Nokia Solutions and Networks PCS002 User Manual ITMN BTSE BS11

Nokia Solutions and Networks ITMN BTSE BS11

BS11 Installation test

Download: Nokia Solutions and Networks PCS002 User Manual ITMN BTSE BS11
Mirror Download [FCC.gov]Nokia Solutions and Networks PCS002 User Manual ITMN BTSE BS11
Document ID18990
Application IDMoQ1AxlUKejiX4HkdqYc5g==
Document DescriptionBS11 Installation test
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize18.66kB (233262 bits)
Date Submitted1999-01-08 00:00:00
Date Available1999-03-16 00:00:00
Creation Date1998-03-04 13:05:40
Producing SoftwareAcrobat Distiller 3.01 for Windows
Document Lastmod1999-01-05 19:14:52
Document TitleITMN:BTSE BS11
Document CreatorWindows PSCRIPT

Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
DRAFT
A30808-X3247-B349-1-7630
CAUTION
Note: This equipment has been tested and found to comply with the
limits for a Class A digital device, pursuant to part 15 of the FCC
Rules. These limits are designed to provide reasonable protection
against harmful interference when the equipment is operated in a
commercial environment. This equipment generates, uses, and can
radiate radio frequency energy and, if not installed and used in
accordance with the instruction manual, may cause harmful
interference to radio communications. Operation of this equipment in a
residential area is likely to cause harmful interference in which case
the user will be required to correct the interference at his own
expense.
ITMN: BTSE BS11
Installation Test
Base Transceiver Station Equipment
Important Notice on Product Safety
Elevated voltages are inevitably present at specific points in this electrical equipment. Some of the
parts can also have elevated operating temperatures.
Non-observance of these conditions and the safety instructions can result in personal injury or in property damage.
Therefore only trained and qualified personnel may install and maintain the system.
The system complies with the standard EN 60950. All equipment connected has to comply with the
applicable safety standards.
Copyright (C) Siemens AG 1998
Issued by the Public Communication Network Group
Hofmannstraße 51
D-81359 München
Technical modifications possible.
Technical specifications and features are binding only insofar as
they are specifically and expressly agreed upon in a written contract.
AD – 2
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Issues
Change indications (Ind.):
N = new;
G = modified;
Document
Titel
Register
0 = deleted;
Page(s)
Issue/Ind.
ADMIN
ITMN: BTSE BS11 . . . . . AD . . . . . . . . . . . . . . . . . . . . . . . . . 1... 8
ITMN: BTSE BS11 . . . . . BS21 . . . . . . . . . . . . . . . . . . . . . . . 1... 56
This document consists of a total of Pages
A30808-X3247-B349-1-7630
AD – 3
ITMN: BTSE BS11
AD – 4
Installation Test
Base Transceiver Station Equipment
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Contents
1.1
1.2
1.3
1.4
1.5
BS11 Installation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-1
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-1
Visual Inspection of BTSE mechanics . . . . . . . . . . . . . . . . . . . . . . . . BS11-4
Visual Inspection of BTSE Electric Installation . . . . . . . . . . . . . . . . . . BS11-5
Abis Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8
Preparation for Offline Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-12
Software Download and Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Execution of Offline Tests . . . . . . . . . . . . . . .
RF and Function Tests . . . . . . . . . . . . . . . . .
Start of Abis Simulation. . . . . . . . . . . . . . . . .
Database download . . . . . . . . . . . . . . . . . . .
Call check with MA-10-Loop . . . . . . . . . . . . .
Bit Error Rate (BERT) Test with MS-Loop . .
Settings at HP 8594A . . . . . . . . . . . . . . . . . .
RFI-Confirmation: Unit ATMN . . . . . . . . . . . .
.....
.....
.....
.....
.....
.....
.....
.....
BS21-19
BS21-19
BS21-21
BS21-25
BS21-27
BS21-29
BS21-31
BS21-33
4.1
4.2
4.3
4.4
Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Frequency/Channel Conversion Table . . . . . . . . . . . . . . . . . . . . . . .
