SEVAN DRILLING UNIT

TABLE OF CONTENT
Company overview
1

Rig Concept and Design

2

Construction/Operations

3

Management

4

“FDPSO” Concept

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

COMPANY OVERVIEW

BUSINESS MODEL FOCUSES ON CORE COMPETENCIES
BOO – Build Own and Operate

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

COMPANY OVERVIEW

SEVAN HULL CONSTRUCTION PROGRAM
Hull # Hull Size Hull Delivery Application
Client
Field/ Location
1 Sevan 300 Q2 2006
FPSO
Petrobras
Brazil
2 Sevan 300 Q1 2007
FPSO
Venture
UK CNS
3 Sevan 300 Q2 2007
FPSO
Oilexco
UK CNS
4 Sevan 300 Q4 2007
FPSO
Venture
UK CNS
Q1 2008
Drilling
Petrobras
GOM
5 Sevan 650

Hull No:1 at topside integration yard November 2006

Presentation NFLB Conference – Bergen February 2007, RO

Hull No:2 and 3* at construction yard January 2007

www.sevanmarine.com

Global solutions: the Sevan Technology can be applied in all
offshore markets

North
Sea

US Gulf

Brazil

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

COMPANY OVERVIEW

CONTRACT STATUS

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLING UNIT

TABLE OF CONTENT
Company overview
1

Rig Concept and Design

2

Construction/Operations

3

Management

4

“FDPSO” Concept

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

CAPACITY RANGE

Typical Main Dimensions:
Storage Displacement Draft Diameter Deck Area
(bbl)
(mt) (m)
(m2)
(m)
Hull Deck
SSP 300
300 000
55 000 18
60
64
3 220
SSP 650
650 000
110 000 22
75
80
5 020
SSP 1000 1 000 000
165 000 28
84
90
6 360
SSP 2000 2 000 000
305 000 33 106 114
10 200

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

PATENTED TECHNOLOGY

Hull in combination with motion dampening features
Tank arrangement

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

HIGH DECK LOAD CAPACITY AND ROBUSTNESS

High Stability Reserves

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

INSIGNIFICANT BENDING STRESS
¾ Eliminating typical fatigue loads for traditional floaters

FPSO

Presentation NFLB Conference – Bergen February 2007, RO

Semi

SSP

www.sevanmarine.com

RIG CONCEPT AND DESIGN

FAVOURABLE DESIGN

ƒ Efficient hull construction with high
repeatability around circle
ƒ Standard panel and block fabrication
ƒ All structural members are of standard
dimensions and quality
ƒ Short construction time
ƒ Double sides/double bottom and
segregated ballast
ƒ Negligible fatigue loads
Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

STRUCTURAL DESIGN – LOWER PART OF HULL

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

DOUBLE BOTTOM SECTIONS

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

SPECIFICATIONS FOR ULTRADEEP WATERS

• Ultra-deep water depths up to 3,000
m (10,000 ft)
• Storage capacity for 10,000 ft of
risers
• Dual activity derrick – optimized
drilling efficiency
• Deck area of 5,800 m2
• Variable deck load capacity of more
than 15,000mT
• High storage capacity limiting need
for re-supply
• High storage capacity for extended
Well Testing
• Equipped with a total of 8 thrusters
configured in accordance with IMO
DP 3 class requirements

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

ENVIRONMENTAL FRIENDLY AND SAFE OPERATIONS

• Zero discharge with closed drain system
(all areas)
• Double barrier philosophy applied for all
potential ”discharge-to-sea” systems
• Large bunkering capacities reducing
frequency of re-bunkering operations
• Latest technology equipment – low diesel
consumption/less emissions
• Rig wide containment and vacuum system
installed to handle any accidental spillage
onboard
• High intact/damaged stability reserves
• Double side – double bottom
• Focus on good arrangements for
access/maintenance of systems/equipment
• Remote operated pipe-handling

