Greenplum DCA Maintenance Guide 2.0.0.0 / 2.0.1.0 Data Computing Appliance 2.0.2.0 2.0.3.0
Greenplum-Data-Computing-Appliance-Maintenance-Guide-2.0.0.0---2.0.1.0---2.0.2.0---2.0.3.0
User Manual:
Open the PDF directly: View PDF
Page Count: 214 [warning: Documents this large are best viewed by clicking the View PDF Link!]
- Important Information Before You Begin
- Replace a Master Server
- Replace a Segment, DIA, or Hadoop server
- Required tools
- Task summary
- Service tag locations
- Reseat cables before replacing a server
- Replace a server in an initialized GPDB module
- Replace a DIA server or a server in an uninitialized GPDB module
- Replace a server in a Greenplum Hadoop module (DCA version 2.0.0.0)
- Replace a server in a Pivotal Hadoop module (version 2.0.1.0 and later)
- Remove the failed PHD server and install the replacement PHD server
- Replace a Disk Drive
- Replace a Power Supply in a Server
- Replace a Fan Assembly or Power Supply in an Arista Switch
- Replace a Switch in the DCA
- Replace an Interconnect Switch Cable
- System Information and Configuration
- New firmware updates for DCA software version 2.0.3.0
- Identify the version of the installed DCA software
- DCA configuration rules
- Racking order
- Racking guidelines
- Mixed System rack components
- Hadoop-only System Rack components (minimum config.)
- HD-Compute System Rack components (minimum config.)
- Aggregation rack components
- Expansion rack components
- Power supply reference
- BMC Controller interface functionality
- BMC Controller LED indicators and meanings
- Network and cabling configurations
- Network hostname and IP configuration
- Multiple-rack cabling reference
- Configuration files
- Location of old core files
- Default passwords
- Connect a workstation to the DCA
- Power Off the DCA
- Linux and vi Command Reference
- Replace a Server in the Greenplum DCA Rack
- Install a Switch in a Rack
- Switch Configuration: Backup and Recovery
- DCA Part Numbers