Cryomech PT410/CP2800 Installation, Service And Maintenance Manual PT415 11 06
User Manual:
Open the PDF directly: View PDF
Page Count: 54
- Model PT415 Cryogenic Refrigerator
- Section 1: Overview
- Section 2: Warranty
- Section 3: Safety
- 3.1 Safety and information symbols
- 3.2 Warnings and cautions
- 3.2.1 Section 4. Technical specifications
- 3.2.2 Section 5. Shipping
- 3.2.3 Section 6. Installation
- Section 6.1 Cold head installation
- Section 6.1.2 Initial preparation of the cold head
- Section 6.2 Compressor package installation
- Section 6.2.1 Step 1 -- Prepare the compressor package location
- Section 6.2.2 Step 2 – Connect the water lines to the compressor
- Section 6.2.3 Step 3 Connect the helium flex lines to the cold head and compressor package
- Section 6.2.5 Step 5 – Connect the compressor to main power
- Section 6.2.6 Step 6 – Remove excess helium from the compressor package prior to running the system for the first time
- 3.2.4 Section 7. Operation
- 3.2.5 Section 8. Routine maintenance
- Section 4: Specifications
- 4.1 Intended use of equipment
- 4.2 Technical specifications
- 4.3 Description of compressor
- 4.3.1 Front panel interfaces
- Low-Pressure Aeroquip(
- Low-Pressure Gauge
- High-Pressure Aeroquip(
- High-Pressure Gauge
- Control Panel
- Cold Head Motor Connector
- Main Circuit Breaker
- Power Circuit Breaker
- Power Indicator Light
- Service Valve
- Service Access
- Cooling Water Inlet Connection
- Cooling Water Outlet Connection
- Power Cord
- Compressor On Button
- Compressor On Indicator Light
- Compressor Off Button
- Compressor Off Indicator Light
- Display Screen
- Select/Enter Button
- INC (Increase) Button
- DEC (Decrease) Button
- Service/Return Button
- Cancel Button
- RS232/488 Port
- System I/O Port
- 4.3.2 Safety devices
- 4.3.1 Front panel interfaces
- Section 5: Inspection and Unpacking
- Section 6: Installation
- 6.1 Cold head installation
- 6.2 Compressor installation
- 6.2.1 Step 1 -- Prepare the compressor package location
- 6.2.2 Step 2 – Connect the water lines to the compressor
- 6.2.3 Step 3 – Connect the helium flex lines to the cold head and compressor package
- 6.2.4 Step 4 – Connect the cold head motor cord
- 6.2.5 Step 5 – Connect the compressor package to the main power
- 6.2.6 Step 6 – Remove excess helium from the system prior to running for the first time
- 6.2.7 Step 7 – Run the system for the first time
- Section 7: Operation
- Section 8: Routine Maintenance