Microsoft Sevan Drilling Presentation SSCLP 300 2007

User Manual: SSCLP-300

Open the PDF directly: View PDF PDF.
Page Count: 54

www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Presentation
Presentation
NFLB Conference
NFLB Conference
Bergen, February 10, 2007
Sevan Marine
Sevan Marine
Drilling Unit
Drilling Unit
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Company overview
Rig Concept and Design
Construction/Operations
Management
“FDPSO” Concept
1
2
3
SEVAN DRILLING UNIT
SEVAN DRILLING UNIT
TABLE OF CONTENT
TABLE OF CONTENT
4
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
BOO – Build Own and Operate
COMPANY OVERVIEW
COMPANY OVERVIEW
BUSINESS MODEL FOCUSES ON CORE COMPETENCIES
BUSINESS MODEL FOCUSES ON CORE COMPETENCIES
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Hull # Hull Size Hull Delivery Application Client Field/ Location
1Sevan 300 Q2 2006 FPSO Petrobras Brazil
2Sevan 300 Q1 2007 FPSO Venture UK CNS
3Sevan 300 Q2 2007 FPSO Oilexco UK CNS
4Sevan 300 Q4 2007 FPSO Venture UK CNS
5
S
evan 650 Q1 2008 Drilling Petrobras GOM
Hull No:1 at topside integration yard November 2006 Hull No:2 and 3* at construction yard January 2007
COMPANY OVERVIEW
COMPANY OVERVIEW
SEVAN HULL CONSTRUCTION PROGRAM
SEVAN HULL CONSTRUCTION PROGRAM
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Global solutions: the Sevan Technology can be applied in all
offshore markets
Brazil
US Gulf
North
Sea
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
COMPANY OVERVIEW
COMPANY OVERVIEW
CONTRACT STATUS
CONTRACT STATUS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Company overview
Rig Concept and Design
Construction/Operations
Management
“FDPSO” Concept
1
2
3
SEVAN DRILLING UNIT
SEVAN DRILLING UNIT
TABLE OF CONTENT
TABLE OF CONTENT
4
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Typical Main Dimensions:
Storage Displacement Draft Deck Area
(bbl) (mt) (m) (m2)
Hull Deck
SSP 300 300 000 55 000 18 60 64 3 220
SSP 650 650 000 110 000 22 75 80 5 020
SSP 1000 1 000 000 165 000 28 84 90 6 360
SSP 2000 2 000 000 305 000 33 106 114 10 200
Diameter
(m)
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
CAPACITY RANGE
CAPACITY RANGE
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Hull in combination with motion dampening features
Tank arrangement
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
PATENTED TECHNOLOGY
PATENTED TECHNOLOGY
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
High Stability Reserves
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
HIGH DECK LOAD CAPACITY AND ROBUSTNESS
HIGH DECK LOAD CAPACITY AND ROBUSTNESS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SSP
FPSO Semi
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
INSIGNIFICANT BENDING STRESS
INSIGNIFICANT BENDING STRESS
¾Eliminating typical fatigue loads for traditional floaters
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
FAVOURABLE DESIGN
FAVOURABLE DESIGN
Efficient hull construction with high
repeatability around circle
Standard panel and block fabrication
All structural members are of standard
dimensions and quality
Short construction time
Double sides/double bottom and
segregated ballast
Negligible fatigue loads
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
STRUCTURAL DESIGN
STRUCTURAL DESIGN
LOWER PART OF HULL
LOWER PART OF HULL
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
DOUBLE BOTTOM SECTIONS
DOUBLE BOTTOM SECTIONS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Ultra-deep water depths up to 3,000
m (10,000 ft)
Storage capacity for 10,000 ft of
risers
Dual activity derrick – optimized
drilling efficiency
Deck area of 5,800 m2
Variable deck load capacity of more
than 15,000mT
High storage capacity limiting need
for re-supply
High storage capacity for extended
Well Testing
Equipped with a total of 8 thrusters
configured in accordance with IMO
DP 3 class requirements
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
SPECIFICATIONS FOR ULTRADEEP WATERS
SPECIFICATIONS FOR ULTRADEEP WATERS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Zero discharge with closed drain system
(all areas)
Double barrier philosophy applied for all
potential ”discharge-to-sea” systems
