Trends In Gas Turbine Exhaust And Noise Emissions Siemens Portable Generator 580 Session2Part2
User Manual: Siemens Portable Generator 580
Open the PDF directly: View PDF .
Page Count: 34
- GAS TURBINE SYSTEMS APPLICATIONSA Canadian PerspectiveSession 2 : Part II
- Slide Number 2
- Slide Number 3
- Slide Number 4
- Slide Number 5
- Slide Number 6
- Slide Number 7
- Slide Number 8
- Slide Number 9
- Slide Number 10
- Slide Number 11
- Slide Number 12
- Slide Number 13
- Slide Number 14
- Slide Number 15
- Slide Number 16
- Slide Number 17
- Waste Heat Recovery and CHP
- Slide Number 19
- Slide Number 20
- Slide Number 21
- Slide Number 22
- Combined Cycle Repowering of Steam Boiler Systems
- Slide Number 24
- Slide Number 25
- Slide Number 26
- Slide Number 27
- Cogeneration in the Alberta Oilsands ‘Mining’ Sector(with onsite Upgrading)
- Shell Muskeg Oilsands Project
- Slide Number 30
- Gasification & Syngas in Power and Oilsands
- Slide Number 32
- Slide Number 33
- Slide Number 34

GASTURBINESYSTEMSAPPLICATIONS
ACanadianPerspective
Session2:PartII
•SomeHistoricalPerspectivesonVariousEnergySectors
•Examplesof‘First’andUniqueInstallations
•Simple&CombinedCyclePower
•NaturalGasProduction&Pipelines
•Cogeneration,WHRandGasification
ManfredKlein
ProgramCoordinator,Energy&Environment
GasTurbineLabs, NationalResearchCouncil
613‐949‐9686 manfred.klein@nrc‐cnrc.gc.ca
CooperRollsCoberra 6456 OPTINexen Gasification
IAGTFall2010Course– Hamilton,Ontario
GELM1500(S&S)

GasTurbineSystemsinCanadianIndustrial
Sectors,2010estimate(M.Klein)
Simple
Cycle
Combined
Cycles
Comb. Cycle
Cogen
Simple
Cogen
Sector
total
ElectricPower 4240 6650 10890
GasPipelines 4950 120 5070
UpstreamGas 80 120 340 540
Oilsands &Refineries 115 575 1400 2075
Chemicals,
Forestry,Metals
3175 400 3575
Manufacturing 40 1150 170 1360
Institutional 210 55 265
Est.Total 9425 6770 5230 2365 23790
•Notincl.retiredunits
•20290MWGTs,and3440MWofsteamturbines
InstalledMW

BrownBoveri,1939,Switzerland
Pinetree Line,OldHRSGBoilers
1.5MWOrenda OT5(1962,HerbS.)
Canada’s1st GTcogen plants

Canadiantribalclassdestroyers,1972.
‐World’s1st allgasturbinepoweredships,
poweredby;
•twoPratt&WhitneyFT12of7,400shp
•twoP&WFT4gasturbinesof50,000shp
•3SolarSaturn0.7MWgensets
TRUMPrefit,1992;13000shp Allison570
MarineGasTurbines
12HalifaxClassPatrolFrigates
1992‐96 (CODAG)
2GELM2500units,48000Hp
PielstickCruiseDiesel,12000Hp
COGOG
GELM2500naval‐technology.com
PWFT4&ST‐6,
BrasD’Or,1968
(DND)

ElectricPower
PeakingPowerStations
•Manyinstalledafter1965
Easternpowerfailures
•Remoteservice
•NuclearStandby,Emergency
TwoJT3units,Success,Sask.
ABB11Landis,Sask GEFr6,MeadowLakeSK
ABB11,ATCOSturgeonAB
RROlympusPOD‐50units
CadillacStn,HydroQuebec
4Olympus,2MarsOPGDarlington
RROlympus,from
Concorde593Engine

2Alstom 11N,260MW
Brandon,ManHydro
EPCOR’sCloverBar243MW
‐GELM6000
‐two100MWGELMS100units
RecentPeakingFacilities
•ReplacingOldSteamBoilers
•SynchronousCondensers
LM6000,oil,MaritimeElec.PEI
4GEFr7,HydroQuebec
Becancour ,Gentilly Standby
OPGSolarUnits,Toronto2003
(Toromont)
LM6000,ATCOValleyview,AB

