V7 Copy Hydronics C4 Burnham Oil Boiler Installation Manual
V7 SERIES to the manual b2a7fe7d-86fd-401b-bf00-921413a711c6
User Manual: Hydronics C4
Open the PDF directly: View PDF .
Page Count: 47
Download | |
Open PDF In Browser | View PDF |
Price - $3.00 INSTALLATION, OPERATING AND SERVICE INSTRUCTIONS FOR V7 SERIES OIL FIRED BOILER KNOCKDOWN & PACKAGED HEATING UNITS These instructions have been reviewed by ULC and found suitable for use in the installation of ULC labeled V-7 Series Boilers. As an ENERGY STAR® Partner, Burnham Corporation has determined that the V73WR (0.60 GPH), V74WR (0.80 GPH), V75WR (0.90 GPH), and V76WR (1.15 GPH) meet the ENERGY STAR® guidelines for Energy efficiency established by the United States Environmental Protection Agency (EPA). The ULC label or listed marking on a product is the only evidence provided by Underwriters' Laboratories of Canada to identify products which have been produced under the listing and follow-up service. For service or repairs to boiler, call your heating contractor. When seeking information on boiler, provide Boiler Model Number and Serial Number as shown on Rating Label. Boiler Model Number _V7 ____-____ Boiler Serial Number 6_ _ _ _ _ _ _ Heating Contractor Phone Number Address 8142711R24-7/99 Installation Date 1 IMPORTANT INFORMATION - PLEASE READ THIS PAGE CAREFULLY 1. THIS BOILER HAS LIMITED WARRANTIES, COPIES OF WHICH ARE PRINTED ON THE BACK COVER OF THIS MANUAL. 2. THIS BOILER IS SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOORING. BOILER CANNOT BE INSTALLED ON CARPETING. 3. ALL BOILERS MUST BE INSTALLED IN ACCORDANCE WITH NATIONAL, STATE AND LOCAL PLUMBING, HEATING AND ELECTRICAL CODES AND THE REGULATIONS OF THE SERVING UTILITIES WHICH MAY DIFFER FROM THIS MANUAL. AUTHORITIES HAVING JURISDICTION SHOULD BE CONSULTED BEFORE INSTALLATIONS ARE MADE. IN ALL CASES, REFERENCE SHOULD BE MADE TO THE FOLLOWING STANDARDS: USA BOILERS A. Current Edition of American National Standard ANSI/NFPA 31, “Installation of Oil Burning Equipment”, for clearances between boiler, vent connector and combustible material. B. Current Edition of American National Standard ANSI/NFPA 211, “Chimneys, Fireplaces, Vents, and Solid Fuel Burning Appliances”, For Chimney requirements, type of venting material and clearances between vent connector pipe and combustible materials. C. Current Edition of American Society of Mechanical Engineers ASME CSD-1, “Controls and Safety Devices for Automatically Fired Boilers”, for assembly and operations of controls and safety devices. CANADA BOILERS A. Current Edition of Canadian Standards Association CSA B139, “Installation Code for Oil Burning Equipment”, for recommended Installation Practices. 4. ALL HEATING SYSTEMS SHOULD BE DESIGNED BY COMPETENT CONTRACTORS AND ONLY PERSONS KNOWLEDGEABLE IN THE LAYOUT AND INSTALLATION OF HYDRONIC HEATING SYSTEMS SHOULD ATTEMPT INSTALLATION OF ANY BOILER. 5. THE BOILER MUST BE CONNECTED TO AN APPROVED CHIMNEY IN GOOD CONDITION. SERIOUS PROPERTY DAMAGE COULD RESULT IF THE BOILER IS CONNECTED TO A DIRTY OR INADEQUATE CHIMNEY. THE INTERIOR OF THE CHIMNEY FLUE MUST BE INSPECTED AND CLEANED BEFORE THE START OF THE HEATING SEASON AND SHOULD BE INSPECTED PERIODICALLY THROUGHOUT THE HEATING SEASON FOR ANY OBSTRUCTIONS. A CLEAN AND UNOBSTRUCTED CHIMNEY FLUE IS NECESSARY TO ALLOW NOXIOUS FUMES THAT COULD CAUSE INJURY OR LOSS OF LIFE TO VENT SAFELY AND WILL CONTRIBUTE TOWARD MAINTAINING THE BOILER’S EFFICIENCY. 6. READ THE LITERATURE ENCLOSED BY THE MANUFACTURER WITH THE VARIOUS ACCESSORY DEVICES. THESE ACCESSORY DEVICES MUST BE INSTALLED AND USED ACCORDING TO THE RECOMMENDATIONS OF THE MANUFACTURER. 7. IT IS THE RESPONSIBILITY OF THE INSTALLING CONTRACTOR TO SEE THAT ALL CONTROLS ARE CORRECTLY INSTALLED AND ARE OPERATING PROPERLY WHEN THE INSTALLATION IS COMPLETED. 8. FOR OPTIMUM PERFORMANCE AND SERVICEABILITY FROM THIS BOILER ADHERE TO THE FOLLOWING RECOMMENDATIONS: A. DO NOT TAMPER WITH THE BOILER OR CONTROLS. Retain your contractor or a competent serviceman to assure that the boiler is properly adjusted and maintained. B. Clean flueways at least once a year - preferably at the end of the heating season to remove soot and scale. Inside of firebox should also be cleaned at the same time. C. Have oil burner and controls checked at least once a year or as may be necessitated. WARNING This boiler is designed to burn No. 2 fuel oil only. Do not use gasoline, crankcase drainings, or any oil containing gasoline. Never burn garbage or paper in this boiler. Do not convert to any solid fuel (i.e. wood, coal) or gaseous fuel (i.e. natural gas, LP/propane). All flammable debris, rags, paper, wood scraps, etc., should be kept clear of the boiler at all times. Keep the boiler area clean and free of fire hazards. WARNING All boilers equipped with burner swing door have a potential hazard which can cause severe property damage, personal injury or loss of life if ignored. Before opening swing door, turn off service switch to boiler to prevent accidental firing of burner outside the combustion chamber. Be sure to tighten swing door fastener completely when service is completed. WARNING High water temperatures increase the risk of burns or scalding injury. Install an automatic tempering (mixing) valve at the tankless heater outlet to avoid excessively hot water at the fixtures. 2 IMPOR TANT Before starting to in stall this oil bo iler, read these in structio ns carefu lly. Keep instruction s in legible condition and po sted n ear oil boiler fo r reference by owner an d service technician . TABLE OF CONTENTS I. II. III. IV. V. VI. General Information ............................. 3 Knockdown Boiler Assembly ............... 7 Installation Instructions ...................... 12 Operating Instructions ........................ Boiler Cleaning .................................. Repair Parts ........................................ Burner Specifications ......................... SECTION I: GENERAL INFORMATION Figure 1A: V72 thru V79 Water Boiler Without Tankless Heater (WB) TABLE 1: DIMENSIONAL DATA (SEE FIGURES 1A THRU 1E) Boiler Model No. Dimensions Minimum Chimney Size Water Content Gallons Heat Transfer Surface Area Sq. Ft. Approximate Shipping Weight (LB.) Steam Boiler Water Boiler Steam Boiler 8" x 8" x 15' ---- 10.6 ---- 381 6" 8" x 8" x 15' ---- 13.5 ---- 524 8-3/8" 6" 8" x 8" x 15' 10.8 13.2 13.8 478 10-3/4" 6" 8" x 8" x 15' ---- 15.9 ---- 580 V74 19-3/8" 10-3/8" 6" 8" x 8" x 15' 13.5 15.9 19.7 575 V75 23-3/8" 12-3/8" 7" 8" x 8" x 15' 16.1 18.5 25.6 674 V76 27-3/8" 14-3/8" 7" 8" x 8" x 15' 18.6 21 31.4 773 V77 31-3/8" 16-3/8" 8" 8" x 12" x 15' 21.2 23.6 37.3 872 V78 35-3/8" 18-3/8" 8" 8" x 12" x 15' 23.8 26.2 43.1 971 V79 39-3/8" 20-3/8" 8" 8" x 12" x 15' 26.4 28.8 49.0 1070 "A" "B" "C" V72 11-3/8" 6-3/8" 5" V713 16" 8-3/4" V73 15-3/8" V714 20" NO TE: 1. Maximum Working Pressure 15 PSI (Steam) and 30 PSI (Water) 2. The V72, V713 and V714 Boilers are available as packaged water boilers only 3. The V713 and V714 are not ULC listed Models 3 21 29 31 46 Figure 1B: V73 thru V79 Water Boiler with Tankless Heater (WBT) Figure 1C: V73 thru V79 Steam Boiler with or without Tankless Heater ("SBT" or "SB") 4 Βυρνηαµ Figure 1D: V713 and V714 Packaged Water Boiler Less Tankless Heater (WB) Burnham Figure 1E: V713 and V714 Packaged Water Boiler with Tankless Heater (WBT) 5 A. INSPECT SHIPMENT carefully for any signs of damage. 2. FOR BASEMENT INSTALLATION, provide a solid base, such as concrete, if floor is not level, or if water may be encountered on floor around boiler. 1. ALL EQUIPMENT is carefully manufactured, inspected and packed. Our responsibility ceases upon delivery of crated boiler to the carrier in good condition. 3. PROVIDE SERVICE CLEARANCE of at least 24” on right side of boiler for removal of rear tankless heater. Provide at least 24” clearance from front jacket panel for servicing and removal of front tankless heater (increase to 30" for #A54 heater). Provide at least 24" clearance from right side of boiler or top of boiler for cleaning flueways. Boiler flueways may be cleaned either from the top or from the side. 2. ANY CLAIMS for damage or shortage in shipment must be filed immediately against the carrier by the consignee. No claims for variances from, or shortage in orders, will be allowed by the manufacturer unless presented within sixty (60) days after receipt of goods. 4. For minimum clearances to combustible materials. See Table 2. B. LOCATE BOILER in front of final position before removing crate. See Figures 1A thru 1E. C. PROVIDE AIR SUPPLY AND VENTILATION to accommodate proper combustion. If natural ventilation is inadequate, provide a screened opening or duct from the boiler room to the outside. The opening or duct must be sized so the boiler input will not exceed 4,000 BTUH/Sq. In. of free area. If other air consuming appliances are near the boiler, the air inlet should be larger. Consult respective manufacturers. 1. LOCATE so that smoke pipe connection to chimney will be short and direct. BOILER IS SUITABLE FOR INSTALLATION ON COMBUSTIBLE FLOOR. Boiler cannot be installed on carpeting. NOTE 1: Listed clearances comply with American National Standard ANSI/NFPA 31, Installation of Oil Burning Equipment. TABLE 2: Minimum Installation Clearances To Combustible Materials (Inches) Boiler A Above B Front C Chimney Connector V7 6 24 18 D Rear E Sides 6 6 NOTE 2: V7 Series boilers can be installed in rooms with clearances from combustible material as listed above. Listed clearances cannot be reduced for alcove or closet installations. NOTE 3: For reduced clearances to combustible material, protection must be provided as described in the above ANSI/NFPA 31 standard. 6 SECTION II: KNOCKDOWN BOILER ASSEMBLY Note: If Boiler is Packaged Go To Section III section as shown in Fig. 3. Place gaskets so as not to allow any flueway blockage. A. REMOVAL OF BARE BOILER FROM SKID 1. Boiler is secured to base with 4 bolts, 2 on front and 2 on rear, see Figure 2. Remove all bolts. 2. Cut the remainder of the roll into two (2) equal pieces. Place each piece along the sides, allowing the ends to overlap the front and rear pieces. 2. Tilt boiler to right and to rear. Using right rear leg as pivot, rotate boiler 90° in a clockwise direction, and lower left side of boiler to floor. Tilt boiler and remove crate skid. Do not allow any flueway blockage. 3. Position canopy body within the retaining bar which borders the flueway openings on top of the bare boiler block assembly. Figure 2 B. MOVE BOILER TO PERMANENT POSITION by sliding or walking. C. TEST BOILER FOR LEAKS before installing controls, trim, and jacket, and before connecting to heating system. 1. Loosen nuts on tie rods until only finger tight. 2. Install pressure gauge (at least 30 P.S.I. capacity), a hose to the city water and a valve in the supply tapping. Plug remainder of tappings. Figure 3 3. Fill boiler with water and apply a pressure of at least 10 pounds but no more than 30 pounds gauge pressure. IMPORTANT: Jacket support bracket must be facing left side of boiler — see Figure 3. 4. Secure canopy to boiler with two (2) 1/4" - 20 x 3" lg. carriage bolts, 1/4" flat washers and 1/4" - 20 wing nuts provided. 4. Examine Boiler carefully inside and outside for leaks or damage due to shipment or handling. D. DRAIN WATER FROM BOILER. Remove gauge, valve and plugs from those tappings to be used. Leave other tappings plugged or bushed according to Figure 4. H. INSTALL the following steam or water trim that would be concealed or inaccessible after flush jacket is installed, see Figure 4 for boiler tapping locations and usage. E. INSPECT JOINTS BETWEEN SECTIONS. All joints are factory sealed. If there are any spaces due to shipment or handling, seal them with boiler putty. 