Large bunkering capacities reducing
frequency of re-bunkering operations
Latest technology equipment – low diesel
consumption/less emissions
Rig wide containment and vacuum system
installed to handle any accidental spillage
onboard
High intact/damaged stability reserves
Double side – double bottom
Focus on good arrangements for
access/maintenance of systems/equipment
Remote operated pipe-handling
DESIGNED TO THE HIGHEST ENVIRONMENTAL AND SAFETY STANDARDS
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
ENVIRONMENTAL FRIENDLY AND SAFE OPERATIONS
ENVIRONMENTAL FRIENDLY AND SAFE OPERATIONS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Det Norske Veritas (DNV) Classification with the following class notations:
1A1 Mobile Offshore Drilling & Storage Unit (N)
–DRILL
DYNPOS-AUTRO (DP 3)
–HELDK-SH
– CRANE
STERN LOADING
ICS (Integrated Computer System)
LCS-DC (Loading Computer System)
Designed in accordance with the following DNV specifications:
OSS-101 Rules for Classification of Offshore Drilling and Support Units
OSS-102 Rules for Classification of Floating Production and Storage Units
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
REGULATORY FRAMEWORK / CERTIFICATION
REGULATORY FRAMEWORK / CERTIFICATION
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
The vessel shall be registered in the Bahamas’ Ship Register and comply with the latest and
relevant International Rules and Regulations for world-wide operations including:
9Governing Bahamas Maritime regulations
9International Code for the Construction and Equipment of Mobile Offshore Drilling Units, 1989 (MODU Code1989).
9International Convention for the Safety of Life at Sea of 1974, (SOLAS 1974) including applicable amendments.
9International Convention of Load Lines 1966 including protocol of 1988.
9International Convention for preventing Collisions at Sea
9International Tele-Communications Union (ITU) Radio Regulations
9International Conference for the Prevention of Pollution from Ships, 1973/1978 (MARPOL 73/78).
9International Convention on Tonnage Measurement of Ships
9ISO 7547 Air-conditioning and ventilation of accommodation spaces on board ships
9IMO Code 645, “Guideline for the Vessels with Dynamic Positioning Systems”
9US Coast Guard Regulations for Foreign Flagged Vessels operating in navigable waters of the US
9CENELEC (EN 50000 series) or IEC 60079 – standard series.
9Low Voltage Directive (LVD) 73/23/EEC amended by 93/68 EEC
9Electromagnetic Compatibility Directive 89/336/EEC amended by 92/31 EEC and 93/68/EEC.
9Norwegian Helicopter Deck regulations BSL D-51 issued by the Norwegian Civil Aviation Authority
9CAP437 issued by UK Civil Aviation Authority
9Regulations and guidelines for potable water systems and potable water supply on offshore units issued by the
Norwegian Institute for Public Health.
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
REGULATORY FRAMEWORK / CERTIFICATION
REGULATORY FRAMEWORK / CERTIFICATION
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
In house hydrostatic and hydrodynamic analysis
Sevan has over the last three years invested ~NOK 50 million on
the development of the Sevan technology
2001 2002 2003 2004
Patent process
Quotations and construction schedules from leading Yards
Co-op with ABB and Schlumberger for the design, fabrication and operation of the process plant
Steel design of the hull
Assessment of flexibility, size variation and deck load capacity
Structural design and main scantling drawings
Building of 1st unit at
Yantai Raffles Shipyard
Generic model
tests at Marintek
DNV review of
technical, cost and
schedule risks
Model tests for
Haltenbanken,
GoM and Brazil
DNV Concept
Risk Analysis
DNV Design
Appraisal
Demo/Model testing
LABOCEAN, Rio
Pre-qualified
by Petrobras
Patent PCT
recommendation
Main scantling
appr. initiated
Detail
eng. and
fabrication
drawings
completed
Verification of
riser and mooring
configuration at
Marintek
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
CONCEPT VERIFICATION PROCESS
CONCEPT VERIFICATION PROCESS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
KEY EQUIPMENT CONTRACTS
KEY EQUIPMENT CONTRACTS
MAIN HULL/TOPSIDE
HANTONG SHIPYARD/
TBA.
