LENNOX Furnace/Heater, Gas Manual L0807032

User Manual: LENNOX LENNOX Furnace/Heater, Gas Manual LENNOX Furnace/Heater, Gas Owner's Manual, LENNOX Furnace/Heater, Gas installation guides

Open the PDF directly: View PDF PDF.
Page Count: 4

DownloadLENNOX  Furnace/Heater, Gas Manual L0807032
Open PDF In BrowserView PDF
LENNOX

GAS UNITS
KITS & ACCESSORIES

(''2002Lennox Industries
Inc.
Dallas,Texas

_Technical
Jt_ Publications
Litho

U.S.A.

WIRING HARNESS
REPLACEMENT
KIT

504,456M
1/2002

INSTALLATION INSTRUCTIONS
FOR WIRING HARNESS REPLACEMENT
USED WITH G26, GHR26, G32, GHR32 AND AM30 UNITS

KITS

A,WARNING
Package 1 of I contains:
Harness assembly(ies) - quantity varies from 1 to 4
Wires - quantity varies from 0 to 3
1 - Patch plate
2 - #8- 18 X 1/2 screws
1 - Strain relief bushing
1 - Amp plug cap
1 - Foam plug (AM30 kit only)

DRIP LOOP

3

These
kits
assembly(ies)

are
used
to replace
wiring
in units as outlined in table 1.

Unit Model Number

Kit Number

G26 & 90UGF

23M24

G32

23M25

G32V

23M26

GHR26

23M27

GHR32

23M28

GHR32V

23M29

AM30

23M30

-

harness

1

-

In many cases, these units are equipped with
separate harnesses that are connected by Molex
plugs in the blower deck. Remove these harnesses
and plugs from the unit.

2

-

Use the provided plug to fill the square hole left by the
three-wire
combustion
air
inducer
harness
connectors.

3

-

Enlarge the hole left by the nine-wire harness
connectors.
It must be
large
enough
to
accommodate the replacement wiring harness and
strain-relief bushing.

4

-

Install the provided patch plate over the enlarged
hole. Use the two provided screws to secure the
patch plate to the blower deck.

5

-

6

-

WARNING

of AM30

1 - Disconnect power and gas supplies to the unit
2 - Remove unit access panels.
01/02

IIIIIIIdlllllllIIIIIlllllIIIIIllllllll

Identify existing wiring harness(es) to be replaced. If
the unit is equipped with harnesses routed through a
single strain relief bushing in the blower deck,
remove the existing harnesses and bushing. Route
replacement hamesses through the existing hole in
the blower deck and secure in place using the
provided strain
relief bushing.
Make wiring
connections per existing wiring diagram. Restore
gas and power supplies to the unit and follow start up
procedures.
G26, GHR26 & 90UGF

&,WARNING

Units with Exception

/

Secure the 9-pin (P58) and 6-pin (P156) harness
connectors to the matching connectors (J58 and
J156) on the SureLight control board.
Route the P84 and P159 two-wire harnesses from
the 6-pin (P156) harness through the patch plate in
the blower deck, Connect the P84 plug (black and
white wire) to the J84 jack on the combustion air
inducer motor. Connect the P159 plug (two white
wires) to the J159 jack on the electrode.
504,456M

IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII

7 - Route all wires from the P58 harness through the
patch plate in the blower deck, Fold the strain relief
bushing around the harness wires and snap the
bushing into place in the round patch plate hole.
8 - Make the wiring connections as outlined below:
a - Connect the piggy back terminal with the two
blue wires to the Sl 0 primary limit along with the
blue wire from pin position 6. Connect the loose
blue wire from the piggy back to the NO terminal
on the S18 combustion air pressure proving
switch.
b - Connect the yellow and orange wires to the gas
valve.
c - Connect the two brown wires to the S47 flame
rollout switch,
d - Connect the purple wire to the C terminal on the
S18 combustion air pressure proving switch,
9 - Restore gas and power supplies to the unit. Replace
access panels and follow start up procedures.

