LENNOX Furnace/Heater, Gas Manual L0806829
User Manual: LENNOX LENNOX Furnace/Heater, Gas Manual LENNOX Furnace/Heater, Gas Owner's Manual, LENNOX Furnace/Heater, Gas installation guides
Open the PDF directly: View PDF .
Page Count: 9
Download | |
Open PDF In Browser | View PDF |
® Technlc_J GAS KITS AND ACCESSORIES LJtho U.S., _ ©1993 Lennox Industries Inc. Dallas, Texas 502,887M 7/93 Supersedes INSTALLATION INSTRUCTIONS LB--63093B (64H88) GAS TWINNING KIT 502,583M FOR TWINNING KIT, NON--CONTINUOUS USED WITH GAS FIRED FURNACES A--Installing Auxiliary Package 1 of I contains: FAN, Auxiliary Limit Controls ($92) limit controls (identified as $92 on wiring 4-- #8 -- 18 screws diagram key charts) must be installed to provide protection from overheating in case of blower failure. Install auxiliary limits as described in the following sections according to the application. 5-- Grommets For Upflow Units: (Figure 1) 1- - Twinning control box with cover 2- - Auxiliary limit controls on mounting bracket 4- - 1/4" piggy back terminal connectors 1- - Loosen blower housing screw. 5- - Dual male terminal connectors 2-- Slide bracket with auxiliary limit between blower housing and blower deck. 3-- Tighten screw to secure auxiliary limit in place. Twinning kit and gas fired furnaces must be installed and wired in accordance with local codes. Authorities having jurisdiction should be consulted before installation. Refer to NEC standard in the US or CEC standard in Canada on all wire insulations and sizes. 4-- Wire limits in series with Class II 24V voltage circuit according to wiring diagrams in figures 7 and 9. NOTE--Wires used to connect auxiliary limit control should have insulated terminals. AUXILIARY LIMIT LOCATION FOR UPFLOW FURNACES B LOWE R_F"_'_t2,. Twinning kit (LB--63093B) is used for either single or two--stage burner operation with simultaneous blower operation. The two units must be of the same application: upflow, downflow or horizontal. Furnaces must also be of the same blower size. The heating speed taps on each unit must be set the same. The cooling speed tap of one unit must also be that same as the other unit. The control system is designed for single or two- -stage heating and single or two- -stage cooling. NOTE--Air stratification problems may result from using two stage heating with twinning kit. This gas twin kit does not include the feature for continuous low speed fan. A separate gas twinning kit with that feature is available as part no. 35J93. Installation of the gas twinning kit is in three parts. The auxiliary limits are installed in each furnace. Next, the gas twin control box is installed. Finally, the wiring is done to complete the project. Page1 BLOWER HOUSING _ _AUXlLIARY LIMIT (on bracket) FIGURE 1 For Downflow and Horizontal Units: (Figure 2) 1- - Using limit bracket as a guide, place bracket on the side of the blower housing and drill mounting hole. Hole should be 1"to 1- -1/2" from the edge of blower housing. Position limit so that limit face is mounted toward return air opening. 2- - Secure limit bracket with sheet screw to the side of the blower housing. 3--Wire limits in series with low voltage circuit according to wiring diagrams in figures 5, 7 and 9. NOTE--Wires used to connect auxiliary limit control should have insulated terminals. 1-- Disconnect and remove each unit transformer. Kit transformer is the only transformer needed. 2-- All power to twinning kit control box is supplied through furnace #2 door switch to terminal 8 in the twin kit control box. AUXILIARY LIMIT LOCATION FOR DOWNFLOW AND HORIZONTAL FURNACES BLOWER HOUSING AUXILIARY LIMIT (on bracket) _ SCREW I BLOWER DECK BLOWER I FIGURE 2 B--Installing Gas Twin Kit Control Box Twinning kit control box should be installed, with screws provided, on furnace side panel or any convenient location, See figure 3, TWIN KIT CONTROL BOX LOCATION II MOUNT BOX CONTROL IN A CONVENIENT LOCATION I I 2 AMP REPLACEABLE FUSE 3- - All line voltage connections must be made at the line voltage terminal strip or the line power blocks. Wire power and neutral lines to each furnace. Each furnace requires a separate power supply. 4-- All Class II 24V voltage connections must be made at the Class II 24V voltage terminal strip. 5-- The auxiliary limit controls must be connected in series in the Class II 24V voltage circuit. 6-- System must be properly grounded and blowers must have the same speed taps for cooling and the same speed taps for heating. Tape all unused wires. 7- - Unitfan controlsand indoor blower relay coils must be wired in parallel in the Class II 24V voltage circuit. 8- - For cooling applications, the "Y" or "Y1" or "Y2" wire must run to the compressor contactor and back to the ground side of the low voltage circuit in the kit control box. 9- - Use 14 gauge wire to wire kit to unit. 10- - Use replacement piggy back terminals (provided) if existing terminal are damaged when removing transformers and wiring units together. 