DESIGNED TO THE HIGHEST ENVIRONMENTAL AND SAFETY STANDARDS

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

REGULATORY FRAMEWORK / CERTIFICATION
‰ Det Norske Veritas (DNV) Classification with the following class notations:
™ 1A1 Mobile Offshore Drilling & Storage Unit (N)
–

DRILL

–

DYNPOS-AUTRO (DP 3)

–

HELDK-SH

–

CRANE

–

STERN LOADING

–

ICS (Integrated Computer System)

–

LCS-DC (Loading Computer System)

‰ Designed in accordance with the following DNV specifications:
–

OSS-101 Rules for Classification of Offshore Drilling and Support Units

–

OSS-102 Rules for Classification of Floating Production and Storage Units

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

REGULATORY FRAMEWORK / CERTIFICATION
‰

The vessel shall be registered in the Bahamas’ Ship Register and comply with the latest and
relevant International Rules and Regulations for world-wide operations including:
9 Governing Bahamas Maritime regulations
9 International Code for the Construction and Equipment of Mobile Offshore Drilling Units, 1989 (MODU Code1989).
9 International Convention for the Safety of Life at Sea of 1974, (SOLAS 1974) including applicable amendments.
9 International Convention of Load Lines 1966 including protocol of 1988.
9 International Convention for preventing Collisions at Sea
9 International Tele-Communications Union (ITU) Radio Regulations
9 International Conference for the Prevention of Pollution from Ships, 1973/1978 (MARPOL 73/78).
9 International Convention on Tonnage Measurement of Ships
9 ISO 7547 Air-conditioning and ventilation of accommodation spaces on board ships
9 IMO Code 645, “Guideline for the Vessels with Dynamic Positioning Systems”
9 US Coast Guard Regulations for Foreign Flagged Vessels operating in navigable waters of the US
9 CENELEC (EN 50000 series) or IEC 60079 – standard series.
9 Low Voltage Directive (LVD) 73/23/EEC amended by 93/68 EEC
9 Electromagnetic Compatibility Directive 89/336/EEC amended by 92/31 EEC and 93/68/EEC.
9 Norwegian Helicopter Deck regulations BSL D-51 issued by the Norwegian Civil Aviation Authority
9 CAP437 issued by UK Civil Aviation Authority
9 Regulations and guidelines for potable water systems and potable water supply on offshore units issued by the
Norwegian Institute for Public Health.

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

CONCEPT VERIFICATION PROCESS
•

Sevan has over the last three years invested ~NOK 50 million on
the development of the Sevan technology
Pre-qualified
by Petrobras
DNV review of
technical, cost and
schedule risks

DNV Concept
Risk Analysis

Patent PCT
recommendation

Model tests for
Haltenbanken,
GoM and Brazil

Generic model
tests at Marintek

2001

DNV Design
Appraisal

Demo/Model testing
LABOCEAN, Rio

2002

Detail
eng. and
fabrication
drawings
completed

Main scantling
appr. initiated

2003
Patent process

Quotations and construction schedules from leading Yards

Verification of
riser and mooring
configuration at
Marintek

2004
Building of 1st unit at
Yantai Raffles Shipyard

Co-op with ABB and Schlumberger for the design, fabrication and operation of the process plant
In house hydrostatic and hydrodynamic analysis
Steel design of the hull
Assessment of flexibility, size variation and deck load capacity
Structural design and main scantling drawings

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

KEY EQUIPMENT CONTRACTS
MAIN HULL/TOPSIDE
HANTONG SHIPYARD/
TBA.