1. STEAM BOILER — Top tappings: a. Tapping "L" — Install 2" plug in rear section top supply tapping on boiler sizes V73 thru V75. F. INSPECT FLUE COVER PLATES for tightness. If loose, retighten mounting hardware. If flue plate or sealing insulation is damaged repair or replace as needed. b. Tapping “M” — Install ¾” coupling and ¾” x 8” long nipple into ¾” tapping located next to front section top supply tapping — all boiler sizes. G. INSTALL AND SECURE CANOPY with cerafelt gasket and hardware provided to ensure gas tight seal — see Figure 3. 2. WATER BOILER — Top tappings: a. Tapping “L” — Install 2” plug in rear section top supply tapping on boiler sizes V73 thru V79. 1. Cut two (2) strips 13 ¾” lg. from the roll of cerafelt gasket insulation. Place one (1) strip across the top of the front section and the other across the rear 7 Figure 4: Boiler Tapping Locations and Usage (Knockdown Boilers Only) PU R P O SE O F TA PP IN G S Ta p p in g L o ca tio n S te a m B o ile r S ize N o n -H e a te r W a te r B o ile r w /H e a te r N o n -H e a te r F ro n t H e a te r R e ar H e a te r L 81 48A O p era tin g C on tr ol L81 24 C O p era tin g C on tr ol F lus h Plu g A ¾" PA 4 04A P r es su retro l (P r obe LW C O ) P lugg ed (F lo at LW C O ) B ¼" P re ss ure /Va cu um G aug e Tem p era tu re/P re ss ur e G aug e C ¾" P ro be LW C O Std. P lugg ed (F lo at LW CO ) F lus h Plu g C- C ¾" F lus h Plu g F lus h Plu g F lus h Plu g W ater G au ge G las s (P r obe LW CO ) W ater G aug e G lass , P re ss ur etrol, a nd LW C O (F lo at) D ½" F ¾" G 1½ " B us he d to ¾ " for Dr ainc oc k (O ptiona l Re tu rn ) R etur n H 1½ " R etur n B us he d to ¾ " for Dr ainc oc k (O ptiona l Re tu rn ) L4 006 A O p era tin g C on tr ol -- -- - F lus h Plu g -- -- - Dis re gar d L81 24 C O p era tin g C on tr ol J 1½ " S u rfac e B low off - Plu gge d F lus h Plu g K 2" F r on t Su pply ( 3 th ru 9 Se ction ) F r on t Su pply ( 3 th ru 9 Se ction ) L 2" P lug ged , O ption al S e co nd Su pply ( 3 th ru 5 Se ction ) R eq uire d S e co nd Su pply ( 6 th ru 9 Se ction ) Plu gge d ( 3 th ru 9 Se ction ) M ¾" S afety Valv e P ¾" Au xilia ry Tapp ing - Plu gge d R ¾" Au xilia ry Tapp ing - Plu gge d Re lie f Valv e A ux . Ta pp in g Plu gge d Dis re gar d A ux . Ta pp in g Plu gge d Au xilia ry Tapp ing - Plu gge d 8 Figure 5: Knockdown Boiler Jacket Assembly b. Tapping “M” —Install ¾” x 8” long nipple into ¾” tapping located next to front section top supply tapping — all boiler sizes. I. side panel mounting holes with the front and rear panel holes. Secure with #8 x ½” long sheet metal screws. INSTALL FLUSH JACKET (See Figure 5). 5. Install jacket top panel. Place jacket top panel on boiler and secure to front, rear and left side panels with #8 x ½” long sheet metal screws. 1. Remove burner swing door mounting plate. Loosen the bottom bolt three full turns. Remove (5) remaining 5/16” bolts securing mounting plate to boiler sections. 6. Install jacket lower right side panel. Align right side panel mounting holes with front and rear panel holes. Secure with #8 x ½” long sheet metal screws. Lift up and remove plate. 7. Install jacket upper right side access panel. Using the thumb holes, hold access panel 1” above lower right side panel. Engage flanges on access panel with surrounding panels and lower into position until access panel is resting flush with top panel and bottom flange is properly locked into position with lower right side panel. 2. Install rear jacket panel. Align two dimpled holes on jacket panel with the cast iron lugs. Secure with two #10 x 3/8” long self tapping screws. 3. JACKET FRONT PANEL a. Install black plastic collar extension to jacket front panels with 7-13/16" dia. heater opening. Engage two (2) retaining tabs over raw edge of opening. Provide support behind the panel with one hand while applying pressure on collar to snap each tab over edge of opening until all eight (8) tabs are securing collar. 8. Attach the data labels shipped in the instruction envelope as follows: (see Figure 5). a. Place the Rating Label (serialized) approximately 1/4" below the top edge and 3-1/2" from the right edge of the jacket front panel as shown. Mark outline of label on jacket with a pencil. Remove paper backing from label, realign label with pencil marks and apply label to jacket by using backing paper to rub across face of label. b. Install front jacket panel. Locate two 3/16” diameter holes on front panel approximately 16” up from the bottom of the panel and 4½” in from each side. Align these holes with the similarly located cast iron lugs on the front section. Secure with two #10 x 3/8” long selftapping screws. b. Locate the Combination Label (P/N 8142756) on the front right corner of top panel, approximately 3/8" from each edge as shown. Mark the location and apply label in the same 4. Install jacket left side panel. Fold panel at perforation keeping insulation inward. Align left 9 Figure 6 burner to the left. Install two remaining 5/16” x ½” long bolts in horizontal sets of holes. Level burner and fully tighten all bolts. manner as rating label. c. On steam boilers, install the Lowest Permissible Water Level Plate, Form No. 1204 (shipped in Steam Trim Carton), on the jacket right side panel. Align the two holes in the plate with the two 1/8” dia. holes located near the front edge, in line with the lower sight glass tapping, and secure with #8 x ½” lg. sheet metal screws. J. K. INSTALL STEAM BOILER TRIM AND CONTROLS (See Figures 1C & 4). 1. Thread the combination pressure/vacuum gauge into the ¼” tapping. Tighten with wrench applied to the square shank of the gauge. Do not apply pressure to the gauge case — this might destroy the calibration of the gauge. INSTALL OIL BURNER (See Figure 6). 1. Check target wall and cerafelt blanket in combustion chamber. If any damage or movement occurred during shipment, repair or replace as needed. 2. Thread 1½” x ¾” bushing and a ¾” drain cock into the 1½” tapping located in the lower right corner of the front casting. Tighten with wrench. NOTE: Lower rear section tapping “H” is used for standard condensate return on steam boilers. 2. Check the burner mounting plate and swing door insulation pieces for damage and adhesion. If damaged, replace insulation. If loose, re-attach with RTV 732 or 736 silicone caulk. 3. Thread safety relief valve, as shown in Figure 1C, into 3/4" coupling and 3/4” x 8” nipple previously installed in step H. Tighten with wrench. 3. Engage bottom slot on burner mounting plate with matching bolt in bottom tapping of front section. Align mounting holes and fasten the mounting plate to the boiler sections with (5) five 5/16” bolts and washers removed in step 8a. Fully tighten all bolts. NOTE: Pipe discharge as shown in Figure 8. 4. Install probe type LWCO if so equipped. Thread probe into ¾” tapping located on the front section directly above the protectorelay on the oil burner. Read the manufacturer’s instructions packed with the probe LWCO for proper pipe dope application. DO NOT use Teflon tape on probe threads. Use of teflon can render the probe LWCO inoperational. Slip the LWCO control over the probe and clamp in place. Connect the wire(s) between the probe and control per the manufacturer’s instructions. Install 4. Place burner flange gasket on burner swing door and thread two 5/16” x ½” long bolts into vertical set of holes approximately three full turns. 5. Insert oil burner air tube into the opening of the burner swing door. Align keyhole slot with vertical set of bolts, engage hex head of bolts and rotate 10 the sight glass using the two ½” tappings to the right of the probe LWCO. 4. Screw drain valve into 1½” tapping in lower rear section using 1½” x ¾” bushing (note - lower front section tapping “G” (see Figure 4) is used for standard return on water boilers). 5. Install float-type Low Water Cutoff, if so equipped. See Figure below. a. Install nipples and unions in Tappings D. b. Mount hardware to low water cutoff body. Install assembly. c. Install water gage glass on low water cutoff assembly's tee fittings. 5. If CIRCULATOR (not supplied with boiler) is to be mounted directly to 1½" boiler return tapping "G", use the piping arrangements outlined in steps a. thru e. as follows: a. Thread 1½” x 3” long nipple and 1½” x 90° elbow into the return tapping and tighten with a pipe wrench. 6. Install Limit Control. a. Probe LWCO: Install Limit in Tapping A using ¾ NPT x 2" nipple, ¾ NPT elbow, ¾ NPT x ¼ NPT bushing, and syphon. See Figure below right. b. Float LWCO: Remove ¼ NPT plug from top of Low Water Cutoff. Install Syphon and Limit into this tapping. See Figure below. b. Thread 1½” NPT x 15” long pipe nipple into the 90° elbow and tighten with a pipe wrench. c. Thread one of the circulator flange onto the pipe nipple and tighten with a pipe wrench. Position flange so that the bolt slots are perpendicular to the boiler front. 7. On units equipped with a tankless heater, install the aquastat controller well in the ¾” tapping in tankless heater plate. Slip the bulb of the aquastat into the well and secure the control in place with the set screw. d. Place a flange gasket in the flange groove on the circulator and mount the circulator on the flange installed in step 3. Note that this is the return piping and the flow arrow on the circulator should point down ê. Fasten circulator with 7/16” nuts and bolts. 8. Connect the field wiring to the pressure limit, the LWCO, the burner J-box, and from the aquastat control (if equipped with tankless heater) to the oil burner primary control's "T-T" terminals. Make the wiring connections as shown in Figures 17 thru 20. e. Bolt second circulator flange and gasket to the circulator with 7/16” nuts and bolts. 6. Install pressure relief valve, as shown in Figure 1B, onto ¾” x 8” nipple previously installed in Step H. Tighten with wrench. L. INSTALL WATER TRIM AND CONTROLS (See Figures 1B and 4). 1. Thread ½” pipe plugs into gauge glass tappings in the upper right side of front section. NOTE: Pipe discharge as shown in Figure 9. 7. On units without a tankless heater, install the control well into the ¾” tapping located on the front of the boiler in the upper left corner. Tighten the well and insert the control’s bulb into the well. Secure the control with set screw on the control. 2. Thread ¾” pipe plug in probe low water cut off tapping (just left of gauge glass tappings). 3. Thread combination pressure/temperature gauge into ¼” tapping. Tighten with wrench applied to the square shank of the gauge. Do not apply pressure to the gauge case - this might destroy the calibration of the gauge. 8. On units with a tankless heater, install the control well in the ¾” tapping on the tankless heater plate. Tighten the well and insert the control’s bulb into the well. Secure the control with set screw on the control. 9. Connect the field wiring from the circulator to the control and from the control to the burner J-Box. Make the wiring connections as shown on Figures 21 and 22. NOTE: Proceed to Installation Instructions Section III, step E, to continue. Float-type Low Water Cutoff Installation 11 Limit Installation for Probe LWCO Equipped Boilers SECTION III: INSTALLATION INSTRUCTIONS 4. Packaged boilers with Probe style LWCO. Install Limit in Tapping A using ¾ NPT x 2" nipple, ¾ NPT elbow, ¾ NPT x ¼ NPT bushing, and syphon included in trim bag. See Figure on previous page. Connect wiring harness from Low Water Cutoff. See Figure below. A. REMOVE CRATE — (Packaged Boilers) 1. Remove all fasteners at crate skid. 2. Lift outside container and remove all other inside protective spacers and bracing. Remove draft regulator box and miscellaneous trim bag containing safety/relief valve, and pipe fittings. B. REMOVAL OF BOILER FROM SKID TS-39-126-A 5. If this boiler is used in connection with refrigeration systems, the boiler must be installed so that the chilled medium is piped in parallel with the heating boiler using appropriate valves to prevent the chilled medium from entering the boiler, see Figure 10. Also consult I = B = R Installation and Piping Guides. TS-39-26-A Fig. 7 1. Boiler is secured to base with 4 bolts, 2 on left side and 2 on right side, see Figure 7. Remove all bolts. 