IAGT Fall 2010 Course – Hamilton, Ontario

GAS TURBINE SYSTEMS APPLICATIONS
A Canadian Perspective
Session 2 : Part II
• Some Historical Perspectives on Various Energy Sectors

• Examples of ‘First’ and Unique Installations
• Simple & Combined Cycle Power
• Natural Gas Production & Pipelines
• Cogeneration, WHR and Gasification

GE LM1500 (S&S)

Cooper Rolls Coberra 6456

OPTI Nexen Gasification

Manfred Klein
Program Coordinator, Energy & Environment
Gas Turbine Labs, National Research Council
613‐949‐9686
manfred.klein@nrc‐cnrc.gc.ca

Gas Turbine Systems in Canadian Industrial
Sectors, 2010 estimate (M.Klein)
Installed MW

Simple
Cycle

Combined
Cycles

Comb. Cycle
Cogen

Simple
Cogen

Sector
total

Electric Power

4240

6650

10890

Gas Pipelines

4950

120

5070

Upstream Gas

80

120

340

540

Oilsands & Refineries

115

575

1400

2075

3175

400

3575

1150

170

1360

210

55

265

5230

2365

23790

Chemicals,
Forestry, Metals
Manufacturing

40

Institutional
Est. Total

9425

6770

• Not incl. retired units
• 20290 MW GTs, and 3440 MW of steam turbines

Canada’s 1st GT cogen plants

Pinetree Line, Old HRSG Boilers

Brown Boveri, 1939, Switzerland

1.5 MW Orenda OT5 (1962, Herb S.)

Marine Gas Turbines
Canadian tribal class destroyers, 1972.
‐World’s 1st all gas turbine powered ships,
powered by;
(DND)

• two Pratt & Whitney FT12 of 7,400 shp
• two P&W FT4 gas turbines of 50,000 shp
• 3 Solar Saturn 0.7 MW gensets
TRUMP refit, 1992; 13000 shp Allison 570
COGOG
12 Halifax Class Patrol Frigates
1992‐96 (CODAG)
2 GE LM2500 units, 48000 Hp
Pielstick Cruise Diesel, 12000 Hp

PW FT4 & ST‐6,
Bras D’Or, 1968
GE LM2500

naval‐technology.com

Electric Power
Peaking Power Stations
Two JT3 units, Success , Sask.

• Many installed after 1965
Eastern power failures
• Remote service
• Nuclear Standby, Emergency
ABB 11 Landis, Sask

RR Olympus, from
Concorde 593 Engine

4 Olympus, 2 Mars OPG Darlington

ABB 11, ATCO Sturgeon AB

GE Fr6, Meadow Lake SK

RR Olympus POD‐50 units
Cadillac Stn, Hydro Quebec

Recent Peaking Facilities
• Replacing Old Steam Boilers

• Synchronous Condensers
LM6000, oil, Maritime Elec. PEI

LM6000, ATCO Valleyview, AB

2 Alstom 11N, 260 MW
Brandon, Man Hydro
(Toromont)

OPG Solar Units, Toronto 2003
EPCOR’s Clover Bar 243 MW
‐ GE LM 6000
‐ two 100 MW GE LMS100 units

4 GE Fr7, Hydro Quebec
Becancour , Gentilly Standby

Early Aeroderivative Units, Pipelines

Orenda 14 , F86 jet

CF100

Orenda OT3 and OT2100

Typical Facts
Power:
Press Ratio:
Heat Rate:
Exh. Temp:
Mass Flow:

Portable unit, TCPL Stn 95, 1986 (NEB)

OT2100s
10 MW
7.6
14 GJ/MWhr
500oC
64 kg/s
Orenda Portable Unit, Kapuskasing ON

First Generation Gas turbine Units on Canadian Gas Pipelines
Spectra

NOVA/TCPL

Alliance
PNG

TransGas

TransCanada PipeLines

BCGas

• 1955‐60 recip engines installed across systems
1960’s
• First Industrial gas turbines , TCPL (Clark, W62, W92)
• 1st aeros on WEI, NOVA, TCPL; GE LM1500, Orenda OT2
• 1964‐73 40 Rolls Royce Avons, on TCPL and Union Gas

Union Gas

First Rolls Royce Aeroderivative unit in Pipeline service,
at TransCanada Stn 13, Caron, Sask.

wikipedia.org

Rolls Royce Avon (AP1, RT121, RT248, RT160)
Typical Facts
Power:
Press Ratio:
Heat Rate:
Exh. Temp:
Mass Flow:

RR Avon 76G
10 MW
9
12.8 GJ/MWh
550oC
77 kg/s

MK

Two 10 MW Avons, TCPL Stn 17, Regina SK.