11 - -Insert provided plastic grommets in knockouts used for wiring. 12--Affix provided wiring diagrams for each unit (unit1, unit 2) on outside of furnace cabinet in a visible and convenient location. Do not cover up existing unit schematic diagrams. COVER (INSTALLED) FIGURE 3 C--Furnace Installation Guidelines Setting Units and Installing Ducts Refer to unit installation instructions for setting of individual furnaces and follow the procedures outlined. If a common return duct is used, air entry should be uniform to ensure eq ual air flow through the two furnaces. Duct must be designed to prevent air stratification, especially in two- -stage operation. Venting Refer to furnace installation instructions and AGNGAMA venting booklet supplied with unit for guidelines. G21/GSR21 and G26 units require separate intake and exhaust pipes. Gas Piping Refer to furnace installation instructions for guidelines. Make sure gas piping is properly sized to supply two furnaces. Install piping so that there are no undue loads on the furnace gas piping. Entire system must be checked for leaks as directed in unit instructions. Figure 4 shows internal wiring of twinning kit control box. Typical wiring diagrams in figures 5 through 10 show the two furnaces in standard speed. For single stage heat operation, add heat anticipator setting of each furnace together. If the value is higher that the heat anticipation setting of the thermostat used, an isolation relay must be used. For two- -stage heat operation, refer to original unit wiring diagram for heat anticipator setting for each thermostat. Refer to individual furnace installation instructions for start--up and adjustment procedures. Fan control settings must be the same for both furnaces. Both blower door interlock switches must be engaged to supply power to the blowers and furnace control systems. When there is a call for heat, heat relay within the twinning kit control system is energized supplying power to the furnace ignition control systems. Both indoor blowers will come on when the fan- -on setting of either furnace is reached. When heat demand is satisfied, the heat relay is de--energized, cutting power to the furnace ignition control systems and closing the gas valves. Both indoor blowers will continue to run until the fan- -off settings are Page 2 reached on both fan controls. If one of the blowers should fail during a call for heat, a limit will break power to the heat relays, thus closing the gas valves. The one working blower will continue to run until the fan--off settings of both fan controls of the two furnaces are reached. The auxiliary limit resets automatically when sufficiently cooled, so the furnaces will continue to cycle with the auxiliary limit controls.An exception is on GSR21 units are equippedwith manual reset auxiliary limits (S21). When the thermostat is in the fan- -on or cooling mode, the parallel indoor blower relay coils are energized, switching the blowers to high speed or the selected cooling speed tap. The control transformer is protected by a 2 amp fuse in the twinning kit control box. 2 < no G < _ _z_ iz JJ z ou,o z u_u J_zz_ _© _ S z _D 2 8 L DD D_[1 - D_[:1 D_[1 D_[1 D_[1 D_[1 D_[1 D-J1 FIGURE 4 Page 3 DDDD II II I IIlllll %11 . ill r _ZI II I • _Jwl LL I J I J I I _lr • I7 I I I I A WIRE USED FOR TWO 5TABE HEAT APPLICATIONS ONLY. A WIRE USED FOR SINGLE STAGE HEAT APPLICATION5 ONLY. I ] _IZZZ_ I I I I I I J L 4 _2 L DESCRIPTION COMPONENT ]ONTROL BLOWER _OTOR 6LO#ER JACK BLOWER MOTOR qELAY ACCESSORY uLU6 BLOWER MOTOR 5WITCH DOOR INTERLOCK 5WITCH L[N[_(SECONDARYJ ERMINAL 5TRIP T_IN KIT (EY q5 t3 J#3 (109 _45 _51 _92 621 I "11 _ ,LINE VOLTAGE FIELD INSTALLED 24 VOLT FIELD INSTALLED _NEC/CEC CLASS 2 NOTE ALL REMAINING WIRES FACTORY INSTALLED -- m UNIT UNIT NO. NO 2 J¢5 I 5°2 $92 P45 551 I KIO£ • _ I I I I I K 09 A,_ ii _i_ LI I I 1 L h L I / I J r AI5 J LI_ 120/60/12 N_ A IJ II I k _ 120/60/I N 22N NN 1 ill • J I 2¢V POWER I I UNiT / 2 (R] 24V I I NOTE WHEN 24V POWER o _ UNITS ARE TWINNEB FOR SINGLE _ I UNIT R I I FI • I 'TB21 TO CHAN_E MOTOR SPEED TAP AND FOR BLOWER SPEEB ELECTION PROCEDURE,REFER TO INSTALLATION INSTRUCTION [_PORTANT TO PREVENT WOTOR 6URNOUT,NEVER CONNECT MORE THAN ONE _OTOR LEAD TO ANY ONE CONNECTION. ]rm 0 G G WI WI W2 ',_2 | I > Q I i 24v I BURNOUT,NEVER CONNECT MORE THAN gNE _OTOR LEAB TO ANY ONE CONNECTION. ® I ® [] HEAT I WiRE IS NBT USEB FOR TWO STAGE HEAT APPLICATIONS, o i I l i ,_, =z U I TBZI Z_ HE4T 2 WIRE IS USEB FOR TWO STA6E HEAT APPLICATION5 ONLY o _125 ANB INSULAT[gN ARE UNKNg'/_N, USE SAME SIZE THERMOPLASTIC I05aC _[RE WITH 4/64" [NSULATIGN THICKNESS_ _ _ _ z_ NOTE = I _d ADB KI09 RELAY FOR ACCESSBRY £PBTIO AMP, 2_ V4C COIL 24v COMMON o< q_ _ °_ mm mc_ LI J • LI
Source Exif Data:File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Page Count : 9 Page Layout : SinglePage Page Mode : UseNone Producer : Goby Monitor Application version 4, 0, 0, 13 Create Date : Sun Jul 20 21:08:15 2008 Author : Title : Subject :EXIF Metadata provided by EXIF.tools