Binary-HEX-Decimal Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Power/Level Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Used Expressions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BS21-35
BS21-35
BS21-45
BS21-45
BS21-46
Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ABB - 47
A30808-X3247-B349-1-7630
.......
.......
.......
.......
.......
.......
.......
.......
......
......
......
......
......
......
......
......
AD – 5
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Illustrations
AD – 6
Fig. 1.1.1
Installation Test Sequence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-3
Fig. 1.3.1
Antenna Cabling (example) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-6
Fig. 1.1
Connection panel (for external antenna). . . . . . . . . . . . . . . . . . . . . BS11-9
Fig. 1.2
Protection circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-10
Fig. 1.4.3
SW3 /The black square stands for toggle) and TB01 ÷ TB04. . . . BS11-11
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Tables
Tab. 1.3.1
Technical Data: BS-11i and BS-11e . . . . . . . . . . . . . . . . . . . . . . . BS11-7
Tab. 1.2
Fuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8
Tab. 1.1
SW3 dip-switch configuration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8
Tab. 1.2
TB01 ÷ TB04 configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-9
Tab. 4.1
Frequency/Channel Conversion Table . . . . . . . . . . . . . . . . . . . . BS21-35
Tab. 4.2
GSM Table. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-35
Tab. 4.3
E-GSM Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-37
Tab. 4.1.4
DCS Part 1/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-38
Tab. 4.1.5
DCS Part 2/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-39
Tab. 4.1.6
DCS Part 3/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-40
Tab. 4.1.7
PCS Part 1/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-42
Tab. 4.8
PCS Part 2/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-42
Tab. 4.9
PCS Part3/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-44
Tab. 4.1
Binary-HEX-Decimal Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-45
Tab. 4.1
Power conversion table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-45
A30808-X3247-B349-1-7630
AD – 7
ITMN: BTSE BS11
AD – 8
Installation Test
Base Transceiver Station Equipment
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
1 BS11 Installation Test
1.1
1.1.1
Introduction
Aims of Installation and Commissioning
The installation and commissioning of a network element followed by unit acceptance is
proof of:
Correct, complete delivery according to network planning and the customer
order.
Correct mechanical and electrical installation according to the installation
documents.
The functional ability of the the supplied HW
(correct functioning of the NEs at an interface in relation to other network
elements)
It is assumed that:
The commissioning tests are concentrated on the function of the HW. This limits the
commisioning test to simply a function test.
This is according to the requirements for modern communication systems regarding
self-tests, and a quick and economic commissioning procedure. As the function test is
based on self-test routines a high degree of reliability is achieved.
1.1.2
Test Strategy
The commissioning tests are based on the production end-test which is carried out for
each BTSE in the customer configuration.
The production end-tests are documented in a report which is included in the BTS
delivery, and attached to the site-specific documentation.
The commissioning and unit acceptance test can therefore be limited to a simple function test.
This checks the above-mentioned aims and can also check whether damage has
occured during transport.
Any further tests or measurements must only be carried out if suspicion of a fault is
proved during the function test.
1.1.3
1.1.3.1
Using the ITMN
Required knowledge
Only trained personnel should carry out the installation and installation tests.
1.1.3.2
Test Equipment
The test equipment and tools required for the tests are described in the corresponding
chapters.
A30808-X3247-B349-1-7630
BS11 – 1
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
1.1.3.3
Procedure in the Event of Faults
If faults occur in on-line operation they should be localized and cleared in accordance
with the instructions in the User Manual (UMN).
1.1.3.4
Procedure in the Event of Serious Faults
Serious faults are those which are not dealt with in the UMN. First the specialist in the
installation team should try to clear the fault. If the installation technician is not qualified
to eliminate serious faults, a fault report must be filled out, providing the following information in detail:
–
description of the test step attempted
–
description of the system response
–
description of any system activities taking place at the same time, e.g. work done by
other testers during modifications to hardware or software
The fault report must be sent to the Technical Assistance Center (TAC).