DRILLING MUD PUMPS
WIRTH
MOORING WINCHES
AKER KVÆRNER
DIESEL ENGINES
ROLLS ROYCE
THRUSTERS
ROLLS ROYCE
MARINE RISER SYSTEM
Aker Kværner Subsea
POWER, ELECTRICAL
SYSTEMS AND
TELECOM
SIEMENS
DYNAMIC POSITIONING
SYSTEMS
KONGSBERG SIMRAD
DRILLING CONTROL
SYSTEM
AKER KVÆRNER MH
BLOWOUT PREVENTER
(BOP), CONTROL
SYSTEM AND MUX
CAMERON
DERRICK,
PIPEHANDLING, CRANES
AND LIFTING TACKLE
AKER KVÆRNER MH
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
OPTIMISED DRILLING EFFICIENCY
OPTIMISED DRILLING EFFICIENCY
Wirth GH 4500-EG-AC-SV drawwork, with Baylor
Brake & feed off control/Auto Driller
Drillers control room with 2 operator stations
Derrick, 46 x 52 ft base, 210 ft height, SWL
2,000,000 lbs (1,000 sh.t)
Standbuilding while drilling (drillpipe / casing)
Racking capacity 40,000 ft DP and 10,000 ft casing
Drill String Compensator 1,000 kips, 25 ft stroke
Bridge crane vertical pipe handling system
Two iron roughnecks on drill floor
MH DDM-1000-AC-2M Top drive, 1,000 t
Rotary table, 60 ½” hydraulic
Kill & choke manifold, 15,000 PSI
Mud standpipe manifold, 7,500 PSI
Skid-off position 12 ft from centre with Riser and
BOP deployed
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
4 of Wirth HP mud pumps, 7,5”x14”x2200, 7,500
psi
5 of Derrick® Flo-line ® Cleaner Model #FLC503
Shale shakers
Flexible mud system - high storage capacity
Optimised tank design for effective cleaning and
operation
1 of Derrick® Flo-line ® Cleaner Model #FLC503
Mud Cleaner
Automated mixing system
Direct Acting Riser Tensioner system 3,200,000
lbs
BOP skid, 400 mT
BOP overhead crane, 2 x 200 mT
Utility winches, 6 ea 5 mT, 1 x 10 mT. 4 ea
manrider utility winches
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
OPTIMISED DRILLING EFFICIENCY CONT.
OPTIMISED DRILLING EFFICIENCY CONT.
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
RIG CAPACITIES
RIG CAPACITIES
- STATION KEEPING -
- STORAGE CAPACITIES -
- GENERAL CAPACITIES -
44 280
30 400
7 – 9
7 – 8
32 000 – 44 200
26 400 – 36 000
6 – 7
7 – 8
30 000 – 48 000
22 000 – 35 000
9 – 13
6 – 7
Power (kW)
Thrusters (kW)
Transit speed (knots)
North Sea Operation (m Hs)
5 000
1 000
5 000
5 000
780
780
Up to 150 000
3 100 – 4 500
600
2 600 – 3 100
1 700 – 3 200
600 – 850
280 – 460
NA
3 000 – 5 000
600 – 1 000
2 000 – 3 000
2 000 – 3 000
600 – 850
300 – 500
Up to 100 000
Fuel storage (m3)
Base oil (m3)
Drill water (m3)
Liquid mud (m3)
Bulk mud (m3)
Bulk Cement (m3)
Crude oil storage (bls)
61 250
> 15 000
5 500
150
10,000
51 000 – 63 000
7 000 – 7 700
5 000 – 7 000
120 – 160
10,000
60 000 – 80 000
15 000 – 20 000
5 500 – 7 000
120 – 140
10,000
Operating displacement (mT)
Deck load capacity (mT)
Deck area (m2)
Accommodation
Water depth (ft)
SSP DRILLER6TH GENERATION SEMIDRILL SHIP
Source: Sevan Marine and other Drilling Company presentations
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
¾8 ea Rolls Royce B32:40V12A Diesel Generators, Max
5535kW continuous alternator rating.
¾Siemens power distribution and VFD’s.
