LENNOX Air Handler (indoor Blower&evap) Manual L0805359
User Manual: LENNOX LENNOX Air Handler (indoor blower&evap) Manual LENNOX Air Handler (indoor blower&evap) Owner's Manual, LENNOX Air Handler (indoor blower&evap) installation guides
Open the PDF directly: View PDF .
Page Count: 4
Download | |
Open PDF In Browser | View PDF |
INSTALLATION INSTRUCTIONS Lithe U.S.A. ,t_ 2001 Dattas, Texas, USA These instructions are for CB17-185, CBH17-185, CB17-275, and CBH17-275. These instructions are intended as a general guide and do not supersede national or local codes in any way. Consult authorities who have jurisdiction before installation. CB17 blower coil units are designed for indoor vertical applications only. CBH17 blower coil units are designed for indoor horizontal applications only. Figure 1 shows a typical CB17 installation. Figure 2 shows a typical CBH17 installation. CB17 & CBH17 Series Units BLOWER COIL UNITS _ 504,438M 11/2001 Supersedes 502,512M Technical J_L Publications LithoUSA General Information ............................. CB17 & CBH17 Series Units ...................... 1 1 Shipping & Packing List .......................... Blower Motor Drive Kit Selection .................. Installation ..................................... 1 1 2 Refrigerant Piping Connections ................... Wiring ......................................... Condensate Drain Connection .................... Duct Connections ............................... 2 3 4 4 Determining the Unit's Air Volume ................. 4 RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE CB17 Blower Coil Unit Package 1 of 2 contains the following: Upflow Installation 1 - Assembled blower coil unit Figure 1 1 - Plastic bag R_URN 1 - Condensate drain plug <> 1 - Blower drive belt 6 - Plastic grommets OU_OOA Blower CBH17 A_R su_v Motor Drive Kit Package 2 of 2 contains the following: 1 - Blower motor pulley Suspended Horizontal Installation Figure 2 A IMPORTANT 1 - Blower motor 1 - Plastic bag containing blower motor bolts and washers Check equipment for shipping damage. If you find any damage, immediately contact the last carrier, The blower motor drive kits listed on the unit nameplate and in table 1 are available for use with the CB17 and CBH17 units. 11/01 IIIHIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 504,438M Page 1 IIIIIIIIIIIIIIIIIIIIIIIIIIIII Table 1 4 - Install the blower motor pulley and belt, Blower Motor Drive Kits Nominal Motor Horsepower (kW) Maximum Usable Horsepower (kW) RPM Range of All Available Drive Setups @ 1725 RPM Motor Speed DKB17-185 /275-2-10 2.0 (1.5) 2.30 (1.7) 520-660 *DKB17-18 5/275-2-11 2.0 (1.5) 2.30 (1.7) 520-660 Model Number 5 - Adjust the motor mounting plate for proper belt tension, Ideal tension is the lowest tension at which the belt will not slip under peak load conditions. Overtightening the belt will shorten the life of the belt and bearings, 6 - Tighten the motor mounting plate bolts and recheck the belt for proper tension. The coil is divided into two sections, Each section has its DKB17-185 /275-3-12 3.0 (2.2) 3.45 (2.6) 600-750 *DKB17-18 5/275-3-13 3.0 (2.2) 3.45 (2.6) 600-750 DKB17-185 /275-5-14 5.0 (3.7) 5.75 (4.3) 690-830 *DKB17-18 5/275-5-15 5.0 (3.7) 5.75 (4.3) 690-830 own suction line connection and expansion valve or valves. This configuration allows the use of a solenoid valve to control the flow of refrigerant into one coil section. Use this feature for capacity reduction or latent heat control, If a solenoid valve is used, install it directly ahead of the expansion valve of the coil section being controlled. Size the solenoid valve for approximately 50 percent of the total evaporator unit capacity. *Not available for U.L. listed units Connect the refrigerant piping from the bottom coil section to the first-stage condensing unit. ** RPM (revolutions per minute) 1 - Remove the blower access panel, 2 - Use the provided bolts and washers to install the blower motor on the motor mounting plate. Refer to figure 3, 3 - Make wiring connections per the wiring section and figure 4. The expansion valves are sized specifically for the two stages. The CB17/CBH17-185 has a 7-1/2-ton first- and second-stage expansion valve. The CB17/CBH17-275 has two 5-ton first- and second-stage expansion valves, Because of the two-section coil configuration, take care in piping the system, Refer to the condensing unit installation instructions to properly type and size the refrigerant lines for these coils. NOTE - CBf 7 and CBHf 7 series evaporator coils have a holding charge of nitrogen or dry air, If there is no pressure when the rubber plugs are removed, check the coil or line set for leaks before installing, After installation, puff a vacuum on the line set before releasing the unit charge into the system. 1 - Route piping through either side of the unit. 2 - Remove the knockouts from the piping mullion. Install the rubber grommets into the piping holes, Motor 3 - Remove the plugs from the suction line and from the two liquid line stubs, Pulley Suction Line Connections Motor Wiring Box side) Motor Adjustment Figure 3 4 - Note the location of the factory-installed expansion valve bulbs. Remove the expansion valve bulbs from the manifold so that the heat of the torch will not damage them during brazing. 5 - After connecting the refrigerant piping to the coil suction and liquid line stubs, replace the expansion valve bulbs, Ensure that each bulb is tightly clamped to the suction manifold. NOTE - The expansion valve bulbs must be reinstaffed in their original factory location, Bolt 6 - Insulate the suction line with a tubular slip-on insulation Page 2 4 - Secure the strain relief bushing to the blower motor wiring box, NOTE - Complete all refrigerant piping connections before installing the blower contactor kit, 5 - Insert the adapter bushing into the 7/8 inch (22 mm) hole in the motor wiring box, Electrical connections must comply with local codes. Refer to figure 4 for blower coil field wiring only. Electrical conduit knockouts are provided in the piping mullion, 6 - Secure the strain relief bushing at the motor wiring box. 7 - Route the blower motor leads away from sharp edges, Motor leads may need to be trimmed, 1 - Remove the knockout, _ Install the plastic bushing, NOTE - If an electric heat section has been installed in _ Position the box over the plastic bushing and secure the blower contactor kit (LB-51207CB), Refer to figure 4 for field wiring, the unit, the blower contactor kit is not required. The cabinet is equipped with knockouts for the wiring from the blower motor to the electric heat system. 24V POWER - %JZ_ S4 A A ECON o K36 _ w2 A _> K3S
Source Exif Data:File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 4 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 4, 0, 0, 13 Create Date : Mon Jun 30 04:19:39 2008 Author : Title : Subject :EXIF Metadata provided by EXIF.tools