2. Tilt boiler to right and to rear. Using right rear leg as pivot, rotate boiler 90° in a clockwise direction, and lower left side of boiler to floor. Tilt boiler and remove crate skid. Care should be exercised to prevent damage to jacket or burner. 6. If this boiler is connected to heating coils located in air handling units where they may be exposed to refrigerated air, the boiler piping must be equipped with flow control valves to prevent gravity circulation of boiler water during the operation of the cooling system. 7. Use a boiler bypass if the boiler is to be operated in a system which has a large volume or excessive radiation where low boiler water temperatures may be encountered (i.e. converted gravity circulation system, etc.). Remove the circulator and install a pipe tee between the circulator and boiler return along with a second tee in the supply piping as shown in Figure 11. The bypass should be the same size as the supply and return lines with valves located in the bypass and supply outlet as illustrated in Figure 11 in order to regulate water flow for maintenance of higher boiler water temperature. Set the by-pass and boiler supply valves to a half throttle position to start. Operate boiler until the system water temperature reaches its normal operating range. Adjust the valves to maintain 180°F boiler water temperature. Adjust both valves simultaneously. Closing the boiler supply valve and opening the bypass valve will raise the boiler water temperature and lower the supply temperature. Opening the boiler supply valve while closing the by-pass valve will lower the boiler water temperature and raise the supply temperature. C. MOVE BOILER TO PERMANENT POSITION by sliding or walking. D. INSPECT COMBUSTION TARGET WALL AND COMBUSTION CHAMBER LINER 1. OPEN FLAME OBSERVATION DOOR AND/OR BURNER SWING DOOR on front of boiler. Use flashlight to inspect target wall secured to rear section with silastic sealant. Inspect ceramic fiber blanket secured to floor of boiler with water glass adhesive. If either is damaged they must be replaced. E. CONNECT SUPPLY AND RETURN PIPING TO HEATING SYSTEM. CLEARANCES — Steam and hot water pipes shall have clearances of at least ½” from all combustible construction. 1. With STEAM HEATING, see Figure 8. Consult I = B = R Installation and Piping Guide No. 200. 2. With Forced Circulation HOT WATER HEATING, see Figure 9. Consult I = B = R Installation and Piping Guide No. 200. 3. Packaged boilers. Install Safety Valve in Tapping M. Use ¾ NPT x 8" nipple and ¾ NPT coupling included in trim bag. Safety Valve must be installed with spindle in vertical position. 8. A hot water boiler installed above radiation level must be provided with a low water cutoff device as part of the installation. 12 TS-39-17-D Fig 8: V73 Thru V79 Recommended Boiler Piping For Gravity Return Steam Boiler TS-39-4-C Fig. 9: V72 thru V79, V713 and V714 Recommended Boiler Piping for Series Loop Forced Hot Water System 13 In order to insure long product life, oxygen sources should be eliminated. This can be accomplished by taking the following measures: 1. Repairing system leaks to eliminate the need for addition of make-up water. 2. Eliminating open tanks from the system. 3. Eliminating and/or repairing fittings which allow oxygen absorption. TS-O-62-B 4. Use of non-permeable materials in the distribution system. 5. Isolating the boiler from the system water by installing a heat exchanger. F. CONNECT TANKLESS HEATER PIPING AS SHOWN IN Figure 12. See Tables 3 and 3A for Tankless Heater Ratings. Fig. 10: Recommended Piping for Combination Heating & Cooling (Refrigeration) Systems Water Boilers TS-0-63-B TS-39-7-A Fig. 12: Schematic Tankless Heater Piping Fig. 11: Recommended Bypass Piping Water Boilers THE FOLLOWING GUIDELINES SHOULD BE FOLLOWED WHEN PIPING THE TANKLESS HEATER: 1. FLOW REGULATION — If flow through the heater is greater than its rating, the supply of adequate hot water may not be able to keep up with the demand. For this reason a flow regulator matching the heater rating should be installed in the cold water line to the heater. The flow regulator should preferably be located below the inlet to the heater and a minimum of 3’ away from the inlet so that the regulator is not subjected to excess temperatures that may occur during “off” periods when it is possible for heat to be conducted back through the supply line. The flow regulator also limits the flow of supply water regardless of inlet pressure variations in the range of 20 to 125 psi. CAUTION Oxygen contamination of boiler water will cause corrosion of iron and steel boiler components, and can lead to boiler failure. Burnham's standard warranty does not cover problems caused by oxygen contamination of boiler water. There are many possible causes of oxygen contamination such as: 1. Addition of excessive make-up water as a result of system leaks. 2. Absorption through open tanks and fittings. 2. TEMPERING OF HOT WATER — Installation of an automatic mixing valve will lengthen the delivery of the available hot water by mixing some 3. Oxygen permeable materials in the distribution system. 14 TABLE 3: TANKLESS HEATER DATA: Rear Mounted Heater on Steam and Water Boilers Boiler Model Heater No. Heater Rating (GPM) WARNING Install an automatic mixing valve at the tankless heater outlet to avoid risk of burns or scalding due to excessively hot water at the fixtures. Adjust and maintain the mixing valve in accordance with the manufacturer's instructions. Pressure Drop thru Heater (PSI) Steam Water Steam Water V713 V1-2 --- 3.25 --- 5.6 V73 V1-2 2.75 3 3.9 4.7 V1-1 --- 3.5 --- 4.4 V1-2 --- 4 --- 8 V74 V1-2 3 3.25 4.7 5.6 V75 V1-2 3.25 3.5 5.6 6.4 V76 V1-2 3.75 3.75 7.2 7.2 V77 V1-2 3.75 4 7.2 8 V78 V1-2 4 4.5 8 9.8 V79 V1-2 4 4.5 8 9.8 3. FLUSHING OF HEATER — All water contains some sediment which settles on the inside of the coil. Consequently, the heater should be periodically backwashed. This is accomplished by installing hose bibs as illustrated and allowing water at city pressure to run into hose bib A, through the heater, and out hose bib B until the discharge is clear. The tees in which the hose bibs are located should be the same size as heater connections to minimize pressure drop. V714 4. HARD WATER — A water analysis is necessary to determine the hardness of your potable water. This is applicable to some city water and particularly to well water. An appropriate water softener should be installed based on the analysis and dealer’s recommendation. This is not only beneficial to the tankless heater but to piping and fixtures plus the many other benefits derived from soft water. TABLE 3A: TANKLESS HEATER DATA: Front Mounted Heater on Water Boilers Boiler Model Heater No. Heater Rating (GPM) Pressure Drop Thru Heater (PSI) V73 222 3 22 V74 222 3.5 22 V75 222 4 30.5 V76 222 4.5 33 222 4.6 33 A54 5.5 36 222 4.75 40 A54 6 39.5 222 4.75 40 A54 6 39.5 NOTE: STEAM BOILERS a. During summertime operation, the normal water line should be raised 1”, from 22-5/8” to 23-5/8” (see Figure 1C) for improved tankless heater performance. G. INSTALL SMOKEPIPE — The V7 should be vented into a fireclay tile-lined masonry chimney or chimney constructed from type L vent or a factory built chimney that complies with the type HT requirements of UL103. The chimney and vent pipe shall have a sufficient draft at all times, to assure safe proper operation of the boiler. See Figure 13 for recommended installation. V77 V78 1. Install a draft regulator (supplied with boiler) following the instructions furnished with the regulator. See Figure 14 for alternate draft regulator locations. V79 cold water with the hot. This prevents excessive and possibly scalding hot water at the fixtures. In addition, savings of hot water will be achieved since the user will not waste as much hot water while seeking water temperature to his liking. Higher temperature hot water required by dishwashers and automatic washers is possible by piping the hot water from the heater prior to entering the mixing valve. The mixing valve should be “trapped” by installing it below the cold water inlet to heater to prevent lime formation in the valve. 2. Consider the chimney overall. Chimneys that have a high heat loss may become less suitable as the heat loss of the home goes down and the efficiency of the boiler installed goes up. Most homes have a chimney appropriate for the fuel and the era in which the home was built. That may have been a coal fired or an inefficient oil fired boiler built into a home without insulation or storm windows. With increasing fuel prices that home probably has been insulated and fitted with storm windows so that the heat loss of the home has been reduced. This 15 Fig. 14: Proper and Improper Locations of Draft Regulator Fig. 13: Recommended Smokepipe Arrangement and Chimney Requirements 3. For the same reasons as in (2.) above, heat extractors mounted into the breeching are not recommended. requires less fuel to be burned and sends less heat up the chimney. H. INSTALL ELECTRIC WIRING in accordance with National Electrical Code and local regulations. A separate ELECTRICAL CIRCUIT should be run from meter with a Fused Disconnect Switch in the Circuit. Wiring should conform to Figures 17 thru 23. A new boiler probably has a higher efficiency than the boiler being replaced. That probably means that the stack temperature from the new boiler will be lower than that from the old boiler and with less room air being drawn up the chimney to dilute the stack gases. The combination of a large uninsulated chimney, reduced firing rate, reduced firing time, lower stack temperature and less dilution air can, in some cases, contribute to the condensing of small amounts of water vapor in the chimney. Such condensation, when it occurs, can cause chimney deterioration. In extreme cases, condensed water may be visible on the outside of the breeching or chimney. In those extreme cases, the chimney may have to be lined to insulate the chimney and thus prevent the condensation. The addition of dilution air into the chimney may assist in drying the chimney interior surfaces. CANADA- Refer to CSA standard C22.2 Part 1, 1990, Electrical Features of Fuel Burning Equipment (Gas and Oil). I. FUEL UNITS AND OIL LINES SINGLE-PIPE OIL LINES - Standard burners are provided with single-stage 3450 rpm fuel units with the by-pass plug removed for single-pipe installations. The single-stage fuel unit may be installed single-pipe with gravity feed or lift. Maximum allowable lift is 8 feet. See Figure 15. TWO-PIPE OIL LINES - For two-pipe systems where more lift is required, the two-stage fuel unit is recommended. Table 4 (single-stage) and Table 5 (two-stage) show allowable lift and lengths of 3/8-inch and 1/2-inch OD tubing for both suction and return lines. Refer to Figure 16. A massive chimney on a cold, or exposed outside wall may have produced adequate draft when it was fired with a higher input and greater volumes of heated gases. With reduced input and volume, the draft may be severely affected. In one instance our research showed a new chimney of adequate sizing produced only -.035" W.C. after 30 minutes of continuous firing at 13.0% CO2. Outside wall chimneys take longer to heat up and can have .00" W.C. draft at burner startup. You may have to consider a special alloy chimney flue liner with insulation around it and a stabilizing draft cap or even a draft inducing fan in severe cases. Be sure that all oil line connections are absolutely airtight. Check all connections and joints. Flared fittings are recommended. Do not use compression fittings or PTFE ("Teflon®") tape. Open the air-bleed valve and start the burner. For clean bleed, slip a 3/16" ID hose over the end of the bleed valve and bleed into a container. Continue to bleed for 15 seconds after oil is free of air bubbles. Stop burner and close valve. 