INOVA Geophysical Equipment FSU2 Data Collection Device utilizing a radio channel for command and control User Manual Field Operations
INOVA Geophysical Equipment Limited Data Collection Device utilizing a radio channel for command and control Field Operations
User Manual
Draft Uncontrolled Release ® FireFly Field Operations Quick Reference Guide Release 2.0 1018-010030C Rev. PC8 July 2008 Draft Uncontrolled Release ION Geophysical Corporation 12300 Parc Crest Drive Stafford, Texas 77477-2416 USA Tel +1.281.552.3002 Fax +1.281.879.3626 www.iongeo.com Copyright © 2008 ION Geophysical Corporation. All rights reserved. No part of this publication may be reproduced, transmitted, transcribed, stored in a retrieval system, or translated into any language or computer language in any format or by any means, electronic, mechanical, magnetic, optical, chemical, manual, or otherwise, without prior written permission of ION Geophysical Corporation. Copyright violators also may be subject to civil penalties. ION Geophysical makes no warranties as to the accuracy, validity, or fitness for use or application of the contents of this document. ION Geophysical reserves the right to revise the information in this document at any time without notice. Although an attempt has been made to ensure the accuracy of the following material, no responsibility is assumed by ION for any use, or for any consequences resulting from any use, of the information contained herein. No guarantee of suitability for any purpose is offered or implied. FireFly® is a registered trademark of ION Geophysical Corp.; SCORPION® is a registered trademark of ION Geophysical Corp.. ION has attempted, throughout this document, to distinguish proprietary trademarks from descriptive terms by following the capitalization style used by the manufacturer. All brand names and product names used in this document are trade names, service marks, trademarks, or registered trademarks of their respective owners. Print date: November, 2007 Original publication date: November, 2007 PDF part number: 1018-010030-0001PC7 To order printed copies of this document, please reference the following part number: 1018-010030-0002C Draft Uncontrolled Release Contents Loading the Equipment ......................................................................................................................2 Equipment Layout/Distribution .........................................................................................................3 Changing the External Battery ...........................................................................................................5 Field Shooting for Dynamite..............................................................................................................6 FSU/SVSM Pickup ............................................................................................................................8 FCC ID: MCV-FSU2 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause interference, and (2) this device must accept any interference, including interference that may cause undesired operation of the device. FCC Modification Rule for User Manuals: Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment. Warning RF Exposure Compliance The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 60 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter. Users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance. FireFly Field Operations Quick Reference Guide Draft Uncontrolled Release Loading the Equipment To load the equipment onto the hasps, perform the following tasks: 1. Load the FSUs and SVSMs onto the hasp 2. Load the external batteries onto the hasp Equipment and Time • A crew of one • Empty field hasp • 6 FSUs (Field Station Units) • 6 SVSMs • 6 charged External Batteries • Holding tube for antennas Time: 15 minutes (when performed by single crew member) FireFly Field Operations Quick Reference Guide TASK: Loading the Hasp 1. Connect the SVSM to the FSU: a. Connect the sensor connector to the FSU cable connector. b. Wrap the dustcap wires around the connector and connect the dustcaps together. 2. Load the antennas into the holding tubes. 3. Connect and load the remaining SVSMs and FSUs for this hasp until all six FSUs, SVSMs, Batteries and the holding tube have been loaded. 4. Load the equipment onto the hasp by stringing the hasp through the molded loops on the FSU, SVSM and the batteries. FireFly Field Operations Quick Reference Guide Equipment Layout/Distribution For incremental equipment layout distribution: • Set up the equipment at the receiver location • Navigate from receiver to receiver, dropping the hasp at every sixth receiver • Navigate from hasp to hasp Equipment and Crew A crew of three people: • Line Boss (LB): carries NavTool on alignment tool and antennas • Helper 1 (H1): Carries drill • Helper 2 (H2) carries two hasps of gear • Secure the helicopter-ground assembly at the first station, and unload the first set of the FSU/SVSM units from hasp. • Attach the antenna to the antenna mount. • Plug the SVSM cable into the FSU. • Plug the external battery into the FSU as shown in Figure 1-1 and wait 30 seconds. Figure 1-1. FSU connections Battery Connection on FSU Crew size can changed depending on the operations layout. The minimum crew will be two. Note TASK: Lay Out And Distribute Equipment 1. Locate hasp (LB). Use Navtool to locate the hasp dropped by the helicopter or mule, and move hasp to the closest station location. 2. Unload equipment (H1 & H2). Connection on External Battery Draft Uncontrolled Release SVSM Connection on FSU FireFly Field Operations Quick Reference Guide 3. Place FSU and SVSM (LB, H1&H2). • Using NavTool, determine the proper location for SVSM (LB). • Power on the FSU by swiping with magnet. • Auger a hole for the VectorSeis sensor (SVSM) and place the SVSM securely in the hole. 4. Take alignment readings (LB). • Keeping the NavTool attached to the Alignment pole, place the Alignment pole over the SVSM to get a reading. 5. 6. Figure 1-2. NavTool on Alignment Pole 7. 8. 