¾2 ea Offshore deck cranes, lift radius 10m to 50m, 60mT.
¾8 ea Rolls Royce Aqumaster UUC 355 Thrusters, 3800kW.
RIG CONCEPT AND DESIGN
RIG CONCEPT AND DESIGN
MACHINERY AND PROPULSION
MACHINERY AND PROPULSION
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Profile in Center View
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Profile in Midship View
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Profile in Port View
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Upper Hull
El. 28.500
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Upper Hull
El. 32.500
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Upper Hull
El. 36.500
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Upper Hull
El. 45.500
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
SEVAN DRILLER
SEVAN DRILLER
GENERAL ARRANGEMENTS / LAYOUT
Upper Hull
Living Quarters Deck C, D, E, F and G
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Company overview
Rig Concept and Design
Construction/Operations
Management
“FDPSO” Concept
1
2
3
SEVAN DRILLING UNIT
SEVAN DRILLING UNIT
TABLE OF CONTENT
TABLE OF CONTENT
4
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
The project execution will be divided in the following main phases:
Project Definition System engineering, Layout drawings, design basis documents
Detail Design and Engineering Structural and mechanical analyses, Design verification, Design drawings
issued for construction.
Procurement Specification of Bid packets. Bid evaluations, Production of components
and modules, Procurement support, expediting, Quality Surveillance,
component testing
Construction Main construction of Hull and decks at selected Ship yard. Construction of
Drilling and Mud Module at Nymo. Construction of engine room modules,
etc. at selected construction sites.
Transport Transport of SSP hull from construction yard to installation and hook-up
yard in Europe. Transport of equipment and modules to installation yard.
Hook-Up Install all equipment and Modules on main hull
MC and Commissioning Mechanical completion of modules and Commissioning of complete
system. (for hull systems; partly at hull construction yard)
Offshore Commissioning and Start-Up
CONSTRUCTION PROJECT
CONSTRUCTION PROJECT
PROJECT EXECUTION
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Project Manager
HSEQ
Fred Egil Hansen
Bjørn Egil Gustavsen
Cost Control
Kari Arntzen
Document Control
Nina Risdal
Planning
Roger Arntzen
Drilling
Mike O’Hara
Operation
Willy Tørrhaug
Procurement
Sidsel Skagen
Technical Safety
Bernt Christensen
Sevan Marine
Arne Smedal
Interface Coord.
Walter Andersen
Contracts
Morten Smørdal
Vendor/Supply follow up
TBN
Project Sponsors
Completion team
Anbjørn Egeland
HULL-Fabrication
Egil Pedersen
Hook Up team
Per A. Godager
Per Clausen
Kåre Syvertsen
SSP Construction
SSP Technology
Engineering
Gunnar Johnsen
Accommodation
Gorm Holmedal
Arrangement
Hugo Gustavsen
EIT
Sigfred Jensen
Marine Systems
Torger Kyvik
Structural Design
Jan Jørgensen
CONSTRUCTION PROJECT
CONSTRUCTION PROJECT
PROJECT MANAGEMENT ORGANISATION
PROJECT MANAGEMENT ORGANISATION
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
CONSTRUCTION PROJECT
CONSTRUCTION PROJECT
KEY MILESTONES
KEY MILESTONES
ENGINEERING & CONSTRUCTION
ENGINEERING & CONSTRUCTION
Project Start Up May 2006
Long Lead Items Ordered Oct 2006
Start Detailed Engineering Dec 2006
Start Fabrication / Steel Cutting April 2007
Start Hook-up / Installation in China Feb 2008
Start final integration and commissioning (EU Yard) Aug 2008
Sail Away from Yard Jan 2009
Arrival Drilling Location (GoM) Mar 2009
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Established in June 2006.
