Nokia Solutions and Networks PCS002 User Manual ITMN BTSE BS11
Nokia Solutions and Networks ITMN BTSE BS11
Contents
- 1. User manuals index
- 2. BS11 Introduction
- 3. BS11 Installation
- 4. BS11 Installation test
BS11 Installation test
Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 DRAFT A30808-X3247-B349-1-7630 CAUTION Note: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. ITMN: BTSE BS11 Installation Test Base Transceiver Station Equipment Important Notice on Product Safety Elevated voltages are inevitably present at specific points in this electrical equipment. Some of the parts can also have elevated operating temperatures. Non-observance of these conditions and the safety instructions can result in personal injury or in property damage. Therefore only trained and qualified personnel may install and maintain the system. The system complies with the standard EN 60950. All equipment connected has to comply with the applicable safety standards. Copyright (C) Siemens AG 1998 Issued by the Public Communication Network Group Hofmannstraße 51 D-81359 München Technical modifications possible. Technical specifications and features are binding only insofar as they are specifically and expressly agreed upon in a written contract. AD – 2 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Issues Change indications (Ind.): N = new; G = modified; Document Titel Register 0 = deleted; Page(s) Issue/Ind. ADMIN ITMN: BTSE BS11 . . . . . AD . . . . . . . . . . . . . . . . . . . . . . . . . 1... 8 ITMN: BTSE BS11 . . . . . BS21 . . . . . . . . . . . . . . . . . . . . . . . 1... 56 This document consists of a total of Pages A30808-X3247-B349-1-7630 AD – 3 ITMN: BTSE BS11 AD – 4 Installation Test Base Transceiver Station Equipment A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Contents 1.1 1.2 1.3 1.4 1.5 BS11 Installation Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-1 Visual Inspection of BTSE mechanics . . . . . . . . . . . . . . . . . . . . . . . . BS11-4 Visual Inspection of BTSE Electric Installation . . . . . . . . . . . . . . . . . . BS11-5 Abis Interface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8 Preparation for Offline Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-12 Software Download and Activation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 3.1 3.2 3.3 3.4 3.5 3.6 3.7 Execution of Offline Tests . . . . . . . . . . . . . . . RF and Function Tests . . . . . . . . . . . . . . . . . Start of Abis Simulation. . . . . . . . . . . . . . . . . Database download . . . . . . . . . . . . . . . . . . . Call check with MA-10-Loop . . . . . . . . . . . . . Bit Error Rate (BERT) Test with MS-Loop . . Settings at HP 8594A . . . . . . . . . . . . . . . . . . RFI-Confirmation: Unit ATMN . . . . . . . . . . . . ..... ..... ..... ..... ..... ..... ..... ..... BS21-19 BS21-19 BS21-21 BS21-25 BS21-27 BS21-29 BS21-31 BS21-33 4.1 4.2 4.3 4.4 Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Frequency/Channel Conversion Table . . . . . . . . . . . . . . . . . . . . . . . Binary-HEX-Decimal Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Power/Level Conversion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Used Expressions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-35 BS21-35 BS21-45 BS21-45 BS21-46 Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ABB - 47 A30808-X3247-B349-1-7630 ....... ....... ....... ....... ....... ....... ....... ....... ...... ...... ...... ...... ...... ...... ...... ...... AD – 5 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Illustrations AD – 6 Fig. 1.1.1 Installation Test Sequence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-3 Fig. 1.3.1 Antenna Cabling (example) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-6 Fig. 1.1 Connection panel (for external antenna). . . . . . . . . . . . . . . . . . . . . BS11-9 Fig. 1.2 Protection circuit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-10 Fig. 1.4.3 SW3 /The black square stands for toggle) and TB01 ÷ TB04. . . . BS11-11 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Tables Tab. 1.3.1 Technical Data: BS-11i and BS-11e . . . . . . . . . . . . . . . . . . . . . . . BS11-7 Tab. 1.2 Fuses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8 Tab. 1.1 SW3 dip-switch configuration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-8 Tab. 1.2 TB01 ÷ TB04 configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS11-9 Tab. 4.1 Frequency/Channel Conversion Table . . . . . . . . . . . . . . . . . . . . BS21-35 Tab. 4.2 GSM Table. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-35 Tab. 4.3 E-GSM Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-37 Tab. 4.1.4 DCS Part 1/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-38 Tab. 4.1.5 DCS Part 2/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-39 Tab. 4.1.6 DCS Part 3/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-40 Tab. 4.1.7 PCS Part 1/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-42 Tab. 4.8 PCS Part 2/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-42 Tab. 4.9 PCS Part3/3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-44 Tab. 4.1 Binary-HEX-Decimal Table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-45 Tab. 4.1 Power conversion table . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BS21-45 A30808-X3247-B349-1-7630 AD – 7 ITMN: BTSE BS11 AD – 8 Installation Test Base Transceiver Station Equipment A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 1 BS11 Installation Test 1.1 1.1.1 Introduction Aims of Installation and Commissioning The installation and commissioning of a network element followed by unit acceptance is proof of: Correct, complete delivery according to network planning and the customer order. Correct mechanical and electrical installation according to the installation documents. The functional ability of the the supplied HW (correct functioning of the NEs at an interface in relation to other network elements) It is assumed that: The commissioning tests are concentrated on the function of the HW. This limits the commisioning test to simply a function test. This is according to the requirements for modern communication systems regarding self-tests, and a quick and economic commissioning procedure. As the function test is based on self-test routines a high degree of reliability is achieved. 1.1.2 Test Strategy The commissioning tests are based on the production end-test which is carried out for each BTSE in the customer configuration. The production end-tests are documented in a report which is included in the BTS delivery, and attached to the site-specific documentation. The commissioning and unit acceptance test can therefore be limited to a simple function test. This checks the above-mentioned aims and can also check whether damage has occured during transport. Any further tests or measurements must only be carried out if suspicion of a fault is proved during the function test. 1.1.3 1.1.3.1 Using the ITMN Required knowledge Only trained personnel should carry out the installation and installation tests. 1.1.3.2 Test Equipment The test equipment and tools required for the tests are described in the corresponding chapters. A30808-X3247-B349-1-7630 BS11 – 1 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 1.1.3.3 Procedure in the Event of Faults If faults occur in on-line operation they should be localized and cleared in accordance with the instructions in the User Manual (UMN). 1.1.3.4 Procedure in the Event of Serious Faults Serious faults are those which are not dealt with in the UMN. First the specialist in the installation team should try to clear the fault. If the installation technician is not qualified to eliminate serious faults, a fault report must be filled out, providing the following information in detail: – description of the test step attempted – description of the system response – description of any system activities taking place at the same time, e.g. work done by other testers during modifications to hardware or software The fault report must be sent to the Technical Assistance Center (TAC). 1.1.3.5 Dealing with Defective BTSE If a BTSE should prove to be defective, it should be sent in appropriate packing to the repair center with the following information: BS11 – 2 – Name and code number of the BTSE – Description of the fault A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment 1.1.3.6 ITMN: BTSE BS11 Installation Test Sequence START Visual Check of BTSE-Mechanics Visual Check of BTSE-Electrics Preparations for Offline Tests Execution of Offline Tests Preparation / Execution of Online Tests END Fig. 1.1.1 Installation Test Sequence A30808-X3247-B349-1-7630 BS11 – 3 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 1.1.4 1.1.4.1 Safety Instructions System Voltages The BTSE requires a power supply voltage from 83 Vac to 265 Vac with frequency from 45 Hz to 65 Hz. 1.1.4.2 Changing Fuses Fuses may only be changed by operater. Only authorized fuses as given in the manual may be used. Fuses are to be changed as described in this manual. 