Firetide 8020-1 Firetide Wireless Mesh Node User Manual rev

Firetide Inc. Firetide Wireless Mesh Node Users Manual rev

Users Manual_rev.pdf

Download: Firetide 8020-1 Firetide Wireless Mesh Node User Manual rev
Mirror Download [FCC.gov]Firetide 8020-1 Firetide Wireless Mesh Node User Manual rev
Document ID3740218
Application IDSRtksUvWU8H/Tm/IQzJaWg==
Document DescriptionUsers Manual_rev.pdf
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize139.33kB (1741586 bits)
Date Submitted2018-02-05 00:00:00
Date Available2018-02-06 00:00:00
Creation Date2018-02-01 16:41:20
Producing SoftwareFoxit Reader PDF Printer Version 8.2.0.1217
Document Lastmod2018-02-02 12:13:21
Document TitleUsers Manual_rev.pdf

Firetide Installation Guide
HotPort 8020 Mesh Node
Published Dec 2017
Revised Feb 2018
© 2017 Firetide, Inc. All rights reserved.
Firetide, the Firetide logo, HotPort are all trademarks of Firetide Inc. All other trademarks are
the property of their respective owners. Information in this document is subject to
change without notice.
Firetide, Inc.
2105 S. Bascom Avenue, Suite 220
Campbell, CA 95008
USA
www.firetide.com
HotPort 8020 Mesh Node Installation Guide
Contents
About this document............................................................................................................................ 4
1.1
Audience ............................................................................................................................................. 4
1.2
Instructions to purchaser and installer...................................................................................................... 4
1.3
Purpose ............................................................................................................................................... 4
1.4
Conventions ......................................................................................................................................... 4
1.5
Document feedback............................................................................................................................... 4
1.6
Contacting customer support .................................................................................................................. 4
HotPort 8020 mesh node ..................................................................................................................... 5
Installation ............................................................................................................................................ 5
Preparing what you need to install ........................................................................................................... 5
3.1
HotPort mesh node in an IP67 enclosure .................................................................................................. 6
3.1.1
Package contents of 8020 mesh node ............................................................................................... 6
The following accessories can be purchased separately from Firetide ................................................................. 6
3.2
Interface of an outdoor mesh .................................................................................................................. 7
3.2.1
Node LEDs .................................................................................................................................... 8
3.2.2
Console Port/Reset ........................................................................................................................ 9
3.2.3
Ethernet ports............................................................................................................................... 9
3.2.4
Antenna Connectors .................................................................................................................... 10
3.2.5
Pressure relief valve ..................................................................................................................... 10
3.2.6
Ground screw point ..................................................................................................................... 10
Test before you install........................................................................................................................ 10
4.1
Before you install: ............................................................................................................................... 10
4.2
Tests to do ......................................................................................................................................... 10
4.3
Licenses which are not included ............................................................................................................ 10
4.4
Certification requirement ..................................................................................................................... 10
Doing the tests ....................................................................................................................................... 10
Power Specifications ............................................................................................................................... 12
6.1
Power input and Power out .................................................................................................................. 12
6.2
Operating TX Power limit of radio .......................................................................................................... 12
Environmental Specifications ............................................................................................................... 12
HotPort8020 mesh node installation.................................................................................................... 12
HotPort 8020 Mesh Node Installation Guide
8.1
Installation Steps:................................................................................................................................ 12
8.2
Tools required .................................................................................................................................... 12
8.3
Doing the site survey ........................................................................................................................... 13
8.4
Safe installation practices ..................................................................................................................... 13
8.5
Preparing a mesh node for installation ................................................................................................... 14