through the hole in the blower deck and insert the
pin into the P44 connector on the two-stage
control. Connect the blue wire from the C
terminal on the low fire pressure switch to the C
terminal on the high fire pressure switch.
GHR32Q Units -- Connect the blue wire from pin
position 6 to the $10 primary limit switch.
c - Connect the yellow wire to terminal C on the gas
valve.
d - Connect the two brown wires to the S47 rollout
switch
e - G32Q Units -- Connect the purple wire to the NO
terminal on the S102 high fire pressure switch,
GHR32Q Units -- Connect the purple wire to the
NO terminal on the S18 combustion air proving
switch.
f - G32Q Units Only -- Connect the blue wire from
pin position 6 to the Sl0 primary limit switch.
7

-

G32Q & GHR32Q Units

a - Connect the orange wire from pin position 3 to
the MV terminal on the gas valve.
b - Connect the yellow wire to the RTN terminal on
the SureLight board,
c - Connect the brown wire from pin position 5 to the
W2 terminal on the thermostat.
d - Connect the brown wire from pin position 6 to the
HI terminal on the gas valve,

1 - Remove existing harnesses and plugs from the unit.
The two-piece 9-pin harness that connects through
the blower deck will be replaced by the provided
harnesses.
2-Enlarge
the hole left by the 9-pin harness
connectors,
It must be
large enough
to
accommodate the replacement wiring harness and
strain-relief bushing.

8

-

If the two-stage board is equipped with a 9-pin
connector -- Select the remaining harness with a
matching connector and discard the remaining
harness. Secure the 9-pin connector to the matching
connector on the two-stage board. Secure the 6-pin
(P156) connector to the matching connector (J156)
on the SureLight control board. Secure the (P98)
3-pin connector to the combustion air inducer
connector in the blower deck. Secure the 2-pin
connector (P159) to the matching (J159) connector
on the ignitor. Make the wiring connections from the
9-pin plug as outlined below:
a - Connect the red wire from pin position 1 to the
blower motor HEAT terminal,
b - Connect the wire from pin position 4 to TB1
terminal 1.
c- Connect the wire from pin position 7 to TB1
terminal 2.
d - Connect the brown wire from pin position 8 to the
blower motor ACB LOW terminal.

g

-

If the two-stage board is not equipped with a
9-pin connector -- Select the remaining harness
that includes a 6-pin connector, a 2-pin connector
and a 3-pin connector. Discard the remaining
harness, Secure the 6-pin connector (P156) to the
matching (J156) connector on the SureLight control
board. Secure the (P98) 3-pin connector to the
combustion air inducer connector in the blower deck.
Secure the 2-pin connector (P159) to the matching
(J159) connector on the ignitor. Make the wiring
connections from the 3-pin (P98)plug as outlined
below:

3 - Install the provided patch plate over the enlarged
hole. Use the two provided screws to secure the
patch plate to the blower deck,
4 - Select the provided harness which includes a 2-pin
plug with one (G32Q) or two (GHR32Q) blue wire(s)
attached. Secure the 9-pin (P58) connector to the
matching connector (J58) on the SureLight control
board. Secure the 6-pin (J33) connnector to the
matching connector (P33) on the two-stage board.
5- G32Q Units - Secure the 2-pin plug (J44) to the
matching connector (P44) on the two-stage board,
GHR32Q Units - Secure the 2-pin plug (P135) to the
matching connector (J 135) on the secondary limit on
the blower housing. Connect the blue wire with the
piggy back terminal from pin position 1 on the
connector (P135) to the Sl0 primary limit switch,
Connect the other wire from the piggy back terminal
on the SlO primary limit switch to the C terminal on
the $18 combustion air proving switch,
6 - Make the wiring connections from P58 as outlined
below:

