SEE SPECIALTIES TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. TRIM OIL PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. WALLS LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. PRELIMINARY BID 06/12/2017 CEILING LATEX PAINT FARROW & BALL TBD TBD USE FARROW & BALL PRIMER AS REQ'D. ISSUE DATE TRIM OIL PAINT TBD TBD USE FARROW & BALL PRIMER AS REQ'D. FARROW & BALL SEE SPECIALTIES KEY PLAN AV BIANCO DOLOMITI SPECIFICATION ROOM # / NAME RK ST-03 NOTES E9 PA COLOR/FINISH Artacho / Oh Residence 5T HS T N AREA OF WORK 1220 PARK AVE, APT 4B STAMP NOT FOR CONSTRUCTION TITLE FINISH & MILLWORK SCHEDULES TRIM SCHEDULE ROOM # / NAME TYPE SPECIFICATION MANUFACTURER NOTES TR-01 EXISTING TO REMAIN N/A N/A PATCH/REPAIR AS REQ'D TR-02 NEW TO MATCH EXSTG. N/A N/A V.I.F. TR-03 PLASTER CROWN TBD BALMER TR-04 SOLID WOOD DOOR CASING CUSTOM OGEE TR-05 SOLID WOOD BASE CUSTOM FLAT/OGEE PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER A-700.00 PAGE 16 OF 18 ITEM KITCHEN / 104 E-2 E-3 MANUFACTURER GARLAND N/A - EXISTING, VIF HOOD PRESTIGE UIB58-1200 SUB-ZERO WINE REF. SUB-ZERO E-5 DISHWASHER E-6 IN-WALL COFFEE MAKER MIELE ICE MAKER HOSHIZAKI E-7 E-8 E-10 MICROWAVE LAUNDRY / 118 WASHER E-11 DRYER E-12 DRIP PAN BI-48S/S IW-30R, LEFT HAND HINGE EXISTING, VIF MIELE ICE MAKER PUMP E-9 DESCRIPTION RANGE REFRIGERATOR E-4 MODEL NUMBER PANASONIC INSERT POWERPACK EXHAUST HOOD, 1200 CFM 58"X14"X18" COORD. W/SPEC. ST STEEL INSERT COORDINATE INSTALLATION W/MILLWORK SURROUND BUILT-IN SIDE-BY-SIDE REFRIGERATOR/FREEZER 48"X84"X24" COORD. W/SPEC. ST STEEL TUBULAR HANDLE BY SUB-ZERO 30"X84"X24" COORD. W/SPEC. CUSTOM DOOR & HANDLES BY G.C. CUSTOM SOLID OVERLAY DOOR ST STEEL EXSTG D/W TO BE RELOCATED 30" INTEGRATED WINE STORAGE W/REFRIGERATOR DRAWERS UNDERCOUNTER DISHWASHER HS-5061 PUMP FOR UNDERCOUNTER ICEMAKER W3048 ASKO EXSTG RANGE TO BE RELOCATED UNDERCOUNTER ICEMAKER MIELE VIF WASHING MACHINE TUMBLE DRYER-AIR VENTED DRYER N/A CUSTOM 18 GAUGE STAINLESS STEEL DRIP PAN LOCATED UNDER W/D ST STEEL LOCATION P-1 P-2 P-3 BUTLER'S PANTRY / 105 P-4 P-5 COORDINATE INSTALLATION W/MILLWORK SURROUND GC TO PROVIDE DRIP PAN WITH SENSOR SHUT OFF AND VIBRATION ISOLATORS (BY MASON INDUSTRIES OR EQUIV.) KITCHEN / 104 POWDER RM / 109 P-6 E-13 POWDER RM / 109 E-14 MASTER BATH / 115 E-15 BATH 1 / 112 E-16 BATH 2 / 120 E-17 BATH 3 / 123 E-18 E-19 GENERAL SPEAKERS MANUFACTURER EXHAUST FAN ELECTRIC RADIANT HEAT FLOORING ELECTRIC RADIANT HEAT FLOORING ELECTRIC RADIANT HEAT FLOORING ELECTRIC RADIANT HEAT FLOORING SMOKE / CO DETECTOR MODEL NUMBER DESCRIPTION VIF 23 1/2"x 33 31/2"x 23 7/8" 23 1/2"x 33 3/8"x 23 7/8" ST STEEL COORD. INSTALL W/ADJACENT MILLWORK WHITE STACKED, ORDER INSTALLATION KIT AS REQ'D WHITE (CUSTOM) ST STEEL SIZE COLOR / FINISH WARMUP STICKY MAT G.C. TO COORDINATE ELECTRICAL REQUIREMENTS WARMUP NADWM WARMUP STICKY MAT G.C. TO COORDINATE ELECTRICAL REQUIREMENTS WARMUP NADWM WARMUP STICKY MAT G.C. TO COORDINATE ELECTRICAL REQUIREMENTS WARMUP NADWM WARMUP STICKY MAT G.C. TO COORDINATE ELECTRICAL REQUIREMENTS KN-COSM-1B HARDWIRED COMBINATION SMOKE AND CARBON MONOXIDE DETECTOR RL-01 RL-02 WS-01 DL-01 ST DA ST SS LUCIFER LUCIFER N/A, BY OWNER N/A, BY OWNER WAC 32 11 32 19 16 2RP-AD-1 RECESSED DOWNLIGHT ROUND ADJUSTABLE 2RP-FD-2 RECESSED DOWNLIGHT, WET LOCATION N/A, BY OWNER N/A, BY OWNER INVISILED PRO 2 2RP-AD-1 2RP-FD-2, WET LOCATION N/A N/A LED-TX24 DESCRIPTION / NOTES RECESSED DOWNLIGHT ROUND ADJUSTABLE GEAR-DRIVEN, 80 CRI, 3000, 133 LUMENS ROUND PINHOLE APERTURE FIXTURE DEEP REGRESS WET LOCATION, 80 CRI, 3000, 133 LUMENS SURFACE MOUNTED WALL SCONCE SURFACE MOUNTED PENDANT LIGHT HIGH OUTPUT LED TAPE LIGHT FAUCET BARBER WILSON 2020 TOILET LEFROY BROOKS LW600/LW601 TOILET ACCESSORIES LEFROY BROOKS TB 6009/CB5471/L1-6025 WALL MOUNTED W/CROSS HANDLES NICKEL/ WHITE VIF ZINC COORDINATE INSTALLATION W/MILLWORK BELOW SEE SPECIFICATION NICKEL/ WHITE WALL MOUNTED CLASSIC TOILET W/BLACK HANDLE & SEAT CLASSIC BLACK TOILET SEAT/BLACK LEVER CISTERN HANDLE/CLASSIC FLOOR BOLTS WHITE WHITE/ NICKEL/ BLACK MASTERCRAFT LAVATORY, 5.5" SPOUT TOILET N/A EXISTING N/A EXISTING, VIF FLUSHOMETER TOILET VIF WHITE P-10 FLUSHOMETER VALVE SLOAN 'ROYAL' G.C. TO COORDINATE WITH EXISTING TOILET VIF NICKEL P-11 SINK LEFROY BROOKS LB 7203 CHARTERHOUSE P-12 FAUCET LEFROY BROOKS M1-1101 LEVER HANDLE 3-HOLE BASIN MIXER W/P.U.W. P-13 BATHTUB KALDEWEI 683 PURO BATH 1 / 112 TUB FILL 3 HOLE W/ BALL JOINTED STAND LB 3225 NICKEL 4" DIAMETER TRIM 4" DIAMETER TRIM N/A N/A VIF FINISH NOTES WHITE COORDINATE MOUNTING AND INSTALLATION AS REQ'D. NICKEL MECHANICAL ENGINEER LEFROY BROOKS M1-4302 CROSS HANDLE PRESSURE BALANCE W/LEVER 2-WAY DIVERTER TRIM NICKEL LEFROY BROOKS M1-4101 TWO HANDLE PRESSURE BALANCE ROUGH W/ 2-WAY DIVERTER NICKEL LEFROY BROOKS M1-4610/YI-4612 5" WALL SHOWER ROSE W/ ANGLES SHOWER PROJECTION ARM NICKEL TOILET N/A EXISTING N/A EXISTING, VIF FLUSHOMETER TOILET VIF WHITE P-19 FLUSHOMETER VALVE SLOAN 'ROYAL' G.C. TO COORDINATE WITH EXISTING TOILET VIF CHROME P-20 SINK LEFROY BROOKS LB 7703 LA CHAPPELLE WHITE W/ BALL JOINTED STAND LB 3227 P-21 FAUCET LEFROY BROOKS CH 1224 HANDLE CROSS HANDLE CONNAUGHT 3-HOLE BASIN MIXER CHROME 1920'S HANDLE P-22 BATHTUB KALDEWEI VIF SANIFORM P-23 TUB FILL LEFROY BROOKS C1-1031 WALL BATH SPOUT P-24 SHOWER / TUB CONTROLS LEFROY BROOKS CW-4055 / CH1224 HANDLE P-25 SHOWER / TUB CONTROLS ROUGH LEFROY BROOKS MI-4101 / CH 1224 HANDLE P-26 SHOWERHEAD / ARM LEFROY BROOKS LB-1728/YI-4612 TOILET N/A EXISTING N/A EXISTING, VIF P-28 FLUSHOMETER VALVE SLOAN 'ROYAL' P-29 SINK N/A EXISTING N/A EXISTING, VIF P-30 FAUCET N/A EXISTING N/A EXISTING, VIF P-31 BATHTUB KALDEWEI VIF SANIFORM P-32 TUB FILL LEFROY BROOKS C1-1031 WALL BATH SPOUT CHROME P-33 SHOWER / TUB CONTROLS LEFROY BROOKS CW 4050 / CH 1224 HANDLE WHITE LEVER CONCEALED GODOLPHIN THERMOSTATIC MIXING VALVE TRIM ONLY CHROME P-34 SHOWER / TUB CONTROLS ROUGH LEFROY BROOKS M1-4201 TWO HANDLE THERMOSTATIC ROUGH W/FLOW CONTROL P-35 DIVERTER LEFROY BROOKS CW-1015 P-36 DIVERTER ROUGH LEFROY BROOKS R1-4002 P-37 SHOWERHEAD / ARM LEFROY BROOKS LB-1728/YI-4612 TOILET N/A EXISTING N/A EXISTING, VIF FLUSHOMETER TOILET VIF WHITE VIF NICKEL BATH 3 / 123 PLUMBING AND ELECTRICAL ENGINEER VIF G.C. TO COORDINATE WITH EXISTING TOILET G.C. TO VERIFY OPERABILITY, USE SALVAGE AS REQ'D FOR REPAIRS G.C. TO VERIFY OPERABILITY, USE SALVAGE AS REQ'D FOR REPAIRS WHITE CHROME/ WHITE 1920'S HANDLE CHROME 1920'S HANDLE VIF WHITE VIF CHROME VIF WHITE PORCELAIN VIF WHITE WALL LEVER FLOW CONTROL TRIM ONLY 3/4" RECESSED FLOW CONTROL ROUGH EIGHT JET BRUNSWICK ADJUSTABLE ROSE/ANGLES SHOWER PROJECTION ARM 'ROYAL' N/A COORDINATE MOUNTING AND INSTALLATION AS REQ'D. G.C. TO COORDINATE WITH EXISTING TOILET P-40 SINK