DYNAMIC POSITIONING
SYSTEMS
KONGSBERG SIMRAD

DERRICK,
PIPEHANDLING, CRANES
AND LIFTING TACKLE
AKER KVÆRNER MH

BLOWOUT PREVENTER
(BOP), CONTROL
SYSTEM AND MUX

DRILLING MUD PUMPS
WIRTH

CAMERON
MOORING WINCHES
AKER KVÆRNER

DRILLING CONTROL
SYSTEM
AKER KVÆRNER MH

DIESEL ENGINES
ROLLS ROYCE

THRUSTERS

MARINE RISER SYSTEM

POWER, ELECTRICAL
SYSTEMS AND
TELECOM

ROLLS ROYCE

Aker Kværner Subsea

SIEMENS

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

OPTIMISED DRILLING EFFICIENCY
• Wirth GH 4500-EG-AC-SV drawwork, with Baylor
Brake & feed off control/Auto Driller
• Drillers control room with 2 operator stations
• Derrick, 46 x 52 ft base, 210 ft height, SWL
2,000,000 lbs (1,000 sh.t)
• Standbuilding while drilling (drillpipe / casing)
• Racking capacity 40,000 ft DP and 10,000 ft casing
• Drill String Compensator 1,000 kips, 25 ft stroke
• Bridge crane vertical pipe handling system
• Two iron roughnecks on drill floor
• MH DDM-1000-AC-2M Top drive, 1,000 t
• Rotary table, 60 ½” hydraulic
• Kill & choke manifold, 15,000 PSI
• Mud standpipe manifold, 7,500 PSI
• Skid-off position 12 ft from centre with Riser and
BOP deployed

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

OPTIMISED DRILLING EFFICIENCY CONT.

• 4 of Wirth HP mud pumps, 7,5”x14”x2200, 7,500
psi
• 5 of Derrick® Flo-line ® Cleaner Model #FLC503
Shale shakers
• Flexible mud system - high storage capacity
• Optimised tank design for effective cleaning and
operation
• 1 of Derrick® Flo-line ® Cleaner Model #FLC503
Mud Cleaner
• Automated mixing system
• Direct Acting Riser Tensioner system 3,200,000
lbs
• BOP skid, 400 mT
• BOP overhead crane, 2 x 200 mT
• Utility winches, 6 ea 5 mT, 1 x 10 mT. 4 ea
manrider utility winches

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

RIG CAPACITIES
DRILL SHIP

6TH GENERATION SEMI

SSP DRILLER

- GENERAL CAPACITIES Operating displacement (mT)
Deck load capacity (mT)
Deck area (m2)
Accommodation
Water depth (ft)

60 000 – 80 000
15 000 – 20 000
5 500 – 7 000
120 – 140
10,000

51 000 – 63 000
7 000 – 7 700
5 000 – 7 000
120 – 160
10,000

61 250
> 15 000
5 500
150
10,000

- STORAGE CAPACITIES Fuel storage (m3)
Base oil (m3)
Drill water (m3)
Liquid mud (m3)
Bulk mud (m3)
Bulk Cement (m3)
Crude oil storage (bls)

3 000 – 5 000
600 – 1 000
2 000 – 3 000
2 000 – 3 000
600 – 850
300 – 500
Up to 100 000

3 100 – 4 500
600
2 600 – 3 100
1 700 – 3 200
600 – 850
280 – 460
NA

5 000
1 000
5 000
5 000
780
780
Up to 150 000

- STATION KEEPING Power (kW)
Thrusters (kW)
Transit speed (knots)
North Sea Operation (m Hs)

30 000 – 48 000
22 000 – 35 000
9 – 13
6–7

32 000 – 44 200
26 400 – 36 000
6–7
7–8

44 280
30 400
7–9
7–8

Source: Sevan Marine and other Drilling Company presentations

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

RIG CONCEPT AND DESIGN

MACHINERY AND PROPULSION
¾8 ea Rolls Royce B32:40V12A Diesel Generators, Max
5535kW continuous alternator rating.
¾Siemens power distribution and VFD’s.
¾2 ea Offshore deck cranes, lift radius 10m to 50m, 60mT.
¾8 ea Rolls Royce Aqumaster UUC 355 Thrusters, 3800kW.

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Profile in Center View

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Profile in Midship View

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Profile in Port View

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Upper Hull
El. 28.500

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Upper Hull
El. 32.500

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Upper Hull
El. 36.500

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Upper Hull
El. 45.500

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER

GENERAL ARRANGEMENTS / LAYOUT

‰ Upper Hull
Living Quarters Deck C, D, E, F and G

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLING UNIT

TABLE OF CONTENT
Company overview
1

Rig Concept and Design

2

Construction/Operations

3

Management

4

“FDPSO” Concept

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

CONSTRUCTION PROJECT

PROJECT EXECUTION
The project execution will be divided in the following main phases:
•

Project Definition

System engineering, Layout drawings, design basis documents

•

Detail Design and Engineering

Structural and mechanical analyses, Design verification, Design drawings
issued for construction.