1.1.3.5
Dealing with Defective BTSE
If a BTSE should prove to be defective, it should be sent in appropriate packing to the
repair center with the following information:
BS11 – 2
–
Name and code number of the BTSE
–
Description of the fault
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
1.1.3.6
ITMN: BTSE BS11
Installation Test Sequence
START
Visual Check of
BTSE-Mechanics
Visual Check of
BTSE-Electrics
Preparations for
Offline Tests
Execution of
Offline Tests
Preparation /
Execution
of Online Tests
END
Fig. 1.1.1 Installation Test Sequence
A30808-X3247-B349-1-7630
BS11 – 3
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
1.1.4
1.1.4.1
Safety Instructions
System Voltages
The BTSE requires a power supply voltage from 83 Vac to 265 Vac with frequency from
45 Hz to 65 Hz.
1.1.4.2
Changing Fuses
Fuses may only be changed by operater. Only authorized fuses as given in the manual
may be used. Fuses are to be changed as described in this manual.
1.1.4.3
Grounding of Modules / Racks
The BTSE must be plugged in correctly to ground it before power is switched on. Ground
connections between racks must be plugged in correctly.
1.1.4.4
CE Declaration of Conformity
The CE declaration of conformity for the product will be fulfilled if the setup and cabling
is undertaken in accordance with the specification in the manual and the documentation
listed there, such as mounting instructions, cable lists etc.Where necessary, account
should be taken of project-specific documentation.
Deviations from the specifications or independent changes during setup, such as use of
cable types with lower screening values, for example, can lead to the CE requirements
being violatad. In such cases the CE declaration of conformity is invalidated and the
responsibility passes to the person who has caused the deviations.
1.2
Visual Inspection of BTSE mechanics
All of the visual checks of the BTSE installation mechanical part are listed below.
1.2.1
BS11 – 4
BS - 11 i/900.1
–
Check that the BTSE has been fastened to the wall or pole in compliance with the
safety conditions (refer to Micro BTS-IS para. 2.1). In particular, make sure that the
wall or pole is capable of supporting the weight of the BTSE and the stresses due to
wind load.
–
Check that the BTSE code is correct: it must be 134-1791/01.
–
Check that the solar shield is the correct color and that it has been correctly
mounted.
–
Where installation of the tilting mechanism is foreseen, check that the inclination is
correct.
–
Check that the antenna panel has been correctly mounted.
–
Check that all cables necessary for operation are present and that they have been
passed through the raceways.
–
Check that the raceways for cable passage have been correctly positioned and
fastened.
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
–
1.2.2
1.3
ITMN: BTSE BS11
Check that the connector panel closing cover with relative wrench is present.
BS - 11 e/900.1
–
Check that the BTSE has been fastened to the wall or pole in compliance with the
safety conditions (refer the IMN). In particular, make sure that the wall or pole is
capable of supporting the weight of the BTSE and the stresses due to wind load.
–
Check that the BTSE code is correct: it must be 134-1791/02.
–
Check that the solar shield is the correct color and that it has been correctly
mounted.
–
Check that the dummy panel has been correctly mounted.
–
Check that all cables necessary for operation are present and that they have been
passed through the raceways.
–
Check that the raceways for cable passage have been correctly positioned and
fastened.
–
Check that the antenna (external) has been correctly installed. Where installation of
the tilting mechanism is foreseen, check that the inclination is correct.
–
Check that the connector panel closing cover with relative wrench is present.
Visual Inspection of BTSE Electric Installation
All of the visual checks of the BTSE installation electrical part are listed below.
1.3.1
BS - 11 i/900.1
Open the connector panel cover and check that the following cables are present and
correctly connected:
1.3.2
–
power supply
–
PCM
–
RF
BS - 11 e/900.1
–
Carry out the checks indicated in section 5.1.
–
Check that the antenna cable has been correctly connected (Fig. 5.1.)
–
Check that the antenna cable has been grounded at the top, in the middle and at the
bottom.
–
Check that the coaxial lightening discharges are present on both antenna cables.
