Locks 6111/6111DS Installation Instructions 107681

User Manual: Locks 6111/6111DS Installation Instructions Mayflower Sales - Von Duprin

Open the PDF directly: View PDF PDF.
Page Count: 2

*931226-00*
931226-00
Note: Check with factory for retrot applications.
1
For lock or device preparation, see their directions. Also see application schedule on other side.
2
Prepare mullion for strike (see other side).
3
Wire strike (Figure 1). (Switches on 6111DS only.)
4
Test strike: Apply solenoid power. Fail secure (FSE) lip unlocks. Fail safe (FS) lip locks. Figure 1 shows status of switches.
5
Install strike with two #12-24 screws. Make sure clearance between latch bolt and strike lip is 1/32” (Figure 2).
6
If latch bolt does not extend far enough to actuate tripper, install extension (Figure 3). (Tripper on 6111DS only.)
7
Test door: With strike unlocked, door opens with latch bolt extended. When door closes, latch bolt rides over strike lip.
Figure 1
DC input is
nonpolarized.
NOTE
!
J1
J2 P2
Switches hown with tripper
depressed, strike lip closed and locked
(switches and tripper on 6111DS only)
P1
P1 J1A P1A
SO-12 or SO-24
12 VDC
or
24 VDC
12 VAC SO-12 12 VDC
or
24 VAC SO-24 24 VDC
{
{
J2
Fail safe (FS)
J2
Fail secure (FSE)
S1
S2
1
2
3
4
5
6
S1
S2
1
2
3
4
5
6
Wiring
for DC
supply
Wiring
for AC
supply
Solenoid
Standard: 5 A, 30 VDC
Gold: 0.25 A, 30 VDC
SWITCH RATINGS
}
P2
Red (C)
Blue
Yellow
White (C)
Gray
Violet }
S1
(monitors
tripper)
S2
(monitors
strike lip)
Use crimp
connectors to
splice field wiring
to P1 leads
Yellow solenoid wires = 12 VDC, 0.57 A
Black solenoid wires = 24 VDC, 0.29 A
(also shown on strike label)
SOLENOID POWER REQUIREMENTS
Use crimp connectors to
splice field wiring to P2
leads; insulate unused leads
Tripper
Figure 3
Extension
Figure 2
Top view;
faceplate not
shown for clarity
1/32”
Latch
bolt
Strike
lip
NOTE:
Static Strength Rating 1500 lb.
Dynamic Strength Rating 70ft.-lb.
Endurance Rating 250,000 c.
89/336/EEC
Electric Strike Double Door with Mullion Rim Application
6111/6111DS
Installation Instructions
© Allegion 2014
Printed in U.S.A.
931226-00 Rev. 01/14-c
Mullion Preparation for Strike
Von Duprin Device “B”
22 Rim and 98/99 Rim 3-7/16
33/35 Rim EO/DT/NL/TP 2-13/32”
33A/35A Series Rim 2-15/32”
44/88 Rim EO/DT/NL/TP 3-1/2
44/88 Rim K 3-3/8
For other devices, consult factory.
“B”
Application Schedule
RHR shown active
LHR shown inactive
“B”
299 or
268 strike
3/16”
ref.
5/16”
minimum
2-5/8
#16 drill and
#12-24 tap
2 places
Electric strike
4-1/2
X
XX
X
Line X-X corresponds to
line X-X on device template
5-1/4
1-3/32
4854 or DL 4854
mullion
1/2” 3/4
2-3/16
1-7/16
#25 drill and
#10-24 tap
2 places
1-15/16”
1/2”
2-1/8
3/4”
1-1/16
2-1/4
C strike and
device
L
#25 drill and #10-24 tap
for 268 strike only
on DL 4854
Customer Service
1-877-671-7011 www.allegion.com/us

Navigation menu