Miller Edge MGL916 Monitored Gate Link User Manual Layout 1

Miller Edge, Inc. Monitored Gate Link Layout 1

User Manual

2-1.    Open and unpack the antenna, batteries,          transmitter and receiver units.2-2.    Loosen screws from the top cover and          remove the lid. 2-3.    Route the wires from the monitored edge          through the strain relief cable fitting for          approximately four inches.         Strip the insulation from the two wires back ¼”          and secure the wires in the terminal block         marked SE 1. (not polarized.)2-4.    Place the two AA lithium batteries in their holders           in the proper direction, paying attention to the (+)           and (-) ends.2-5.    Tuck the wires connected to the SE terminal           block neatly and pull the excess wire back           through the strain relief. Securely tighten the           cable fitting.P.O. Box 159 • West Grove, PA 19390 • 800-220-3343 • 610-869-4422 • Fax: 610-869-4423 • www.milleredge.com6809 South Harl Ave., Suite A • Tempe, AZ 85283 • 800-887-3343 • 480-755-3565 • Fax: 480-755-3558MGL-K20_Inst_20151015Model #  MGL-K20INSTALLATION  INSTRUCTIONSIMPORTANT: READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATIONKit Contents:1.    MGL-TX20 Transmitter unit2.    MGL-RX20 Receiver unit3.    Receiver antenna 4.   (2) AA lithium batteries  5.   (4) #6 pan head transmitter mounting screws1-Parts ListPART NUMBER2-Install Transmitter and TestThe Monitored Gate Link (MGL) transmitter/receiver system is intended to provide a wireless connection between a monitoredsafety edge and a motorized operator that  controls  the associated gate. MGL meets the  UL 325-2016 requirements formonitored devices and has been certified as a UL 325 recognized component. It is designed for use on operators that comply withUL 325-2016 using a T2 terminated edge sensor.Required:1. 1/8” flat blade screwdriver2. 1/4” flat blade screwdriver3. T2 (10K/BLUE BAND) terminated sensing edgeRecommended:• VOM for test purposes• Mounting screws as required for receiver(2-6) EDGE WIRING TO SEI TERMINAL BLOCKTOP LIDSCREWS TEST BUTTONTRANSMITTER PCBSTRAIN RELIEFFITTINGMonitored Gate LinkImage Pending

Navigation menu