1.1.4.3 Grounding of Modules / Racks The BTSE must be plugged in correctly to ground it before power is switched on. Ground connections between racks must be plugged in correctly. 1.1.4.4 CE Declaration of Conformity The CE declaration of conformity for the product will be fulfilled if the setup and cabling is undertaken in accordance with the specification in the manual and the documentation listed there, such as mounting instructions, cable lists etc.Where necessary, account should be taken of project-specific documentation. Deviations from the specifications or independent changes during setup, such as use of cable types with lower screening values, for example, can lead to the CE requirements being violatad. In such cases the CE declaration of conformity is invalidated and the responsibility passes to the person who has caused the deviations. 1.2 Visual Inspection of BTSE mechanics All of the visual checks of the BTSE installation mechanical part are listed below. 1.2.1 BS11 – 4 BS - 11 i/900.1 – Check that the BTSE has been fastened to the wall or pole in compliance with the safety conditions (refer to Micro BTS-IS para. 2.1). In particular, make sure that the wall or pole is capable of supporting the weight of the BTSE and the stresses due to wind load. – Check that the BTSE code is correct: it must be 134-1791/01. – Check that the solar shield is the correct color and that it has been correctly mounted. – Where installation of the tilting mechanism is foreseen, check that the inclination is correct. – Check that the antenna panel has been correctly mounted. – Check that all cables necessary for operation are present and that they have been passed through the raceways. – Check that the raceways for cable passage have been correctly positioned and fastened. A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment – 1.2.2 1.3 ITMN: BTSE BS11 Check that the connector panel closing cover with relative wrench is present. BS - 11 e/900.1 – Check that the BTSE has been fastened to the wall or pole in compliance with the safety conditions (refer the IMN). In particular, make sure that the wall or pole is capable of supporting the weight of the BTSE and the stresses due to wind load. – Check that the BTSE code is correct: it must be 134-1791/02. – Check that the solar shield is the correct color and that it has been correctly mounted. – Check that the dummy panel has been correctly mounted. – Check that all cables necessary for operation are present and that they have been passed through the raceways. – Check that the raceways for cable passage have been correctly positioned and fastened. – Check that the antenna (external) has been correctly installed. Where installation of the tilting mechanism is foreseen, check that the inclination is correct. – Check that the connector panel closing cover with relative wrench is present. Visual Inspection of BTSE Electric Installation All of the visual checks of the BTSE installation electrical part are listed below. 1.3.1 BS - 11 i/900.1 Open the connector panel cover and check that the following cables are present and correctly connected: 1.3.2 – power supply – PCM – RF BS - 11 e/900.1 – Carry out the checks indicated in section 5.1. – Check that the antenna cable has been correctly connected (Fig. 5.1.) – Check that the antenna cable has been grounded at the top, in the middle and at the bottom. – Check that the coaxial lightening discharges are present on both antenna cables. – Check the grounding of the cable guiding-slit plate when present. – Check that the antenna is correctly positioned and has the exact tilting value. A30808-X3247-B349-1-7630 BS11 – 5 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Fig. 1.3.1 Antenna Cabling (example) BS11 – 6 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment 1.3.3 ITMN: BTSE BS11 Technical Data Technical Data are listed in Tab. 1.1 OBJECT BS-11 i/900.1 BS-11 e/900.1 Weight ~ 23 kg ~ 23 kg Volume 0,5x0,45x0,13 (mm) 0,5x0,45x0,13 (mm) Input AC Power 83 ÷ 265 Vac 83 ÷ 265 Vac Watts 80W 250W Operating temperature -45° to +45°C -45° to +45°C Frequency uplink 880-915 MHz 880-915 MHz Frequency downlink 925-960 MHz 925-960 MHz TRX_max per rack TRX_max per microcell Antenna Internal External TX Power M1, M2, M3 and 2W GSM Power Classes M1, M2, M3 and 2W GSM Power Classes Tab. 1.3.1 Technical Data: BS-11i and BS-11e 1.3.4 Power Supply Check Verify the presence of the power supply voltage and that its value is 230 VAC – 50 Hz or 110 VAC – 60 Hz. 1.3.5 Grounding Check Measure the ground resistance value between the grounding screw placed on the BTSE and the grounding system ground plate. The resistance value must be less than or equal to 5W. 1.3.6 PCM Check Verify the presence of the PCM flux and, if necessary, remove the line terminators or disconnecting switches present in the junction box. 1.3.7 RF Cables Check (only in case of external antenna) Verify that the antenna and cable VSWR is less than 1.5. 1.3.8 Fuses Four fuses are mounted in the connection panel. Their functions are listed in Tab. 1.2. A30808-X3247-B349-1-7630 BS11 – 7 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 FUSE TYPE F1 10 A delayed Protects TRX0 power supply F2 10 A delayed Protects TRX0 power supply F3 10 A delayed Protects TRX1 power supply F4 10 A delayed Protects TRX1 power supply Tab. 1.2 1.4 FUNCTION Fuses Abis Interface The BTSE is pre-set with 120 Ohm impedance at the factory. It is possible, however, to change the impedance value and move it to 75 Ohm. Proceed as follows to change the impedance: – Open the connector panel cover, using the appropriate wrench supplied, to gain access to the panel. – Unscrew (Fig. 1.1.) the 4 screws (1) and remove the cover (2), thus gaining access to the protection circuit. – Unscrew the screw (1, Fig. 1.2.). – Lift up the protection circuit using the two handles (2, Fig. 1.2.). – Set the switches on the mini dip-switch SW3 Fig. 1.3.) as indicated in Tab. 1.1. (“75 Ohm impedance” column). The jumpers for the connection with 75 Ohm impedance are placed in the inner of the entry cables cover. DIP-SWITCH 75 Ohm IMPEDANCE 120 Ohm IMPEDANCE Tab. 1.1 SW3 dip-switch configuration Carry out the connections indicated in Fig. 1.2. on the T0B1 ÷ TB04 terminal board. BS11 – 8 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment TERMINAL BOARD 75 Ohm IMPEDANCE 120 Ohm IMPEDANCE TB01 2-3 NO JUMPER TB02 2-3 NO JUMPER TB03 2-3 NO JUMPER TB04 2-3 NO JUMPER Tab. 1.2 Fig. 1.1 A30808-X3247-B349-1-7630 ITMN: BTSE BS11 TB01 ÷ TB04 configuration Connection panel (for external antenna) BS11 – 9 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 pin 2 pin 4 pin 6 pin 8 pinning of J01 and J02 pin 1 pin 3 pin 5 Fig. 1.2 BS11 – 10 pin 5 Protection circuit A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Fig. 1.4.3 SW3 /The black square stands for toggle) and TB01 ÷ TB04 – Set the protection circuit in its slot making sure that the plastic handles do not go between the connector pins. – Place the protection circuit cover in position and tighten the 4 fastening screws. – Close the connector panel cover with the appropriate wrench. A30808-X3247-B349-1-7630 BS11 – 11 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 1.5 Preparation for Offline Tests The purpose of this chapter is to execute all commissioning activities for checking the delivery quality and quantity of the BTSE on site. The following steps have to be executed to start the system: 1. Obtain the recommended test and test equipment 2. Preparation of the test and test equipment 3. BTSE power on 4.Start of LMT 5. Download of the Safety SW 6. Creation of HW related MO 7. Set attributes for BTSE 8. Offline tests Finally all documents must be filled in and all activities must be confirmed by the customer. 