2nd Generation Aeroderivative Units
• First Rolls Royce RB211 on Pipeline (1974)
• Coberra 264 at TCPL Stn 2, Burstall, Sask.

A
Coberra
6256

RR Avon, 3 RB211s 2 GE LM2500 (Total 143 MW)

RB211 dle, TCPL

33 MW RR 6761, TCPL Nordegg, AB

RB211 driven compressors,
Union Gas Storage, Dawn ON

Versatile Applications ‐ GE LM2500
• First Unit Installed on NOVA Princess, 1972
• then at Westcoast P/L in BC, 1973

GTCC , Cochrane Ont, Algonquin
Galaxy

From CF6‐50, TF39

Northland Peaker, Kirkland L. ON
(Gryphon)

PGT25+, Spectra Gas, BC

LM2500

LM2500+ G4 DLE

4 LM2500 units, 1994
Hibernia Platform, Nfld

GT Operations and Maintenance Symposium
Oct 21‐23, 1974 Edmonton AB
(NRCC Associate Committee on Propulsion)
Chair: Ray Stauffer, AGTL
Session Topics
• Inlet Icing Problems
• Performance Testing
• Trend Monitoring
• Compressor Cleaning
• Panel Session ‐ Lube Oil

Papers by;
Rolls Royce, Cooper, FARR
Westinghouse, Orenda,
United Aircraft
TCPL, Westcoast, AGTL,
DND, DOW
NRCC, Carleton U,
Texas A&M, IPEL

‐ Led to formation of ‘Canadian GT Users Assoc’ – then IAGT
‐ 1st organizers ‐ Herb Saravanamuttoo and Bernie MacIsaac, Carleton University
‐ Hosted by Nat’l Research Council, then by Cdn Gas Assoc. in 1990 (now both)

Natural Gas Processing
NGL Extraction
Lean Oil Absorption
• Older process for heavy
NGLs ‐ needs Heat
Cryogenic Process
• For removal of C2, C3
• Turboexpander cooling

McMahon BC, ATCO/Spectra
2 x W251B12 (SGT‐900)

Interpipe Cochrane AB (ANG)
Two RB211 GTCHP units

First large Canadian CHP with
Aeroderivative GT, (RB211) 1978
Shell Waterton Gas Plant

Siemens Cyclone
Unocal Aitken Ck, BC

SableGas Goldboro, NS
4 Solar Mars & Centaur units

2 A501K, Spectra, Pine R. BC

Replacement of Recip Engines on Canadian Pipelines

Solar Mars

• First pipeline Mars unit installed at NOVA, 1977
• ~ 200 Solar Saturn, Centaur, Taurus and Mars units
installed on pipelines

(MK)

New 8 MW Solar Mars GT Installation at
ANG Crowsnest BC , 1981

Third Generation Gas Turbines
General Electric LM1600
•

1st installed at NOVA Knight AB, 1988

•

Only DLE at Elko, ANG (+ 4 water Injected units)

TCPL Stn 55, Dryden ON

Boralex/Cascades
Cogen ‐ 1st & only in
Quebec, (2 LM1600)
Kingsey Falls
(geps)

First Rolls Royce Spey
installed at TCPL Stn 41,
Winnipeg, 1976

F404
Typical Facts
Power:
Press Ratio:
Heat Rate:
Exh. Temp:
Mass Flow:

14 MW
20
10 GJ/MWhr
490oC
47 kg/s

PGT16, TCPL Stittsville ON
turbine‐support.co.uk

First GE LM6000 Installation, 1991
Ottawa Health Sciences Center
• Absorption Chiller for Inlet
• Active Condenser Noise cancellation
• Steam Injection for NOx control

TransAlta OHSC, 68 MWe Cogen Plant

GE LM6000

2‐Speed Alstom 26 MW Steam Turbine

Rolls Royce Trent – First unit at Whitby Cogeneration, 1997

Trent 3‐spool gas turbine (50‐60 MW)
80 MW CHP, TCPL/Weyerhauser, Bear Ck, AB

Atlantic Packaging, Whitby, ON 50 MWe

RR Atwater Test Cell, Montreal

Waste Heat Recovery and CHP
Use of high temp exhaust energy ‐ waste
heat for electricity
WHR = ‘Renewable’ = Zero Emissions
Steam
•