9. • Take a GPS and Compass reading with NavTool and transmit the readings to FSU. Move to the next station (LB, H1 & H2). • Pick up hasp and drill and move to the next station. • (LB only) Navigate to the next location using NavTool. Unload equipment (H1 & H2). • Unload the next sets of the FSU/SVSM units from hasp and place the units at the station location. • Plug the antenna, SVSM cable, and the external battery into the FSU. Wait 30 seconds after plugging battery into FSU. Repeat step 3 and step 4 for all remaining in the hasp (LB, H1 & H2). Move to final station in pack (LB, H1 & H2). • Secure the empty hasp at final station that station (H2). • Use NavTool to take GPS reading for the empty hasp position (LB). Use NavTool to select next full hasp in the field (LB) and repeat step 1 to step 9. Draft Uncontrolled Release FireFly Field Operations Quick Reference Guide Changing the External Battery You can change out an external battery in the field. Crew and Equipment • A crew of two using the buddy system • Charged external battery and cable • NavTool • Magnet • Hasp (to hold external battery) Time: 15 minutes (when performed by single crew member) 1. Navigate to position for changing battery. 2. Unplug the external battery from the FSU. 3. Plug the new battery into the FSU. The FSU will reboot when the battery is attached. 4. If the FSU does not reboot, power on the FSU by swiping with magnet. 5. Verify that the NavTool connects to the FSU. 6. Place discharged battery on hasp. The discharged battery should be recharged and checked at the Battery Charging Module. Figure 1-3. FSU connections Battery Connection on FSU Connection on External Battery Draft Uncontrolled Release SVSM Connection on FSU FireFly Field Operations Quick Reference Guide Field Shooting for Dynamite Crew and Equipment A crew of two: • Shooter (S): Pelton Shot Pro® II firing pack (includes all Pelton equipment), digital compass mounted to firing pack, NavTool, and radio • Helper 1 (H1): Backpack with water, miscellaneous tools, and radio The total number of shooting crews will vary depending on the daily production targets, resources and equipment. The communication collision management allows shooting crews to operate independently and in parallel so a higher number of total crews can operate simultaneously, compared to traditional dynamite shooting operations. Note TASK: Shooting 1. Navigate to the source position using NavTool and take a GPS reading (S & H1). 2. Prepare for shooting (S & H1). • (H1 only) Connect the firing line to the cap lead at the drill hole. • Stretch out the firing line and the geophone line while moving a safe distance (typically a minimum of 100 feet) from this source position in the direction of the next source position, if possible. • Place the uphole geophone beside the shooting position so that the uphole time of the shot can be measured. • Remove the Shot Pro backpack and place it upright on the ground. Place NavTool on top of shooting pack (it shows status during shooting and is used for data entry). 3. Prepare for shooting (S). • Press the READY button and wait for the ARM notification from the recorder. • When the ARM notification is received (green LEDs flash on the Shot Pro front panel and the NavTool displays a message), press and hold the two buttons on the Shot Pro to charge the firing voltage and arm the Shot Pro. Continue holding the Draft Uncontrolled Release Draft Uncontrolled Release buttons until the FIRE command is received. Figure 1-4. Pelton ShotPro At this point, the shooter has control over the shot detonating. If the area around the shot hole is not clear, the shooter can release the buttons to abort the shot. Warning FireFly Field Operations Quick Reference Guide 4. Take the Shot (S). • When the FIRE command is received and the shot is detonated, release the charge buttons. • Select the shot status (good, misfire, or blow out) on the NavTool before moving to the next shot point. • If the shot was a misfire, retry the shot. You do not need to radio the mis-fire into the recorder over voice radio. The system automatically puts the shooter back into the shooting queue to try the shot again. 5. Clean up and navigate to next position (S&H1) • (H1) Clean up the detonated shot hole. • (S) Put the Shot Pro backpack on and use NavTool to go to the next position. 6. Repeat step 2 through step 5 for all assigned source positions for the day. If the Helper (H1) is lagging due to cleanup duties, the Shooter (S) should navigate to the next source position alone and connect the firing line to the cap lead himself. Note FireFly Field Operations Quick Reference Guide FSU/SVSM Pickup Equipment and Crew The pickup crew will be the same size as the deployment crew. • Line Boss (LB): carries NavTool on alignment tool and hasp. • Helper 1 (H1): Carries extraction tool and miscellaneous equipment. Crew size can changed depending on the operations layout. The minimum crew will be two.: Note TASK: Pick Up Equipment 1. Locate hasp (LB, H1 & H2). • Use NavTool to navigate to empty hasp (LB). • Pick up hasp and open it (H1). 2. Navigate to first station (LB, H1 & H2). 3. Pick up FSU, SVSM, and battery and put into hasp (LB, H1 & H2). • (LB only) Verify the FSU ID by tapping the appropriate button: Picked up, Other FSU Picked Up, or No FSU Picked Up. • (H1) Retrieve SVSM, using extraction tool if necessary. • (H2) Gather the FSU, SVSM, and external battery and place them onto hasp. 4. Navigate to next position and repeat step 3 (LB, H1 & H2). 5. Move to final station on a hasp (LB, H1 & H2). • Ensure that all ground assembly equipment is on the hasp. • Secure the hasp, place it into the helibag, and attach the helicopter lanyard to it. • Use NavTool to take GPS reading for the helibag (LB). 6. Use NavTool to select next full hasp in the field (LB) and repeat step 1 to step 5. Draft Uncontrolled Release www.iongeo.com 12300 Parc Crest Drive Tel + 1 281 552 3002 Stafford, TX 77477 USA Fax + 1 281 879 3626
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : No Page Mode : UseOutlines XMP Toolkit : 3.1-701 Producer : Acrobat Distiller 7.0.5 (Windows) Creator Tool : FrameMaker 7.2 Modify Date : 2008:07:23 10:09:55Z Create Date : 2008:07:23 10:09:55Z Format : application/pdf Title : Field Operations.book Creator : wcarlisl Document ID : uuid:60a70648-d9d3-4654-bcb6-6f46467b8b17 Instance ID : uuid:0a27bc24-c8da-40ea-807e-0766f71bee74 Page Count : 12 Author : wcarlislEXIF Metadata provided by EXIF.tools