Itron 100GDLD AMR transceiver device for utility meters User Manual 100G Datalogging Installation Guide Direct Mount

Itron, Inc. AMR transceiver device for utility meters 100G Datalogging Installation Guide Direct Mount

Contents

Users Manual Part 3

Download: Itron 100GDLD AMR transceiver device for utility meters User Manual 100G Datalogging Installation Guide   Direct Mount
Mirror Download [FCC.gov]Itron 100GDLD AMR transceiver device for utility meters User Manual 100G Datalogging Installation Guide   Direct Mount
Document ID1114242
Application IDianYcNaC0f+qVFkooGlSaw==
Document DescriptionUsers Manual Part 3
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize93.45kB (1168127 bits)
Date Submitted2009-05-21 00:00:00
Date Available2009-05-27 00:00:00
Creation Date2009-04-22 09:17:40
Producing SoftwareAdobe PDF Library 9.0
Document Lastmod2009-04-22 09:18:12
Document Title100G Datalogging Installation Guide - Direct Mount
Document CreatorAcrobat PDFMaker 9.1 for Word
Document Author: Itron

CHAPTER 6
Elster American and Itron Actaris Commercial Meter
Installation
This chapter provides instructions to install the 100G Datalogging Gas Endpoint on Elster
American and Itron/Actaris Commercial Meters.
Warning Handle the commercial 100G Datalogging Gas Endpoint
carefully so the metal passive radiator antenna is not damaged.
100G Datalogging Installation Guide - Direct Mount
57
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
Removing the Index/ Index Assembly from the Meter
Commercial 100G Datalogging Gas Endpoints can be mounted on Elster American Meters
in various configurations. These instructions show metal mounting plates without tamper
seal cups and plastic mounting plates with tamper seal cups to represent mounting plate
options.
Mounting plate with tamper seal cups Mounting plate without tamper seal cups
Indexes may be mounted on the 100G Datalogging Commercial Elster American Gas
Endpoint without mounting plates.
Index covers may (or may not) have tamper seal cups (on the back of the cover) for added
security. Index removal assumes the installer will remove any tamper seals or wires before
continuing with these instructions.
Note It may not be necessary to dismantle your commercial index assembly (index and
cover). These instructions do not include index/cover assembly for those applications.
Some diaphragm commercial meters do not require an index assembly mounting plate.
Indexes can be mounted directly to the endpoint.
58
100G Datalogging Installation Guide - Direct Mount
Removing the Index/ Index Assembly from the Meter
To Remove the Index Assembly
1. Remove any tamper seals (1) (or wire seals) from the index cover and mounting plate
screws (2). Set the index/cover assembly aside. You will re-install it later in these
instructions.
2. Remove the index cover screws from the meter. Verify screws are 1/2" long and are
not corroded. If the screws are the correct length and are not corroded, keep them to
re-install the 100G Datalogging Gas Endpoint assembly later in this procedure. If the
screws are damaged or not the correct length, discard.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals,
and other leftover materials. Do not leave materials on customer premises.
100G Datalogging Installation Guide - Direct Mount
59
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
3. Remove the gasket from the index cover mounting plate (if applicable). Set it aside
where it will not be damaged. Remove the tamper seals from the mounting plate.
Remove the mounting plate screws and separate the mounting plate from the meter.
Place the mounting plate where it will not be damaged. You will use it later in this
installation.
Programming the 100G Datalogging Commercial Gas
Endpoint
The 100G Datalogging Gas Endpoint must be programmed with the FC200SR
handheld computer loaded with EndPoint-Link® or Point-Link Pro® software version
5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information.
Caution The 100G Datalogging Commercial Endpoint must be programmed
before use. Follow the steps in this section to properly program the endpoint.
60
100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Commercial Gas Endpoint
Take note of the index drive rate shown on the index. The endpoint is programmed based on
the drive rate. Elster American commercial meter index drive rates may be 5-, 10- or 100
cubic feet.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the index drive rate into the 100G Datalogging Gas Endpoint using the
FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR
as close to vertical as possible. For best success, keep the FC200SR within 6 feet of
the target endpoint. Verify you have the correct programming mode (Fixed Network
Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your
application. Programming parameters are based on the mode defined by your system
administrator.