–
Check the grounding of the cable guiding-slit plate when present.
–
Check that the antenna is correctly positioned and has the exact tilting value.
A30808-X3247-B349-1-7630
BS11 – 5
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Fig. 1.3.1 Antenna Cabling (example)
BS11 – 6
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
1.3.3
ITMN: BTSE BS11
Technical Data
Technical Data are listed in Tab. 1.1
OBJECT
BS-11 i/900.1
BS-11 e/900.1
Weight
~ 23 kg
~ 23 kg
Volume
0,5x0,45x0,13 (mm)
0,5x0,45x0,13 (mm)
Input AC Power
83 ÷ 265 Vac
83 ÷ 265 Vac
Watts
80W
250W
Operating temperature
-45° to +45°C
-45° to +45°C
Frequency uplink
880-915 MHz
880-915 MHz
Frequency downlink
925-960 MHz
925-960 MHz
TRX_max per rack
TRX_max per microcell
Antenna
Internal
External
TX Power
M1, M2, M3 and 2W
GSM Power Classes
M1, M2, M3 and 2W
GSM Power Classes
Tab. 1.3.1 Technical Data: BS-11i and BS-11e
1.3.4
Power Supply Check
Verify the presence of the power supply voltage and that its value is 230 VAC – 50 Hz
or 110 VAC – 60 Hz.
1.3.5
Grounding Check
Measure the ground resistance value between the grounding screw placed on the BTSE
and the grounding system ground plate. The resistance value must be less than or
equal to 5W.
1.3.6
PCM Check
Verify the presence of the PCM flux and, if necessary, remove the line terminators or
disconnecting switches present in the junction box.
1.3.7
RF Cables Check (only in case of external antenna)
Verify that the antenna and cable VSWR is less than 1.5.
1.3.8
Fuses
Four fuses are mounted in the connection panel. Their functions are listed in Tab. 1.2.
A30808-X3247-B349-1-7630
BS11 – 7
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
FUSE
TYPE
F1
10 A delayed
Protects TRX0 power supply
F2
10 A delayed
Protects TRX0 power supply
F3
10 A delayed
Protects TRX1 power supply
F4
10 A delayed
Protects TRX1 power supply
Tab. 1.2
1.4
FUNCTION
Fuses
Abis Interface
The BTSE is pre-set with 120 Ohm impedance at the factory.
It is possible, however, to change the impedance value and move it to 75 Ohm.
Proceed as follows to change the impedance:
–
Open the connector panel cover, using the appropriate wrench supplied, to gain
access to the panel.
–
Unscrew (Fig. 1.1.) the 4 screws (1) and remove the cover (2), thus gaining access
to the protection circuit.
–
Unscrew the screw (1, Fig. 1.2.).
–
Lift up the protection circuit using the two handles (2, Fig. 1.2.).
–
Set the switches on the mini dip-switch SW3 Fig. 1.3.) as indicated in Tab. 1.1. (“75
Ohm impedance” column).
The jumpers for the connection with 75 Ohm impedance are placed in the inner of the
entry cables cover.
DIP-SWITCH
75 Ohm IMPEDANCE
120 Ohm IMPEDANCE
Tab. 1.1
SW3 dip-switch configuration
Carry out the connections indicated in Fig. 1.2. on the T0B1 ÷ TB04 terminal board.
BS11 – 8
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
TERMINAL BOARD
75 Ohm IMPEDANCE
120 Ohm IMPEDANCE
TB01
2-3
NO JUMPER
TB02
2-3
NO JUMPER
TB03
2-3
NO JUMPER
TB04
2-3
NO JUMPER
Tab. 1.2
Fig. 1.1
A30808-X3247-B349-1-7630
ITMN: BTSE BS11
TB01 ÷ TB04 configuration
Connection panel (for external antenna)
BS11 – 9
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
pin 2
pin 4 pin 6
pin 8
pinning of J01 and J02
pin 1
pin 3 pin 5
Fig. 1.2
BS11 – 10
pin 5
Protection circuit
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Fig. 1.4.3 SW3 /The black square stands for toggle) and TB01 ÷ TB04
–
Set the protection circuit in its slot making sure that the plastic handles do not go
between the connector pins.