1.5.1 Recommended Test Equipment and Tools Several devices, instruments, accessories and utensils have to be provided and prepared for commisioning on site. 1.5.1.1 Test equipment The equipment listed below has to be present for call simulation and verification of correct operation. SBS Abis Simulator BS11 – 12 HW: Portable PC min.80386DX, 16Bit AT, 4 MByte RAM 120MByte HD VGA/SVGA 640x480 Monitor Mouse 2x serial IF 1x parallel IF, 1hour Battery Time Full-Size Expansion Slot for MA-10 Card A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 SW: MA-10 Base Package, Abis application Cable: 120Ω-MA10-Card<->Abis 75Ω-MA10-Card<->Abis Local Maintenance Terminal LMT HW: Portable PC min.80386DX, 16Bit AT, 4 MByte RAM 120MByte HD VGA/SVGA 640x480 Monitor Mouse 2x serial IF 1x parallel IF, 1hour Battery Time Full-Size Expansion Slot for V.11-IF->EICON-CARD:X.21-Level1/LAPBLevel2 SW: MS-DOS-5.0 or higher OSI-Gateway-V3R1 LMT Version:see actual SW Release Note Virus Scanner e.g. McAFEE-V117 Cable: 15-PIN (NE) - 26PIN (LMT) Spectrum Analyser HP 8594A/E HW: HP8594A/E Option:004/010/021/101/102/105 SW: GSM: HP 85715B Personality Card DCS: HP 85722B Personality Card Cable: BNC_male-SMA_male: e.g.RG58 Adapter: N_male-BNC_female MS_BS RF Coupling BOX HW: Cable: BNC_male-BNC_male (MS) 3x:7/16_male-N_male (RX/TX) Adapter: A30808-X3247-B349-1-7630 MS_BS-Coupling-Box (RF) 7/16_male-N_male Tool: BS11 – 13 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 Absorber 20dB/25Watt 50 Ω Termination N_male Mobile Station MS HW: GSM-P1 GSM-S1 +CarKit GSM-S3 +CarKit DCS-PT-11+CarKit DCS Mercury one-to-one plus Car Kit SW: Tracer SW-P1 Test-SIM Test Plug-In SIM Multimeter HW: 1.5.1.2 SIEMENS Multimeter Tools Special tools for commissioning activities on site are listed below. IC Extraction Tools IC-Extraction Tool for DIL-EPROM -IC-Extraction Tool for PLCC Antistatic Set for ESD Module Handling SMA Tool for Semi-rigid Cable Connectors SMC Tool for Semi-rigid Cable Connectors Semi Rigid Bending Tool for Semi rigid cable connection TDMA Measuring Tools (Tests with HP 8594A/E) and Trigger Adapter BS11 – 14 HW: 2 Measuring cable with BNC-Plugs male (sufficient length) Adapter SMC male - BNC female Trigger adapter for TAD at MCLK or LI (50-pins AMP-Plug with 2 x BNC-Plug female ) 2 Adapter N-Connector male - BNC female A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment 1.5.2 1.5.2.1 ITMN: BTSE BS11 HP 8590 series spectrum analyser operating manual User´s Guide HP85715B GSM900 Transmitter Measurement Personality User´s Guide HP 85722B DCS1800 Transmitter Measurement Personality Preparation and Presetting of Test Equipment Test equipment For minimum test time and correct test results the devices have to be prepared on site. Spectrum Analyzer HW: the HP8594A/E needs a warm-up time of 20 minutes depending on the available options. The display shows "OVEN COLD" during the heating phase. Afterwards a CALIBRATION has to be carried out for defined measurement execution. SW: The SW of GSM/DCS card has to be installed in advance. Cable: For special tests, e.g."Power versus Time" a BNC loop at the backplane has to be provided: GATE-OUTPUT(TTL) to EXTERN TRIGGER INPUT The cable from CCLK(TAD) to GATE-INPUT(TTL) for TDMA-FRAME Trigger has to be connected. See analyzer operating manual for more detailed information. 1.5.2.2 Software (SW) For all tests only released SW (corresponding to the BTSE HW/SW release) is allowed to be running on the test equipment (TE). 1.5.2.3 Boot Software/Firmware (SW/FW) For all tests only the released SW is allowed to be running on the BTSE corresponding to the BTSE HW/SW/FW release/revision. 1.5.3 1.5.4 1.5.4.1 Connections – Open the connector panel cover, using the appropriate wrench supplied, to gain access to the panel itself (Fig. 1.1.). – Unscrew the 4 screws (1) and remove the cover (2), to gain access to connector J02 (Fig. 1.2.). BTSE Power ON Power On Power the BTSE by setting the ON/OFF switch to ON. NOTE: A30808-X3247-B349-1-7630 After having disconnected the power from the BTSE, it is necessary to wait a couple of seconds before powering it. BS11 – 15 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 1.5.4.2 LED Indication The SL01 LED on the connector panel must be illuminated with green light. This means that the BTSE is connected to the network. BS11 – 16 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 2 Software Download and Activation 1. Switch on power of BS11 2. Activate LMT and Login as Administrator and Enter the PASSWORD (default=admin) 3. a. MBTS Phase 1: Warm up b. MBTS Phase 2: Normal (after a few minutes) 4. Download of safety SW Software -->Download-->Browse: (the Download window appears) select the file btsbmcXX.swi (XX=version numbe)r -->ok-->start Download wait about 15’ - after Download:--> Cancel (100% readed) - after 1’: LMT shows: MBTS Phase: 1 Load SMU SAFETY wait about 5’ 5. Creation of the objects: LMT-window shows MBTS Phase: 2 wait Min Config LI-->Create Obj: select desired properties-->Send-->o.k. GPSU-->Create Obj-->send-->o.k. ALCO-->Create Obj-->send-->o.k. CCLK-->Create Obj-->send-->o.k. BTSU-->SET Attributes: select desired properties-->send-->o.k.