8.6
Preparing earth ground ........................................................................................................................ 15
8.7
Installing a mesh node and antenna assembly ......................................................................................... 16
8.8
Attaching the mesh node to a wall ......................................................................................................... 17
8.9
Attaching a mesh node to a vertical pole ................................................................................................ 18
8.10
Attaching a mesh node to a horizontal pole............................................................................................. 19
8.11
Panel antenna Assembly ...................................................................................................................... 21
8.12
Mesh node installation with RF cable assembly on a vertical pole. .............................................................. 22
Trouble shooting ................................................................................................................................ 24
Cannot see a mesh node in Web NMS.................................................................................................... 24
After multiple reboots a mesh node is missing ........................................................................................ 24
Performance not as expected ................................................................................................................. 24
Resetting an outdoor mesh node to factory default settings................................................................. 25
10
Weather proof procedures ............................................................................................................ 26
10.1
Tools and materials ........................................................................................................................ 26
To make a weatherproof connection you need the following tools and materials: .............................. 26
Making weatherproof cable to node connections.................................................................................. 26
You need to make weather proof two connections:.................................................................................... 26
To make a weather proof cable to node connection: ............................................................................ 26
11
Information to User, Purchaser & Installer ................................................................................... 28
11.1
Federal Communication Commission Interference Statement .................................................... 28
HotPort 8020 Mesh Node Installation Guide
1 About this document
This section lists the audience, purpose, summary of information, and conventions used in this document.
1.1 Audience
This documents intended for certified professionals who install Firetide wireless solutions.
1.2 Instructions to purchaser and installer
This equipment must be professionally installed. The installer is responsible for adjusting the transmit power output of the
system to assure compliance with FCC Part15 EIRP limits and human radiation safety regulations.
1.3 Purpose
This document has the information and procedures necessary to install and do basic tests with Firetide HotPort 8020 mesh
node.
1.4 Conventions
Certaininformationhasspecialmeaningforthereader.Thisinformationappearswith an icon that indicates a particular condition,
such as a warning or caution, or a label, such as “Note” or “Best Practice”.
 Electrical hazards are those environments where the danger of electrocution is probable. This image appears
before each electrical hazard statement.
 Warnings contain safety information that you must obey. If you do not obey the instruction in warning, the result
might include serious injury or death. This image appears before each warning statement.
 Cautions contain information that you should obey to avoid minor injury, inconvenience, and damage to equipment.
This image appears before each caution statement.
 Notes contain optional advice and information particular to a special case or application.
 Best practices contain specific recommendations based on industry-standard expectations.
1.5 Document feedback
If you find an error or content missing from this document, we want to hear about it. You can send you feedback about any
of our documents to FT-Techpubs@firetide.com.
1.6 Contacting customer support
If you need support, depending on the problem, you might be asked for this information:
 Description of the problem
 FMA and an installed management license
 Channel and frequency plan
 Recent spectrum analysis
 Device topology in Google Earth (KMZ file)
 Network map or topology plan with device information
You must also have administrator access to the mesh to be able to receive technical support.
The next table lists the contact information for customer support.
Worldwide customer support
Americas
Days/Hours
Contact
Monday to Friday 7:00 am to http://www.firetide.com/support
5:30 pm PST (Pacific Standard +1 (877) FIRETIDE, extension 2
T ime)
+1(408) 399-7771, extension 2
+1(408) 355-7271
HotPort 8020 Mesh Node Installation Guide
Africa
Asia
Australia
Europe
Monday to Friday
8:00am to 5:30 pm IST (India
Standard Time)
http://www.firetide.com/support
+91-8040215111
Fax +1(408) 317-2257
2 HotPort 8020 mesh node
Firetide HotPortTM mesh node has two radios which operate in 802.11a, n and ac 4x4 MIMO mode.
The default configuration is 2x2 MIMO. With Software license 4x4 MIMO can be enabled.
The following software licenses are available. **
License
Descriptions
Remarks
SW-8020-2x2MIMO
802.11n/ac 2x2MIMO
Default
SW-8020-4x4MIMO
802.11n/ac 4x4 MIMO
Add on license
SW-FMA-Mgmt.
Management License
Add on license
SW-Mobility
Mobility License
Add on license
If you plan on using DFS, it is mandatory to take training class from Firetide. On successful completion of the class Firetide
will provide login credentials for DFS configuration using Firetide Management Appliance.
**Subject to software implementation.
3 Installation
Please read before Installation
You must complete the training program and be certified by Firetide to be able to install Firetide
products.
Before you install an outdoor mesh node in a permanent location, you need to make sure you have all of the
correct components and make sure the components are operational.
To get