Five Ontario Plants, one in Alberta

Organic Rankine Cycles
•

TCPL, EPCOR

8 plants in BC, Sask, AB

Turboexpanders for pressure recovery

RB211 WHR, LM2500 1991, North Bay ON
Nipigon, Ontario (TCPL/EPCOR)

Calstock, ON
ORMAT Pentane Turbine Set

Gas/Biomass

Empress Foothills Decompression – Recompression (1990)

NOVA

“pressure recovery”

1000 psi

950 psi

Inlet
Separator

40 106 m3/d

600 psi
25

40

40

55

38 106 m3/d

2 Recompressors
10

16 MW

Gas to Gas Heat
Exchange
Condenser &
cooling water

To Stripping Plant 40 106 m3/d

500 psi

E

1050
psi

16 MW
3 TurboExpanders

Brake
Compressor
800 psi

35

Use 16 MW turboexpander to partially recompress
returned pipeline gas for Foothills Pipeline

Gas Cooler
30

1000 psi

Foothills
38 106 m3/d
mafitrench.com

MK

Gas Turbines in Atlantic Canada (1500 MW)_
Gas Turbine Units
Peak Power
26
Combined Cycle 3
Cogeneration
2
Oil & Gas
14
45

1

2
3

9

2

4

4

1

2

4

4

1

2 4
1

4

1

Rolls; RB211, Olympus, Avon
P&W; FT4, FT8
Solar; Mars, Taurus
GE; LM2500, LM5000, LM6000, Fr6B
Alstom; 11N, GT24

Offshore Applications
• Hibernia
• Sable Gas
• PetroCan Terra Nova FPSO
• Husky White Rose FPSO

Terra Nova FPSO, Two GE Frame 6B
SableGas Thebaud (RB211)

Husky SeaRose

White Rose Power, 3 RB211, Husky, Nfld

Utility Boiler Repowering
Replacing boiler supply for steam
turbines with HRSG steam, plus gas
turbine primary power

Replace
old boiler

• 1st Utility Plant, Medicine Hat AB, 1980‐2003
• Six projects over last decade (1600 MWe)

Queen Elizabeth Repowering, Saskatoon SK

(courtesy; Gas Turbine World)

Six Hitachi H25 units, IST HRSGs

Combined Cycle Repowering of Steam Boiler Systems

MK

ATCO Brighton Beach, 580 MW Windsor ON (OPA)
(replaced Ont Hydro Keith Stn, 2004)

OPA
TCPL Portlands , Toronto 550 MW, 2008
(2 GE Frame 7F replace RL. Hearn Stn.)

Bayside 285 MW, Saint John NB
(Alstom GT24 repowers Courtney Bay oil‐fired
steam turbine in 2001, NB Power)

(Emera)
Tufts Cove Emera NSP, Dartmouth, NS
Two GE LM6000, with IST OTSGs added in 2009

New Combined Cycles
Largest source of merchant power
generation over last decade
• Mostly for intermittent duty
• 14 new plants, 5100 MWe
•

Alberta; 750 MWe
Ontario; 3800 MWe

Siemens SGT6‐5000, Calpine Calgary

2 LM6000 GTCC, Nexen Balzac, AB

2 GE Fr7FA, Invenergy St. Clair (OPA)

(MK)

GE Fr7FB, Sithe Goreway (OPA)

Canada’s 1st large Industrial Cogen
Facility, DOW Sarnia, 1972

TransAlta Sarnia 650 MWe

(JP Zanyk)

Three Alstom GT11N2 units
(JP Zanyk)

• First Two baseload Frame 7B units
• Repowering of industrial coal unit

GT11N2, 110 MW

52 MW GE Frame 7B (BTEC Turbines)

Canada’s 3rd large industrial CHP, 1994
‐ First large gas turbine with DLN
combustion in Canada

First GE Frame 6FA unit
‐ Installed at AES Kingston Cogen
plant 1997 (Celanese/KOSA)

110 MW Westinghouse W501D (SGT6‐2000)
Herb S.

1st 6FA unit, AES Kingston, ON

Sithe/CASCO Cardinal, ON (Macquarie)

Kingston (GE Fr 6FA)

Other Industrial CHP facilities with
Aeroderivative GT units

(courtesy
B. Mintern,
Irving Oil)

TCPL Grandview, Irving Refinery, Saint John NB

ATCO Power, Rainbow Lake AB
90 MW peaking & CHP facility, Husky gas plant

GE LM6000 dle

2 LM6000, GTAA Pearson Airport CHP (OPA)

Cogeneration in the Alberta Oilsands ‘Mining’ Sector
(with onsite Upgrading)