WATERWORKS MRLVCU "MANCHESTER" UNDERMOUNT WHITE PORCELAIN SINK P-41 FAUCET LEFROY BROOKS M1-1100 MACKINTOSH CROSS HANDLE 3-HOLE BASIN MIXER N/A COORDINATE MOUNTING AND INSTALLATION AS REQ'D. P-42 BATHTUB KALDEWEI VIF CAYONO P-43 TUB CONTROLS LEFROY BROOKS M1-2400 N/A COORDINATE MOUNTING AND INSTALLATION W/MILLWORK AS REQ'D. P-44 TUB ROUGH LEFROY BROOKS R1-4035 P-45 DIVERTER FOR HAND HELD SHOWER @ TUB LEFROY BROOKS M1-1011 LEVER 2-WAY WALL DIVERTER TRIM NICKEL P-46 DIVERTER ROUGH LEFROY BROOKS R1-4000 2-WAY WALL DIVERTER ROUGH N/A LEFROY BROOKS M1-1021 HANDSHOWER W/METALISED HANDLE NICKEL LEFROY BROOKS Y1-1069/Y1-1004/ M1-5462 DOUBLE INTERLOCK SHOWER HOSE/WALL OUTLET/ADJUSTABLE HANDHELD SHOWER BRACKET NICKEL P-48 P-49 LEFROY BROOKS M1-4405 CROSS HANDLE THERMOSTATIC W/ LEVER FLOW CONTROL TRIM ONLY TWO HANDLE THERMOSTATIC ROUGH W/FLOW CONTROL VIF NOT FOR CONSTRUCTION RELOCATE EXISTING TOILET, GC TO SUPPLY AND INSTALL NEW FLUSH VALVE N/A NICKEL M1-4201 P-51 DIVERTER LEFROY BROOKS M1-1011 LEVER 2-WAY WALL DIVERTER TRIM NICKEL P-52 DIVERTER ROUGH LEFROY BROOKS R1-4000 2-WAY WALL DIVERTER ROUGH N/A LEFROY BROOKS M1-4600/Y1-4500 8" SHOWER ROSE/CEILING SHOWER PROJECTION ARM NICKEL LEFROY BROOKS M1-1021 HANDSHOWER W/METALISED HANDLE NICKEL LEFROY BROOKS Y1-1069/Y1-1004/ M1-5462 DOUBLE INTERLOCK SHOWER HOSE/WALL OUTLET/ADJUSTABLE HANDHELD SHOWER BRACKET NICKEL P-55 STAMP NICKEL LEFROY BROOKS P-54 1920'S HANDLE WHITE SHOWER ROUGH SHOWERHEAD / ARM HAND HELD SHOWER HAND HELD SHOWER ACCESSORIES AREA OF WORK 1220 PARK AVE, APT 4B CUSTOM MARBLE TOP W/ URBAN ARCHAELOGY CRYSTAL LEGS W/ "DECO" FINNIALS IN NICKEL P-50 P-53 HS N CHROME SLOAN HAND HELD SHOWER @TUB HAND HELD SHOWER ACCESSORIES @ TUB SHOWER CONTROLS 5T CHROME FLUSHOMETER VALVE P-47 E9 T WHITE P-39 CROSS HANDLE WALL-MOUNTED 3-HOLE BATH FILLER TRIM ONLY CROSS WALL-MOUNTED 3-HOLE BATH FILLER ROUGH RELOCATE EXISTING TOILET, GC TO SUPPLY AND INSTALL NEW FLUSH VALVE VIF P-38 MASTER BATH / 115 KEY PLAN CHROME COORDINATE MOUNTING AND INSTALLATION AS REQ'D. WHITE RELOCATE EXISTING TOILET, GC TO SUPPLY AND INSTALL NEW FLUSH VALVE GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 CHROME CONCEALED GODOLPHIN PRESSURE BALANCE MIXING VALVE W/WHITE LEVER 2-WAY DIVERTER TRIM TWO HANDLE PRESSURE BALANCE ROUGH W/ 2-WAY DIVERTER & 1920'S CONNAUGHT KNOB EIGHT JET BRUNSWICK ADJUSTABLE ROSE/ANGLES SHOWER PROJECTION ARM FLUSHOMETER TOILET JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 NICKEL BATH 2 / 120 DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 WHITE WALL BATH SPOUT SHOWER / TUB CONTROLS SHOWER / TUB CONTROLS ROUGH SHOWERHEAD / ARM OWNER CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 CODE CONSULTANT M1-1031 SEE A-120 FOR LOCATIONS SIZE RELOCATE EXISTING TOILET, GC TO SUPPLY AND INSTALL NEW FLUSH VALVE 3-HOLE W/ BALL JOINTED STAND LB 3225 VIF 1220 PARK AVE, APT 4B NEW YORK, NY 10128 ARCHITECT LEFROY BROOKS G.C. TO COORDINATE INSTALLATION MODEL N/A SEE SPECIFICATION MC-6455 P-17 NADWM SPECIFICATION N/A - EXISTING UNDERMOUNT INSTALLATION, PROVIDE BLOCKING AS REQ'D. PROVIDE UNDERSIDE DEADENING AT SINK WHITE BARBER WILSON NOTES WARMUP BY OWNER QTY SINK MIXER AND HANDSPRAY W/ WHITE HANDLE & PORCELAIN LEVER HANDLES ZINC COUNTER WITH INTEGRATED DOUBLE SINK & DRAINBOARD NOTES 31 5/8"x11"x19 5/8" FAUCET P-16 LIGHTING FIXTURE SCHEDULE MANUFACTURER 1030 G.C. TO COORDINATE ALL PLUMBING FIXTURES TO BE ADEQUATELY SEALED TO THE WALL ASSEMBLY WITH MILDEW RESISTANT SILICONE SEALANTS FOR STAND-ALONE ICE MAKER, GC TO MAKE PROVISION TO FLUSH THE SUPPLY PIPING, IN ORDER TO PREVENT CLOGS AND ALLOW FOR FLUSHING OUT THE LINE IF NECESSARY TYPE BARBER WILSON STACKED, COORDINATE VENTING AS REQ'D FIXTURE AND APPLIANCE NOTES 2. FAUCET ALLIA SINGLE BOWL UNDERMOUNT FIRECLAY SINK P-8 P-27 1. 6307 CHARTERHOUSE P-18 KIDDE ROHL COLOR / FINISH SIZE LB 7203 WHISPERCEILING FAN, 80 CFM FV-08VQ5 PANASONIC SINK DESCRIPTION LEFROY BROOKS P-9 MISC. EQUIPMENT SCHEDULE ITEM MODEL NUMBER SINK P-15 LOCATION MANUFACTURER P-7 P-14 EQUIP ID # ITEM SEE NOTE 2 BY OWNER T754 W/T (CUSTOM) ID # ST STEEL AM-50BAE BY OWNER NOTES VIF BUILT-IN COFFEE MACHINE WITH BEAN 23 1/2"x17 7/8"x19" TO CUP SYSTEM CVA 6401 HOSHIZAKI COLOR / FINISH SIZE AV E-1 LOCATION RK EQUIP ID # Artacho / Oh Residence PLUMBING SCHEDULE PA APPLIANCE SCHEDULE PRELIMINARY BID 06/12/2017 ISSUE DATE N/A TITLE FIXTURES, APPLIANCES AND LIGHTING SCHEDULES PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER A-701.00 PAGE 17 OF 18 Artacho / Oh Residence 1220 PARK AVE, APT 4B NEW YORK, NY 10128 DOOR SCHEDULE OWNER NO. LOCATION TYPE MATERIAL WIDTH (VIF) 101 ENTRY SINGLE LEAF, 6 PANEL, EXSTG. WOOD VIF 102 FOYER CLOSET PAIR, 6 PANEL, EXSTG. WOOD VIF 105 HARDWARE NOTES VIF EXSTG. N/A EXSTG./ENTRY REPAIR/REFINISH AS REQ'D. VIF EXSTG. N/A CLOSET REPAIR/REFINISH AS REQ'D/RE-USE (2) EXSTG. DOORS, SALVAGE DURING DEMOLITION N/A PASSAGE WOOD VIF VIF PTD. METAL VIF VIF PTD. N/A EXSTG./ENTRY REPAIR/REFINISH AS REQ'D., APPLY NEW FLUSH METAL FACE TO CONCEAL PANEL PTD. METAL VIF VIF PTD. N/A EXSTG./ENTRY REPAIR/REFINISH AS REQ'D. CODE CONSULTANT WOOD VIF VIF EXSTG. N/A EXSTG./ENTRY REPAIR/REFINISH AS REQ'D. VIF VIF N/A N/A N/A N/A JAM CONSULTANTS, INC. 104 WEST 29TH STREET, 9TH FLOOR NEW YORK, NY 10001 TEL. (212) 244-4427 DINING ROOM N/A FRAMED OPENING 107A LIVING ROOM PAIR, 3 PANEL, EXSTG. WOOD VIF VIF EXSTG. N/A EXSTG. REPAIR/REFINISH AS REQ'D. 107B LIVING ROOM PAIR, 3 PANEL, EXSTG. WOOD VIF VIF EXSTG. N/A EXSTG. RE-USE FROM FORMER D.R. LOCATION, REPAIR/REFINISH AS REQ'D. 108A STUDY SINGLE LEAF, 6 PANEL, EXSTG. WOOD VIF VIF EXSTG. N/A EXSTG./ENTRY REPAIR/REFINISH AS REQ'D. WOOD/LACQUER VIF VIF TO MATCH EXSTG. N/A POCKET TRACK BY HAFELE, HAWA, PULLS BY RAJACK 109 110 111A 111B 112 114 115 116 117 118 119A 119B 120 121 122 123 124 N/A POCKET/SINGLE LEAF, 6 PANEL, NEW TO MATCH EXSTG. POCKET/SINGLE LEAF, 6 POWDER ROOM PANEL, NEW TO MATCH EXSTG. SINGLE LEAF, 6 PANEL, HALL EXSTG. SINGLE LEAF, PANEL, BEDROOM 1 EXSTG. PAIR, SINGLE PANEL, BEDROOM 1 CLST EXSTG. SINGLE LEAF, PANEL, BATH 1 EXSTG. POCKET/SINGLE LEAF, MASTER BEDROOM SINGLE PANEL, NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, MASTER BATH EXSTG. STUDY WALK-IN-CLOSET SINGLE LEAF, PANEL, NEW TO MATCH EXSTG. POCKET/SINGLE LEAF, SINGLE PANEL, NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, LAUNDRY NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, BEDROOM 2 EXSTG. PAIR, SINGLE PANEL, BEDROOM 2 CLST NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, BATH 2 EXSTG. SINGLE LEAF, PANEL, HALL CLOSET NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, BEDROOM 3 EXSTG. SINGLE LEAF, PANEL, BATH 3 EXSTG. SINGLE LEAF, PANEL, BEDROOM 3 W.I.C. EXSTG. WALK-IN-CLOSET DAVIES TOEWS ARCHITECTURE 448 E. 13TH STREET, STOREFRONT NEW YORK, NY 10009 TEL: (718) 222-1202 TO MATCH EXSTG. 