Make the wiring connections from J33 as outlined
below:

a - G32Q Units Only-- Connect the piggy back quick
connect terminal to the SlO primary limit.
b - G32Q Units -- Connect the other blue wire to the
C terminal on the S 102 high fire pressure switch,
G32Q-75 Units Only -- Connect the other blue
wire from SlO to terminal C on the S128 low fire
pressure switch. The kit also includes two loose
wires (one pink and one blue). Connect the quick
connect end of the pink wire to the NO terminal
on the low fire pressure switch. Route the wire

Page 2

a - ConnecttheblackwiretotheNOterminalonthe
Kll relayonthetwo-stageboard
b - Connecttheredwiretothe NCterminalonthe
Kll relayonthetwo-stageboard.
c - Connecttheblackwirefrompinpositon4 onthe
6-pinconnector(P156)totheC terminalonthe
Kll relayonthetwo-stageboard.
10- Foldthe strainreliefbushingaroundthe harness
wiresandsnapthe bushingintoplacein theround
patchplatehole,
11- Restoregasandpowersupplies
totheunit.Replace
accesspanelsandfollowstartupprocedures.
G32V & GHR32V Units
1 - Remove existing harnesses and plugs from the unit,
The two-piece 9-pin harness that connects through
the blower deck will be replaced by the provided
harnesses,
2-Enlarge
the hole left by the 9-pin harness
connectors.
It must be
large enough
to
accommodate the replacement wiring harness and
strain-relief bushing.
3 - Install the provided patch plate over the enlarged
hole. Use the two provided screws to secure the
patch plate to the blower deck.
4 - Select the provided harness which includes a 6-pin
connector and a 9-pin connector; but. does NOT
include a 3-pin connector. Secure the 9-pin (P58)
connector to the matching connector (J58) on the
SureLight control board. Secure the 6-pin (J33)
connector to the matching connector (P33) on the
two-stage board,
G32V Units Only-- Secure the 2-pin plug (J44) to the
matching connector (P44) on the two-stage board.
5 - Route all remaining wires through the patch plate in
the blower deck.
6 - Make the wiring connections from P58 as outlined
below:
a - Connect the yellow wire to terminal C on the gas
valve.
b - Connect the two brown wires to the S47 rollout
switch
c - G32V Units -- Connect the purple wire to the NO
terminal on the S102 high fire pressure switch.
GHR32V Units -- Connect the purple wire to the
NO terminal on the S18 combustion air proving
switch,
7 - Make the wiring connections from J33 as outlined
below:
a - G32V Units -- Connect the blue wire from pin
position 1 to the C terminal on the S102 high fire
pressure switch.
G32V-75 Units Only -- Connect the blue wire
from pin position 1 to the C terminal on the S128
low fire pressure switch.The kit includes two
loose wires (one pink and one blue). Connect the
quick connect end of the pink wire to the NO
terminal on the low fire pressure switch. Route
the wire through the hole in the blower deck and