During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100
cubic feet; the last two digits (tens and units) are programmed as zeros (0). After
programming is complete, the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly.
Caution Do not turn the drive wriggler faster than one turn per second.
100G Datalogging Installation Guide - Direct Mount
61
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
•
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
•
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
To Attach the 100G Datalogging Commercial Gas Endpoint to the Elster
American Commercial Meter
Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so
the metal passive radiator antenna is not damaged.
1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the
wriggler until the drive notches line up with the meter wriggler's drive teeth.
62
100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Commercial Gas Endpoint
2. Align the endpoint so the screw holes line up with the meter's top screw holes.
Carefully lower the endpoint on the meter with the wriggler notches lining up with the
meter's wriggler teeth.
Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint
must line up with the INLET label on the meter case.
3. Verify the bottom of the endpoint and the top of the meter meet. The endpoint housing
should rest on top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Commercial Gas
Endpoint if a gap exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter
wriggler's drive teeth. Pushing down on the endpoint could damage the
endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the
endpoint's upper wriggler back and forth until the endpoint aligns with the
meter's drive teeth.
100G Datalogging Installation Guide - Direct Mount
63
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
4. Place the index cover mounting plate on the commercial 100G Datalogging Gas
Endpoint so the printing "FLOW FRONT AL800 AL1000 AL1400 AL2300 AL5000
TURBINE ROTARY" stamped on the plate is toward the front of the meter. (A gap
between the mounting plate and meter at the screw locations is normal.)
5. Install four mounting screws (SCR-0062-001 - see Installation Prerequisites on page 8
for screw information) and tighten them in an alternating diagonal sequence. For
metal mounting plates with a flat screw surface, use endpoint mounting screws with
internal tooth washers. For plastic mounting plates with tamper screw cups, use
endpoint mounting screws (AS-568A-011, 5/16" ID x 7/16" OD o-rings may be used
for a maximum moisture seal). Turn each screw 1/4 to 1/2 turn after it contacts the
mounting plate. If you have access to a torque driver, tighten mounting screws to 72
inch-pounds.
6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press
into place with an 11/32" nut driver or similar blunt tool.
64
100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Commercial Gas Endpoint
To Attach the Index/Cover Assembly on the Elster American Commercial
Meter
1. Place the mounting plate gasket (previously removed) on the index cover mounting
plate. Align the gasket and index cover mounting plate screw holes.
2. Place the index/cover assembly on the index mounting plate. (The index must face the
direction it faced before removal.) Attach the index/cover assembly on the mounting
plate using original index screws. Insert one screw and tighten two turns to hold it in
place on the mounting plate. Insert the second mounting screw and tighten until
secure. Completely tighten the first mounting screw. Each index cover mounting
screw must be tightened evenly.
3. Turn the commercial 100G Datalogging Gas Endpoint wriggler so it intersects with
the index wriggler. Carefully lower the index-cover mounting plate assembly onto the
100G Datalogging Gas Endpoint.
4. Install four endpoint mounting screws (SCR-0062-001, see Installation Prerequisites
on page 8). Tighten screws in an alternating diagonal pattern.
•
Insert the first screw and tighten enough to hold index assembly in place.
•
Insert the second screw diagonal to first screw and tighten two to three turns.
•
Insert the third screw, tightening two or three turns.
•
Insert the fourth screw and tighten until secure.
•
Tighten the first, 2nd, and third screw until secure. Turn each screw 1/4 to 1/2
turn after it contacts the cover.
Each endpoint mounting screw must be tightened evenly. If you have access to a
torque-driver, tighten mounting screws to 72-inch pounds.
100G Datalogging Installation Guide - Direct Mount
65
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
5. Install new tamper or wire seals. If tamper seals are installed, press into place with an
11/32 nut driver or similar blunt tool. Crimp the seal if utility-approved wire seals are
installed.
This completes installation of the 100G Datalogging Commercial Gas Endpoint on an Elster
American Commercial meter.
