Nokia Solutions and Networks T6EK1 1X-EVDO SC480 BTS Microcell Base Station Transmtr User Manual print instructions
Nokia Solutions and Networks 1X-EVDO SC480 BTS Microcell Base Station Transmtr print instructions
Contents
- 1. User Manual Part 1 of 4
- 2. User Manual 2 of 4
- 3. User Manual 3 of 4
- 4. User Manual 4 of 4
User Manual 4 of 4
Compact BTS Expansion Configuration (Indoor) – continued Figure E-8: Two Expansion BTSes Cabling Diagram Power and Ground not shown Ensure that the expansion BTSes have the expansion cMPC cards installed. LOCAL GPS LA EXPANSION 2 STARTER LA LA EXPANSION 1 DC TX 2 COMBINER TX 1 RX MAIN RX DIV E-18 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Compact BTS Expansion Configuration (Indoor) – continued Figure E-9: One Expansion BTS Cabling Diagram Power and Ground not shown LOCAL GPS Ensure that the expansion BTS has an expansion cMPC card installed. LA STARTER LA EXPANSION 1 LA TX 1 RX MAIN RX DIV Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT E-19 Compact BTS Expansion Configuration (Indoor) – continued Table E-11: BBX (Carrier) to cCLPA Via RS485 BTS cCLPA Starter – BBX1 cCLPA–1 Starter – BBX4 cCLPA–1 Expansion 1 – BBX1 cCLPA–2 Expansion 1 – BBX4 cCLPA–2 Expansion 2 – BBX1 cCLPA–1 Expansion 2 – BBX4 cCLPA–1 Expansion 3 – BBX1 cCLPA–2 Expansion 3 – BBX4 cCLPA–2 Table E-12 shows in tabular format the BTS–to–cCLPA cabling of Figure E-1. Table E-12: Starter and Three Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) Expansion 2 – BBX1 CPA–A (CPA–1) Expansion 2 – BBX4 CPA–A (CPA–1) Expansion 3 – BBX1 CPA–B (CPA–2) Expansion 3 – BBX4 CPA–B (CPA–2) Starter and Two Expansion BTSes to cCLPA Cabling Table E-13 shows in tabular format the BTS–to–cCLPA cabling of Figure E-2. E-20 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Compact BTS Expansion Configuration (Indoor) – continued Table E-13: Starter and Two Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) Expansion 2 – BBX1 CPA–A (CPA–1) Expansion 2 – BBX4 CPA–A (CPA–1) Starter and One Expansion BTS to cCLPA Cabling Table E-14 shows in tabular format the BTS–to–cCLPA cabling of Figure E-3. Table E-14: Starter and One Expansion BTS Cabling for Circuit or Packet to Dual cCLPAs BTS Jun 2004 cCLPA Starter – BBX1 CPA–A (CPA–1) Starter – BBX4 CPA–A (CPA–1) Expansion 1 – BBX1 CPA–B (CPB–2) Expansion 1 – BBX4 CPA–B (CPB–2) 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT E-21 Multiple Compact BTS Configuration (Outdoor) Introduction This section covers only the outdoor version of the multiple Compact BTS configuration. Materials Needed The following materials are required to configure expansion BTSes. Varied length cables with RJ45 connectors Varied length cables with RF connectors Conduit (customer supplied) DC Power source (custoemr supplied) Battery Backup (customer supplied) External Combiner and Directional Coupler A combiner and directional coupler are required for some of the configurations. The following are the recommended specifications for the combiner and directional coupler. Table E-15: Combiner and Directional Coupler Specifications Item Specifications Combiner Connector: N–Type Frequency Range: Up to 2 GHz Insertion Loss: 3.5 dB maximum Return Loss: 16 dB minimum Average Input Power: 60 Watts minimum Directional Coupler Connector: N–Type Frequency Range: 810 to 950 MHz Coupling: 30 +/–1 dB Directivity: 28 dB minimum Return Loss: 18 dB minimum Average Input Power: 10 Watts minimum S Motorola recommended directional coupler is P/N 809643T03 S Recommended cable with combiner is Andrew LDF4–50 or equivalent E-22 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Multiple Compact BTS Configuration (Outdoor) – continued S Directional coupler and combiner are not environmentally protected , and so must be placed within the TME. ExpansionCompact BTS Installation Procedure Follow the procedure in Table E-16for installation of multiple Compact BTSes. Table E-16: Procedure for Installing Expansion Compact BTSes Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure E-1. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure E-2. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure E-3. Proceed to step 3. If conduit is not used, dress cables as necessary. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. Frame ID Switch Settings Refer to Chapter 5, Figure 5-1 or Figure 5-2 or Table 5-1 through Table 5-4 for the Frame DIP Switch settings. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT E-23 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-10: Three Expansion BTSes Cabling Diagram Power and Ground not shown EXPANSION 3 LOCAL GPS TME RF–GPS CONNECTOR LIGHTNING ARRESTOR cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS E-24 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-11: Outdoor Two Expansion BTSes Cabling Diagram Power and Ground not shown LOCAL GPS TME RF–GPS CONNECTOR LIGHTNING ARRESTOR cCLPA 1 EXPANSION 2 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT E-25 Multiple Compact BTS Configuration (Outdoor) – continued Figure E-12: Outdoor One Expansion BTS Cabling Diagram Power and Ground not shown LOCAL GPS LIGHTNING ARRESTOR TME RF–GPS CONNECTOR cCLPA 1 STARTER EXPANSION 1 LIGHTNING ARRESTOR RX MAIN TX1 cCLPA 2 RX DIV TX2 TME ANTENNA CONNECTORS Other Diagrams For single cCLPA and no cCLPA, refer to the diagrams for indoor and allow for the TME connectors as shown in the diagrams presented in this appendix. E-26 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Appendix F: Logical BTS Configuration Appendix Content Logical BTS LAN Configuration for Compact BTS (Indoor) . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Materials Needed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS ID Switch Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Logical BTS LAN Cabling Installation Procedure . . . . . . . . . . . . . . . . F-1 F-1 F-1 F-1 F-3 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Logical BTS LAN Configuration for Compact BTS (Indoor) Introduction This appendix covers only the Logical BTS configuration for cicruit Compact BTS. The diagrams cover only the LAN connections. This configuration is set up to be used only with other Compact BTSes. Power and ground cabling are not shown. The LAN operates at 10Mbps which is an ethernet standard. It provides an interface for each GLI in the confiiguration. Refer to Figure 6-1 for location of the LAN connectors. In circuit mode, the LAN connections are used by the LMF to download data, and for use in calibration, acceptance testing, and optimization. Use these diagrams in conjunction with the diagrams for expansion BTSes in Appendix E. Logical BTS for 1.9 GHz, +27V A or B band circuit configurations is not supported. Materials Needed The following materials are required to configure LAN connections BTSes. S 7 – RG–58 U cables (Length depends on spacing) S 14 – BNC, Terminaton Resistor Plugs (IEC 169–8 spec) S 2 – BNC, 50 Ohm terminations BTS ID Switch Settings Refer to Chapter 5, Figure 5-1 or Figure 5-2 or Table 5-1 through Table 5-4 for the BTS DIP Switch settings. Figure F-1: Three Expansion BTSes LAN Cabling Diagram 50–ohm Loads 50–ohm Loads Ain Bin Aout Bout STARTER Jun 2004 Ain Bin Aout Bout Ain Bin Aout Bout EXPANSION 1 EXPANSION 2 Ain Bin Aout Bout EXPANSION 3 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT F-1 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Figure F-2: Two Expansion BTSes LAN Cabling Diagram 50–ohm Loads Ain Bin Aout Bout STARTER Ain Bin Aout Bout Ain Bin Aout Bout EXPANSION 1 EXPANSION 2 50–ohm Loads Figure F-3: One Expansion BTS LAN Cabling Diagram 50–ohm Loads Ain Bin Aout Bout Ain Bin Aout Bout STARTER F-2 50–ohm Loads EXPANSION 1 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Logical BTS LAN Cabling Installation Procedure Follow the procedure in Table F-1 for installation of LAN cables for Logical BTS. Table F-1: Procedure for Installing LAN Cabling for Logical BTS Step Action Follow the procedure in Chapter 4 for installing a Compact BTS in a rack. For a 3 BTS expansion configuration, follow Figure F-1. Proceed to step 3. 2a For a 2 BTS expansion configuration, follow Figure F-2. Proceed to step 3. 2b For a 1 BTS expansion configuration, follow Figure F-3. Proceed to step 3. Route LAN cables through conduit from Starter to Expansion BTS 1. Route LAN cables through conduit from Starter to Expansion BTS 2 or 3 (depending on configuration). If in use, route LAN cables from Expansion BTS 1 to Expansion BTS 2. If in use, route LAN cables from Expansion BTS 2 to Expansion BTS 3. Ensure that unused LAN connections are terminated in 50 ohms. If not already performed, proceed to Appendix E for expansion cabling diagrams. Perform Optimization and ATP as described in Chapter 6. LMF Help provides further information. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT F-3 Logical BTS LAN Configuration for Compact BTS (Indoor) – continued Notes F-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Appendix G: Integrated BTS Router Preliminary Operations Appendix Content Integrated BTS Router Preliminary Operations – Introduction . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Preliminary Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . When to Perform the Verifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . G-1 G-1 G-1 G-1 Verify GLI3 Software Version and Span Parameter Settings . . . . . . . . . . . . . . . Verify GLI3 Software Version and Span Parameter Settings . . . . . . . . Required Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Verifying GLI3 Software Version and Span Parameter Settings . . . . . . G-2 G-2 G-2 G-2 Change GLI3 Span Parameter Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Change GLI3 Span Parameter Configuration . . . . . . . . . . . . . . . . . . . . G-6 G-6 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Integrated BTS Router Preliminary Operations – Introduction Introduction The information and procedures provided are performed in cases where the GLI3 load and span parameters need to be verified. Preliminary Operations Implementing the Integrated BTS Router (IBR) function requires some preliminary checks of the GLI3 cards which will be used. This appendix provides the procedures to accomplish these checks. The checks are: S Verification that IBR–capable software is installed on GLI3 cards which will be used for IBR S Verification that span parameter settings on GLI3 cards match the requirement for the spans at the BTS where the cards will be installed. When to Perform the Verifications All preliminary verifications provided in this chapter can be performed at either the BTS site or in a central facility equipped to power–up the GLI3 cards. Depending on the circumstances of the cards’ use, however, it may be advantageous in reducing the on–site upgrade time and logistics to perform some of the verifications prior to installation at the BTS site. Table G-1 lists card conditions of use and the corresponding suggested verification locations for the software version and span parameter settings. Table G-1: Suggested Preliminary Verification Locations GLI3 Card Condition Installed and operating (circuit or packet) Jun 2004 Installation Location Software Version Verification Location Span Parameter Settings Verification Location Site where installed At site Not required unless span type will change Different operating site from where currently installed At site where currently installed Before or after installation at different site 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-1 Verify GLI3 Software Version and Span Parameter Settings Verify GLI3 Software Version and Span Parameter Settings Software Version Verification – Before upgrading a BTS to packet backhaul with an IBR, the software version installed in the GLI3 card or cards must be verified. If the installed software version does not support IBR functionality, it must be upgraded to a version which does. For BTS sites which are already in operation, the upgrade can be done through a network download to the GLI3 once it is installed. For cards to be installed in new BTS sites not previously in operation, the upgrade requires special procedures, and must be done with Motorola Field Operations or Account Team assistance. Span Parameter Settings – Prior to initializing a GLI3 card for the first time in a live circuit BTS or IBR packet BTS site, the span parameter settings in the card must be verified as matching those provisioned in the OMC–R database. If the settings are not correct, the card will be unable to communicate with the RAN network elements and the site will not go into service. Procedures are included in this section to change the GLI3 card span parameter settings if this is necessary to match those required for the BTS. Required Items The following items are required to perform the verification: S Local Maintenance Facility (LMF) computer with the LMF application program version installed which is compatible with