Locks 80 0180 219_E 3890 Removable Mullion Installation Instructions Inst
User Manual: Locks 3890 Removable Mullion Installation Instructions Mayflower Sales - Adams Rite
Open the PDF directly: View PDF .
Page Count: 1
Download | |
Open PDF In Browser | View PDF |
STEP 1 STEP 2 DRILL 1/4" DIA. HOLES * Measure door opening height from finished floor to bottom of header. * Use mounting plate as a template to drill three 1/4" dia.holes for 10-32 rivnuts lining up centerlines as shown in fig. 1. SIDE OUTER DER A E OF H * Subtract 1 1/8" from door opening dimension to get length of mullion. 10-32 X 1/4" PAN HEAD SCREW 2 PLCS 2 1/4" 2 * Install mounting plate with three 10-32 x 3/4" flat head screws. * Measure and cut mullion to size. WASHER- 1/4 2 PLCS * Install top fitting on mounting plate using two 1/4-20 x 3/4" pan head machine screws. OUTER SIDE 2 10-32 X 3/4" FLAT HEAD CAP SCREW 10-32 RIVNUTS (SUPPLIED W/ RIVNUT INSTALLATION KIT) This dimension is used when the door is flush with the outside of the header. If this is not the case add the distance that the door is moved inward from the face of the header to this dimension. MULLION Ø 17/64" HOLE KNURLED SPACER 2 PLCS TOP FITTING MULLION LENGTH 1 1/8" LESS THAN DOOR OPENING HEIGHT 1/4-20 X 3/8" ACORN NUT 2 PLCS MOUNTING PLATE DOOR OPENING HEIGHT 1/4-20 X 2 1/4" PAN HEAD SCREW 2 PLCS STRIKE 2 PLCS 1" 1/4-20 X 3/4" PAN HEAD SCREW 1/4-20 x 3/4" PAN HEAD SCREW CL FINISHED FLOOR LINE STEP 3 1 * Use the bottom fitting as a template and place it on the floor against the doors lining up on centerlines. 1 2 2" * Drill two 17/64" dia. holes through mullion using top and bottom fitting holes as guide. * Mark and drill two 1/2" dia. holes by 7/8" deep. www.adamsrite.com Phone: 800-626-7590 800-872-3267 Fax: 866-582-4641 800-232-7329 STEP 4 * Slide mullion into top and bottom fittings. The bottom fitting is in line with the top fitting. * Insert two 1/2" dia. zinc anchors and mount bottom fitting with two 1/4-20 x 3/4" pan head mach. screw. 10-32 X 1/2" FLAT HD. SCR. 4 PLCS CL 1/4-20 ANCHORS 2 PLCS 1" For G88 5/8" For 8800 DOOR (SECTION VIEW) FIG. 1 BOTTOM FITTING CL DRILL 1/2" DIA. HOLES X 7/8" DEEP DOOR 2" CENTERLINE OF PUSHBAR ON THE DOOR * Install & tighten the two10-32 x 1/4" pan head screws into the rear of both fittings to stabilize the mullion. * Insert 1/4 -20 x 2 1/4" pan head screw through holes in fittings and mullion. * To install the strikes, drill two 9/32" holes through mullion at the pushbar centerline and insert knurled spacers. * Slip toothed washer onto screws and secure with 1/4-20 x 3/8" acorn nuts. * Mount the strikes to the mullion using four 10-32 X 1/2" flat head cap screws. 3890 REMOVABLE MULLION FPR ALUMINUM DOORS 80-0180-219 Rev. E ECN: 11955C Date: 07-10-12 Page 1 of 1 Appvd: MP Date: 07-19-12
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.4 Linearized : Yes Author : dolid\dolid (DOLID) Create Date : 2012:07:20 13:23:55-07:00 Modify Date : 2016:08:03 14:55:02-04:00 XMP Toolkit : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26 Metadata Date : 2016:08:03 14:55:02-04:00 Creator Tool : SolidWorks 2011 SP5.0 (2011272) Document ID : uuid:9ab1f21c-789e-4394-ba55-1c3bffa4c8a2 Instance ID : uuid:5e3a33c7-fb06-402f-8941-967cd839c544 Format : application/pdf Title : 80-0180-219_E Creator : dolid\dolid (DOLID) Producer : SolidWorks PDF Publisher Page Mode : UseOutlines Page Count : 1EXIF Metadata provided by EXIF.tools