•

Procurement

Specification of Bid packets. Bid evaluations, Production of components
and modules, Procurement support, expediting, Quality Surveillance,
component testing

•

Construction

Main construction of Hull and decks at selected Ship yard. Construction of
Drilling and Mud Module at Nymo. Construction of engine room modules,
etc. at selected construction sites.

•

Transport

Transport of SSP hull from construction yard to installation and hook-up
yard in Europe. Transport of equipment and modules to installation yard.

•

Hook-Up

Install all equipment and Modules on main hull

•

MC and Commissioning

Mechanical completion of modules and Commissioning of complete
system. (for hull systems; partly at hull construction yard)

•

Offshore Commissioning and Start-Up

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

CONSTRUCTION PROJECT

PROJECT MANAGEMENT ORGANISATION
Project Sponsors
Sevan Marine

Project Manager

Arne Smedal

Bjørn Egil Gustavsen

SSP Technology

Cost Control

HSEQ

Kåre Syvertsen

Kari Arntzen

Fred Egil Hansen

SSP Construction
Per Clausen

Document Control

Planning

Nina Risdal

Roger Arntzen

Contracts

Vendor/Supply follow up

Morten Smørdal

TBN

Engineering

Procurement

HULL-Fabrication

Hook Up team

Completion team

Operation

Gunnar Johnsen

Sidsel Skagen

Egil Pedersen

Per A. Godager

Anbjørn Egeland

Willy Tørrhaug

Structural Design
Jan Jørgensen
Marine Systems
Torger Kyvik
EIT
Sigfred Jensen
Arrangement
Hugo Gustavsen
Accommodation
Gorm Holmedal
Interface Coord.
Walter Andersen
Drilling
Mike O’Hara
Technical Safety
Bernt Christensen
Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

CONSTRUCTION PROJECT

KEY MILESTONES – ENGINEERING & CONSTRUCTION

™ Project Start Up

May 2006

™ Long Lead Items Ordered

Oct 2006

™ Start Detailed Engineering

Dec 2006

™ Start Fabrication / Steel Cutting

April 2007

™ Start Hook-up / Installation in China

Feb 2008

™Start final integration and commissioning (EU Yard)

Aug 2008

™ Sail Away from Yard

Jan 2009

™Arrival Drilling Location (GoM)

Mar 2009

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

PROCORP OFFSHORE MANAGEMENT SERVICES AS
POMS

– Established in June 2006.
– Headquarter in Trondheim, office in Oslo
– Ownership: ProCorp ASA (51%), Management 49%

Ambition

– To build an independent offshore drilling and production management
services company that will:
• Cover all geographical areas
• Be a preferred partner for the owners in all aspect of the
drilling/production operation

Scope of Work

Business Model

– Operation of offshore mobile drilling and production units
Systems
People
– Operations
- Qualifications
– Maintenance
- Training
– Procurement
- Incentives
– HSE
– Provide highly qualified operational services

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

PROCORP OFFSHORE MANAGEMENT SERVICES AS

OPERATIONS MANAGEMENT

100%

100%

Sevan
Sevan Marine
Marine
Sevan
Sevan Driller
Driller

Presentation NFLB Conference – Bergen February 2007, RO

ProdJack
ProdJack
Jack-up
Jack-up Unit
Unit ## 11 ++ 22

www.sevanmarine.com

OPERATIONS MANAGEMENT

OPERATIONAL MANAGEMENT RESPONSIBILITY
Developmentand
and
I.I. Development
implementationofoftotal
total
implementation
integrated
QHSE
integrated QHSE
ManagementSystem
System
Management

Emergency
II.II. Emergency
Preparedness
Preparedness
management
management

III. Budget and Cost
III. Budget and Cost
management /
management /
reporting
reporting

VIII. Execution of Drilling
VIII. Execution of Drilling
Contractincluding
including
Contract
operational/
admin.
operational/ admin.
interfacewith
withClient
Client
interface

IV. Unit
Unitinsurance
insurance
IV.
management
management

VII.Contract
ContractManagement
Management
VII.