16 TABLE 4: SINGLE-STAGE UNITS (3450 RPM) TWO-PIPE SYSTEMS Lift "H" (See Fig. 16) Figure 15 IMPORTANT Single-pipe installations must be absolutely airtight or leaks or loss of prime may result. Bleed line and fuel unit completely. Manimum Length of Tubing "H" + "R" (See Figure 16) 3/8" OD Tubing (3 GPH) 1/2" OD Tubing (3 GPH) 0' 84' 100' 1' 78' 100' 2' 73' 100' 3' 68' 100' 4' 63' 100' 5' 57' 100' 6' 52' 100' 7' 47' 100' 8' 42' 100' 9' 36' 100' 10' 31' 100' 11' 26' 100' 12' 21' 83' 13' --- 62' 14' --- 41' TABLE 5: TWO-STAGE UNITS (3450 RPM) TWO-PIPE SYSTEMS Lift "H" (See Fig. 16) Figure 16 17 Maximum Length of Tubing "H" + "R" (See Figure 16) 3/8" OD Tubing (3 GPH) 1/2" OD Tubing (3 GPH) 0' 93' 100' 2' 85' 100' 4' 77' 100' 6' 69' 100' 8' 60' 100' 10' 52' 100' 12' 44' 100' 14' 36' 100' 16' 27' 100' 18' --- 76' Fig. 17: Wiring Diagram for Steam Boilers with Standard Hydrolevel CG-450 Probe LWCO, Beckett AFG Burner and Controls, with or without Tankless Heater Fig. 18: Wiring Diagram for Steam Boilers with Optional McDonnell & Miller PS-801 Probe LWCO, Beckett AFG Burner and Controls, with or without Tankless Heater BOILER SEQUENCE OF OPERATION WITH PROBE LWCO When the thermostat calls for heat, it energizes the cad cell primary control, bringing on the burner. The burner will operate until the thermostat is satisfied or the limit setting on the high limit is reached. When the high limit control restores the circuit on a drop in pressure, the burner will start if the thermostat is still calling for heat. Any of the probe low water cutoffs will shut down the burner after a 10-15 second delay, if the water level in the boiler drops too low. The Hydrolevel CG-450 and the McDonnell & Miller PS-804-120 low water cutoffs will shut down the burner for 90 seconds every 10 minutes of firing time to allow water level to stabilize. If the water level is too low the burner will not be allowed to restart. Any of the probe low water cutoffs reset and restart the burner with a call for heat a few seconds after the water is returned to its normal level. On burner start, if the cad cell does not see flame within approximately 45 seconds, primary control will lock out on safety and must be reset before burner can be restarted. When there is no demand for heat, the operating control will maintain the boiler water temperature at the selected setting for proper operation of the domestic water heater, if equipped with optional tankless heater. 18 TS-39- -C Rev. O Fig. 19: Wiring Diagram for Steam Boilers with Optional McDonnell & Miller PS-804-120 Probe LWCO, Beckett AFG Burner and Controls, with or without Tankless Heater NOTE: The McDonnell Miller low water cut off incorporates a 10 second delay to prevent nuisance burner cut-off due to rapid water level fluctuations. The LWCO also has a time delay of 15 seconds which allows additional fill time after water touches the probe. Red LED indicates a low water condition. Fig. 20: Wiring Diagram for Steam Boilers with McDonnell & Miller #67 LWCO, Beckett AFG Burner and Controls, with or without Tankless Heater BOILER SEQUENCE OF OPERATION WITH FLOAT LWCO When the thermostat calls for heat, it energizes the cad cell primary control, bringing on the burner. The burner will operate until the thermostat is satisfied or the limit setting on the high limit is reached. When the high limit control restores the circuit on a drop in pressure, the burner will start if the thermostat is still calling for heat. The low water cut off will shut down the burner if the water level in the boiler drops too low. The control resets and restarts the burner with a call for heat a few seconds after the water is returned to its normal level. On burner start, if the cad cell does not see flame within approximately 45 seconds, primary control will lock out on safety and must be reset before burner can be restarted. When there is no demand for heat, the operating control will maintain the boiler water temperature at the selected setting for proper operation of the domestic water heater, if equipped with optional tankless heater. 19 Fig. 21: Wiring Diagram for Water Boilers with Beckett AFG Burner and Controls, without Tankless Heater SEQUENCE OF OPERATION A call for heat by the thermostat energizes the L8148A control which in turn energizes the R4184D primary control to turn on the burner. If burner ignites within approximately 45 seconds and the cad cell sees flame, the burner will continue to operate until the call for heat is satisfied or the setting of the high limit is reached. The circulator will operate as long as the thermostat is calling for heat. If the thermostat is not satisfied and the high limit is reached, the circulator will continue to operate, and the burner will stop until the high limit is closed by a drop in boiler water temperature. Fig. 22: Wiring Diagram for Water Boilers with Beckett AFG Burner and Controls, with Tankless Heater SEQUENCE OF OPERATION A call for heat by the thermostat energizes the L8124C control which in turn energizes the R4184D primary control to turn on the burner. If burner ignites within approximately 45 seconds and the cad cell sees flame the burner will continue to operate until the call for heat is satisfied. The circulator will also operate when the thermostat calls for heat if the boiler water temperature is up to the setting of the low limit in the L8124C control. If boiler water temperature is below the low limit setting the burner will operate but the circulator will not, giving preference to the domestic hot water demand. On call for heat by the thermostat the burner will continue to operate until the thermostat is satisfied or the setting of the high limit is reached. If the thermostat is not satisfied when the high limit is reached the burner will stop but the circulator will continue to operate until the thermostat is satisfied. Any time the boiler water temperature drops below the setting of the low limit the burner will be energized in order to maintain domestic water temperature. 20 SECTION IV: OPERATING AND SERVICE INSTRUCTIONS WARNING All boilers equipped with burner swing door have a potential hazard which can cause severe property damage, personal injury or loss of life if ignored. Before opening swing door, turn off service switch to boiler to prevent accidental firing of burner outside the combustion chamber. Be sure to tighten swing door fastener completely when service is completed. (Note - If make-up water line is equipped with pressure reducing valve, system will automatically fill to 12 psi. Leave globe valve open). A. ALWAYS INSPECT INSTALLATION BEFORE STARTING BURNER. B . FILL HEATING SYSTEM WITH WATER. NOTE: It is important, especially in a steam system, to properly remove the oil and dirt from the system. Failure to clean the system can result in erratic water lines and surging. j. Open isolation valve in boiler supply piping. k. Remove hose from bib cock. C. CHECK CONTROLS, WIRING AND BURNER to be sure that all connections are tight and burner is rigid, that all electrical connections have been completed and fuses installed, and that oil tank is filled and oil lines have been tested. CLEAN HEATING SYSTEM IF boiler water or condensate return water is dirty or if erratic water lines or surging exist after a few days of boiler operation. Refer to step "N" for proper cleaning instructions for steam and water boilers. D. LUBRICATION — Follow instruction on burner and circulator label to lubricate, if oil lubricated. Most motors currently used on residential type burners employ permanently lubricated bearings and thus do not require any field lubrication. Water lubricated circulators do not need field lubrication. 1. STEAM BOILERS — Fill boiler to normal water line. Refer to Figure No. 1C. 2. HOT WATER BOILERS. Fill entire heating system with water and vent air from system. Use the following procedure on a series loop or multi-zoned system installed as per Figure 9, to remove air from system when filling: Do not over-lubricate. This can cause as much trouble as no lubrication at all. E. SET CONTROLS with burner service switch turned “OFF”. a. Close isolation valve in boiler supply piping. b. Isolate all circuits by closing zone valves or balancing valves. 1. SET ROOM THERMOSTAT about 10° above room temperature. c. Attach a hose to bib cock located just below isolation valve in boiler supply piping. 2. PRESS RED RESET BUTTON on primary control (R4184D/R8184G) and release. (Note - Terminate hose in five gallon bucket at a suitable floor drain or outdoor area). 3. On STEAM BOILERS, set cut-in pressure on PA404 pressuretrol for three (3) pounds and differential pressure for two (2) pounds. These pressures may be varied to suit individual requirements of installation. d. Starting with one circuit, open zone valve. e. Open bib cock. f. Open fill valve (make-up water line should be located directly above isolation valve in boiler supply piping). 4. On STEAM BOILERS WITH TANKLESS DOMESTIC WATER HEATERS, set boiler water temperature dial on L4006 operating control at 190°F (max.). Set differential at 10°. g. Allow water to overflow from bucket until discharge from hose is bubble free for 30 seconds. 5. On WATER BOILERS WITHOUT TANKLESS HEATERS, set high limit dial on L8148 at 210°F. This temperature may be varied to suit requirements of installation. h. Open zone valve to the second zone to be purged, then close the first. Repeat this step until all zones have been purged, but always have one zone open. At completion, open all zone valves. 6. On WATER BOILERS WITH TANKLESS HEATERS, set operating control dial (low limit) on L8124 at 190°F and high limit dial at 210°F. Operating control (low limit) must be a minimum of 20° below high limit setting. Set differential at 25°. i. Close bib cock, continue filling the system until the pressure gauge reads 12 psi. Close fill valve. 21 NOTICE Burner-specific references in the follow ing instructions pertain to the Beckett AFG , supplied as standard equipment. For optional burners, Riello R40 and Carlin EZ-1HP and 102CRD-3, consult Table 6 at the rear of this manual for specifications, the instruction booklet shipped with the burner, and the appropriate Supplemental Instructions shipped w ith the boiler: Supplemental Instructions for: Riello R40 Carlin EZ-1HP Carlin 102CRD-3 V72 thru V77; V713 and V714: "L1" and "F" head burners have a fixed head which is non-adjustable. To check combustion head location refer to Figure 24. F. REMOVE GUN ASSEMBLY 1. Items to be checked are nozzle size, type, and angle; head size (and setting on MD(V1)head); gun setting; and positioning of electrodes. This informations is shown in Figures 23 and 24 and Table 6 (at rear of manual). V78 & V79: “V1” (variable) head burners have the ability to control air by moving the head either forward or back. 2. Reinstall gun assembly. G. ADJUST OIL BURNER BEFORE STARTING. Loosen the adjusting plate assembly hold down screw. Slide the head and plate to the required firing rate setting as shown in Figure 24. Tighten the screw and knurled nut. 1. SET BURNER AIR BAND AND AIR SHUTTER, see Table 6 at rear of manual.. 2. OPEN ALL OIL LINE VALVES. 