106 108B ARCHITECT MECHANICAL ENGINEER HAMILTON AIR. 262 WEST 38TH STREET #301 NEW YORK, NY 1018-5808 TEL. (212) 682-2710 PLUMBING AND ELECTRICAL ENGINEER WOOD/LACQUER VIF VIF TO MATCH EXSTG. N/A POCKET TRACK BY HAFELE, HAWA, PULLS BY RAJACK WOOD VIF VIF EXSTG. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD VIF VIF EXSTG. N/A CLOSET REPAIR/REFINISH AS REQ'D/RE-USE (2) EXSTG. DOORS, SALVAGE DURING DEMOLITION WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/LACQUER VIF VIF PTD. N/A POCKET TRACK BY HAFELE, HAWA, PULLS BY RAJACK WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/LACQUER VIF VIF PTD. N/A POCKET TRACK BY HAFELE, HAWA, PULLS BY RAJACK WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. WOOD/MIRROR VIF VIF PTD. N/A EXSTG. REPAIR/REFINISH AS REQ'D. GREEN SOLUTIONS ENGINEERING AND ENERGY MANAGEMENT CONSULTING ENGINEERS, PC 104-15 95TH AVE OZONE PARK, NY 11416 TEL. (917) 362-6719 KEY PLAN AV 104B MANUF. RK 104A FINISH E9 PA 103 SINGLE LEAF, 6 PANEL, HALL NEW TO MATCH EXSTG. SINGLE LEAF, PANEL, KITCHEN EXSTG. SINGLE LEAF, PANEL, KITCHEN EXSTG. SINGLE LEAF, 6 PANEL, BUTLER'S PANTRY EXSTG. HT (VIF) CECILIA ARTACHO OH & KENNEY OH 1220 PARK AVE, APT 4B NEW YORK, NY 10128 5T HS T N AREA OF WORK 1220 PARK AVE, APT 4B STAMP NOT FOR CONSTRUCTION GLAZING NOTES WINDOW SCHEDULE NO. 104A 104B 106A 106B 107A 107B 107C 107D 107E 108 111 112 114A 114B 115 119A 119B 120 122 123 LOCATION TYPE CLAD MAGNUM TILT/TURN CLAD MAGNUM KITCHEN TILT/TURN CLAD ULTIMATE DINING ROOM DOUBLE HUNG CLAD ULTIMATE DINING ROOM DOUBLE HUNG CLAD ULTIMATE LIVING ROOM DOUBLE HUNG CLAD ULTIMATE LIVING ROOM DOUBLE HUNG CLAD ULTIMATE LIVING ROOM DOUBLE HUNG CLAD ULTIMATE LIVING ROOM DOUBLE HUNG CLAD ULTIMATE LIVING ROOM DOUBLE HUNG CLAD ULTIMATE STUDY DOUBLE HUNG CLAD ULTIMATE BEDROOM 1 DOUBLE HUNG CLAD ULTIMATE BATH 1 DOUBLE HUNG CLAD ULTIMATE MASTER BEDRM DOUBLE HUNG CLAD ULTIMATE MASTER BEDRM DOUBLE HUNG CLAD ULTIMATE MASTER BATH DOUBLE HUNG CLAD MAGNUM BEDROOM 2 TILT/TURN CLAD MAGNUM BEDROOM 2 TILT/TURN CLAD MAGNUM BATH 2 TILT/TURN CLAD MAGNUM BEDROOM 3 TILT/TURN CLAD MAGNUM BATH 3 TILT/TURN KITCHEN OPER. MANUF. RH MARVIN LH MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN N/A MARVIN LH MARVIN RH MARVIN RH MARVIN LH/RH MARVIN RH MARVIN R.O. WIDTH 4'-4", VIF 4'-0", VIF 4'-4", VIF 4'-4", VIF 4'-0", VIF 4'-0", VIF 4'-0", VIF 4'-0", VIF 4'-0", VIF 6'-4", VIF 6'-4", VIF 3'-10", VIF 3'-10", VIF 3'-10", VIF 3'-10", VIF 4'-4", VIF 4'-4", VIF 2'-0", VIF 6'-4", VIF 2'-0", VIF R.O. HT 5'-2", VIF 5'-2", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 6'-0", VIF 5'-2", VIF 5'-2", VIF 4'-2", VIF 6'-0", VIF 5'-2", VIF GLAZING TYPE LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON LOW E1 W/ ARGON U FACTOR EXT FINISH .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 .30 SEE NOTE 2 INTERIOR FINISH AIR LEAKAGE PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED PINE / PRIMED MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 MEETS ASTM E283 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. ALL EXTERIOR WINDOWS TO REPLACE EXISTING GC TO COORDINATE EXTERIOR FINISH WITH BUILDING MANAGEMENT FOR BUILDING STANDARD, ALL REPLACEMENT WINDOWS MUST FOLLOW THE BUILDING'S WINDOW MASTER PLAN AND CONFORM IN COLOR, STYLE AND DIMENSIONS TO THE ORIGINAL WINDOW CONFIGURATION OF THE BUILDING. WINDOW / FRAME EXTERIOR FINISH AND PANNING OF THE MASTER WINDOW FRAME AND THE MULLIONS AT GANGED WINDOWS ARE TO BE BUILDING STANDARD. PERIMETER SEALANT TO BE HIGH QUALITY URETHANE SEALANT, COLOR TO MATCH THE WINDOW FRAME. ROUGH OPENINGS PROVIDED ARE FOR REFERENCE ONLY, GC TO VERIFY ALL DIMENSIONS IN THE FIELD. WINDOW MASONRY OPENINGS MAY NOT BE MODIFIED. INSPECT SILL AND LINTEL INTEGRITY AND REPORT ANY IRREGULARITIES TO BUILDING MANAGEMENT IMMEDIATELY. INSTALL NEW FRAMES IN MASONRY OPENINGS SET TRUE AND PLUMB AND ANCHOR TO MASONRY. INSTALLER IS RESPONSIBLE FOR THE STRUCTURAL INTEGRITY OF THE WINDOW INSTALLATION AND IS TO ASSURE THAT THE QUANTITY AND SPACING OF ANCHORS IS BASED UPON THE EXISTING CONDITIONS, EXPOSURE, AND HEIGHT OF THE WINDOW INSTALLATION WITHIN THE BUILDING. CAULK EXTERIOR PERIMETER BETWEEN NEW FRAMES AND MASONRY WITH BUTYL TAPE COMPOUND APPLIED WITH HAND PRESSURE GUN AND TROWEL OFF NEATLY. REPAIR AROUND WINDOWS BROKEN PLASTER, TO A TROWELLED HARD SMOOTH FINISH, THAT OCCURRED DURING PERFORMANCE OF THE WORK. ONLY BUILDING-APPROVED SIX OVER SIX DOUBLE HUNG WINDOWS MAY BE INSTALLED WITH EXTERIOR TO MATCH EXISTING WINDOWS IN FRONT ELEVATIONS. WINDOW INSTALLATIONS MUST BE COORDINATED WITH THE RESIDENT MANAGER AT LEAST FIVE (5) DAYS PRIOR TO THE DESIRED DATE. PRIOR TO THE INSTALLATION OF THE REPLACEMENT WINDOWS, PROVIDE A SAMPLE TO THE BUILDING TO ASSURE THAT SUCH WINDOW REPLACEMENTS CONFORM IN COLOR, STYLE AND DIMENSIONS TO THE EXISTING WINDOWS IN THE BUILDING. THE CONTRACTOR IS TO MAINTAIN A SAFE SITE AND IS FULLY RESPONSIBLE FOR COMPLYING WITH ALL APPLICABLE CITY REGULATIONS REGARDING SITE SAFETY. PRELIMINARY BID 06/12/2017 ISSUE DATE TITLE WINDOW AND DOOR SCHEDULES PROJECT NO: 1701 SCALE: AS NOTED SHEET NUMBER A-702.00 PAGE 18 OF 18 HVAC ABBREVIATIONS HVAC SYMBOL LEGEND 24 x 12 NEW DUCTWORK, FIRST DIMENSION IS SIDE SHOWN 24 x 12 EXISTING DUCTWORK TO BE REMOVED 24 x 12 DOWN AC ACD AD AHU AP ATC BS BOD BTU BTUH CFM CH DUCT ELBOW, POSITIVE PRESSURE (SUPPLY), FIRST DIMENSION INDICATES SIDE TO WHICH ARROW IS POINTING UP W/ IN FL Air Conditioning Automatic Control Damper Access Door Air Handling Unit Access Panel Automatic Temperature Control Building Supply Bottom of Duct British Thermal Unit BTU per Hour Cubic Feet per Minute Chilled or Chiller CHW CHWR CHWS CUH CWR CWS D EXH or EX FA FC FCU FD PROJECT NAME: HVAC EQUIPMENT SCHEDULE Chilled Water Chilled Water Return Chilled Water Supply Cabinet Unit Heater Condenser Water Return Condenser Water Supply Drain Exhaust Free Area or Fire Alarm Flexible Connection Fan Coil Unit Floor Drain or Fire Damper CEILING DIFFUSER, ROUND NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO) FLA FLEX FS FT FTR LSD R RET RH RPM RTU SA SD Full Load Amps Flexible Flow Switch Feet Fin Tube Radiation Linear Slot Diffuser Radius Return Air Relative Humidity Revolutions per Minute Roof-Top Unit Supply Air Smoke Detector or Smoke Damper SE SFD SHC SP SF SS SUP TEFC TEMP TTW TYP V VD Smoke Exhaust Combination Smoke / Fire Damper Sensible Heat Capacity Static Pressure Square Feet Stainless Steel Supply Totally Enclosed Fan Cooled Temperature Thru-the-wall Typical Volts Volume Damper NUMBER MANUFACTURER MODEL SPECIFICATION VOLTS MCA COOLING MBH CFM GPM POUNDS WIDTH HEIGHT