66
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
Installing the 100G Datalogging Commercial Gas Endpoint on
an Itron/Actaris Commercial Meter
This section provides instructions for installing the 100G Datalogging Commercial Gas
Endpoint on Itron/Actaris 675A, 800A, and 1000A commercial meters. Installation requires
an Itron/Actaris adapter kit from Itron/Actaris.
Itron/Actaris Adapter Kit (Part Number 80005901-01)
Adapter plate
Endpoint mounting screws (4)
Screw bushings (4)
Tamper seals
Extension driver
Before You Begin
Follow To Remove the Index/Index Assembly from the Meter on page 57 to prepare the
Itron-Actaris meter for installation. Program the Commercial 100G Datalogging Gas
Endpoint (see Programming the 100G Datalogging Gas Endpoint Assembly on page 60)
prior to installation.
100G Datalogging Installation Guide - Direct Mount
67
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter
1. Turn the 100G Datalogging Commercial Gas Endpoint over and place the four
mounting screw bushings into the screw holes on the endpoint.
2. Turn the 100G Datalogging Commercial Gas Endpoint on its side and align the
wriggler with the Itron-Actaris Commercial meter's drive dog.
68
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
3. Inlet lettering on the 100G Datalogging Commercial Gas Endpoint must line up with
Inlet lettering on the meter. Slowly lower the endpoint on the Itron-Actaris
Commercial meter aligning the drive dog and wriggler. The endpoint housing should
rest on the top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Gas Endpoint if a gap
exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter
wriggler's drive teeth. Pushing down on the endpoint could damage the
endpoint wriggler or meter drive teeth. To eliminate a gap, remove the 100G
Datalogging Gas Endpoint and repeat steps 2 and 3.
To Attach the Index on the Itron-Actaris Commercial Meter
1. Place the Itron-Actaris adapter plate on the 100G Datalogging Commercial Gas
Endpoint with the two small screw holes in the adapter plate to the back of the meter.
Meter Front
100G Datalogging Installation Guide - Direct Mount
69
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
2. Place the extension driver on the 100G Datalogging Commercial Gas Endpoint
wriggler.
3. Align the index wriggler with the commercial 100G Datalogging Commercial Gas
Endpoint wriggler driver extension.
4. Install the two index mounting screws. Tighten the first screw two or three turns.
Install second screw and tighten to secure. Tighten the first screw to a snug fit. Each
index mounting screw must be tightened evenly.
70
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on an Itron/Actaris Commercial Meter
5. Place the index cover over the index with the clear side covering the index dials for
easy reading. Align the holes in the index cover with the endpoint adapter plate
mounting holes. Secure with the four mounting screws from the adapter kit. Tighten
the mounting screws in a diagonal alternating pattern.
•
Insert the first screw and tighten enough to hold the index in place.
•
Insert the second screw and tighten two to three turns.
•
Insert the third mounting screw and tighten two to three turns.
•
Insert the fourth mounting screw and tighten.
Tighten the first, third and second screw. Turn each screw 1/4 to 1/2 turn after the
screw contacts the index cover. Each index mounting screw must be tightened evenly.
If you have access to a torque-driver, tighten mounting screws to 72-inch pounds.
6. Insert tamper seals in the tamper seal cups on the index cover and press into place
with an 11/32 nut driver or similar blunt tool.
100G Datalogging Installation Guide - Direct Mount
71
Chapter 6
Elster American and Itron Actaris Commercial Meter Installation
This completes installation of the commercial 100G Datalogging Gas Endpoint on the ItronActaris Commercial meter.
72
100G Datalogging Installation Guide - Direct Mount
CHAPTER 7
Sensus/Rockwell Commercial Meter Installation
This chapter provides instructions to install the 100G Datalogging Commercial Gas
Endpoint on a Commercial Sensus/Rockwell diaphragm meter.
Removing the Index/ Index Assembly from the Meter
100G Datalogging Commercial Gas Endpoints can be mounted on Sensus/Rockwell
Commercial Meters in various configurations. These instructions show the index assembly
mounted without a mounting plate.
Note Sensus/Rockwell diaphragm commercial meters do not require an index
assembly mounting plate. Indexes can be mounted directly to the endpoint.