Preparing what you need to install
what you need to set up a mesh node:
Open the box.
Remove the contents.
Check the contents for damage. If a part is missing or damaged, call your Firetide reseller.
If the contents are good and correct, keep the box for future use.
HotPort 8020 Mesh Node Installation Guide
3.1
HotPort mesh node in an IP67 enclosure
3.1.1
Package contents of 8020 mesh node





Eight detachable 5GHz Omni- directional antennas for staging
Pole and wall mounting kit
Mounting screws and bolts
Ground cable
Cat6 Ethernet cable
The following accessories can be purchased separately from Firetide




4x4 MIMO 18.5 dBi gain 5G panel outdoor rated antenna
7 dBi gain 5G dipole antenna
RF cable assembly with lightning arrester
802.3 AT+ PoE injector
HotPort 8020 Mesh Node Installation Guide
3.2 Interface of an outdoor mesh
The following picture of 8020 mesh node shows the front view and the rear view describing
node LEDs, antenna port connectors of the radio, Ethernet ports(PoE input and PSE output port),
debug console/reset and the pressure valve with weatherproof cap protection and node ground
point.
For information about cables and accessories approved for use with Firetide devices,
refer to the Accessories Guide.

Front View
HotPort 8020 Mesh Node Installation Guide

3.2.1

Rear View
Node LEDs
Hotport8020 mesh node has 5 LEDs as shown in the following picture.
o Power LED



OFF: Mesh node does not receive power.
Amber: Device is powering up
Green: Device is powered up and ready to use
o Ethernet LEDs of LAN1 and LAN2 port



OFF: No Ethernet link detected
Amber: Link speed (10/100 Mbps),Blinking - Activity
Green-Link speed (1000Mbps), Blinking- Activity
o Radio1 and Radio2 LEDs


OFF: No Radio neighbor detected
Green: Radio Neighbor connected, Blinking-Activity
HotPort 8020 Mesh Node Installation Guide
3.2.2
Console Port/Reset
Console port and reset button are co-located as shown in the picture below, which is covered by a weatherproof
cap, held with a cable tie.
Note: Console port is meant to be used only for debugging purpose by Firetide support.
Reset button is above the console port RJ45 connector.
Refer the “procedure for reset” on page 24 to do a factory reset of the mesh node.
3.2.3
Ethernet ports
Ports 1 & 2 of HotPort 8020 mesh node are Gigabit Ethernet LAN ports.
LAN1 Port can receive power from an 802.3at+ compliant PoE source.
LAN2 Port can source power to an 802.3af compliant device.
HotPort 8020 Mesh Node Installation Guide
3.2.4
Antenna Connectors
3.2.5
3.2.6
HotPort 8020 mesh node has eight N type female antenna connectors, four connectors per radio.
Pressure relief valve
o The pressure relief valve shown on the rear cover is protected by a weatherproof cap.
Ground screw point
The ground screw is on the lower left side of the bottom cover. Adequate grounding of the mesh
node must be ensured.
4 Test before you install
You should set up and test the mesh nod in door on a table before you install them in permanent locations.
4.1 Before you install:
Make sure all of the equipment are in working condition
Configure mesh nodes to reduce configuration effort in the field
Test the stability and performance of the nodes.
4.2 Tests to do
Power on each device
Attach all antennas and make sure you can see all devices in Web NMS
Perform throughput test
4.3 Licenses which are not included
FMA network management software and appropriate licenses are required. Before you set up the network,
you must purchase all licenses from your Firetide distributor.
For the procedures related to license installation, refer to the FMA Reference Manual.
4.4 Certification requirement
Professionals who install and manage networks that contain Firetide products must comply
with the training and certification requirements of the installation.
5 Doing the tests
For efficiency, you can configure six to eight mesh nodes at one time. To do tests and capture data with
FMA software:
1. Refer to the FMA product guide for the prerequisites of HW requirement.
2.
Connect the power cable to the PoE adaptor, connect through CAT5e / CAT6 Ethernet cable
from the PoE output of PoE Adaptor to LAN1 PoE input port of the mesh node.
3.
Attach the staging antennas to each mesh node
4.
FMA can be accessed through it’s URL using an internet browser. It will launch the login page.
HotPort 8020 Mesh Node Installation Guide
10
5.
Enter user name and password to login. The default username and password is: admin / admin.
The picture below shows the Login screen.
6. Make sure that all mesh nodes are loaded in FMA. if youcan notseeany or allof the
meshnodes,see the troubleshooting information in the FMA Product Guide
7. Set the country code on the nodes. All nodes intended for use in the UnitedStates will
be set to US Country code.Once the US Country code isset, changing to a different
Country code later will not be possible.
Caution: Make sure you configure the device for the correct country. If you do not
configure the country correctly, the device might operate in a manner that is not legal
in that country and/or create problems with other wireless devices
a) Go to Mesh configurations, Select the country of operation from the drop-down list.
b) Save Mesh configurations. When you set the country code the system refreshes the
mesh configuration and gives all visible nodes in the same country code. For a few
minutes the mesh nodes might disappear from the topology view in WebNMS.
8. To configure mesh-wide settings, go to Mesh > Configure Mesh... Set the radio
operational mode as needed.
Note: For information about specific features and the configuration process, see the FMA
Reference Manual.
9. Check network throughput on each link between mesh nodes. For procedures,
see the FMA Product Configuration Guide.
Note: If you are not able to send and/or receive data, see “Troubleshooting” on
page 23.
10. After you finish the tests, remove the staging antennas.
HotPort 8020 Mesh Node Installation Guide
11
6 Power Specifications
6.1 Power input and Power out
Power input: LAN1 port: IEEE 802.3at+ compliant, PoE-PD
Power output: LAN2 port: IEEE 802.3af compliant, PoE-PSE