-->cancel BBSIG 0-->Create Obj-->use default properties-->send-->o.k. PA_0-->Create Obj-->select desired properties-->send-->o.k. 6. Configuration -->Get Attribute-->E.S.N: if error message appears-->go:step 7, if not: step 9 -->Get Attribute-->CALIBRATION: if error message appears-->go:step XY, if not: step YY 7. Logoff-->Logon-->Factory-->E.S.N.: enter values according to the BS11 label 135 Code - 2044 Sequence Number / 02. Edition Number . 07 Version Number +Serial-Number -->send-->o.k.-->cancel A30808-X3247-B349-1-7630 IN – 17 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 8. Configuration-->SET Attributes-->Calibration: enter for Chain 1: 0 Chain 2: 0 PLL Calibration: 1024 Antenna Type: External or Internal -->send-->o.k.-->cancel 9. LMT window: MBTS phase: Load from BSC If the connection between BS11 and BSC already exists and the BTSU parameters are stored in the BSC (TEI...) an automatic download from BSC to BTSE is started if not: -->10 10. Download from LMT - Operator Access-->Logoff-->Logon-->Administrator:Password - Software-->Download-->Browse: -->select the desired SW-Load Header - o.k.-->start Download wait about 15’ - after Download: Cancel (100% reached) after 1’: LMT shows: MBTS Phase: 1 Load SMU SAFETY wait about 5’ IN – 18 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 3 Execution of Offline Tests 3.1 3.1.1 RF and Function Tests Purpose of the Abis Simulation on the MA-10 Card The Mobile Radio Analyzer MA-10 is used for offline functional tests on site. A database download has to be done with the MA-10 after succesfull creation of HW related objects. The DB download allows to execute two test procedures: 1. BERT test with MS loop. 2. Voice test with MA-10 loop. 3.1.2 Preparation of the Abis Simulation The Abis Simulation contains a MA-10 Card with SW on disk and the application SW Abis Simulation Ext. SIEMENS. The SW requires a DOS computer with WINDOWS 3.X. The MA-10 has to be installed and tested in advance, according to the Installation Manual BN 3032/98.80(W&G). In addition refer to the Operating Manual BN 3032/94.08(W&G) of Abis Simulation Ext. SIEMENS. The neccessary cable for the connetion to the BTSE Abis interface has to be provided. The IMSI of TestSim, which will be used for the MS, has to be entered in "SAG.INI" -File (one of the ABIS SIMULATION EXT.SIEMENS files) in advance. Note: See also additional information in the help menue of the simulator. 3.1.3 Connection of Test equipment (TE) To achieve reliable measurement results the connections must be plugged correctly and faultless contact must be guaranteed. The complete equipment has to be connected in the following order: 1. Attenuator (20dB/25W) to HYCOM/DUCOM/DUKIT(ANT) 2. HYCOM/DUCOM/DUKIT (Test) to RF-(Connection-)Box(Test) 3. RF-Box(RXAMOD/RXAMCO) to RXAMOD/RXAMCO (RFin) 4. RXAMOD(RFout) to RCAP(RX0-5)(with specific attenuation) RXAMCO (out) to TPU (in) 5. MS to RF-Box(MS) 6. MA-10 Card to RCAP/OVPT-Abis A30808-X3247-B349-1-7630 BS11 – 19 Installation Test Base Transceiver Station Equipment ITMN: BTSE BS11 3.1.4 Check BTSE Phase Before you start the Abis Simulation check the phase of the BTSE at the LMT. It must be in Phase three. BS11 – 20 A30808-X3247-B349-1-7630 Installation Test Base Transceiver Station Equipment 3.2 ITMN: BTSE BS11 Start of Abis Simulation Start MA-10 control WINDOWS has to be started first before the MA-10 is started. The start of Abis Simulation requires the start of MA-10 Control. The HW and SW performs the necessary boot procedure automatically. Click on the MA-10 Control icon SIEMENSAbisSim Application Start The ABIS SIMULATION EXT SIEMENS Window appears. SIEMENSAbisSim Phase x (Select from application field). Load Test File The released test sequence has to be loaded. File Load Test File...
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.2 Linearized : No Create Date : 1998:03:04 13:05:40 Producer : Acrobat Distiller 3.01 for Windows Creator : Windows PSCRIPT Title : ITMN:BTSE BS11 Modify Date : 1999:01:05 19:14:52 Page Count : 57 Page Mode : UseOutlinesEXIF Metadata provided by EXIF.tools