3. Attach a plastic hose to fuel pump vent fitting and provide a pan to catch the oil. It might be necessary to move the head forward or back one position at a time to optimize the smoke and CO2 readings. See Figure 24. 4. REMOVE GAUGE PORT PLUG from fuel pump and install pressure gauge capable of reading at least 150 PSI. 3. ADJUST DRAFT REGULATOR for a draft of — .02” (water gauge) over the fire after chimney has reached operating temperature and while burner is running. 5. OPEN FLAME OBSERVATION DOOR on front of boiler. 4. READJUST AIR BANDS on burner for a light orange colored flame while the draft over the fire is —.02”. Use a smoke tester and adjust air for minimum smoke (not to exceed #1) with a minimum of excess air. Make final check using suitable instrumentation to obtain a CO2 of 11.5 to 12.5% with draft of —.02” (water gauge) in fire box. These settings will assure a safe and efficient operating condition. If the flame appears stringy instead of a solid fire, try another nozzle of the same type. Flame should be solid and compact. After all adjustments are made recheck for a draft of —.02” over the fire. H. START OIL BURNER. 1. Open vent fitting on fuel pump. 2. TURN ‘ON’ BURNER service switch and allow burner to run until oil flows from vent fitting in a SOLID stream without air bubbles for approximately 10 seconds. 3. Close vent fitting and burner flame should start immediately. I. Burnham Part Number 8142761 8142759 8142760 ADJUST OIL PRESSURE. 1. Locate oil pressure adjusting screw and turn screw to obtain 140 PSI pressure (100 PSI for V74R only). 2. DO NOT REMOVE PRESSURE GAUGE until later. J. OTHER ADJUSTMENTS 1. ADJUST THE AIR BAND AND/OR AIR SHUTTER. (Non-Burnham Drawing Copy from other Manual) Adjust air supply by loosening lock screws and moving the air shutter and if necessary the air band. Refer to Table 6 for preliminary settings. 2. ADJUST THE COMBUSTION HEAD. Fig. 23: "F" Head Electrode Positioning and Gun Setting (Beckett AFG) 22 (Non-Burnham Drawing, Copy from LE Manual, 81433010R4, Page 13, without "Figure 12A, 12B, 12C and 12D"; sample enclosed) Fig. 24: "L1" and "V1" Head Electrode Positioning and Gun Setting (Beckett AFG) 5. TURN “OFF” BURNER and remove pressure gauge. Install gauge port plug and tighten. Start burner again. 6. CAD CELL LOCATION AND SERVICE The burner is supplied with a cadmium sulfide flame detector mounted at the factory, mounted on the bottom of the ignitor. See Figure 25. To service cad cell or to replace the plug in portion, swing open the ignitor. After service is complete, be sure to fasten down the ignitor. 7. FLAME FAILURE The V7 boiler controls operate the burner automatically. If for unknown reasons the burner ceases to fire and the reset button on the primary control has tripped, the burner has experienced ignition failure. Before pressing the reset button call your serviceman immediately. Figure 25: Cad Cell Location 23 CAD CELL TEST g. Open line switch. Clean cell face and see that cell is securely in socket. Reconnect leads. Reset safety switch. h. Close line switch. If burner starts and runs beyond safety switch cut-out time, cell is good. If not, install new cell. K. CHECK FOR CLEAN CUT OFF OF BURNER. 3. WARNING — Check High Limit Control — Jumper Thermostat Terminals. Allow burner to operate until shut-down by limit. Installation is not considered complete until this check has been made. 1. AIR IN THE OIL LINE between fuel unit and nozzle will compress when burner is on and will expand when burner stops, causing oil to squirt from nozzle at low pressure as burner slows down and causing nozzle to drip after burner stops. Usually cycling the burner operation about 5 to 10 times will rid oil line of this air. REMOVE JUMPER. 4. Check low water cut off control with water level at normal water line (see Figure 1C). Raise thermostat setting to allow burner to operate. Open boiler drain to allow water level to drop to bottom of sight glass until burner operation is shut-down by low water cutoff. 2. IF NOZZLE CONTINUES TO DRIP, repeat step K.1.. If this does not stop the dripping, remove cutoff valve and seat, and wipe both with a clean cloth until clean, then replace and readjust oil pressure. If dripping or after burn persist replace fuel pump. Close boiler drain and refill to normal water line. Burner should automatically restart during fill. Lower thermostat setting. L. TEST CONTROLS. 5. Check operating control on boiler equipped with tankless heaters. With burner off, draw hot water until burner starts, then turn off hot water and check burner shut-down. WARNING Before installation of the boiler is considered complete, the operation of the boiler controls should be checked, particularly the primary control and high limit control. IF CONTROLS DO NOT MEET REQUIREMENTS OUTLINED IN PARAGRAPH L., REPLACE CONTROL AND REPEAT CHECK-OUT PROCEDURES. 1. Check thermostat operation. Raise and lower thermostat setting as required to start and stop burner. M. MAINTENANCE OF LOW WATER CUTOFF DEVICES 2. VERIFY PRIMARY CONTROL SAFETY FEATURES using procedures outlined in Instructions furnished with control (See back of control cover) or instructions as follows: IMPORTANT Probe and float type low water cut-off devices require annual inspection and maintenance. CHECKOUT PROCEDURE 1. PROBE TYPE LOW WATER CUT-OFF FOR SERVICEMAN ONLY Although these devices are solid state in their operation, the probe is exposed to possible contamination in the boiler water and subject to fouling. a. Check wiring connections. Close line switch. Check power at control. PRIMARY RELAY TEST It is important to physically remove the probe from the boiler tapping annually and inspect that probe for accumulation of scale or sediment. b. Disconnect cad cell leads (f-f). Reset safety switch. c. Set controller to call for heat. Burner should start. Follow these steps to inspect, clean and/or replace the probe: d. Jumper F-F terminal within 15 to 30 seconds. Burner should run. a. Turn off electric service to the boiler. b. Drain boiler water to a level below the tapping for the probe. e. Remove F-F Jumper. Burner shuts down in approximately 15 to 60 seconds. c. Disconnect wiring connections between the low water cutoff control and the probe. f. If burner operates as described, relay is good. If not, install new relay. 24 d. Dismount the low water cutoff control from the probe. required. Examine all visible wiring for brittle or worn insulation and make sure electrical contacts are clean and that they function properly. Give special attention to solder joints on bellows and float when this type of control is used. Check float for evidence of collapse and check mercury bulb (where applicable) for mercury separation or discoloration. Do not attempt to repair mechanisms in the field. Complete replacement mechanisms, including necessary gaskets and installation instructions are available from the manufacturer. e. Unscrew the probe from the boiler tapping. f. Inspect that portion of the probe that is exposed to the boiler water for a scale or sediment buildup. g. Light deposits may be removed by wiping the probe with a damp cloth. Wiping the probe with a cloth soaked in vinegar will remove more tenacious lime deposits. The most stubborn deposits may be removed from the probe by using a diluted amount, 3 parts of water to 1 part of phosphoric acid (H2PO4). N. BOILER AND SYSTEM CLEANING INSTRUCTIONS FOR TROUBLE FREE OPERATION. 1. STEAM BOILERS CAUTION a. Oil, greases & sediments which accumulate in a new boiler and piping must be removed from the system in order to prevent an unsteady water line and carry over of the water into the supply main above boiler. Exercise caution when handling phosphoric acid and follow the instruction label on its container. h. Clean the pipe threads of the probe to remove old, hardened pipe dope and other foreign matter. Operate the boiler with steam in the entire system for a few days allowing the condensate to return to the boiler. If the condensate can temporarily be wasted, operate boiler only for the length of time it takes for condensate to run clear. If the latter cannot be achieved or if the condensate is returned to the boiler, boil out the boiler using the SURFACE BLOWOFF connection, see Figure 4. i. Apply a moderate amount of good quality pipe dope to the pipe threads on the probe, leaving the two end threads bare. Do not use PTFE (Teflon) tape. j. Screw the probe into the boiler tapping. k. Mount the low water cutoff control on the probe. l. Reconnect the control to probe wiring. i. m. Fill the boiler to its normal waterline. n. Add boiler water treatment compound as needed (refer to paragraph N.). o. Restore electric service to the boiler. p. Fire burner to bring the water in the boiler to a boil to drive off free oxygen. Drain boiler until 1” of water is visible in gauge glass. Run temporary 1½” pipe line from the surface blowoff connection to an open drain or some other location where hot water may be discharged safely. Do not install valve in this line. ii. Drain about 5 gallons of hot water from boiler into a container and dissolve into it an appropriate amount of recommended boil out compound. Remove safety valve & add solution to boiler water thru exposed tapping using a funnel. q. WARNING — BEFORE RETURNING BOILER TO SERVICE: Follow the low water cutoff check out procedure in step L.4.. 2. FLOAT TYPE LOW WATER CUT-OFF During the heating season, if an external low water cutoff is on the boiler, the blow off valve should be opened once a month (use greater frequency where conditions warrant), to flush out the sediment chamber so the device will be free to function properly. NOTICE Check with local authorities or consult local water treatment services for acceptable chemical cleaning compounds. Low-water cutoffs and water feeders should be dismantled annually by qualified personnel, to the extent necessary to insure freedom from obstructions and proper functioning of the working parts. Inspect connecting lines to boiler for accumulation of mud, scale, etc., and clean as iii. Start burner and operate sufficiently to boil the water without producing steam pressure. Boil for about 5 hours. Open boiler feed pipe sufficiently to permit a steady trickle of water from the surface blowoff pipe. 25 v. Continue this slow boiling and trickle of overflow for several hours until the water coming from the overflow is clear. iv. Stop burner and drain boiler in a manner and to a location that hot water can be discharged with safety. v. Refill boiler to normal water line. If water in gauge glass does not appear to be clear, repeat steps (i. thru iii.) and boil out the boiler for a longer time. b. Low pressure steam boilers such as the V7 Series should be maintained with appropriate water treatment compounds. Add suitable water treatment compounds as recommended by your qualified water treatment company. vi. If the boiler water becomes dirty again at a later date due to additional sediment loosened up in the piping, close gate valve in Hartford Loop, open drain cock in return main, turn on oil burner and allow Condensate to flow to drain until it has run clear for at least 30 minutes while feeding water to boiler so as to maintain normal water level. Turn off oil burner, drain boiler, open gate valve in Hartford Loop, then repeat step 1 above. c. Remove temporary surface blowoff piping, plug tapping and reinstall safety valve. Boil or bring water temperature to 180°F promptly in order to drive off the dissolved gases in the fresh water. d. If unsteady water line, foaming or priming persist, install gate valve in Hartford Loop and drain valves in return main and at boiler as shown in Figure 8 and proceed as follows: i When boiler has cooled down sufficiently (crown sheet of sections are not too hot to touch), close the drain cocks at boiler and in return main and feed water slowly up to normal level in boiler. Turn on oil burner and allow boiler to steam for 10 minutes, then turn off burner. Draw off one quart of water from bottom gauge glass fitting and discard. Draw off another quart sample and if this sample is not clear, repeat the cycle of draining the boiler and return main and refilling the boiler until sample is clear. e. Make pH or Alkalinity Test. Connect hoses from drain cocks to floor drain. Close gate valve in Hartford Loop and open drain cock in return main. Fill boiler to normal water level, turn on oil burner and operate boiler at this water level for at least 30 minutes after the condensate begins to run hot, then turn off burner. After boiler and system have been cleaned and refilled as previously described, test the pH of the water in the system. This can easily be done by drawing a small sample of boiler water and testing with hydrion paper which is used in the same manner as litmus paper, except it gives specific readings. A color chart on the side of the small hydrion dispenser gives the reading in pH. Hydrion paper is inexpensive and obtainable from any chemical supply house or through your local druggist. The pH should be higher than 7, but lower than 11. Add some of the washout chemical (caustic soda), if necessary, to bring the pH within the specified range. Close all radiator valves. Remove all supply main air valves and plug the openings in supply main. ii. Draw about 5 gallons of hot water from boiler into a container and dissolve into it the appropriate amount of a recommended boilout compound. Remove safety valve from boiler and pour this solution into boiler, then reinstall safety valve. f. Boiler is now ready to be put into service. 