DEPTH AHU-1, 2 & 3 FIRST COMPANY 30HXC HORIZONTAL CONCEALED FAN COIL 208V 5.4A 30,000 --- --- 103 393 4" 11" 237 8" ACCU-1, 2 & 3 AEROSYS THDC-30PGLX THRU-WALL CONDENSING UNIT 208V 18.8A 28,200 --- --- 195 36" 19" 1812" RESIDENCE 1220 Park Avenue Apt. #4B CEILING RETURN CEILING EXHAUST New York, NY CEILING DIFFUSER, RECTANGULAR OR SQUARE NECK (CEILING DIFFUSERS ARE 4-WAY THROW UNO) SUPPLY REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL) RETURN/EXHAUST REGISTER OR GRILLE (VERTICAL MOUNT, SIDEWALL) T THERMOSTAT/TEMPERATURE SENSOR MOTORIZED DAMPER 262 WEST 38TH STREET #301 NEW YORK , NY 10018-5808 35 MT. VERNON ST. RIDGEFIELD PARK, NJ 07660 PH: 212-682-2710 FX: 201-440-6981 rvogel@hamiltonair.com FIRE DAMPER CONFLICTS: BATHROOM FIXTURES ON EXSTG ROUGHING BATHROOM BEDROOM KITCHEN BEDROOM LAUNDRY BUTLER'S PANTRY COMMENTS: DINING ROOM ENTRY HALL BEDROOM FOYER BEDROOM POWDER ROOM STUDY LIVING ROOM DRAWING NAME: BATHROOM BATHROOM Mechanical Plan HVAC Symbol Legend & HVAC Schedule SEAL & SIGNATURE: 1 M-100 Mechanical Plan - Apt. #4B DATE: 05/16/17 REVISIONS: #1 #2 06/02/17 06/08/17 Scale:1/4" = 1'-0" M-100.00 1 OF 2 PROJECT NAME: RESIDENCE 1220 Park Avenue DUCT DUCT MOUNTED SUPPLY DIFFUSER LINING UNIT WILL BE HELD 2" FROM CEILING SEPARATE SPEED CLIP WASHER HILTI TWO PART EPOXY MAX C L 16" TYP. PINS SPOT WELDED TO DUCTWORK Apt. #4B New York, NY VD MAX CL 16" TYP. THREADED ROD COATED SURFACE OF INSULATION EXPOSED TO AIR STREAM REFRIGERANT LINES TO CONDENSING UNIT 18" MIN. REQUIRED PLAN VIEW DISCONNECT SWITCH SUPPLY DUCT 3" 3" TYPICAL STUD-WELDED PINS AND SPEED CLIP WASHER (SEE DETAIL "A") AIR HANDLER ALL ENDS OF LINER COATED WITH ADHESIVE NOT MORE THAN 3" FROM EDGE OF LINER SPEED CLIP WASHER PRESSED DOWN OVER PIN TO LINING FLEXIBLE CONNECTION WATER BUG SAFETY PAN ADHESIVE OVER COMPLETE SURFACE OF DUCT CONDENSATE DRAIN WILL BE RUN TO AN EXISTING INDIRECT FUNNEL WITH PRIMER AND ACCESS DOOR PROVIDED BY LICENSED PLUMBER. VIBRATION ISOLATOR SPRINGS MASON INDUSTRIES MODEL# 30N-X-X54 OR EQUAL LINING (THICKNESS AS SPECIFIED) PRESSED DOWN OVER GRIP-PIN DUCT WELD-PIN STUD WELDED TO DUCT (PINS FASTENED TO DUCT WITH ASHESIVE NOT APPROVED) CONDENSATE LINE WILL BE SUPPORTED WITH 1 18" COPPER CLAMP TO SUPPORT LINE TO INDIRECT FUNNEL. VOLUME DAMPER (VD) DETAIL 'A' AIR HANDLER HANGING - DETAIL 1 M-200 ISOMETRIC VIEW SOUND LINING INSTALLATION DETAIL 2 M-200 NOT TO SCALE 262 WEST 38TH STREET #301 NEW YORK , NY 10018-5808 35 MT. VERNON ST. RIDGEFIELD PARK, NJ 07660 PH: 212-682-2710 FX: 201-440-6981 rvogel@hamiltonair.com 3 M-200 NOT TO SCALE METHOD OF HANGING DUCTWORK 4 M-200 NOT TO SCALE TYPICAL SUPPLY OUTLET DETAIL NOT TO SCALE CONFLICTS: MECHANICAL NOTES COMMENTS: PATCH AND FINISH TO MATCH EXISTING EXISTING WINDOW AND SILL FABRIC FLASHING DOES NOT INCLUDE LOUVER 1 " FLASHING AT METAL ANGLE LINTEL 20 2 1 STEEL ANGLE 2" x4" LINTEL WITH 6" BEARING BOTH SIDES PROVIDE LINTEL AT OPENINGS OVER 30" WIDE 1/2" OVERSIZED SLEEVE CHASSIS SEALANT W/ BACKER ROD W/ WEEP HOLES @ QUARTER POINTS W H THRU-THE-WALL SOUND SLEEVE STEEL RAIL MINIMUM 3/4" CLEAREANCE BETWEEN CHASSIS AND SLEEVE. INSERT CLOSED CELL NEOPRENE FOAM TO PROVIDE A WEATHETIGHT SEAL ALL AROUND CHASSIS EXTRUDED BLADED ANODIZED ALUMINUM ARCH. GRILLE LOUVER WILL BE CAULKED ON ALL SIDES AND ATTACHED TO SLEEVE NOT BUILDING. LOUVER WILL BE PAINTED, COLOR PROVIDED BY BUILDING RADIATOR SHUT-OFF VALVE ALLOW FOR THICKNESS OF NEOPRENE PAD (1") AND STEEL RAIL MASON TYPE SUPER W NEOPRENE PAD (1") AT EACH CORNER OF UNIT PITCH UNIT 12" TO EXTERIOR UNION (TYPICAL) AUTOMATIC VENT 16X CUSTOM VIBRATION ISOLATOR PADS MASON TYPE SUPER (W) SOUND SLEEVE OVERSIZED TO ACCOMODATE FIRE DAMPERS. CONDESING UNIT WILL BE WRAPPED ON EXTERIOR WITH KINETICS TYPE KDD3553 SOUND INSULATION. DETAIL OF RAIL CEMENT BED SLOPED 12" TO EXTERIOR THERMOSTATIC STEAM TRAP ESCUTCHEON PLATE (TYPICAL) SEALANT W/ BACKER ROD W/ WEEP HOLES @ QUARTER POINTS 1 4" STEEL ANGLE (2"X2") CUSTOM STAINLESS STEEL DRIP EDGE 3 4"RUNOUT SLEEVE FIRESTOPPING L.P.S CONDENSING UNIT SOUND SLEEVE COPPER FLASHING FINISH FLUSH W/ EXTERIOR SLEEVE TURN UP AND CONT. UP BOTH SIDES OF UNIT SLEEVE 1" TH. MASON SUPER W PADS W 31" H D THDC R UNIT 2521" 2021" THDC P UNIT 37" 21" THDC T UNIT 2521" 34" 2021" 2021" L.P.R DRAWING NAME: EXISTING BRICK WALL BLOCKING AS REQUIRED 5 M-200 DETAIL AT CONDENSER WALL PENETRATION NOT TO SCALE 6 M-200 TYPICAL CONDENSER SOUND SLEEVE DETAIL NOT TO SCALE 7 M-200 CAST IRON STEAM RADIATOR DETAILS NOT TO SCALE BUILDING NOTES Mechanical Plan DETAILS SEAL & SIGNATURE: DATE: 05/16/17 REVISIONS: #1 #1 06/02/17 06/08/17 M-200.00 2 OF 2 OWNER: GENERAL NOTES ABBREVIATIONS E9 PA RK AV ELECTRICAL DEMOLITION NOTES 5T HS T N AREA OF WORK ELECTRICAL SYMBOLS MEP: SUBMISSIONS: DL RL ST DA ST SS WS PROJECT TITLE: DRAWING TITLE: ELECTRICAL SYMBOLS, ABBREVIATIONS, NOTES & DRAWINGS LIST MSB B.B. Seal & Signature E-001.00 1 E9 PA R KA V OWNER: 5T HS T N AREA OF WORK MEP: SUBMISSIONS: PROJECT TITLE: DRAWING TITLE: ELECTRICAL SPECIFICATIONS MSB B.B. Seal & Signature E-002.00 2 E9 PA R KA V OWNER: 5T HS T N AREA OF WORK MEP: SUBMISSIONS: PROJECT TITLE: DRAWING TITLE: ELECTRICAL SPECIFICATIONS MSB B.B. Seal & Signature E-003.00 3 OWNER: LIMIT OF WORK AV LIMIT OF WORK DL DL E9 PA RK DL 5T HS T N $D$D RL SD WS WS RL BATH 3 123 $D$D DL DL $D$D$WS D RL DL RL DL KITCHEN 104 BATH 2 120 BEDROOM 2 119 WS WS DL AREA OF WORK DL DL RL NO WORK WS RL WS RL $D$D ST DA WS ST DA $$$ ST $D$D $D$D$D SD RL WS RL RL SD DL WIC 117 RL FOYER 102 RL RL RL WS $D$D$D SD WS $D $D $D ST DA $D$D ST HALL 110 $D RL DL $D RL RL WIC 116 DINING ROOM 106 ENTRY 101 HALL 113 ST ST $D $D $D RL WS ST WIC 124 DL DL HALL 121 SD $D DL RL $D $D$D $D$D RL ST RL ST ST RL RL RL RL RL WS WS ST BEDROOM 1 111 RL RL MASTER BEDROOM 114 $D$ $D ROOM POWDER 109 RL RL RL ST RL WS WS WS RL RL WS RL WS BATH 1 RL 112 RL RL SUBMISSIONS: WS $D$D RL $D$D$D WS MASTER BATH 115 WS WS LIVING ROOM 107 WS STUDY 108 $D$D ST DA ST DA WS MEP: BUTLER'S PANTRY 105 DL DL LIMIT OF WORK WS RL DL LAUNDRY 118 SD RL RL HALL 103 WS WS $D BEDROOM 3 122 WS $D RL $D WS $D$D WS WS DL RL WS WS NO WORK NO WORK NO WORK PROJECT TITLE: LIGHTING NOTES DRAWING TITLE: ELECTRICAL LIGHTING PLAN MSB B.B. Seal & Signature E-100.00 4 OWNER: POWER NOTES LIMIT OF WORK E9 5T APP: RANGE APP: HOOD GFCI PA RK AV APP: DW GFCI GFCI LIMIT OF WORK HS T N GFCI SD TEL GFCI AREA OF WORK TV GFCI GFCI TEL NO WORK APP: WINE REF APP: REF TV APP: DRYER APP: WASHER APP: COFFEE GFCI GFCI TEL GFCI LIMIT OF WORK MEP: TV SD SD SD TEL SD GFCI TV TV TEL TEL SD TV SUBMISSIONS: GFCI GFCI GFCI NO WORK NO WORK NO WORK PROJECT TITLE: DRAWING TITLE: ELECTRICAL POWER PLAN MSB B.B. Seal & Signature E-200.00 5 E9 PA RK AV OWNER: 5T HS T N AREA OF WORK MEP: SUBMISSIONS: PROJECT TITLE: SHEET NOTES DRAWING TITLE: ELECTRICAL RISER DIAGRAM 3-27-15 MSB B.B. Seal & Signature E-300.00 6 E9 PA RK AV OWNER: 5T HS T N AREA OF WORK MEP: A B SUBMISSIONS: C D PROJECT TITLE: DRAWING TITLE: ELECTRICAL DETAILS 3-27-15 MSB E F B.B. Seal & Signature E-400.00 OWNER: SYMBOL ABBREV. THE PLUMBING SYSTEMS (SANITARY, WASTE, VENT AND WATER DISTRIBUTION ) AND ALL ASSOCIATED EQUIPMENT WILL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE FULL REQUIREMENTS OF THE NEW YORK CITY 2014 PLUMBING CODE. COMPLIANCE WITH THE FULL PROVISIONS OF ALL NEW YORK CITY BUILDING AND PLUMBING CODE ACCESSIBILITY REQUIREMENTS AND PLUMBING FIXTURE FLOW REQUIREMENTS OF THE N.Y.C. 2014 PLUMBING CODE. 1.THE SANITARY SYSTEM SHALL BE PROVIDED IN FULL ACCORDANCE WITH THE GENERAL PROVISIONS OF SECTION PC3O1. DESCRIPTION 3.EQUIPMENT HOOK-UP AND THE JOINING WILL BE FULL COMPLIANCE WITH SECTIONS PC605 AND PC705. V VENT PIPING CW COLD WATER PIPING HW HOT WATER PIPING C.T.E. CONNECT TO EXISTING WASHER AND JAM NUT DROP THREADED HANGER ROD SHUT-OFF VALVE TYPICAL EXPANSION SHIELD 4.THE INSTALLATION OF FIXTURES WILL BE IN FULL ACCORDANCE WITH PC CHAPTER 4. RISER 6.VERTICAL AND HORIZONTAL PIPING WILL BE HUNG AND SUPPORTED AS DIRECTED IN SPECIFICATIONS AND WITH THE FULL COMPLIANCE WITH SECTION PC3O8. CLEANOUT SA SHOCK ARRESTOR 7.THE WATER SUPPLY SYSTEMS OF THE SUBJECT BUILDING SHALL BE INSTALLED AND MAINTAINED IN FULL COMPLIANCE WITH PC CHAPTER 6. DRAWING LIST 8.THE SANITARY DRAINAGE SYSTEM WILL BE SIZED AND INSTALLED IN FULL COMPLIANCE WITH PC DRAWING NUMBER CHAPTER 7. 9.THE VENT PIPING FOR THE SANITARY DRAINAGE SYSTEM OF THE SUBJECT BUILDING WILL BE INSTALLED IN FULL COMPLIANCE WITH SECTION PC702 & PC CHAPTER 9. 10. THE STORM DRAINAGE SYSTEM AND PIPING WILL BE INSTALLED IN FULL COMPLIANCE WITH PC CHAPTER 11. 11. GAS PIPING AND EQUIPMENT WILL BE INSTALLED IN FULL COMPLIANCE WITH THE NEW YORK CITY FUEL GAS CODE. PLUMBING LEGENDS, NOTES, ABBREVIATIONS, DETAILS AND SPECIFICATIONS P-100.00 PLUMBING FLOOR PLAN - DEMOLITION P-200.00 PLUMBING FLOOR PLAN - NEW WORK P-300.00 PLUMBING RISER DIAGRAMS VENT 3. CONTRACTORSHALLCOORDN I ATEWORKWTIHALLOTHERTRADESANDEXS I TN I GCONDTIO I NSON THEJOBSTIEANDMAN I TAN I REQUR I EDCELIN I GHEG I HTSANDCONDTIO I NS. A1.4.. HANGERSANDSUPPORTS. A1.5.. REMOVALSASNOTED. A1.6.. FURNSI HANDN I STALLACOMPLETEFUELGASDSI TRBI UTO I NSYSTEMFROMTHEGASMETERSTOALL GASFR I EDEQUPI MENTASN I DC I ATEDONTHEDRAWN I GS. D4.1.. CONDUCTTESTSN I ACCORDANCEWTIHTHESPECFIC I ATO I NSORASDR I ECTEDBYBULIDN IG MANAGEMENT. A1.7.. PROVD I EALLNECESSARYPPI EF,TITN I GSV, ALVESE, TCA. NDMAKEALLFN I ALFUELGASPPI N IG CONNECTO I NSTOALLEQUPI MENT. D4.2.. PPI N I GTESTSARETOBECONDUCTEDPRO I RTOPAN I TN I GN I, SULATN I GO , RCONCEALN I GWTIHN I THE BULIDN I G. A1.8.. ALLREQUR I EMENTSFORN I STALLATO I NOFGASPPI N I GSHALLBEN I ACCORDANCEWTIH USAS-IZ21-1964N I',STALLATO I NOFGASAPPLAI NCESANDGASPPI N I G.' D4.3.. ALLMATERAI LSE, QUPI MENTANDCOSTSN I VOLVEDN I TESTN I GTHEPPI N I GSYSTEMSSHALLBE N I CLUDEDN I THEWORK. A1.9.. EACHPEI CEOFEQUPI MENTSHALLBEPROVD I EDWTIHANN I DVI D I UALSHUT-OFFVALVE. D4.4.. SANTIARYPPI N I GSHALLBETESTEDWTIHWATERFORTWOHOURSATAPRESSUREOFFVI EPSG I OR TENFOOTWATERCOLUMNU , NLESSOTHERWSI EDR I ECTED. D4.5.. TESTWATERPPI N I GAT1-12/"TM I ESTHESTATC I WATERPRESSUREFOR2HOURS. COLD WTR HOT WTR 1/2" DESCRIPTION SK SINK 2" 2" 1/2" WC WATER CLOSET 4" 2" 3/4" LAV LAVATORY 2" 2" 1/2" 1/2" WM WASHING MACHINE 2" 2" 3/4" 3/4" DW DISHWASHER 2" 2" - 1/2" BT BATH TUB 2" 2" 1/2" 1/2" SH SHOWER 2" 2" 1/2" 1/2" PIPE 16 GAUGE GALV. STEEL SHIELD TYP. FOR PIPE HANGERS D4.. UPONCOMPLETO I NOFALLPPI N I GSYSTEMSN , OTFIYTHEBULIDN I GMANAGEMENTN I, WRTIN I GF,VI EDAYSN I ADVANCEOFTHETM I ELEAKTESTSARETOBEMADE. AFTERCAREFULLYSTUDYN I GTHEDRAWN I GSANDSPECFIC I ATO I NSA, NDBEFORESUBMTITN I GTHER I PROPOSALE, ACHBD I DERSHALLVSI TITHESTIETOASCERTAN I CONDTIO I NSOFTHESTIEA, NDTHE NATUREANDEXACTQUANTTIYOFWORKTOBEPERFORMEDN . OEXTRAWLILBEALLOWEDFITHE CONTRACTORFALISTOEXAMN I ETHESTIEO , RHAVN I GEXAMN I EDTHESTIET,HECONTRACTORFALIS TONOTFIYTHEOWNERN I WRTIN I GOFANYDSI CREPANCEI STHATHEMAYHAVENOTEDBETWEENTHE EXSI TN I GCONDTIO I NSA, NDDRAWN I GSANDSPECFIC I ATO I NS. B1.2.. THECONTRACTORSHALLVERFIYALLMEASUREMENTSOFHSI OWNOROTHERSATTHESTIEA, ND SHALLBERESPONSBI LEFORCORRECTNESSOFSAMEASRELATEDTOHSI WORK. B1.3.. CONTRACTORSHALLCOOPERATEWTIHALLOTHERCONTRACTORSWHOFURNSI HANDN I STALLWORK N I CONNECTO I NWTIHTHEWORKOFTHSI PROJECTG . VI ETHEMCOMPLETEDATAASTOHSI REQUR I EMENTSA, NDNOTFIYBULIDN I GMANAGEMENTOFANYCONDTIO I NTHATWLILN I TERFEREWTIH PROPERCOMPLETO I NOFTHSI WORKC . OOPERATEN I THESCHEDULN I GOFTHSI WORKWTIHTHE WORKOFOTHERCONTRACTSSOASNOTTODELAYJOBPROGRESS. E2.. HOTANDCOLDWATERPPI N I GTOBETYPELCOPPERWTIHBRAZEDFTITN I GSP. ROVD I ETYPEKCOPPERFOR PPI N I GN I THEGROUND. E3.. N I SULATO I NONHOTANDCOLDWATERPPI N I GSHALLBEFBI ERGLASSN I SULATO I NWTIHKRAFTPAPER BACKN I GV, APORBARREI RONCOLDWATERF,R I EANDSMOKERESSI TANTR . EFERTOPLUMBN I GN I SULATO IN SCHEDULEFORN I SULATO I NTHC I KNESS. E4.. FORGASPPI N I G2,"SZIEANDSMALLERA, TOPENTRYBALLVALVEC , RANEA' CCESSOW ' TIHBUENAN'S' EATN I ACARBONSTEELBODYWTIHFXI EDHANDLE. E5.. VALVESSHALLBECASTBRONZEBALLTYPEA, POLLOOREQUAL. E6.. FTITN I GSSHALLBE125LBG . ALVANZIEDMALLEABLER I ONS, TEAMPATTERNANDSHALLBEFEI LDWRAPPED ANDCOATEDTOMATCHMLILWRAPPEDPPI E. B2.1.. ALLWORKSHALLCOMPLYWTIHTHEREQUR I EMENTSOFTHENEWYORKCTIYBULIDN I GCODENFPA, ALLAPPLC I ABLEFEDERALA, NDLOCALCODESANDANYOTHERAGENCEI SHAVN I GJURSI DC I TO I N. E7.. ALLFUELGASPPI EABOVEGROUNDN I, SD I EOFTHESHALLBESCHEDULE40S, TEELPPI EB. ETHLEHEMSTEEL COO . RAPPROVEDOTHER. B2.2.. THECONTRACTORSHALLN I CLUDEN I HSI BD I THECOSTOFALLREQUR I EDPERMTISF,EES, N I SPECTO I NST,ESTSANDCERTFIC I ATESOFAPPROVAL. E8.. ALLDOMESTC I WATERVALVESSHALLBELEADFREE. B3.. 2 3 3 1 PIPE 2016 NYCECC COMPLIANCE STATEMENT ALLHOTWATERHEATERSANDHOTWATERSUPPLYPP IN I GSHALLMEETREQUR I EMENTSOFTHE2016NEW YORKCTIYENERGYCONSERVATO I NCODE(NYCECC2016A )NDMUSTBEVERFIE I DTHROUGHDATABYTHE MANUFACTURERORTHROUGHCERTFIC I ATO I NUNDERANAPPROVEDCERTFIC I ATO I NPROGRAM. INSULATED PIPE 2 SLEEVE 3 ESCUTCHEON ON BOTH SIDES 4 PARTITION, WALL OR FLOOR (SEE ARCHITECTURAL DRAWINGS FOR FIRE RATING) 5 5 B4.. OBEYALLSECURTIYREGULATO I NSESTABLSI HEDBYTHEBULIDN I GMANAGEMENTA, NDABD I EBYALL BULIDN I GRULESANDREGULATO I NSB. ULIDN I GMANAGEMENTS' APPROVALSHALLBEOBTAN I ED BEFOREENTERN I GSECUREDAREASOFTHEBULIDN I GSOFTHEBULIDN I G. MAN I TAN I ALLAREASU , NDERCONTRACTORS' CONTROLF,REEOFEXTRANEOUSDEBRSI . B4.2.. SCHEDULEREGULARCOLLECTO I NANDDSI POSALOFDEBRSI DALIYANDMOREFREQUENTLYFI NECESSARY. RATED PARTITION, WALL OR FLOOR ONLY) THRU SLEEVE. USE CONTINUOUS INSULATION (ITEM 5) AT NON-RATED PARTITION, WALL OR WALL B5.1.1.. ALLCUTTN I GD , RLILN I GA, NDROUGHPATCHN I GREQUR I EDFORTHEWORKSHALLBEPROVD I ED BYTHECONTRACTORC . ONTRACTORREFERTOBULIDN I GALTERATO I NAGREEMENT. B5.1.2.. ALLCUTTN I GD , RLILN I GOROTHERCONSTRUCTO I NOPERATO I NSWHC I HCREATEEXCESSVI E NOSI EORVBI RATO I NSHALLBESCHEDULEDWTIHTHEOWNERC . ONTRACTORSHALLPAYFOR ANYOVERTM I EWORKREQUR I ED. B5.1.3.. B5.2.. 