VI.Regulatory
VI.Regulatory
Compliance/Class-,Flag
Flag
Compliance/Class-,
Stateand
Coastal
State- and Coastal
Authoritymanagement
management
Authority

Presentation NFLB Conference – Bergen February 2007, RO

Personnelmanagement
management
V.V.Personnel
including
recruitment,
including recruitment,
training,salary,
salary,taxation
taxation
training,
etc.
etc.

www.sevanmarine.com

PROCORP OFFSHORE MANAGEMENT SERVICES AS

PEOPLE AND OPERATIONAL EXPERIENCE
Management

Operational Experience

Christian Huseby
Norwegian State Authorised Public Accountant
Master of Science, Business Administration

Senior Partner

Stein Eggan
BA (Hons) Business Organization

VP – Commercial/Business Development

Willy Tørhaug
Certified Drilling Superintendent / Company
man.
SVP Operations

Dag Eggan
Master of Science, Environmental Engineering

ƒ Operation of Offshore Units from shallow to ultra-deep harsh
environment waters
ƒ Start-up and running of a new Drilling Company (e.g. Ocean Rig)
ƒ Development of total integrated HES&Q management system for
overall management of a drilling contractor to comply with
requirements from both regulators and operators
ƒ Operational interface to yard/new-build projects
ƒ Co-ordination and preparation of safety/risk- and working
environment related analysis/assessments required to achieve
compliance with class, flag state and coastal authorities
ƒ Preparation of required applications for Regulatory Compliance, and
interface with relevant regulators /Clients to achieve final operational
Certification in relevant countries
ƒ Recruitment and training of operational personnel to professionally
operate the unit, meeting the qualification requirements as defined in
the HES&Q management system and set forth by clients/regulators
ƒ General operational management of offshore unit(s) on behalf of
Owner
ƒ Marketing/Contract Management

SVP HES&Q

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

OPERATIONAL MANAGEMENT EXPERIENCE
Key Operational Experience

ƒ Operation of Ocean Rig’s SSDR Leiv Eiriksson and SSDR Eirik Raude from
shallow to ultra-deep (2100 meters) harsh environment waters including:
- West Africa - Angola/Congo (> 20 deepwater wells) (2002 – 2006)
- East Coast Canada - Nova Scotia (4 deepwater wells) and Newfoundland (Flemish Pass
2 deepwater wells) (2002 – 2004)
- Cuba (1 deepwater well) (2004)
- UK West of Shetland (1 deepwater well) (2004)
- Norwegian North Sea (2 deepwater wells) (2004 – 2006)
- Norwegian Barents Sea (4 wells – DP/POSMOOR ATA Mode) (2004 – 2006)

• Above operations with Clients - Exxon Mobil, Chevron, BP, TotalFinaElf, Shell, BG
Group, Repsol, EnCana, PetroCanada, Statoil, Hydro and Eni.

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

OPERATIONAL MANAGEMENT EXPERIENCE
Key Operational Experience

ƒ Operational interface management during shipyard construction/completion of
SSDR Leiv Eiriksson and Eirik Raude in Mississippi, US and Halifax, Canada
(1997 – 2002) including;
- Build-up of operational organisation onshore/offshore
- Development of total integrated QHSE management system for overall management of a
drilling contractor
- Preparation of Operational Acceptance Test Criteria and management of Acceptance
Testing from shipyard
- Recruitment and training of operational personnel
- Co-ordination and preparation of safety/risk- and working environment related
analysis/assessments
- Preparation of required applications for Regulatory Compliance/Certification including
Norwegian PSA, UK HSE, Canada Petroleum Boards (CNSOPB & CNLOPB), MMS/US
Coast Guard etc.
- Client interface – operational acceptance and contract management