6.2 Operating TX Power limit of radio
Allowed Radio Power limits, supported frequencies and channel bandwidth shall vary based on country/region
of operation and Operating TX Power is compliant to FCC 15.407(a) power limit.
7 Environmental Specifications





Operating temperature: -30o C to + 60o C
Storage temperature: -40o C to +70o C
Humidity (non-condensing): 10 % to 90 %
Storage humidity (non-condensing): 5 % to 95 %
Max altitude: 15,000 ft. (4,600 meters)
8 HotPort8020 mesh node installation
The configured mesh nodes are ready for installation in the permanent outdoor location.
8.1 Installation Steps:
1. Do a site survey to make sure that no safety hazards are present.
2. Gather all required tools.
3. Prepare safety equipment and confirmearthgroundprocedures.
4. Attach the mesh nodes and antennas to poles that are attached to a mast, tower, or roof.
5. Install the mesh node and antennas assembly and other devices, such as cameras.
8.2 Tools required
To install HotPort 8020 mesh nodes, you need to use:





Screwdriver set
Small adjustable wrench
Wire cutters to cut tie wraps around cables
Electrical tape and butyl masti c tape to weatherproof the connectors
Spray to prevent corrosion
Other equipment you might need includes:



Ladder
Lift truck
Safety equipment
HotPort 8020 Mesh Node Installation Guide
12
8.3 Doing the site survey
Before you install any equipment outside, check the entire site:


To identify possible hazards that might be new since the site survey
To identify the presence of objects that might cause interference for the radios
Warning! Certified professionals must install Firetide products. Failure to install this
equipment correctly can result in equipment damage, personal injury, or death.
Electrical shock hazard warning! Make a plan to keep the installation
personnel safe.
Warning! Do not install Firetide products where possible contact with power lines
can be made. Antennas, poles, towers, guy wires, or cables can touch power lines.
People can be injured or killed if they touch or hold any part of the
equipment when it contacts electric lines. Make sure that equipment and
personnel do not directly or indirectly contact power lines.
Warning! Do not open the cover:


Dangerous voltages inside.
No serviceable parts inside.
8.4 Safe installation practices
Best practice: Install HotPort 8020 meshnodes on poles that areat sufficient distance
from power lines.