0.21 - 0.28 100 1.0 1.0 1.5 1.5 40 - 60 0.21 - 0.27 75 0.5 0.5 1.0 1.0 <40 0.20 - 0.26 75 0.5 1.0 1.0 1.0 HANGER ROD THECHLORN I ATN I GMATERAI LSHALLBELQ I UD I CHLORN I EGAS-WATERMXI TUREC , ALCU IM HYPOCHLORTIES, ODU I MHYPOCHLORTIEO , RCHLORN I ATEDLM I EANDWATERMXI TURE CONFORMN I GTOTHESTANDARDSOFTHEAWWAANDSHALLBEN I TRODUCEDN I TOTHESYSTEM N I ANAPPROVEDMANNER. TESTN IG F3.1.. TAKESAMPLESOFWATERFORBACTERO I LOGC I ALTESTN I GASPRESCRBI EDBYTHEDEPARTMENTOF HEALTH. F3.2.. SHOULDTHESAMPLESFALITOMEETTHEMN IM I UMSTANDARDSASSETFORTHBYTHEDEPARTMENT OFHEALTHR , EPEATTHEDSI N I FECTN I GPROCEDUREANDSUBMTINEWSAMPLESFORTESTN I G. PROVD I EALLDRLILN I GANDPATCHN I GFOREXPANSO I NBOLTSH , ANGERSANDOTHERSUPPORTS FORPROPERANDSAFEN I STALLATO I NOFTHEWORK. F3.3.. CONTRACTORSHALLTESTFUELGASDSI TRBI UTO I NSYSTEMASHEREN I SPECFIEI DANDTOTHE SATSI FACTO I NOFTHELOCALBULIDN I GDEPARTMENTL,OCALUTLITIYCOA,. NDNFPA-56T.HE CONTRACTORSHALLGVI ENOTLESSTHAN3DAYSNOTC I ETOALLPARTEI SPRO I RTOTHETESTA. LL LABORM , ATERAI LE, TCR . EQUR I EDTOPERFORMTHETESTSSHALLBEFURNSI HEDBYTHSI CONTRACTORA. LLTESTSMUSTBECOMPLETEDBEFOREPPI N I GSI CONCEALED. TESTPPI N I GANDSYSTEMSFOLLOWN I GTHEPROCEDURESSPECFIEI DHEREN IR , EQUR I EDBY CODEORASDR I ECTEDBYTHEBULIDN I GMANAGEMENT. B5.2.2.. TESTN I GSHALLCOMPLYWTIHNEWYORKCTIYPLUMBN I GCODESECTO I N312. THEBULIDN I GWLILBEOCCUPEI DANDN I OPERATO I NDURN I GTHEPROGRESSOFTHEWORKW . HEN NECESSARYTOTEMPORARLIYHALTBULIDN I GEGRESSORFLOWOFPERSONNELTRAFFC IC , ONFER WTIHTHEBULIDN I GMANAGEMENTSREPRESENTATVI EANDARRANGETHEPERO I DOFN I TERRUPTO IN FORATM I EMUTUALLYAGREEDUPONTI.SI REQUR I EDTHATTHEWORKN I DC I ATEDANDO / RSPECFIEI D SHALLESTABLSI HEDROUTN I EOFTHEBULIDN I G. B6.2.. ATNOTM I ESHALLEXSI TN I GSERVC I ESBECUTOFFORSTOPPEDWTIHOUTTHEBULIDN IG MANAGEMENTS' WRTITENPERMSI SO I NP. RO I RTOSTOPPN I GSERVC I ESCONTRACTORSHALL N I VESTG I ATEAREASTOBEAFFECTEDANDNOTFIYTHEBULIDN I GMANAGEMENTASTOTHETM IE REQUR I EDTOPERFORMHSI WORKANDACTVI ATESERVC I ESC . ONTRACTORSHALLPERFORMALL PREPARATORYWORKPRO I RTOSHUTDOWNN I ORDERTOMN IM I ZIEN I CONVENEI NCESFI.THE BULIDN I GMANAGEMENTREQUR I ESS, HUTDOWNSSHALLBEPERFORMEDONANOVERTM I EBASSI AT NOADDTIO I NALCOSTTOTHEBULIDN I GMANAGEMENT. CONCRETE ANCHOR HILTI-KWICK BOLT, SERIES HDI, OR APPROVED EQUAL. WASHER & NUT B6.3.. NOWORKSHALLBELEFTN I COMPLETENORANYHAZARDOUSSTIUATO I NSCREATEDWHC I HWLIL AFFECTTHELFIEORSAFETYOFTHEPUBLC I ANDO / RBULIDN I GOCCUPANTSA. TNOTM I ESHALLTHE WORKN I TERFEREWTIHORCUTOFFANYOFTHEEXSI TN I GSERVC I ESWTIHOUTTHEBULIDN IG MANAGEMENTS' WRTITENPERMSI SO I N. UNINSULATED PIPE TYPE 'A' ATTACHMENT TO SLAB B6.4.. NOWORKSHALLBELEFTN I SUCHAMANNERASTOCREATELEAKAGEW , ATERDAMAGEOROTHER DETRM I ENTALSTIUATO I NS. NOT TO SCALE C. SUBMTITALS C1.. C1.1.. AS-BULITDRAWN I GS PROVD I ETWO(2)COMPLETESETSOFFULLSZIEAS-BULITDRAWN I GSCOVERN I GEVERYASPECTOF THEWORKC . OMPLETESETSHALLN I CLUDEVALVETAGSANDVALVESCHEDULE. ARTACHO/OH RESIDENCE 1220 PARK AVE, APT. 4B NY, NY 10128 FABRC I ATEANDN I STALLHANGERSANDSUPPORTSN I COMPLAI NCEWTIHTHELATESTEDTIO I NOFTHE FOLLOWN I G: MAN I TENANCEOFEXSI TN I GFACLITIEI SANDCONDUCTOFTHEWORK B6.1.. PROJECT TITLE: PPI EHANGERSANDSUPPORTS G1.. HANGER ROD ALLOWTHEDSI N I FECTN I GSOLUTO I NTOREMAN IN I THESYSTEMFORAMN IM I UMPERO I DOF24 HOURSF.OLLOWN I GTHEDSI N I FECTN I GPERO I DF,LUSHALLPPI N I GV, ALVESANDOUTLETSWTIH CLEANWATERUNTLIRESD I UALCHLORN I ECONTENTSI NOTGREATERTHAN02.PARTSPER MLILO I NU , NLESSOTHERWSI EDR I ECTED. CUTTN I GOFWALLSSHALLBEDONEASAPPROVEDBYTHEBULIDN I GMANAGEMENTN I ACAREFUL MANNERSOASNOTTOSERO I USLYM I PAR I THEAPPEARANCEORSTRENGTHOFTHE STRUCTURE. B5.2.1.. B6.. PIPE NOT TO SCALE F3.. G. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATION. TYPICAL CLEVIS HANGER PIPE SUPPORT DETAIL F2.0.1.1.. TESTN IG CONCRETE PAN CONSTRUCTION 105 - 140 DSI N I FECTTHEWATERPPI N I GSYSTEMSWTIHASOLUTO I NCONTAN IN I GNOTLESSTHAN50 PARTSPERMLILO I NOFAVALIABLECHLORN I E. CUTTN I GANDPATCHN IG B5.1.4.. 1 TO <1 1/2 1 1/2 TO <4 4 TO <8 F2.0.1.. F2.0.2.. CALCIUM SILICATE INSULATION (AT FIRE SUBMISSIONS: DSI N I FECTN IG SPECAI LREQUR I EMENTS B5.1.. NOT TO SCALE INSULATION CONDUCTIVITY FLUID OPERATION TEMPERATURE RANGE CONDUCTIVITY MEAN RATING AND USAGE (°4) TEMPERATURE, °F <1 Btu. in (h.ft.°F FLUSHALLNEWANDO / RREPAR I EDPOTABLEWATERPPI N I GSYSTEMSWTIHCLEANP, OTABLEWATER UNTLINODR I TYWATERFLOWSFROMTHEOUTLETS. F2.. B4.1.. B5.. FLUSHN IG F1.1.. CLEANN IG PIPE PENETRATION THRU FIRE WALL TABLE C403.2.10 MINIMUM PIPE INSULATION THICKNESS (INCHES) DSI N I FECTN I GANDBACTERO I LOGC I ALTESTN IG SECURTIY F1.. FILL VOID BETWEEN SLEEVE AND PIPE (OR INSULATION) TO FULL DEPTH WITH INTUMESCENT FIRE STOPPING MATERIAL (AT FIRE RATED WALL). MAXIMUM VOID 1/2-INCH MEP: ABOVEGROUNDSANTIARYANDVENTPPI N I GANDFTITN I GSSHALLBETYLERPPI ECON . O-HUBSERVC IE WEG I HTCASTR I ONPPI N I GCONFORMN I GTOCSI P3I01WTIHNEOPRENEGASKETSCONFORMN I GTO ASTMC564ANDSTAN I LESSSTEELMD I RANGE(4BAND)CLAMPSCONFORMN I GTOASTMC1540AS MANUFACTUREDBYHUSKYNO2.000ORMSI SO I NTYPE“HW”(.2)BANDCLAMPSARENOTPERMTITED. CODESR , EGULATO I NSANDSTANDARDS B3.1.. 1 AREA OF WORK CASTR I ONSOLIPPI EANDFTITN I GSSHALLBEMARKEDWTIHTHECOLLECTVI ETRADEMARKOFTHECAST R I ONSOLIPPI EN I STTIUTE(CSI P)IANDBELSI TEDBYNSFN I TERNATO I NAL E1.1.. F. 4 T N MATERAI LS E1.. THEWORKSHALLBECAREFULLYLAD I OUTN I ADVANCETOAVOD I UNNECESSARYCUTTN I G, CHANNELN I GC , HASN I GORDRLILN I GOFFLOORSW , ALLSP, ARTTIO I NSC , ELIN I GSOROTHERSURFACES. WHERESUCHWORKSI NECESSARYH , OWEVERT,HEWORKSHALLBECAREFULLYDONEA. NYDAMAGE TOTHEBULIDN I GOREQUPI MENTSHALLBEPATCHEDANDO / RREPAR I EDN I ANAPPROVEDMANNERBY SKLILEDMECHANC I SATNOADDTIO I NALCOSTTOTHEOWNER. NOT TO SCALE NOTES: HS GENERAL B2.. TYPICAL PIPE HANGER DETAIL 8. ALLWORKSHALLCONFORMTOWTIHALTERATO I NAGREEMENTSETFORTHBYARTOCHOO /H RESD I ENCE1220PARKAVENUEAPPLC I ATO I NAGREEMENTANDALLAPPLC I ABLECODESA.LL RENOVATO I NWORKSHALLBECOMPLETEDN I COMPLA I NCEWTIHTHETERMSC , ONDTIO I NS, REGULATO I NSANDREQUR I EMENTSOFTHEBULIDN I GSOWNERANDMANAGERA.NYAGREEMENT WHC I HDR I ECTLYADDRESSTHES I SUEOFCONSTRUCTO I NANDONSTIEPROCEDUREMUSTBE N I CORPORATEDN I TOTHEC , ONTRACTORSCONSTRUCTO I NCONTRACTANDDOCUMENTS. WATERR-HEATN I GEQUP I MENTNOTSUPPLE I DWTIHN I TEGRALHEATTRAPSANDSERVN I GNON-CR I CULATN IG SYSTEMSSHALLBEPROVD I EDWTIHHEATTRAPSONTHESUPPLYANDDS I CHARGEPP IN I GASSOCA I TEDWTIH THEEQUP I MENTN I ACCORDANCEWTIHNYCECC2016REQUR I EMENTS. MODFIYPPI N I GARRANGEMENTSASNECESSARYTOSUTICONDTIO I NSN I THEBULIDN I GA, NDTOPERMTI ACCESSTOEQUPI MENTANDACCESSOREI S. E9 5T GENERALREQUR I EMENTS B1.4.. 