Huawei Technologies PRU11WIFI pico Remote Radio Unit User Manual Installation Guide
Huawei Technologies Co.,Ltd pico Remote Radio Unit Installation Guide
Contents
- 1. Users Manual
- 2. User Manual
Users Manual
DBS3900 LampSite Installation Guide Issue 08 Date 2016-05-30 HUAWEI TECHNOLOGIES CO., LTD. Copyright © Huawei Technologies Co., Ltd. 2016. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: http://www.huawei.com Email: support@huawei.com Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide About This Document About This Document Overview This document describes how to install the modules and cables for the BBU, DCU3900, RHUB3908, pRRU3901, pRRU3902, pRRU3907, pRRU3911, and pRRU3911+WIFI. It also provides checklists for hardware installation. Unless otherwise specified, BBU in this document refers to BBU3900 and BBU3910. DCU3900 in this document refers to DCU. RHUB3908 in this document refers to RHUB. Unless otherwise specified, pRRU in this document refers to pRRU3901, pRRU3902, pRRU3907, pRRU3911, and pRRU3911+WIFI. Product Version The following table lists the product version related to this document. Product Name Solution Version DBS3900 LampSite SRAN10.1 and later versions RAN17.1 and later versions eRAN8.1 and later versions eRAN TDD 8.1 and later versions Product Version V100R010C10 and later versions Intended Audience This document is intended for: Issue 08 (2016-05-30) BTS installation personnel Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. ii DBS3900 LampSite Installation Guide Contents Contents About This Document .................................................................................................................... ii 1 Changes in DBS3900 LampSite Installation Guide ............................................................... 1 2 Installation Preparations ............................................................................................................. 5 2.1 Reference Documents ................................................................................................................................................... 5 2.2 Preparing Tools and Instruments................................................................................................................................... 5 2.3 Requirements for Installation Personnel ....................................................................................................................... 7 3 Unpacking and Checking ............................................................................................................ 8 4 Installing a BBU .......................................................................................................................... 10 5 Installing a DCU.......................................................................................................................... 11 6 Installing an RHUB .................................................................................................................... 12 6.1 Information About the Installation .............................................................................................................................. 12 6.1.1 Installation Scenarios ............................................................................................................................................... 13 6.1.2 Installation Clearance Requirements ....................................................................................................................... 18 6.1.3 Installation Environment .......................................................................................................................................... 21 6.2 Installation Process ..................................................................................................................................................... 23 6.3 Installing an RHUB .................................................................................................................................................... 24 6.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack .................................................................................................. 24 6.3.2 Installing an RHUB in a 19-Inch Shelf .................................................................................................................... 27 6.3.3 Installing an RHUB on a Wall ................................................................................................................................. 30 6.4 Installing RHUB Cables ............................................................................................................................................. 34 6.4.1 Requirements for Cable Layout ............................................................................................................................... 34 6.4.2 Cable List ................................................................................................................................................................. 37 6.4.3 Cable Connections ................................................................................................................................................... 43 6.4.4 Cable Installation Process ........................................................................................................................................ 44 6.4.5 Installing PGND Cable ............................................................................................................................................ 45 6.4.6 Installing Ethernet Cable ......................................................................................................................................... 47 6.4.7 Installing CRPI Optical Cables ................................................................................................................................ 50 6.4.8 Installing Alarm Cable (Optional) ........................................................................................................................... 53 6.4.9 Installing Power Cable ............................................................................................................................................. 53 6.5 Checking the RHUB Hardware Installation................................................................................................................ 55 Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. iii DBS3900 LampSite Installation Guide Contents 6.6 Power-on Check on an RHUB .................................................................................................................................... 56 7 Installing a pRRU3901................................................................................................................ 59 7.1 Information About the Installation .............................................................................................................................. 60 7.1.1 Product Family......................................................................................................................................................... 60 7.1.2 Installation Scenario ................................................................................................................................................ 60 7.1.3 Space Requirements ................................................................................................................................................. 64 7.1.4 Installation Environment Requirements................................................................................................................... 65 7.2 Obtaining the MAC Address (Optional) ..................................................................................................................... 66 7.3 Installation Process ..................................................................................................................................................... 67 7.4 Installing a pRRU3901 ............................................................................................................................................... 68 7.4.1 pRRU3901 Mounting Kits ....................................................................................................................................... 69 7.4.2 Installing a pRRU3901 on a Wall ............................................................................................................................ 70 7.4.3 Installing a pRRU3901 on a Ceiling ........................................................................................................................ 74 7.4.4 Installing a pRRU3901 on a Pole............................................................................................................................. 77 7.4.5 Installing a pRRU3901 on a Plate ............................................................................................................................ 80 7.4.6 Installing a pRRU3901 on a Keel ............................................................................................................................ 83 7.4.7 Installing the Cabinet ............................................................................................................................................... 86 7.5 Installing pRRU3901 Cables ...................................................................................................................................... 93 7.5.1 Requirements for Cable Layout ............................................................................................................................... 93 7.5.2 pRRU3901 Cable List .............................................................................................................................................. 94 7.5.3 Cable Connections (Indoor) ..................................................................................................................................... 95 7.5.4 Cable Connections (Outdoor) .................................................................................................................................. 98 7.5.5 Cable Connections (LTE TDD) ............................................................................................................................... 99 7.5.6 pRRU3901 cable installation process .................................................................................................................... 101 7.5.7 Installing an Ethernet Cable ................................................................................................................................... 101 7.5.8 Installing an RF jumpers (Optional) ...................................................................................................................... 104 7.6 Checking the pRRU3901 Hardware Installation....................................................................................................... 106 7.7 Powering on the pRRU3901 ..................................................................................................................................... 107 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI................................................ 109 8.1 Information About the Installation ............................................................................................................................ 110 8.1.1 Product Family....................................................................................................................................................... 110 8.1.2 Installation Scenario .............................................................................................................................................. 112 8.1.3 Space Requirements ............................................................................................................................................... 116 8.1.4 Installation Environment Requirements................................................................................................................. 117 8.2 Installation Process ................................................................................................................................................... 118 8.3 Installing a pRRU ..................................................................................................................................................... 119 8.3.1 Mounting Kits ........................................................................................................................................................ 119 8.3.2 Installing a pRRU on a Wall .................................................................................................................................. 120 8.3.3 Installing a pRRU on a Ceiling .............................................................................................................................. 124 8.3.4 Installing a pRRU on a Pole .................................................................................................................................. 127 8.3.5 Installing a pRRU on a Plate .................................................................................................................................. 129 Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. iv DBS3900 LampSite Installation Guide Contents 8.3.6 Installing a pRRUon a Keel ................................................................................................................................... 136 8.3.7 Installing a pRRU on Steel Hangers ...................................................................................................................... 140 8.3.8 Installing the Cabinet ............................................................................................................................................. 144 8.4 Installing pRRU Cables ............................................................................................................................................ 148 8.4.1 Requirements for Cable Layout ............................................................................................................................. 148 8.4.2 Cable List ............................................................................................................................................................... 149 8.4.3 Cable Connections ................................................................................................................................................. 150 8.4.4 Cable Installation Process ...................................................................................................................................... 154 8.4.5 Installing a pRRU3902 Ethernet Cable .................................................................................................................. 154 8.4.6 Installing a pRRU3911/pRRU3911+WIFI Ethernet Cable .................................................................................... 159 8.4.7 Installing a pRRU3902 RF Jumper (Optional) ...................................................................................................... 163 8.4.8 Installing a pRRU3911 RF Jumper (Optional) ...................................................................................................... 165 8.5 (Optional) Installing a Combiner .............................................................................................................................. 167 8.6 Checking the pRRU Hardware Installation .............................................................................................................. 169 8.7 Powering on the pRRU ............................................................................................................................................. 170 9 Installing a pRRU3907 or pRRU3916 .................................................................................... 172 9.1 Information About the Installation ............................................................................................................................ 172 9.1.1 pRRU Product Family ........................................................................................................................................... 173 9.1.2 Constraints and Limitations ................................................................................................................................... 173 9.1.3 Installation Clearance and Space Requirements .................................................................................................... 176 9.1.4 Installation Environment Requirements................................................................................................................. 179 9.2 Installation Process ................................................................................................................................................... 180 9.3 Installing a pRRU ..................................................................................................................................................... 180 9.3.1 pRRU Mounting Kits ............................................................................................................................................. 180 9.3.2 Installing a pRRU on a Wall .................................................................................................................................. 182 9.3.3 Installing a pRRU on a Pole .................................................................................................................................. 185 9.4 Installing pRRU Cables ............................................................................................................................................ 187 9.4.1 Cabling Requirements............................................................................................................................................ 187 9.4.2 pRRU Cable List.................................................................................................................................................... 189 9.4.3 pRRU3907 Cable Connections .............................................................................................................................. 190 9.4.4 pRRU3916 Cable Connections .............................................................................................................................. 190 9.4.5 pRRU cable installation process ............................................................................................................................ 191 9.4.6 Installing a PGND Cable ....................................................................................................................................... 192 9.4.7 Installing a pRRU3907 RF Jumper ........................................................................................................................ 193 9.4.8 Installing a pRRU3916 RF Jumper ........................................................................................................................ 197 9.4.9 Opening the Cover Plate of a pRRU Cabling Cavity ............................................................................................. 199 9.4.10 Installing an Ethernet Cable ................................................................................................................................. 200 9.4.11 Closing the Cover Plate of a pRRU Cabling Cavity ............................................................................................ 202 9.5 Checking the pRRU Hardware Installation .............................................................................................................. 204 9.6 Powering on the pRRU ............................................................................................................................................. 205 10 (Optional) Installing the Extender-PoE90 .......................................................................... 207 Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide Contents 11 (Optional) Installing the EXD3902 and Cables ................................................................. 211 11.1 Installation Scenario................................................................................................................................................ 212 11.2 Installation Clearance and Space Requirements ..................................................................................................... 215 11.3 Installation Process ................................................................................................................................................. 218 11.4 Installing an EXD3902 ........................................................................................................................................... 218 11.4.1 EXD3902 Mounting Kits ..................................................................................................................................... 218 11.4.2 Installing an EXD3902 on a Wall ........................................................................................................................ 220 11.4.3 Installing an EXD3902 on a Pole ......................................................................................................................... 223 11.5 Installing EXD3902 Cables .................................................................................................................................... 225 11.5.1 Cabling Requirements .......................................................................................................................................... 225 11.5.2 EXD3902 Cable Connections .............................................................................................................................. 226 11.5.3 Installling a PGND cable ..................................................................................................................................... 227 11.5.4 Opening the Cover Plate of an EXD3902 Cabling Cavity ................................................................................... 229 11.5.5 Installing an Ethernet Cable ................................................................................................................................. 230 11.5.6 Closing the Cover Plate of an EXD3902 Cabling Cavity .................................................................................... 231 11.6 Checking the EXD3902 Hardware Installation ....................................................................................................... 232 11.7 Powering on the EXD3902 ..................................................................................................................................... 233 12 (Optional) Installing the PoE Surge Protector and Cables ............................................. 235 13 (Optional) Installing the RF Surge Protector and Cables ............................................... 237 14 (Optional) Installing the Cabinet and Cabinet Cables .................................................... 239 14.1 Installation Clearance Requirements ...................................................................................................................... 239 14.2 Mounting Bracket and Attachment Plate ................................................................................................................ 240 14.2.1 Mounting Bracket ................................................................................................................................................ 240 14.2.2 Attachment Plate .................................................................................................................................................. 242 14.3 Installing a Cabinet ................................................................................................................................................. 242 14.3.1 Installing the Cabinet on a Wall ........................................................................................................................... 242 14.3.2 Installing the Cabinet on a Pole ........................................................................................................................... 247 14.3.3 Installing the Cabinet on U-steel.......................................................................................................................... 250 14.3.4 Installing the Cabinet on Angle Steel ................................................................................................................... 254 14.3.5 Installing the Cabinet on Metal Grid.................................................................................................................... 257 14.3.6 Installing the Cabinet on the Floor ....................................................................................................................... 262 14.4 Installing Cabinet Cables ........................................................................................................................................ 266 14.4.1 Cable Connections ............................................................................................................................................... 266 14.4.2 Installing a PGND Cable for the Cabinet............................................................................................................. 269 15 Appendix .................................................................................................................................. 271 15.1 MAC Collection Template ...................................................................................................................................... 271 15.2 Assembling a Shielded RJ45 Connector and an Ethernet Cable ............................................................................. 272 15.3 DBS3900 LampSite Engineering Label .................................................................................................................. 276 15.4 Attaching an L-Shaped Label ................................................................................................................................. 278 15.5 Attaching a Sign Plate Label ................................................................................................................................... 280 Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. vi DBS3900 LampSite Installation Guide 1 Changes in DBS3900 LampSite Installation Guide Changes in DBS3900 LampSite Installation Guide This chapter describes the changes in the DBS3900 LampSite Installation Guide. 08 (2016-05-30) This is the eighth commercial release. Compared with 07 (2015-12-30), this issue incorporates the following new topics: 8.3.4 Installing a pRRU on a Pole 10 (Optional) Installing the Extender-PoE90 11 (Optional) Installing the EXD3902 and Cables Compared with 07 (2015-12-30), this issue incorporates the following changes: Content Change Description 8.4.5 Installing a pRRU3902 Ethernet Cable Renamed the outdoor Extender to Extender-PoE90. 8.4.6 Installing a pRRU3911/pRRU3911+WIFI Ethernet Cable Compared with 07 (2015-12-30), no information is deleted. 07 (2015-12-30) This is the seventh commercial release. Compared with 06 (2015-10-30), this issue incorporates the following new topics: 8.4.6 Installing a pRRU3911/pRRU3911+WIFI Ethernet Cable 12 (Optional) Installing the PoE Surge Protector and Cables 13 (Optional) Installing the RF Surge Protector and Cables 14 (Optional) Installing the Cabinet and Cabinet Cables Compared with 06 (2015-10-30), this issue incorporates the following changes: Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 1 Changes in DBS3900 LampSite Installation Guide Content Change Description Entire document Added the information about pRRU3911 and the cabinet used in the outside scenario. Compared with 06 (2015-10-30), no information is deleted. 06 (2015-10-30) This is the sixth commercial release. Compared with 05 (2015-08-30), this issue includes the following new topics: 9 Installing a pRRU3907 or pRRU3916 Compared with 05 (2015-08-30), no information is changed. Compared with 05 (2015-08-30), no information is deleted. 05 (2015-08-30) This is the fifth commercial release. Compared with 04 (2015-07-30), no information is added. Compared with 04 (2015-07-30), this issue incorporates the following changes Content Change Description 6.4.7 Installing CRPI Optical Cables Added the descriptions about the CPRI optical fiber connection in sharing BBUs with Macro Networks scenario. Compared with 04 (2015-07-30), no information is deleted. 04 (2015-07-30) This is the fourth commercial release. Compared with 03 (2015-06-30), no information is added. Compared with 03 (2015-06-30), this issue incorporates the following changes. Content Change Description Entire document Added the RHUB that has no electrical transmission port. Compared with 03 (2015-06-30), no information is deleted. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 1 Changes in DBS3900 LampSite Installation Guide 03 (2015-06-30) This is the third commercial release. Compared with 02 (2015-05-08), this issue includes the following new topics: 5 Installing a DCU Compared with 02 (2015-05-08), this issue incorporates the following changes: Content Change Description Entire document Added the descriptions about the DCU. Compared with 02 (2015-05-08), no information is deleted. 02 (2015-05-08) This is the second commercial release. Compared with 01 (2015-03-23), no information is added. Compared with 01 (2015-03-23), this issue incorporates the following changes: Content Change Description 6.4.9 Installing Power Cable Modified the RHUB configurations of upper-level circuit breakers. 8.1.2 Installation Scenario Deleted the minimum space requirements of the pRRU3901. 8.1.3 Space Requirements Deleted the minimum space requirements of the pRRU3902. 8.3.2 Installing a pRRU on a Wall Added the step about locking the protection screw of pRRU3902. 8.3.3 Installing a pRRU on a Ceiling 8.3.5 Installing a pRRU on a Plate 8.3.6 Installing a pRRUon a Keel Compared with 01 (2015-03-23), no information is deleted. 01 (2015-03-23) This is the first commercial release. Compared with draft B (2015-02-10), this issue includes the following new topics: 8 Installing a pRRU3902 or pRRU3911 Compared with draft B (2015-02-10), this issue incorporates the following changes: Content Issue 08 (2016-05-30) Change Description Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 1 Changes in DBS3900 LampSite Installation Guide Content Change Description Entire document Added the descriptions about the pRRU3902. Compared with draft B (2015-02-10), no information is deleted. Draft B (2015-02-10) This is a draft release. Compared with draft A (2015-01-15), no information is added. Compared with draft A (2015-01-15), this issue incorporates the following change: Content Change Description 6.1.1 Installation Scenarios Added the descriptions about the RHUB panel must not face upwards. Compared with draft A (2015-01-15), no information is deleted. Draft A (2015-01-15) This is a draft release. Compared with Issue 08 (2014-12-30) of V100R009C00, no information is added. Compared with Issue 08 (2014-12-30) of V100R009C00, this issue incorporates the following change: Content Change Description Entire document The base station in the LampSite solution is renamed DBS3900 LampSite. Compared with Issue 08 (2014-12-30) of V100R009C00, no information is deleted. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 2 Installation Preparations Installation Preparations About This Chapter Before starting the installation, you must obtain the required reference documents, tools, and instruments, and familiarize yourself with the skills required. 2.1 Reference Documents Before the installation, you must read the following documents: 2.2 Preparing Tools and Instruments This section describes the tools and instruments that must be prepared before the installation. 2.3 Requirements for Installation Personnel This section describes requirements for installation engineers. They must be qualified and trained, and familiar with correct operation methods and safety precautions before performing any operations. 2.1 Reference Documents Before the installation, you must read the following documents: DBS3900 LampSite Hardware Description Installation Reference 2.2 Preparing Tools and Instruments This section describes the tools and instruments that must be prepared before the installation. Marker Torque screwdriver Diagonal pliers Level (M4 to M6) Power cable crimping tool Issue 08 (2016-05-30) RJ11 crimping tool Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Cable cutter DBS3900 LampSite Installation Guide 2 Installation Preparations Rubber mallet Crown saw (Ø60) Wire stripper Hammer drill (Ø6, Ø8 and Ø12) Torque wrench (Ø10 mm) Protective gloves Guarded blade utility knife ESD gloves Long measuring tape Multimeter Network cable tester Vacuum cleaner Ladder Torque wrench for SMA connector Socket wrench (M6) Hole screwdriver (T20) – Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 2 Installation Preparations 2.3 Requirements for Installation Personnel This section describes requirements for installation engineers. They must be qualified and trained, and familiar with correct operation methods and safety precautions before performing any operations. Before the installation, pay attention to the following items: Technical engineers must take Huawei training and be familiar with proper installation and operation methods. The number of installation personnel depends on the engineering schedule and installation environment. Generally, three to five persons are required. Generally, only three to five onsite personnel are necessary. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 3 Unpacking and Checking Unpacking and Checking This section describes how to unpack and check the delivered equipment to ensure that the materials are complete and intact. Context The following lists important notes when you are transporting, lifting, or installing the equipment or components: Protect them from colliding with doors, walls, shelves, or other objects. Wear clean gloves and do not touch them with bare hands, sweat-soaked gloves, or dirty gloves. You must power on the RHUB or pRRU within 7 days after it is unpacked. Procedure Step 1 Count the total number of the shipments. If... Then... The total number of the components is consistent with that recorded in the packing lists on all packing boxes Go to Step 2. The total number of the components is inconsistent with that recorded in the packing lists on all packing boxes Report the problems and causes to the local Huawei office. Step 2 Check the exterior of each packing box. If... Then... The exterior of each packing box is intact Go to Step 3. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 3 Unpacking and Checking If... Then... It is damaged or soaked Report the problems and causes to the local Huawei office. The collision label is red Do not unpack the packing box and claim for compensation from the transportation company. Step 3 Check the type and quantity of the equipment in the boxes according to the packing list. If... Then... The type and number are consistent with the packing list on each packing list Sign the Packing List with the operator. There is any shortage, wrong delivery, or damaged equipment Report the problems and causes to the local Huawei office. Perform the following operations to protect the components from any damages and help find out the cause of any damage in future: 1. Store the unpacked equipment and packing materials indoors. 2. Take photos of the storeroom, rusted or eroded equipment, packing box, and packing materials. 3. File the photos. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. DBS3900 LampSite Installation Guide 4 Installing a BBU Installing a BBU This chapter describes the process of installing a BBU. For details about the installation of the BBU, see DBS3900 Installation Guide. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 10 DBS3900 LampSite Installation Guide 5 Installing a DCU Installing a DCU This chapter describes the process of installing a DCU. For details about the installation of the DCU, see DCU3900 Installation Guide. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 11 DBS3900 LampSite Installation Guide 6 Installing an RHUB Installing an RHUB About This Chapter This chapter describes the process of installing an RHUB. RHUBs are classified into those with electrical transmission ports and those with no electrical transmission ports. Unless otherwise specified, this document uses the RHUBs with no electrical transmission ports as an example. 6.1 Information About the Installation This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment. 6.2 Installation Process The RHUB installation involves installing an RHUB module, installing RHUB cables, checking the RHUB hardware installation, and powering on the RHUB. 6.3 Installing an RHUB An RHUB can be installed in a cabinet, rack, shelf, or on a wall. 6.4 Installing RHUB Cables This section describes how to install cables for an RHUB. 6.5 Checking the RHUB Hardware Installation After an RHUB is installed, check the installation of hardware including the devices and related cables. 6.6 Power-on Check on an RHUB This section describes the power-on check on the RHUB after the RHUB hardware is installed and checked. 6.1 Information About the Installation This section describes the information to be learnt before RHUB installation, including the RHUB installation scenarios, clearance, and installation environment. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 12 DBS3900 LampSite Installation Guide 6 Installing an RHUB 6.1.1 Installation Scenarios An RHUB can be installed in a 19-inch cabinet, rack, shelf, or on a wall. To prevent the RHUB from water drops, the RHUB panel must not face upwards (shown in Figure 6-1) in any installation scenarios. Figure 6-1 Improper installation mode The RHUB mounting ears are installed in standard mode or reverse mode. The reverse mode is used by default. The two installation modes are defined as follows: Issue 08 (2016-05-30) In standard mode, the front of the mounting ear is aligned with the RHUB panel, as shown in Figure 6-2. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 13 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-2 Installing mounting ears in standard mode In reverse mode, the front of the mounting ear is 31 mm away from the RHUB panel, as shown in Figure 6-3. Figure 6-3 Installing mounting ears in reverse mode Installing an RHUB in a 19-Inch Cabinet or Rack Installing an RHUB in a 19-inch cabinet or rack: Secure the mounting ear to the mounting bracket by using M6 screws. If there are no other modules installed in the 1 U space near the RHUB, install the RHUB directly. Otherwise, remove the modules before installing the RHUB. Before installation, you need to check the installation mode supported by the rack and adjust the position of the mounting ear. Figure 6-4 and Figure 6-5 show RHUBs installed in a cabinet or rack, respectively. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 14 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-4 Installing an RHUB in a 19-inch cabinet or rack in standard mode Figure 6-5 Installing an RHUB in a 19-inch cabinet in reverse mode Installing an RHUB in a 19-Inch Shelf When an RHUB is installed in a 19-inch shelf, the shelf must be installed on a wall. One shelf can house multiple RHUBs with 1 U space between two RHUBs. Figure 6-6 and Figure 6-7 show RHUBs installed in a 19-inch shelf. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 15 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-6 RHUB installed in a 19-inch shelf in standard mode Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 16 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-7 RHUB installed in a 19-inch shelf in reverse mode Installing an RHUB on a Wall An RHUB can be installed on a wall. The wall on which an RHUB is installed must meet the following requirements: When a single RHUB is installed, the wall must have a capacity of bearing at least four times the weight of the RHUB. Expansion bolts must be tightened to 10 N·m (88.507 bf·in.) to ensure the bolts work properly and the wall remains intact without cracks in it. Figure 6-8 shows an RHUB installed on a wall. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 17 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-8 RHUB installed on a wall 6.1.2 Installation Clearance Requirements When an RHUB is installed in a 19-inch cabinet, rack, shelf, or on a wall, a minimum clearance is required for easy cabling and operation and maintenance. A recommended installation clearance is provided based on experience. Do not install or place inflammable materials above or under an RHUB. A clearance of 350 mm must be reserved in front of the air intake vent of the fan of the power supply unit (PSU) for maintenance. Figure 6-9 shows the installation clearance for the RHUB installed in a 19-inch cabinet, rack, or shelf. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 18 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-9 Installation clearance for an RHUB installed in a 19-inch cabinet, rack, or shelf Figure 6-10 and Figure 6-11 shows the recommended and minimum installation clearance respectively when the RHUB is installed on a wall. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 19 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-10 Recommended installation clearance for a wall-mounted RHUB (unit: mm) Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 20 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-11 Minimum installation clearance for a wall-mounted RHUB (unit: mm) 6.1.3 Installation Environment The installation environment of an RHUB involves the running environment specifications for the RHUB and other specifications. RHUB Running Environment Specifications Table 6-1 shows the environment specifications for the RHUB installed indoors. The temperature and humidity of the installation position must ensure normal operation. A cool and ventilated place is recommended. The heat dissipation holes on the RHUB cannot be blocked. Table 6-1 RHUB environment specifications Specifi cations Issue 08 (2016-05-30) Installation Scenario RHUB Quantity Condition Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Remarks 21 DBS3900 LampSite Installation Guide 6 Installing an RHUB Specifi cations Installation Scenario RHUB Quantity Condition Remarks Operati ng tempera ture Installed on a wall or in a 19-inch rack. N/A -5°C to +50°C N/A Installed in a shelf. -5°C to +45°C N/A -5°C to +43°C N/A -5°C to +40°C N/A Relativ humidit Installed in all scenarios. N/A 5% RH to 95% RH N/A Altitude N/A N/A -60 m to +1800 m Works properly. 1800 m to 4000 m Above the 1800 m altitude, the maximum operating temperature decreases by 1°C each time the altitude increases by 220 m. Installing more than one RHUB, 1 U space is required between two RHUBs. Other Running Environment Specifications The RHUB cannot be installed at an air outlet of the heat dissipation box of an air conditioner or other heat-generating appliances. The RHUB cannot be installed near a strong heat source. The RHUB cannot be installed in a position with water dripping, such as outdoor equipment of air conditioners, pipe, and leaking or dripping roofs. The installation position must be far from rains. If the RHUB is installed on a wall, there must be no window on either side of the wall. The installation position must be far away from high voltage, highly corrosive devices, flammable or explosive substances, and electromagnetic interference such as power stations, high-voltage substations, and wired TV towers. The RHUB must be installed in a dry, ventilating, and dust-proof place. If the RHUB is installed in parking areas or basements, the installation position must be well-ventilated. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 22 DBS3900 LampSite Installation Guide 6 Installing an RHUB Requirements for the Upper-level Circuit Breaker Type C upper-level AC circuit breakers or slow-blow fuses must be used for power cables. The maximum current must not exceed 16 A. Table 6-2 describes the recommended specifications. Table 6-2 Circuit breaker specifications for power cables Power Supply Upper-level AC Circuit Breaker (For a single RHUB) Cross-Sectional Area of the Input Power Cable 220 V AC single-phase ≥6A 1.5 mm2 110 V AC dual-live-wire 110 V AC single-phase ≥ 12 A 6.2 Installation Process The RHUB installation involves installing an RHUB module, installing RHUB cables, checking the RHUB hardware installation, and powering on the RHUB. Figure 6-12 shows the RHUB installation process. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 23 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-12 RHUB installation process 6.3 Installing an RHUB An RHUB can be installed in a cabinet, rack, shelf, or on a wall. 6.3.1 Installing an RHUB in a 19-Inch Cabinet or Rack This section describes how to install an RHUB in a 19-inch cabinet. Procedure The following describes how to install an RHUB with mounting ears in reverse mode: If necessary, request one more person for assistance. a. Issue 08 (2016-05-30) With one hand holding it, align the mounting holes with the installation holes, slowly push the RHUB into the required position in the cabinet, as shown in Figure 6-13. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 24 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-13 Pushing an RHUB into a cabinet b. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 6-14. Figure 6-14 Tightening screws The following describes how to install an RHUB with mounting ears aligned with the RHUB panel: If necessary, request one more person for assistance. a. Issue 08 (2016-05-30) Remove the mounting ears on both sides of the RHUB by removing the four M4×8 screws, as shown in Figure 6-15. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 25 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-15 Removing mounting ears and screws b. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws with a torque of 1.4 N•m to install the removed mounting ears again, as shown in Figure 6-16. The mounting ears must be aligned with the RHUB panel. Figure 6-16 Installing mounting ears in standard mode c. Issue 08 (2016-05-30) With one hand holding it, align the mounting holes with the installation holes, slowly push the RHUB into the required position in the cabinet, as shown in Figure 6-17. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 26 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-17 Pushing an RHUB into a cabinet d. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 6-18. Figure 6-18 Tightening screws ----End 6.3.2 Installing an RHUB in a 19-Inch Shelf If a shelf houses more than one RHUB, 1 U space is required between two RHUBs. The PSU must be installed at the bottom of the cabinet. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 27 DBS3900 LampSite Installation Guide 6 Installing an RHUB Procedure The following describes how to install an RHUB with mounting ears installed in reverse mode: If necessary, request one more person for assistance. a. With one hand holding it, align the mounting holes with the installation holes, slowly push the RHUB into the required position in the shelf. b. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 6-19. Figure 6-19 Tightening screws The following describes how to install an RHUB with mounting ears installed in standard mode: If necessary, request one more person for assistance. a. Issue 08 (2016-05-30) Remove the mounting ears on both sides of the RHUB by removing the four M4×8 screws, as shown in Figure 6-20. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 28 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-20 Removing mounting ears and screws b. Use a torque screwdriver or Phillips screwdriver to tighten the four M4×8 screws with a torque of 1.4 N•m to install the removed mounting ears again, as shown in Figure 6-21. The mounting ears must be aligned with the RHUB panel. Figure 6-21 Installing mounting ears in standard mode Issue 08 (2016-05-30) c. With one hand holding it, align the mounting holes with the installation holes, slowly push the RHUB into the required position in the cabinet, as shown in . d. Use a torque screwdriver or Phillips screwdriver to tighten the four M6×16 screws with a torque of 2 N•m, as shown in Figure 6-22. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 29 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-22 Tightening screws ----End 6.3.3 Installing an RHUB on a Wall An RHUB can be installed on a wall. Context Suitable for mounting on concrete or other non-combustible surface only. Procedure Step 1 The mounting ears are installed in reverse mode by default. Before installing an RHUB on a wall, modify the installation mode of the mounting ears on the RHUB. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 30 DBS3900 LampSite Installation Guide 6 Installing an RHUB Use a torque screwdriver or Phillips screwdriver to remove the mounting ears on both sides of the RHUB by removing the four M4×8 screws, as shown in Figure 6-23. Figure 6-23 Removing screws and mounting ears Rotate the mounting ears 90 degrees clockwise, and use a torque screwdriver or Phillips screwdriver to secure the mounting ear with a torque of 1.4 N•m, as shown in Figure 6-24. Figure 6-24 Installing mounting ears and screws Step 2 Determine the position on the wall for installing the RHUB based on the requirements in the engineering blueprint and 6.1.2 Installation Clearance Requirements. Place the RHUB to the Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 31 DBS3900 LampSite Installation Guide 6 Installing an RHUB position to be installed against the wall, and then mark the four anchor points where the mounting ear screws are fastened using a marker, as shown in Figure 6-25. Figure 6-25 Anchor points for installing an RHUB on a wall (1) Level (2) RHUB (3) Wall To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Drill holes at the anchor point and install expansion bolts, as shown in Figure 6-26. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 32 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-26 Drilling holes and installing expansion bolts (1) M6×60 expansion bolt (2) Nut (3) Spring washer (4) Flat washer (5) Extension tub 1. Use a hammer drill with bit 8 to drill holes with a diameter of 8 mm and a depth of 45 mm to 50 mm at the marked anchor points. All the holes have the same depth. 2. Use a vacuum cleaner to clear the dust inside and around each hole. If the distance between two holes is incorrect, mark and drill holes again. 3. Partially tighten an expansion bolt and place it vertically into each hole. 4. Use a rubber mallet to hit the expansion bolt until the entire expansion sleeve is in the hole. 5. Remove the M6×60 bolt, nut, spring washer, and flat washer from each expansion bolt in sequence. After removing an expansion bolt, ensure that the top of the expansion sleeve is level with the wall. If it is not level, the RHUB cannot be installed on the concrete floor evenly and securely. Step 4 Align the mounting holes with the four M6×60 expansion bolts. Install spring washer 6 and flat washer 6 in sequence on each M6×60 expansion bolt, insert the bolts to each expansion tub, and then use a torque wrench or socket wrench to tighten the four M6×60 bolts with a torque of 5 N•m to secure the RHUB to the wall, as shown in Figure 6-27. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 33 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-27 Installing an RHUB on a wall As shown in the preceding figure, when the RHUB is placed against the wall, ensure that the RHUB panel is vertical to the ground and the PSU is on the lower part of the RHUB panel. ----End 6.4 Installing RHUB Cables This section describes how to install cables for an RHUB. 6.4.1 Requirements for Cable Layout Cables must be routed according to the specified cabling requirements to prevent signal interference. If a cable listed below is not required, skip the requirements for routing the cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 34 DBS3900 LampSite Installation Guide 6 Installing an RHUB General Requirements for Cable Layout National Standards Code for Engineering Design of Generic Cabling System for Building and Campus (GB 50311-2007) Code for Engineering Acceptance of Generic Cabling System for Building and Campus (GB50312-2007). Security Protection Engineering Technology Specifications (GB 50348-2004) Code for Construction and Acceptance of the Electronic Information System Room (GB 50462-2008) Code for Quality Acceptance of the Intelligent Building Engineering (GB 50339-2003) Code for Quality Acceptance of Electric Engineering Construction in Building (GB 50303-2002) Technical Specification for Construction and Acceptance of Telecommunication Conduit Engineering (GB 50374-2006) International Standards Generic Cabling for Customer Premises (ISO/IEC 11801) Commercial Building Telecommunications Cabling Standard (EIA/TIA 568) Commercial Building Standard for Telecommunication Pathways and Spaces (EIA/TIA 569) Administration Standard for Commercial Telecommunications Infrastructure (EIA/TIA 606) Grounding and Bonding Requirements for Telecommunications in Commercial Buildings (EIA/TIA 607) Generic Cabling Systems for Information Technology (EN 50173) Cabling Installation for Information Technology (EN 50174) Bending radius The bending radius of a power cable or a protection ground (PGND) cable is at least five times the diameter of the cable. The bending radius of an optical cable is at least 20 times the diameter of the optical cable, and the minimum bending radius of the branch at each end of the optical cable is 30 mm. The bending radius of the signal cable must be at least five times the diameter of the cable. Cable Binding Cables of the same type are bound together. Different types of cables must be separately routed with a minimum spacing of 30 mm and cannot be entangled or crossed. The cables are bound tightly and neatly and the cable sheath is intact. The cable ties face the same direction and all cable ties bound at similar positions must be in a straight line. The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for each outdoor cable tie. All cut surfaces have no sharp edges. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 35 DBS3900 LampSite Installation Guide 6 Installing an RHUB Labels or nameplates are attached to both ends, joints, or turns of cables after they are installed. Safety The steel pipe or fire-resistant rigid polyvinyl chloride pipe should be used for the cable duct or for routing cables. The cross-sectional usage of the cable duct should be 30% to 50% and that of the pipe for routing cables should be 25% to 30%. Cables are placed away from sharp objects or wall burrs. If these positions are inevitable, protection pipes are required for the cables. Cables are routed away from heat sources, or heat-insulation materials are added between cables and heat sources. Cables are routed away the cooling vents of the RHUB. A clearance is reserved at turns of a cable or the position close to a device, facilitating cable and device maintenance. The recommended clearance is about 0.1 m. Requirements for Special Cables Ethernet Cable A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that 1/3 space inside the pipes must be vacant. The point at which an Ethernet cable is bundled must be spaced 400 mm or less from the Ethernet port on an RHUB. For the RHUB used in the elevator engine room on the rooftop, generator set for the subway engine, and equipment room with central air conditioning, Ethernet cables must be led through metallic conduits that are reliably grounded at both ends. Power cable Positions for routing power cables meet requirements of the engineering design. Cables are routed only by qualified and trained personnel before all preparations are made. Cables are routed in an untangled and orderly fashion. PGND cable PGND cables are buried in the ground or routed indoors. They cannot be routed overhead before they are routed into the equipment room. Outer conductors of coaxial cables and both ends of the shield layers on shielded cables are in proper electrical contact with the metal surface of the equipment to which they are connected. PGND cables and signal cables are installed in an untangled and orderly fashion. A certain distance is reserved between them to prevent interference from each other. Fuses or switches are not allowed on PGND cables. Other devices cannot be used for electrical connections of PGND cables. All the metal parts in the equipment are reliably connected to the ground terminal. Optical cable Cables are routed in an untangled and orderly fashion. Optical fibers cannot be bound at turns. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 36 DBS3900 LampSite Installation Guide 6 Installing an RHUB Optical fibers cannot be stretched with too much force or stepped on, and they are far away from sharp objects. Heavy objects cannot be placed on optical cables. When optical cables are routed, the extra length of the cables is coiled around special devices, such as a fiber coiler. Even strength is applied when optical cables are coiled and optical cables cannot be bent in a forcible manner. Vacant optical connectors are covered with dust-proof caps. Fiber optic cables cannot be squeezed by the cabinet door when routed through the cabinet. If optical cables need to be routed on the tower platform, the optical cables are routed along the inner side of the guard rail and the distance between the guard rail and the cable is the shortest one. If optical cables need to be routed close to a device on the tower, the optical cables are secured to the guard rail or pole with cable clips and the device cannot be far away from the position for securing the optical cables. If the optical cable close to a device on the tower is too long, the optical cables are wrapped and secured to the tower. 6.4.2 Cable List The DBS3900 LampSite cable list includes BBU cable list, DCU cable list, RHUB cable list, pRRU cable list. BBU Cable List The following table lists BBU3900 cables and BBU3910 cables. Except the CPRI fiber optic cable, for details about the cables exterior and related description in Table 6-3 and Table 6-4, see 3900 Series Base Station Cables. Table 6-3 BBU3900&BBU3910 cable list Cable One End The Other End Connector Installation Position Connector Installation Position BBU PGND Cable OT terminal (M4, 6 mm2 or 0.009 in.2) Ground terminal on the BBU OT terminal (M8, 6 mm2 or 0.009 in.2) External ground bar BBU Power Cable 3V3 connector -48V port on UPEU in BBU Depending on the power equipment Depending on the power equipment E1/T1 Cable DB26 male connector E1/T1 port on the UMPT, GTMU, UELP, WMPT, or UTRP in the BBU Depending on site requirements External transmission equipment E1/T1 Surge DB26 male E1/T1 port on DB25 INSIDE port Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 37 DBS3900 LampSite Installation Guide 6 Installing an RHUB Cable One End The Other End Connector Installation Position Connector Installation Position Protection Transfer Cable connector the UMPT, GTMU, UELP, WMPT, or UTRP in the BBU connector on the UELP in the SLPU FE/GE Ethernet Cable RJ45 connector FE0 port near OUTSIDE on the UFLP in the BBU RJ45 connector External transmission equipment FE0 port on the UMPT, GTMU, or WMPT in the BBU FE/GE port on the UTRP in the BBU FE/GE port on the LMPT in the BBU RJ45 connector FE0 port near INSIDE on the UFLP in the SLPU FE/GE Surge Protection Transfer Cable RJ45 connector FE0 port on the UMPT, GTMU, or WMPT in the BBU FE/GE port on the UTRP in the BBU Interconnection Cable Between FE/GE Electrical Ports RJ45 connector FE0 port on the WMPT in the BBU RJ45 connector FE0 port on the GTMU in the BBU Interconnection Cable Between FE/GE Optical Ports LC connector FE1 port on the WMPT in the BBU LC connector FE1 port on the GTMU in the BBU FE/GE Fiber Optic Cable LC connector FE1 port on the WMPT, GTMU, LMPT, or UMPT in the FC, SC, or LC connector External transmission equipment Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 38 DBS3900 LampSite Installation Guide 6 Installing an RHUB Cable One End Connector The Other End Installation Position Connector Installation Position BBU CPRI Optical Fiber DLC connector CPRI port on the GTMU, WBBP, LBBP, or UBRI in the BBU DLC connector CPRI_W port on an RRU APMI-BBU Monitoring Signal Cable RJ45 connector MON1 port on the UPEU or UEIU in the BBU Twisted pair TX+, TX-, RX+, or RXport on the APMI HEUA-BBU Monitoring Signal Cable RJ45 connector M0N1 port on the UPEU or UEIU in the BBU RJ45 connector COM_IN port on the HEUA CMUA-BBU Monitoring Signal Cable RJ45 connector M0N1 port on the UPEU or UEIU in the BBU RJ45 connector COM_IN port on the CMUA CMUE-BBU Monitoring Signal Cable RJ45 connector M0N1 port on the UPEU or UEIU in the BBU RJ45 connector COM_IN port on the CMUE CMUEA-BBU Monitoring Signal Cable RJ45 connector M0N1 port on the UPEU or UEIU in the BBU RJ45 connector COM_IN port on the CMUEA EMUA/EMUB Monitoring Signal Cable RJ45 connector M0N1 port on the UPEU or UEIU in the BBU DB9 male connector RS-485 port on the EMUA PSU (EPW25-24S48D ) Monitoring Signal Cable RJ45 connector EXT_ALM0 port on the UPEU or UEIU in the BBU Cord end terminal ALM terminal on the PSU (DC/DC) PSU (EPW25-24S48D ) In-Position Signal Cable RJ45 connector EXT_ALM0 port on the UPEU or UEIU in the BBU RJ45 connector RESENT port on the PSU (DC/DC) BBU Alarm Cable RJ45 connector EXT_ALM0 port on the UPEU or RJ45 connector External alarm device Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 39 DBS3900 LampSite Installation Guide 6 Installing an RHUB Cable One End Connector The Other End Installation Position Connector Installation Position UEIU in the BBU GPS Clock Signal Cable SMA male connector GPS port on LMPT, USCU, or UMPTa6 in the BBU Type N female connector GPS surge protector BBU Interconnection Signal Cables DLC connector M0 to M4 ports on the UCIU in the BBU DLC connector CI port on the UMPT in the BBU Cable Between Two Combined Base Stations DB15 male connector GCK port on the UCIU in the BBU MD36 or DB15 male connector DCTB or DGLUb Adapter Used for Local Maintenance USBa connector USBa port on the UMPT in the BBU Network connector Ethernet cable a: The security of the USB port is ensured by encryption, and the USB port can be shut down using commands. The USB commission port is used for commissioning the base station rather than configuring and exporting information of the base station. The following table lists BBU3910A cables. Table 6-4 BBU3910A cable list Cable One End The Other End Connector Installation Position Connector Installation Position PGND cable for the BBU3910A OT terminal (M6, 16 mm2 or 0.025 in.2) Ground terminal on the BBU3910A OT terminal (M8, 16 mm2 or 0.025 in.2) Ground terminal on the ground bar Power cable for the BBU3910A EPC4 connector NEG(-) and RTN(+) ports on the BBU3910A Depending on the power equipment Depending on the power equipment Dry contact alarm cable for the BBU3910A DB15 waterproof male connector (waterproof on the connector's both sides) EXT_ALM port on the BBU3910A Cord end terminal Equipment to be monitored RS485 alarm cable for the DB15 waterproof EXT_ALM port on the RJ45 connector COM_IN port on the Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 40 DBS3900 LampSite Installation Guide 6 Installing an RHUB Cable One End The Other End Connector Installation Position BBU3910A male connector (waterproof on the connector's both sides) BBU3910A CPRI Optical Fiber DLC connector CPRI port on the BBU3910A DLC connector CPRI_W port on an RRU FE/GE fiber optic cable LC connector GE1 port on the BBU3910A LC, FC, or SC connector External transmission equipment FE/GE Ethernet cable RJ45 connector GE0 port on the BBU3910A RJ45 connector External transmission equipment E1/T1 cable DB26 waterproof male connector E1/T1 port on the BBU3910A Depending on site requirements External transmission equipment Connector Installation Position OPM50M DCU Cable List For details about the DCU cables, see DCU3900 Cables in DCU3900 Hardware Description. RHUB Cable List Table 6-5 lists RHUB cables. Table 6-5 RHUB cable list Cable One End The Other End Connector Connected to... Connector Connected to... PGND cable OT terminal (M4, 6 mm2 [0.009 in.2]) Ground screws on the RHUB OT terminal (M6, 6 mm2 [0.009 in.2]) Ground terminal on the external ground bar Power Supply Cable C13 female connector AC power input socket on the RHUB 3-pin connector External power input socket CPRI Optical Fiber DLC connector CPRI port on the LBBP, WBBP or UBBP in the BBU DLC connector CPRI0 or CPRI1 port on the RHUB CPRI port on DLC connector CPRI port on the Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 41 DBS3900 LampSite Installation Guide 6 Installing an RHUB Cable One End Connector The Other End Connected to... Connector Connected to... the LBBP, WBBP or UBBP in the BBU DCU CPRI port on the DCU CPRI0 or CPRI1 port on the RHUB CPRI0 or CPRI1 port on the RHUB DLC connector CPRI0 or CPRI1 port on the RHUB CPRI port on the LBBP, WBBP or UBBP in the BBU FC connector, SC connector, or LC connector ODF CPRI port on the DCU CPRI0 or CPRI1 port on the RHUB Ethernet Cable RJ45 connector CPRI_E0~CP RI_E7 port on the RHUB RJ45 connector CPRI_E0~CPRI_ E1 port on the pRRU (Optional) Alarm Cable RJ45 connector EXT_ALM port on the RHUB Bare end Alarm signal port of the monitored equipment If one end of the CPRI cable is connected to the DLC connector, the other end connects the BBU, DCU or RHUB through the DLC connector. If one end of the CPRI cable is connected to the ODF adapter, the other end connects the BBU or RHUB through a connector corresponding to the adapter. The connectors include the FC connector, SC connector, and LC connector. The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. pRRU Cable List Table 6-6 lists pRRU cables. Table 6-6 List of pRRU3901 cables Cable Issue 08 (2016-05-30) One End The Other End Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 42 DBS3900 LampSite Installation Guide 6 Installing an RHUB Ethernet Cable (Optional) RF Jumper Connector Connected to ... Connector Connected to ... RJ45 connector CPRI_E0~CP RI_E7 port on RHUB RJ45 connector CPRI_E0~CPRI_ E1 port on pRRU RJ45 connector Transmission port on Access Control(AC) RJ45 connector GE port on pRRU3901 CPRI_E1 port on pRRU3911/ pRRU3911+ WIFI External antenna TX/RX RF port on pRRU Based on the port model of the antenna system. SMA straight male connector/Type N male connector Antenna system When the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, In the indoor scenario, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. In the outdoor scenario (only pRRU3901 and pRRU3902), the Ethernet cable is divided into two parts, one among RHUB-PoE surge protector 2- PoE surge protector 3-Extender and the other among the Extender- PoE surge protector 4- PoE surge protector 1-pRRU. 6.4.3 Cable Connections This section describes the cable connections for an RHUB. Figure 6-28, Figure 6-29 shows the cable connections for an RHUB. The port of ETH are reserved. Figure 6-28 Cable connections for an RHUB (indoor) (1) CPRI optical cable (2) Alarm cable (3) Ethernet cable (4) Power cable (5) PGND cable Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 43 DBS3900 LampSite Installation Guide 6 Installing an RHUB The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. Figure 6-29 Cable connections for an RHUB (outdoor) (1) CPRI optical cable (2) Alarm cable (3) Ethernet cable (4) Power cable (5) PGND cable The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. 6.4.4 Cable Installation Process This section describes the process of installing RHUB cables. Figure 6-30 shows the RHUB cable installation process. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 44 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-30 RHUB cable installation process 6.4.5 Installing PGND Cable An RHUB PGND cable ensures proper grounding of an RHUB. Prerequisites The OT terminals at both ends of the PGND cable are prepared. Context The yellow and green or green PGND cable is a single cable. The cross-sectional area of the PGND cable is 6 mm2 (0.009 in.2). Both ends of the cable are OT terminals, as shown in Figure 1. Figure 6-31 Exterior of a PGND cable (1) OT terminal (6 mm2 [0.009 in.2], M4) Issue 08 (2016-05-30) (2) OT terminal (6 mm2 [0.009 in.2], M6) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 45 DBS3900 LampSite Installation Guide 6 Installing an RHUB If the PGND cable is provided by the customer, a copper-core cable with a minimum cross-sectional area of 6 mm2 (0.009 in.2) or 10 AWG is recommended. The OT terminals at both ends of the PGND cable are assembled at the site. The M6 OT terminal has the default size. You can replace it with another OT terminal of the expected size based on the site requirement. Ensure proper grounding of the RHUB using a PGND cable. When installing the PGND cable, tightly press the OT terminal in the correct direction, as shown in Figure 6-32. Figure 6-32 Correct direction of an OT terminal for the PGND cable Procedure Step 1 Route the PGND cable by referring to 6.4.1 Requirements for Cable Layout. Step 2 Use a torque screwdriver or Phillips screwdriver to secure the M4 OT terminal at one end of the PGND cable to the ground screw on the RHUB panel with a torque of 1.4 N•m. If the OT terminal is a one-hole OT terminal, connect it to the ground screw on the lower part of the RHUB panel, as shown in Figure 6-33. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 46 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-33 Installing an RHUB PGND cable Step 3 Use a torque screwdriver or Phillips screwdriver to secure the M8 OT terminal at one end of the PGND cable to the wiring terminal on the ground bar at the site with a torque of 1.4 N•m. ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 6.4.6 Installing Ethernet Cable This section describes how to install an Ethernet cable. Prerequisites The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-sectional area must be 24 AWG or larger and frame spread rating must be CM or higher. The Ethernet cables can be straight-through cables or crossover cables. With the internal PoE module providing power, the maximum length of an Ethernet cable is 100 m. With the Extender, the distance of the pRRU and RHUB can be extended by the Extender up to a total distance of 200 m. Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. Context The Ethernet cable has the following functions: Provides power supply for the pRRU when connected to the CPRI_E0 port on the pRRU. Transmits CPRI signals between an RHUB and a pRRU. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 47 DBS3900 LampSite Installation Guide 6 Installing an RHUB For details about the cable connections in the different scenarios, see 6.4.3 Cable Connections. The Ethernet cable connections between RHUB and pRRUs are the same. The following section describes the connections between RHUB-Extender-pRRU3901 as an example. In the outdoor scenario, PoE surge protector is needed to provide surge protection for the Ethernet ports. For details about the installation of PoE surge protector, see 12 (Optional) Installing the PoE Surge Protector and Cables. Procedure Step 1 Make the Ethernet cables. 1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable of Installation Reference. Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the unshielded RJ45 connector and the Ethernet cable. Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected. 2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips. 3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2. 4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference. Step 2 Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design. Step 3 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. Step 4 Remove the dustproof cap of the CPRI_E0 port on the pRRU. Step 5 Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU panel, as shown in Figure 6-34, Figure 6-35. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 48 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-34 Install an Ethernet cable between an RHUB and a pRRU3901 (1) Ethernet cable (2) CPRI_E0 port on the pRRU3901 Figure 6-35 Install an Ethernet cable between an RHUB and a pRRU3902 or pRRU3911/ pRRU3911+WIFI (1) Ethernet cable Issue 08 (2016-05-30) (2) CPRI_E0 port on the pRRU3902 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 49 DBS3900 LampSite Installation Guide 6 Installing an RHUB Figure 6-36 Install an Ethernet cable between an RHUB and a pRRU3907 (1) Ethernet cable (2) CPRI_E0 port on the pRRU ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 6.4.7 Installing CRPI Optical Cables Optical fibers can be used to interconnect BBU and RHUBs, or cascade RHUBs. Context Multi-mode optical modules for CPRI ports are labeled MM and each has a black or gray puller. Single-mode optical modules are labeled SM and each has a blue puller. For details about the connection of CPRI optical cables, see CPRI Topology in DBS3900 LampSite Technical Description. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 50 DBS3900 LampSite Installation Guide 6 Installing an RHUB An optical module to be installed must match the rate of its corresponding port. The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Therefore, you must insert a fiber optic cable into an unpacked optical module within 20 minutes. Procedure Step 1 Install an optical module, as shown in Figure 6-37 and Figure 6-38. 1. Remove the dust-proof cap from the CPRI port on the RHUB panel. 2. Remove the dust-proof cap on the optical module. 3. Lower the puller of the optical module. 4. Insert the optical module into the CPRI port on the RHUB, DCU, BBU or ODF. 5. Raise the puller of the optical module. Figure 6-37 Removing the dust-proof cap from a port Figure 6-38 Installing an optical module Step 2 Install a CPRI optical cable, as shown in Figure 6-39. 1. Remove the dust-proof cap from the optical cable connector. 2. Install the optical cables by referring to Table 6-7. Table 6-7 CPRI optical cable connections One End Issue 08 (2016-05-30) The Other End Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 51 DBS3900 LampSite Installation Guide 6 Installing an RHUB Connect or Connected to Connector Connected to DLC connecto BBU/LBBP&WBBP/CPRI port DLC connector CPRI0 or CPRI1 port on the RHUB BBU/LBBP&WBBP/CPRI port DLC connector CPRI port on the DCU CPRI0 or CPRI1 port on the RHUB CPRI port on the DCU CPRI0 or CPRI1 port on the RHUB DLC connector CPRI0 or CPRI1 port on the RHUB BBU/LBBP&WBBP/CPRI port FC, SC, or LC connector ODF CPRI port on the DCU CPRI0 or CPRI1 port on the RHUB In sharing BBUs with Macro Networks scenario, RHUBs share only main control boards with with RF modules on macro base stations, not baseband processing units. If one end of the CPRI cable is connected to the DLC connector, the other end connects the BBU or RHUB through the DLC connector. If one end of the CPRI cable is connected to the ODF adapter, the other end connects the BBU/DCU or RHUB through a connector corresponding to the adapter. The connectors include the FC connector, SC connector, and LC connector. When connecting the CPRI cable to the TX and RX ports of the optical module through connectors in a cross manner, ensure that one end of a core of the CPRI cable is connected to the TX port and the other end is connected to the RX port. Figure 6-39 shows how to install a CPRI optical cable for connecting the BBU and RHUBs. Figure 6-39 Installing an CRPI optical cable Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 52 DBS3900 LampSite Installation Guide 6 Installing an RHUB ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 6.4.8 Installing Alarm Cable (Optional) An RHUB alarm cable transmits dry node alarm signals. Prerequisites Connectors for an alarm cable are prepared. Context Figure 6-40 shows the exterior of an RHUB alarm cable. 6.4.2 Cable List shows the installation position on both ends of the RHUB cable. Figure 6-40 RHUB alarm cable Procedure Step 1 Connect the RJ45 connector on one end of the alarm cable to the EXT_ALM port on the RHUB. Step 2 Connect the other end of the alarm cable to the alarm cable port on the device to be monitored. ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 6.4.9 Installing Power Cable The RHUB power cable provides 110 V AC/220 V AC power supply for the RHUB. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 53 DBS3900 LampSite Installation Guide 6 Installing an RHUB Context Table 6-8 lists the recommended configurations of upper-level circuit breakers and power cables for a RHUB. Table 6-8 Configurations of upper-level circuit breakers and power cables Power Supply Upper-level AC Circuit Breaker (For a single RHUB) Cross-Sectional Area of the Input Power Cable 220 V AC single-phase ≥6A 1 mm2 110 V AC single-phase ≥ 10 A 1.25 mm2 Procedure Step 1 Route the power cable by referring to 6.4.1 Requirements for Cable Layout. Step 2 Connect the power connector on the X1 end to the AC power input port on the RHUB panel, as shown in Figure 6-41. Step 3 Connect the power connector on the X2 end to the external power supply port, as shown in Figure 6-41. Figure 6-41 Installing an RHUB power cable ----End Follow-up Procedure 1. Issue 08 (2016-05-30) Route the cable, and then use a cable tie to bind the cable. For details, see 6.4.1 Requirements for Cable Layout. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 54 DBS3900 LampSite Installation Guide 2. 