IQ OQ Form_Series3IQ PQ Form Series3IQ
User Manual: Form_Series3IQ-OQ-PQ
Open the PDF directly: View PDF .
Page Count: 2
Download | ![]() |
Open PDF In Browser | View PDF |
AQUALAB – WATER ACTIVITY METER INSTALLATION / OPERATIONAL QUALIFICATIONS AquaLab Information Manufacturer: Model Number: Serial Number: Company: Department: Room Number: Contact: Calibration SOP #: Calibration Frequency: Decagon Devices, Inc. Series 3TE Decagon (800) 755-2751 Daily/Before each use Installation Qualification Installation of AquaLab includes placing the instrument on a level surface in a location where the temperature remains fairly stable. This location should be well away from air conditioner and heater vents, open windows, outside doors, or other items that may cause rapid temperature fluctuation. After finding a good location for your AquaLab, plug the power cord to the back of the unit and a standard AC outlet. The ON/OFF switch is located on the lower right corner of the AquaLab’s back panel. AquaLab properly installed at facility Qualified By: Date Qualified: (Vendor Representative/Analyst Name) Operational Qualification AquaLab’s operation and performance is verified by measuring specially prepared salt solutions that have a specific molality and water activity. In order to provide the most accurate readings, your AquaLab should ideally be allowed a warm-up period of at least 15 minutes after turning it on. Performance Verification Standards come in four water activity levels: 0.250, 0.500, 0.760, and 0.984aw. AquaLab will read each salt solution within ±0.003aw of the stated value. Standard @ 25°C 13.41m LiCl 0.250 0.250 8.57m LiCl 0.500 0.500 6.0m NaCl 0.760 0.760 0.5m KCl 0.984 0.984 aw ±0.003 AquaLab measured Verification Standards within specification: YES Qualifications met Vendor Acceptance Criteria: Page 1 of 2 °C YES NO NO AQUALAB – WATER ACTIVITY METER INSTALLATION / OPERATIONAL QUALIFICATIONS (Complete the following if “NO” has been checked, otherwise enter N/A) Explanation of why Acceptance Criteria not met: Action Plan to meet Acceptance Criteria: (Check after completion of Action Plan) Qualification meets Vendor’s Acceptance Criteria after completion of Action Plan: Comments: YES NO Training on the proper use, calibration and maintenance of AquaLab was provided. (Signature/Date) Analyst: (Print Name) (Sign Name) Page 2 of 2 (Date)
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : Yes Author : anthony Create Date : 2006:08:02 23:18:08Z Modify Date : 2014:08:13 09:26:08-07:00 XMP Toolkit : Adobe XMP Core 5.4-c005 78.147326, 2012/08/23-13:03:03 Producer : Acrobat Distiller 5.0.5 (Windows) Metadata Date : 2014:08:13 09:26:08-07:00 Creator Tool : PScript5.dll Version 5.2.2 Format : application/pdf Creator : anthony Title : Microsoft Word - IQ-OQ.doc Document ID : uuid:ee1934fd-bfcc-b148-8d9e-0815e54316d8 Instance ID : uuid:5ec1c0fe-f318-7d47-83b7-f693f9c2d566 Page Count : 2EXIF Metadata provided by EXIF.tools