The horizontal distance from a tower, pole or antenna to the nearest power line
should be at least twice the total length of the pole/antenna combination. This
distance ensures that the pole will not contact a power line if it falls during or after
installation.
Select equipment locations that allow safe and simple installation.
Do not work alone.
Use approved non-conducting ladders, shoes, and other safety equipment.
Make sure all equipment is in good condition.
If a tower or pole begins falling, do not catch it.
If a wire or pole touches a power line, do not touch it.
Do not install antennas or towers on windy days.
Make sure all towers and poles are correctly grounded.
Make sure all electrical cables connected to antennas have lightning arrestors.
A connection to earth ground and a lightning arrestor can prevent fire damage or
personal injury in case of lightning, static build-up, or short circuit within the
equipment connected to the antenna.
HotPort 8020 Mesh Node Installation Guide
13


Use 10AWG ground wire and corrosion-resistant connectors to connect the base of
the antenna pole or tower directly to the building protective ground or to one or
more approved grounding rods.
Refer to the National Electrical Code for grounding information.
8.5 Preparing a mesh node for installation
It is easier to install all devices to one object, such as pole, and then attach the pole assembly
to the roof. If you attach the devices to a pole attached to the roof top, factors, such as
weather, can make the installation more difficult and dangerous.
Warning! Only use antennas that are rated for outdoor applications.
Warning! Failure to comply with these installation instructions might result in severe personal injury
including electrical shock or permanent damage to equipment.
Warning! Make sure that all safety equipment is in good condition. Do not use broken or damaged tools
or equipment. Always use safe work practices and obey all local and national guidance for earth ground
requirements and electricity.
Note: Collect all tools before you install the mesh nodes.
Make sure that you have antennas rated for outdoor use. For information about antennas and how
to select them, see the Firetide Antenna and Accessory Guide.
Warning! Max Operating TX Power allowed Power limits is as per FCC 15.407(a).
Note: Install the antenna and any other wireless devices higher than the HotPort mesh node.
1. Toa pole that you can install at a permanent outdoor site, attach these items:
a) Brackets for the meshnode
b) Antenna bracket
2. Attach the antenna to the antenna bracket. Refer to the antenna installation procedures.
HotPort 8020 Mesh Node Installation Guide
14
8.6 Preparing earth ground
Warning. A Hot Port mesh node must be correcty connected to earth ground.
Failure to do so can result in equipment damage, injury, or death.
The product warranty does not include damage from incorrect grounding.
Obey all local building and electrical codes regarding antennas.
If not available, refer to the National Electric Code (NEC).
Earth grounding guidelines include:
 If you attach a mesh node and antenna to a tower or pole, attach the base of the tower
pole to the building’sground ortooneor more approved grounding rods with 10 AWG ground wire and
corrosion-resistant connectors.
 Connect the grounding cable to rain gutters only if the rain gutter is connected to earth
ground.
 Ground rods are copper-plated and 1.8 to 2.4 meters (6 to 8 feet) long.
 Install all ground components in straight lines. If you must make a bend, do not make a
sharp bend.
 Earth-to-ground should be less than 5 ohms.
 Some salt compounds are corrosive and can cause copper ground rods to corrode.
 To prepare the soil for ground rods:
If the soil contains rocks or sand, insert the ground rods into the ground Pull out
the ground rods.
Put in an approved ground enhancement material into the holes where the
grounding rods go.
 Put in the ground rods.
HotPort 8020 Mesh Node Installation Guide
15
8.7 Installing a mesh node and antenna assembly
The process to install antenna to a mesh node for a mast or tower or to a roof installation