6 Installing an RHUB Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 6.5 Checking the RHUB Hardware Installation After an RHUB is installed, check the installation of hardware including the devices and related cables. Table 6-9 lists the hardware installation checking items. Table 6-9 Hardware installation checking list No. Item The position for each device conforms to the engineering design and meets the space requirement. Ensure that the RHUB is properly installed. The surface of the RHUB is neat and clean. The external paint is intact. The labels, tags, and nameplates are correct, legible, and complete. Table 6-10 lists the checking list of the power cable and PGND cable connections. Table 6-10 Checklist for power cable and PGND cable connections No. Item The power cables and PGND cables comply with the requirements of local regulations. The power cables or the PGND cables are not inversely connected or short-circuited. The power cables and PGND cables are bound separately from other cables. Labels are attached to both ends of the power cables, PGND cables, optical fibers, and Ethernet cables. The power cables and PGND cables are intact. The power cables and PGND cables have no weld nugget. No breaking device such as a switch or fuse lies in the electric connection of the grounding system. The redundant part of PGND cable is stripped off. The lugs at both ends of the power cable or PGND cable are securely soldered or crimped. 10 The flat washers and spring washers are fixed securely and closely at all the wiring terminals. 11 The work GND cable and PGND cable of the BTS share a group of grounding conductors with the lightning and GND cables of the building. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 55 DBS3900 LampSite Installation Guide 6 Installing an RHUB Table 6-11 lists the check items of the signal cable connection. Table 6-11 Checklist for the signal cable connection No. Item The connectors of the signal cables must securely connected. The connectors of the signal cables are intact. The signal cables are intact. The cable ties are evenly spaced. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. The extra length of the cable ties is cut and removed. The cut surfaces of the indoor cables are smooth and have no sharp edges. The cable layout facilitates maintenance and expansion. Correct and clear labels are attached to both ends of the signal cables. The distance between the bundled fiber tails and the RHUB panel is less than 70 mm. Table 6-12 lists the checking items for other cable connections. Table 6-12 Checklist for other cable connections No. Item The connectors of the other cables must securely connected. Labels on the cables are legible and bound based on the engineering requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. Positions for routing the cables must meet requirements of the engineering design. 6.6 Power-on Check on an RHUB This section describes the power-on check on the RHUB after the RHUB hardware is installed and checked. Context After the RHUB and pRRUs are installed and connected to each other, power on them no matter whether the BBU is installed. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 56 DBS3900 LampSite Installation Guide 6 Installing an RHUB Power-on check involves high-voltage operation. Be cautious when conducting the power-on check. Any direct contact with the input voltage or indirect contact through damp objects might endanger your life. Procedure Step 1 Measure the RHUB earth resistance. If... Then... The RHUB earth resistance is less than 10 ohms Go to Step 2. The RHUB earth resistance is equal to or larger than 10 ohms Find out the cause and ensure that the resistance meets requirement. Then, go to Step 2. Step 2 Measure the voltage of the RHUB. If... Then... The external power supply ranges from 100 V AC to 240 V AC Go to Step 3. The external power supply does not range from 100 V AC to 240 V AC Find out the cause and ensure that the resistance meets requirement. Then, go to Step 3. Step 3 Power on the RHUB. Wait 3 to 5 minutes, check the status of the RUN indicator of the RHUB after the RHUB runs properly. If the Status of the RUN Indicator... It Indicates that... Then... Steady on The power supply is normal while the board is faulty. Power off the RHUB, and power on it again after rectifying the board fault. Steady off There is no power input or the board is faulty. Power off the RHUB, and check the power input again. Rectify the board faulty and power on the RHUB again if the power input is normal. On for 1s and off for 1s The devices work properly. End the operation. On for 0.125s and off for 0.125s The board software is being uploaded. Power off the RHUB if the uploading is not finished in 5 minutes, and check whether the configuration file is correct. Power on the RHUB again after the fault is rectified. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 57 DBS3900 LampSite Installation Guide 6 Installing an RHUB If an RHUB is not connected to any BBU, the RHUB is considered normally powered on when any indicator on the RHUB is on. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 58 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Installing a pRRU3901 About This Chapter This chapter describes the pRRU3901 installation process. The pRRU3901 can have two transmission ports (plus PWR port) or three transmission ports (plus PWR port or no PWR port). Unless otherwise specified, this document uses the pRRU3901 with three transmission ports plus no PWR port as an example. 7.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU3901, including the pRRU3901 product family, installation scenarios, installation space and environment requirements. 7.2 Obtaining the MAC Address (Optional) Before installing a pRRU3901, record the media access control (MAC) address, which will be used during pRRU3901 commissioning. This section applies only when a pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board. 7.3 Installation Process This section describes the pRRU3901 installation process, which involves installing a pRRU3901, and cables, checking the pRRU3901 hardware installation, and powering on the pRRU3901. 7.4 Installing a pRRU3901 This section describes the pRRU3901 installation process. A pRRU3901 can be installed on a wall, ceiling, indoor metal pole, or standard keel, but not on an aluminum panel or a non-standard keel. 7.5 Installing pRRU3901 Cables This section describes the procedure of installing the pRRU3901 cables. 7.6 Checking the pRRU3901 Hardware Installation pRRU3901 hardware installation checking includes hardware and cable installation checking. 7.7 Powering on the pRRU3901 This section describes the power-on check on the pRRU3901 after the pRRU3901 hardware is installed and checked. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 59 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 7.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU3901, including the pRRU3901 product family, installation scenarios, installation space and environment requirements. 7.1.1 Product Family This chapter describes the configurations and functions of the pRRU3901 components. Table 7-1 lists the pRRU3901 product family. Table 7-1 pRRU3901 product family Category Equip ment Optional or Mandatory Quantity Function Main equipment pRRU 3901 Mandatory Processes the radio frequency signals. Extern al antenn Optional Provides external antennas for the pRRU3901. Mounti ng kits Mandatory Cabine Optional None and one Extender is needed Yes and two Extenders are needed Auxiliary device Extend er NOTE Configure two external antennas for each RF daughter board. Optional Supports the pRRU3901 installation on a wall, pole, ceiling, or keel. The mounting kits vary with the pRRU3901 installation mode. 1 or 2 NOTE The quantity depends on the number of Ethernet cables in use. Install the pRRU3901 and Extender in the outdoor scenario. Extends the distance between the pRRU3901 and RHUB. 7.1.2 Installation Scenario The pRRU3901 can be installed on a wall, ceiling, pole, or keel. The following table describes the installation in different scenarios. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 60 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Installing a pRRU3901 on a wall The pRRU3901 must keep a minimum of 0.5 m away from the power equipment with interference, and keep a minimum of 2 m away from the source with radiation. The pRRU3901 must keep away from a metal wall to avoid the impact on the antenna performance. When a pRRU3901 is installed on a wall, installation modes vary with the quality of wall, as shown in Table 7-2. Table 7-2 Wall-mounted suggestion Installation Mode Requirements Installing the pRRU3901 on a wall by drilling holes The wall can bear a load at least four times the weight of a pRRU3901. The screws must be tightened with a torque of 10 N·m. This ensures the screws work properly and the wall remains intact without cracks in it. The wall can bear a load at least four times the weight of a pRRU3901. The thickness of the wall is less than 80 mm. For details, see 7.4.2 Installing a pRRU3901 on a Wall. Installing the pRRU on a wall using a V clamp through an attachment plate For details, see 7.4.5 Installing a pRRU3901 on a Plate. Installing the pRRU3901 on a wall using a plate on a metal wall Issue 08 (2016-05-30) The wall cannot bear a load at least four times the weight of the pRRU. For example, EPS walls, MDF walls, or walls cannot be drilled. Mounting Brackets Installation Diagram 1. Plate 2. Screw (M6X50) 3. Plastic expansion sleeve 4. Flat washer 1. Plate 2. V clamp 3. Bolt (M6X80) The plate is prepared by customers. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 61 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Installing a pRRU3901 on a ceiling When a pRRU3901 is installed on a ceiling, installation modes vary with the quality of the ceiling, as shown in Table 7-3. Table 7-3 Ceiling-mounted suggestion Installation Mode Requirements Installing the pRRU3901 on a ceiling by drilling holes The ceiling, such as a concrete ceiling, can bear a load at least four times the weight of the pRRU3901. The screws must be tightened with a torque of 10 N·m. This ensures the screws work properly and the ceiling remains intact without cracks in it. Installing the pRRU3901 on a ceiling using a V clamp through an attachment plate The ceiling, such as a concrete ceiling, can bear a load at least four times the weight of the pRRU3901. For details, see 7.4.5 Installing a pRRU3901 on a Plate. The thickness of the ceiling is less than 80 mm. Installing the pRRU3901 on a pole A pole under the ceiling can bear a load at least four times the weight of the pRRU3901. For details, see Table 7-4. For details, see Table 7-4. A keel under the ceiling can bear a load at least four times the weight of the pRRU3901. For details, see Table 7-5. For details, see Table 7-5. For details, see 7.4.3 Installing a pRRU3901 on a Ceiling. For details, see 7.4.4 Installing a pRRU3901 on a Pole. Installing the pRRU3901 on a keel For details, see 7.4.6 Installing a pRRU3901 Issue 08 (2016-05-30) Mounting Brackets Installation Diagram 1. Plate 2. Screw (M6X50) 3. Plastic expansion sleeve 4. Flat washer 1. Plate 2. V clamp 3. Bolt (M6X80) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 62 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Installation Mode Requirements Mounting Brackets Installation Diagram on a Keel. Installing the pRRU3901 on a pole When a pRRU3901 is installed on a pole, installation modes vary with the diameter of the pole, as shown in Table 7-4. Table 7-4 Pole-mounted suggestion Installation Mode Requirements Mounting Brackets Installing the pRRU3901 on a pole The diameter of the pole ranges from 30 mm to 70 mm. 1. Plate 2. V clamp 3. Bolt (M6X80) The diameter of the pole ranges from 70 mm to 110 mm. 1. Plate 2. Hose clamp, which is prepared by the customer Installation Diagram For details, see 7.4.4 Installing a pRRU3901 on a Pole. Installing the pRRU3901 on a keel The pRRU3901 can be installed on a keel of U-shape, T-shape, or H-shape. For the keels of other shapes, they are determined based on the onsite requirements. Table 7-5 Keel-mounted installation suggestion Installation Mode Requirements Mounting Brackets Installing the pRRU3901 on a keel The keel is in U-shape, T-shape, H-shape, or other shapes. 1. Plate 2. V clamp 3. Bolt (M6X80) For details, see 7.4.6 Installing a pRRU3901 on a Keel. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Installation Diagram shows the pRRU installed on a U-shaped keel. 63 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 pRRU3901 cabinet In the outdoor scenario, pRRU3901 should be installed in the cabinet. Table 7-6 Cabinet installation suggestion Installation Mode Requirement Mounting Brackets Installing the cabinet Remove the housing before installing a pRRU3901 in the cabinet. 1. Plate For details, see7.4.7 Installing the Cabinet Installation Diagram 7.1.3 Space Requirements This chapter describes the space requirements of the pRRU3901. When the pRRU3901 is installed on a wall, ceiling, pole or keel, the minimum space is required for easy cabling and O&M. Based on the engineering practice, the recommendation for the installation space is provided. During installation, a minimum clearance of 2 m must be reserved between the pRRU3901 working on the 2.6 GHz band and the Wi-Fi module if they need to process services concurrently. Figure 7-1 shows the recommended space requirements of the pRRU3901. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 64 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-1 Recommended space requirements of the pRRU3901 The recommended space for installing a single pRRU3901 is described as follows: At least 300 mm above the pRRU3901 is reserved for maintenance. At least 300 mm under the pRRU3901 is reserved for cabling. At least 300 mm on the left of the pRRU3901 is reserved for maintenance. At least 300 mm on the right of the pRRU3901 is reserved for maintenance. At least 400 mm in front of the pRRU3901 is reserved for maintenance At least 40 mm on the back of the pRRU3901 is reserved for ventilation. In the outdoor scenario, there is no space requirement for the pRRU3901 installing in the cabinet. 7.1.4 Installation Environment Requirements The installation environment of a pRRU3901 involves the running environment specifications for the pRRU3901 and other specifications. Running Environment Specifications Table 7-7 shows the environment specifications for the pRRU3901 installed indoors. Table 7-7 pRRU3901 environment specifications Specificat ions Condition Operating temperatur Indoor: - 5 °C to + 40 °C Outdoor: - 20 °C to + 40 °C Remarks Relative humidity 5% RH to 95% RH Altitude - 60 m to + 1800 m Works properly. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 65 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Specificat ions Condition Remarks 1800 m to 4000 m Above the 1800 m altitude, the maximum operating temperature decreases by 1 °C each time the altitude increases by 220 m. Other Running Environment Specifications The pRRU3901 cannot be installed at an air outlet of the heat dissipation box of an air conditioner or other heat-generating appliances. The pRRU3901 cannot be installed near a strong heat source. The pRRU3901 cannot be installed in a position with water dripping, such as outdoor equipment of air conditioners, pipe, and leaking or dripping roofs. The installation position must be far from rains. If the pRRU3901 is installed on a wall, there must be no window on either side of the wall. The installation position must be far away from high voltage, highly corrosive devices, flammable or explosive substances, and electromagnetic interference such as power stations, high-voltage substations, and wired TV towers. The pRRU3901 must be installed in a dry, ventilating, and dust-proof place. If the pRRU3901 is installed in parking areas or basements, the installation position must be well-ventilated. 7.2 Obtaining the MAC Address (Optional) Before installing a pRRU3901, record the media access control (MAC) address, which will be used during pRRU3901 commissioning. This section applies only when a pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board. Context The MAC address indicates the IP address through which a device can be reached. Procedure Step 1 Remove the backup WIFI MAC label from the front housing of the pRRU3901 and keep them secure, as shown in Figure 7-2. Issue 08 (2016-05-30) Do not remove the WIFI MAC label on the side of the pRRU3901 housing. Before removing the backup WIFI MAC label, photograph it. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 66 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-2 Removing backup WIFI MAC label Step 2 Save the MAC according to 15.1 MAC Collection Template, and report it to the pRRU3901 commissioning personnel. ----End 7.3 Installation Process This section describes the pRRU3901 installation process, which involves installing a pRRU3901, and cables, checking the pRRU3901 hardware installation, and powering on the pRRU3901. Figure 7-3 shows the pRRU3901 installation process. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 67 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-3 pRRU3901 installation process 7.4 Installing a pRRU3901 This section describes the pRRU3901 installation process. A pRRU3901 can be installed on a wall, ceiling, indoor metal pole, or standard keel, but not on an aluminum panel or a non-standard keel. Note the following when installing the pRRU3901: Issue 08 (2016-05-30) The pRRU3901 cannot be grounded. If the pRRU3901 is grounded but the RHUB connected to this pRRU3901 is not, the pRRU3901 may fail to be powered on. A minimum distance of 50 cm must be reserved between the pRRU3901 and the incandescent lamp. The installation spacing between the pRRU3901 and the temperature sensor must be greater than 50 cm. It is good practice to install the pRRU3901 on materials that can tolerate a temperature higher than 65°C and have an ignition point higher than 70°C. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 68 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 7.4.1 pRRU3901 Mounting Kits This section describes the pRRU3901 mounting kits. Figure 7-4 shows the exterior of the pRRU3901 mounting kits. Figure 7-4 pRRU3901 mounting kits (1) V clamp (2) Mounting bracket (3) Screw (M6x50) (4) Plastic expansion sleeve (5) Bolt (M6x80) (6) Flat washer The following figure shows the specifications of the mounting bracket. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 69 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-5 Mounting bracket specifications 7.4.2 Installing a pRRU3901 on a Wall This section describes how to install a pRRU3901 on an indoor wall. If a wall indoors has adequate load bearing capacity and installation space, it is good practice to install the pRRU3901 on the wall. If the wall does not have adequate load bearing capacity, choose an installation mode based on site requirements. Context This section describes only the wall-mounted installation in which mounting kits are directly installed on the wall without auxiliary devices. The procedure for other wall-mounted installation modes is similar. Procedure Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 7.1.3 Space Requirements. Step 2 Place the mounting bracket in the installation position against the wall. Then, level the mounting bracket and use a marker to mark two anchor points. See Figure 7-6. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 70 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-6 Anchor points on the pRRU3901 mounting bracket (unit: mm) (1) Wall (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with φ8 bore to drill holes at the marked anchor points, as shown in Figure 7-7. Use a vacuum cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 71 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-7 Drilling holes and installing expansion bolts Step 4 Lead the M6x50 screws through the washers, and then through the drilling holes on the mounting bracket to the plastic expansion sleeves, and torque the screws to 5 N•m, as shown in Figure 7-8. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 72 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-8 Installing the mounting bracket If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and then press the pRRU3901 downwards until a click is heard. See Figure 7-9. It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 73 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-9 Installing the pRRU3901 on a wall ----End 7.4.3 Installing a pRRU3901 on a Ceiling This section describes how to install a pRRU3901 on the ceiling, such as the concrete ceiling, when the ceiling has adequate load bearing capacity and installation space. Context If the pRRU3901 is installed on a ceiling, the temperature of the ceiling may increase by a maximum of 30 degrees. Therefore, whether a pRRU3901 can be installed on a ceiling depends on the ceiling material. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 74 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Procedure Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 7.1.3 Space Requirements. Step 2 Place the mounting bracket in the installation position against the ceiling. Then, level the mounting bracket and use a marker to mark two anchor points. See Figure 7-10. Figure 7-10 Anchor points on the pRRU3901 mounting bracket (unit: mm) (1) Ceiling (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with φ8 bore to drill holes at the marked anchor points, as shown in Figure 7-11. Use a vacuum cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 75 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-11 Drilling holes and installing expansion bolts Step 4 Lead the M6x50 screws through the washers, and then through the drilling holes on the mounting bracket to the plastic expansion sleeves, and use a torque screwdriver to torque the screws to 5 N•m, as shown in Figure 7-12. Figure 7-12 Installing the mounting bracket If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and then press the pRRU3901 downwards until a click is heard. See Figure 7-13. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 76 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Figure 7-13 Installing a pRRU3901 on a ceiling ----End 7.4.4 Installing a pRRU3901 on a Pole This section describes how to install a pRRU3901 on a metal pole indoors. Procedure Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 7.1.3 Space Requirements. Step 2 If the diameter of the pole ranges from 30 mm to 70 mm, use the delivered V clamp, mounting bracket, and bolts to install the pRRU3901 on the pole. Lead the M6x80 bolts through the mounting bracket, and torque the bolts to 5 N•m, as shown in Figure 7-14. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 77 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-14 Securing the pRRU3901 mounting bracket on the metal pole If the diameter of the pole is greater than 70 mm, use the hose clamp to install the mounting bracket on the pole. The hose clamp is prepared by customers. Torque the bolts to 5 N•m, as shown in Figure 7-15. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 78 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-15 Securing the pRRU3901 mounting bracket on the metal pole Step 3 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and then press the pRRU3901 downwards until a click is heard. See Figure 7-16. It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 79 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-16 Installing a pRRU3901 on a pole ----End 7.4.5 Installing a pRRU3901 on a Plate This section describes how to install a pRRU3901 on a plate. If a suspended ceiling plate has adequate load bearing capacity and installation space, the pRRU3901 can be installed on the plate. However, it is good practice not to install a pRRU3901 on an aluminum plate. Procedure Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 7.1.3 Space Requirements. Step 2 Place the mounting bracket in the installation position against the wall. Then, level the mounting bracket and use a marker to mark two anchor points. See Figure 7-17. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 80 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-17 Anchor points on the pRRU3901 mounting bracket (unit: mm) (1) Plate (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with φ8 bore to drill holes at the anchor points. Step 4 Lead the M6x80 bolts through the mounting bracket and the ceiling plate, and use a torque screwdriver to torque the bolts to 5 N•m, as shown in Figure 7-18. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 81 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-18 Installing the pRRU3901 mounting bracket Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and then press the pRRU3901 downwards until a click is heard. See Figure 7-19. It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 82 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-19 Installing a pRRU3901 on a plate ----End 7.4.6 Installing a pRRU3901 on a Keel This section describes how to install a pRRU3901 on a keel. If a suspended ceiling plate cannot bear the pRRU3901, the pRRU3901 can be installed on the keel on the ceiling. Context Before installing the pRRU3901 on a keel, ensure that the keel is strong enough to bear the pRRU3901. The mounting bracket of the pRRU3901 can be installed on the keel of the following specifications: GBT 11981-2008, JIS A6517-2002, and ASTM C635 C635M-2007. The installation mode depends on onsite requirements because there are various keels. This section describes the procedure of installing a pRRU3901 on the keel of JIS standard used in Japan. The procedure of installing a pRRU3901 on other keels is the same as that of installing a pRRU3901 on the keel of JIS standard. Procedure Step 1 Determine the position for installing the pRRU3901 based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 7.1.3 Space Requirements. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 83 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Step 2 Place the V clamp across the keel, and use a marker to mark the projective positions of the mounting holes on the suspended ceiling plate, as shown in Figure 7-20. Figure 7-20 Anchor points on the suspended ceiling plate (unit: mm) To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill to drill holes at the anchor points. You are advised to use the hammer drill with Ф12 bore. Step 4 Lead the M6x80 bolts through the mounting bracket and the suspended ceiling plate. Use a torque screwdriver to torque the bolts to 5 N•m, as shown in Figure 7-21. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 84 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-21 Installing the pRRU3901 mounting bracket Step 5 Fit the four hooks of the pRRU3901 into the mounting holes on the mounting bracket and then press the pRRU3901 downwards until a click is heard. See Figure 7-22. It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 85 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-22 Installing a pRRU3901 on a keel ----End 7.4.7 Installing the Cabinet In the outdoor scenario, the pRRU3901 should be installed in the cabinet firstly. Context When installed in the cabinet, the housing of pRRU3901 should be removed. An RF surge protector provides surge protection for the RF ports on pRRU3902, and a PoE surge protector provides surge protection for the CPRI ports. One pRRU3901 with internal antenna need to be configured with one or two PoE surge protectors. One pRRU3901 with external antenna need to be configured with one PoE surge protector, or two RF surge protectors when one RF daughter board is configured, or four RF surge protectors when two RF daughter boards are configured. Procedure Step 1 Remove the housing on the top and at the bottom of pRRU3901, as shown in Figure 7-23. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 86 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-23 Removing the housing of pRRU3901 1. Use the M4 Phillips screwdriver to loosen the Phillips screw on the pRRU housing. Wrench and remove the housing from the installation position of the Phillips screw hole, as shown in Figure 7-24. Figure 7-24 Removing the pRRU housing Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 87 DBS3900 LampSite Installation Guide 2. 7 Installing a pRRU3901 The pRRU housing and the RF daughter board can be secured using either Phillips screws or protection screws, requiring the same installation operations. This section uses Phillips screws as an example to describe the installation operations. Keep the Phillips screw secure for future use. Use the M4 Phillips screwdriver to loosen the Phillips screws on the RF daughter board, as shown in Figure 7-25. Figure 7-25 Loosen the Phillips screws 3. Issue 08 (2016-05-30) Use the left hand to hold the RF daughter board and the right hand to hold the right handle of the RF daughter board to remove the RF daughter board and put it into an ESD box or bag, as shown in Figure 7-26. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 88 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-26 Removing the RF daughter board in slot1 4. Use an M3 Phillips screwdriver to loosen the two fastening screws of the light pipe, and remove the light pipe, as shown in Figure 7-27. Figure 7-27 Removing the light pipe 5. Issue 08 (2016-05-30) Use the M3 Phillips screwdriver to loosen the four fastening screws of the pDock mother board, and remove the pDock mother board, as shown in Figure 7-28. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 89 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-28 Removing the pDock mother board 6. Install the RF daughter boards in slots S1, and use the M4 Phillips screwdriver to tighten the two fastening screws always carried on each daughter board to 1.4 N•m, as shown in Figure 7-29. Figure 7-29 Installing the RF daughter boards Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 90 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 The installation positions of the RF daughter boards must be consistent before and after the replacement. Step 2 Install the plate onto the cabinet, as shown in Figure 7-30. Figure 7-30 Installing the plate onto the cabinet Make sure all the cables are installed before installing the plate. For details about installing the cables of pRRU3901, see Figure 7-31. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 91 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-31 Installing the pRRU3901 cables (1) RF Jumper (2) CPRI_E0 port (3) Ethernet Cable Step 3 Fit the four hooks on pRRU3901 into the hooks on the mounting bracket, and then push pRRU3901 down against the mounting bracket until a click is heard, as shown in Figure 7-32. Figure 7-32 Installing a pRRU3901 into the cabinet Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 92 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 ----End 7.5 Installing pRRU3901 Cables This section describes the procedure of installing the pRRU3901 cables. 7.5.1 Requirements for Cable Layout Cables must be routed according to the specified cabling requirements to prevent signal interference. If certain cables listed below are not required, skip the requirements for routing these cables. General Requirements for Cable Layout National Standards Code for Engineering Design of Generic Cabling System for Building and Campus (GB 50311-2007) Code for Engineering Acceptance of Generic Cabling System for Building and Campus (GB50312-2007). Security Protection Engineering Technology Specifications (GB 50348-2004) Code for Construction and Acceptance of the Electronic Information System Room (GB 50462-2008) Code for Quality Acceptance of the Intelligent Building Engineering (GB 50339-2003) Code for Quality Acceptance of Electric Engineering Construction in Building (GB 50303-2002) Technical Specification for Construction and Acceptance of Telecommunication Conduit Engineering (GB 50374-2006) International Standards Generic Cabling for Customer Premises (ISO/IEC 11801) Commercial Building Telecommunications Cabling Standard (EIA/TIA 568) Commercial Building Standard for Telecommunication Pathways and Spaces (EIA/TIA 569) Administration Standard for Commercial Telecommunications Infrastructure (EIA/TIA 606) Grounding and Bonding Requirements for Telecommunications in Commercial Buildings (EIA/TIA 607) Generic Cabling Systems for Information Technology (EN 50173) Cabling Installation for Information Technology (EN 50174) Bending radius The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper must be longer than 35 mm, 50 mm, and 127 mm, respectively. The bending radius of a power cable is at least three times the diameter of the cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 93 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 The bending radius of a signal cable must be at least five times of the diameter of the cable. Cable binding Cables of the same type are bound together. Different types of cables must be separately routed with a minimum spacing of 30 mm and cannot be entangled. The cables are bound tightly and neatly and the sheaths of the cables is intact. The cable ties face the same direction and all cable ties bound at similar positions must be in a straight line. The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for each outdoor cable tie before the extra length is cut off. All cut surfaces are without sharp edges. Labels or nameplates are attached to both ends, joints, or turns of cables after they are installed. Safety The steel pipe or fire-resistant rigid polyvinyl chloride pipe should be used for the cable duct or for routing cables. The cross-sectional usage of the cable duct should be 30% to 50% and that of the pipe for routing cables should be 25% to 30%. Cables are placed away from sharp objects or wall burrs. If these positions are inevitable, protection pipes are required for the cables. Cables are routed away from heat sources, or heat-insulation materials are added between cables and heat sources. A clearance is reserved at turns of a cable or the position close to a device, facilitating cable and device maintenance. The recommended clearance is about 0.1 m. Requirements for Special Cables Ethernet Cable A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that 1/3 space inside the pipes must be vacant. The point at which an Ethernet cable is bundled must be spaced 400 mm or less from the Ethernet port on a pRRU. For the pRRU3901 used in the elevator engine room on the rooftop, generator set for the subway engine, and equipment room with central air conditioning, Ethernet cables must be led through metallic conduits that are reliably grounded at both ends. 7.5.2 pRRU3901 Cable List This section describes pRRU3901 cable connections. Table 7-8 List of pRRU3901 cables Cable One End Connector Issue 08 (2016-05-30) The Other End Connected to ... Connector Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Connected to ... 94 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Cable Ethernet Cable (Optional) RF Jumper One End The Other End Connector Connected to ... Connector Connected to ... RJ45 connector CPRI_E0~CP RI_E7 port on RHUB RJ45 connector CPRI_E0~CPRI_ E1 port on pRRU RJ45 connector Transmission port on Access Control(AC) RJ45 connector GE port on pRRU3901 CPRI_E1 port on pRRU3911/ pRRU3911+ WIFI External antenna TX/RX RF port on pRRU Based on the port model of the antenna system. SMA straight male connector/Type N male connector Antenna system When the RHUB and the pRRU3901 connected using the Ethernet cable. If the Extender is used, In the indoor scenario, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901. In the outdoor scenario, the Ethernet cable is divided into two parts, one among RHUB-PoE surge protector 2- PoE surge protector 3-Extender and the other among the Extender- PoE surge protector 4- PoE surge protector 1-pRRU3901. 7.5.3 Cable Connections (Indoor) This section describes the cable connections for a single pRRU3901 and multiple pRRU3901s in UMTS, LTE FDD, UMTS+LTE FDD, LTE FDD+LTE FDD mode. Before installing the pRRU3901 cables, you must be aware of the following information: The pRRU3901 can obtain power supply through the power over Ethernet (PoE). For external antennas corresponding to RF daughter board 1, the TX port and RX port are ANT0 and ANT1, respectively. For external antennas corresponding to RF daughter board 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively. The external antenna system is optional, and the pRRU3901 jumpers are not delivered. By default, the pRRU3901s are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one. One end of the pRRU3901 RF jumper is the SMA male connector, which is connected to the external antenna TX/RX RF port on the pRRU3901. The other end of the pRRU3901 RF jumper is the type N male connector, which is connected to the antenna system. For the standard of the pRRU3901 RF jumper, see (Optional) RF Jumper of the DBS3900 LampSite Hardware Description. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 95 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-33 shows the cable connection when the pRRU3901 is configured with only one RF Daughter Board. Figure 7-33 pRRU3901 cable connection (1) (1) Ethernet cable (2) RF jumper The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901. When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd-numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example. Figure 7-34 shows the cable connection when the pRRU3901 is configured with two RF Daughter Boards. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 96 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-34 pRRU3901 cable connection (2) (1) Ethernet cable (2) RF jumper The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901. When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd-numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example. Figure 7-34 shows the cable connection when the pRRU3901 is configured with two RF Daughter Boards and one Wi-Fi daughter board. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 97 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-35 pRRU3901 cable connection (3) (1) Ethernet cable (2) RF jumper The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3901. When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd-numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example. 