IQ OQ Form_Series3IQ PQ Form Series3IQ
User Manual: Form_Series3IQ-OQ-PQ
Open the PDF directly: View PDF .
Page Count: 2

AQUALAB – WATER ACTIVITY METER
INSTALLATION / OPERATIONAL QUALIFICATIONS
Page 1 of 2
AquaLab Information
Manufacturer: Decagon Devices, Inc.
Model Number: Series 3TE
Serial Number:
Company:
Department:
Room Number:
Contact: Decagon (800) 755-2751
Calibration SOP #:
Calibration Frequency: Daily/Before each use
Installation Qualification
Installation of AquaLab includes placing the instrument on a level surface in a location where the
temperature remains fairly stable. This location should be well away from air conditioner and heater
vents, open windows, outside doors, or other items that may cause rapid temperature fluctuation.
After finding a good location for your AquaLab, plug the power cord to the back of the unit and a
standard AC outlet. The ON/OFF switch is located on the lower right corner of the AquaLab’s back
panel.
AquaLab properly installed at facility
Qualified By: Date Qualified:
(Vendor Representative/Analyst Name)
Operational Qualification
AquaLab’s operation and performance is verified by measuring specially prepared salt solutions
that have a specific molality and water activity. In order to provide the most accurate readings, your
AquaLab should ideally be allowed a warm-up period of at least 15 minutes after turning it on.
Performance Verification Standards come in four water activity levels: 0.250, 0.500, 0.760, and
0.984aw. AquaLab will read each salt solution within ±0.003aw of the stated value.
Standard @ 25°C aw ±0.003 °C
13.41m LiCl 0.250
0.250
8.57m LiCl 0.500
0.500
6.0m NaCl 0.760
0.760
0.5m KCl 0.984
0.984
AquaLab measured Verification Standards within specification: YES NO
Qualifications met Vendor Acceptance Criteria: YES NO

AQUALAB – WATER ACTIVITY METER
INSTALLATION / OPERATIONAL QUALIFICATIONS
Page 2 of 2
(Complete the following if “NO” has been checked, otherwise enter N/A)
Explanation of why Acceptance Criteria not met:
Action Plan to meet Acceptance Criteria:
(Check after completion of Action Plan)
Qualification meets Vendor’s Acceptance Criteria after completion of Action Plan: YES NO
Comments: Training on the proper use, calibration and maintenance of AquaLab was provided.
(Signature/Date)
Analyst:
(Print Name) (Sign Name) (Date)