To Remove the Index/Index Assembly from the Meter
1. Remove any tamper seals (or wire seals) from the index cover and remove the index
cover mounting screws. You will re-install it later in these instructions.
100G Datalogging Installation Guide - Direct Mount
73
Chapter 7
Sensus/Rockwell Commercial Meter Installation
2. Remove the index screws from the meter. Set the index cover aside where it will not
be damaged or fill with dirt, rain or snow. You will re-install the index later in this
procedure.
Note Properly dispose all unused screws, old index covers, gaskets, tamper seals,
and other leftover materials. Do not leave materials on customer premises.
Programming the 100G Datalogging Gas Endpoint
The 100G Datalogging Commercial Endpoint must be programmed with the
FC200SR handheld computer loaded with EndPoint-Link® or Point-Link Pro®
software version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint
Programming Guide (TDC-0744) for more complete programming information.
Caution The 100G Datalogging Commercial Sensus/Rockwell Endpoint must be
programmed before use. Follow the steps in this section to properly program the
endpoint.
74
100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Gas Endpoint
Take note of the index drive rate shown on the index. The endpoint is programmed based on
the drive rate. Sensus/Rockwell commercial meter index drive rates may be 5-, 10- or 100cubic feet. The seven-dial index shown is a 100-cubic feet drive rate.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the index drive rate into the commercial endpoint using the FC200SR. For all
programming and "Check Endpoint" operations, hold the FC200SR as close to vertical
as possible. For best success, keep the FC200SR within 6 feet of the target endpoint.
Verify you have the correct programming mode (Fixed Network Mode,
Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your
application. Programming parameters are based on the mode defined by your system
administrator.
During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100
cubic feet; the last two digits (tens and units) are programmed as zeros (0). After
programming is complete, the endpoint assembly will read to the nearest cubic foot.
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
•
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
•
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
100G Datalogging Installation Guide - Direct Mount
75
Chapter 7
Sensus/Rockwell Commercial Meter Installation
Attaching the 100G Datalogging Commercial Endpoint to a
Sensus/Rockwell Commercial Diaphragm Meter
Warning Handle the 100G Datalogging Commercial Gas Endpoint carefully so
the metal passive radiator antenna is not damaged.
To Attach the 100G Datalogging Commercial Endpoint
1. Tilt the 100G Datalogging Commercial Gas Endpoint at an angle and turn the
wriggler until the drive notches line up with the meter wriggler's drive teeth.
2. Align the 100G Datalogging Commercial Gas Endpoint so the screw holes line up
with the meter's top screw holes. Carefully lower the endpoint on the meter so the
wriggler's bars line up with the meter drive dog. Itron recommends installation with
one bar inserted into the meter drive dog's u-shaped gear.
Warning The INLET label on the 100G Datalogging Commercial Gas Endpoint
must line up with the INLET label on the Sensus/Rockwell meter case.
76
100G Datalogging Installation Guide - Direct Mount
Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter
3. Verify the bottom of the 100G Datalogging Commercial Gas Endpoint and the top of
the meter meet. The endpoint housing should rest on top of the meter without gaps.
Warning Do not press down on the 100G Datalogging Commercial Gas
Endpoint if a gap exists between the endpoint and the meter.
A gap may be caused by misalignment of the endpoint wriggler and meter
wriggler's drive teeth. Pushing down on the endpoint could damage the
endpoint wriggler or meter drive teeth. To eliminate a gap, slowly turn the 100G
Datalogging Commercial Gas Endpoint's upper wriggler back and forth until the
endpoint aligns with the meter's drive teeth.
4. Align the 100G Datalogging Commercial Gas Endpoint with the index mounting
holes. Verify the index drive dog intersects with the endpoint's wriggler. Install the
endpoint mounting screws (SCR-0062-003 see Installation Prerequisites on page 8 for
screw information). Turn each screw 1/4 to 1/2 turn after it contacts the
index/endpoint assembly.
100G Datalogging Installation Guide - Direct Mount
77
Chapter 7
Sensus/Rockwell Commercial Meter Installation
5. Install the index cover. For index covers with flat-surface screw holes, use screws
(SCR-0062-002), flat washers (WSH-0020-005), and cork washers (WSH-0032-001).