2. WATER BOILERS iii. Turn on oil burner and keep operating while feeding water to boiler slowly. This will raise water level in boiler slowly so that water will be boiling hot and will rise slowly into supply main and back through return main, flowing from drain hose at about 180°F. Continue until water runs clear from drain hose for at least 30 minutes. a. Filling of Boiler and System — General —-In a hot water heating system, the boiler and entire system (other than the expansion tank) must be full of water for satisfactory operation. Water should be added to the system until the boiler pressure gauge registers 12 psi. To insure that the system is full, water should come out of all air vents when opened. iv. Stop feeding water to boiler but continue operating oil burner until excess water in boiler flows out through supply main and water lowers (by steaming) until it reaches normal level in boiler. Turn off oil burner. Drain boiler. Open all radiator valves. Reinstall all supply main air valves. Open gate valve in Hartford Loop. b. Boiling Out of Boiler and System. The oil and grease which accumulate in a new hot water boiler can be washed out in the following manner. i. Remove safety relief valve using extreme care to avoid damaging it. ii. Add an appropriate amount of 26 recommended boil out compound. and can vary from sample to sample. For all of those reasons a spare nozzle is a desirable item for a serviceman to have. iii. Replace safety relief valve. iv. Fill the entire system with water. v. 2. FLAME SHAPE — Looking into the combustion chamber through the observation door, the flame should appear straight with no sparklers rolling up toward the crown of the chamber. If the flame drags to the right or left, sends sparklers upward or makes wet spots on the target wall, the nozzle should be replaced. If the condition persists look for fuel leaks, air leaks, water or dirt in the fuel as described above. Start firing the boiler. vi. Circulate the water through the entire system. vii. Vent the system, including the radiation. viii. Allow boiler water to reach operating temperature, if possible. ix. Continue to circulate the water for a few hours. x. 3. FUEL LEAKS — Any fuel leak between the pump and the nozzle will be detrimental to good combustion results. Look for wet surfaces in the air tube, under the ignitor, and around the air inlet. Any such leaks should be repaired as they may cause erratic burning of the fuel and in the extreme case may become a fire hazard. Stop firing the boiler. xi. Drain the system in a manner and to a location that hot water can be discharged with safety. xii. Remove plugs from all available returns and wash the water side of the boiler as thoroughly as possible, using a highpressure water stream. 4. AIR LEAKS — Any such leaks should be repaired, as they may cause erratic burning of the fuel and in extreme cases may become a fire hazard. xiii. Refill the system with fresh water. c. Add appropriate boiler water treatment compounds as recommended by your qualified water treatment company. 5. GASKET LEAKS — If 11.5 to 12.5% CO2 with a #1 smoke cannot be obtained in the breeching, look for air leaks around the burner mounting gasket, observation door, and canopy gasket. Such air leaks will cause a lower CO2 reading in the breeching. The smaller the firing rate the greater effect an air leak can have on CO2 readings. d. Make pH or Alkalinity Test. After boiler and system have been cleaned and refilled as previously described, test the pH of the water in the system. This can easily be done by drawing a small sample of boiler water and testing with hydrion paper which is used in the same manner as litmus paper, except it gives specific readings. A color chart on the side of the small hydrion dispenser gives the reading pH. Hydrion paper is inexpensive and obtainable from any chemical supply house or thru your local druggist. The pH should be higher than 7 but lower than 11. Add appropriate water treatment chemicals, if necessary, to bring the pH within the specified range. With this lower level of protection, care must be exercised to eliminate all of the free oxygen in the system. 6. DIRT — A fuel filter is a good investment. Accidental accumulation of dirt in the fuel system can clog the nozzle or nozzle strainer and produce a poor spray pattern from the nozzle. The smaller the firing rate, the smaller the slots become in the nozzle and the more prone to plugging it becomes with the same amount of dirt. 7. WATER — Water in the fuel in large amounts will stall the fuel pump. Water in the fuel in smaller amounts will cause excessive wear on the pump, but more importantly water doesn’t burn. It chills the flame and causes smoke and unburned fuel to pass out of the combustion chamber and clog the flueways of the boiler. e. Boiler is now ready to be put into service. 8. COLD OIL — If the oil temperature approaching the fuel pump is 40°F or lower poor combustion or delayed ignition may result. Cold oil is harder to atomize at the nozzle. Thus, the spray droplets get larger and the flame shape gets longer. An outside fuel tank that is above grade or has fuel lines in a shallow bury is a good candidate for cold oil. The best solution is to bury the tank and lines deep enough to keep the oil above 40°F. O. HINTS ON COMBUSTION 1. NOZZLES — Although the nozzle is a relatively inexpensive device, its function is critical to the successful operation of the oil burner. The selection of the nozzle supplied with the V7 boiler is the result of extensive testing to obtain the best flame shape and efficient combustion. Other brands of the same spray angle and spray pattern may be used but may not perform at the expected level of CO2 and smoke. Nozzles are delicate and should be protected from dirt and abuse. Nozzles are mass-produced 9. HIGH ALTITUDE INSTALLATIONS Air openings must be increased at higher altitudes. Use instruments and set for 11.5 to 12.5% CO2. 27 clean water to prescribed water level. IMPORTANT 4. Always keep the manual fuel supply valve shut off if the burner is shut down for an extended period of time. SUCTION LINE LEAKS - THE OIL MUST BE FREE OF AIR. Try bleeding the pump through a clear tube. There must be no froth visible. There are various test kits available to enable you to look at the oil through clear tubing adapted to the supply line at the pump fitting. Air eliminators are on the market that have potential. Also, electronic sight glasses are being used with good success. At times, new tubing must be run to the tank or new fittings put on. Just make sure you get the air out. Any air leaks in the fuel line will cause an unstable flame and may cause delayed ignition noises. Use only flare fittings in the fuel lines. 5. To recondition the heating system in the fall season after a prolonged shut down, follow the instructions outlined in Section IV, Items A through M. CAUTION This boile r contains controls w hich may cause the boiler to shut down and not res ta rt w ithout se rv ice. If damage due to froze n pi pes is a possibility, the heating system should not be left unattended in cold we ather; or appropriate safeguards and alarms s hould be installed on the he ating system to prevent damage if the boile r is i nope rative. 10. START-UP NOISE — Late ignition is the cause of start-up noises. If it occurs recheck for electrode settings, flame shape, air or water in the fuel lines. 11. SHUT DOWN NOISE — If the flame runs out of air before it runs out of fuel, an after burn with noise may occur. That may be the result of a faulty cut-off valve in the fuel pump, or it may be air trapped in the nozzle line. It may take several firing cycles for that air to be fully vented through the nozzle. Water in the fuel or poor flame shape can also cause shut down noises. Q. FREQUENT WATER ADDITION IMPORTANT CHECK TEST PROCEDURE. A very good test for isolating fuel side problems is to disconnect the fuel system and with a 24" length of tubing, fire out of an auxiliary five gallon pail of clean, fresh, warm #2 oil from another source. If the burner runs successfully when drawing out of the auxiliary pail then the problem is isolated to the fuel or fuel lines being used on the jobsite. A leaky system will increase the volume of make-up water supplied to the boiler which can significantly shorten the life of the boiler. Entrained in make-up water are dissolved minerals and oxygen. When the fresh, cool make-up water is heated in the boiler the minerals fall out as sediment and the oxygen escapes as a gas. Both can result in reduced boiler life. The accumulation of sediment can eventually isolate the water from contacting the cast iron. When this happens the cast iron in that area gets extremely hot and eventually cracks. The presence of free oxygen in the boiler creates a corrosive atmosphere which, if the concentration becomes high enough, can corrode the cast iron through from the inside. Since neither of these failure types are the result of a casting defect the warranty does not apply. Clearly it is in everyone’s best interest to prevent this type of failure. The maintenance of system integrity is the best method to achieve this. P. ATTENTION TO BOILER WHILE NOT IN OPERATION. 1. IMPORTANT IF BOILER IS NOT USED DURING WINTER TIME, IT MUST BE FULLY DRAINED TO PREVENT FREEZE DAMAGE. 2. Spray inside surfaces with light lubricating or crankcase oil using gun with extended stem so as to reach all corners. 