0244 1 513 Natural Gas Boosters Low Capacity

User Manual: 0244-1

Open the PDF directly: View PDF PDF.
Page Count: 2

Notes: Ratings based on inlet gas at standard pressure of 14.7
PSIA, temperature 70°F, 0.6 specific gravity natural gas and 1.0
specific gravity air for UL Listing. Allowable maximum inlet to UL
standards is 15.2 PSIA or 13” WC and nominal 70°F.
Gas Boosters include standard shaft, 115/230V, 1Ph or 208/230/460V,
3Ph, 60Hz, 3500 RPM, class 1, group D, UL Listed, explosion-proof
motor with thermal overload protection and junction box.
The Spencer Turbine Company introduced the first hermetically
sealed multistage natural gas boosters in 1975. The company
continues to lead the industry with a range of designs using
Spencer's standard overhung blowers and multiple, spark-resistant
aluminum alloy impellers mounted directly on heavy-duty extended
motor shafts.
Spencer’s Low Capacity Series UL Listed Natural Gas Booster is a
single-stage design. Installations can boost pressure levels by 9
inches WC, with volumes to 12,000 ICFH. Spencer’s simple direct
drive and generous internal clearances provide for long-term
reliability and quiet operation — well within OSHA limits. The
unique leaktight hermetic design also provides a continuous flow
of natural gas around the explosion-proof motor, cooling the
motor and extending its life.
In addition, Spencer offers the GasCube™ series, an easy-to-install
natural gas booster skid package. It is pre-engineered, prepiped
and has a compact footprint. The GasCube package is also available
in organized modules for on-site assembly. Spencer’s complete
line of hermetic, single and multistage, low and high-pressure
gas boosters — including the GasCube skid package — undergo
standard commercial tests at the factory for leaks as well as for
power input, volume and pressure.
For information on Spencer’s High Capacity Series UL Listed Natural
Gas Boosters, refer to Bulletin TDS-512 and for information on
the GasCube Series, refer to Bulletin No. 515.
Performance Data
GAS @ .6 Sp.Gr
Hermetically Sealed – UL Listed
Single stage centrifugal design
Volume to 12,000 ICFH
P to 9" WC
Explosion-proof motor – UL Listed
Product Features
TECHNICAL DATA SHEET
UL Listed Natural
Gas Boosters
Low Capacity Series
GL-0231-1/2-R 3 Thd 1/2 9000 6.4
GL-0244-1/2-R 4 Thd 1/2 12000 6.75
GL-0325-1/2-R 3 Thd 1/2 5400 9
Volume Pressure
ICFH IN WC
Catalog Inlet Motor
Number Outlet Hp
º
The Spencer Turbine Company 600 Day Hill Road, Windsor, CT USA 06095 TEL 800-232-4321 860-688-8361 www.spencerturbine.com
UL Listed Natural Gas Boosters
Low Capacity Series Dimensions: Shown in inches
Notes:
1. No special equipment foundation is necessary, but a level concrete
floor or block is recommended. Simply rest machine on cork pads
furnished; do not use anchor bolts. Flexible piping connections
are recommended.
2. Outlet position must be specified when the gas booster is ordered.
3. All dimensions are for reference only unless certified.
4. All units have thermal overload protection in motor and must be
connected according to NEC and local codes.
GL-O231-1/2-R 1915/16 45/881/16
GL-O244-1/2-R 201/1643/479/16
GL-O325-1/2-R 1915/16 45/881/16
A
C
231/4
113/4
16
221/8
165/16
189/16
15/8*
*13/4on GL-0244-1/2-R
141/4
TDS-513B Copyright ©2009 The Spencer Turbine Company 0809KBA1.75
The Turbine Company, 600 Day Hill Road, Windsor, CT 06095-4706
Blowers & Vacuum Systems with an Engineering Edge
TEL 800-232-4321 860-688-8361 FAX 860-688-0098 www.spencerturbine.com
º
Outlet Position:
Available outlet position as viewed from the outlet end of
the machine. Specify position on order.
Impeller
Explosion-
Proof Motor
Rotation
Inspection
Port
Axial Inlet
Electrical
Connector
Lifting
Lug
Cork Isolation Pads
1"(25 mm) thick
Gas Booster
Casing
Outlet
(Position 1)
Head
Gasket
Catalog
Number
Date: ________________________________________
Signed:_______________________________________
Customer Name: _______________________________
Customer Order No.: ____________________________
Project Name: _________________________________
Sales Order No.:________________________________
B
AB C
For Customer Approval Certified Correct
Spencer may make improvements and dimensional changes to
equipment designs based on market trends and requirements.
For product selection assistance, please email
marketing@spencer-air.com or visit our website at
www.spencerturbine.com to locate the Spencer
representative in your area.

Navigation menu