7. ALLVALVESSHALLBELEADFREEANDACCESSB I LE 3. D3.. E. TAG 6. PLUMBN I GCONTRACTORSHALLBERESPONSB I LETOREPAR I ANDREPLACEANYEXS I TN IG SUSPENDEDCELIN I GSANDO / RFN IS I HESDAMAGEDBYN I STALLATO I NOFPP IN I GUNDERPLUMBN IG CONTRACT. SERVC I EWATERHEATN I GEQUP I MENTSHALLBEPROVD I EDWTIHCONTROLSTOALLOWSETPON I TOF100FFOR EQUP I MENTSERVN I GDWELLN I GUNTISAND90FFOREQUP I MENTSERVN I GOTHEROCCUPANCE I SN I ACCORDANCEWTIHNYCECC2016REQUR I EMENTS. PROMPTLYN I STALLPPI N I GREQUR I EDTOBECONCEALEDN I FLOORW , ALLORCELIN I GCONSTRUCTO I NTO NOTCAUSEDELAYTOOTHERWORKA, NDTOALLOWAMPLETM I EFORNECESSARYTASKSANDAPPROVALS. PLUMBN I GFXI TURES. B1.1.. 5. MATERA I LSE,QUP I MENTANDSYSTEMSN I STALLEDSHALLMEETALLPERTN I ENTREQUR I EMENTSOF NEWYORKCTIYBULIDN I GCODESN , ATO I NALFR I EPROTECTO I NASSOCA I TO I NF,EDERAL REGULATO I NSO , CCUPATO I NALSAFETYANDHEALTHACT(OSHAA )NDANYNATO I NALLY RECOGNZIEDAPPROVALAGENCE I SASWELLASAPPLC I ABLELOCALCODESANDREGULATO I NS. 2. D2.. A1.3.. B1.. 4. PLUMBN I GCONTRACTORSHALLPROVD I EALLMATERA I LSE,QUP I MENTS,ERVC I ESL,ABORAND TESTSNECESSARYFORCOMPLETEEXECUTO I NOFALLPLUMBN I GWORK. 1. N I STALLALLEQUPI MENTANDPPI N I GSYSTEMSUSN I GTHEBESTSTANDARDPRACTC I ESOFTHETRADEAND LEAVESYSTEMCOMPONENTSCOMPLETEANDREADYFOROPERATO I NU . NLESSOTHERWSI ENOTED, SPECFIEI DORN I DC I ATEDA, LLPPI N I GANDEQUPI MENTSHALLBECONNECTEDN I ACCORDANCEWTIH MANUFACTURERS' RECOMMENDEDDETALISANDASAPPROVEDBYTHEOWNER. PPI N I GV, ALVESANDACCESSOREI S. 1. CONTRACTORSHALLVERFIYEXS I TN I GCONDTIO I NSN I FE I LDPRO I RTOCOMMENCEMENTOFWORK. 2. EXS I TN I GPP IN I GARRANGEMENTSAREAPPROXM I ATEANDARESHOWNFORESTM I ATN IG PURPOSESONLYC . ONTRACTORMUSTVERFIYEXACTLOCATO I NSANDROUTN I GPRO I RTO N I STALLATO I NOFNEWWORK. D1.. A1.2.. B. FIXTURE CONNECTION SCHEDULE SOIL/WASTE PPI N I GSYSTEMSA, CCESSOREI SS, UPPORTSS, LEEVEST,ESTN IG ALTERATO I NSANDADDTIO I NTOTHEEXSI TN I GSANTIARYDRAN I AGEANDVENTSYSTEMH , OTANDCOLD WATERSUPPLYSYSTEM. HANGER 14. TEMPORARY TOILET FACILITIES SHALL BE PROVIDED FOR WORKMAN AS PER SECTION PC311. GENERAL PLUMBING NOTES: FOR PLUMBING FIXTURE MANUFACTURER AND MODEL NUMBERS REFER TO ARCHITECTURAL DRAWING A-700 DRAWING LIST P-001.00 12. ALL TRENCHING SHALL BE DONE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION PC306. 13. RAT PROOFING SHALL BE IN ACCORDANCE WITH SECTION PC304. NOT TO SCALE CO WORKUNDERTHSI CONTRACTSHALLN I CLUDEALLLABORM , ATERAI LE, QUPI MENTP, LANTSERVC I ESAND ADMN I SI TRATVI ETASKSREQUR I EDTOCOMPLETEANDMAKEOPERABLETHEPLUMBN I GWORKSHOWNON THEDRAWN I GSANDSPECFIEI DHEREN IN I, CLUDN I G: A1.1.. BREAK 5.TRAPS FOR FIXTURES AND DRAIN LINES WILL BE PROVIDED AND CLEANOUTS INSTALLED IN FULL COMPLIANCE WITH SECTIONS PC412, PC708 AND PC CHAPTER 10. A1.. EXPANSION SHIELD SOIL, WASTE PIPING BELOW FLOOR BA WORKN I CLUDED D. S,W 2.THE MATERIALS USED IN THE PLUMBING SYSTEMS WILL BE PROVIDED IN FULL ACCORDANCE WITH SECTIONS PC3O2 AND PC303. A. V PLUMBING LEGEND NEW YORK CITY BUILDING DEPARTMENT PLUMBING NOTES: PLUMBING SPECIFICATIONS: PA RK A CONCRETE FLOOR ARTACHO/OH RESIDENCE 1220 PARK AVE, ATP 4B NY, NY 10128 G1.1.. MSSMANUALSP-89P, PI EHANGERSANDSUPPORTSF,ABRC I ATO I NANDN I STALLATO I NPRACTC I ES. G1.2.. HANGN I GMATERAI LSSHALLHAVEASAFETYFACTOROF5BULIT-N I ANDBEDESG I NEDANDARRANGED TOMN IM I ZIEVBI RATO I N. G1.3.. DESG I NANDN I STALLPPI ESUPPORTSTOAVOD IN I TERFERENCEWTIHOTHERPPI N I GD , UCTSC , ONDUTI ANDSUPPORTS. G1.4.. PROVD I ESEPARATESUPPORTSFORALLBRANCHESN . OBRANCHTWOFEETN I LENGTHOROVER SHALLBEN I STALLEDWTIHOUTANAPPROVEDHANGERP. ROVD I EHANGERSATALLJON IT CONNECTO I NS. G1.5.. PROVD I EALLAUXLIAI RYSTRUCTURALSTEELMEMBERSNECESSARYTOSUPPORTALLPPI N I GAND EQUPI MENT. H. DRAWING TITLE: PLUMBING LEGENDS, NOTES, DETAILS AND SPECIFICATIONS GUARANTEES H1.. ALLN I STALLATO I NSM , ATERAI LE, QUPI MENTANDWORKFURNSI HEDANDPERFORMEDUNDERTHESE SPECFIC I ATO I NSSHALLBEGUARANTEEDFORONEYEARFROMTHEDATEOFTHEFN I ALACCEPTANCE. H2.. ALLSYSTEMSFOUNDDEFECTVI EATSUCHTESTN I GORDURN I GTHEGUARANTEEPERO I DSHALLBE REPLACEDORREPAR I EDBYTHSI CONTRACTORWTIHOUTANYADDTIO I NALCHARGEA. NYLABORM , ATERAI L, EQUPI MENTORN I STRUMENTNECESSARYFORSUCHREPAR I ORREPLACEMENTSHALLBEN I CLUDEDAND FREEOFCHARGE. AO JV NTS Seal & Signature P001.00 SHEET 1 OF 3 OWNER: DISCONNECT KITCHEN SINK, DISHWASHER AND WASHING MACHINE. CUT AND CAP 2" WASTE, 2" VENT BRANCH 1 " H&CW BRANCH PIPING BACK PIPING BACK TO STACKS, 2 TO RISERS. MODIFY EXISTING PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. 2. 3 " GAS PIPING DISCONNECT GAS RANGE. CUT AND CAP 4 BACK TO RISER. MODIFY EXISTING PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. 5. 6. 7. 8. 9. HS T N DISCONNECT FLOOR MOUNTED WATER CLOSET. MODIFY 3 " CW BRANCH PIPING AND CAP EXISTING 4" SAN. AND 4 FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. AREA OF WORK DISCONNECT FLOOR MOUNTED WATER CLOSET. CUT AND 3 " CW PIPING BACK CAP 4" SAN. PIPING BACK TO STACK, 4 TO RISER. MODIFY EXISTING PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. DISCONNECT BATHTUB. MODIFY AND CAP EXISTING 2" WASTE. AND12" H&CW BRANCH PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. DISCONNECT BATHTUB. CUT AND CAP 2" WASTE, 2" VENT 1 " H&CW BRANCH BRANCH PIPING BACK TO STACKS, 2 PIPING BACK TO RISERS. MODIFY EXISTING PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. LIMIT OF WORK 4. CONTRACTOR SHALL CAREFULLY REMOVE EXISTING WATER CLOSETS AND PREP FOR REUSE. FOR MORE INFORMATION REFERENCE ARCHITECTURAL CONSTRUCTION PLAN AND PLUMBING DRAWING P-200. E9 5T NO WORK 3. 1. V 1. GENERAL NOTE NO WORK EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 4 LIMIT OF WORK EXISTING UP&DN 2" GAS RISER 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER MEP: 2 1 3 DISCONNECT LAVATORY. MODIFY AND CAP 2" WASTE AND 1 " H&CW BRANCH PIPING. FOR MORE INFORMATION 2 REFER TO DRAWING P200. DISCONNECT LAVATORY. CUT AND CAP 2" WASTE, 2" VENT 1 " H&CW BRANCH BRANCH PIPING BACK TO STACKS, 2 PIPING BACK TO RISERS. MODIFY EXISTING PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. PA RK A KEYNOTES ARTACHO/OH RESIDENCE 1220 PARK AVE, ATP 4B NY, NY 10128 7 BATH 3 123 BEDROOM 2 119 5 KITCHEN 104 BATH 2 120 6 8 DISCONNECT STALL SHOWER. MODIFY AND CAP 2" WASTE AND12" H&CW BRANCH PIPING. FOR MORE INFORMATION REFER TO DRAWING P200. . NO WORK LIMIT OF WORK HALL 103 BEDROOM 3 122 10. DISCONNECT SINK. CUT AND CAP 2" WASTE, 2" VENT 1 " H&CW BRANCH BRANCH PIPING BACK TO STACKS, 2 PIPING BACK TO RISERS. MODIFY EXISTING CW PIPING FOR CONNECTION TO NEW. FOR MORE INFORMATION REFER TO DRAWING P200. LAUNDRY 118 BUTLER'S PANTRY 105 10 DINING ROOM 106 HALL 121 ENTRY 101 HALL 113 WIC 124 FOYER 102 HALL 110 SUBMISSIONS: WIC 116 WIC 117 BEDROOM 1 111 9 8 MASTER BEDROOM 114 POWDER ROOM 109 LIVING ROOM 107 6 MASTER BATH 115 6 STUDY 108 BATH 1 112 4 4 8 EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER PROJECT TITLE: ARTACHO/OH RESIDENCE 1220 PARK AVE, APT. 4B NY, NY 10128 DRAWING TITLE: PLUMBING FLOOR PLAN - DEMOLITION PLUMBING FLOOR PLAN - DEMOLITION SCALE: 1/4" = 1'-0" AO JV NTS Seal & Signature P100.00 SHEET 2 OF 4 OWNER: 2. 