are same.
Note: Gather and take all tool s and materials with you to the installation site.
Warning! Donot install this product on a windy or rainy day.
Toinstall a meshnode and antenna assembly in a permanent outdoor location:
1) Safely lift and carefully put the assembly on the roof.
2) Connecting to a MIMO antenna:
 Terminate the unused port of radio antenna ports and MIMO antenna ports with a
50 ohm terminator.
 If your MIMO antenna has four RF Co nnectors (two 45 degree connectors and two
90 degree vertical connector), then only use the two 45 degree connectors. DO NOT
use the vertical connector, and place a 50 ohm terminator on the vertical connector.
The neighbor antenna should also use two 45 degree connectors.
 If your MIMO antenna has four connectors (two 45 degree connectors and two 90
degree connector), but your neighbor MIMO antennas has only two connectors (two
90 degree connectors), then mount your MIMO antenna with the two 90 degree
connectors in a diamond pattern. The MIMO antenna with the four connectors
should maintain its mount in a square pattern.
3) Attach the pole to which the mesh node and antenna are attached to a mast, tower or
roof.
 Attach the cables that have integrated lightning arrestors, or attach the cables and
install lightning arrestors.
 Make drip loops with cables.
 Connect earth ground. See “Preparing earth ground” on page 15.
4) Make all connectors weatherproof. See “Weather proof procedures” on page 25.
5) Connect the CAT5E/CAT6 Ethernet cable from PoE adaptor power port to LAN1 port of
the Mesh node.
6) Cover all unused connectors, if any.
7) Verify that the mesh nodeworks:
 Ping the IP address
 Use one or more mesh nodes
 Do throughput tests with FMA and record the results as a benchmark test
HotPort 8020 Mesh Node Installation Guide
16
8.8 Attaching the mesh node to a wall
The below procedures shows how to install the Mesh node into a wall.
1) Mark the four locations of the mounting holes on the flat mounting surface.
2) Drill 37mm deep 8mm holes on the markings and hammer the bolts into the openings.
3) Place the lock and flat washer on the four hex cap screws and drive the screws to attach
the bracket to the back of the Mesh node.
4) Attach the device on to the wall by tightening the bolt’s flat washer and nuts to secure
the mounting base to the mounting surface.
HotPort 8020 Mesh Node Installation Guide
17
Note: The installation is correct if the node does not easily move from side to side.
Best practice: Use a spray to prevent corrosion on the bracket and mount hardware.
8.9 Attaching a mesh node to a vertical pole
The Mesh node comes with two sets of brackets - wall mount bracket and pole mount bracket.
Attaching the mesh node to a pole requires both pole mount as well as wall mount brackets.
The below procedures show how to attach the Mesh node into a vertical pole.
1. Place the lock and flat washer on the four hex cap screws and drive the screws
to attach bracket to the back of the mesh node.
2. Drive the four round head screws to attach the pole mount bracket to the wall
mount bracket.
HotPort 8020 Mesh Node Installation Guide
18
3. Thread the open end of the pole strap through the two tabs on the pole mount
brackets.
4. Lock and tighten the pole strap to secure the pole mount bracket to the
pole.
Note: The installation is correct if the node does not easily move from side to side.
Best practice: Use a spray to prevent corrosion on the bracket and mount hardware.
8.10 Attaching a mesh node to a horizontal pole
To attach the mesh node to a horizontal pole procedures are same as attaching the node to a
vertical pole. Following picture shows the mesh node attached to a horizontal pole.
HotPort 8020 Mesh Node Installation Guide
19
Note: The installation is correct if the node does not easily move from side to side.
Best practice: Use a spray to prevent corrosion on the bracket and mount hardware.
HotPort 8020 Mesh Node Installation Guide
20
8.11 Panel antenna Assembly
Following picture shows 4x4 Panel Antenna installed with RF cable.
Following picture shows the Installation of Panel Antenna to a vertical pole.