TypicalFacts OT2100s
Power: 10MW
PressRatio: 7.6
HeatRate: 14GJ/MWhr
Exh.Temp: 500oC
MassFlow: 64kg/s
Orenda OT3andOT2100 Portableunit,TCPLStn 95,1986(NEB)
EarlyAeroderivative Units,Pipelines
Orenda 14,F86jet CF100
Orenda PortableUnit,Kapuskasing ON

•1955‐60recip enginesinstalledacrosssystems
1960’s
•FirstIndustrialgasturbines,TCPL(Clark,W62,W92)
•1st aeros onWEI,NOVA,TCPL;GELM1500,Orenda OT2
•1964‐73 40RollsRoyceAvons,onTCPLandUnionGas
FirstGenerationGasturbineUnitsonCanadianGasPipelines
Spectra
TransCanadaPipeLines
NOVA/TCPL
Alliance
UnionGas
TransGas
PNG
BCGas

TypicalFacts RRAvon76G
Power: 10MW
PressRatio: 9
HeatRate: 12.8GJ/MWh
Exh.Temp: 550oC
MassFlow: 77kg/s
First Rolls Royce Aeroderivative unit in Pipeline service,
at TransCanada Stn 13, Caron, Sask.
Two10MWAvons,TCPLStn 17,ReginaSK.
wikipedia.org
RollsRoyceAvon(AP1,RT121,RT248,RT160)
MK

RRAvon,3RB211s2GELM2500(Total143MW)
A
RB211dle,TCPL
2nd Generation Aeroderivative Units
•First Rolls Royce RB211 on Pipeline (1974)
•Coberra 264 at TCPL Stn 2, Burstall, Sask.
RB211drivencompressors,
UnionGasStorage,DawnON
33MWRR6761,TCPLNordegg,AB
Coberra
6256

LM2500
GTCC,CochraneOnt,Algonquin
4LM2500units,1994
HiberniaPlatform,Nfld
NorthlandPeaker,KirklandL.ON
(Gryphon)
FromCF6‐50,TF39
Galaxy
PGT25+,SpectraGas,BC
VersatileApplications‐ GELM2500
•FirstUnitInstalledonNOVAPrincess,1972
•thenatWestcoast P/LinBC,1973
LM2500+G4DLE

GTOperationsandMaintenanceSymposium
Oct21‐23,1974EdmontonAB
(NRCCAssociateCommitteeonPropulsion)
Chair:RayStauffer,AGTL
SessionTopics
•InletIcingProblems
•PerformanceTesting
•TrendMonitoring
•CompressorCleaning
•PanelSession‐LubeOil
‐Ledtoformationof‘CanadianGTUsersAssoc’–thenIAGT
‐1st organizers‐ HerbSaravanamuttoo andBernieMacIsaac,CarletonUniversity
‐HostedbyNat’lResearchCouncil,thenbyCdn GasAssoc.in1990(nowboth)
Papersby;
RollsRoyce,Cooper,FARR
Westinghouse,Orenda,
UnitedAircraft
TCPL,Westcoast,AGTL,
DND,DOW
NRCC,CarletonU,
TexasA&M,IPEL

McMahonBC,ATCO/Spectra
2xW251B12(SGT‐900)
Interpipe Cochrane AB (ANG)
Two RB211 GTCHP units
Siemens Cyclone
Unocal Aitken Ck, BC
FirstlargeCanadianCHPwith
Aeroderivative GT,(RB211) 1978
Shell Waterton Gas Plant
2A501K,Spectra,PineR.BC
NaturalGasProcessing
NGLExtraction
SableGas Goldboro,NS
4SolarMars&Centaurunits
LeanOilAbsorption
•Olderprocessforheavy
NGLs‐ needsHeat
CryogenicProcess
•ForremovalofC2,C3
•Turboexpander cooling

New8MWSolarMarsGTInstallationat
ANGCrowsnest BC,1981
Replacement of Recip Engines on Canadian Pipelines
SolarMars
•FirstpipelineMarsunitinstalledatNOVA,1977
•~200SolarSaturn,Centaur,TaurusandMarsunits
installedonpipelines
(MK)

ThirdGenerationGasTurbines
GeneralElectricLM1600
•1stinstalledatNOVAKnightAB,1988
•OnlyDLEatElko,ANG(+4waterInjectedunits)
TypicalFacts
Power: 14MW
PressRatio: 20
HeatRate: 10GJ/MWhr
Exh.Temp: 490oC
MassFlow: 47kg/s PGT16,TCPLStittsville ON
F404
TCPLStn 55,DrydenON
(geps)
FirstRollsRoyceSpey
installedatTCPLStn 41,
Winnipeg,1976
turbine‐support.co.uk
Boralex/Cascades
Cogen ‐1st &onlyin
Quebec,(2LM1600)
Kingsey Falls