–
Place the protection circuit cover in position and tighten the 4 fastening screws.
–
Close the connector panel cover with the appropriate wrench.
A30808-X3247-B349-1-7630
BS11 – 11
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
1.5
Preparation for Offline Tests
The purpose of this chapter is to execute all commissioning activities for
checking the delivery quality and quantity of the BTSE on site.
The following steps have to be executed to start the system:
1. Obtain the recommended test and test equipment
2. Preparation of the test and test equipment
3. BTSE power on
4.Start of LMT
5. Download of the Safety SW
6. Creation of HW related MO
7. Set attributes for BTSE
8. Offline tests
Finally all documents must be filled in and all activities must be confirmed by the
customer.
1.5.1
Recommended Test Equipment and Tools
Several devices, instruments, accessories and utensils have to be
provided and prepared for commisioning on site.
1.5.1.1
Test equipment
The equipment listed below has to be present for call simulation and verification of
correct operation.
SBS Abis Simulator
BS11 – 12
HW:
Portable PC min.80386DX, 16Bit AT, 4 MByte RAM
120MByte HD
VGA/SVGA 640x480 Monitor
Mouse
2x serial IF
1x parallel IF, 1hour Battery Time
Full-Size Expansion Slot for MA-10 Card
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
SW:
MA-10 Base Package, Abis application
Cable:
120Ω-MA10-Card<->Abis
75Ω-MA10-Card<->Abis
Local Maintenance Terminal LMT
HW:
Portable PC min.80386DX, 16Bit AT, 4 MByte RAM
120MByte HD
VGA/SVGA 640x480 Monitor
Mouse
2x serial IF
1x parallel IF, 1hour Battery Time
Full-Size Expansion Slot for V.11-IF->EICON-CARD:X.21-Level1/LAPBLevel2
SW:
MS-DOS-5.0 or higher
OSI-Gateway-V3R1
LMT Version:see actual SW Release Note
Virus Scanner e.g. McAFEE-V117
Cable: 15-PIN (NE) - 26PIN (LMT)
Spectrum Analyser HP 8594A/E
HW:
HP8594A/E
Option:004/010/021/101/102/105
SW:
GSM: HP 85715B Personality Card
DCS: HP 85722B Personality Card
Cable:
BNC_male-SMA_male: e.g.RG58
Adapter:
N_male-BNC_female
MS_BS RF Coupling BOX
HW:
Cable:
BNC_male-BNC_male (MS)
3x:7/16_male-N_male (RX/TX)
Adapter:
A30808-X3247-B349-1-7630
MS_BS-Coupling-Box (RF)
7/16_male-N_male
Tool:
BS11 – 13
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Absorber 20dB/25Watt
50 Ω Termination N_male
Mobile Station MS
HW:
GSM-P1
GSM-S1 +CarKit
GSM-S3 +CarKit
DCS-PT-11+CarKit
DCS Mercury one-to-one plus Car Kit
SW:
Tracer SW-P1
Test-SIM
Test Plug-In SIM
Multimeter
HW:
1.5.1.2
SIEMENS Multimeter
Tools
Special tools for commissioning activities on site are listed below.
IC Extraction Tools
IC-Extraction Tool for DIL-EPROM
-IC-Extraction Tool for PLCC
Antistatic Set
for ESD Module Handling
SMA Tool
for Semi-rigid Cable Connectors
SMC Tool
for Semi-rigid Cable Connectors
Semi Rigid Bending Tool
for Semi rigid cable connection
TDMA Measuring Tools (Tests with HP 8594A/E) and Trigger Adapter
BS11 – 14
HW:
2 Measuring cable with BNC-Plugs male (sufficient length)
Adapter SMC male - BNC female
Trigger adapter for TAD at MCLK or LI
(50-pins AMP-Plug with 2 x BNC-Plug female )
2 Adapter N-Connector male - BNC female
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
1.5.2
1.5.2.1
ITMN: BTSE BS11
HP 8590 series spectrum analyser operating manual
User´s Guide HP85715B GSM900 Transmitter Measurement Personality
User´s Guide HP 85722B DCS1800 Transmitter Measurement Personality
Preparation and Presetting of Test Equipment
Test equipment
For minimum test time and correct test results the devices
have to be prepared on site.
