IQ OQ Form_Series3IQ PQ Form Series3IQ

User Manual: Form_Series3IQ-OQ-PQ

Open the PDF directly: View PDF PDF.
Page Count: 2

DownloadIQ-OQ Form_Series3IQ-OQ-PQ Form Series3IQ-OQ-PQ
Open PDF In BrowserView PDF
AQUALAB – WATER ACTIVITY METER
INSTALLATION / OPERATIONAL QUALIFICATIONS
AquaLab Information
Manufacturer:
Model Number:
Serial Number:
Company:
Department:
Room Number:
Contact:
Calibration SOP #:
Calibration Frequency:

Decagon Devices, Inc.
Series 3TE

Decagon (800) 755-2751
Daily/Before each use

Installation Qualification
Installation of AquaLab includes placing the instrument on a level surface in a location where the
temperature remains fairly stable. This location should be well away from air conditioner and heater
vents, open windows, outside doors, or other items that may cause rapid temperature fluctuation.
After finding a good location for your AquaLab, plug the power cord to the back of the unit and a
standard AC outlet. The ON/OFF switch is located on the lower right corner of the AquaLab’s back
panel.
AquaLab properly installed at facility
Qualified By:

Date Qualified:
(Vendor Representative/Analyst Name)

Operational Qualification
AquaLab’s operation and performance is verified by measuring specially prepared salt solutions
that have a specific molality and water activity. In order to provide the most accurate readings, your
AquaLab should ideally be allowed a warm-up period of at least 15 minutes after turning it on.
Performance Verification Standards come in four water activity levels: 0.250, 0.500, 0.760, and
0.984aw. AquaLab will read each salt solution within ±0.003aw of the stated value.
Standard @ 25°C
13.41m LiCl
0.250
0.250
8.57m LiCl
0.500
0.500
6.0m NaCl
0.760
0.760
0.5m KCl
0.984
0.984

aw ±0.003

AquaLab measured Verification Standards within specification:
YES
Qualifications met Vendor Acceptance Criteria:

Page 1 of 2

°C

YES
NO

NO

AQUALAB – WATER ACTIVITY METER
INSTALLATION / OPERATIONAL QUALIFICATIONS

(Complete the following if “NO” has been checked, otherwise enter N/A)

Explanation of why Acceptance Criteria not met:

Action Plan to meet Acceptance Criteria:

(Check after completion of Action Plan)

Qualification meets Vendor’s Acceptance Criteria after completion of Action Plan:
Comments:

YES

NO

Training on the proper use, calibration and maintenance of AquaLab was provided.

(Signature/Date)

Analyst:
(Print Name)

(Sign Name)

Page 2 of 2

(Date)



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.3
Linearized                      : Yes
Author                          : anthony
Create Date                     : 2006:08:02 23:18:08Z
Modify Date                     : 2014:08:13 09:26:08-07:00
XMP Toolkit                     : Adobe XMP Core 5.4-c005 78.147326, 2012/08/23-13:03:03
Producer                        : Acrobat Distiller 5.0.5 (Windows)
Metadata Date                   : 2014:08:13 09:26:08-07:00
Creator Tool                    : PScript5.dll Version 5.2.2
Format                          : application/pdf
Creator                         : anthony
Title                           : Microsoft Word - IQ-OQ.doc
Document ID                     : uuid:ee1934fd-bfcc-b148-8d9e-0815e54316d8
Instance ID                     : uuid:5ec1c0fe-f318-7d47-83b7-f693f9c2d566
Page Count                      : 2
EXIF Metadata provided by EXIF.tools

Navigation menu