insert the pin into the P44 connector on the
two-stage control, Connect the blue wire from
the C terminal on the low fire pressure switch to
the C terminal on the high fire pressure switch.
GHR32V Units -- Connect the blue wire from pin
position 1 to the C terminal on the S18
combustion air proving switch.
b - Connect the orange wire from pin position 3 to
the MV terminal on the gas valve.
c - Connect the yellow wire from pin position 4 to the
RTN terminal on the SureLight board,
d - Connect the brown wire from pin position 6 to the
HI terminal on the gas valve,
8 - If the two-stage board is equipped with a 9-pin
connector -- Select the remaining harness that
includes a 9-pin connector. Secure the 9-pin
connector to the matching connector on the
two-stage board. Secure the 6-pin (P 156) connector
to the matching connector (J156) on the SureLight
control board. Secure the 3-pin (P98) connector to
the combustion air inducer connector in the blower
deck. Secure the 2-pin connector (P159) to the
matching (J159) connector on the ignitor.
9 - If the two-stage board is not equipped with a
9-pin connector -- Select the remaining harness
that includes a 6-pin connector, a 2-pin connector
and a 3-pin connector, Secure the 6-pin connector
(P156) to the matching (J156) connector on the
SureLight control board. Secure the 2-pin connector
(P159) to the matching (J159) connector on the
ignitor. Secure the 3-pin (P98) connector to the
combustion air inducer connector in the blower deck.
Make the remaining wiring connections from the
3-pin (P98)plug as outlined below:
a - Connect the black wire to the NO terminal on the
Kll relay,
b - Connect the red wire to the NC terminal on the
Kll relay,
c- Connect the black wire from J156 pin 4 to C
terminal of the Kll relay on the two-stage board
10 - Select the provided harness which includes a 15-pin
plug, Discard the remaining harness. Secure the
15-pin (J73) connector to the matching connector
(P73) on the VSP blower control board.
11 - Make the wiring connections from J73 as outlined
below:
a - Connect the piggy back connector on the blue
wire from pin position 1 to terminal C on the TB1
terminal block, Connect the other end of the blue
wire to terminal C on the SureLight control board,
b - Connect the piggy back connector on the green
wire from pin position 2 to the G terminal on the
TB1 terminal strip. Connect the other end of the
green wire to the G terminal on the SureLight
control board.
c - Connect the brown wire from pin position 3 to the
W2 terminal on the TB1 terminal strip. Connect
the other end of the brown wire into pin position
5 on the 6-pin (J33) connector on the two-stage
control board,

Page 3

d - Connectthepurplewirefrompinposition
4 tothe
DSterminalontheTB1terminalblock,
e- G32VUnits -- Route the blue wire from pin
position 5 through the hole in the blower deck,
Connect the wire to the S 10 primary limit switch.
GHR32V Units -- Secure the 2-pin (P135)
connector to the matching connector (J135) on
the secondary limit switch on the blower housing.
Connect the blue wire from pin position 1 of P135
to the S1O primary limit switch.
f - Connect the blue wire from pin position 6 to the
R terminal on the TB1 terminal block.
g - Connect the black wire from pin position 13 to the
R terminal on the SureLight control board. Route
the existing wire from the R terminal on the
SureLight control board through the hole in the
blower deck. Connect this wire to the Sl0
primary limit switch.
h - Connect the orange wire from pin position 15 to
the MY terminal on the gas valve,
12 - Fold the strain relief bushing around the harness
wires and snap the bushing into place in the round
patch plate hole,
13 - Restore gas and power supplies to the unit, Replace
access panels and follow start up procedures.
AM30
The unit may be equipped with two 3-pin harnesses

joined by connectors at the blower deck. Remove existing
harnesses and plugs from the unit, The two-piece 3-pin
harness that connects through the blower deck will be
replaced by the provided longer wires.
1 - Disconnect power and gas supplies to the unit
2 - Remove unit access panels.
3

-

Enlarge the hole left by the 9-pin harness
connectors.
It must be
large
enough
to
accommodate the replacement wiring harness and
strain-relief bushing.

4

-

Install the provided patch plate over the enlarged
hole. Use the two provided screws to secure the
patch plate to the blower deck,

5

-

6

-

Connect stripped end of provided black wire to wire
nut in pump housing and connect quick connect
terminal to PUMP terminal on AM30 control board.
Connect stripped end of provided white wire to wire
nut in pump housing and connect quick connect
terminal to NEUTRAL terminal on AM30 control
board.

7- Connect stripped end of provided green wire to
screw terminal on pump and screw terminal on
transformer.
8 - Restore gas and power supplies to the unit. Replace
unit access panels and follow start up procedures.

Page 4



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.2
Linearized                      : No
Page Count                      : 4
Page Layout                     : SinglePage
Page Mode                       : UseNone
Producer                        : Goby Monitor Application version 4, 0, 0, 13
Create Date                     : Sun Jul 20 21:10:38 2008
Author                          : 
Title                           : 
Subject                         : 
EXIF Metadata provided by EXIF.tools

Navigation menu