For index covers with tamper seal cups, use screws, (AS-568A-011, 5/16" ID x 7/16
OD) o-rings, and tamper seals.
6. Place new tamper seals over screws (if mounting plate has tamper seal cups) and press
into place with an 11/32" nut driver or similar blunt tool. If your mounting assembly
requires a utility-approved wire seal, pass wires through holes in the screw heads and
crimp the approved wire seal.
78
100G Datalogging Installation Guide - Direct Mount
Attaching the 100G Datalogging Commercial Endpoint to a Sensus/Rockwell Commercial Diaphragm Meter
This completes installation of the 100G Datalogging Gas Endpoint on the Sensus/Rockwell
Commercial Diaphragm meter.
100G Datalogging Installation Guide - Direct Mount
79
Chapter 7
80
Sensus/Rockwell Commercial Meter Installation
100G Datalogging Installation Guide - Direct Mount
CHAPTER 8
Dresser ROOTS Commercial Rotary Meter Installation
This chapter provides the instructions to mount 100G Datalogging Gas Endpoints
(residential and commercial) on Dresser ROOTs Commercial Rotary Meters.
Some commercial AMR applications require a Dresser ROOTS Rotary Meter with a
residential 100G Datalogging Gas Endpoint. Only Elster American version residential 100G
Datalogging Gas Endpoints are compatible with Dresser ROOTS series rotary gas meters.
This chapter provides the instructions to mount an Elster American residential 100G
Datalogging Gas Endpoint on Dresser ROOTS AMR-ready Rotary Commercial Meters.
Installation requires an AMR adapter kit supplied by Dresser. Refer to the Meter
Compatibility List on page 2 for Dresser AMR adapter kit part numbers.
Installation Prerequisites
Materials Supplied By Itron
• 100G Datalogging Gas Endpoint
•
New tamper seals - if applicable
Materials Supplied by You
• AMR-ready Dresser ROOTS Rotary Meter
•
Adapter Kit from Dresser
Note Follow the Dresser Field Installation Instructions to modify the AMR-ready
Dresser ROOTS Meter for 100G Datalogging Gas Endpoint installation. Contact
Dresser distributor or Dresser representative for installation instructions specific to
the required AMR adapter kit.
100G Datalogging Installation Guide - Direct Mount
81
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
Installation Examples
The following pictures show typical installations.
Dresser B3 CTR/TC
Dresser LMMA CTR
Dresser LMMA TC
Dresser 8C15
82
100G Datalogging Installation Guide - Direct Mount
Programming the 100G Datalogging Gas Endpoint Assembly
Programming the 100G Datalogging Gas Endpoint Assembly
The 100G Datalogging Gas Endpoint must be programmed with the FC200SR
handheld computer loaded with EndPoint-Link® or Point-Link Pro® software version
5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming Guide
(TDC-0744) for more complete programming information.
Caution The 100G Datalogging Gas Endpoint must be programmed before use.
Follow the steps in this section to properly program the endpoint.
The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A
CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming
Information on page 85.
To Program the 100G Datalogging Gas Endpoint
1. Program the meter drive rate into the 100G Datalogging Gas Endpoint using the
FC200SR. For all programming and "Check Endpoint" operations, hold the FC200SR
as close to vertical as possible. For best success, keep the FC200SR within 6 feet of
the target endpoint. Verify you have the correct programming mode (Fixed Network
Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode) for your
application. Programming parameters are based on the mode defined by your system
administrator.
During programming, the 100G Datalogging Gas Endpoint is set to the nearest 100
cubic feet; the last two digits (tens and units) are programmed as zeros (0). After
programming is complete, the endpoint assembly will read to the nearest cubic foot.
100G Datalogging Installation Guide - Direct Mount
83
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Gas Endpoint using the FC200SR.
84
•
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Gas Endpoint is counting correctly.
•
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Gas Endpoint.
100G Datalogging Installation Guide - Direct Mount
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register
Settings and Direct Drive Programming Information
Use the information in the following tables to program Dresser Roots Series B3, LMMA,
and S3A Non-compensated Counter (CTR) and Temperature Compensated Counter (TC)
registers. Reference the Meter Compatibility List on page 2 to confirm compatibility.