the software release installed on the BSS refer to Chapter 6 Optimization/ATP in this manual. S One of the following – Motorola cable part number CGDSMMICABLE219112 – Fabricated DB–9 receptacle–to–8–contact MMI connector cable (see the MMI Cable Fabrication Section of Appendix D for fabrication instructions and Figure 6-9 for connection) – SLN2006A MMI Interface Kit (this kit is no longer available to order), consisting of the following: –– Motorola Model TRN9666A null modem board –– Motorola 3009786R01 MMI cable or equivalent S (For use with SLN2006A only) Straight–through RS–232 cable, DB–9 to DB–9, and DB–9 to DB–25 connector adapter (see Figure D-1) Verifying GLI3 Software Version and Span Parameter Settings Follow the procedure in Table G-2 to verify GLI3 card software version and span parameter settings. G-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step Action If it has not been done, start a GLI3 MMI communication session on the LMF computer as described in Table 6-11. Verify the installed software version by entering the following at the GLI3 prompt: display version Response to the command will depend on the operating mode of the card. Responses similar to the following will be displayed for: 3a – Cards in circuit mode: GLI3> display version 01.09.1980 20:01:59 MGLI–002–2 OOS–SBY BTS–CDMA 16.41.200.14 RAM version: 16.41.200.14 ROM version: 16.41.200.14 Built: Tue Oct 21 09:52:28 2003 il27–2112 Bootrom version: 16.41.200.12 Bootrom Built: Thu Oct 2 03:11:34 2003 IL27–0775 Bootblock version: 16.1.59.00 Bootblock Built: Wed Apr 10 07:08:06 2002 RIPCORD004 This GLI board is in RAM Booted from /nvram00/loads/gli3_ckt_rom_upgrade.elf Next boot from /nvram00/loads/gli3_ckt_rom_upgrade.elf GLI3> . . . continued on next page Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-3 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step 3b Action – For cards in packet mode: GLI3> display version 03.23.2004 18:16:07 MGLI–250–1 CC PRESENT BTS–CDMA 16.41.00.11 INTERNAL RAM VERSION: 16.41.0.11 RAM Built: Tue Mar 2 04:59:33 2004 il27–2112 BOOTROM VERSION: 16.41.00.08 BOOTROM Built: Tue Feb 17 10:52:27 2004 il27–0507 BOOTBLOCK VERSION: 16.1.59.00 BOOTBLOCK Built: Wed Apr 10 07:08:06 2002 RIPCORD004 SYSTEM VERSION: 2.16.4.50.15 COMMITTED VERSION: 2.16.4.50.15 NEXT VERSION: 2.16.4.50.15 BACK UP VERSION 2.16.4.50.10 CURRENT RELEASE PATH: /nvram00/screl/2.16.4.50.15/ CURRENT LIF: /nvram00/screl/2.16.4.50.15/NE_LIF.xml CURRENT IMAGE: /nvram00/screl/2.16.4.50.15/gli_ram.bin.0108 CODE SERVER: 128.0.0.1 GLI3> Note the bootROM or System version numbers displayed and determine if the GLI3 is loaded with IBR–capable code as follows: S If the booROM version number is 2.16.41.00.08 or later, the GLI3 is IBR–capable S If the System version number is 2.16.4.50.7 or later (for example, 2.16.4.50.25), the GLI3 is IBR–capable NOTE If the card is to be installed in a new BTS site which has not previously been in operation, contact the local Motorola Account Team for assistance in upgrading the card with IBR–capable software version. . . . continued on next page G-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Verify GLI3 Software Version and Span Parameter Settings – continued Table G-2: Verify GLI3 Software Version and Span Parameter Settings Step Action Verify the span parameter settings for frame format, equalization, and linkspeed by entering the following at the GLI3> prompt: config ni current The system will respond with a display similar to the following: The frame format in flash Equalization: Span A – Default (0–131 Span B – Default (0–131 Span C – Default (0–131 Span D – Default (0–131 Span E – Default (0–131 Span F – Default (0–131 is set to use T1_2. feet feet feet feet feet feet for for for for for for T1/J1, T1/J1, T1/J1, T1/J1, T1/J1, T1/J1, 120 120 120 120 120 120 Ohm Ohm Ohm Ohm Ohm Ohm for for for for for for E1) E1) E1) E1) E1) E1) Linkspeed: Default (56K for T1 D4 AMI, 64K otherwise) Currently, the link is running at the default rate The actual rate is 0 NOTE S Defaults for span equalization are 0–131 feet for T1/J1 spans and 120 Ohm for E1. S Default linkspeed is 56K for T1 D4 AMI spans and 64K for all other types. S There is no need to change from defaults unless the provisioned span configuration requires it. The span parameter settings in the GLI must match those provisioned in the OMC–R database for the BTS. If they do not, proceed to Table G-3 in the Change GLI3 Span Parameter Settings section. If no other MMI actions are required for the card, terminate the MMI communication session and disconnect the LMF computer from the card. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-5 Change GLI3 Span Parameter Settings Change GLI3 Span Parameter Configuration If span parameter settings in the GLI3 card do not match the OMC–R database span parameters for the BTS where they are to be installed, follow the procedure in Table G-3 to change them. Table G-3: Set GLI3 Span Parameter Configuration Step Action If it has not been done, start a GLI3 MMI communication session on the LMF computer as described in Table 6-11. At the GLI3> prompt, enter the following: config ni format The terminal will display a response similar to the following: COMMAND SYNTAX: config ni format option Next available options: LIST – option : Span Option E1_1 : E1_1 – E1 HDB3 CRC4 no TS16 E1_2 : E1_2 – E1 HDB3 no CRC4 no TS16 E1_3 : E1_3 – E1 HDB3 CRC4 TS16 E1_4 : E1_4 – E1 HDB3 no CRC4 TS16 T1_1 : T1_1 – D4, AMI, No ZCS T1_2 : T1_2 – ESF, B8ZS J1_1 : J1_1 – ESF, B8ZS (Japan) – Default J1_2 : J1_2 – ESF, B8ZS T1_3 : T1_3 – D4, AMI, ZCS NOTE With this command, all active (in–use) spans will be set to the same format. To set or change the span type, enter the correct option from the list at the entry prompt (>), as shown in the following example: > T1_2 NOTE The entry is case–sensitive and must be typed exactly as it appears in the list. If the entry is typed incorrectly, a response similar to the following will be displayed: CP: Invalid command 01.061980 00:11’59 MGLI–000–2 INS–ACT BTS–CDMA 16.1.68.00 GLI3> . . . continued on next page G-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action An acknowledgement similar to the following will be displayed: The value has been programmed. It will take effect after the next reset. GLI3> If the current GLI span rate must be changed, enter the following MMI command: config ni linkspeed A response similar to the following will be displayed : Next available options: LIST – linkspeed : Span Linkspeed 56K : 56K (default for T1_1 and T1_3 systems) 64K : 64K (default for all other span configurations) NOTE With this command, all active (in–use) spans will be set to the same linkspeed. To set or change the span linkspeed, enter the required option from the list at the entry prompt (>), as shown in the following example: > 64K NOTE The entry is case–sensitive and must be typed exactly as it appears in the list. If the entry is typed incorrectly, a response similar to the following will be displayed: CP: Invalid command 01.061980 00:12’04 MGLI–000–2 INS–ACT BTS–CDMA 16.1.68.00 GLI3> An acknowledgement similar to the following will be displayed: The value has been programmed. GLI3> It will take effect after the next reset. . . . continued on next page Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-7 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action If the span equalization must be changed, enter the following MMI command: config ni equal A response similar to the following will be displayed: COMMAND SYNTAX: config ni equal Next available options: LIST – span : Span a : Span b : Span c : Span d : Span e : Span f : Span span equal . . . continued on next page G-8 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step Action At the entry prompt (>), enter the designator from the list for the span to be changed as shown in the following example: > a A response similar to the following will be displayed : COMMAND SYNTAX: config ni equal a equal Next available options: LIST – equal : Span Equalization 0 : 0–131 feet (default for T1/J1) 1 : 132–262 feet 2 : 263–393 feet 3 : 394–524 feet 4 : 525–655 feet 5 : LONG HAUL 6 : 75 OHM 7 : 120 OHM (default for E1) 8 : T1 Long Haul mode. No Attenuation 9 : T1 Long Haul mode. 7.5 dB Attenuation 10 : T1 Long Haul mode. 15.0 dB Attenuation 11 : T1 Long Haul mode. 22.5 dB Attenuation 12 : E1 Long Haul mode. ! CAUTION When selecting span equalization settings, comply with the following or the BTS may operate erratically or unpredictably: S For ALL BTS types, do not select any of the following settings if they are displayed: – – – – 5 LONG HAUL 6 75 OHM 11 T1 