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

OPERATIONAL MANAGEMENT EXPERIENCE
Key Operational Experience

ƒ Start-up and running of a new Drilling Company (e.g. Ocean Rig) including
establishment of local operational entities in US (Houston/Pascagoula), West
Africa (Luanda/Cabinda/Point Noire), Canada (Halifax/St. John’s), Cuba (Havana),
UK (Aberdeen) and Norway (Stavanger/Bergen/Harstad/Hammerfest)
ƒ Operational preparations and start-up in the GoM including;
- Sea Trials and Client Acceptance Testing (ExxonMobile)
- MMS/US Goast Guard Rig Acceptance and Certification (Letter of Inspection) including
co-ordination of US CG Documentation Reviews/Rig Inspections
- Management of Visa application process for non-US crew and onshore base personnel in
the GoM
- Offshore operations/reporting under the US MMS/OSHA regime.

ƒ Previous operational management history with Transocean, Saipem, Norcem,
Golar Nor etc.

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLER
Dayshift/Nightshift
Personnel

OFFSHORE ORGANISATION
Offshore Installation Manager
(OIM)

Radio Operator

12 hours shift
Personnel
Camp Boss
Total Crew No. onboard : 67

Medic

Safety Officer

Rig
Superintendent
2 x Storekeeper

Technical
Section Leader

Electrical
Section Leader

Drilling Section Leader
(Toolpusher)

Stability
Section Leader

Ass. Tech. Sect.
Leader

2 x Electricians

Tourpusher

Stability S.L. II

2 x Electronics

2 x Driller

4 x Engine Room Op’s

2 x Motormen

Hydraulic Engineer

2 x Subsea Engineers

4 x DP Operator
2 x Assistant Driller
2 x Deck Foreman
2 x Derrickman
2 x Crane Operators

Rig Mechanic

2 x Pumpman

Welder

10 x Roughneck

Presentation NFLB Conference – Bergen February 2007, RO

Subsea
Section Leader

10 x Roustabouts

www.sevanmarine.com

SEVAN DRILLER

OPERATIONAL BASE ORGANISATION – US BRANCH OFFICE
VP Drilling Operations
(Norway)

US Area Manager

Operational Support
Group

Operational Service
Agreement

Legal
Counsel

QHSE
Advisor

Maintenance

Rig Manager

E&I

Logistics/Purchasing

Technical Superint.

Personnel Co.ord.

Rig Accountant

Drilling

Subsea

Marine Operations

IT & Document Control

Rig Organization
OIM
(Ref. next slide)

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS

SEVAN DRILLING – SENIOR MANAGEMENT
CEO
Jan Erik Tveteraas

Sevan Marine ASA
Support - Main Org.

VP Marketing & Bus. Dev
Fredrik Major

Human Resources /
Accounting

VP QHSE
Dag Eggan

VP Drilling Operations
Willy Tørhaug

Maintenance

Marine Operations

Electrical & Instrumentation

Drilling

Subsea

OPERATIONAL
SUPPORT GROUP

Area Manager
Sevan America
(Ref. previous slide)

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN FDPSO ORGANISATION

SEVAN INTEGRATED OPERATING ORGANISATION
VP Operations
Erling Andreas
Ronglan
VP Drilling Operations
Willy Tørhaug
“Offshore Drilling
Services AS”

Administration Support

VP QHSE
Dag Eggan
“Offshore Drilling
Services AS”

Sevan Internal Support

Operational Support

¾ Office Administration

¾ Document Control
¾ Accounting
¾ Engineering
¾ Project Management
¾ Planning

¾ Marine
¾ Drilling
¾ Subsea

QHSE

Maintenance

E&I

Process

Human
Resources

Logistic
Purchasing

Drilling

TBA

Røtvold

TBA

Børresen

TBA

TBA

TBA

Operations Manager
Sevan Piranema
Heitor Gioppo
Operations Manager
Sevan Hummingbird
Dave Steward
”FDPSO”
TBA