TransAlta OHSC,68MWe Cogen Plant
2‐SpeedAlstom 26MWSteamTurbine
GELM6000
FirstGELM6000Installation,1991
OttawaHealthSciencesCenter
•AbsorptionChillerforInlet
•ActiveCondenserNoisecancellation
•SteamInjectionforNOx control

RRAtwaterTestCell,Montreal
AtlanticPackaging,Whitby,ON50MWe
RollsRoyceTrent–FirstunitatWhitbyCogeneration,1997
80MWCHP,TCPL/Weyerhauser,BearCk,AB
Trent3‐spoolgasturbine(50‐60MW)

WasteHeatRecoveryandCHP
Useofhightempexhaustenergy‐ waste
heatforelectricity
WHR=‘Renewable’=ZeroEmissions
Steam
•FiveOntarioPlants,oneinAlberta
OrganicRankine Cycles
•8plantsinBC,Sask,AB
Turboexpanders forpressurerecovery
Nipigon,Ontario(TCPL/EPCOR)
RB211WHR,LM25001991,NorthBayON
Calstock,ON
Gas/Biomass
ORMATPentaneTurbineSet
TCPL,EPCOR

Condenser&
coolingwater
GasCooler
GastoGasHeat
Exchange
Inlet
Separator
40106m3/d
38106m3/d
ToStrippingPlant
Brake
Compressor
3TurboExpanders
16MW
16MW
2Recompressors
1000psi
950psi
600psi
500psi
800psi
1050
psi
1000psi
NOVA
Foothills
40 55
40
25
30
35
10
EmpressFoothillsDecompression– Recompression(1990)
40106m3/d
38106m3/d
Use16MWturboexpander topartiallyrecompress
returnedpipelinegasforFoothillsPipeline
E
mafitrench.com MK
“pressurerecovery”

4
4
4
1
4
9
1
1
2
3
4
4
2
GasTurbineUnits
PeakPower26
CombinedCycle3
Cogeneration2
Oil&Gas 14
45
1
2
GasTurbinesinAtlanticCanada(1500MW)_
Rolls;RB211,Olympus,Avon
P&W;FT4,FT8
Solar;Mars,Taurus
GE;LM2500,LM5000,LM6000,Fr6B
Alstom;11N,GT24
2
1

TerraNovaFPSO,TwoGEFrame6B
WhiteRosePower,3RB211,Husky,Nfld
OffshoreApplications
•Hibernia
•SableGas
•PetroCan TerraNovaFPSO
•HuskyWhiteRoseFPSO
HuskySeaRose
SableGas Thebaud (RB211)

QueenElizabethRepowering,SaskatoonSK
SixHitachiH25units,ISTHRSGs
(courtesy;GasTurbineWorld)
UtilityBoilerRepowering
Replacingboilersupplyforsteam
turbineswithHRSGsteam,plusgas
turbineprimarypower
•1st UtilityPlant,MedicineHatAB,1980‐2003
•Sixprojectsoverlastdecade(1600MWe)
Replace
oldboiler

CombinedCycleRepoweringofSteamBoilerSystems
ATCOBrightonBeach,580MWWindsorON
(replacedOnt HydroKeithStn,2004)
Bayside 285MW,SaintJohnNB
(Alstom GT24repowersCourtneyBayoil‐fired
steamturbinein2001,NBPower)
TuftsCoveEmera NSP,Dartmouth,NS
TwoGELM6000,withISTOTSGsaddedin2009
TCPLPortlands ,Toronto550MW,2008
(2GEFrame7FreplaceRL.HearnStn.)
MK
(Emera)OPA
(OPA)

2 LM6000 GTCC, Nexen Balzac, AB (MK)
2GEFr7FA,Invenergy St.Clair(OPA) GEFr7FB,Sithe Goreway (OPA)
NewCombinedCycles
•Largestsourceofmerchantpower
generationoverlastdecade
•Mostlyforintermittentduty
•14newplants,5100MWe
Alberta;750MWe
Ontario;3800MWe
SiemensSGT6‐5000,CalpineCalgary

52MWGEFrame7B(BTECTurbines)
•FirstTwobaseload Frame7Bunits
•Repoweringofindustrialcoalunit
Canada’s1stlargeIndustrialCogen
Facility,DOWSarnia,1972
TransAlta Sarnia 650 MWe
ThreeAlstom GT11N2units
(JPZanyk)
GT11N2,110MW
(JPZanyk)

Sithe/CASCOCardinal,ON(Macquarie)
1st6FAunit,AESKingston,ON
Kingston(GEFr6FA)
Canada’s3rd largeindustrialCHP,1994
‐FirstlargegasturbinewithDLN
combustioninCanada
FirstGEFrame6FAunit
‐InstalledatAESKingstonCogen
plant1997(Celanese/KOSA)
110MWWestinghouseW501D(SGT6‐2000)
HerbS.