3. With steam boilers, at end of season add sufficient water to fill boiler to top of water column and leave it that way until fall when water should be drained again to proper level. If at this time boiler water is dirty, drain water, flush out boiler, and refill with 28 (Non-Burnham Drawing Copy from other Manual) AQUASTAT SWITCHING ACTION WITHIN L8124C CONTROL The switching action within the L8124C control has three settings: 1. high limit 2. low limit 3. adjustable differential EXAMPLE: Set point of 140°F; differential set at 25°F. On a temperature rise, R-B will break and R-W will make at 155°F. On a temperature fall, R-B will make and R-W will break at 130°F. Set low limit indicator at the minimum temperature recommended for domestic hot water supply. This setting must be at least 20°F below high limit setting to prevent one switch from locking out the other. HIGH LIMIT OPERATION —The high limit opens and turns off the burner when the water temperature reaches the set point. The high limit automatically resets after the water temperature drops past the set point and through the 10°F differential. Set the indicator at desired shutoff temperature. Set the differential the desired number of degrees. 25°F differential gives longest burner cycles. AQUASTAT SWITCHING ACTION WITHIN L8148A CONTROLS The switching action in the L8148A control has one setting, the high limit. The switching relay is controlled by the low voltage room thermostat. On a call for heat, the relay contacts make to complete the line voltage circulator circuit and also the burner circuit if the boiler water temperature is below the high limit setting. The high limit switch shuts off the burner if boiler water temperature exceeds the high limit setting. Set the indicator at the desired shutoff temperature. LOW LIMIT OPERATION —On a temperature rise, with the adjustable differential at the minimum setting of 10°F, the burner circuit (R-B) breaks and the circulator circuit (R-W) makes at the low limit set point. On a temperature drop of 10°F below the set point, the R-B circuit makes and the R-W circuit breaks. ADJUSTABLE DIFFERENTIAL —At any differential setting greater than 10°F, the R-B make temperature and R-W break temperature will remain the same-control setting minus 10°F. The R-B break and RW make temperature will be the set point temperature plus the difference between the differential setting and 10°F. SECTION V: BOILER CLEANING WARNING A ll b oiler clea nin g mus t be comp le ted w ith burn er s erv ic e sw it ch turne d o ff. B oiler s e quippe d w it h bu rner sw in g do or ha ve a pot ent ia l h az ard wh ic h c an ca use s ev ere prop ert y da mage , per sona l injury or los s of lif e if ignor ed. B ef ore ope nin g s wing d oor, tu rn of f se rvice sw it ch to boiler to prev en t a cc ide nta l firing of b urne r out si de the co mbus tion c ham ber. B e s ure to t igh ten sw in g do or f ast ene r c omp let ely w he n s erv ic e is co mplete d. 29 smokepipe, burner mounting plate, burner swing door and all flue plates are secured in place. 1. Install the canopy taking care to align the gaskets without blocking the flueways. If gasket is damaged, replace as needed. 2. Reinstall flue plates, making sure gasket on each plate is in place and forms gas tight seal. If damaged replace as needed. 3. Reinstall jacket top panel and secure with sheet metal screws. Replace jacket upper right side access panel. 4. Reinstall smokepipe on canopy and secure to collar with sheet metal screws. 5. Install swing door mounting plate to front section with fasteners, see Figure 6. 6. Reinstall burner in reverse order of disassembly outlined in paragraph A.2 above. For details, see Figure 6. A. CLEAN THE FLUEWAYS (See Figure 26). 1. Prior to cleaning boiler, lay a protective cloth or plastic over combustion chamber blanket to collect debris falling from flueways. 2. For access to firebox On boilers with burner swing door and flexible fuel line(s), remove fastener securing door and swing door open. For full access to firebox, remove burner and swing door from mounting plate by pulling hairpin cotter from bottom of hinge pin and removing pin from hinge. Set burner aside. Remove swing door mounting plate, see Figure 6. 3. For cleaning from the side: a. Lift the jacket's upper right side access panel off to expose the flue cleanout plates. b. Loosen nuts securing the flue cleanout plates and remove the plates. The insulation should be removed with the plates taking care not to damage the insulation. 4. For cleaning from the top: a. Lift the jacket's upper right side access panel off to allow removal of the jacket top panel. b. Remove as much smokepipe as necessary to allow removal of the jacket top panel and canopy (smokebox). c. Remove the jacket top panel. d. Remove the canopy, being careful not to damage the ceramic fiber gasket. 5. Using a 1¼” diameter wire or fibre bristle brush (30” handle) clean the flueways. Brush from the top and/or side using horizontal and diagonal strokes for best results. DO NOT allow brush to strike the target wall or liner in the chamber. B. CLEAN TOP OF BOILER SECTIONS (if cleaning from the top). Brush and vacuum the tops of the boiler sections. Figure 26: Cleaning of Boiler Flueways C. CLEAN THE FIREBOX. Using wire or fibre bristle brush, clean crown of boiler and inside of water legs. DO NOT allow brush to strike target wall or blanket in the combustion chamber. WARNING The boiler must be connected to an approved chimney in good condition. Serious property damage could result if the boiler is connected to a dirty or inadequate chimney. The interior of the chimney flue must be inspected and cleaned before the start of the heating season and should be inspected periodically throughout the heating season for any obstructions. A clean and unobstructed chimney flue is necessary to allow noxious fumes that could cause injury or loss of life to vent safely and will contribute toward maintaining the boiler's efficiency. D. AFTER CLEANING, remove protective cloth with debris and vacuum as necessary, but be careful not to damage blanket. Inspect target wall, combustion chamber blanket, burner mounting plate insulation and burner swing door insulation for signs of damage. If damaged, replace as needed. E. REASSEMBLE BOILER. CAUTION: Do not start the burner unless canopy, 30 SECTION VI: REPAIR PARTS All V7 Series Repair Parts may be obtained through your local Burnham Wholesale distributor. Should you require assistance in locating a Burnham Distributor in your area, or have questions regarding the availability of Burnham products or repair parts, please contact your Burnham Regional Sales Office as listed below. B urnh am Corpo rati on Regional Offices A. Burnham Corporation - Central & Western Regions P.O. Box 3079 Lancaster, PA 17604-3079 Phone: (717) 481-8400 FAX: (717) 481-8408 C. Burnham Corporation - M etropolitan Region P.O. Box 3079 Lancast er, PA 17604-3079 Phone: (717) 481-8400 FAX: (717) 481-8409 B. B urnham Sales Corporation - Northeast Region 19-27 M ystic Avenue Somerville, MA 02145 Phone: (617) 625-9735 FAX: (617) 625-9736 D. B urnham Corporation - Mid-At lantic Region P.O. Box 3079 Lancaster, PA 17604-3079 Phone: (717) 481-8400 FAX: (717) 481-8409 Contact Regional Office Indicated for your State Alabama A Nebraska A Oregon A Alaska A Nevada A Pennsylvania D Arizona A New Hampshire B Rhode Island B Arkansas A New Jersey South Carolina A California A Atlantic, Burlington, Camden, South Dakota A Colorado A Cape May, Cumberland, Tennessee A Connecticut B Gloucester, Mercer, Texas A Delaware D Monmouth, Ocean, Salem Utah A Florida A Counties Vermont B Georgia A Hawaii A New Mexico Idaho A New York Illinois A Albany, Fulton, Montgomery, Indiana A Rensselaer, Saratoga, Iowa A Schenectady, Schoharie, Kansas A Warren, Washington Counties Kentucky A All Other Counties Louisiana A Maine Maryland Massachusetts B Athens, Belmont, Gallia, Michigan A Jefferson, Lawrence, Meigs, Minnesota A Monroe, and Washington Mississippi A Counties Missouri A Montana A All other Counties D C A Virginia Arlington,Accomack,Clarke, Fairfax,Frederick,Fauquier, Loudoun,Northampton and B D Prince William Counties All other Counties A Washington A C Washington, D.C. D North Carolina A West Virginia D B North Dakota A Wisconsin A D Ohio Wyoming A Canada A All other Counties Oklahoma D A A 31 32 BARE BOILER ASSEMBLY Item No. Description Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79 BARE BOILER ASSEMBLY (See Page 32 for Illustration) Front Section (Non-Htr.), Machined Water 71727019 1 --- 1 --- 1 1 1 1 1 1 Front Section (Non-Htr.), Machined Water 71727015 --- 1 --- 1 --- --- --- --- --- --- Front Section (Non-Htr.), Machined Steam 71727018 --- --- 1 --- 1 1 1 1 1 1 2 Front Section w/Htr. Opening, Machined Water 71727016 --- --- 1 --- 1 1 1 1 1 1 2A Front Section w/Htr. Opening, Machined Steam 71727017 --- --- 1 --- 1 1 1 1 1 1 Center Section 7172202 --- 1 --- 2 --- --- --- --- --- --- Center Section 71727021 --- --- 1 --- 2 3 4 5 6 7 Narrow Back Section (Non-Htr.), Machined 7172204 --- 1 --- 1 --- --- --- --- --- --- 4A Wide Back Section (Non-Htr.), Machined Water 71727033 1 --- 1 --- 1 1 1 1 1 1 4B Wide Back Section (Non-Htr.), Machined Steam 71727034 --- --- 1 --- 1 1 1 1 1 1 Rear Section w/Htr. Opening, Machined 7172203 --- 1 --- 1 --- --- --- --- --- --- Rear Section w/Htr. Opening, Machined 71727036 --- --- 1 --- 1 1 1 1 1 1 6 5" Cast Iron Slip Nipple 7066003 1 --- 2 --- 3 4 5 6 7 8 7 2½" Cast Iron Slip Nipple 7066001 1 4 2 6 3 4 5 6 7 8 8 Rear Target Wall Insulation 8202701 1 1 1 1 1 1 1 1 1 1 Combustion Chamber Liner, ½" x 23" x 4" 82027023 1 --- --- --- --- --- --- --- --- --- Combustion Chamber Liner, ½" x 24" x 5" 82022033 --- 1 --- --- --- --- --- --- --- --- Combustion Chamber Liner, ½" x 23" x 8" 82027031 --- --- 1 --- --- --- --- --- --- --- Combustion Chamber Liner, ½" x 24" x 9" 82022043 --- --- --- 1 --- --- --- --- --- --- Combustion Chamber Liner, ½" x 23" x 12" 82027041 --- --- --- --- 1 --- --- --- --- --- Combustion Chamber Liner, ½" x 23" x 16" 82027051 --- --- --- --- --- 1 --- --- --- --- Combustion Chamber Liner, ½" x 23" x 20" 82027061 --- --- --- --- --- --- 1 --- --- --- Combustion Chamber Liner, ½" x 23" x 24" 82027071 --- --- --- --- --- --- --- 1 --- --- Combustion Chamber Liner, ½" x 23" x 28" 82027081 --- --- --- --- --- --- --- --- 1 --- Combustion Chamber Liner, ½" x 23" x 32" 82027091 --- --- --- --- --- --- --- --- --- 1 Tie Rod, 3/8"-16 x 7¾" Lg. 80861072 2 --- --- --- --- --- --- --- --- --- Tie Rod, 3/8"-16 x 12½" Lg. 80861010 --- 2 2 --- --- --- --- --- --- --- Tie Rod, 3/8"-16 x 17" Lg. 80861011 --- --- --- 2 2 --- --- --- --- --- Tie Rod, 3/8"-16 x 20¾" Lg. 80861012 --- --- --- --- --- 2 --- --- --- --- Tie Rod, 3/8"-16 x 25¼" Lg. 80861013 --- ---- --- --- --- --- 2 --- --- --- Tie Rod, 3/8"-16 x 27½" Lg. 80861014 --- --- --- --- --- --- --- 2 --- --- Tie Rod, 3/8"-16 x 31½" Lg. 80861015 --- --- --- --- --- --- --- --- 2 --- Tie Rod, 3/8"-16 x 36½" Lg. 80861036 --- --- --- --- --- --- --- --- --- 2 1 1A 3 4 5 8A 9 CONTINUED ON PAGES 34 AND 35 33 34 BARE BOILER ASSEMBLY (CONTINUED) CONTINUED FROM PAGE 33 Item Description No. Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79 BARE BO ILER ASSEMBLY (See Page 34 for Illustration) 10 Flue Cover Plate Assembly 6112214 1 2 2 3 3 4 5 6 7 8 11 Heater Cover Plate Gasket - Front Heater 8036068 --- --- 1 --- 1 1 1 1 1 1 11A Heater Cover Plate Gasket - Rear Heater 8036058 --- 1 1 1 1 1 1 1 1 1 Blank Heater Cover Plate (WB) - Front Heater 7036002 --- --- 1 --- 1 1 1 1 1 1 12A Tapped Heater Cover Plate (WBTL) - Front Heater 7036001 --- --- 1 --- 1 1 1 1 1 1 12B Blank Heater Cover Plate (SB & WB) - Rear Heater 7036020 --- --- 1 --- 1 1 1 1 1 1 12C Tapped Heater Cover Plate (WBTL) - Rear Heater 7036021 --- 1 1 1 1 1 1 1 1 1 222A Heater Carton Assy. - (WBT) Front Heater 6036036 --- --- 1 --- 1 1 1 1 1 1 1 A54 Heater Carton Assy. - (WBT) Front Heater 6031204 --- --- --- --- --- --- --- 1 1 13A V1-2 Heater Assy. - (SBT & WBT) - Rear Heater 6036031 --- 1 1 --- 1 1 1 1 1 1 13B V1-1 Heater Carton Assy. - (WBT) Rear Heater 6036030 --- --- --- 1 --- --- --- --- --- --- Burner Swing Door Mounting Plate 7172705 1 1 1 1 1 1 1 1 1 1 Burner Swing Door Mounting Plate Insulation 82027021 1 1 1 1 1 1 1 1 1 1 15 Rope Gasket - Burner Mounting Plate - 53" Lg. 72027014 1 1 1 1 1 1 1 1 1 1 16 Burner Swing Door 7172706 1 1 1 1 1 1 1 1 1 1 16A Burner Swing Door Insulation 82027022 1 1 1 1 1 1 1 1 1 1 16B Rope Gasket (Burner Swing Door) - 28" Lg. 72027015 1 1 1 1 1 1 1 1 1 1 16C Hinge 7022701 2 2 2 2 2 2 2 2 2 2 16D Hinge Pin 80861614 1 1 1 1 1 1 1 1 1 1 16E Hairpin Cotter 80861667 1 1 1 1 1 1 1 1 1 1 17 Observation Port Cover 7026001 1 1 1 1 1 1 1 1 1 1 18 Spring 3/8" I.D. x ½" Lg. 8026015 1 1 1 1 1 1 1 1 1 1 19 Canopy Sealing Strip (½" x 1" x 98") 7202710 1 1 1 1 1 1 1 1 1 1 V72 Canopy Assembly, Type II 611270211 1 --- --- --- --- --- --- --- --- --- V713 Canopy Assembly 611270313 --- 1 --- --- --- --- --- --- --- --- V73 Canopy Assembly, Type II 611270311 --- --- 1 --- --- --- --- --- --- --- V714 Canopy Assembly 611270413 --- --- --- 1 --- --- --- --- --- --- V74 Canopy Assembly, Type II 611270411 --- --- --- --- 1 --- --- --- --- --- V75 Canopy Assembly, Type II 611270511 --- --- --- --- --- 1 --- --- --- --- V76 Canopy Assembly, Type II 611270611 --- --- --- --- --- --- 1 --- --- --- V77 Canopy Assembly, Type II 611270711 --- --- --- --- --- --- --- 1 --- --- V78 Canopy Assembly, Type II 611270811 --- --- --- --- --- --- --- --- 1 --- V79 Canopy Assembly, Type II 611270911 --- --- --- --- --- --- --- --- --- 1 12 13 14 14A 20 --- OR--- 35 36 TS-39-112-D V713 and V714 FLUSH JACKET Item No. Description Part No. V713 V714 V713 and V714 Flush Jacket Components - Items 1 thru 6 Include Insulation As Part of Assembly 1 Jacket Front Panel Assembly 60427097 1 1 2 Jacket Rear Panel Assembly 60427096 1 1 604270314 1 --- 3 Jacket Left Side/Top Panel Assembly 604270414 --- 1 604270322 1 --- 604270422 --- 1 604270337 1 --- 604270437 --- 1 604270336 1 --- 604270436 --- 1 604270335 1 --- 604270435 --- 1 1 1 4 5 Jacket Top Panel Assembly Jacket Lower Right Side Panel Assembly Jacket Upper Right Side Access Panel Assembly without Heater Opening (WB Only) 6 Jacket Upper Right Side Access Panel Assembly with Heater Opening (WBT Only) Jacket Bracket (WB Only) 7042715 Jacket Bracket (WBT Only) 7042714 7 37 38 TS-39-109-D V72 Thru V79 FLUSH JACKET Item No. Description Part No. V72 V73 V74 V75 V76 V77 V78 V79 V72 Thru V79 Flush Jacket Components - Items 1 thru 7 Include Insulation As Part of Ass'y Jacket Front Panel Ass'y w/o Htr. Opg. (Wtr. Blr.) 60427090 1 Jacket Front Panel Ass'y w/o Htr. Opg. (Stm. Blr.) 60427091 --- Jacket Front Panel Ass'y w/Htr. Opg. (Wtr. Blr.) 60427092 --- Jacket Front Panel Ass'y w/Htr. Opg. (Stm. Blr.) 60427094 --- 1 1 2 Plastic Collar Extension-Jkt. Frt. Panel w/Htr. Opg. 3 Jacket Rear Panel Assembly 4 5 6 1 1 1 1 1 1 8032704 --- 1 1 1 1 1 1 60427093 1 1 1 1 1 1 1 1 604270241 1 --- --- --- --- --- --- --- 604270341 --- 1 --- --- --- --- --- --- 604270441 --- --- 1 --- --- --- --- --- 604270541 --- --- --- 1 --- --- --- --- 604270641 --- --- --- --- 1 --- --- --- 604270741 --- --- --- --- --- 1 --- --- 604270841 --- --- --- --- --- --- 1 --- 604270941 --- --- --- --- --- --- --- 1 604270221 1 --- --- --- --- --- --- --- 604270321 --- 1 --- --- --- --- --- --- 604270421 --- --- 1 --- --- --- --- --- 604270521 --- --- --- 1 --- --- --- --- 604270621 --- --- --- --- 1 --- --- --- 604270721 --- --- --- --- --- 1 --- --- 604270821 --- --- --- --- --- --- 1 --- 604270921 --- --- --- --- --- --- --- 1 604270234 1 --- --- --- --- --- --- --- 604270334 --- 1 --- --- --- --- --- --- 604270434 --- --- 1 --- --- --- --- --- 604270534 --- --- --- 1 --- --- --- --- 604270634 --- --- --- --- 1 --- --- --- 604270734 --- --- --- --- --- 1 --- --- 604270834 --- --- --- --- --- --- 1 --- 604270934 --- --- --- --- --- --- --- 1 604270233 1 --- --- --- --- --- --- --- 604270333 --- 1 --- --- --- --- --- --- 604270433 --- --- 1 --- --- --- --- --- 604270533 --- --- --- 1 --- --- --- --- 604270633 --- --- --- --- 1 --- --- --- 604270733 --- --- --- --- --- 1 --- --- 604270833 --- --- --- --- --- --- 1 --- 604270933 --- --- --- --- --- --- --- 1 604270332 --- 1 --- --- --- --- --- --- 604270432 --- --- 1 --- --- --- --- --- 604270532 --- --- --- 1 --- --- --- --- 604270632 --- --- --- --- 1 --- --- --- 604270732 --- --- --- --- --- 1 --- --- 604270832 --- --- --- --- --- --- 1 --- 604270932 --- --- --- --- --- --- --- 1 Jacket Left Side/Top Panel Assembly Jacket Top Panel Assembly Jacket Lower Right Side Panel Assembly Jacket Upper Right Side Access Panel Assembly without Heater Opening 7 Jacket Upper Right Side Access Panel Assembly with Heater Opening 39 40 V73 Thru V79 STEAM BOILERS - TRIM AND CONTROLS Item No. Description Part No. V73 V74 V75 V76 V77 V78 V79 V73 Thru V79 STEAM BOILERS - TRIM AND CONTRO LS (See Page 40 for Illustration) 1. Draft Regulator 1A DR-6 Draft Regulator 8116029 1 1 1 1 --- --- --- 1B DR-7 Draft Regulator 8116001 --- --- --- --- 1 1 1 8142711 1 1 1 1 1 1 1 2. Instruction Envelope Containing: 2A Ins tallation and Operating Instructions 2B 10 Year Lim ited Warranty Mailer (Steam Boilers ) 81460121 1 1 1 1 1 1 1 2C I= B=R Pam phlet 81460061 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3. Probe Low Water Cutoff Low Water Cutoff, Hy drolevel CG450 (less probe) 80160628 Low Water Cutoff, McDonnell & Miller P S-801-120 80160624 Low Water Cutoff, McDonnell & Miller P S-804-120 80160662 3B Probe, Hydrolev el EL-1214 (Hydrolevel CG450) 80160629 1 1 1 1 1 1 1 3C Limit, Honeywell PA404A1009 80160300 1 1 1 1 1 1 1 3D Syphon, ¼ NPT x 4" x 180° 806603030 1 1 1 1 1 1 1 3D1 Bushing, ¾ NPT x ¼ NPT 806600508 1 1 1 1 1 1 1 3D2 Elbow, ¾ NPT 806601520 1 1 1 1 1 1 1 3D3 Nipple, ¾ NPT x 2" 806600003 1 1 1 1 1 1 1 8056091 1 1 1 1 1 1 1 3A 3E Gage Glass S et, 6", ConBraCo 20-104-10 4. Float Low Water Cutoff 4A Low Water Cutoff, McDonnell & Miller 67 80160597 1 1 1 1 1 1 1 4B Limit, Honeywell PA404A1009 80160300 1 1 1 1 1 1 1 4C Syphon, ¼ NPT x 4" x 180° 806603030 1 1 1 1 1 1 1 4D Gage Glass S et, 6", ConBraCo 20-104-10 8056091 1 1 1 1 1 1 1 5. Miscellaneous Trim and Controls 5A Oil Prim ary Control, Honeywell R8184G1286 80160416 1 1 1 1 1 1 1 5B Safety Valve, ¾ NPT, 15 psi, ConBraCo 13-51108 81660530 1 1 1 1 1 1 1 5B1 Coupling, ¾ NPT 806602561 1 1 1 1 1 1 1 5B2 Nipple, ¾ NPT x 8" 806600221 1 1 1 1 1 1 1 5C Drain Valve, ¾ NPT, ConBraCo 31-606-02 806603011 1 1 1 1 1 1 1 5C1 Bushing, 1½ NPT x ¾ NPT 806600507 1 1 1 1 1 1 1 5D Limit, Honeywell L4006A2015 (SB PT & SB FT) 80160400 1 1 1 1 1 1 1 5E Well, ¾ NPT x 1½ ", Honeywell 123890A 80160426 1 1 1 1 1 1 1 41 42 V72 Thru V79, V713 and V714 WATER BOILERS - TRIM AND CONTROLS ITEM DESCRIPTION NO. Part No. V72 V713 V73 V714 V74 V75 V76 V77 V78 V79 V7 2 Thru V79, V713 and V7 14 WATER BO ILERS - TRIM AND CO NTROLS (See Page 42 for Illustration) 1. DRAFT REGULATO R 1A DR-6 Draft Regulator 8116029 1 1 1 1 1 1 1 ---- ---- ---- 1B DR-7 Draft Regulator 8116001 ---- ---- ---- ---- ---- ---- ---- 1 1 1 8142711 1 1 1 1 1 1 1 1 1 1 2. INSTRUC TIO N ENVELOPE CONTAINING : 2A Installation and Operating Instructions 2B Limited Warranty Mailer (Water Boilers) 81460135 1 1 1 1 1 1 1 1 1 1 2C I=B=R Pamphlet 81460061 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 ---- 1 1 1 1 1 1 1 1 1 80160426 1 1 1 1 1 1 1 1 1 1 80160497 ---- 1 1 1 1 1 1 1 1 1 80160473 1 1 1 1 1 1 1 1 1 1 8056007 1 1 1 1 1 1 1 1 1 1 3. CONTROLS 3A 3B 3C Honeywell L8148A1090 Hi Limit, Circ. Relay (WB) --OR -Honeywell L8124C1102 Hi & Lo Limit, Circ. Relay (WBT) Honeywell #123870A Immersion Well, ¾NPT x 1½ Insulation (WB) -- OR -Honeywell #123872A Immersion Well, ½NPT x 3" Insulation (WBT) Honeywell R4184D (1027/1001) Protectorelay 80160449U 80160406U 4. CIRCULATOR & PIPING (Packaged Boiler O nly) 4A Circulator, Taco 007F (position 2) 4B Gasket, Taco "00" Series Circulator 806602006 2 2 2 2 2 2 2 2 2 2 4C Circulator Flange, 1½"NPT 806602014 2 2 2 2 2 2 2 2 2 2 4D Cap Screw, Hex Head, 7/16" -14 x 1½" 80861301 4 4 4 4 4 4 4 4 4 4 4E Hex Nut, 7/16" - 14 80860406 4 4 4 4 4 4 4 4 4 4 4F Nipple, 1½"NPT x18" 806600011 1 1 1 1 1 1 1 1 1 1 4G Tee, 1½" x ¾" x 1½"NPT, Black 806601003 1 1 1 1 1 1 1 1 1 1 4H Nipple, 1½"NPT x 3" 806600006 1 1 1 1 1 1 1 1 1 1 5. MISCELLANEOUS WATER TRIM 5A Relief Valve, ¾"NPT, F/F 30 LB, Conbraco 10-408-05 81660319 1 1 1 1 1 1 1 1 1 1 5B Nipple, ¾"NPT x 8" 806600221 1 1 1 1 1 1 1 1 1 1 5C Temp/Pressure Gauge, 2½" Dia., ENFM #41042.5210 8056169U 1 1 1 1 1 1 1 1 1 1 5D Drain Cock, ¾"NPT Short Shank 806603011 (WB and WBT), Conbraco #31-606-02 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Plug, Square Head, 1½"NPT (Packaged) 806603515 5E Reducing Bushing, 1½" x ¾"NPT (Knockdown) 80660507 43 44 Beckett AFG Burner BECKETT OIL BURNER PART NOS. FOR V7 SERIES BOILERS NOTE: When ordering parts always give the serial and model numbers shown on the boiler and burner. Also provide the name of the part(s) and part number as listed below. Boiler Model V72 V713 V73 V714 V74 V75 V76 V77 V78 V79 Air Tube Combination AFG70MB AF72YH AF44XN AF72YY AF44WH AF44RA AF44XO AF72WK AFG50MD AFG50MD Beckett's Spec No. BCB6111 BCB6119 BCB6112 BCB6120 BCB6113 BCB6114 BCB6115 BCB6116 BCB6117 BCB6118 Air Band 3492 3492 3492 3492 3492 3492 3492 3492 3492 3492 Air Band Nut 4150 4150 4150 4150 4150 4150 4150 4150 4150 4150 Air Band Screw 4198 4198 4198 4198 4198 4198 4198 4198 4198 4198 Air Shutter 3709 3709 3709 3709 3709 3709 3709 3709 3709 3709 Air Shutter Screw 4198 4198 4198 4198 4198 4198 4198 4198 4198 4198 Blower 2999 2999 2999 2999 2999 2999 2999 2999 2999 2999 Coupling 2454 2454 2454 2454 2454 2454 2454 2454 2454 2454 Low Firing Rate Baffle 5880 5880 [1] --- [1] --- --- --- --- --- Bulkhead Knurled Locknut 3666 3666 3666 3666 3666 3666 3666 3666 3666 3666 Connector Tube Assembly 5636 5636 5636 5636 5636 5636 5636 5636 5636 5636 Electrode Clamp 149 149 149 149 149 149 149 149 149 149 Electrode Clamp Screw 4219 4219 4219 4219 4219 4219 4219 4219 4219 4219 Electrode Insulator Assembly 5780 5780 5780 5780 5780 5780 5780 5780 5780 5780 Spider Spacer Assembly 5503 5503 5503 5503 5503 5503 5503 5503 5503 5503 Escutcheon Plate 3493 3493 3493 3493 3493 3493 3493 3493 --- --- --- --- --- --- --- --- --- --- 5941 5941 Head 5912 360003 [4] 360004 360006 360016 5913 5913 Head Screws 4221 4221 4221 4221 4221 4221 4221 4221 4221 4221 Flange Gasket 31498 31498 31498 31498 31498 31498 31498 31498 31498 31498 AFG Housing 5877 5877 5877 5877 5877 5877 5877 5877 5877 5877 Motor 2456 2456 2456 2456 2456 2456 2456 2456 2456 2456 Nozzle Adapter 213 213 213 213 213 213 213 213 213 213 NL72BN NL72YH NL44YH NL72YY NL44WP NL44YB NL44X0 NL72WK NL50MD NL50MD 2460 2460 2460 2460 2460 2460 2460 2460 2460 2460 Adjusting Plate Assembly Nozzle Line Electrode Assembly Pump [5] 360004 [6] 360006 [7] 360012 Static Plate 3384 3384 [2] 3384 3384 [3] 3383P 3384 3383P None 3383P 3383P Ignitor 51771 51771 51771 51771 51771 51771 51771 51771 51771 51771 Ignitor Hinge Screw 4217 4217 4217 4217 4217 4217 4217 4217 4217 4217 Ignitor Holding Screw 4292 4292 4292 4292 4292 4292 4292 4292 4292 4292 Ignitor Gasket Kit 51304 51304 51304 51304 51304 51304 51304 51304 51304 51304 Wire Guard 10251 10251 10251 10251 10251 10251 10251 10251 10251 10251 Junction Box 5770 5770 5770 5770 5770 5770 5770 5770 5770 5770 Flame Detector 7006 7006 7006 7006 7006 7006 7006 7006 7006 7006 Oil Solenoid Valve 21789 21789 21789 21789 21789 21789 21789 21789 21789 21789 [1] 5880 in V73R, V73M and V74R [2] 3912 in V73M and V73R [3] 3384 in V74M and V74R [4]360000 in V73R; 360003 in V73M [5] 360003 in V74R and V74M [6] 360003 in V75R; 360006 in V75M [7] 360006 in V76R; 360012 in V76M 45 Print word document 46 47
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : Yes Create Date : 2001:01:25 15:43:40 Producer : Acrobat Distiller 4.0 for Windows Subject : V7 copy Author : sdepugh Creator : Adobe PageMaker 6.5 Title : V7 copy Modify Date : 2001:01:30 10:23:58-05:00 Page Count : 47EXIF Metadata provided by EXIF.tools