7.5.4 Cable Connections (Outdoor) This section describes the cable connections for a pRRU3901 installed outside. Before installing the pRRU3901 cables, you must be aware of the following information: The pRRU3901 can obtain power supply through the power over Ethernet (PoE). For external antennas corresponding to RF daughter board 1, the TX port and RX port are ANT0 and ANT1, respectively. For external antennas corresponding to RF daughter board 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively. The external antenna system is optional, and the pRRU3901 jumpers are not delivered. By default, the pRRU3901s are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one. One end of the pRRU3901 RF jumper is the SMA male connector, which is connected to the Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 98 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 external antenna TX/RX RF port on the pRRU3901. The other end of the pRRU3901 RF jumper is the type N male connector, which is connected to the antenna system. For the standard of the pRRU3901 RF jumper, see (Optional) RF Jumper of the DBS3900 LampSite Hardware Description. pRRU3901 can be configured with one RF daughter board, or two RF daughter boards, or two RF daughter boards and one WiFi daughter board. Figure 7-36 shows the cable connection when the pRRU3901 is configured with only one RF Daughter Board in the outside scenario. Figure 7-36 pRRU3901 cable connection (1) PoE surge protector 1 (2) pRRU3901 (3) RF surge protector When two Ethernet cables are used to transmit CPRI signals, connect one end of the cables to the CPRI_E0 and CPRI_E1 ports on the pRRU panel and the other end to any two ports of CPRI_E0 to CPRI_E7 on the RHUB panel. On the RHUB panel, CPRI_E0 and CPRI_E1, CPRI_E2 and CPRI_E3, CPRI_E4 and CPRI_E5, and CPRI_E6 and CPRI_E7 are used in pairs. CPRI_E0 on the pRRU panel connects to the even-numbered CPRI port (for example, CPRI_E0, CPRI_E2, CPRI_E4, or CPRI_E6) on the RHUB panel, and CPRI_E1 on the pRRU panel connects to the odd-numbered CPRI port (for example, CPRI_E1, CPRI_E3, CPRI_E5, or CPRI_E7). This document describes signal transmission using one Ethernet cable as an example. The Extender can be used to lengthen the distance between the RHUB and the pRRU3901 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one among the RHUB, PoE surge protector 2, PoE surge protector 3, Extender and the other among Extender, PoE surge protector 4, PoE surge protector 1, pRRU3901. For details about installation of the PoE surge protector and cables, see 12 (Optional) Installing the PoE Surge Protector and Cables. For details about installation of the RF surge protector and cables, see 13 (Optional) Installing the RF Surge Protector and Cables. 7.5.5 Cable Connections (LTE TDD) This section describes the cable connections for a single pRRU3901 and multiple pRRU3901s in LTE TDD mode. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 99 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Before installing the pRRU3901 cables, you must be aware of the following information: The pRRU3901 can obtain power supply through the power over Ethernet (PoE). For external antennas corresponding to RF daughter board 1, the TX port and RX port are ANT0 and ANT1, respectively. For external antennas corresponding to RF daughter board 2, the TX port and RX port are ANT2 and ANT3, respectively. For external antennas corresponding to RF daughter board 3, the TX port and RX port are ANT4 and ANT5, respectively. The external antenna system is optional, and the pRRU3901 jumpers are not delivered. By default, the pRRU3901s are configured with built-in antennas. If the external antenna system is connected, the antenna system automatically switches to the external one. One end of the pRRU3901 RF jumper is the SMA male connector, which is connected to the external antenna TX/RX RF port on the pRRU3901. The other end of the pRRU3901 RF jumper is the type N male connector, which is connected to the antenna system. For the standard of the pRRU3901 RF jumper, please see (Optional) RF Jumper of the DBS3900 LampSite Hardware Description. Figure 7-37 shows the cable connection when the pRRU3901 is configured with only one RF Daughter Board. Figure 7-37 pRRU3901 cable connection (1) (1) Ethernet cable (2) RF jumper Figure 7-38 shows the cable connection when the pRRU3901 is configured with one RF Daughter Boards and one Wi-Fi daughter board. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 100 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-38 pRRU3901 cable connection (2) (1) Ethernet cable (2) RF jumper 7.5.6 pRRU3901 cable installation process This section describes the process of installing pRRU3901 cables. Figure 7-39 shows the process of installing pRRU3901 cables. Figure 7-39 pRRU3901 cable installation process 7.5.7 Installing an Ethernet Cable This section describes how to install an Ethernet cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 101 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Prerequisites The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-sectional area must be 24 AWG or larger and frame spread rating must be CM or higher. The Ethernet cables can be straight-through cables or crossover cables. With the internal PoE module providing power, the maximum length of an Ethernet cable is 100 m. With the Extender, the distance of the pRRU3901 and RHUB can be extended by the Extender up to a total distance of 200 m. Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. Context The Ethernet cable has the following functions: Provides power supply for the pRRU3901 when the cable connects the CPRI_E0 port on the pRRU3901 to the RHUB. Transmits CPRI signals between an RHUB and a pRRU3901. Provides Wi-Fi services for the pRRU3901 when the cable connects the GE port on the pRRU3901 with three transmission ports to the AC. Using the CPRI_E1 port on the pRRU3901 has the same Ethernet cable connection to the RHUB as using the CPRI_E0 port. The following section describes the connection using the CPRI_E0 port. For details about the cable connections in the different scenarios, see 7.5.3 Cable Connections (Indoor) and 7.5.4 Cable Connections (Outdoor). The Ethernet cable connections between RHUB and pRRUs are the same. The following section describes the connections between RHUB-Extender-pRRU3901 as an example. In the outdoor scenario, PoE surge protector is needed to provide surge protection for the Ethernet ports. For details about the installation of PoE surge protector, see 12 (Optional) Installing the PoE Surge Protector and Cables. Procedure Step 1 Make the Ethernet cables. 1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable of Installation Reference. Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the unshielded RJ45 connector and the Ethernet cable. Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected. 2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips. 3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2. 4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference. Step 2 Install an Ethernet cable between an RHUB and a pRRU3901. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 102 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 1. Remove the dustproof cap of the CPRI_E0 port on the pRRU3901. 2. Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU3901 panel. 3. Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender. 4. Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design, as shown in Figure 7-40. Figure 7-40 Installing an Ethernet cable (1) Ethernet cable (2) GE port on the pRRU3901 (3) CPRI_E0 port on the pRRU3901 The pRRU3901 can have two transmission ports plus one PWR port or three transmission ports (plus one PWR port or no PWR port), requiring the same installation operations. This section uses the pRRU3901 with three transmission ports no PWR port as an example. Step 3 Optional: Install the Ethernet cable between the pRRU3901 and the AC. This operation is required when the pRRU3901 with three transmission ports is configured with a Wi-Fi daughter board. 1. Remove the dustproof cap of the GE port on the pRRU3901. 2. Connect the RJ45 connector at one end of the Ethernet cable to the GE port on the pRRU3901 panel. 3. Connect the RJ45 connector at the other end of the Ethernet cable to the transmission port of the AC based on the engineering design, as shown in Figure 7-40. ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 103 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 7.5.8 Installing an RF jumpers (Optional) The RF jumpers transmit radio frequency signals. One end of the RF jumpers is the SMA straight male connector, and the other end is the type N connector. Context If the RF jumper is provided by the customer, the jumper must not be lower than the RG316 specifications. In addition, the jumpers can be used after they are checked by Huawei engineers. pRRU3901s can be connected to external whip antennas or external remote antennas (through pRRU3901 RF jumpers). Whip antennas are delivered optionally. RF jumpers are not delivered. For details about the cable connections in the different scenarios, see 7.5.3 Cable Connections (Indoor)and 7.5.4 Cable Connections (Outdoor). The installation of RF jumper cables are the same. The following section describes the connections between antenna and pRRU3901 in the indoor scenario as an example. In the outdoor scenario, RF surge protector is needed to provide surge protection for the RF ports. For details about the installation of RF surge protector, see 13 (Optional) Installing the RF Surge Protector and Cables. Procedure Step 1 Expose the SMA female connector by removing the pRRU3901 antenna housing, as shown in Figure 7-41. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 104 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-41 Removing the pRRU3901 antenna housing Step 2 Use a torque wrench with a torque of 0.6 N•m to connect the SMA straight male connector on a jumper to the ANT port on the pRRU3901 panel. Tighten it with hands, and then use a torque wrench to tighten it with a rotational speed of less than or equal to 2.4 rpm to tighten it. Step 3 Connect the type N female connector of the jumper to the type N male connector of the RF feeder connected to the built-in antenna. Tighten the feeder close to the type N connector to ensure that the jumper is not tightened. In this way, the connectors on both ends of a jumper are not affected by the external force. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 105 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 Figure 7-42 Installing jumpers between the pRRU3901 and external antennas ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 7.6 Checking the pRRU3901 Hardware Installation pRRU3901 hardware installation checking includes hardware and cable installation checking. Table 7-9 lists the hardware installation checking items. Table 7-9 Hardware installation checking list No. Item Ensure that the pRRU3901 is not grouned. The position for each device conforms to the engineering design and meets the space requirement. Ensure that the pRRU3901 is properly installed. The surface of the pRRU3901 is neat and clean. The external paint is intact. The labels, tags, and nameplates are correct, legible, and complete. Table 7-10 lists the check items of the signal cable connection. Table 7-10 Checklist for the signal cable connection No. Issue 08 (2016-05-30) Item Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 106 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 No. Item The connectors of the signal cables must securely connected. The connectors of the signal cables are intact. The signal cables are intact. The cable ties are evenly spaced. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. The extra length of the cable ties is cut and removed. The cut surfaces of the indoor cables are smooth and have no sharp edges. The cable layout facilitates maintenance and expansion. Correct and clear labels are attached to both ends of the signal cables. Table 7-11 lists the checking items for other cable connections. Table 7-11 Checklist for other cable connections No. Item The connectors of the other cables must securely connected. Labels on the cables are legible and bound based on the engineering requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. Positions for routing the cables must meet requirements of the engineering design. 7.7 Powering on the pRRU3901 This section describes the power-on check on the pRRU3901 after the pRRU3901 hardware is installed and checked. Context After the RHUB and pRRUs are installed and connected to each other, power on them no matter whether the BBU is installed. Procedure Step 1 Power on the pRRU3901. Wait 3 to 5 minutes, check the status of the RUN indicator on the pRRU3901. If the RUN Indicator... Because... Then... Steady on There is power input, but the Power off the power supply, Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 107 DBS3900 LampSite Installation Guide 7 Installing a pRRU3901 If the RUN Indicator... Because... Then... board is faulty. rectify the fault, and power on the pRRU3901. Steady off There is no power input, or an alarm is reported on the board. Power off the power supply and check the power input. If no fault is found after the pRRU3901 is powered off, clear the fault on the board, and power on the pRRU3901. On for 1s and off for 1s The device works properly. End this operation. On for 0.125s and off for 0.125s The software of the board is loading. Wait five minutes for the software to be successfully loaded. If the software is loading five minutes later, shut off the power supply. Check whether the data configuration file is correct. After the fault is rectify, power on the pRRU3901 again. Check the indicator status 30 minutes after the power-on if a pRRU is not connected to any BBU. The pRRU is considered normally powered on when any indicator on the pRRU is on. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 108 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI About This Chapter This chapter describes the pRRU3902/pRRU3911/pRRU3911+WIFI installation process. The pRRU3902 and pRRU3911/pRRU3911+WIFI are installed in similar way, and this chapter uses the pRRU3902 as an example. 8.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU, including product family, installation scenarios, installation space and environment requirements. 8.2 Installation Process This section describes the pRRU installation process, which involves installing a pRRU, and cables, checking the pRRU hardware installation, and powering on the pRRU. 8.3 Installing a pRRU This section describes the pRRU installation process. A pRRU can be installed on a wall, ceiling, indoor metal pole, or keel, but not on an aluminum panel or a non-standard keel. 8.4 Installing pRRU Cables This section describes the procedure of installing the pRRU cables. 8.5 (Optional) Installing a Combiner This section describes how to install a combiner. The pRRU3902 using external antennas must be configured with a combiner. 8.6 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. 8.7 Powering on the pRRU This section describes the power-on check on the pRRU after the pRRU hardware is installed and checked. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 109 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI 8.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU, including product family, installation scenarios, installation space and environment requirements. 8.1.1 Product Family This chapter describes the configurations and functions of the pRRU components. Table 8-1 lists the pRRU product family. Table 8-1 pRRU product family Product Type Category Equipment Optional or Mandatory Quantity Function pRRU390 Main equipment pRRU3902 with internal antennas Mandatory Functions as a remote radio unit that processes RF signals. pRRU3902 supporting external antennas Mandatory Functions as a remote radio unit that processes RF signals. It has no internal antennas and must connect to external antennas. Combiner Optional Combines signals of RF units operating in different frequency bands. Mounting kits Mandatory Supports the pRRU3902 installation on a wall, ceiling, keel, or steel hangers. The mounting Auxiliary device Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 110 DBS3900 LampSite Installation Guide Product Type 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Category Equipment Optional or Mandatory Quantity Function kits vary with the pRRU3902 installation mode. Cabinet Extender Optional Optional None and one Extender is needed Yes and two Extenders are needed 1 or 2 NOTE The quantity depends on the number of Ethernet cables in use. pRRU391 1/pRRU3 911+WIF Main equipment Auxiliary device Issue 08 (2016-05-30) Install the pRRU3902 and Extender in the outdoor scenario. Extends the distance between the pRRU3902 and RHUB. pRRU3911 Mandatory Functions as a remote radio unit that processes RF signals. pRRU3911+ WIFI Mandatory Functions as a remote radio unit that processes RF signals. Mounting kits Mandatory Supports the pRRU3911/ pRRU3911 +WIFI installation on a wall, ceiling, keel, or steel hangers. The mounting kits vary with the installation mode. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 111 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Product Type Category Equipment Optional or Mandatory Quantity Function Extender Optional 1 or 2 Extends the distance between the pRRU3911/ pRRU3911 +WIFI and RHUB. NOTE The quantity depends on the number of Ethernet cables in use. 8.1.2 Installation Scenario The pRRU can be installed on a wall, ceiling, keel, or steel hangers. The following table describes the installation in different scenarios. Installing on a wall The pRRU must keep a minimum of 0.5 m away from the power equipment with interference, and keep a minimum of 2 m away from the source with radiation. The pRRU must keep away from a metal wall to avoid the impact on the antenna performance. When a pRRU is installed on a wall, installation modes vary with the quality of wall, as shown in Table 8-2. Table 8-2 Wall-mounted suggestion Installation Mode Requirements Installing the pRRU on a wall by drilling holes The wall can bear a load at least four times the weight of a pRRU. For details, see 8.3.2 Installing a pRRU on a Wall. The screws must be tightened with a torque of 1.5 N·m. This ensures the screws work properly and the wall remains intact without cracks in it. Issue 08 (2016-05-30) Mounting Brackets Installation Diagram 1. Plate 2. Screw (M3.5x35) 3. Plastic expansion sleeve 4. Flat washer Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 112 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Installation Mode Requirements Installing the pRRU on a wall using a clamp through an attachment plate The wall can bear a load at least four times the weight of a pRRU. The thickness of the wall is less than 45 mm. Mounting Brackets 1. 2. 3. 4. Installation Diagram Plate Clamp Bolt (M4x35) Bolt (M4x60) For details, see 8.3.5 Installing a pRRU on a Plate. Installing the pRRU on a wall using a plate on a metal wall The wall cannot bear a load at least four times the weight of the pRRU. For example, EPS walls, MDF walls, or walls cannot be drilled. The plate is prepared by customers. Installing on a ceiling When a pRRU is installed on a ceiling, installation modes vary with the quality of the ceiling, as shown in Table 8-3. Table 8-3 Ceiling-mounted suggestion Installation Mode Requirements Installing the pRRU on a ceiling by drilling holes The ceiling, such as a concrete ceiling, can bear a load at least four times the weight of the pRRU. The screws must be tightened with a torque of 1.5 N·m. This ensures the screws work properly and the ceiling remains For details, see 8.3.3 Installing a pRRU on a Ceiling. Issue 08 (2016-05-30) Mounting Brackets Installation Diagram 1. Plate 2. Screw (M3.5 x 35) 3. Plastic expansion sleeve 4. Flat washer Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 113 DBS3900 LampSite Installation Guide Installation Mode 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Requirements Mounting Brackets Installation Diagram intact without cracks in it. Installing the pRRU on a ceiling using a clamp through an attachment plate For details, see 8.3.5 Installing a pRRU on a Plate. Installing the pRRU on a keel For details, see 8.3.6 Installing a pRRUon a Keel. The ceiling, such as a concrete ceiling, can bear a load at least four times the weight of the pRRU. The thickness of the ceiling is less than 45 mm. A keel under the ceiling can bear a load at least four times the weight of the pRRU. 1. 2. 3. 4. Plate U-shaped metal plate Bolt (M4 x 35) Bolt (M4 x 60) For details, see Table 8-5. For details, see Table 8-5. Installation on a pole To install a pRRU on a pole, use small hose clamps with a diameter ranging from 60 mm to 114 mm or larger hose clamps with a diameter ranging from 114 mm to 381 mm. Table 8-4 Pole-mounted installation suggestion Installation Mode Requirement Mounting Brackets Installing the pRRU on a pole The pole diameter ranges from 60 mm to 114 mm or from 114 mm to 381 mm 1. Plate 2. Hose clamp (prepared by customer) For details, see 8.3.4 Installing a pRRU on a Pole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Installation Diagram 114 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Installing on a keel The pRRU can be installed on a keel of U-shape, T-shape, or H-shape. For the keels of other shapes, they are determined based on the onsite requirements. Table 8-5 Keel-mounted installation suggestion Installation Mode Requirements Mounting Brackets Installing the pRRU on a keel The keel is in U-shape, T-shape, H-shape, or other shapes. 1. 2. 3. 4. For details, see 8.3.6 Installing a pRRUon a Keel. Plate U-shaped metal plate Bolt (M4 x 35) Bolt (M4 x 60) Installation Diagram shows the pRRU installed on a U-shaped keel. Installing on a on steel hangers Either M6 or M8 steel hangers can be used for installation. Table 8-6 Steel hangers installation suggestion Installation Mode Requirements Mounting Brackets Installing the pRRU on a steel hangers Either M6 or M8 steel hangers can be used for installation. 1. 2. 3. 4. For details, see 8.3.7 Installing a pRRU on Steel Hangers. Installation Diagram Plate U-shaped metal plate Bolt (M4 x 35) Bolt (M4 x 60) Cabinet In the outside scenario, pRRU3902 should be installed in the cabinet. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 115 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Table 8-7 Cabinet installation suggestion Installation Mode Requirement Mounting Brackets Installing the cabinet For details, see 8.3.8 Installing the Cabinet. – 1. Plate Installation Diagram 8.1.3 Space Requirements This chapter describes the space requirements of the pRRU. When the pRRU is installed on a wall, ceiling, pole or keel, the minimum space is required for easy cabling and O&M. Based on the engineering practice, the recommendation for the installation space is provided. Figure 8-1 shows the recommended space requirements of the pRRU when the external antenna is required. Figure 8-1 Recommended space requirements When the external antenna is required, the recommended space for installing a single pRRU is described as follows: Issue 08 (2016-05-30) At least 300 mm above the pRRU is reserved for maintenance. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 116 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI At least 300 mm under the pRRU is reserved for cabling. At least 300 mm on the left of the pRRU is reserved for maintenance. At least 300 mm on the right of the pRRU is reserved for maintenance. At least 400 mm in front of the pRRU is reserved for maintenance At least 40 mm on the back of the pRRU is reserved for ventilation. In the outdoor scenario, there is no space requirement for the pRRU3902 installing in the cabinet. 8.1.4 Installation Environment Requirements The installation environment of a pRRU involves the running environment specifications for the pRRU and other specifications. Running Environment Specifications Table 8-8 shows the environment specifications for the pRRU installed indoors. Table 8-8 environment specifications Specificat ions Condition Operating temperatur Indoor: - 5 °C to + 40 °C Outside: - 20 °C to + 40 °C Remarks Relative humidity 5% RH to 95% RH Altitude - 60 m to + 1800 m Works properly. 1800 m to 4000 m Above the 1800 m altitude, the maximum operating temperature decreases by 1°C each time the altitude increases by 220 m. Other Running Environment Specifications The pRRU cannot be installed at an air outlet of the heat dissipation box of an air conditioner or other heat-generating appliances. The pRRU cannot be installed near a strong heat source. The pRRU cannot be installed in a position with water dripping, such as outdoor equipment of air conditioners, pipe, and leaking or dripping roofs. The installation position must be far from rains. If the pRRU is installed on a wall, there must be no window on either side of the wall. The installation position must be far away from high voltage, highly corrosive devices, flammable or explosive substances, and electromagnetic interference such as power stations, high-voltage substations, and wired TV towers. The pRRU must be installed in a dry, ventilating, and dust-proof place. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 117 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI If the pRRU is installed in parking areas or basements, the installation position must be well-ventilated. 8.2 Installation Process This section describes the pRRU installation process, which involves installing a pRRU, and cables, checking the pRRU hardware installation, and powering on the pRRU. Figure 8-2 shows the pRRU installation process. Figure 8-2 Installation process Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 118 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI 8.3 Installing a pRRU This section describes the pRRU installation process. A pRRU can be installed on a wall, ceiling, indoor metal pole, or keel, but not on an aluminum panel or a non-standard keel. Note the following when installing the pRRU: The pRRU cannot be grounded. If the pRRU is grounded but the RHUB connected to this pRRU is not, the pRRU may fail to be powered on. A minimum distance of 50 cm must be reserved between the pRRU and the incandescent lamp. The installation spacing between the pRRU and the temperature sensor must be greater than 50 cm. It is good practice to install the pRRU on materials that can tolerate a temperature higher than 65°C and have an ignition point higher than 70°C. 8.3.1 Mounting Kits This section describes the pRRU mounting kits. Figure 8-3 shows the exterior of the pRRU mounting kits. Figure 8-3 Mounting kits (1) Mounting bracket (2) U-shaped metal plate (3) Screw (3.5X35) (4) Plastic expansion sleeve (5) Bolt (M4X35) (6) Bolt (M4X60) (7) Flat washer – – Figure 8-4, Figure 8-5 show the specifications of the mounting bracket. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 119 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-4 Mounting bracket specifications Figure 8-5 U-shaped metal plate specifications 8.3.2 Installing a pRRU on a Wall This section describes how to install a pRRU on an indoor wall. If a wall indoors has adequate load bearing capacity and installation space, it is good practice to install the pRRU on the wall. If the wall does not have adequate load bearing capacity, choose an installation mode based on site requirements. Context This section describes only the wall-mounted installation in which mounting kits are directly installed on the wall without auxiliary devices. The procedure for other wall-mounted installation modes is similar. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 120 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. Step 2 Place the mounting bracket in the installation position against the wall. Then, level the mounting bracket and use a marker to mark four anchor points. See Figure 8-6. Figure 8-6 Anchor points on the pRRU mounting bracket (1) Wall (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with φ6 bore to drill holes at the marked anchor points, as shown in Figure 8-7. Use a vacuum cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 121 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-7 Drilling holes and installing expansion bolts Step 4 Lead the M3.5x35 screws through the washers, and then through the drilling holes on the mounting bracket to the plastic expansion sleeves, and torque the screws to 1.2 N•m, as shown in Figure 8-8. Figure 8-8 Installing the mounting bracket If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-9. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 122 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-9 Installing a pRRU on a wall Before installing the pRRU, connect one end of the Ethernet cable to the CPRI_E0 port on pRRU. It is good practice to perform the installation from the side view to promptly align the hooks with the rotation axis. Step 6 Optional: Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-10. The protection screw protects the pRRU from being removed and must be locked if required. Figure 8-10 Locking the protection screw (1) M4 threaded hole Issue 08 (2016-05-30) (2) Hole for self-tapping screws Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Quincunx screw 123 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI ----End 8.3.3 Installing a pRRU on a Ceiling This section describes how to install a pRRU on the ceiling, such as the concrete ceiling, when the ceiling has adequate load bearing capacity and installation space. Context If the pRRU is installed on a ceiling, the temperature of the ceiling may increase by a maximum of 30 degrees. Therefore, whether a pRRU can be installed on a ceiling depends on the ceiling material. Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. Step 2 Place the mounting bracket in the installation position against the ceiling. Then, level the mounting bracket and use a marker to mark four anchor points. See Figure 8-11. Figure 8-11 Anchor points on the pRRU mounting bracket (1) Ceiling (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill with φ6 bore to drill holes at the marked anchor points, as shown in Figure 8-12. Use a vacuum cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 124 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-12 Drilling holes and installing expansion bolts Step 4 Lead the M3.5x35 screws through the washers, and then through the drilling holes on the mounting bracket to the plastic expansion sleeves, and use a torque screwdriver to torque the screws to 1.2 N•m, as shown in Figure 8-13. Figure 8-13 Installing the mounting bracket If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-14. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 125 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-14 Installing a pRRU on a ceiling Before installing the pRRU, connect one end of the Ethernet cable to the CPRI_E0 port on pRRU. It is good practice to perform the installation from the side view to promptly align the hooks with the rotation axis. Step 6 Optional: Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-15. The protection screw protects the pRRU from being removed and must be locked if required. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 126 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-15 Locking the protection screw (1) M4 threaded hole (2) Hole for self-tapping screws (3) Quincunx screw ----End 8.3.4 Installing a pRRU on a Pole This section describes how to install a pRRU on a metal pole indoors. Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the pRRU installation clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. Step 2 Secure the pRRU mounting bracket on the metal pole, as shown in Figure 8-16. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 127 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-16 Securing the pRRU mounting bracket on the metal pole 1. Determine a position for installing the pRRU. Then, place the separate mounting kit onto the pole, thread the hose clamp through the mounting kit, and encircle the pole with the hose clamp, as shown by illustrations a, b, and c in Figure 8-16. 2. Use an M6 inner hexagon screwdriver to tighten the bolt on each hose clamp to 5 N·m to secure the mounting kit, as shown by illustration d in Figure 8-16. Step 3 Fit the four hooks of the pRRU into the mounting holes on the mounting bracket and then press the pRRU downwards until a click is heard. See Figure 8-17. It is good practice to connect one end of an Ethernet cable to the CPRI_E0 port on the pRRU before the pRRU is installed. It is good practice to perform the installation from the side view to promptly align the hooks with the mounting holes. Figure 8-17 Installing the pRRU on a pole ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 128 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI 8.3.5 Installing a pRRU on a Plate This section describes how to install a pRRU on a plate. If a suspended ceiling plate has adequate load bearing capacity and installation space, the pRRU can be installed on the plate. However, it is good practice not to install a pRRU on an aluminum plate. The installation modes are classified into installation on a removable suspended ceiling plate and installation on an overall suspended ceiling. Procedure Installation on a removable suspended ceiling plate This installation mode applies when the suspended ceiling plate (for example, a metal plate) is removable. a. Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. b. Place the mounting bracket in the installation position against the wall. Then, level the mounting bracket and use a marker to mark two anchor points. See Figure 8-18. Figure 8-18 Anchor points on the pRRU mounting bracket (1) Suspended ceiling plate (2) Mounting bracket (3) Anchor point To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Issue 08 (2016-05-30) c. Use a hammer drill with φ6 bore to drill holes at the anchor points. d. Lead two bolts (M4) through the mounting bracket and the suspended ceiling plate, and use a torque screwdriver to torque the bolts to 1.4 N•m, as shown in Figure 8-19. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 129 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-19 Installing the pRRU mounting bracket The bolt used for installing the pRRU on a suspended ceiling plate depends on the plate thickness: The delivered bolt (M4x35) is used if the plate thickness is less than 25 mm. The delivered bolt (M4X60) is used if the plate thickness ranges from 25 mm to 45 mm. If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. e. Issue 08 (2016-05-30) Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-20. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 130 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-20 Installing a pRRU on a plate If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. f. Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-21. The protection screw protects the pRRU from being removed and must be locked if required. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 131 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-21 Locking the protection screw (1) M4 threaded hole (2) Hole for self-tapping screws (3) Quincunx screw Installation on an overall suspended ceiling This installation mode applies when the suspended ceiling (for example, made of plaster board) cannot be removed. a. Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. b. Issue 08 (2016-05-30) Use a crown saw to drill a hole with a diameter of 60 mm to 65 mm at the installation position for the pRRU, as shown in Figure 8-22. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 132 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-22 Drilling holes by using a crown saw To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. c. Use a bolt (M4) to partially connect the mounting bracket and the U-shaped metal plate, as shown in Figure 8-23. Figure 8-23 Partially connecting the mounting bracket and the U-shaped metal plate The bolt used for installing the pRRU on a suspended ceiling plate depends on the plate thickness: Issue 08 (2016-05-30) The delivered bolt (M4x35) is used if the plate thickness is less than 25 mm. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 133 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI d. The delivered bolt (M4X60) is used if the plate thickness ranges from 25 mm to 45 mm. Lead the U-shaped metal plate through the hole on the ceiling, as shown in Figure 8-24. Figure 8-24 Routing the U-shaped metal plate through the hole on the ceiling e. Install another bolt with the same length and use a torque screwdriver to torque the bolts to 1.4 N·m, as shown in Figure 8-25. Figure 8-25 Assembling the mounting bracket and the U-shaped metal plate If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. f. Issue 08 (2016-05-30) Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-26. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 134 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-26 Installing a pRRU on a plate Before installing the pRRU, connect one end of the Ethernet cable to the CPRI_E0 port on pRRU. It is good practice to perform the installation from the side view to promptly align the hooks with the rotation axis. g. Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-27. The protection screw protects the pRRU from being removed and must be locked if required. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 135 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-27 Locking the protection screw (1) M4 threaded hole (2) Hole for self-tapping screws (3) Quincunx screw ----End 8.3.6 Installing a pRRUon a Keel This section describes how to install a pRRU3901 on a keel. If a suspended ceiling plate cannot bear the pRRU, the pRRU can be installed on the keel on the ceiling. The standard keel with a width less than 45 mm, instead of the non-standard keel, is recommended. Context Before installing the pRRU on a keel, ensure that the keel is strong enough to bear the pRRU. The mounting bracket of the pRRU can be installed on the keel of the following specifications: GBT 11981-2008, JIS A6517-2002, and ASTM C635 C635M-2007. The installation mode depends on onsite requirements because there are various keels. This section describes the procedure of installing a pRRU on the keel of JIS standard used in Japan. The procedure of installing a pRRU on other keels is the same as that of installing a pRRU on the keel of JIS standard. The keel used on the ceiling is thin. During installation, fix the mounting kits onto the large surface instead of the small surface of the keel to prevent distorting the keel. Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 136 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Step 2 Place the U-shaped metal plate across the keel. Use a marker to mark the projective positions of the mounting holes on the suspended ceiling plate, as shown in Figure 8-28. Figure 8-28 Anchor points on the suspended ceiling plate To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling holes. Step 3 Use a hammer drill to drill holes at the anchor points. You are advised to use the hammer drill with Ф12 bore. Step 4 Lead two bolts (M4) through the mounting bracket and the ceiling plate. Use a torque screwdriver to torque the bolts to 1.4 N•m, as shown in Figure 8-29. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 137 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-29 Installing the mounting bracket The bolt used for installing the pRRU on a suspended ceiling plate depends on the plate thickness: The delivered bolt (M4 x 35) is used if the plate thickness is less than 25 mm. The delivered bolt (M4 x 60) is used if the plate thickness ranges from 25 mm to 45 mm. If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-30. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 138 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-30 Installing a pRRU on a keel Before installing the pRRU, connect one end of the Ethernet cable to the CPRI_E0 port on pRRU. It is good practice to perform the installation from the side view to promptly align the hooks with the rotation axis. Step 6 Optional: Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-31. The protection screw protects the pRRU from being removed and must be locked if required. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 139 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-31 Locking the protection screw (1) M4 threaded hole (2) Hole for self-tapping screws (3) Quincunx screw ----End 8.3.7 Installing a pRRU on Steel Hangers This section describes how to install a pRRU on steel hangers. Context Either M6 or M8 steel hangers can be used for installation. Procedure Step 1 Determine the position for installing the pRRU based on the construction blueprint and the clearance requirements. For details about the clearance requirements, see 8.1.3 Space Requirements. Step 2 Install two steel hangers onto the ceiling. A distance of 90 mm must be retained between the two hangers, as shown in Figure 8-32. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 140 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-32 Installing steel hangers Step 3 Install the nuts, spring washers, flat washers, and a U-shaped metal plate onto the steel hangers, and use a torque wrench to torque the U-shaped metal plate to 5 N•m (on M6 steel hangers) or 12 N•m (on M8 steel hangers). See Figure 8-33. The edge side of the U-shaped metal plate must face upwards. The nuts on the underside of the U-shaped metal plate must be completely fixed into the steel hangers, and the lower surface of a nut cannot be exposed on the end side of steel hangers, as shown in Figure 8-33. Figure 8-33 Installing the U-shaped metal plate onto the steel hangers (1) Nuts Issue 08 (2016-05-30) (2) Spring washers Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Flat washers 141 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI (4) Steel hangers (5) U-shaped metal plate – Step 4 Lead two bolts (M4x35) through the mounting bracket and the ceiling plate. Use a torque screwdriver to torque the bolts to 1.4 N•m, as shown in Figure 8-34. Figure 8-34 Installing the mounting bracket If the screws cannot be tightened using a Phillips screwdriver, use a hex key or an electric screwdriver to assist the installation. Step 5 Fit the rotation axis on the pRRU into the hooks on the mounting bracket, and then push the pRRU against the mounting bracket until a click is heard. See Figure 8-35. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 142 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-35 Installing a pRRU on a keel Before installing the pRRU, connect one end of the Ethernet cable to the CPRI_E0 port on pRRU. It is good practice to perform the installation from the side view to promptly align the hooks with the rotation axis. Step 6 Optional: Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-36. The protection screw protects the pRRU from being removed and must be locked if required. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 143 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-36 Locking the protection screw (1) M4 threaded hole (2) Hole for self-tapping screws (3) Quincunx screw ----End 8.3.8 Installing the Cabinet In the outdoor scenario, the pRRU3902 should be installed in the cabinet firstly. Context An RF surge protector provides surge protection for the RF ports on pRRU3902, and a PoE surge protector provides surge protection for the CPRI ports. One pRRU3902 with internal antenna need to be configured with one PoE surge protector. One pRRU3902 with external antenna need to be configured with one PoE surge protector and four RF surge protectors at the same time. Procedure Step 1 Install the plate onto the cabinet, as shown in Figure 8-37. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 144 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-37 Installing the plate onto the cabinet Make sure all the cables are installed before installing the plate. For details about installing the cables of pRRU3902, see Figure 8-38. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 145 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-38 Installing the pRRU3902 cables (1) RF Jumper (2) CPRI_E0 port (3) Ethernet Cable Step 2 Fit the rotation axis on pRRU3902 into the hooks on the mounting bracket, and then push pRRU3902 against the mounting bracket until a click is heard, as shown in Figure 8-39. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 146 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-39 Installing a pRRU3902 into the cabinet Step 3 Optional: Use T20 with hole screwdriver to lock the protection screw on the attachment plate. See Figure 8-40. The protection screw protects the pRRU3902 from being removed and must be locked if required. Figure 8-40 Locking the protection screw (1) M4 threaded hole Issue 08 (2016-05-30) (2) Hole for self-tapping screws Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Quincunx screw 147 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI ----End 8.4 Installing pRRU Cables This section describes the procedure of installing the pRRU cables. 8.4.1 Requirements for Cable Layout Cables must be routed according to the specified cabling requirements to prevent signal interference. If certain cables listed below are not required, skip the requirements for routing these cables. General Requirements for Cable Layout National Standards Code for Engineering Design of Generic Cabling System for Building and Campus (GB 50311-2007) Code for Engineering Acceptance of Generic Cabling System for Building and Campus (GB50312-2007). Security Protection Engineering Technology Specifications (GB 50348-2004) Code for Construction and Acceptance of the Electronic Information System Room (GB 50462-2008) Code for Quality Acceptance of the Intelligent Building Engineering (GB 50339-2003) Code for Quality Acceptance of Electric Engineering Construction in Building (GB 50303-2002) Technical Specification for Construction and Acceptance of Telecommunication Conduit Engineering (GB 50374-2006) International Standards Generic Cabling for Customer Premises (ISO/IEC 11801) Commercial Building Telecommunications Cabling Standard (EIA/TIA 568) Commercial Building Standard for Telecommunication Pathways and Spaces (EIA/TIA 569) Administration Standard for Commercial Telecommunications Infrastructure (EIA/TIA 606) Grounding and Bonding Requirements for Telecommunications in Commercial Buildings (EIA/TIA 607) Generic Cabling Systems for Information Technology (EN 50173) Cabling Installation for Information Technology (EN 50174) Bending radius The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper must be longer than 35 mm, 50 mm, and 127 mm, respectively. The bending radius of a power cable is at least five times the diameter of the cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 148 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI The bending radius of a signal cable must be at least five times the diameter of the cable. Cable binding Cables of the same type are bound together. Different types of cables must be separately routed with a minimum spacing of 30 mm and cannot be entangled. The cables are bound tightly and neatly and the sheaths of the cables is intact. The cable ties face the same direction and all cable ties bound at similar positions must be in a straight line. The extra length of each indoor cable tie must be cut off. A slack of 5 mm is reserved for each outdoor cable tie before the extra length is cut off. All cut surfaces are without sharp edges. Labels or nameplates are attached to both ends, joints, or turns of cables after they are installed. Safety The steel pipe or fire-resistant rigid polyvinyl chloride pipe should be used for the cable duct or for routing cables. The cross-sectional usage of the cable duct should be 30% to 50% and that of the pipe for routing cables should be 25% to 30%. Cables are placed away from sharp objects or wall burrs. If these positions are inevitable, protection pipes are required for the cables. Cables are routed away from heat sources, or heat-insulation materials are added between cables and heat sources. A clearance is reserved at turns of a cable or the position close to a device, facilitating cable and device maintenance. The recommended clearance is about 0.1 m. Requirements for Special Cables Ethernet Cable A maximum of 100 Ethernet cables can be bundled if no PVC pipes are used. If pipes are used, a maximum of 24 Ethernet cables can be led through a pipe. In this case, ensure that 1/3 space inside the pipes must be vacant. The point at which an Ethernet cable is bundled must be spaced 400 mm or less from the Ethernet port on a pRRU. For the pRRU used in the elevator engine room on the rooftop, generator set for the subway engine, and equipment room with central air conditioning, Ethernet cables must be led through metallic conduits that are reliably grounded at both ends. 8.4.2 Cable List This section describes pRRUcable connections. pRRU3902 Cables Table 8-9 List of pRRU3901 cables Cable Issue 08 (2016-05-30) One End The Other End Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 149 DBS3900 LampSite Installation Guide Ethernet Cable (Optional) RF Jumper 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Connector Connected to ... Connector Connected to ... RJ45 connector CPRI_E0~CP RI_E7 port on RHUB RJ45 connector CPRI_E0~CPRI_ E1 port on pRRU RJ45 connector Transmission port on Access Control(AC) RJ45 connector GE port on pRRU3901 CPRI_E1 port on pRRU3911/p RRU3911+WI FI External antenna TX/RX RF port on pRRU Based on the port model of the antenna system. SMA straight male connector/Type N male connector Antenna system 8.4.3 Cable Connections This section describes the cable connections for a single pRRU. pRRU3902 (Indoor) Figure 8-41 shows the cable connection of pRRU3902 with internal antenna. Figure 8-41 pRRU3902 cable connection (1) (1) Ethernet cable Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. – 150 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI The Extender can be used to lengthen the distance between the RHUB and the pRRU3902 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3902. Figure 8-42 shows the cable connection when the pRRU3902 supporting external antennas. Figure 8-42 pRRU3902 cable connection (2) (1) Ethernet cable (2) RF jumper The Extender can be used to lengthen the distance between the RHUB and the pRRU3902 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3902. pRRU3902 (Outdoor) Figure 8-43 shows the cable connection of pRRU3902 intalled outside. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 151 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-43 pRRU3902 cable connection (1) PoE surge protector 1 (2) pRRU3902 (3) RF surge protector The Extender can be used to lengthen the distance between the RHUB and the pRRU3902 connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one among the RHUB, PoE surge protector 2, PoE surge protector 3, Extender and the other among Extender, PoE surge protector 4, PoE surge protector 1, pRRU3902. For details about installation of the PoE surge protector and cables, see 12 (Optional) Installing the PoE Surge Protector and Cables. For details about installation of the RF surge protector and cables, see 13 (Optional) Installing the RF Surge Protector and Cables. pRRU3911+WIFI Figure 8-44 shows the cable connections of pRRU3911+WIFI. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 152 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-44 pRRU cable connection (1) (1) Ethernet cable The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3911. Figure 8-45 shows the cable connections of pRRU with external antenna. Figure 8-45 pRRU3911+WIFI cable connection (2) (1) Ethernet cable The Extender can be used to lengthen the distance between the RHUB and the pRRU connected using the Ethernet cable. If the Extender is used, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 153 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI 8.4.4 Cable Installation Process This section describes the process of installing pRRU cables. Figure 8-46 shows the process of installing pRRU cables. Figure 8-46 cable installation process Only the pRRU3902 using external antennas requires RF jumpers, and the pRRU3911/pRRU3911+WIFI requires no RF jumpers. 8.4.5 Installing a pRRU3902 Ethernet Cable This section describes how to install an Ethernet cable. Prerequisites The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-sectional area must be 24 AWG or larger and frame spread rating must be CM or higher. The Ethernet cables can be straight-through cables. With the internal PoE module providing power, the maximum length of an Ethernet cable is 100 m. With the Extender, the distance of the pRRU3901 and RHUB can be extended by the Extender up to a total distance of 200 m. Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. Context The Ethernet cable has the following functions: Provides power supply for the pRRU3902 when the cable connects the CPRI_E0 port on the pRRU3902 to the RHUB. Transmits CPRI signals between an RHUB and a pRRU3902. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 154 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI For details about the cable connections in the different scenarios, see 8.4.3 Cable Connections. The Ethernet cable connections between RHUB and pRRUs are the same. The following section describes the connections between RHUB-Extender-pRRU3902 as an example. In the outdoor scenario, PoE surge protector is needed to provide surge protection for the Ethernet ports. For details about the installation of PoE surge protector, see 12 (Optional) Installing the PoE Surge Protector and Cables. Procedure Step 1 Make the Ethernet cables. 1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable, Assembling the Shielded RJ45 Connector and the Ethernet Cable. Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the RJ45 connector and the Ethernet cable. Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected. The pRRU3902 supports both unshielded and shielded Ethernet cables. It is good practice to use unshielded Ethernet cables. 2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips. 3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2. 4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference. Step 2 Install an Ethernet cable between an RHUB and a pRRU3902. Step 3 Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU3902 panel. Step 4 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender. In this scene, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3902. Step 5 Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design, as shown in Figure 8-47. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 155 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-47 Installing an Ethernet cable (1) Ethernet cable (2) CPRI_E0 port on the pRRU3902 Step 6 Optional: If the pRRU3902 is installed in a place with water dripping risks, seal its Ethernet ports with mastic cement. 1. Take about 40 g mastic cement, as shown in Figure 8-48. Figure 8-48 Mastic cement cube 2. Flatten the mastic cement into a 20 cm strip, as shown in Figure 8-49. Figure 8-49 Flattening the mastic cement into a strip Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 156 DBS3900 LampSite Installation Guide 3. 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Shape the mastic cement strip around the Ethernet ports from outside the connector clips. Ensure the external sides of the connectors are fully sealed, as shown in Figure 8-50. Figure 8-50 Sealing the connector external side Compress the mastic cement downwards along the connector external side. Do not press the mastic cement towards the connector. This operation may damage the connector clip and make it unable to hold the connector, causing cable disconnection, as shown in Figure 8-51. Figure 8-51 Correct and incorrect ways for sealing the connector 4. Issue 08 (2016-05-30) Shape the mastic cement around the cables in a repeating 8 manner, as shown in Figure 8-52. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 157 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-52 Shaping the mastic cement between cables 5. Compress and flatten the mastic cement until the Ethernet ports are fully covered and sealed. Nip the mastic cement from the connector side upwards along the cables until 10 mm high, as shown in Figure 8-53. This ensures that the mastic cement envelop does not crack in case the cable is bent. Figure 8-53 Fully sealed Ethernet ports ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 158 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 8.4.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 8.4.6 Installing a pRRU3911/pRRU3911+WIFI Ethernet Cable This section describes how to install a pRRU3911/pRRU3911+WIFI Ethernet cable. Prerequisites The Ethernet cable must be of Category 5e (enhanced) or higher. In addition, its cross-sectional area must be 24 AWG or larger and frame spread rating must be CM or higher. The Ethernet cables can be straight-through cables. With the internal PoE module providing power, the maximum length of an Ethernet cable is 100 m. With the Extender, the distance of the pRRU3911/pRRU3911+WIFI and RHUB can be extended by the Extender up to a total distance of 200 m. Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. Context The Ethernet cable has the following functions: Provides power supply for the pRRU3911/pRRU3911+WIFI when the cable connects the CPRI_E0 port on the /pRRU3911+WIFI to the RHUB. Transmits CPRI signals between an RHUB and a pRRU3911/pRRU3911+WIFI. Procedure Step 1 Make the Ethernet cables. 1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable, Assembling the Shielded RJ45 Connector and the Ethernet Cable. Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the RJ45 connector and the Ethernet cable. Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected. 2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips. 3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2. 4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference. Step 2 Install an Ethernet cable between an RHUB and a pRRU3911/pRRU3911+WIFI. Step 3 Connect the RJ45 connector at one end of the Ethernet cable to the CPRI_E0 port on the pRRU3911/pRRU3911+WIFI panel. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 159 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Step 4 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender. In this scene, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU3911/pRRU3911+WIFI. Step 5 Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design, as shown in Figure 8-54. Figure 8-54 Installing an Ethernet cable (1) Ethernet cable (2) CPRI_E0 port (3) CPRI_E1 port Step 6 Optional: If the Wi-Fi daughter board is used, install the Ethernet cable to connect the AC and the pRRU3911/pRRU3911+WIFI. 1. Remove the dustproof cap from the CPRI_E1 port. 2. Connect an RJ45 connector of the Ethernet cable to the CPRI_E1 port on the pRRU3911/pRRU3911+WIFI. 3. Connect the other RJ45 connector of the Ethernet cable to the transmission port on the AC based on the engineering design requirements. See Figure 8-54. Step 7 Optional: If the pRRU3902 is installed in a place with water dripping risks, seal its Ethernet ports with mastic cement. 1. Issue 08 (2016-05-30) Take about 40 g mastic cement, as shown in Figure 8-55. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 160 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-55 Mastic cement cube 2. Flatten the mastic cement into a 20 cm strip, as shown in Figure 8-56. Figure 8-56 Flattening the mastic cement into a strip 3. Shape the mastic cement strip around the Ethernet ports from outside the connector clips. Ensure the external sides of the connectors are fully sealed, as shown in Figure 8-57. Figure 8-57 Sealing the connector external side Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 161 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Compress the mastic cement downwards along the connector external side. Do not press the mastic cement towards the connector. This operation may damage the connector clip and make it unable to hold the connector, causing cable disconnection, as shown in Figure 8-58. Figure 8-58 Correct and incorrect ways for sealing the connector 4. Shape the mastic cement around the cables in a repeating 8 manner, as shown in Figure 8-59. Figure 8-59 Shaping the mastic cement between cables 5. Issue 08 (2016-05-30) Compress and flatten the mastic cement until the Ethernet ports are fully covered and sealed. Nip the mastic cement from the connector side upwards along the cables until 10 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 162 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI mm high, as shown in Figure 8-60. This ensures that the mastic cement envelop does not crack in case the cable is bent. Figure 8-60 Fully sealed Ethernet ports ----End 8.4.7 Installing a pRRU3902 RF Jumper (Optional) The RF Jumpers transmit radio frequency signals between pRRU3902 with external antennas and the combiners. Only the pRRU3902 using external antennas can be configured with an RF Jumper. Context An RF jumpers delivered is 50 cm at most. If the RF jumper is provided by the customer, the jumper must not be lower than the RG316 specifications. In addition, the jumpers can be used after they are checked by Huawei engineers. pRRU3902s can be connected to external whip antennas or external remote antennas (through pRRU3902 RF jumpers). Whip antennas are delivered optionally. RF jumpers are not delivered. For details about the cable connections in the different scenarios, see 8.4.3 Cable Connections. The installation of RF jumper cables are the same. The following section describes the connections between antenna and pRRU3902 in the indoor scenario as an example. In the outdoor scenario, RF surge protector is needed to provide surge protection for the RF ports. For details about the installation of RF surge protector, see 13 (Optional) Installing the RF Surge Protector and Cables. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 163 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Procedure Step 1 Use a torque wrench with a torque of 0.6 N•m to connect the SMA straight male connector on a jumper to the ANT port on the pRRU3902 panel. Tighten it with hands, and then use a torque wrench to tighten it with a rotational speed of less than or equal to 2.4 rpm to tighten it. Step 2 Connect the type N female connector of the jumper to the type N male connector of the RF feeder connected to the PORT port of the combiner, as shown as Table 8-10. Table 8-10 Connections of the RF jumper between pRRU3902 and combiners One End The Other End Connector Connected to... Connector Connected to... SMA straight male connector pRRU3902/ANT0 RF port Type N male connector Combiner1/PORT1 or PORT2 prot Issue 08 (2016-05-30) pRRU3902/ANT1 RF port Combiner2/PORT1 or PORT2 prot pRRU3902/ANT2 RF port Combiner1/PORT2 or PORT2 prot pRRU3902/ANT3 RF port Combiner2/PORT2 or PORT1 prot Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 164 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-61 Installing jumpers between the pRRU3902 and Combiners ----End Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 8.4.8 Installing a pRRU3911 RF Jumper (Optional) The RF Jumpers transmit radio frequency signals between pRRU3911 and the external antennas. Only the pRRU3911 using external antennas can be configured with an RF Jumper. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 165 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Context An RF jumpers delivered is 50 cm at most. If the RF jumper is provided by the customer, the jumper must not be lower than the RG316 specifications. In addition, the jumpers can be used after they are checked by Huawei engineers. pRRU3911s can be connected to external whip antennas or external remote antennas (through pRRU3911 RF jumpers). Whip antennas are delivered optionally. RF jumpers are not delivered. Procedure Step 1 Use a torque wrench with a torque of 0.6 N•m to connect the SMA straight male connector on a jumper to the ANT port on the pRRU3902 panel. Tighten it with hands, and then use a torque wrench to tighten it with a rotational speed of less than or equal to 2.4 rpm to tighten it. Step 2 Connect the type N female connector of the jumper to the type N male connector of the RF feeder connected to the built-in antenna. Tighten the feeder close to the type N connector to ensure that the jumper is not tightened. In this way, the connectors on both ends of a jumper are not affected by the external force. Figure 8-62 Installing jumpers between the pRRU3911 and external antennas ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 166 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Follow-up Procedure 1. Route the cable, and then use a cable tie to bind the cable. For details, see 7.5.1 Requirements for Cable Layout. 2. Label the installed cable. For details, see section 15.4 Attaching an L-Shaped Label. 8.5 (Optional) Installing a Combiner This section describes how to install a combiner. The pRRU3902 using external antennas must be configured with a combiner. Context This section describes how to mount a combiner on a wall as an example. The actual installation mode depends on actual requirements. Procedure Step 1 Use a marker to mark two anchor points according to inter-hole spacing, as shown in Figure 8-63. Figure 8-63 Marking anchor points Step 2 Use a hammer drill with φ6 bore to drill holes at the marked anchor points, as shown in Figure 8-64. Use a vacuum cleaner to clean the dust inside and around the holes and measure the distance between them. If they are inaccurately positioned, re-measure and re-drill the holes. Then, use a rubber mallet to hit a plastic expansion sleeve into each hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 167 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Figure 8-64 Drilling holes and installing expansion bolts Step 3 Place the Extender in the corresponding position and use an M3 Phillips screwdriver to torque the screws to 1 N•m, as shown in Figure 8-65. Figure 8-65 Installing the Extender ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 168 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI 8.6 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. Table 8-11 lists the hardware installation checking items. Table 8-11 Hardware installation checking list No. Item Ensure that the pRRU is not grouned. The position for each device conforms to the engineering design and meets the space requirement. Ensure that the pRRU is properly installed. The surface of the pRRUis neat and clean. The external paint is intact. The labels, tags, and nameplates are correct, legible, and complete. Table 8-12 lists the check items of the signal cable connection. Table 8-12 Checklist for the signal cable connection No. Item The connectors of the signal cables must securely connected. The connectors of the signal cables are intact. The signal cables are intact. The cable ties are evenly spaced. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. The extra length of the cable ties is cut and removed. The cut surfaces of the indoor cables are smooth and have no sharp edges. The cable layout facilitates maintenance and expansion. Correct and clear labels are attached to both ends of the signal cables. Table 8-13 lists the checking items for other cable connections. Table 8-13 Checklist for other cable connections No. Item The connectors of the other cables must securely connected. Labels on the cables are legible and bound based on the engineering requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. Positions for routing the cables must meet requirements of the engineering Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 169 DBS3900 LampSite Installation Guide No. 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI Item design. 8.7 Powering on the pRRU This section describes the power-on check on the pRRU after the pRRU hardware is installed and checked. Context After the RHUB and pRRUs are installed and connected to each other, power on them no matter whether the BBU is installed. Procedure Step 1 Power on the pRRU. The pRRU supports PoE. The RHUB supplies power to the pRRU in PoE mode through the CPRI_E0 port on the pRRU. Step 2 Power on the pRRU. Wait 3 to 5 minutes, check the status of the 3GPP indicator on the pRRU. If the 3GPP Indicator... Because... Then... Blinks white at 4 Hz The pRRU is loading software, configuring data, or it is not running. Wait until the software is loaded. If the loading is not completed in five minutes, power off the pRRU and check whether the data configuration file is correct. After the fault is rectified, power on the pRRU again. Blinks white at 0.5 Hz (on for 1s and off for 1s) The pRRU is working properly and does not transmit power. Check whether the services have been configured and power amplification have been enabled on the pRRU. Is steady white The cell is set up and transmits power properly. No further action is required. Is steady orange. There is power input, but the hardware is faulty. Power off the pRRU, rectify the hardware fault, and then power it on again. Blinks orange at 0.5 Hz (on for 1s and off for 1s) A minor alarm (indicating an HDLC link disconnection, for example) is generated. Troubleshoot based on the alarm information. Is off The board is not powered on. Turn off the power supply switch and check whether the Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 170 DBS3900 LampSite Installation Guide 8 Installing a pRRU3902 or pRRU3911 or pRRU3911+WIFI If the 3GPP Indicator... Because... Then... power input is normal. If the power input is normal, check for and rectify board faults, and turn on the power supply switch again. Check the indicator status 30 minutes after the power-on if a pRRU is not connected to any BBU. The pRRU is considered normally powered on when any indicator on the pRRU is on. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 171 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Installing a pRRU3907 or pRRU3916 About This Chapter This chapter describes the pRRU3907or pRRU3916 installation process. The pRRU3907 and pRRU3916 are installed in similar way, and this chapter uses the pRRU3907 as an example. 9.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU, including the pRRU product family, installation scenarios, installation space and environment requirements. 9.2 Installation Process This section describes the pRRU installation process, which involves installing a pRRU, and cables, checking the pRRU hardware installation, and powering on the pRRU. 9.3 Installing a pRRU This section describes the pRRU installation process. 9.4 Installing pRRU Cables This chapter describes the procedures for installing pRRU cables. 9.5 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. 9.6 Powering on the pRRU This section describes the power-on check on the pRRU after the pRRU hardware is installed and checked. 9.1 Information About the Installation This section describes the information that you must be familiar with before installing a pRRU, including the pRRU product family, installation scenarios, installation space and environment requirements. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 172 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 9.1.1 pRRU Product Family This chapter describes the configurations and functions of the pRRU components. Table 9-1 lists the pRRU product family. Table 9-1 pRRU product family Categor Equipment Optional or Mandatory Quantity Function Main equipmen pRRU3907/pR RU3916 Mandatory Functions as a remote radio unit that processes RF signals. Auxiliary device Mounting kits Mandatory Supports the pRRU installation on a wall or pole. The mounting kits vary with the pRRU installation mode. Extender Optional 1/2 Extends the distance between the pRRU and RHUB. NOTE The quantity depends on the number of Ethernet cables in use. 9.1.2 Constraints and Limitations The pRRU can be installed on a wall or pole.Installation scenarios must meet heat-dissipation and waterproofing requirements of the RRU. Requirements for the Installation Scenarios Application scenarios: To ensure proper heat dissipation of the pRRU, the following requirements must be met: The pRRU cannot be installed in an enclosed cabinet without a cooling system. The pRRU cannot be installed in an enclosed camouflage box. The pRRU cannot be installed in an enclosed equipment room without a cooling system. When multiple pRRUs are installed in centralized mode, the minimum clearance requirements must be met. For details, see 9.1.3 Installation Clearance and Space Requirements. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 173 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 If the pRRU is inappropriately installed, heat dissipation of the pRRU deteriorates and the pRRU may not work properly, as shown in Figure 9-1. Figure 9-1 Inappropriately installed pRRU Correct installation methods: To ensure the heat dissipation of the pRRU and waterproofing of the ports at the bottom of the RRU, the vertical deviation angle of a pRRU must be less than or equal to 10°, as shown in Figure 9-2. Figure 9-2 Requirements for the vertical deviation angle of a pRRU (1) pRRU (2) Installation support (pole or wall) Table 9-2 lists the mounted suggestions of different installation scenarios. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 174 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Table 9-2 mounted suggestion Installation Mode Requirement Installing the pRRU on a wall The wall can bear a load at least four times the weight of a pRRU. The screws must be tightened with a torque of 30 N·m. This ensures the screws work properly and the wall remains intact without cracks in it. The diameter of a pole for installing a pRRU ranges from 60 mm (2.36 in.) to 114 mm (4.49 in.). The recommend ed diameter is 80 mm (3.15 in.). The recommend ed thickness of the pole wall is 3.5 mm (0.14 in.) or above. For details, see9.3.2 Installing a pRRU on a Wall. Installing the pRRU on a pole For details, see 9.3.3 Installing a pRRU on a Pole. Issue 08 (2016-05-30) Mounting Brackets 1. 2. 3. 4. 5. Installation Diagram M6x60 bolt Nut Spring washer Flat washer Expansion sleeve 1. Mounting kit 2. Hose clamp Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 175 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 9.1.3 Installation Clearance and Space Requirements This section describes the recommended and minimum clearances for a pRRU. Clearance for a pRRU When the pRRU is installed on a wall or pole, the minimum clearance is required for easy cabling and operation and maintenance (O&M). Based on the engineering practice, the recommendation for the installation clearance is provided. The recommended clearances are for customers, ensuring normal running and providing appropriate space for O&M. If installation space is sufficient, leave the recommended clearances after installing equipment. The minimum clearance ensures normal operation and heat dissipation, but O&M activities such as checking indicator status and opening the cover plate of a cabling cavity cannot be properly conducted. If installation space is restricted, leave the minimum clearance after installing equipment. Figure 9-3 show the clearances for installing a pRRU. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 176 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-3 Clearances for installing a pRRU Installation Spacing Between pRRUs Figure 9-4 lists the horizonta spacing between pRRUs. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 177 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-4 Clearances for installing a pRRU Figure 9-5 lists the vertical spacing between pRRUs. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 178 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-5 Clearances for installing a pRRU 9.1.4 Installation Environment Requirements The installation environment of a pRRU involves the running environment specifications for the pRRU. Running Environment Specifications Table 9-3 shows the environment specifications for the pRRU installed outdoors. Table 9-3 pRRU environment specifications Specifications Condition Operating temperature - 40 °C to + 50 °C Relative humidity 5% RH to 95% RH Altitude - 60 m to + 1800 m Works properly. 1800 m to 4000 m Above the 1800 m altitude, the maximum operating temperature Issue 08 (2016-05-30) Remarks Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 179 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Specifications Condition Remarks decreases by 1 °C each time the altitude increases by 220 m. 9.2 Installation Process This section describes the pRRU installation process, which involves installing a pRRU, and cables, checking the pRRU hardware installation, and powering on the pRRU. Figure 9-6 shows the pRRU installation process. Figure 9-6 pRRU installation process 9.3 Installing a pRRU This section describes the pRRU installation process. 9.3.1 pRRU Mounting Kits This section describes mounting kits and attachment plates for installing pRRUs. Figure 9-7 shows the exterior of the pRRU. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 180 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-7 Front and side of a pRRU (1) Attachment plate Figure 9-8 shows a mounting bracket and a attachment plate. Figure 9-8 Mounting bracket and common attachment plate for installing a pRRU (1) Attachment plate Issue 08 (2016-05-30) (2) Mounting bracket (3) Hose clamp Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (4) Expansion bolt 181 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 9.3.2 Installing a pRRU on a Wall This section describes the procedure and precautions for installing a pRRU on a wall. Context The wall for installing pRRUs must meet the following requirements: The wall must be able to bear a weight four times heavier than the pRRU's weight. Expansion bolts must be tightened to 30 N·m (265.52 lbf·in.) to ensure that the bolt assemblies work properly and the wall remains intact. Do not stand a pRRU upright because the RF ports cannot support the weight of the pRRU. Place a foam pad or cardboard under a pRRU to protect the pRRU housing from damage during the installation. Procedure Step 1 Determine a position for installing the pRRU on a wall, use a level to verify that the marking-off template is placed horizontally, and then use a marker to mark anchor points, as shown in Figure 9-9. Figure 9-9 Marking anchor points (1) Level Issue 08 (2016-05-30) (2) Tapped hole Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Marker 182 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 It is recommended that the separate mounting kit be 1200 mm (47.24 in.) to 1600 mm (62.99 in.) above the ground. Step 2 Drill holes at the anchor points and install expansion bolts in the holes, as shown in Figure 9-10. Figure 9-10 Drilling a hole and inserting an expansion bolt assembly (1) M6x60 bolt 1. (2) Nut (3) Spring washer (4) Flat washer (5) Expansion tube Use a hammer drill with a φ8 bit to drill holes vertically at the marked anchor points. Ensure that the depth of each hole ranges from 45 mm (1.77 in.) to 50 mm (1.97 in.). Take proper safety measures to protect your eyes and respiratory tract against the dust before drilling holes. 