Attach the panel antenna to the antenna bracket
Attach one end of RF cable to the Panel antenna and the other end of RF cable that have lightning
arrestors to the mesh node.
Refer section 8.7 for installation of mesh node and panel antenna assembly process.
HotPort 8020 Mesh Node Installation Guide
21
8.12 Mesh node installation with RF cable assembly on a vertical pole.
Front View:
Note: Connect the lightning arrester of all antenna ports to protective ground.
HotPort 8020 Mesh Node Installation Guide
22
Rear view:
HotPort 8020 Mesh Node Installation Guide
23
9 Trouble shooting
If a mesh nod e does not operate correctly try these suggestions.
If you recorded the performance of your network when you set it up, you have a
benchmark against which you can compare future performance and you might be able to identify problem
areas faster than if you try to diagnose a new problem.
Cannot see a mesh node in Web NMS
If you cannot see one or more mesh nodes in FMA, make sure that you set the extended range and
multiple hop feature.
If you can see the head node but no other nodes, then you also might have a configuration problem.
After multiple reboots a mesh node is missing
If a mesh node reboots five times within 10minutes, the mesh node loads the second saved firmware
image.
The previous firmware, if older or different from the firmware of the other mesh nodes in a mesh
network, might not be recognized by the mesh and FMA will not detect the mesh node.
Performance not as expected
If the network performance is not as expected:






Identify re use in your channel plan. If you have no channel reuse in the network, do a spectrum
analysis.
Check for self-interference. For example, the radios in a single device might connect.
Check the frequency plan and make sure that all the radios are configured correctly.
Make sure that each node is connected to the correct devices and nodes.
Determine the total throughput with an end to end test.
Determine the throughput of each link with tests.
HotPort 8020 Mesh Node Installation Guide
24
Resetting an outdoor mesh node to factory default settings
You can reset an outdoormeshnodewiththis procedure.
Theresetbutton is inside the console opening above the RJ45 Connector.
Caution! When a HotPort mesh node is reset, all configuration information is erased.
For this procedure you need these items:
Paperclip, pen, or pencil
Adjustable wrench
To reset an outdoor mesh node:
Power up the mesh node.
Remove the weather proof cover of console / reset port. Use a wrench if the valve is too
tight to remove by hand.
Caution! Do not use pliers to remove the pressure relief valve because you can break it.
Press and holdtheresetbuttonwiththepaperclipfor10 seconds until the Power LED changes
the color to amber and blinks.
The device reboots, and the LEDs turn to green indicating its operational status.
Wait one minute, and then log into WebNMS.
Configure the mesh node or apply a previously saved configuration file.
Cover the console / reset port with the weather proof cover.
Using WebNMS configure the mesh node.
HotPort 8020 Mesh Node Installation Guide
25
10 Weather proof procedures
Cable connections become loose over time because of vibration. Loose connections let moisture
contact and erode the interface to a connector. To prevent performance problems due to
moisture damage, Firetide recommends that you use butyl mastic to make weather proof all outdoor
connections.
Butylmastic is a synthetic rubber sealant that you can use to make a connection weather proof. It is
slightly sticky and stays flexible; it bonds to itself to make a good seal. Butymastic and a layer
of electrical tape keeps the cable assembly clean, dry, and easy to change in the future.
Note: To make a strong water tight connection, keep a high level of tension in the butyl mastic when
you stretch it over the cable and connector.
10.1 Tools and materials
To make a weatherproof connection you need the following tools and materials:
 Screw driver
 Pliers
 Utility knife
 Vinyl electrical tape
Note: Vinyl electrical tape between the cable assembly and the mastic tape makes future changes
easier than mastic tape put directly on the cable. Vinyl electrical tape as a cover over the mastic tape
prevents the mastic from melting in hot weather.
 Rubber splicing or mastic tape (also known as self-amalgamating, self- sealing, self-fusing, nonvulcanized tape)
 Pencil or wooden dowel for small clearances
 Cleaning supplies (if necessary)
Making weatherproof cable to node connections
You need to make weather proof two connections:
 From the antenna cable to the lightning arrester
 From the lightning arrester to the node
To make a weather proof cable to node connection:
 Gather the tools and materials to do the procedure.
 Ensure that the cable and connectors are clean. Clean off oil, water, grease, and dirt before you
continue.
 Wrap a layer of electrical tape (sticky side out) over the arrester to node connector and wrap
approximately 1 inch (2.5cm) of cable. Overlap the tape by 40% with each turn.
 Repeat for the antenna cable to arrester connection.
HotPort 8020 Mesh Node Installation Guide
26
Note: To make a watertight connection, keep tension in the butyl mastic when you stretch it over the
cable and connector.