(MK)
Two GE Fr 5 units, Syncrude, Mildred Lake
WHR with IST OTSGs in 1998

80 MWe Cogen Plants, Aurora 1&2 (GE 7EA)

TransAlta, SUNCOR Poplar R. 2001
2‐ 115 MW Alstom GT11N2
2 Steam Turbines, 130 MW

TransAlta

Shell Muskeg Oilsands Project

Bitumen to
Upgrader

(Shell)

Two GE 7EA turbines use heat recovery to
produce steam for Muskeg Mine (ATCO Power)

150 MW ATCO cogen plant at the Scotford Upgrader.
One GE 7EA with DLN, output 80 MW

Oilsands
Steam Assisted Gravity
Drainage (SAGD)

Deltak Once Through Heat Recovery Steam
Generator (OTHRSG)

PETRO-CANADA
Boiler Feed Water

Air Intake

Exhaust gases
GE 7FA
Gas(7241)
turbine

EOR Steam
Generators
Steam

Fuel Gas
Electrical
Power

Mixed Fuel

Hot Oil
System

• ATCO CNRL Primrose
MacKay River Cogeneration , TCPL PetroCan
• Esso Cold Lake
• EnCana Foster Ck
• OPTI Nexen Long Lake
• CNRL Horizon
• SUNCOR Firebag
• 170 MW GE 7FA gas turbine
• Deltak Once Through Heat
Recovery Steam Generator

(courtesy; J. Szyszkowski, TCPL, IAGT 2005)

Gasification & Syngas
in Power and Oilsands
• Minimize natural gas use

• Polygeneration with H2
• Onsite Upgrading
• Reliable H2/CO combustion
• Future CO2 Capture and Storage

Future CCS ?

1st Cdn Gasification Project, Long Lake AB

OPTI Nexen
Long Lake

Gas Turbine CHP in Municipal and
Institutional Applications
• Small GT systems, sized to thermal loads
• Can use absorption chilling in summer
• District energy
• Most plants in Ontario

York U., Two Solar Taurus (JP Zanyk)

Microturbine CHP, Minto Hotel, Ottawa

London Health Sciences (OPA)

Queens Kingston
Hospital (2 Solar Taurus)

Countryside DES, London ON (OPA)

NRCC Heating / Power Plant
‐ Canada’s only Federal GT CHP (1993)
(courtesy, S. Vohra, NRC)

NRC Bldg M6
SIEMENS SGT100
GT GENSET
4.5 MW
CONDENSER
BOILER
No. 4

BOILER
No. 3
BOILER
No. 2

BOILER
No. 1

HEAT RECOVERY
BOILER
(on mezzanine)

CONTROL ROOM
ABSORPTION CHILLER – 200 Tons

Heating, lbs/hr:
Summer 12,000
Winter 55,000
Power : 4 of 12 MW total load

Some Lessons Learned
• Many varied Gas Turbine unit types and ‘industrial’ systems
• Several “World’s First’ applications in Canadian sectors
• Fuel flexibility, Reliability, Gasification are important GT challenges
• GTs in various systems represent key solutions, to contribute to
about ¼ of world’s total energy/GHG solutions (GTCC, CHP, IGCC ...)
• Clean Energy success depends on balanced ‘System Integration’
plus New Cycles, Alternative Fuels, and a better Business Case

TCPL Stittsville

GTAA Pearson Airport (IST)

GTAA Plant Tour, IAGT 2006



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 4.0-c316 44.253921, Sun Oct 01 2006 17:14:39
Creator Tool                    : Acrobat PDFMaker 8.1 for PowerPoint
Modify Date                     : 2010:10:18 10:23:27-04:00
Create Date                     : 2010:10:18 10:23:11-04:00
Metadata Date                   : 2010:10:18 10:23:27-04:00
Producer                        : Acrobat Distiller 8.1.0 (Windows)
Format                          : application/pdf
Creator                         : Manny
Title                           : Trends in Gas Turbine Exhaust and Noise Emissions
Document ID                     : uuid:e021d2b7-e87e-48c6-8ae0-f074a70005f9
Instance ID                     : uuid:6beb4f1e-2fd2-4b72-b3eb-2f5248455d38
Company                         : Grizli777
Page Count                      : 34
Page Layout                     : SinglePage
Author                          : Manny
EXIF Metadata provided by EXIF.tools

Navigation menu