2. Use a vacuum cleaner to clear the dust out from inside and around the holes, and measure the distances between holes. If any of the holes is beyond the acceptable range, mark a new anchor point and drill a new hole. 3. Tighten the expansion bolts slightly, and place each expansion bolt vertically into each hole. 4. Use a rubber mallet to pound each expansion bolt until the corresponding expansion tube completely enters the hole. Leave 20 mm (0.79 in.) of the expansion bolt outside the wall. 5. Remove the M6x60 bolt, nut, spring washer, and flat washer in sequence. Step 3 Place the mounting kit onto the wall, insert four M6x60 bolts into the tapped holes on the mounting kit, and tighten each bolt to 5 N·m (44.25 lbf·in.) to secure the mounting kit, as shown in Figure 9-11. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 183 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-11 Securing the separate mounting kit (1) Nut (2) Spring washer (3) Flat washer Step 4 Hold the pRRU, hang the two dowels on the top of the pRRU attachment plate onto the separate mounting kit, and push the pRRU until it snaps into place, as shown by illustrations a and b in Figure 9-12. Step 5 Use the M6 inner hexagon screwdriver to tighten the screw on the top of the separate attachment plate to 7 N·m (61.96 lbf·in.), as shown by illustration c in Figure 9-12. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 184 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-12 Securing the pRRU onto the mounting kit ----End 9.3.3 Installing a pRRU on a Pole This section describes the procedure and precautions for installing a pRRU on a pole. Context Do not stand a pRRU upright because the RF ports cannot support the weight of the pRRU. Place a foam pad or cardboard under a pRRU to protect the pRRU housing from damage during the installation. Procedure Step 1 Determine a position for installing the separate mounting kit, as shown in Figure 9-13. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 185 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-13 Distance between the separate mounting kit and the ground It is recommended that the separate mounting kit be 1200 mm (47.24 in.) to 1600 mm (62.99 in.) above the ground. Step 2 Install the mounting kit, as shown in Figure 9-14. Figure 9-14 Installing a pRRU mounting kit 1. Determine a position for installing the pRRU. Then, place the separate mounting kit onto the pole, thread the hose clamp through the mounting kit, and encircle the pole with the hose clamp, as shown by illustrations a, b, and c in Figure 9-14. 2. Use an M6 inner hexagon screwdriver to tighten the bolt on each hose clamp to 5 N·m (44.25 lbf·in.) to secure the mounting kit, as shown by illustration d in Figure 9-14. Step 3 Secure the pRRU onto the separate mounting kit, as shown in Figure 9-15. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 186 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-15 Securing the pRRU onto the mounting kit 1. Hang the two dowels on the top of the pRRU attachment plate onto the mounting kit, and push the pRRU until it snaps into place, as shown by illustrations a and b in Figure 9-15. 2. Use the M6 inner hexagon screwdriver to tighten the screw on the top of the attachment plate to 7 N·m (61.96 lbf·in.), as shown by illustration c in Figure 9-15. ----End 9.4 Installing pRRU Cables This chapter describes the procedures for installing pRRU cables. 9.4.1 Cabling Requirements Cables must be laid out according to the specified cabling requirements to prevent signal interference. If a cable listed below is not required, skip the cabling requirements of the cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 187 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 General Cabling Requirements Bending radius requirements The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bending radius of a 5/4'' feeder must be greater than 380 mm (14.96 in.). The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bending radius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bending radius of an ordinary 1/2'' jumper must be greater than 127 mm (5.00 in.). The bending radius of a PGND cable must be at least three times its diameter. The bending radius of a signal cable must be at least five times its diameter. Cable binding requirements Cables of the same type must be bound together. Different types of cables must be separately laid out and bound, with a minimum distance of 30 mm (1.18 in.) from each other. Cables must be bound tightly and neatly. The sheaths of cables must not be damaged. Cable ties must face the same direction, and those at the same horizontal line must be in a straight line. The excess of indoor cable ties must be cut off. The excess of 5 mm (0.197 in.) of outdoor cable ties should be reserved, and the cut surfaces must be smooth without sharp edges. After cables are installed, labels or nameplates must be attached to the cables at their ends, curves, and interconnection positions. Security requirements When laying out cables, avoid sharp objects, for example sharp edges on the wall. If necessary, use tubes to protect the cables. When laying out cables, keep cables away from heat sources, or use heat insulation materials to insulate the cables from the heat sources. Reserve a proper distance (0.1 m [3.937 in.] is recommended) between equipment and cables especially at the cable curves to protect the cables and equipment. Indoor cabling requirements Route each cable into the room through the feeder window. Reserve drip loops for all cables outside the feeder window before routing them into the room. Ensure that the radiuses of the drip loops are greater than or equal to the minimum bending radiuses of the cables. When routing a cable into the room, ensure that a person is assisting you in the room. Apply waterproof treatment to the feeder window. Outdoor Cabling Requirements Protect outdoor cables against potential damage. For example, thread the cables through tubes. Cables to be protected include AC power cables, transmission cables, and cables laid out underground. Use cable clips to secure cables outdoors. Arrange cables neatly along the routing direction and use cable clips to secure the cables. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 188 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Determine the positions where the clips are installed according to the actual situation. For example, 7/8" feeders are secured with clips at an interval of 1.5 m (4.92 ft) to 2 m (6.56 ft), and CPRI fiber optic cables and power cables are secured with clips at an interval of 1 m (3.28 ft) to 1.5 m (4.92 ft). Ensure that the clips are evenly spaced and in the same direction. When fastening cables with a clip, ensure that the cables are aligned neatly and are routed through the holes in the clip. Do not stretch the cables too tightly. When using clips to secure cables, tighten the screws on the clips after all cables are arranged and laid out. Special Cabling Requirements Cabling of PGND cables PGND cables for a base station must be connected to the same ground bar. PGND cables must be buried in the ground or routed indoors. The external conductor of the coaxial wire and the shield layer of the shielded cable must have proper electrical contact with the metal surface of the equipment which they are connected to. PGND cables and signal cables must be installed separately. A certain distance must be reserved between them to prevent interference from each other. Switches or fuses must not be installed on the PGND cables. Other devices must not be used for electrical connections of the PGND cables. All the metal parts in the housing of the equipment must be reliably connected to the ground terminal. 9.4.2 pRRU Cable List This section describes pRRU cables, connectors added to the pRRU cables, and installation positions for both ends of each cable. Table 9-4 List of pRRU3901 cables Cable Ethernet Cable (Optional) RF Jumper Issue 08 (2016-05-30) One End The Other End Connector Connected to ... Connector Connected to ... RJ45 connector CPRI_E0~CP RI_E7 port on RHUB RJ45 connector CPRI_E0~CPRI_ E1 port on pRRU RJ45 connector Transmission port on Access Control(AC) RJ45 connector GE port on pRRU3901 CPRI_E1 port on pRRU3911/p RRU3911+WI FI External antenna TX/RX RF Based on the port model of the antenna SMA straight male connector/Type Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Antenna system 189 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Cable One End The Other End Connector Connected to ... Connector N male connector port on pRRU system. Connected to ... 9.4.3 pRRU3907 Cable Connections This section describes pRRU3907 cable connections. Figure 9-16 shows the cable connections when a pRRU3907 is installed. Figure 9-16 Cable connections when a pRRU3907 is installed (1) pRRU3907 PGND cable (2) pRRU3907 RF jumper (3) pRRU3907 Ethernet cable (4) pRRU3907 Ethernet cable 9.4.4 pRRU3916 Cable Connections This section describes pRRU3916 cable connections. Figure 9-17 shows the cable connections when a pRRU3916 is installed. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 190 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-17 Cable connections when a pRRU3916 is installed (1) pRRU3916 PGND cable (2) pRRU3916 RF jumper (3) pRRU3916 Ethernet cable (4) pRRU3916 Ethernet cable 9.4.5 pRRU cable installation process This section describes the process of installing pRRU cables. Figure 9-18 shows the process of installing pRRU cables. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 191 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-18 pRRU cable installation process 9.4.6 Installing a PGND Cable This section describes the procedure for installing a PGND cable. Procedure Step 1 Prepare a pRRU PGND cable. 1. Cut the cable to a length suitable for the actual cable route. 2. Add OT terminals to both ends of the cable by following the instructions in Assembling the OT Terminal and the Power Cable. Step 2 Install the pRRU PGND cable. Connect one end of the PGND cable with an M6 OT terminal to the ground terminal at the RRU bottom and the other end of the cable with an M8 OT terminal to the external ground bar, as shown in Figure 9-19. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 192 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-19 Installing a pRRU PGND cable Crimp OT terminals in correct directions, as shown in Figure 9-20. Figure 9-20 Correct direction for crimping an OT terminal Step 3 Label the installed cable by following the instructions in 15.5 Attaching a Sign Plate Label. ----End 9.4.7 Installing a pRRU3907 RF Jumper This section describes the procedure for installing an RF jumper. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 193 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Procedure Step 1 Remove the dustproof cap from the ANT port to be used on the pRRU3907. Step 2 Connect the type N male connector at one end of the pRRU3907 RF jumper to the ANT port at the bottom of the pRRU3907 in sequence, and use a torque wrench to tighten the connector to 1 N·m (8.85 lbf·in.), as shown in Figure 9-21. Figure 9-21 Installing an RF jumper Step 3 Connect the other end of the pRRU3907 RF jumper to the external antenna system. Step 4 Waterproof the connector of the RF jumper by cold shrink sleeve, as shown in Figure 9-22. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 194 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-22 Waterproofing the connector of the RF jumper Wrap cold shrink sleeves around the RF jumpers before installing the connectors. Do not rotate the adjacent connectors of a connector that has been wrapped with a cold shrink sleeve. Otherwise, the cold shrink sleeve may be damaged. During installation, ensure that no foreign substance, including sand, enters the sleeve. 1. Wrap a PVC insulation tape around the exposed area of the connector. The wrapped area is 15 mm away from the end of the connector, with a total length of 40 mm. 2. Ensure that dimensions (L x W) of the waterproof tape is 50 mm x 50 mm. Stretch the tape horizontally until it is twice of the original length and wrap it around the upper area of the connector. Ensure that the upper end of the waterproof tape overlays that of the PVC insulation tape. 3. Push the cold shrink sleeve to the end of the pRRU3907 connector while gently pulling out the support strip along the jumper until the sleeve shrinks and secures the connector. 4. Pull out the support strip along the direction indicated by the arrow. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 195 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Ensure that the sleeve shrinks around the end of the pRRU3907 connector and that the upper end of the sleeve and the connector end is 6 mm apart or less. Step 5 Check the dustproof caps on antenna connectors. In outdoor scenarios, dustproof caps must be waterproofed, as shown in Figure 9-23. Do not remove dustproof caps from vacant antenna connectors. Figure 9-23 Waterproofing a dustproof cap (1) Dustproof cap (2) PVC insulation tape (3) Waterproof tape 1. Verify that dustproof caps are not removed. 2. Wrap one layer of PVC insulation tape on each connector from bottom up. 3. Wrap three layers of waterproof tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. 4. Wrap three layers of PVC insulation tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. When wrapping waterproof tape, stretch the tape evenly until it is twice of the original length. When wrapping PVC insulation tape, do not stretch it. Wrap each layer of tape around each connector tightly and neatly, and ensure that the adhesive surface of each layer of tape overlaps more than 50% of the lower layer. When cutting off a cable tie, reserve a surplus length of 3 mm (0.12 in.) to 5 mm (0.20 in.). ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 196 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Follow-up Procedure 1. Route the cable by following the instructions in section 9.4.1 Cabling Requirements and use cable ties to bind the cable. 2. Label the installed cable. For details, see section Attaching the Color Ring. 15.5 Attaching a Sign Plate Label and 9.4.8 Installing a pRRU3916 RF Jumper This section describes the procedure for installing a pRRU3916 RF jumper. Procedure Step 1 Remove the dustproof cap from the RF port to be used on the an pRRU3916. Step 2 Connect the type N male connector at one end of each pRRU3916 RF jumper to the ANT port at the bottom of the pRRU3916 in sequence, and use a torque wrench to tighten the connector to 1 N·m (8.85 lbf·in.), as shown in Figure 9-24. Figure 9-24 Installing a pRRU3916 RF jumper Step 3 Connect the other end of the pRRU3916 RF jumper to the external antenna system. Step 4 Waterproof the ANT port on each pRRU3916 and the BTS and ANT ports on the external auxiliary filter (AUF), as shown in Figure 9-25. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 197 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-25 Waterproofing a connector of an RF jumper (1) PVC insulation tape (2) Waterproof tape 1. Ensure that dustproof caps are not removed. 2. Wrap one layer of PVC insulation tape on each connector from bottom up. 3. Wrap three layers of waterproof tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. 4. Wrap three layers of PVC insulation tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. When wrapping waterproof tape, stretch the tape evenly until it is twice of the original length. When wrapping PVC insulation tape, do not stretch it. Wrap each layer of tape around each connector tightly and neatly, and ensure that the adhesive surface of each layer of tape overlaps more than 50% of the lower layer. When cutting off a cable tie, reserve a surplus length of 3 mm (0.12 in.) to 5 mm (0.20 in.). Step 5 If a pRRU3916 with an external antenna is to be installed, do not remove the dustproof cap from an unused RF port. Waterproof this RF port, as shown in Figure 9-26. Figure 9-26 Waterproofing an RF port with a dustproof cap (1) Dustproof cap Issue 08 (2016-05-30) (2) PVC insulation tape Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Waterproof tape 198 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 1. Ensure that dustproof caps are not removed. 2. Wrap one layer of PVC insulation tape on each connector from bottom up. 3. Wrap three layers of waterproof tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. 4. Wrap three layers of PVC insulation tape on each connector, first from bottom up, then from top down, and finally from bottom up. Wrap each layer of the tape around the connector tightly. When wrapping waterproof tape, stretch the tape evenly until it is twice of the original length. When wrapping PVC insulation tape, do not stretch it. Wrap each layer of tape around each connector tightly and neatly, and ensure that the adhesive surface of each layer of tape overlaps more than 50% of the lower layer. When cutting off a cable tie, reserve a surplus length of 3 mm (0.12 in.) to 5 mm (0.20 in.). Step 6 Route the cable by following the instructions in section "Cabling Requirements" and use cable ties to bind the cable. Step 7 Label the installed cable. For details, see section Attaching the Color Ring. 15.5 Attaching a Sign Plate Label and ----End 9.4.9 Opening the Cover Plate of a pRRU Cabling Cavity This section describes the procedure for opening the cover plate of a pRRU cabling cavity. Procedure Step 1 Wear ESD gloves. Take proper ESD protection measures, for example, wear ESD gloves, to prevent electrostatic damage to boards, modules, or electronic components. Step 2 Use an M6 inner hexagon screwdriver to loosen the screw on the cover plate of the pRRU cabling cavity, and open the cover plate, as shown in Figure 9-27. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 199 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-27 Opening the cover plate of the pRRU cabling cavity (1) Cover plate (2) Cabling cavity (3) Cable clip for Ethernet cables (4) Cable clip for Ethernet cables (5) Cable trough for Ethernet cables (6) Cable trough for Ethernet cables (7) Waterproof block Step 3 Remove the waterproof block. Remove only the waterproof blocks for cables to be installed. ----End 9.4.10 Installing an Ethernet Cable This section describes how to install an Ethernet cable. Context The Ethernet cable must be of Category 5e (enhanced) or higher. With the internal PoE module providing power, the maximum length of an Ethernet cable is 100 m. With the Extender, the distance of the pRRU and RHUB can be extended by the Extender up to a total distance of 200 m. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 200 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. The Ethernet cable has the following functions: − − Provides power supply for the pRRU when the cable connects the CPRI_E0 port on the pRRU to the RHUB. Transmits CPRI signals between an RHUB and a pRRU. Procedure Step 1 Connect the RJ45 connector at one end of the Ethernet cable to the PoE port on the pRRU panel, and push the cables into the cable clips. Step 2 Optional: Connect the RJ45 connector at the other end of the Ethernet cable to the output port of the Extender. Then, connect the RJ45 connector at one end of another Ethernet cable to the input port of the Extender. In this scenario, the Ethernet cable is divided into two parts, one between the RHUB and the Extender and the other between the Extender and the pRRU. Step 3 Connect the RJ45 connector at the other end of the Ethernet cable to any port ranging from CPRI_E0 to CPRI_E7 on the RHUB panel based on the engineering design, as shown in Figure 9-28. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 201 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-28 Installing an Ethernet cable (1) Ethernet cable (2) CPRI_E0 port on the pRRU The connection mode of CPRI_E0 port is the same to that of CPRI_E1 port on pRRU, and this chapter uses CPRI_E0 as an example. ----End Follow-up Procedure 1. Route the cable by following the instructions in section 9.4.1 Cabling Requirements and use cable ties to bind the cable. 2. Label the installed cable. For details, see section 15.5 Attaching a Sign Plate Label. 9.4.11 Closing the Cover Plate of a pRRU Cabling Cavity This section describes the procedure for closing the cover plate of a pRRU cabling cavity. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 202 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Procedure Step 1 Insert waterproof blocks into vacant cable troughs in the cabling cavity, as shown in Figure 9-29. Figure 9-29 is for reference only and vacant cable troughs must be blocked based on onsite requirements. Ensure that cables and waterproof blocks are properly inserted into troughs. Figure 9-29 Correct placement of waterproof blocks Step 2 Close the cover plate of the pRRU cabling cavity, and use an M6 inner hexagon screwdriver to tighten the screw on the cover plate to 4.8 N·m (42.48 lbf·in.), as shown in Figure 9-30. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 203 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Figure 9-30 Closing the cover plate of a pRRU cabling cavity Step 3 Take off the ESD gloves, and pack up all tools. ----End 9.5 Checking the pRRU Hardware Installation pRRU hardware installation checking includes hardware and cable installation checking. Table 9-5 lists the hardware installation checking items. Table 9-5 Hardware installation checking list No. Item The installation position of each device strictly complies with the engineering design and meets clearance requirements. Sufficient space is reserved for equipment maintenance. The pRRU is securely installed. The cover plate is securely installed on the RRU cabling cavity. Waterproof blocks are securely installed in vacant cable troughs of the pRRU cabling cavity, and the cover plate of the cabling cavity is securely installed. In addition, vacant RF ports are covered with dustproof caps and the caps are tightened. Labels are correct, legible, and complete at both ends of each cable, feeder, and jumper. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 204 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Table 9-6 lists the check items of the signal cable connection. Table 9-6 Checklist for the signal cable connection No. Item The connectors of the signal cables must securely connected. The connectors of the signal cables are intact. The signal cables are intact. The cable ties are evenly spaced. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. The extra length of the cable ties is cut and removed. The cut surfaces of the indoor cables are smooth and have no sharp edges. The cable layout facilitates maintenance and expansion. Correct and clear labels are attached to both ends of the signal cables. Table 9-7 lists the checking items for other cable connections. Table 9-7 Checklist for other cable connections No. Item The connectors of the other cables must securely connected. Labels on the cables are legible and bound based on the engineering requirements. The cables must be bound tightly and neatly. The sheaths of the cables must not be damaged. Positions for routing the cables must meet requirements of the engineering design. There are no connectors or joints on each PGND cable. None of PGND cables can be short-circuited or reversely connected. In addition, these cables are not damaged or broken. PGND cables are separately bound from other cables. The protection grounding of the pRRU and the surge protection grounding of the building share one group of ground conductors. 9.6 Powering on the pRRU This section describes the power-on check on the pRRU after the pRRU hardware is installed and checked. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 205 DBS3900 LampSite Installation Guide 9 Installing a pRRU3907 or pRRU3916 Context After the RHUB and pRRUs are installed and connected to each other, power on them no matter whether the BBU is installed. Procedure Step 1 Power on the pRRU. Wait 3 to 5 minutes, check the status of the 3GPP indicator on the pRRU. If the 3GPP Indicator... Because... Then... Blinks white at 4 Hz The pRRU is loading software, configuring data, or it is not running. Wait until the software is loaded. If the loading is not completed in five minutes, power off the pRRU and check whether the data configuration file is correct. After the fault is rectified, power on the pRRU again. Blinks white at 0.5 Hz (on for 1s and off for 1s) The pRRU is working properly and does not transmit power. Check whether the services have been configured and power amplification have been enabled on the pRRU. Is steady white The cell is set up and transmits power properly. No further action is required. Is steady orange. There is power input, but the hardware is faulty. Power off the pRRU, rectify the hardware fault, and then power it on again. Blinks orange at 0.5 Hz (on for 1s and off for 1s) A minor alarm (indicating an HDLC link disconnection, for example) is generated. Troubleshoot based on the alarm information. Is off The board is not powered on. Turn off the power supply switch and check whether the power input is normal. If the power input is normal, check for and rectify board faults, and turn on the power supply switch again. Check the indicator status 30 minutes after the power-on if a pRRU is not connected to any BBU. The pRRU is considered normally powered on when any indicator on the pRRU is on. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 206 DBS3900 LampSite Installation Guide 10 (Optional) Installing the Extender-PoE90 10 (Optional) Installing the Extender-PoE90 This section describes the Extender-PoE90 installation process. Context When an RHUB and a pRRU need extended install, use Extender-PoE90. With the Extender-PoE90, the distance of the pRRU and RHUB can be extended by the Extender-PoE90 up to a total distance of 200 m. The Extender-PoE90 can be installed on a wall or ceiling in the same mode. This section describes wall-mounted installation as an example. Only space above and under the Extender-PoE90 is required to be reserved when installing the Extender-PoE90. The recommended space for installing the Extender-PoE90 is described as follows: At least 150 mm above the Extender-PoE90 is reserved for cabling. At least 150 mm under the Extender-PoE90 is reserved for cabling. Indoor scenario: Procedure a. Issue 08 (2016-05-30) Use a marker to mark the two anchor points according to inter-hole spacing, as shown in Figure 10-1. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 207 DBS3900 LampSite Installation Guide 10 (Optional) Installing the Extender-PoE90 Figure 10-1 Marking anchor points b. Drill holes at the anchor points, and install expansion bolt assemblies, as shown in Figure 10-2. The diameter of the hole is 6 mm, and the depth is 25 mm to 30 mm. Figure 10-2 Drilling holes and installing expansion bolts c. Issue 08 (2016-05-30) Place the Extender-PoE90 in the corresponding position and use an M4 Phillips screwdriver to tighten the screws to 1.4 N•m, as shown in Figure 10-3. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 208 DBS3900 LampSite Installation Guide 10 (Optional) Installing the Extender-PoE90 Figure 10-3 Installing Extender-PoE90 d. Installing the Ethernet cables at the two ends of Extender-PoE90, as shown in Figure 10-4. Figure 10-4 Installing the Ethernet cables (1) Issue 08 (2016-05-30) Outdoor: Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 209 DBS3900 LampSite Installation Guide 10 (Optional) Installing the Extender-PoE90 a. Installing the Ethernet cables at the two ends of Extender-PoE90, as shown in Figure 10-5. Figure 10-5 Installing the Ethernet cables (2) b. Install the Extender-PoE90 to the cabinet, and keep the OUTPUT interface on top, as shown in Figure 10-6. Figure 10-6 Installing the Extender-PoE90 to the cabinet ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 210 DBS3900 LampSite Installation Guide 11 11 (Optional) Installing the EXD3902 and Cables (Optional) Installing the EXD3902 and Cables About This Chapter This chapter describes how to install an EXD3902 and its cables. EXD3902 is applied in outdoor scenarios. 11.1 Installation Scenario The EXD3902 can be installed on a pole or wall. Installation scenarios must meet heat-dissipation and waterproofing requirements of the EXD3902. 11.2 Installation Clearance and Space Requirements This section describes the recommended and minimum clearances for an EXD3902. 11.3 Installation Process This section describes the EXD3902 installation process, which involves installing an EXD3902 and cables, checking the EXD3902 hardware installation, and powering on the EXD3902. 11.4 Installing an EXD3902 This section describes the EXD3902 installation process. The EXD3902 can be mounted on a pole or wall depending on the surrounding environment. 11.5 Installing EXD3902 Cables This section describes the procedure for installing EXD3902 cables. 11.6 Checking the EXD3902 Hardware Installation EXD3902 hardware installation checking includes hardware and cable installation checking. 11.7 Powering on the EXD3902 This section describes the power-on check on the EXD3902 after the EXD3902 hardware is installed and checked. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 211 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 11.1 Installation Scenario The EXD3902 can be installed on a pole or wall. Installation scenarios must meet heat-dissipation and waterproofing requirements of the EXD3902. Constraints and Limitations Application scenarios: To ensure proper heat dissipation of the EXD3902, the following requirements must be met: The EXD3902 cannot be installed in an enclosed cabinet without a cooling system. The EXD3902 cannot be installed in an enclosed camouflage box. The EXD3902 cannot be installed in an enclosed equipment room without a cooling system. When multiple EXD3902s are installed in centralized mode, the minimum clearance requirements must be met. For details, see 11.2 Installation Clearance and Space Requirements. If the EXD3902 is inappropriately installed, as shown in Figure 11-1, heat dissipation of the EXD3902 deteriorates and the EXD3902 may not work properly. Figure 11-1 Inappropriately installed EXD3902 Correct installation methods: To ensure heat dissipation of the EXD3902 and waterproofing of the ports at the bottom of the EXD3902, the vertical deviation angle of an EXD3902 must be less than or equal to 10°, as shown in Figure 11-2. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 212 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-2 Requirements for the vertical deviation angle of an EXD3902 (1) EXD3902 (2) Installation support (pole or wall) Pole-mounted Scenario Figure 11-3 shows the recommended pole diameters in different installation scenarios. Figure 11-3 Diameter of a pole The diameter of the pole ranges from 60 mm to 114 mm (80 mm recommended). The pole thickness must be greater than or equal to 3.5 mm. Figure 11-4 shows an EXD3902 installed on a pole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 213 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-4 EXD3902 installed on a pole (1) EXD3902 (2) Attachment plate (3) Mounting kit Wall-mounted Scenario The wall for installing EXD3902s must meet the following requirements: The wall must be able to bear a weight four times heavier than the EXD3902's weight. Expansion bolts must be tightened to 30 N·m to ensure that the bolt assemblies work properly and the wall remains intact. Figure 11-5 shows an EXD3902 installed on a wall. Figure 11-5 EXD3902 installed on a wall (1) EXD3902 Issue 08 (2016-05-30) (2) Attachment plate Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (3) Mounting kit 214 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 11.2 Installation Clearance and Space Requirements This section describes the recommended and minimum clearances for an EXD3902. The recommended clearances are for customers, ensuring normal running and providing appropriate space for O&M. If installation space is sufficient, leave the recommended clearances after installing equipment. The minimum clearance ensures normal operation and heat dissipation, but O&M activities such as checking indicator status and opening the cover plate of a cabling cavity cannot be properly conducted. If installation space is sufficient, leave the minimum clearance after installing equipment. Clearance for an EXD3902 Figure 11-6 shows the clearances for installing an EXD3902. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 215 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-6 Clearances for installing an EXD3902 Installation Spacing Between EXD3902s Installation spacing between EXD3902s includes horizontal and vertical spacing. Figure 11-7 shows the horizontal spacing between EXD3902s. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 216 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-7 Horizontal spacing Figure 11-8 shows the vertical spacing between EXD3902s. Figure 11-8 Vertical spacing Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 217 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 11.3 Installation Process This section describes the EXD3902 installation process, which involves installing an EXD3902 and cables, checking the EXD3902 hardware installation, and powering on the EXD3902. Figure 11-9 shows the EXD3902 installation process. Figure 11-9 EXD3902 installation process 11.4 Installing an EXD3902 This section describes the EXD3902 installation process. The EXD3902 can be mounted on a pole or wall depending on the surrounding environment. 11.4.1 EXD3902 Mounting Kits This section describes mounting kits and attachment plates for installing EXD3902s. Figure 11-10 shows the exterior of an EXD3902. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 218 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-10 Front and side of an EXD3902 (1) Attachment plate Figure 11-11 shows the mounting kits for installing an EXD3902. Figure 11-11 Mounting kits for installing an EXD3902 (1) Attachment plate Issue 08 (2016-05-30) (2) Mounting bracket (3) Hose clamp Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. (4) Expansion bolt 219 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 11.4.2 Installing an EXD3902 on a Wall This section describes the procedure and precautions for installing an EXD3902 on a wall. Context Place a foam pad or cardboard under an EXD3902 to protect the EXD3902 housing from damage during the installation. The wall for installing EXD3902s must meet the following requirements: The wall must be able to bear a weight four times heavier than the EXD3902's weight. Expansion bolts must be tightened to 30 N·m to ensure that the bolt assemblies work properly and the wall remains intact. Procedure Step 1 Determine a position for installing the EXD3902 on a wall, use a level to verify that the marking-off template is placed horizontally, and then use a marker to mark anchor points, as shown in Figure 11-12. Figure 11-12 Marking anchor points (1) Level (2) Tapped hole (3) Marker It is recommended that the separate mounting kit be 1200 mm to 1600 mm above the ground Step 2 Drill holes at the anchor points and install expansion bolts in the holes, as shown in Figure 11-13. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 220 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-13 Drilling a hole and inserting an expansion bolt assembly (1) M6x60 bolt 1. (2) Nut (3) Spring washer (4) Flat washer (5) Expansion tube Use a hammer drill with a φ8 bit to drill holes vertically at the marked anchor points. Ensure that the depth of each hole ranges from 45 mm to 50 mm. Take proper safety measures to protect your eyes and respiratory tract against the dust before drilling holes. 2. Use a vacuum cleaner to clear the dust out from inside and around the holes, and measure the distances between holes. If any of the hole is beyond the acceptable range, mark a new anchor point and drill a new hole. 3. Tighten the expansion bolts slightly, and place each expansion bolt vertically into each hole. 4. Use a rubber mallet to pound each expansion bolt until the corresponding expansion tube completely enters the hole. Leave 20 mm of the expansion bolt outside the wall. 5. Remove the M6×60 bolt, nut, spring washer, and flat washer in sequence. Step 3 Place the mounting kit onto the wall, insert four M6x60 bolts into the tapped holes on the mounting kit, and tighten each bolt to 5 N·m (44.25 lbf·in.) to secure the mounting kit, as shown in Figure 11-14. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 221 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-14 Securing the separate mounting kit (1) Nut (2) Spring washer (3) Flat washer Step 4 Secure the EXD3902 onto the mounting kit, as shown in Figure 11-15. Figure 11-15 Securing the EXD3902 onto the mounting kit Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 222 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 1. Hold the EXD3902, hang the two dowels on the top of the EXD3902 attachment plate onto the separate mounting kit, and push the EXD3902 until it snaps into place, as shown by illustrations a and b in Figure 11-15. 2. Use the M6 inner hexagon screwdriver to tighten the screw on the top of the separate attachment plate to 7 N·m, as shown by illustration c in Figure 11-15. ----End 11.4.3 Installing an EXD3902 on a Pole This section describes the procedure and precautions for installing an EXD3902 on a pole. Context Place a foam pad or cardboard under an EXD3902 to protect the EXD3902 housing from damage during the installation. Procedure Step 1 Determine a position for installing the separate mounting kit, as shown in Figure 11-16. Figure 11-16 Distance between the separate mounting kit and the ground It is recommended that the separate mounting kit be 1200 mm (47.24 in.) to 1600 mm (62.99 in.) above the ground. Step 2 Install the EXD3902 mounting kit, as shown in Figure 11-17. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 223 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-17 Installing the EXD3902 mounting kit 1. Determine a position for installing the EXD3902. Then, place the separate mounting kit onto the pole, thread the hose clamp through the mounting kit, and encircle the pole with the hose clamp, as shown by illustrations a, b, and c in Figure 11-17. 2. Use an M6 inner hexagon screwdriver to tighten the bolt on each hose clamp to 5 N·m to secure the mounting kit, as shown by illustration d in Figure 11-17. Step 3 Secure the EXD3902 onto the mounting kit, as shown in Figure 11-18. Figure 11-18 Securing the EXD3902 onto the mounting kit Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 224 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 1. Hold the EXD3902, hang the two dowels on the top of the EXD3902 attachment plate onto the separate mounting kit, and push the EXD3902 until it snaps into place, as shown by illustrations a and b in Figure 11-18. 