Spectrum Analyzer
HW: the HP8594A/E needs a warm-up time of 20 minutes depending on the
available options.
The display shows "OVEN COLD" during the heating phase. Afterwards a
CALIBRATION has to be carried out for defined measurement execution.
SW: The SW of GSM/DCS card has to be installed in advance.
Cable:
For special tests, e.g."Power versus Time" a BNC loop at the
backplane has to be provided:
GATE-OUTPUT(TTL) to EXTERN TRIGGER INPUT
The cable from CCLK(TAD) to GATE-INPUT(TTL)
for TDMA-FRAME Trigger has to be connected.
See analyzer operating manual for more detailed information.
1.5.2.2
Software (SW)
For all tests only released SW (corresponding to the BTSE HW/SW release) is allowed
to be running on the test equipment (TE).
1.5.2.3
Boot Software/Firmware (SW/FW)
For all tests only the released SW is allowed to be running on the BTSE corresponding
to the BTSE HW/SW/FW release/revision.
1.5.3
1.5.4
1.5.4.1
Connections
–
Open the connector panel cover, using the appropriate wrench supplied, to gain
access to the panel itself (Fig. 1.1.).
–
Unscrew the 4 screws (1) and remove the cover (2), to gain access to connector J02
(Fig. 1.2.).
BTSE Power ON
Power On
Power the BTSE by setting the ON/OFF switch to ON.
NOTE:
A30808-X3247-B349-1-7630
After having disconnected the power from the BTSE, it is necessary to wait
a couple of seconds before powering it.
BS11 – 15
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
1.5.4.2
LED Indication
The SL01 LED on the connector panel must be illuminated with green light. This means
that the BTSE is connected to the network.
BS11 – 16
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
2 Software Download and Activation
1. Switch on power of BS11
2. Activate LMT and Login as Administrator and Enter the PASSWORD
(default=admin)
3. a. MBTS Phase 1: Warm up
b. MBTS Phase 2: Normal (after a few minutes)
4. Download of safety SW
Software -->Download-->Browse:
(the Download window appears)
select the file btsbmcXX.swi
(XX=version numbe)r
-->ok-->start Download
wait about 15’
- after Download:--> Cancel (100% readed)
- after 1’: LMT shows:
MBTS Phase: 1 Load SMU SAFETY
wait about 5’
5. Creation of the objects:
LMT-window shows MBTS Phase: 2 wait Min Config
LI-->Create Obj: select desired properties-->Send-->o.k.
GPSU-->Create Obj-->send-->o.k.
ALCO-->Create Obj-->send-->o.k.
CCLK-->Create Obj-->send-->o.k.
BTSU-->SET Attributes: select desired properties-->send-->o.k.-->cancel
BBSIG 0-->Create Obj-->use default properties-->send-->o.k.
PA_0-->Create Obj-->select desired properties-->send-->o.k.
6. Configuration
-->Get Attribute-->E.S.N: if error message appears-->go:step 7, if not: step 9
-->Get Attribute-->CALIBRATION: if error message appears-->go:step XY, if
not: step YY
7. Logoff-->Logon-->Factory-->E.S.N.: enter values according to the BS11
label
135
Code
- 2044
Sequence
Number
/ 02.
Edition
Number
. 07
Version
Number
+Serial-Number
-->send-->o.k.-->cancel
A30808-X3247-B349-1-7630
IN – 17
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
8.
Configuration-->SET Attributes-->Calibration: enter for
Chain 1: 0
Chain 2: 0
PLL Calibration: 1024
Antenna Type: External or Internal
-->send-->o.k.-->cancel
9.