TCPLGrandview,IrvingRefinery,SaintJohnNB
ATCOPower,RainbowLakeAB
90MWpeaking&CHPfacility,Huskygasplant 2LM6000,GTAAPearsonAirportCHP(OPA)
GELM6000dle
OtherIndustrialCHPfacilitieswith
Aeroderivative GTunits
(courtesy
B.Mintern,
IrvingOil)

CogenerationintheAlbertaOilsands ‘Mining’Sector
(withonsiteUpgrading)
80MWe Cogen Plants,Aurora1&2(GE7EA)
TwoGEFr5units,Syncrude,MildredLake
WHRwithISTOTSGsin1998 2‐115MWAlstom GT11N2
2SteamTurbines,130MW
TransAlta,SUNCORPoplarR.2001
TransAlta
(MK)

ShellMuskegOilsandsProject
Two GE 7EA turbines use heat recovery to
produce steam for Muskeg Mine (ATCO Power)
(Shell) 150 MW ATCO cogen plant at the Scotford Upgrader.
One GE 7EA with DLN, output 80 MW
Bitumento
Upgrader

Air Intake
Mixed Fuel
Steam
PETRO-CANADA
Boiler Feed Water
Deltak Once Through Heat Recovery Steam
Generator (OTHRSG)
Gas turbine
Exhaust gases
Fuel Gas Electrical
Power
GE 7FA
(7241)
Hot Oil
System
EOR Steam
Generators
MacKayRiverCogeneration ,TCPLPetroCan
(courtesy;J.Szyszkowski,TCPL,IAGT2005)
•170MWGE7FAgasturbine
•Deltak OnceThroughHeat
RecoverySteamGenerator
Oilsands
SteamAssistedGravity
Drainage(SAGD)
•ATCOCNRLPrimrose
•Esso ColdLake
•EnCanaFosterCk
•OPTINexen LongLake
•CNRLHorizon
•SUNCORFirebag

Gasification&Syngas
inPowerandOilsands
OPTINexen
LongLake
FutureCCS?
•Minimize natural gas use
• Polygeneration with H2
• Onsite Upgrading
• Reliable H2/CO combustion
• Future CO2 Capture and Storage
1st Cdn GasificationProject,LongLakeAB

CountrysideDES,LondonON(OPA)
LondonHealthSciences(OPA)
QueensKingston
Hospital(2SolarTaurus)
YorkU.,TwoSolarTaurus(JPZanyk)
GasTurbineCHPinMunicipaland
InstitutionalApplications
•SmallGTsystems,sizedtothermalloads
•Canuseabsorptionchillinginsummer
•Districtenergy
•MostplantsinOntario
Microturbine CHP, Minto Hotel, Ottawa

CONDENSER
BOILER
No.3
BOILER
No.2
BOILER
No.1
SIEMENSSGT100
GTGENSET
4.5MW
HEATRECOVERY
BOILER
(onmezzanine)
BOILER
No.4
ABSORPTIONCHILLER– 200Tons
CONTROLROOM
NRCCHeating/PowerPlant
‐Canada’sonlyFederalGTCHP(1993)
NRCBldgM6
(courtesy,S.Vohra,NRC)
Heating,lbs/hr:
Summer12,000
Winter55,000
Power:4of12MWtotalload

• Many varied Gas Turbine unit types and ‘industrial’ systems
•Several “World’s First’ applications in Canadian sectors
• Fuel flexibility, Reliability, Gasification are important GT challenges
•GTs in various systems represent key solutions, to contribute to
about ¼ of world’s total energy/GHG solutions (GTCC, CHP, IGCC ...)
• Clean Energy success depends on balanced ‘System Integration’
plus New Cycles, Alternative Fuels, and a better Business Case
GTAAPearsonAirport(IST)GTAAPlantTour,IAGT2006
SomeLessonsLearned
TCPLStittsville