2. Use the M6 inner hexagon screwdriver to tighten the screw on the top of the separate attachment plate to 7 N·m, as shown by illustration c in Figure 11-18. ----End 11.5 Installing EXD3902 Cables This section describes the procedure for installing EXD3902 cables. 11.5.1 Cabling Requirements Cables must be laid out according to the specified cabling requirements to prevent signal interference. If a cable listed below is not required, skip the cabling requirements of the cable. General Cabling Requirements Bending radius requirements The bending radius of a 7/8'' feeder must be greater than 250 mm (9.84 in.), and the bending radius of a 5/4'' feeder must be greater than 380 mm (14.96 in.). The bending radius of a 1/4'' jumper must be greater than 35 mm (1.38 in.). The bending radius of a super-flexible 1/2'' jumper must be greater than 50 mm (1.97 in.), and the bending radius of an ordinary 1/2'' jumper must be greater than 127 mm (5.00 in.). The bending radius of a PGND cable must be at least three times its diameter. The bending radius of a signal cable must be at least five times its diameter. Cable binding requirements Cables of the same type must be bound together. Different types of cables must be separately laid out and bound, with a minimum distance of 30 mm (1.18 in.) from each other. Cables must be bound tightly and neatly. The sheaths of cables must not be damaged. Cable ties must face the same direction, and those at the same horizontal line must be in a straight line. The excess of indoor cable ties must be cut off. The excess of 5 mm (0.197 in.) of outdoor cable ties should be reserved, and the cut surfaces must be smooth without sharp edges. After cables are installed, labels or nameplates must be attached to the cables at their ends, curves, and interconnection positions. Security requirements When laying out cables, avoid sharp objects, for example sharp edges on the wall. If necessary, use tubes to protect the cables. When laying out cables, keep cables away from heat sources, or use heat insulation materials to insulate the cables from the heat sources. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 225 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Reserve a proper distance (0.1 m [3.937 in.] is recommended) between equipment and cables especially at the cable curves to protect the cables and equipment. Indoor cabling requirements Route each cable into the room through the feeder window. Reserve drip loops for all cables outside the feeder window before routing them into the room. Ensure that the radiuses of the drip loops are greater than or equal to the minimum bending radiuses of the cables. When routing a cable into the room, ensure that a person is assisting you in the room. Apply waterproof treatment to the feeder window. Outdoor Cabling Requirements Protect outdoor cables against potential damage. For example, thread the cables through tubes. Cables to be protected include AC power cables, transmission cables, and cables laid out underground. Use cable clips to secure cables outdoors. Arrange cables neatly along the routing direction and use cable clips to secure the cables. Determine the positions where the clips are installed according to the actual situation. For example, 7/8" feeders are secured with clips at an interval of 1.5 m (4.92 ft) to 2 m (6.56 ft), and CPRI fiber optic cables and power cables are secured with clips at an interval of 1 m (3.28 ft) to 1.5 m (4.92 ft). Ensure that the clips are evenly spaced and in the same direction. When fastening cables with a clip, ensure that the cables are aligned neatly and are routed through the holes in the clip. Do not stretch the cables too tightly. When using clips to secure cables, tighten the screws on the clips after all cables are arranged and laid out. Special Cabling Requirements Cabling of PGND cables PGND cables for a base station must be connected to the same ground bar. PGND cables must be buried in the ground or routed indoors. The external conductor of the coaxial wire and the shield layer of the shielded cable must have proper electrical contact with the metal surface of the equipment which they are connected to. PGND cables and signal cables must be installed separately. A certain distance must be reserved between them to prevent interference from each other. Switches or fuses must not be installed on the PGND cables. Other devices must not be used for electrical connections of the PGND cables. All the metal parts in the housing of the equipment must be reliably connected to the ground terminal. 11.5.2 EXD3902 Cable Connections This section describes EXD3902 cable connections. Figure 11-19 shows the cable connections when an EXD3902 is installed. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 226 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-19 Cable connections when an EXD3902 is installed (1) EXD3902 PGND cable (2) pRRU Ethernet cable (3) RHUB Ethernet cable 11.5.3 Installling a PGND cable This section describes the procedure for installing a PGND cable. Context The cross-sectional area of an EXD3902 PGND cable is 16 mm2. The OT terminals at two ends of the cable are M6 and M8 terminals respectively. Procedure Step 1 Prepare an EXD3902 PGND cable. 1. Cut the cable to a length suitable for the actual cable route. 2. Add OT terminals to both ends of the cable by following the instructions in Assembling the OT Terminal and the Power Cable. Step 2 Installling the EXD3902 PGND cable. Connect one end of the PGND cable with an M6 OT terminal to the ground terminal at the EXD3902 bottom and the other end of the cable with an M8 OT terminal to the external ground bar, as shown in Figure 11-20. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 227 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-20 Installling an EXD3902 PGND cable Crimp OT terminals in correct directions, as shown in Figure 11-21. Figure 11-21 Correct direction for crimping an OT terminal ----End Follow-up Procedure 1. Route the cable by following the instructions in section 11.5.1 Cabling Requirements and use cable ties to bind the cable. 2. Label the installed cable. For details, see section 15.5 Attaching a Sign Plate Label. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 228 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables 11.5.4 Opening the Cover Plate of an EXD3902 Cabling Cavity This section describes the procedure for opening the cover plate of an EXD3902 cabling cavity. Procedure Step 1 Wear ESD gloves. Take proper ESD protection measures, for example, wear ESD gloves, to prevent electrostatic damage to the boards, modules, or electronic components. Step 2 Use an M6 inner hexagon screwdriver to loosen the screws on the cover plate of the EXD3902 cabling cavity, and open the cover plate, as shown in Figure 11-22. Figure 11-22 Opening the cover plate of an EXD3902 cabling cavity (1) Cover plate (2) Cabling cavity (3) Cable clip for Ethernet cables (4) Cable clip for Ethernet cables (5) Cable trough for Ethernet cables (6) Cable trough for Ethernet cables Step 3 Remove the waterproof block. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 229 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Remove only the waterproof blocks for cables to be installed. ----End 11.5.5 Installing an Ethernet Cable This section describes how to install an Ethernet cable. Context The Ethernet cable must be of Category 5e (enhanced) or higher. Ethernet cables are not delivered, and they must be prepared onsite. You need to use a network cable tester to test the Ethernet cable connection. The INPUT port is for connecting to the RHUB, and the OUTPUT port is for connecting to the pRRU. Procedure Step 1 Make the Ethernet cables. 1. Assemble an RJ45 connector and an Ethernet cable by following instructions in Assembling the Unshielded RJ45 Connector and the Ethernet Cable, Assembling the Shielded RJ45 Connector and the Ethernet Cable. Follow pin assignment instructions described in section Ethernet Cable in DBS3900 LampSite Hardware Description to assemble the RJ45 connector and the Ethernet cable. Otherwise, the transmission signal quality deteriorates and CPRI links may be disconnected. 2. Check whether the made RJ45 connector is qualified by following instructions in Checking the Appearance of Metal Contact Strips. 3. To complete the assembly of the other end, repeat Step 1.1 and Step 1.2. 4. Check whether the touch points on the connectors at both ends are normally conducted and well contacted and whether the connections are correct by following instructions in Testing the Connection of Assembled Cables of Installation Reference. Step 2 Connect the RJ45 connector of the cable connecting the RHUB to the INPUT port on the EXD3902 and the RJ45 connector of the cable connecting the pRRU to the OUTPUT port on the EXD3902. Press the cables into the clips, as shown in Figure 11-23. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 230 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-23 Installing Ethernet cables ----End Follow-up Procedure 1. Route the cable by following the instructions in section 11.5.1 Cabling Requirements and use cable ties to bind the cable. 2. Label the installed cable. For details, see section 15.5 Attaching a Sign Plate Label. 11.5.6 Closing the Cover Plate of an EXD3902 Cabling Cavity This section describes the procedure for closing the cover plate of an EXD3902 cabling cavity. Procedure Step 1 Close the cover plate of the EXD3902 cabling cavity. Use an M6 inner hexagon screwdriver to tighten the screws on the cover plate to 4.8 N·m, as shown in Figure 11-24. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 231 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Figure 11-24 Closing the cover plate of an EXD3902 cabling cavity Step 2 Take off the ESD gloves, and pack up all tools. ----End 11.6 Checking the EXD3902 Hardware Installation EXD3902 hardware installation checking includes hardware and cable installation checking. Table 11-1 lists the hardware installation checking items. Table 11-1 Hardware installation checking list No. Item The installation position of each device strictly complies with the engineering design and meets clearance requirements. Sufficient space is reserved for equipment maintenance. The EXD3902 is securely installed. The cover plate is securely installed on the EXD3902 cabling cavity. Waterproof blocks are securely installed in vacant cable troughs of the EXD3902 cabling cavity, and the cover plate for the cabling cavity is securely installed. In addition, vacant RF ports are covered with dustproof caps. Labels are correct, legible, and complete at both ends of each cable, feeder, and jumper. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 232 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables Table 11-2 lists the check items of the signal cable connection. Table 11-2 Checklist for the signal cable connection No. Item The signal cable connectors are securely connected. The signal cable connectors are intact. The signal cables are intact. The signal cables are bound neatly with cable ties to proper tightness, and arranged at even intervals in the same direction. The excess of cable ties is trimmed off without remaining rough edges. The signal cable layout facilitates future maintenance and capacity expansion. Labels at two ends of the signal cables are correct and legible. Table 11-3 lists the checking items for other cable connections. Table 11-3 Checklist for other cable connections No. Item The connectors of the other cables are securely connected. All labels on the cables are legible and are bound according to the engineering requirements. The cables are bound tightly and neatly. The sheaths of the cables are intact. The cable layout complies with the engineering design. There are no connectors or joints on each PGND cable. None of PGND cables can be short-circuited or reversely connected. In addition, these cables are not damaged or broken. PGND cables are separately bound from other cables. The protection grounding of the EXD3902 and the surge protection grounding of the building share one group of ground conductors. 11.7 Powering on the EXD3902 This section describes the power-on check on the EXD3902 after the EXD3902 hardware is installed and checked. Context Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 233 DBS3900 LampSite Installation Guide 11 (Optional) Installing the EXD3902 and Cables An EXD3902 must be powered on within 24 hours after it is unpacked. If the EXD3902 is powered off for maintenance, you must restore its power within 24 hours. Figure 11-25 shows the EXD3902 power-on check procedure. Figure 11-25 EXD3902 power-on check procedure Procedure Step 1 Check that the cables are correctly connected. Step 2 Check the EXD3902 indicator status three to five minutes after it is powered on. The EXD3902 is working normally if the OUTPUT and INPUT indicators blink green and the POWER indicator is steady orange. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 234 DBS3900 LampSite Installation Guide 12 (Optional) Installing the PoE Surge Protector and Cables 12 (Optional) Installing the PoE Surge Protector and Cables This section describes how to install a PoE surge protector and its cables in the cabinet. When the RHUB, pRRU, and extender are installed outdoors, a PoE surge protector is required to provide surge protection for the PoE power supply port. Procedure Step 1 Connect a PGND cable to the PE ground terminal and an Ethernet cable (about 0.4 m long) to the Protect port. See Figure 12-1. Figure 12-1 Installing the PGND Cable and Ethernet Cable (1) Step 2 Install the PoE surge protector in the cabinet. See Figure 12-2. The Surge port must be installed toward the outside. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 235 DBS3900 LampSite Installation Guide 12 (Optional) Installing the PoE Surge Protector and Cables Figure 12-2 Installing the PoE surge protector Step 3 Connect an Ethernet cable to the Surge port, and the other end of the PGND cable to the ground terminal on the cabinet. See Figure 12-3. During the installation, bind the Ethernet cables to the side cable bridge on the cabinet. Figure 12-3 Installing the PGND Cable and Ethernet Cable (2) ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 236 DBS3900 LampSite Installation Guide 13 13 (Optional) Installing the RF Surge Protector and Cables (Optional) Installing the RF Surge Protector and Cables This section describes how to install an RF surge protector and its cables in the cabinet. When the pRRU is installed outdoors, an RF surge protector is required to provide surge protection for the RF port. Procedure Step 1 Install the PGND cable and the RF jumper connected to the Protect port. See Figure 13-1. Figure 13-1 Installing the PGND Cable and RF Jumper (1) Step 2 Install the RF surge protector in the cabinet. See Figure 13-2. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 237 DBS3900 LampSite Installation Guide 13 (Optional) Installing the RF Surge Protector and Cables Figure 13-2 Installing the RF surge protector Alternatively, you can remove the fastener on the cabinet, install the RF surge protector and its cables on the fastener, and then install the combination onto the cabinet. Step 3 Connect an RF jumper to the Surge port, and the other end of the PGND cable to the ground terminal on the cabinet. See Figure 13-3. Figure 13-3 Installing the PGND Cable and RF Jumper (2) The cable hole on the cabinet for the RF jumper must be vertical to the Surge port. Before routing all cables through the cable outlet modules at the bottom of the cabinet, wrap the naked RF jumper by using PVC insulation tape and then apply petroleum jelly. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 238 DBS3900 LampSite Installation Guide 14 14 (Optional) Installing the Cabinet and Cabinet Cables (Optional) Installing the Cabinet and Cabinet Cables About This Chapter This section describes the procedure and precautions for installing a cabinet and cables connected to it. The cabinet can be installed on the wall, pole, channel steel, angle steel, steel mesh, or ground by using mounting kits. Vertical and horizontal installation modes are supported when the cabinet is installed on the steel mesh. 14.1 Installation Clearance Requirements This section describes the recommended and minimum clearances for a cabinet. 14.2 Mounting Bracket and Attachment Plate This section describes mounting brackets and attachment plates for installing a cabinet. 14.3 Installing a Cabinet This section describes the procedure and precautions for installing a cabinet. 14.4 Installing Cabinet Cables This chapter describes the procedure for installing cabinet cables. 14.1 Installation Clearance Requirements This section describes the recommended and minimum clearances for a cabinet. When installing a cabinet, the following clearance requirements should be met. Figure 14-1 show the recommended clearances for installing a cabinet. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 239 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-1 Clearances for installing a cabinet The recommended clearance for installing a cabinet is described as follows: At least 100 mm above the cabinet is reserved for maintenance. At least 150 mm on the left of the cabinet is reserved for maintenance. At least 150 mm on the right of the cabinet is reserved for maintenance. At least 250 mm in front of the cabinet is reserved for maintenance. 14.2 Mounting Bracket and Attachment Plate This section describes mounting brackets and attachment plates for installing a cabinet. 14.2.1 Mounting Bracket This section describes mounting brackets for installing a cabinet. Mounting Bracket for the Cabinet Figure 14-2 shows the mounting bracket for the cabinet. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 240 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-2 Mounting bracket for the cabinet (1) Plastic cap (2) Standard M10 nut (3) Spring washer (4) Thick flat washer (5) Square-neck bolt (6) Hoist clamp on the main bracket (7) Main bracket (8) Inner hexagon screw (9) Pole installation bracket (10) Auxiliary bracket Mounting Bracket for the Metal Grid Figure 14-3 shows the mounting bracket for the metal grid. Figure 14-3 Mounting bracket for the metal grid (1) Clamping jaw Issue 08 (2016-05-30) (2) Horizontal bar Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 241 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables 14.2.2 Attachment Plate This section describes attachment plates for installing a cabinet. Attachment Plate on the Cabinet Side Figure 14-4 shows the attachment plate on the cabinet side. Figure 14-4 Attachment plate on the cabinet side Attachment Plate at the Cabinet Bottom Figure 14-5 shows the attachment plate at the cabinet bottom. Figure 14-5 Attachment plate at the cabinet bottom 14.3 Installing a Cabinet This section describes the procedure and precautions for installing a cabinet. 14.3.1 Installing the Cabinet on a Wall This section describes the procedure and precautions for installing the cabinet on a wall. Procedure Step 1 Disassemble the cabinet mounting brackets, as shown in Figure 14-6. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 242 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-6 Disassembling the mounting brackets (1) Main bracket (2) Square-neck bolt (3) Pole installation bracket (4) Auxiliary bracket (5) Flat washer (6) Spring washer (7) Nut (8) Plastic cap 1. Use an M6 inner hexagon torque screwdriver to remove the four inner hexagon screws on the pole installation bracket, and remove the main bracket from the pole installation bracket. 2. Use an M10 torque wrench to loosen the nuts on the two square-neck bolts, and remove the plastic cap, nuts, spring washers, flat washers, square-neck bolts, and pole installation bracket from the auxiliary bracket. Step 2 Drill holes at the anchor points, and then insert expansion anchor bolt assemblies, as shown inFigure 14-7. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 243 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-7 Drilling a hole and inserting expansion anchor bolt assemblies (1) M10x80 bolt 1. (2) Nut (3) Spring washer (4) Flat washer (5) Expansion tube Use a hammer drill with a φ8 bit to drill holes vertically at the marked anchor points. Ensure that the depth of each hole ranges from 45 mm (1.77 in.) to 50 mm (1.97 in.). Take proper safety measures to protect your eyes and respiratory tract against the dust before drilling holes. 2. Use a vacuum cleaner to clear the dust out from inside and around the holes, and measure the distances between holes. If any of the holes is beyond the acceptable range, mark a new anchor point and drill a new hole. 3. Tighten the expansion bolts slightly, and place each expansion bolt vertically into each hole. 4. Use a rubber mallet to pound the expansion anchor bolt until it goes all the way into the hole. 5. Tighten and then loosen the expansion bolt, and remove the M10 bolt, spring washer, and flat washer in sequence. After dismantling an expansion anchor bolt, ensure that the top of the expansion tube is on the same level as the wall. Otherwise, the device cannot be installed on the wall evenly and securely. Step 3 Install the pole installation bracket on the expansion anchor bolts, place the flat washers, spring washers, and nuts through the expansion anchor bolts in sequence, and then use a 16 Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 244 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables mm (0.63 in.) torque socket to tighten the nuts to 30 N·m (265.52 lbf·in.), as shown in Figure 14-8. Figure 14-8 Installing the pole installation bracket on the expansion anchor bolts Verify that the arrows on the pole installation bracket are pointing up. Step 4 Install the main bracket onto the pole installation bracket, and use an inner hexagon screwdriver to tighten four M6x16 inner hexagon screws to 5 N·m (44.25 lbf·in.) so that the main bracket and pole installation bracket are firmly secured, as shown in Figure 14-9. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 245 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-9 Installing the main bracket (1) Installing the main bracket (2) Installing the main bracket Step 5 Install the attachment plate on the cabinet side onto the rear of the cabinet, and use a torque screwdriver to tighten the stainless steel screws on the attachment plate to 5 N·m (44.25 lbf·in.), as shown in Figure 14-10. Figure 14-10 Installing the attachment plate onto the rear of the cabinet Step 6 Install the cabinet onto the main bracket, as shown in Figure 14-11. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 246 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-11 Installing the cabinet onto the main bracket Step 7 Use an inner hexagon screwdriver to tighten the captive screw into the hole of the attachment plate and main mounting bracket to 5 N·m (44.25 lbf·in.) so that the attachment plate and main mounting bracket are firmly secured, as shown in Figure 14-12. Figure 14-12 Securing the captive screw into the connection hole ----End 14.3.2 Installing the Cabinet on a Pole This section describes the procedure and precautions for installing a cabinet on a pole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 247 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Procedure Step 1 Install the cabinet mounting brackets, as shown in Figure 14-13. Figure 14-13 Installing the cabinet mounting brackets Verify that the arrows on the mounting brackets are pointing up. 1. Adjust the position of the nut and remove one end of the square-neck bolt from the slot on the auxiliary bracket. 2. Slide the mounting brackets onto the pole horizontally and insert the square-neck bolt into the slot. Step 2 Use a 16 mm (0.63 in.) M10 torque wrench to tighten the nuts to 40 N·m (354.03 lbf·in.) so that the mounting brackets are secured onto the pole, as shown in Figure 14-14. Tighten the nuts on the two square-neck bolts alternatively. After the main and auxiliary brackets are secured properly, measure the spacing between the brackets on both sides and ensure that the spacing is the same on the two sides. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 248 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-14 Securing the cabinet mounting brackets Step 3 Install the cabinet onto the main bracket, as shown in Figure 14-15. Figure 14-15 Installing the cabinet onto the main bracket Step 4 Use an inner hexagon torque screwdriver to tighten the captive screw into the holes on the top of the attachment plate and main bracket to 5 N·m (44.25 lbf·in.) so that the attachment plate and main bracket are firmly secured, as shown in Figure 14-16. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 249 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-16 Securing the captive screw into the connection hole ----End 14.3.3 Installing the Cabinet on U-steel This section describes the procedure and precautions for installing the cabinet on U-steel. Context Figure 14-17 shows the top view of the cabinet installed on U-steel. When the width of the narrower edges of the U-steel is less than 40 mm (1.57 in.), only the a and b modes are supported. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 250 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-17 Top view of the cabinet (1) U-steel Procedure Step 1 Install the cabinet mounting brackets, as shown in Figure 14-18. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 251 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-18 Installing the cabinet mounting brackets Verify that the arrows on the mounting brackets are pointing up. 1. Adjust the position of the nut and remove one end of the square-neck bolt from the slot on the auxiliary bracket. 2. Slide the mounting brackets onto the U-steel horizontally and insert the square-neck bolt into the slot. Step 2 Use a 16 mm (0.67 in.) M10 torque wrench to tighten the nuts to 40 N·m (354.03 lbf·in.) so that the mounting brackets are secured onto the U-steel, as shown in Figure 14-19. Tighten the nuts on the two square-neck bolts alternatively. After the main and auxiliary brackets are secured properly, measure the spacing between the brackets on both sides and ensure that the spacing is the same on the two sides. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 252 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-19 Securing the cabinet mounting brackets Step 3 Install the cabinet onto the main bracket, as shown in Figure 14-20. Figure 14-20 Installing the cabinet onto the main bracket Step 4 Use an inner hexagon screwdriver to tighten the captive screw into the holes on the top of the attachment plate and main bracket to 5 N·m (44.25 lbf·in.) so that the attachment plate and main bracket are firmly secured, as shown in Figure 14-21. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 253 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-21 Securing the captive screw into the connection hole ----End 14.3.4 Installing the Cabinet on Angle Steel This section describes the procedure and precautions for installing the cabinet on angle steel. Context Figure 14-22 shows the top view of the cabinet installed on angle steel. Figure 14-22 Top view of the cabinet (1) Angle steel Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 254 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Procedure Step 1 Install the cabinet mounting brackets, as shown in Figure 14-23. Figure 14-23 Installing the cabinet mounting brackets Verify that the arrows on the mounting brackets are pointing up. 1. Adjust the position of the nut and remove one end of the square-neck bolt from the slot on the auxiliary bracket. 2. Slide the mounting brackets onto the angle steel horizontally and insert the square-neck bolt into the slot. Step 2 Use a 16 mm (0.67 in.) M10 torque wrench to tighten the nuts to 40 N·m (354.03 lbf·in.) so that the mounting brackets are secured onto the angle steel, as shown in Figure 14-24. Tighten the nuts on the two square-neck bolts alternatively. After the main and auxiliary brackets are secured properly, measure the spacing between the brackets on both sides and ensure that the spacing is the same on the two sides. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 255 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-24 Securing the cabinet mounting brackets Step 3 Install the cabinet onto the main bracket, as shown in Figure 14-25. Figure 14-25 Installing the cabinet onto the main bracket Step 4 Use an inner hexagon screwdriver to tighten the captive screw into the holes on the top of the attachment plate and main bracket to 5 N·m (44.25 lbf·in.) so that the attachment plate and main bracket are firmly secured, as shown in Figure 14-26. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 256 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-26 Securing the captive screw into the connection hole ----End 14.3.5 Installing the Cabinet on Metal Grid This section describes the procedure and precautions for installing the cabinet on metal grid. The cabinet can be vertically or horizontally installed on the metal grid. Installing the cabinet vertically 1. Install the mounting bracket onto the metal grid, as shown in Figure 14-27. The mounting bracket is recommended to install onto the metal grid close to the round hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 257 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-27 Installing the mounting bracket onto the metal grid (1) Metal grid A 2. Issue 08 (2016-05-30) (2) Round hole (3) Oblong hole Install the cabinet onto the metal grid, as shown in Figure 14-28. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 258 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-28 Installing the cabinet onto the metal grid Installing the cabinet horizontally 1. Install the mounting bracket onto the metal grid, as shown in Figure 14-29. The mounting bracket is recommended to install onto the metal grid close to the round hole. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 259 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-29 Installing the mounting bracket onto the metal grid (1) Metal grid A 2. Issue 08 (2016-05-30) (2) Round hole (3) Oblong hole Use an hexagon screwdriver to remove the attachment plate from the bottom of the cabinet, reinstall the attachment plate onto the side of the cabinet, and tighten the four stainless screws to 5 N·m (44.25 lbf·in.), as shown in Figure 14-30. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 260 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-30 Installing the attachment plate onto the side of the cabinet 3. Issue 08 (2016-05-30) Install the cabinet onto the mounting bracket, as shown in Figure 14-31. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 261 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-31 Installing the cabinet onto the mounting bracket 14.3.6 Installing the Cabinet on the Floor This section describes the procedure and precautions for installing the cabinet on the floor. Procedure Step 1 Keep the horizontal bar of the steel mesh mounting kit clinging to the floor, use a level to verify that the marking-off template is placed horizontally, and then use a marker to mark anchor points, as shown in Figure 14-32. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 262 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-32 Marking anchor points (1) Level (2) Mounting bracket for the metal grid Step 2 Drill holes at the anchor points, and then insert expansion anchor bolt assemblies, as shown in Figure 14-33. Figure 14-33 Drilling a hole and inserting expansion anchor bolt assemblies (1) M10x80 bolt 1. Issue 08 (2016-05-30) (2) Nut (3) Spring washer (4) Flat washer (5) Expansion tube Use a hammer drill with a Ф12 bit to drill holes vertically at the marked anchor points with the depth ranging from 55 mm (2.17 in.) to 60 mm (2.36 in.), use a vacuum cleaner to clear the dust out from inside and around the holes, and measure the distances between holes. If any of the holes is beyond the acceptable range, mark a new anchor point and drill a new hole. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 263 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Take proper safety measures to protect your eyes and respiratory tract against the dust before drilling holes. 2. Tighten the expansion anchor bolts slightly and place one vertically into each hole. 3. Use a rubber mallet to pound the expansion anchor bolt until it goes all the way into the hole. 4. Tighten and then loosen the expansion bolt, and remove the M10 bolt, spring washer, and flat washer in sequence. After dismantling an expansion anchor bolt, ensure that the top of the expansion tube is on the same level as the wall. Otherwise, the device cannot be installed on the wall evenly and securely. Step 3 Fit the horizontal bar of the steel mesh mounting kit on the expansion anchor bolts, place the flat washers, spring washers, and nuts through the expansion anchor bolts in sequence, and then use a 16 mm (0.63 in.) torque socket to tighten the nuts to 30 N·m (265.52 lbf·in.), as shown in Figure 14-34. Figure 14-34 Installing mounting bracket on the expansion anchor bolts Step 4 Use a hexagon screwdriver to remove the attachment plate from the bottom of the cabinet, reinstall the attachment plate onto the side of the cabinet, and tighten the four stainless screws to 5 N·m (44.25 lbf·in.), as shown in Figure 14-35. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 264 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-35 Installing the attachment plate onto the side of the cabinet Step 5 Install the cabinet onto the mounting bracket, as shown in Figure 14-36. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 265 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-36 Installing the cabinet onto the mounting bracket ----End 14.4 Installing Cabinet Cables This chapter describes the procedure for installing cabinet cables. 14.4.1 Cable Connections This section describes the cable connections for the cabinet. At horizontal installation, ensure that all cable outlets can be protected against the rain. After cable connections are complete, apply firestop putty to all cable outlets on the cabinet for waterproofing. Figure 14-37 shows the cable connections for the cabinet. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 266 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-37 Cable connections when a pRRU3901 is installed Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 267 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Figure 14-38 Cable connections when a pRRU3902 is installed Issue 08 (2016-05-30) For details about installation of RHUB Ethernet cables in the cabinet, see 6.4.6 Installing Ethernet Cable. For details about installation of pRRU3901 Ethernet cables in the cabinet, see 7.5.7 Installing an Ethernet Cable. For details about installation of pRRU3902 Ethernet cables in the cabinet, see 8.4.5 Installing a pRRU3902 Ethernet Cable. For details about installation of pRRU3901 RF jumpers in the cabinet, see 7.5.8 Installing an RF jumpers (Optional). For details about installation of pRRU3902 RF jumpers in the cabinet, see 8.4.7 Installing a pRRU3902 RF Jumper (Optional). Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 268 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables For details about installation of PoE surge protector PGND cables, see 12 (Optional) Installing the PoE Surge Protector and Cables. For details about installation of RF surge protector PGND cables, see 13 (Optional) Installing the RF Surge Protector and Cables. 14.4.2 Installing a PGND Cable for the Cabinet This section describes the procedure for installing a PGND cable for the cabinet. Prerequisites The OT terminals at both ends of the PGND cable are prepared. Context The yellow and green or green PGND cable is a single cable. The cross-sectional area of the PGND cable is 6 mm2 (0.009 in.2). Both ends of the cable are OT terminals, as shown in Figure 14-39. Figure 14-39 Exterior of a PGND cable (1) OT terminal (6mm2, M5) (2) OT terminal (6mm2, M6) If the PGND cable is provided by the customer, a copper-core cable with a minimum cross-sectional area of 6 mm2 (0.009 in.2) or 10 AWG is recommended. The OT terminals at both ends of the PGND cable are assembled at the site. The M6 OT terminal has the default size. You can replace it with another OT terminal of the expected size based on the site requirement. Ensure proper grounding of the cabinet using a PGND cable. When installing the PGND cable, tightly press the OT terminal in the correct direction, as shown in Figure 14-40. Figure 14-40 Correct direction of an OT terminal for the PGND cable Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 269 DBS3900 LampSite Installation Guide 14 (Optional) Installing the Cabinet and Cabinet Cables Procedure Step 1 Use a torque screwdriver or Phillips screwdriver to secure the M4 OT terminal at one end of the PGND cable to the ground screw on the cabinet panel with a torque of 1.4 N•m. If the OT terminal is a one-hole OT terminal, connect it to the ground screw on the lower part of the cabinet panel, as shown in Figure 14-41. Figure 14-41 Installing the PGND cable for the cabinet Step 2 Use a torque screwdriver or Phillips screwdriver to secure the M6 OT terminal at one end of the PGND cable to the wiring terminal on the ground bar at the site with a torque of 1.4 N•m. ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 270 DBS3900 LampSite Installation Guide 15 Appendix 15 Appendix About This Chapter This chapter describes reference information during installation. 15.1 MAC Collection Template This section describes the MAC collection template for a pRRU3901 with three transmission ports. 15.2 Assembling a Shielded RJ45 Connector and an Ethernet Cable This section describes how to assemble a shielded RJ45 connector and an Ethernet cable. A straight-through cable is used as an example. 15.3 DBS3900 LampSite Engineering Label This section describes the content and presents the exterior of DBS3900 LampSite engineering labels. 15.4 Attaching an L-Shaped Label This section describes the procedure and precautions to be taken for attaching an L-shaped label. 15.5 Attaching a Sign Plate Label This section describes the procedures and precautions for attaching a sign plate label. 15.1 MAC Collection Template This section describes the MAC collection template for a pRRU3901 with three transmission ports. The MAC collection template is used to record the installation position, MAC address of the site at the initial installation stage to facilitate subsequent commissioning and maintenance. Table 15-1 shows the MAC collection template. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 271 DBS3900 LampSite Installation Guide 15 Appendix Table 15-1 MAC collection template No. Site Number Site Name Sampl 01 pRRU3901 WIFI MAC Location Information xx floor, xx building, xx mansion Note: The MAC collection template is essential to the engineering stage and subsequent maintenance, especially when multiple devices are installed at a short distance. This is because the template defines the radio network to access. Maintain this template with caution. 