LMT window:
MBTS phase: Load from BSC
If the connection between BS11 and BSC already exists and the BTSU parameters are stored in the BSC (TEI...)
an automatic download from BSC to BTSE is started
if not: -->10
10. Download from LMT
- Operator Access-->Logoff-->Logon-->Administrator:Password
- Software-->Download-->Browse:
-->select the desired SW-Load Header
- o.k.-->start Download
wait about 15’
- after Download: Cancel (100% reached)
after 1’: LMT shows:
MBTS Phase: 1 Load SMU SAFETY
wait about 5’
IN – 18
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
3 Execution of Offline Tests
3.1
3.1.1
RF and Function Tests
Purpose of the Abis Simulation on the MA-10 Card
The Mobile Radio Analyzer MA-10 is used for
offline functional tests on site.
A database download has to be done with the MA-10
after succesfull creation of HW related objects.
The DB download allows to execute two test procedures:
1. BERT test with MS loop.
2. Voice test with MA-10 loop.
3.1.2
Preparation of the Abis Simulation
The Abis Simulation contains a MA-10 Card with SW on disk and the
application SW Abis Simulation Ext. SIEMENS. The SW requires a DOS
computer with WINDOWS 3.X.
The MA-10 has to be installed and tested in advance,
according to the Installation Manual BN 3032/98.80(W&G).
In addition refer to the Operating Manual BN 3032/94.08(W&G)
of Abis Simulation Ext. SIEMENS.
The neccessary cable for the connetion to the BTSE Abis interface
has to be provided.
The IMSI of TestSim, which will be used for the MS, has to be
entered in "SAG.INI" -File (one of the ABIS SIMULATION EXT.SIEMENS files) in
advance.
Note: See also additional information in the help menue of the simulator.
3.1.3
Connection of Test equipment (TE)
To achieve reliable measurement results the connections must be plugged correctly and
faultless contact must be guaranteed.
The complete equipment has to be connected in the following order:
1.
Attenuator (20dB/25W)
to HYCOM/DUCOM/DUKIT(ANT)
2.
HYCOM/DUCOM/DUKIT (Test)
to RF-(Connection-)Box(Test)
3.
RF-Box(RXAMOD/RXAMCO)
to RXAMOD/RXAMCO (RFin)
4.
RXAMOD(RFout)
to RCAP(RX0-5)(with specific attenuation)
RXAMCO (out)
to TPU (in)
5.
MS
to RF-Box(MS)
6.
MA-10 Card
to RCAP/OVPT-Abis
A30808-X3247-B349-1-7630
BS11 – 19
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
3.1.4
Check BTSE Phase
Before you start the Abis Simulation check the phase of the BTSE at the LMT. It must
be in Phase three.
BS11 – 20
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
3.2
ITMN: BTSE BS11
Start of Abis Simulation
Start MA-10 control
WINDOWS has to be started first before the MA-10 is started.
The start of Abis Simulation requires the start of MA-10 Control.
The HW and SW performs the necessary boot procedure automatically.
Click on the MA-10 Control icon
SIEMENSAbisSim
Application Start
The ABIS SIMULATION EXT SIEMENS Window appears.
SIEMENSAbisSim Phase x (Select from application field).
Load Test File
The released test sequence has to be loaded.
File
Load Test File...

Apply
Close
Now the MA-10 is ready for the data base download procedure.
Configuration of the BTSE-type
The special BTSE parameters have to be set.
Configuration
BTS Equipment....
BTSE
< select: Network Type, No. of BTS and TRX>
Signalling
< select: Sign. channel type and BTSM as created in BTSE>
Apply
Close
Configuration of BCCH
The network codes have to be entered.
Configuration
BCCH Info...
LAC/CI
< Enter the corresponding network codes>
Apply
Close
BS11 – 22
A30808-X3247-B349-1-7630
Installation Test
Base Transceiver Station Equipment
ITMN: BTSE BS11
Set site specific test parameter
Additionally parameter set for current site configuration will be performed.
Database
Edit