Settings for Series B3 Registers
Model
CTR
Meter size
8C-15C and 2M-11M
Settings
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
16M-56M
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
TC
8C-15C and 2M-11M
Number of dials: 5
Drive rate: 100
PCOMP factor: NONE
16M
Number of dials: 6
Drive rate: 1000
PCOMP factor: NONE
100G Datalogging Installation Guide - Direct Mount
85
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
Settings for LMMA Registers
Model
CTR
Meter size
1.5M-11M
Settings
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
16M
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
TC
1.5M-11M
Number of dials: 5
Drive rate: 50
PCOMP factor: NONE
16M
Number of dials: 6
Drive rate: 500
PCOMP factor: NONE
Settings for Series S3A Registers
Model
CTR
Meter Size
1.5M - 11M
Settings
Number of dials: 5
Drive rate: 10
PCOMP factor: NONE
16M
Number of dials: 6
Drive rate: 100
PCOMP factor: NONE
TC
1.5M - 11M
Number of dials: 5
Drive rate: 100
PCOMP factor: NONE
16M
Number of dials: 6
Drive rate: 1000
PCOMP factor: NONE
86
100G Datalogging Installation Guide - Direct Mount
B3, LMMA, and S3A CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming Information
B3, LMMA and S3A CTR/TC Meter Drive Rates:
Residential Direct Drive Programming*
B3 CTR Meter Size
8C
B3 CTR Meter Drive Rate
10
11C
10
15C
10
2M
10
3M
10
5M
10
7M
10
11M
10
16M
100
23M
100
38M
100
56M
100
Drive rates in this table are for direct-mount residential style endpoints only
(NOT commercial or remote endpoints).
B3 TC Meter Size
8C
B3 TC Meter Drive Rate
100
11C
100
15C
100
2M
100
3M
100
5M
100
7M
100
11M
100
16M
1000
LMMA CTR Meter
Size
1.5M
LMMA CTR Meter Drive Rate
3M
10
5M
10
7M
10
11M
10
16M
100
10
100G Datalogging Installation Guide - Direct Mount
87
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
LMMA TC Meter Size
1.5M
LMMA TC Meter Drive Rate
50
3M
50
5M
50
7M
50
11M
50
16M
500
S3A CTR Meter Size
1.5M
S3A CTR Meter Drive Rate
10
3M
10
5M
10
7M
10
11M
10
16M
100
S3A TC Meter Size
1.5M
S3A TC Meter Drive Rate
100
3M
100
5M
100
7M
100
11M
100
16M
1000
Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell
Adapter.
88
100G Datalogging Installation Guide - Direct Mount
Installing the Residential 100G Datalogging Gas Endpoint Assembly to the Dresser ROOTS Rotary Meter
Installing the Residential 100G Datalogging Gas Endpoint
Assembly to the Dresser ROOTS Rotary Meter
After 100G Datalogging Gas Endpoint programming is complete, attach the 100G
Datalogging residential endpoint assembly to the Dresser ROOTS Rotary Meter. This
mounting procedure applies to B3 CTR/TC, LMMA CTR/TC, and 8C15 series Dresser
ROOTS Meters.
To Attach the 100G Datalogging Gas Endpoint
1. The 100G Datalogging Gas Endpoint must be mounted on the adapter plate in an
upright position. Align the 100G Datalogging Gas Endpoint wriggler with the opening
between the tabs of the adapter's drive dog. Insert one endpoint mounting screw and
tighten enough to hold the endpoint. Do not completely tighten. Insert the second
mounting screw and tighten two turns. Insert the third mounting screw and tighten two
turns. Insert the last mounting screw and tighten until snug. Tighten the remaining
mounting screws in an alternating, diagonal pattern until snug. All mounting screws
must be tightened evenly.
Warning A gap may be caused by misalignment of the endpoint wriggler and
meter wriggler's drive teeth. Pushing down on the endpoint could damage the
endpoint wriggler or meter drive teeth. To eliminate a gap, remove the endpoint
assembly and re-align the endpoint wriggler with the meter drive dog.