Headquarter in Trondheim, office in Oslo
Ownership: ProCorp ASA (51%), Management 49%
To build an independent offshore drilling and production management
services company that will:
Cover all geographical areas
Be a preferred partner for the owners in all aspect of the
drilling/production operation
Operation of offshore mobile drilling and production units
Systems People
– Operations - Qualifications
– Maintenance - Training
– Procurement - Incentives
–HSE
Provide highly qualified operational services
POMS
Ambition
Scope of Work
Business Model
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
PROCORP OFFSHORE MANAGEMENT SERVICES AS
PROCORP OFFSHORE MANAGEMENT SERVICES AS
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Sevan Marine
Sevan Driller
Sevan Marine
Sevan Driller ProdJack
Jack-up Unit # 1 + 2
ProdJack
Jack-up Unit # 1 + 2
PROCORP OFFSHORE MANAGEMENT SERVICES AS
OPERATIONS MANAGEMENT
100% 100%
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
OPERATIONAL MANAGEMENT RESPONSIBILITY
OPERATIONAL MANAGEMENT RESPONSIBILITY
I. Development and
implementation of total
integrated QHSE
Management System
I. Development and
implementation of total
integrated QHSE
Management System
II. Emergency
Preparedness
management
II. Emergency
Preparedness
management
III. Budget and Cost
management /
reporting
III. Budget and Cost
management /
reporting
IV. Unit insurance
management
IV. Unit insurance
management
V. Personnel management
including recruitment,
training, salary, taxation
etc.
V. Personnel management
including recruitment,
training, salary, taxation
etc.
VI.Regulatory
Compliance/Class-, Flag
State- and Coastal
Authority management
VI.Regulatory
Compliance/Class-, Flag
State- and Coastal
Authority management
VII. Contract Management
VII. Contract Management
VIII. Execution of Drilling
Contract including
operational/ admin.
interface with Client
VIII. Execution of Drilling
Contract including
operational/ admin.
interface with Client
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
PROCORP OFFSHORE MANAGEMENT SERVICES AS
PEOPLE AND OPERATIONAL EXPERIENCE
Norwegian State Authorised Public Accountant
Master of Science, Business Administration
Christian Huseby
Senior Partner
BA (Hons) Business Organization
Stein Eggan
Certified Drilling Superintendent / Company
man.
Willy Tørhaug
Master of Science, Environmental Engineering
Dag Eggan
Operational Experience
Operation of Offshore Units from shallow to ultra-deep harsh
environment waters
Start-up and running of a new Drilling Company (e.g. Ocean Rig)
Development of total integrated HES&Q management system for
overall management of a drilling contractor to comply with
requirements from both regulators and operators
Operational interface to yard/new-build projects
Co-ordination and preparation of safety/risk- and working
environment related analysis/assessments required to achieve
compliance with class, flag state and coastal authorities
Preparation of required applications for Regulatory Compliance, and
interface with relevant regulators /Clients to achieve final operational
Certification in relevant countries
Recruitment and training of operational personnel to professionally
operate the unit, meeting the qualification requirements as defined in
the HES&Q management system and set forth by clients/regulators
General operational management of offshore unit(s) on behalf of
Owner
Marketing/Contract Management
VP – Commercial/Business Development
SVP Operations
SVP HES&Q
Management
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Key Operational Experience
Operation of Ocean Rig’s SSDR Leiv Eiriksson and SSDR Eirik Raude from
shallow to ultra-deep (2100 meters) harsh environment waters including:
-West Africa - Angola/Congo (> 20 deepwater wells) (2002 – 2006)
- East Coast Canada - Nova Scotia (4 deepwater wells) and Newfoundland (Flemish Pass
2 deepwater wells) (2002 – 2004)
- Cuba (1 deepwater well) (2004)
- UK West of Shetland (1 deepwater well) (2004)
- Norwegian North Sea (2 deepwater wells) (2004 – 2006)
- Norwegian Barents Sea (4 wells – DP/POSMOOR ATA Mode) (2004 – 2006)
Above operations with Clients - Exxon Mobil, Chevron, BP, TotalFinaElf, Shell, BG
Group, Repsol, EnCana, PetroCanada, Statoil, Hydro and Eni.
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
OPERATIONAL MANAGEMENT EXPERIENCE
OPERATIONAL MANAGEMENT EXPERIENCE
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Key Operational Experience
Operational interface management during shipyard construction/completion of
SSDR Leiv Eiriksson and Eirik Raude in Mississippi, US and Halifax, Canada
(1997 – 2002) including;
- Build-up of operational organisation onshore/offshore
- Development of total integrated QHSE management system for overall management of a
drilling contractor
- Preparation of Operational Acceptance Test Criteria and management of Acceptance
Testing from shipyard
- Recruitment and training of operational personnel
- Co-ordination and preparation of safety/risk- and working environment related
analysis/assessments
- Preparation of required applications for Regulatory Compliance/Certification including
Norwegian PSA, UK HSE, Canada Petroleum Boards (CNSOPB & CNLOPB), MMS/US
Coast Guard etc.