15.2 Assembling a Shielded RJ45 Connector and an Ethernet Cable This section describes how to assemble a shielded RJ45 connector and an Ethernet cable. A straight-through cable is used as an example. Context Figure 15-1 shows the components of an RJ45 connector and an Ethernet cable. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 272 DBS3900 LampSite Installation Guide 15 Appendix Figure 15-1 Components of an RJ45 connector and an Ethernet cable (1) Core wire (2) Aluminum foil (3) Braided layer (4) Outer jacket (5) RJ45 connector Procedure Step 1 Remove the outer jacket (25 mm) of the Ethernet cable, tip the braided layer outwards evenly, and cut off the aluminum foil and guard space. See Figure 15-2. Do not damage the shield layer when removing the jacket. Do not damage the insulation layer of the Ethernet cable when removing the shield layer. Figure 15-2 Removing the jacket of an Ethernet cable Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 273 DBS3900 LampSite Installation Guide 15 Appendix Step 2 Sequence the twisted pair wires neatly by color, and cut the wire end evenly, with a remaining length of 16 mm. See Figure 15-3. Figure 15-3 Arranging twisted pair wires Table 15-2 Pin assignment Pin SN Wire Color White and orange Orange White and green Blue White and blue Green White and brown Brown Step 3 Insert the sequenced twisted pair wires into the RJ45 connector. See Figure 15-4. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 274 DBS3900 LampSite Installation Guide 15 Appendix Figure 15-4 Inserting wires into the RJ45 connector When inserting the wires, ensure that the braided layer that was tipped outwards has inserted inside the connector. Observe the side or front of the RJ45 connector to ensure that the core wires are inserted to the bottom of the RJ45 connector. Step 4 Use a crimping tool to crimp the connector. See Figure 15-5. Figure 15-5 Crimping the connector Step 5 Use a cable cutter to evenly cut off the protruding braided layer of the connector along the wire holder. See Figure 15-6. Figure 15-6 Cutting off the excess braided layer Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 275 DBS3900 LampSite Installation Guide 15 Appendix ----End 15.3 DBS3900 LampSite Engineering Label This section describes the content and presents the exterior of DBS3900 LampSite engineering labels. Label Content The DBS3900 LampSite engineering labels include the RHUB power label, RHUB ground label, RHUB alarm or monitoring label, RHUB optical transmission label, and RHUB network transmission label, the pRRU power label, pRRU network transmission label, pRRU antenna label. The engineering labels are used for DBS3900 LampSite units RHUB and pRRU for indoor scenarios. By default, blank labels are delivered for DBS3900 LampSite and must be filled in onsite. Table 15-3 describes the content of engineering labels. Table 15-3 DBS3900 LampSite Engineering Label Content NE Label Content Description Corresponding port on the base station RHUB Power label Label for the RHUBx power cable. PWR RHUBx PWR x specifies the number of RHUBs and cannot exceed the maximum RHUB number supported by the networking. Ground label RHUBx PGND Label for the RHUBx ground cable. x specifies the number of RHUBs and cannot exceed the maximum RHUB number supported by the networking. Issue 08 (2016-05-30) Alarm or monitorin g label RHUBx Optical transmissi on label RHUBx EXT_AL BBU/RH UBa/RHU Bb Label for the RHUBx alarm cable. EXT-ALM x specifies the number of RHUBs and cannot exceed the maximum RHUB number supported by the networking. Label for the RHUBx CPRI cable. CPRI0 or CPRI1 x specifies the number of RHUBs and cannot exceed the maximum Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 276 DBS3900 LampSite Installation Guide NE 15 Appendix Label Content Description Corresponding port on the base station RHUB number supported by the networking. Network transmissi on label pRRU Power label RHUBx CPRI_Ea pRRUy PWR a can be set to 0 or 1. 0 and 1 respectively correspond to CPRI0 port and CPRI1 port of the upper-level RHUB. b can be set to 0 or 1. 0 and 1 respectively correspond to CPRI0 port and CPRI1 port of the lower-level RHUB. Label for the RHUBx Ethernet cable. x specifies the number of RHUBs and cannot exceed the maximum RHUB number supported by the networking. a can be set to 0 or 1. 0 and 1 respectively correspond to CPRI_E0 port and CPRI_E1 port of the pRRU. Label for the pRRUy power cable. CPRI_E0 to CPRI_E7 PWR or CPRI_E0 y specifies the number of pRRUs and cannot exceed the maximum pRRU number supported by the networking. Network transmissi on label Issue 08 (2016-05-30) pRRUy CPRI_Ea Label for the pRRUy Ethernet cable. y specifies the number of pRRUs and cannot exceed the maximum pRRU number supported by the networking. a can be set to 0 to 7, which respectively correspond to CPRI_E0 port to CPRI_E7 port of the RHUB. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. CPRI_E0 or CPRI_E1 277 DBS3900 LampSite Installation Guide 15 Appendix NE Label Content Description Corresponding port on the base station Antenna label Label for the pRRUy RF Jumper. ANT0 to ANT5 pRRUy ANTa y specifies the number of pRRUs and cannot exceed the maximum pRRU number supported by the networking. a can be set to 0 to 5, which respectively correspond to ANT0 port and ANT5 port of the pRRU. In the label, RHUB and pRRU identify the specific DBS3900 LampSite NEs. If only one RHUB is deployed, mark it as RHUB0 on the label. If multiple RHUBs are deployed, mark them in ascending sequence, beginning with RHUB0. If only one pRRU is deployed, mark it as pRRU0 on the label. If multiple pRRUs are deployed, mark them in ascending sequence, beginning with pRRU0. For details about the maximum number of RHUBs and pRRUs in the DBS3900 LampSite solution, see Typical Configurations in DBS3900 LampSite Technical Description. Label Structure Using the RHUB power label as an example, Figure 15-7 shows the structure of a DBS3900 LampSite engineering label. Figure 15-7 Label structure 15.4 Attaching an L-Shaped Label This section describes the procedure and precautions to be taken for attaching an L-shaped label. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 278 DBS3900 LampSite Installation Guide 15 Appendix Context This section applies to Huawei sign plate labels. If other engineering labels in accordance with local standards are used on site, follow the local standards for attaching sign plate labels. In the DBS3900 LampSite solution, blank L-Shaped engineering labels are delivered by default. The L-shaped label is usually used for the signal cable, E1/T1 cable, optical cable, and power cable. The description in this section takes the Ethernet cable in a base station as an example. Procedure Step 1 Obtain the engineering label to be attached from the whole set of the L-shaped engineering labels, as shown in Figure 15-8. Figure 15-8 Engineering label to be attached Step 2 Attach the long end of the engineering label to the cable in the position 20 mm away from the connector, and then turn over the long end along the adhesive face. Ensure that the edges of the turned-over engineering label are in a line, as shown in Figure 15-9. By default, the label is attached in the position 20 mm away from the connector. If required, you can change the position to make installation faster and more efficient. Consistency and neatness, however, must be maintained. Step 3 Adhere the long end to the labeling area. Ensure that the spacing between the cable and the labeling area is 2 mm to 3 mm. Figure 15-9 Adhering the long end to the labeling area Step 4 Turn over the labeling area along the adhesive face from the bottom, and then finish attaching the engineering label, as shown in Figure 15-10 and Figure 15-11. Ensure that the edges of the turned-over labeling area are in a line. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 279 DBS3900 LampSite Installation Guide 15 Appendix Figure 15-10 Turning over the labeling area along the adhesive face Figure 15-11 Attached engineering label Step 5 Fill in the attached blank label by referring to 15.3 DBS3900 LampSite Engineering Label. ----End 15.5 Attaching a Sign Plate Label This section describes the procedures and precautions for attaching a sign plate label. Context This section applies to Huawei sign plate labels. If other engineering labels in accordance with local standards are used on site, follow the local standards for attaching sign plate labels. A sign plate label is usually used for a power cable, ground label, signal cable, and antenna. This section uses 15.3 DBS3900 LampSite Engineering Label as an example. Procedure Step 1 Lead the cable ties through the holes of a label, and then bind the label to the cable, as shown in Figure 15-12. Ensure that the cable ties are led through the holes of the label in the same direction. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 280 DBS3900 LampSite Installation Guide 15 Appendix Figure 15-12 Binding the label (1): Cable tie (2): Label (3): Cable You should use an outdoor cable tie with a appropriate width in outdoor scenarios (the default is black cable tie with 3.6 mm or 0.14 in. width). The position for banding the label is recommended from 20 mm to 100 mm (0.79 in. to 3.94 in.) away from the cable connector. Ensure the front of the label facing you and not be covered. In case of both ports of the cable connected have different silkscreen, both ends of the cable should bind the port label on the two ends of cable. For example, in dual BTSs cascading scenarios, one end of the cascading FE/GE cable is connected to LAN1 port on BTS0, and the other end connected to WAN port on BTS1. At this point, both ends of the cable should band two labels Micro BTS0 LAN1 and Micro BTS1 WAN. As shown in Figure 15-13, the distance between the two labels is recommended from 10 mm to 20 mm (0.39 in. to 0.79 in.). Figure 15-13 Positions for banding labels You may change the positions for attaching labels in actual situations. For example, you can bind a label where the cable is bent. Step 2 Tighten the cable tie, securing the label on the cable, and then cut off the extra part of the cable tie, as shown in Figure 15-14. Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 281 DBS3900 LampSite Installation Guide 15 Appendix Figure 15-14 Securing the label on the cable (1): Cable tie (2): Cable (3): Label When you bind a label, ensure that the side with characters faces outwards. Ensure that the labels are attached in an orderly and neat manner. When you cut a cable tie, keep a surplus length of 5 mm to 10 mm (0.20 in. to 0.39 in.). ----End Issue 08 (2016-05-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. 282 Safety Information Contents 1 Safety Information .......................................................................................................................... 2 1.1 General Safety Precautions ........................................................................................................................................... 2 1.2 Installation Environment Requirements ....................................................................................................................... 5 1.2.1 Indoor Installation ...................................................................................................................................................... 6 1.3 Electrical Safety ............................................................................................................................................................ 6 1.4 Radiation Safety............................................................................................................................................................ 7 1.4.1 Electromagnetic Field Exposure ................................................................................................................................ 7 1.5 Mechanical Safety ........................................................................................................................................................ 9 1.6 Maintenance Safety .................................................................................................................................................... 11 Safety Information Safety Information 1.1 General Safety Precautions Read all safety information before installing, operating and maintaining Huawei equipment. To ensure personal and equipment safety during installation, operation and maintenance, follow all safety precautions marked on equipment and described in manuals. Items marked Caution, Warning and Danger in the manual do not indicate all safety precautions to be obeyed, but only serve as a supplement to all safety precautions. The equipment should be used in the environment that meets design specifications. Otherwise, equipment failure may occur, and equipment malfunctions, parts damage, personal safety accidents, property loss and other exceptions resulting from such equipment failure are not within the scope of quality warranty. Skilled person: Definitions Skilled person is a term applied to persons who have training or experience in the equipment technology, particularly in knowing the various energies and energy magnitudes used in the equipment. Instructed person: Person who have been instructed and trained by a skilled person, or who are supervised by a skilled person, to identify energy sources that may cause pain and to take precautions to avoid unintentional contact with or exposure to those energy sources. Under normal operating conditions, abnormal operating conditions or single fault conditions, instructed persons should not be exposed to parts comprising energy sources capable of causing injury. Understand potential dangers in operations, and can take proper measures to minimize the dangers. User or operator: Ordinary person is the term applied to all persons other than instructed persons and skilled persons. Ordinary persons include not only users of the equipment, but also all persons who may have access to the equipment or who may be in the vicinity of the equipment. Safety Information Conventions : Caution Symbol, prompts users to be cautious. "Caution" items provide helpful suggestions or reference materials not covered in the document. : Warning Symbol, prompts users to be careful. In this situation, users might perform an action that may result in an equipment damage or loss of data. : Danger Symbol, indicates critical safety instructions. This warning symbol means a danger. Users are in a situation that could cause bodily injury. Before performing any operation on the equipment, involving electric circuits and understand the standard practices for preventing accidents. : High Voltage Symbol, indicates a part exposed to a high voltage. This symbol warns operators that direct contact with the power grid voltage, or indirect contact with the power grid voltage through damp stuff or moisture is fatal. The symbol is attached next to a hazardous voltage point or a protective power supply cover that may be removed during maintenance. : Overheating Symbol, indicates overheating. This symbol is attached to equipment surface that may cause scalds due to a high temperature. The symbol warns users not to touch the equipment during operation or maintenance. Heat insulation gloves should be used to prevent scalds. : Microwave Symbol, indicates that a device emits microwaves. This symbol warns operators not to unfasten the transmitter output feeder or antenna feeder connector when the transmitter is working. If you need to unfasten the feeder connector or work next to the transmit antenna, turn off the transmitter. The symbol is attached next to the output socket of the transmitter power amplifier or antenna socket of the transmitter combiner to indicate RF radiation. or : Protective Earthing Symbol, indicates protection earthing. This symbol is attached next to a protection ground terminal, and used next to a terminal connecting equipment and an external ground system. An equipment ground cable is connected to an external ground bar through the protection ground terminal. : Protective bonding Symbol, indicates equipotential bonding. This symbol is used next to equipotential terminals inside equipment. : Electrostatic symbol: This symbol is used in all electrostatic sensitive areas. Before operating equipment attached with this symbol, wear ESD gloves or an ESD wrist strap. : Altitude description symbol: This symbol indicates that equipment is safe to use only below the altitude of 2000 m. Safety Information : Non-tropical climate symbol: This symbol indicates that equipment is safe to use only in non-tropical climates. : Symbol on/near a fan box/moving part. This symbol is silkscreened on or attached to a fan box panel to warn operators not to touch the fan with fingers. "Do not touch the blades when the fan is rotating!" or : Instruction reading symbol. This symbol is attached to remind instruction reading next to an equipment port to notify a user to read the manual for the usage of the port. Application scenarios of this symbol include but are not limited to: 1. For equipment with multiple power supplies, this symbol is used to replace the multipower symbol next to power supplies, which indicates that the equipment has multiple power supplies and all the power supplies must be cut off to power off the equipment. 2. For equipment with multiple input ports, this symbol is used next to the output ports. Read the manual before connection to understand the rated value and configuration information of power output. 3. For equipment with multiple slots, this symbol is used next to the slots. Read the manual to understand the slot information, board restriction and usage conditions. Basic Safety Precautions Instructed person must obtain related certificates after strict training, understand all the required safety regulations, and master correct operation methods before installing, operating and maintaining Huawei equipment. Equipment installation, operation, and maintenance must comply with local laws and regulations. Safety information in the manual only serves as a supplement to local laws and regulations, and: Only skilled person and instructed person can install, operate, and maintain equipment. Only skilled person and instructed person can remove safety facilities and maintenance equipment. Operators should promptly report faults or errors that may cause safety issues. Equipment operators, including operators, instructed person and skilled person, should have special operation qualifications required by the local country, such as high-voltage operation, climbing, and special equipment operation qualifications. If personal injury or equipment damage may occur during installation, equipment operators should stop operation immediately, report the situation to the project owner, and take effective protective measures. Installation, operation, and maintenance of outdoor equipment are strictly forbidden in lightning, rainy, snowy, windy and other adverse weather conditions. This includes but not limited to outdoor equipment transportation, cabinet installation, power cable installation, and outdoor cable connection. Do not wear watches, bracelets, bangles, rings, necklaces or other conductive objects during equipment installation, operation and maintenance. Dedicated insulation tools, such as insulation gloves, safety clothing, safety helmet, and safety shoes, must be used during equipment installation, operation, and maintenance, as shown in Figure 1-1. Safety Information Figure 1-1 Safety personal protective equipment (PPE) Equipment installation, operation, and maintenance must follow procedures in the Hardware Installation and Maintenance Guide, Configuration Guide, and Operation and Maintenance Guide. Use a voltmeter to measure the voltage at the contact point to prevent electric shocks before touching any metal surface or terminal. Ensure all slots are inserted with boards or filler panels. Prevent exposure of board hazardous voltage and energy, ensure normal working of ventilation channels, control electromagnetic interference, and prevent dusts or foreign matters from the backplane, mother board, and boards. After equipment installation, users should conduct routine checks and maintenance, and promptly replace faulty parts to ensure equipment safe running as required by the Hardware Installation and Maintenance Guide and Operation and Maintenance Guide. After equipment installation, clear equipment area and remove empty packaging materials, such as the carton box, foam, plastics, and cable ties. In case of fire, evacuate from the building or equipment area and press the fire alarm bell, or call the fire emergency number. Do not enter the burning building again in any cases. 1.2 Installation Environment Requirements Ensure the installation environment comply with equipment specifications, including the voltage, temperature, humidity, altitude, pollution degree, overvoltage category , and waterproof and dustproof classification. Do not place the equipment in a flammable, explosive gas or smog environment, or perform any operation in such environment. Keep acidic, alkaline or other corrosive gases away from the installation site. Keep the equipment away from sources of heat or fire, such as the electric heater, microwave oven, oven, water heater, fireplace fire, candle or other places that may Safety Information generate high temperatures. Otherwise, equipment housing will melt or the equipment will be heated and cause a fire. When the equipment is running, do not obscure or cover it with flammables, such as paper and cotton fabrics. Otherwise, heat dissipation of the equipment fails, which will cause housing deformation and a fire. The equipment (or system) must be installed and used in specified areas. Do not block air vents when the equipment is running. Keep air vents at a distance from the wall or other objects that block the air vents as required in the Hardware Installation and Maintenance Guide. The minimum distance is generally 5 cm if it is not specified. The equipment that cannot meet IP54 waterproof and dustproof standard cannot be used in outdoor environments. 1.2.1 Indoor Installation Ensure there is no water penetration, leakage or condensation (in case of air conditioner failure in the equipment room) on the equipment top. Otherwise, water may flow into the equipment, causing equipment failure. If fixed equipment has a large hole at the bottom, the equipment must be installed on concrete, tile or non- combustible surface. Prevent rats and pests from the installation site. Wall Installation Before drilling holes on the wall, ensure there is no circuit, water conduit or gas pipeline in the wall area to be drilled to avoid body injury. Do not place any flammables or explosive objects above or under the equipment, and do not obscure the equipment with foreign objects within 1 m scope. In wall installation mode, ensure no hole facing upwards to prevent water ingress and equipment damage. Ensure screws are securely installed. Otherwise, the equipment may fall due to tension after cable connection, causing equipment damage or even personnel injury. 1.3 Electrical Safety Grounding Before grounding, ensure the protection ground is reliably grounded in accordance with local building distribution specifications. For the equipment requiring grounding, connect the protective earthing cable essential before equipment installation, and disconnect the protective earthing cable after the equipment is removed. For the equipment using a socket with earthing terminal, ensure the earthing terminal is connected to the protective earthing essential. Safety Information AC/DC Operation Requirements The supply voltage of the power system is hazardous, and direct contact or indirect contact through damp stuff with the voltage may cause electric shocks. Irregular and incorrect operations may cause accidents, such as a fire and electric shocks. Before equipment electrical connection, disconnect the related external-equipment breaker. Before connecting the load (electrical equipment) or battery cable, verify that the input voltage is within the rated voltage range of the equipment. Before power-on, verify that equipment electrical connections are correct. Cabling Requirements If the power cable is prepared at the site, only the insulation layer at the wiring part can be cut. Otherwise, it may cause short circuit and accidents such as body injury and a fire. Insulation layer aging or damage may occur when the cable is used in a high-temperature environment. Leave enough distances between the cable and power busbar, current shunt, fuse, heat sink and other heating devices. The signal cable and the strong current cable or high-voltage cable must be bound separately. Cables provided by the customer must comply with local cable regulations. Do not route any cable through the air exhaust vent in the cabinet. If cables are stored in an ambient temperature below 0°C, move the cables to a room temperature environment and store the cables for more than 24 hours before installation ESD Requirements To avoid component damage caused by electrostatic on human body, wear ESD gloves or an ESD wrist strap and properly ground the other end of the ESD wrist strap before touching a circuit board. Hold the board edge where no components are installed, and do not touch chips with hands. Put removed boards in ESD packing for storage or transportation. 1.4 Radiation Safety 1.4.1 Electromagnetic Field Exposure This section describes safety precautions related to electromagnetic field exposure. Strong electromagnetic signals harm human health. Safety Information If the equipment is a radio transmitter or product supporting radio transmission, exposure of radio electromagnetic field (electromagnetic radiation) should be considered. For the high-voltage equipment or facility, exposure of power frequency electromagnetic field should be considered. When professional equipment or facility (such as wireless base station transceiver) is deployed, the user (such as radio service carrier) must comply with local laws and regulations. Before the equipment structure or antenna is modified, re-evaluation of electromagnetic field exposure should be considered. Before the radio frequency (RF) output specifications or parameters are modified, reevaluation of electromagnetic field exposure should be considered. Before the site environment of professional equipment or facility is changed, reevaluation of electromagnetic field exposure should be considered. Restricted Area of Electromagnetic Field Exposure An area with excessive electromagnetic field exposure (restricted area) is a hazardous area at a certain distance from the equipment or facility as required by exposure control limits of related regulations, so as to control public or operator exposure to electromagnetic field. Take proper measures to ensure the safe distance from electromagnetic field exposure, including but not limited to: Plan the professional equipment or facility site in an inaccessible area to the public, and do not publicize the location. Allow only authorized and instructed person to access the professional equipment or facility site. Before entering the area with excessive electromagnetic field exposure, professional personnel should know the location of the restricted area and shut down the transmitter. Set clear signs at the site to remind professional personnel that the current location is in or may be in the area with excessive electromagnetic field exposure. After site installation, conduct regular monitoring and checks. Set effective physical shields and apparent warning signs in all areas with excessive electromagnetic field exposure. Install an isolating device outside the equipment structure. Comply with local regulations in operations. Installation and Use of a Wireless Base Station Transceiver A base transceiver station (BTS) is properly designed so that its RF electromagnetic radiation is under the related standard limits of RF radiation hazard. Therefore, a normal working BTS does no harm to the public and working personnel. However, a BTS with defective antenna cables or other defects may result in excessive RF electromagnetic radiation. Professional personnel should abide by the following rules in BTS installation and operation: Before installing and operating a BTS and its antenna, read safety recommendations and comply with local regulations. Before installing or maintaining an antenna close to the tower or mast with a BTS and its antenna, contact related personnel to shut down the antenna transmitter. If necessary, working personnel at the site should carry radiation monitoring and alarm instrument. Safety Information To ensure safety of public electromagnetic field exposure, abide by the following guiding principles in BTS antenna site installation: In rooftop installation, install antennas at a height over the height of personnel who may work or live on the rooftop. In rooftop installation, install transmit antennas far away from most visited areas, such as the rooftop access point, telephony service point, and HVAC equipment. In rooftop installation, install directional antennas peripherally and do not make them face towards buildings. Properly choose from large antennas (better signal coverage) and small antennas (less visual impact). Install antennas at a far site, although it may be mutually exclusive to local area requirements. When constructing a common installation site, pay special attention to antennas from different manufacturers, especially high-power broadcasting (FM/TV) antennas. Antennas are generally installed in one common site locally, which may increase safety risks. Take special preventive measures at antenna sites next to hospitals or schools. Use of Other Wireless Equipment If any related equipment manual specifies the safe distance of electromagnetic field exposure, this distance requirement should be applied. No application distance is specified for the equipment with low RF transmit power that meets electromagnetic field exposure requirements. No application distance is specified for the equipment with special design that meets electromagnetic field exposure requirements in close use. Use of High-voltage Equipment or Facility Only the power frequency electromagnetic field generated by high-voltage (for example, over 100 kV) equipment or facility are harmful to human. Therefore, the electromagnetic field needs to be evaluated according to related requirements. 1.5 Mechanical Safety Hoisting Safety Do not walk under the crane arm or hoisted objects when heavy objects are being hoisted. Hoisting operators must be trained and qualified before starting to work. Hoisting tools must be check to ensure tool completeness. Before hoisting, ensure that hoisting tools are securely fastened to fixed load-bearing objects or wall. During hoisting, ensure angles between lifting slings are not larger than 90°, as shown in Figure 1-2. Safety Information Figure 1-2 Hoisting heavy objects Ladder Use Safety Before using a ladder, check whether the ladder is intact and confirm its load bearing capacity. Do not use it with overload. The recommended angle between the ladder and the ground is 75°. You can use a right angle to measure the angle, as shown in Figure 1-3. Place the wider ladder legs at the bottom or take protective measures at the bottom to avoid skid. Place the ladder on a stable surface. Figure 1-3 Ladder tilt angle Pay attention to the following points when climbing a ladder: − Prevent your center of gravity from deviating from the ladder edge. − Keep your body stable before climbing to ensure safety. − Do not climb over the fourth beam from the ladder top. Safety Information To climb up to a rooftop, the vertical height of the ladder above the rooftop must be more than 1 m, as shown in Figure 1-4. Figure 1-4 1 m vertical height of the ladder above the rooftop Drilling Safety Pay attention to the following safety precautions when drilling holes on the wall or ground. Do not drill holes on cabinets. Incorrectly drilled holes will damage cabinet electromagnetic shielding performance and internal cables. Metal scraps generated in drilling will cause short circuit on circuit boards in a cabinet. Wear goggles and protective gloves in drilling. Cover equipment before drilling to prevent metal scraps from entering equipment interior. Timely clear and eliminate metal scraps after drilling. Heavy Object Transport Safety Prepare for load bearing in heavy object transport to avoid injury or sprain. When transporting a cabinet, keep your back straight and move steadily to avoid sprain. When transporting equipment with hands, wear protective gloves to avoid cut by edges. When moving or lifting a shelf, hold shelf handles or bottom edge, instead of handles of installed models in the cabinet, such as power modules, fan modules and boards. 1.6 Maintenance Safety Before replacing accessories or parts, wear an ESD wrist strap, and ensure the other end of the ESD wrist strap is grounded and the other end is properly contacted with skin. When replacing parts, take care of parts, bolts, and tools to prevent them from dropping into fans can damaging fans or equipment. When replacing shelves or parts in the cabinet, carefully pull the shelves or parts out from the cabinet to prevent unstable or heavy devices on the cabinet from causing injury or strain. Safety Information Replaceable Fuse Use fuses of the same type and same rating to replace old ones. Before replacing the fuse on the panel, disconnect the equipment power supply. Otherwise, an energy hazard or electric shock may occur, causing body injury. Replaceable fuses are installed on the panel next to the AC/DC power input port or output port. Reference the specifications of backup fuses or fuses on the panel to select the fuse type for replacement. Using different fuses of different specifications may cause equipment damage, body injury, and financial loss. If the fuse rated value is silkscreened on the board, Huawei authorized personnel replace fuses according the silkscreened specifications. If the fuse rated value is not silkscreened on the board, do not maintain board fuses at site. Return them for depot repair. To replace fuses, Huawei authorized personnel replace the fuses according to the supplier model and rated value in the bill of materials (BOM). Fuse Welding pico Remote Radio Unit Compliance and Safety Manual Regulatory Compliance Information 1. USA Regulatory Compliance 1.1 FCC Part 15 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: This device does not cause harmful interference. This device must accept any interference received, including interference that may cause undesired operation. If this device is modified without authorization from Huawei, the device may no longer comply with FCC requirements for Class B digital devices. In that a case, your right to use the device may be limited by FCC regulations. Moreover, you may be required to correct any interference to radio or television communications at your own expense. This device has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This device generates, uses and radiates radio frequency energy. If it is not installed and used in accordance with the instructions, it may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this device does cause harmful interference to radio or television reception, which can be determined by turning the device off and on, the user may take one or more of the following measures: Reorient or relocate the receiving antenna. Reinforce the separation between the device and receiver. Connect the device into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio or TV technician for assistance. 1.2. Warning This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment .This equipment should be installed and operated with minimum distance 35cm between the radiator& your body. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. pico Remote Radio Unit Compliance and Safety Manual Regulatory Compliance Information 2. Canada Regulatory Compliance 2.1 RSS-Gen statement This device complies with Industry Canada licence-exempt RSS standard(s). Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. Le présent appareil est conforme aux CNR d'Industrie Canada applicables aux appareils radio exempts de licence. L'exploitation est autorisée aux deux conditions suivantes : (1) l'appareil ne doit pas produire de brouillage, et (2) l'utilisateur de l'appareil doit accepter tout brouillage radioélectrique subi, même si le brouillage est susceptible d'en compromettre le fonctionnement. 2.2 RSS statement: This device complies with Industry Canada RSS . Operation is subject to the following two conditions: (1) this device may not cause interference, and(2) this device must accept any interference, including interference that may cause undesired operation of the device. Le présent appareil est conforme aux CNR d'Industrie Canada applicables aux appareils radio RSS. L'exploitation est autoris ée aux deux conditions suivantes : (1) l'appareil ne doit pas produire de brouillage, et (2) l'utilisateur de l'appareil doit accepter tout brouillage radioé lectrique subi, même si le brouillage est susceptible d'en compromettre le fonctionnement. 2.3. Warning This equipment complies with IC RF radiation exposure limits set forth for an uncontrolled environment. This transmitter must not be co-located or operating in conjunction with any other antenna or transmitter. This equipment should be installed and operated with minimum distance 3 5cm between the radiator& your body. Cet appareil est conforme aux limitesd'exposition de rayonnement RF IC établiespour un environnement non contrôlé. Cetémetteur ne doit pas être co-implanté oufonctionner en conjonction avec toute autreantenne ou trans metteur. Cet équipement doit être installé et utiliséavec une distance minimale de 35cm entre leradiateur & votre corps. 3. Other Markets For relevant compliance information/documentation for markets not mentioned above, please contact Huawei representative. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Encryption : Standard V4.4 (128-bit) User Access : Print, Extract, Print high-res Author : Huawei Technologies Co.,Ltd. Create Date : 2016:06:20 10:42:07+08:00 Modify Date : 2016:06:27 16:37:15-07:00 Subject : Technical Document Has XFA : No Language : zh-CN Tagged PDF : No XMP Toolkit : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26 Format : application/pdf Creator : Huawei Technologies Co.,Ltd. Description : Technical Document Title : Installation Guide Creator Tool : Microsoft® Office Word 2007 Metadata Date : 2016:06:27 16:37:15-07:00 Producer : Microsoft® Office Word 2007 Document ID : uuid:c4e7951c-1560-4df8-ba5f-d96f88dd9753 Instance ID : uuid:d9cebea3-25cc-4f98-a25a-7284e7f3bd95 Page Count : 303EXIF Metadata provided by EXIF.tools