2. Complete necessary paperwork and verify all excess materials are removed from the
customer's premises.
100G Datalogging Residential Gas Endpoint installation on the Dresser ROOTS Rotary
Meter is complete.
100G Datalogging Installation Guide - Direct Mount
89
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
Installing the 100G Datalogging Commercial Gas Endpoint on
a Dresser ROOTS Rotary Meter
The information in this section guides you through the installation of the 100G Datalogging
Commercial Gas Endpoint on Dresser ROOTS rotary meters.
Note A Dresser ROOTS rotary gas meter with an instrument drive is required for
this installation procedure. These instructions show an Elster American 100G
Datalogging Commercial Gas Endpoint. The installation procedure is the same for
the Sensus/Rockwell 100G Datalogging Commercial Gas Endpoint.
100G Datalogging Elster American
Commercial Gas Endpoint
100G Datalogging Sensus/Rockwell
Commercial Gas Endpoint
Installation Requisites
Installation requires the following items:
90
•
Drive cover kit
•
100G Datalogging Commercial Gas Endpoint
•
A flat, slot-drive screwdriver
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
Programming the 100G Datalogging Commercial Gas
Endpoint Assembly
The 100G Datalogging Commercial Gas Endpoint must be programmed with the
FC200SR handheld computer loaded with EndPoint-Link® or Point-Link Pro® software
version 5.3 or later. See the Endpoint-Link v5.3 (or later) Endpoint Programming
Guide (TDC-0744) for more complete programming information.
Caution The 100G Datalogging Commercial Gas Endpoint must be programmed
before use. Follow the steps in this section to properly program the endpoint.
The endpoint is programmed based on the meter's drive rate. See B3, LMMA, and S3A
CTR/TC Dresser ROOTS Series Register Settings and Direct Drive Programming
Information on page 93.
To Program the 100G Datalogging Commercial Gas Endpoint
1. Program the meter drive rate into the 100G Datalogging Commercial Gas Endpoint
using the FC200SR. For all programming and "Check Endpoint" operations, hold the
FC200SR as close to vertical as possible. For best success, keep the FC200SR within
6 feet of the target endpoint. Verify you have the correct programming mode (Fixed
Network Mode, Mobile/Handheld Mode, or Hard to Read Mobile/Handheld Mode)
for your application. Programming parameters are based on the mode defined by your
system administrator.
During programming, the 100G Datalogging Commercial Gas Endpoint is set to the
nearest 100 cubic feet; the last two digits (tens and units) are programmed as zeros
(0). After programming is complete, the endpoint assembly will read to the nearest
cubic foot.
100G Datalogging Installation Guide - Direct Mount
91
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
2. Slowly turn the endpoint's drive wriggler two turns in the direction shown on the
index drive rate. This verifies the endpoint is counting properly after assembly.
Caution Do not turn the drive wriggler faster than one turn per second.
3. Read the 100G Datalogging Commercial Gas Endpoint using the FC200SR.
92
•
If the read result is higher than the number programmed in Step 1, the 100G
Datalogging Commercial Gas Endpoint is counting correctly.
•
If the read result is not higher than the number programmed in Step 1, replace
the 100G Datalogging Commercial Gas Endpoint.
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
B3, LMMA, and S3A CD/TD Dresser ROOTS Series Meter
Drive Rates
Use the information in the following tables to program 100G Datalogging Commercial
Endpoints installed on Dresser Roots Series B3, LMMA, and S3A Non-compensated
Counter with Instrument Drive (CD) and Temperature Compensated Counter with
Instrument Drive (TD) registers. Reference the Meter Compatibility List on page 2 to
confirm compatibility.
Warning Drive rates listed in the following tables are for commercial endpoint
programming. Do not use these settings to program residential or remote
endpoints.