3 " GAS PIPING. FOR GAS RANGE. FURNISH AND INSTALL 4 MORE INFORMATION REFER TO DRAWING P300. 3. WATER CLOSET. CONNECT TO EXISTING 4" SAN, 2" VENT. AND 1" CW BRANCH PIPING. 1. ALL FLUSHOMETERS ARE TO BE REUSED EXCEPT IN BATHROOM #3. 2. ALL WATER CLOSETS ARE TO BE REUSED EXCEPT IN BATHROOM #3 V KITCHEN SINK AND DISHWASHER. FURNISH AND INSTALL 1 " H&CW BRANCH PIPING. FOR MORE 2" WASTE, 2" VENT, 2 INFORMATION REFER TO DRAWING P300. PA RK A GENERAL NOTES KEYNOTES 1. ARTACHO/OH RESIDENCE 1220 PARK AVE, ATP 4B NY, NY 10128 E9 5T HS T N 5. 1" BATHTUB. CONNECT TO EXISTING 2" WASTE, 2" VENT, 2 H&CW BRANCH PIPING. 6. 1" BATHTUB. FURNISH AND INSTALL 2" WASTE, 2" VENT, 2 H&CW BRANCH PIPING. FOR MORE INFORMATION REFER TO DRAWING P300. 7. 8. 9. LIMIT OF WORK WATER CLOSET WITH FLUSH VALVE. FURNISH AND INSTALL 4" SAN, 2" VENT. AND 1" CW PIPING. FOR MORE INFORMATION REFER TO DRAWING P300. NO WORK 4. NO WORK EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 1" LAVATORY. CONNECT TO EXISTING 2" WASTE, 2" VENT, 2 H&CW CAPPED OUTLETS. STALL SHOWER. CONNECT TO EXISTING 2" WASTE, 2" VENT12" H&CW BRANCH PIPING. 1 " CW BRANCH 10. REFRIGERATOR. FURNISH AND INSTALL 2 PIPING WITH CHECK VALVE AND SHUT OFF VALVE. FOR MORE INFORMATION REFER TO DRAWING P300. 1 MEP: 2" W. PIPING WITHIN FLOOR FILL 3 2 7 BATH 3 123 2" W. PIPING WITHIN FLOOR FILL 4 4" S. PIPING WITHIN FLOOR FILL 5 KITCHEN 104 8 BEDROOM 2 119 6 2" W. PIPING WITHIN FLOOR FILL 11. CLOTHES WASHER IS TO BE LOCATED WITHIN A CURBED WATERPROOF COPPER, STAINLESS STEEL, FIBERGLASS OR PREFAB WASHING MACHINE DRIP PAN RECESSED INTO THE FLOOR FOR EASE OF MAINTENANCE. THE WASHER MUST BE CONNECTED TO AN AUTOMATIC SHUT-OFF AND LEAK DETECTION SYSTEM SIMILAR TO FLOODSTOP FS3 4H-90 BY ONSITE PRO INC. MANUAL SHUT OFF VALVES ARE TO BE PROVIDED IN ADDITION TO THE AUTOMATIC SHUT-OFF SYSTEM AND ARE TO BE ACCESSIBLE WHEN THE APPLIANCE IS IN PLACE. SOFT-SEATED, SPRING LOADED CHECK VALVES AND VACUUM BREAKERS AT BOTH HOT AND COLD WATER SUPPLY ARE ALSO REQUIRED ADJACENT TO THE SHUT OFF VALVES. THE WASHER IS TO BE EQUIPPED WITH A 200 PSI RATED HIGH TEMPERATURE WASHER HOSES WITH 200 PSI BRASS OR EQUIVALENT ENDS. 1 " H&CW 12. SINK. FURNISH AND INSTALL 2" WASTE, 2" VENT, 2 BRANCH PIPING. FOR MORE INFORMATION REFER TO DRAWING P300. 1" GAS DROP BATH 2 120 RADIATOR / WINDOW AC RADIATOR / WINDOW AC 1" LAVATORY. FURNISH AND INSTALL 2" WASTE, 2" VENT, 2 H&CW BRANCH PIPING. FOR MORE INFORMATION REFER TO DRAWING P300. AREA OF WORK LIMIT OF WORK EXISTING UP&DN 114" GAS RISER 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER NO WORK 11 BVA LIMIT OF WORK HALL 103 BEDROOM 3 122 12 LAUNDRY 118 10 BUTLER'S PANTRY 105 RADIATOR WINDOW AC DINING ROOM 106 HALL 121 ENTRY 101 HALL 113 WIC 124 FOYER 102 HALL 110 RADIATOR WIC 116 WIC 117 SUBMISSIONS: 9 4 RADIATOR / WINDOW AC MASTER BEDROOM 114 BEDROOM 1 111 POWDER ROOM 109 2" W. PIPING WITHIN FLOOR FILL 4" S. PIPING WITHIN FLOOR FILL 5 LIVING ROOM 107 6 STUDY 108 3 8 8 4" S. PIPING WITHIN FLOOR FILL 6 MASTER BATH 115 RADIATOR EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER RADIATOR RADIATOR / WINDOW AC RADIATOR 4 BATH 1 112 EXISTING UP&DN 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER RADIATOR / WINDOW AC PROJECT TITLE: RADIATOR RADIATOR RADIATOR ARTACHO/OH RESIDENCE 1220 PARK AVE, APT. 4B NY, NY 10128 4" S. PIPING WITHIN FLOOR FILL PLUMBING FLOOR PLAN - NEW WORK DRAWING TITLE: SCALE: 1/4" = 1'-0" PLUMBING FLOOR PLAN - NEW WORK AO JV NTS Seal & Signature P200.00 SHEET 2 OF 4 OWNER: E9 PA RK AV ARTACHO/OH RESIDENCE 1220 PARK AVE, ATP 4B NY, NY 10128 5T HS T N FLOOR FLOOR 1" 2" CEILING KITCHEN 104 3 4" 3 4" 2" 112" 112" 3 G/1 EXISTING 114" G RISER UP&DN COOKTOP AREA OF WORK 112" 3 4" 4" MASTER BATH 115 2" 1 1" 2" 1 2" 2" 1 2" 2" CEILING EXISTING 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 2" FLOOR 3 2" MEP: LAV BT ST 4" SHUT-OFF VALVE WC COOKTOP (65 CFH) FLOOR 2" GAS RISER DIAGRAM 2" 2" 4" 2" 4" SCALE: N.T.S. BALL VALVE ASSEMBLY 1 2" 3 3 2" SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM FLOOR 2" 3 4" 4" 3 4" SCALE: N.T.S. 3 3 4" 4" 4" CEILING FLOOR 2" 2" PANTRY 105 1 1 KITCHEN 104 2" 2" 3 3 2" SINK DW SK 1 EXISTING 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 3 BATH 1 112 112" 3 4" 114" 11 FLOOR 2" 2" CHECK VALVE 2" 114" WC VALVE AND DRAIN VALVE 4" 1 2" 4" LAV 2" VACUUM BREAKER, CHECK CEILING BATH 1 112 2" 2" 2" 4" 4" 2" 1 1 112" 114" 4" 2" EXISTING 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 2" LAV 1 BT 2" WC 4" 2" 2" FLOOR 2" 4" 4" SUBMISSIONS: SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM SCALE: N.T.S. SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM SCALE: N.T.S. FLOOR 2" 3 2" 3 4" 3 4" 3 4" 3 4" 2" 112" 3 LAUNDRY 118 4" 112" 4" BATH 2 120 WASHING MACHINE VALVE BOX 1" 2 SHOCK ARRESTOR 1" 2" 2" 1 2" EXISTING 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER 2" LAV WM FLOOR CEILING CEILING PROJECT TITLE: BATH 3 123 EX. 2" EX. 2" EX. 2" BT WC DRIP PAN 4" 2" 2" FLOOR 2" 4" 2" 4" EX 12" EX.12" EX. 1" LAV BT WC FLOOR 4" SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM EXISTING 4" V. STACK 2" CW RISER 2" HW RISER 1" HWR RISER ARTACHO/OH RESIDENCE 1220 PARK AVE, APT. 4B NY, NY 10128 2" 4" 2" 4" SCALE: N.T.S. SANITARY, VENT AND DOMESTIC WATER RISER DIAGRAM DRAWING TITLE: PLUMBING RISER DIAGRAMS SCALE: N.T.S. AO JV NTS Seal & Signature P300.00 SHEET 4 OF 4
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : No Create Date : 2017:06:12 16:26:08Z Creator : AutoCAD LT 2017 - English 2017 (21.0s (LMS Tech)) Modify Date : 2017:06:12 16:49:38-04:00 XMP Toolkit : Adobe XMP Core 5.6-c015 84.159810, 2016/09/10-02:41:30 Creator Tool : AutoCAD LT 2017 - English 2017 (21.0s (LMS Tech)) Metadata Date : 2017:06:12 16:49:38-04:00 Producer : pdfplot13.hdi 13.00.052.000 Format : application/pdf Title : 18 Document ID : uuid:06719c9f-5e7b-4e84-884a-ad7d0e8a744a Instance ID : uuid:b9d238d7-c52a-4f19-9fb9-a464670cd6e8 Page Layout : SinglePage Page Mode : UseOutlines Page Count : 30EXIF Metadata provided by EXIF.tools