- Client interface – operational acceptance and contract management
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
OPERATIONAL MANAGEMENT EXPERIENCE
OPERATIONAL MANAGEMENT EXPERIENCE
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Key Operational Experience
Start-up and running of a new Drilling Company (e.g. Ocean Rig) including
establishment of local operational entities in US (Houston/Pascagoula), West
Africa (Luanda/Cabinda/Point Noire), Canada (Halifax/St. John’s), Cuba (Havana),
UK (Aberdeen) and Norway (Stavanger/Bergen/Harstad/Hammerfest)
Operational preparations and start-up in the GoM including;
-Sea Trials and Client Acceptance Testing (ExxonMobile)
- MMS/US Goast Guard Rig Acceptance and Certification (Letter of Inspection) including
co-ordination of US CG Documentation Reviews/Rig Inspections
- Management of Visa application process for non-US crew and onshore base personnel in
the GoM
- Offshore operations/reporting under the US MMS/OSHA regime.
Previous operational management history with Transocean, Saipem, Norcem,
Golar Nor etc.
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
OPERATIONAL MANAGEMENT EXPERIENCE
OPERATIONAL MANAGEMENT EXPERIENCE
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Offshore Installation Manager
(OIM)
Subsea
Section Leader
Stability
Section Leader
Technical
Section Leader Drilling Section Leader
(Toolpusher)
Rig
Superintendent
Radio Operator
Medic
Camp Boss
Safety Officer
2 x Storekeeper
Electrical
Section Leader
Ass. Tech. Sect.
Leader
4 x Engine Room Op’s
Hydraulic Engineer
Rig Mechanic
2 x Motormen
Welder
2 x Electricians
2 x Electronics 2 x Driller
2 x Assistant Driller
2 x Derrickman
2 x Pumpman
10 x Roughneck
Tourpusher
4 x DP Operator
2 x Deck Foreman
2 x Crane Operators
10 x Roustabouts
2 x Subsea Engineers
SEVAN DRILLER
SEVAN DRILLER
OFFSHORE ORGANISATION
OFFSHORE ORGANISATION
Stability S.L. II
Dayshift/Nightshift
Personnel
12 hours shift
Personnel
Total Crew No. onboard : 67
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
VP Drilling Operations
(Norway)
QHSE
Advisor
Logistics/Purchasing Technical Superint.
Rig Organization
OIM
(Ref. next slide)
Rig Manager
Rig AccountantPersonnel Co.ord.
Operational Support
Group
SEVAN DRILLER
SEVAN DRILLER
OPERATIONAL BASE ORGANISATION
OPERATIONAL BASE ORGANISATION
US BRANCH OFFICE
US BRANCH OFFICE
Maintenance
E&I
Marine Operations
Drilling
Subsea
US Area Manager
Legal
Counsel
Operational Service
Agreement
IT & Document Control
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
CEO
Jan Erik Tveteraas
VP QHSE
Dag Eggan
Human Resources /
Accounting
VP Drilling Operations
Willy Tørhaug
Area Manager
Sevan America
(Ref. previous slide)
VP Marketing & Bus. Dev
Fredrik Major
OPERATIONS
OPERATIONS
SEVAN DRILLING
SEVAN DRILLING
SENIOR MANAGEMENT
SENIOR MANAGEMENT
Maintenance
Electrical & Instrumentation
Marine Operations
Drilling
Subsea OPERATIONAL
SUPPORT GROUP
Sevan Marine ASA
Support - Main Org.