B3 CD
Meter Size
8C
B3 CD Meter
Drive Rates
10
11C
10
15C
10
2M
10
3M
10
5M
10
7M
10
11M
10
16M
100
23M
100
38M
100
56M
100
B3 TD
Meter Size
B3 TD Meter
Drive Rate
8C
100
11C
100
15C
100
2M
100
3M
100
5M
100
7M
100
11M
100
16M
1000
100G Datalogging Installation Guide - Direct Mount
93
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
LMMA CD
Meter Size
1.5M
LMMA CD
Meter Drive
Rate
10
3M
10
5M
10
7M
10
11M
10
16M
100
LMMA TD
Meter Size
1.5M
LMMA TD
Meter Drive
Rate
100
3M
100
5M
100
7M
100
11M
100
16M
1000
S3A CD
Meter Size
1.5M
S3A CD
Meter Drive
Rate
100
3M
100
5M
100
7M
1000
11M
100
16M
1000
S3A TD
Meter Size
1.5M
S3A TD
Meter Drive
Rate
100
3M
100
5M
100
7M
100
11M
100
16M
1000
Note S3A rotary meters are LMMA meters retrofitted with Series 3 End Bell
Adapter.
94
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
To Attach the 100G Datalogging Commercial Gas Endpoint to the Meter
Note A cover is installed on the 100G Datalogging Commercial Gas Endpoint
mounted to a Dresser ROOTS Meter with S3A LMMA Accessory Units (or other
Dresser ROOTs adapters with odometer gauges).
1. Locate the INSTRUMENT FACE stamp (2) and position the meter with the drive dog
(1) aligned (as shown).
Warning Handle the commercial 100G Datalogging Commercial Gas
Endpoint carefully so the metal passive radiator antenna is not damaged.
2. Locate the INLET (1) stamp on the endpoint and position the endpoint as shown.
Verify the 100G Datalogging Commercial Gas Endpoint wriggler (3) and drive dog
shaft (2) are aligned.
100G Datalogging Installation Guide - Direct Mount
95
Chapter 8
Dresser ROOTS Commercial Rotary Meter Installation
3. Verify the endpoint wriggler and drive dog shaft are engaged by turning the
commercial endpoint wriggler. When properly engaged, you will feel resistance.
4. Place the index mounting plate on the endpoint and install the four mounting screws.
Do not disturb the shaft alignment.
5. Install the four 100G Datalogging Commercial Gas Endpoint mounting screws
(supplied with the commercial endpoint). Tighten mounting screws in an alternating,
diagonal sequence.
•
Turn each screw 1/4 to 1/2 turn after it contacts the cover.
•
If you can utilize a torque wrench, tighten to 72 inch-pounds.
Each endpoint mounting screw must be tightened evenly.
6. Insert new utility-approved wire seals and crimp (if required).
Note To mount an index and index cover on a rotary meter without an accessory
odometer unit, remove the domed cover and reference To Attach the Index on the
Itron-Actaris Commercial Meter on page 69.
96
100G Datalogging Installation Guide - Direct Mount
Installing the 100G Datalogging Commercial Gas Endpoint on a Dresser ROOTS Rotary Meter
Completed Installation Examples
100G Datalogging Elster American Commercial
Gas Endpoint mounted on a Dresser ROOTS Meter
100G Datalogging Sensus/Rockwell Commercial Gas
Endpoint mounted on a Dresser ROOTS Meter
100G Datalogging Installation Guide - Direct Mount
97

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.6
Linearized                      : No
Author                          : Itron
Create Date                     : 2009:04:22 09:17:40-05:00
Modify Date                     : 2009:04:22 09:18:12-05:00
Subject                         : Gas Solutions
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 4.2.1-c043 52.372728, 2009/01/18-15:08:04
Metadata Date                   : 2009:04:22 09:18:12-05:00
Creator Tool                    : Acrobat PDFMaker 9.1 for Word
Format                          : application/pdf
Title                           : 100G Datalogging Installation Guide - Direct Mount
Description                     : Gas Solutions
Creator                         : Itron
Document ID                     : uuid:5cd0280f-e6b5-4982-ac9f-8d0556119a8f
Instance ID                     : uuid:17d69fbe-9bea-4793-b6a0-284b045789af
Producer                        : Adobe PDF Library 9.0
Page Count                      : 41
EXIF Metadata provided by EXIF.tools
FCC ID Filing: EO9100GDLD

Navigation menu