Rig Manager
Sevan Driller I
TBA
Rig Manager
Sevan Driller II
TBA

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

PREPARATION FOR OPERATIONS – KEY OBJECTIVES
‰

Verify Safety of Operations

‰

Verify Functionality of Systems

‰

Verify Maintainability of Systems

‰

Develop QHSE, Operations & Administrative Manuals, Procedures and other required
controlling documentation including:
- US Coast Guard “LoI” (Letter of Inspection)
- Acknowledgement of Compliance (“AoC”) to PSA and UK Safety Case
- Operational Risk Analysis & Assessment including QRA, PFEER and Emergency Preparedness
Analysis.
- ISM Code Certification (i.e. Rig Safety Management Certificate/Company Document of Compliance)
- ISPS Code Certification including Ship Security Assessment and Ship Security Plan

‰

Logistics
- Order Spare Parts
- Establish, update and implement planned maintenance register and system for rigs

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

PREPARATION FOR OPERATIONS – KEY OBJECTIVES CONT.
‰

Operational Familiarization & Training
- QHSE Management System/Leadership Training
- Regulatory Training
- Vendor Training
- In-house system & equipment training

‰

Client relations
- Participation in development of bids for contracts
- Co-ordination and follow-up of rig visit's from Clients
- Interface Client/Operation/Project

‰

Quality Compliance with respect to Internal Company/Client procedures etc.

‰

Prepare and co-ordinate Contract Quality Plan and Client Bridging Documents

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

OPERATIONS MANAGEMENT

OPERATIONAL FAMILIARIZATION AND TRAINING
‰ Recruitment and training of operational personnel to professionally operate the unit,
meeting the qualification requirements as defined in the QHSE management system and
set forth by Clients/Regulators (including Emergency Preparedness training)
‰ Establishment of specific “pre-hire” Qualification Requirements for each position to be
hired for offshore operations (Bahamas/Local Coastal Requirements)
‰ Definition of position specific in-house Competency Development/Assurance Schemes for
company/rig specific systems & equipment training, e.g;
• QHSE Training
• Rig Emergency Preparedness training
• Position/Function oriented training

‰ Definition of external training matrix for onshore regulatory/emergency preparedness/
vendor specific training, and co-ordination of same
‰ Implementation of personnel database system for detailed control of competency
compliance and personnel co-ordination

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

SEVAN DRILLING UNIT

TABLE OF CONTENT
Company overview
1
2

Rig Concept and Design
Construction/Operations

3

Management

4

“FDPSO” Concept

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com

The Sevan Platform
- the versatile technology
FPSO
Floating Production
Storage Offloading

Gas Treatment Plant
LNG, GTW, LPG, Power Terminal

SICV
Subsea Installation
Construction Vessel

MODU
Mobile Offshore Drilling
Unit

FDPSO
Floating Drilling Production
Storage Offloading
Presentation NFLB Conference – Bergen February 2007, RO

FSO
Floating Storage
Offloading

ACCOMMODATION
Service platform

www.sevanmarine.com

“FDPSO” CONCEPT

FLOATING DRILLING AND PRODUCTION UNIT – NEXT GENERATION

Presentation NFLB Conference – Bergen February 2007, RO

www.sevanmarine.com



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Page Count                      : 54
XMP Toolkit                     : XMP toolkit 2.9.1-13, framework 1.6
About                           : uuid:bf0a50f1-4b98-456d-a96b-19fae7857e2e
Producer                        : Acrobat Distiller 6.0 (Windows)
Create Date                     : 2007:03:01 08:47:01+01:00
Creator Tool                    : PScript5.dll Version 5.2
Modify Date                     : 2007:03:01 08:47:01+01:00
Document ID                     : uuid:ec48fb7e-2eda-4a2e-912f-5b55cfc920b6
Format                          : application/pdf
Title                           : Microsoft PowerPoint - Sevan Drilling presentation.ppt
Creator                         : oht
Author                          : oht
EXIF Metadata provided by EXIF.tools

Navigation menu