Tightly wrap a layer of mastic tape over the electrical tape. Make a 40% overlap on each turn. Start
from the base of the unit to at least 1inch (2.5 cm) of the cable.
Wrap a layer of electrical tape (smooth side out, sticky side in) over the mastic tape.
Wrap a second layer of electrical tape over the first layer of electrical tape.
The lightning arrestor connections are ready for installation in an outdoor environment.
HotPort 8020 Mesh Node Installation Guide
27
11
11.1
Information to User, Purchaser & Installer
Federal Communication Commission Interference Statement
This equipment has been tested and found to comply with the limits for a class-B digital device, pursuant to part
15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when
the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio
frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful
interference to radio communications.
However, there is no guarantee that interference will not occur in a particular installation. If this equipment does
cause harmful interference to radio or television reception, which can be determined by turning the equipment off
and on, the user is encouraged to try to correct the interference by one of the following measures:




Reorient or relocate the receiving antenna.
Increase the separation between the equipment and receiver.
Connect the equipment into an outlet on a circuit different from that to which the receiver is
connected.
Consult the dealer or an experienced radio/TV technician for help.
FCC Caution: Any changes or modifications not expressly approved by the party responsible for compliance could
void the user's authority to operate this equipment.
This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter.
Accessories or components to be used with this equipment to use in the system, must comply with the FCC
Part 15.27 special accessories regulations. It is the responsibility of the user to use the needed special
accessories along with the equipment.
Radiation Exposure Statement
This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This
equipment should be installed and operated with minimum distance 51cm between the radiator & your body.
This equipment must be professionally installed. The installer is responsible for adjusting the transmit power
output of the system to assure compliance with FCC Part15 EIRP limits and human radiation safety
regulations. Operating TX Power allowed Power limits is as per FCC 15.407(a).
Professional installation instruction
1. Installation personal
HotPort 8020 Mesh Node Installation Guide
28
This product is designed for specific application and needs to be installed by a qualified personal who has
RF and related rule knowledge. The general user shall not attempt to install or change the setting.
2. Installation location
The product shall be installed at a location where the radiating antenna can be kept 51cm from nearby
person in normal operation condition to meet regulatory RF exposure requirement.
3. External antenna
Use only the antennas which have been approved by the applicant. The non-approved antenna(s) may
produce unwanted spurious or excessive RF transmitting power which may lead to the violation of FCC
limit and is prohibited.
4. Installation procedure
Please refer to user’s manual for the detail.
5. Warning
Please carefully select the installation position and make sure that the final output power does not exceed
the limit set force in relevant rules. The violation of the rule could lead to serious federal penalty.
HotPort 8020 Mesh Node Installation Guide
29

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.7
Linearized                      : Yes
Encryption                      : Standard V2.3 (128-bit)
User Access                     : Print, Extract
XMP Toolkit                     : Adobe XMP Core 4.0-c316 44.253921, Sun Oct 01 2006 17:14:39
Create Date                     : 2018:02:01 16:41:20+05:30
Creator Tool                    : 
Modify Date                     : 2018:02:02 12:13:21+08:00
Metadata Date                   : 2018:02:02 12:13:21+08:00
Format                          : application/pdf
Description                     : 
Creator                         : 
Title                           : 
Keywords                        : 
Producer                        : Foxit Reader PDF Printer Version 8.2.0.1217
Document ID                     : uuid:f2350578-79d9-4081-bdc2-8addefd97f40
Instance ID                     : uuid:fbf66952-d974-4be8-aa6f-b3062dea6c0c
Page Count                      : 30
Subject                         : 
Author                          : 
EXIF Metadata provided by EXIF.tools
FCC ID Filing: REP-8020-1

Navigation menu