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
VP Operations
Erling Andreas
Ronglan
Administration Support
¾Office Administration
QHSE
TBA
Operations Manager
Sevan Piranema
Heitor Gioppo
Willy Tørhaug
Offshore Drilling
Services AS
Operations Manager
Sevan Hummingbird
Dave Steward
Rig Manager
Sevan Driller I
TBA
Rig Manager
Sevan Driller II
TBA
Maintenance
Røtvold
Process
Børresen
Human
Resources
TBA
Logistic
Purchasing
TBA
Sevan Internal Support
¾Document Control
¾Accounting
¾Engineering
¾Project Management
¾Planning
VP QHSE
Dag Eggan
Offshore Drilling
Services AS
VP Drilling Operations Operational Support
¾Marine
¾Drilling
¾Subsea
”FDPSO”
TBA
E&I
TBA
SEVAN FDPSO ORGANISATION
SEVAN FDPSO ORGANISATION
SEVAN INTEGRATED OPERATING ORGANISATION
SEVAN INTEGRATED OPERATING ORGANISATION
Drilling
TBA
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Verify Safety of Operations
Verify Functionality of Systems
Verify Maintainability of Systems
Develop QHSE, Operations & Administrative Manuals, Procedures and other required
controlling documentation including:
- US Coast Guard “LoI” (Letter of Inspection)
- Acknowledgement of Compliance (“AoC”) to PSA and UK Safety Case
- Operational Risk Analysis & Assessment including QRA, PFEER and Emergency Preparedness
Analysis.
- ISM Code Certification (i.e. Rig Safety Management Certificate/Company Document of Compliance)
- ISPS Code Certification including Ship Security Assessment and Ship Security Plan
Logistics
- Order Spare Parts
- Establish, update and implement planned maintenance register and system for rigs
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
PREPARATION FOR OPERATIONS
PREPARATION FOR OPERATIONS
KEY OBJECTIVES
KEY OBJECTIVES
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Operational Familiarization & Training
- QHSE Management System/Leadership Training
- Regulatory Training
- Vendor Training
- In-house system & equipment training
Client relations
- Participation in development of bids for contracts
- Co-ordination and follow-up of rig visit's from Clients
- Interface Client/Operation/Project
Quality Compliance with respect to Internal Company/Client procedures etc.
Prepare and co-ordinate Contract Quality Plan and Client Bridging Documents
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
PREPARATION FOR OPERATIONS
PREPARATION FOR OPERATIONS
KEY OBJECTIVES CONT.
KEY OBJECTIVES CONT.
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
OPERATIONS MANAGEMENT
OPERATIONS MANAGEMENT
OPERATIONAL FAMILIARIZATION AND TRAINING
OPERATIONAL FAMILIARIZATION AND TRAINING
Recruitment and training of operational personnel to professionally operate the unit,
meeting the qualification requirements as defined in the QHSE management system and
set forth by Clients/Regulators (including Emergency Preparedness training)
Establishment of specific “pre-hire” Qualification Requirements for each position to be
hired for offshore operations (Bahamas/Local Coastal Requirements)
Definition of position specific in-house Competency Development/Assurance Schemes for
company/rig specific systems & equipment training, e.g;
QHSE Training
Rig Emergency Preparedness training
Position/Function oriented training
Definition of external training matrix for onshore regulatory/emergency preparedness/
vendor specific training, and co-ordination of same
Implementation of personnel database system for detailed control of competency
compliance and personnel co-ordination
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Company overview
Rig Concept and Design
Construction/Operations
Management
“FDPSO” Concept
1
2
3
SEVAN DRILLING UNIT
SEVAN DRILLING UNIT
TABLE OF CONTENT
TABLE OF CONTENT
4
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
Gas Treatment Plant
LNG, GTW, LPG, Power Terminal
MODU
Mobile Offshore Drilling
Unit
ACCOMMODATION
Service platform
The Sevan Platform
- the versatile technology
FSO
Floating Storage
Offloading
FDPSO
Floating Drilling Production
Storage Offloading
SICV
Subsea Installation
Construction Vessel
FPSO
Floating Production
Storage Offloading
www.sevanmarine.com
Presentation NFLB Conference – Bergen February 2007, RO
FDPSO” CONCEPT
FDPSO” CONCEPT
FLOATING DRILLING AND PRODUCTION UNIT
FLOATING DRILLING AND PRODUCTION UNIT
NEXT GENERATION
NEXT GENERATION

Navigation menu