Long Haul mode. 22.5 dB Attenuation 12 E1 Long Haul mode S For four–digit BTSs supported with Channel Service Units (CSU), do not select any of the following additional settings: – 8 T1 Long Haul mode. No Attenuation – 9 T1 Long Haul mode. 7.5 dB Attenuation – 10 T1 Long Haul mode. 15.0 dB Attenuation . . . continued on next page Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-9 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step 10 Action At the entry prompt (>), enter the code for the required equalization from the list as shown in the following example: > 0 A response similar to the following will be displayed : > 0 The value has been programmed. It will take effect after the next reset. GLI2> 11 Repeat steps 8 through 10 for each in–use span. 12 NOTE This step must be performed for GLI3 cards operating on a packet image to ensure the span parameter changes will replace the previous settings. For a GLI3 card in packet mode, enter the following: rmfile /nvram00/config/hlp_param.txt A response similar to the following will be displayed : GLI3> rmfile /nvram00/config/hlp_param.txt 11.24.2003 23:14:57 MGLI–004–1 CC PRESENT BTS–CDMA 16.40.00.09 Removing file: /nvram00/config/hlp_param.txt Successfully removed file: /nvram00/config/hlp_param.txt GLI3> 13 * IMPORTANT S After executing the config ni format, config ni linkspeed, and/or config ni equal commands, the affected MGLI/GLI board MUST be reset and reloaded for changes to take effect. S Although defaults are shown in the software, always consult site–specific documentation for span type, equalization, and linkspeed used at the site where the cards are to be installed. Reset the card using the MMI reset command. . . . continued on next page G-10 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Change GLI3 Span Parameter Settings – continued Table G-3: Set GLI3 Span Parameter Configuration Step 14 Action Once the card has completed resetting, execute the following command to verify span settings are as required: config ni current A response similar to the following will be displayed : The frame format in flash Equalization: Span A – 0–131 feet Span B – 0–131 feet Span C – Default (0–131 Span D – Default (0–131 Span E – Default (0–131 Span F – Default (0–131 is set to use T1_2. feet feet feet feet for for for for T1/J1, T1/J1, T1/J1, T1/J1, 120 120 120 120 Ohm Ohm Ohm Ohm for for for for E1) E1) E1) E1) Linkspeed: 64K Currently, the link is running at 64K The actual rate is 0 15 If the span configuration is not correct, perform the applicable step from this table to change it and repeat steps 12, 13, and 14 to verify required changes have been programmed. 16 If no other MMI actions are required for the card, terminate the MMI communication session and disconnect the LMF computer from the card. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT G-11 Change GLI3 Span Parameter Settings – continued Notes G-12 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Appendix H: Integrated BTS Router Installation Appendix Content Integrated BTS Router Installation – Introduction . . . . . . . . . . . . . . . . . . . . . . . Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1 H-1 New Packet BTS Installation with IBR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . New Packet BTS Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Implementing IBR Functionality . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-2 H-2 H-2 H-2 BTS Span Connections for IBR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Span Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . BTS Span Cable . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-4 H-4 H-4 BTS Span Connections for IBR – One Span . . . . . . . . . . . . . . . . . . . . . . . . . . . One Span Frame . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-5 H-5 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Integrated BTS Router Installation – Introduction Background The IBR capability was developed to provide a low–cost solution for providing CDMA packet backhaul benefits at cell sites with lower traffic volumes. The IBR function is implemented by using the GLI3 card Concentration Highway Interface (CHI) bus 2 processor to perform the router function. This is accomplished through changes in the GLI3 card software. A card with the IBR–capable software can perform as a circuit GLI3 card, as a GLI3 with IBR, and as a GLI3 used with external BTS router groups. The card has the capability to recognize the environment in which it is installed and autoselect the appropriate operating mode (circuit, IBR packet, external BTS router packet). Span line channel capability for an IBR–equipped SC480 BTS is limited to those available on a single T1 or E1 span. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT H-1 New Packet BTS Installation with IBR New Packet BTS Installation This section covers the actions necessary for implementing IBR packet capability in the installation of a new BTS. Procedures unique to this implementation are contained in this section. When procedures required in this implementation are contained in other parts of this publication or in other publications, the user will be specifically directed to them at the appropriate places in this section. Prerequisites The following must be accomplished prior to traveling to the BTS site for IBR implementation: S The BTS has been installed as described in Chapter 4 of this manual. S One of the following: – GLI3 card(s) for the site have been verified as having IBR–capable software image installed – Motorola Field Operations or Account Team member is identified to travel to the BTS site to perform GLI3 IBR–capable software installation, if required S GLI3 card(s) for the BTS are on hand for transport to the BTS site or are verified to be at the BTS site S Required publications to support IBR implementation activities are on hand for transportation to the BTS site Implementing IBR Functionality Follow the procedure in Table H-1 to implement IBR functionality for the BTS. Table H-1: Implement IBR Functionality in New BTS Step Action Upon arrival at the site, contact the OMC–R and notify the operator that site operations are starting. If the BTS has not been initially powered up, apply power to the BTS in accordance with the Power Pre–Power–up Tests and Initial Power–up Tests and Procedures described in Chapter 5 of this manual. Once the BTS is fully powered up with these procedures, the GLI3 card should have been seated in the correct slot. If it is not, seat the card at this time and allow each to complete its initialization. If it was not previously done, follow the procedure in Table G-2 to: S Verify the software version in the GLI3 card(s) S Verify the span parameter settings in each GLI3 card match those established for the site in the OMC–R database If the GLI3software requires upgrading for IBR capability, request Motorola Field Operations or Account Team assistance in upgrading the software. If GLI3 card span parameter settings do not match those required, change them as necessary by following the procedure in Table G-3. . . . continued on next page H-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 New Packet BTS Installation with IBR – continued Table H-1: Implement IBR Functionality in New BTS Step Action Refer to the site documentation for IBR spans and inspect the BTS span cabling connections to be sure they match Figure H-1. Correct any cabling discrepancies between the BTS span cabling and site documentation, referring to Figure H-1 and the Install Span and Alarm Cables and Span Line Cable Pin Numbering Chapter 4 of this manual as required. If the BTS requires optimization and/or ATP, perform them at this time by following the applicable procedures in Chapter 6 of this manual. 10 When all preparations for BTS operation are completed, contact the OMC–R and notify the operator that the BTS is ready for operation and request notification when the operator no longer requires support on–site. 11 When advised that there is no further requirement for on–site support of BTS and IBR initialization, proceed to Chapter 8 and follow the procedures to prepare to leave the site. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT H-3 BTS Span Connections for IBR BTS Span Connections The illustration in this section provides the detail of span connection for a non–redundant BTS to support IBR packet operation. The required configuration for IBR in redundant BTS is a single span. BTS Span Cable All connections in the BTS span connection diagram for IBR are based on the use of the following Motorola–standard BTS span cable: Table H-2: BTS Span Cables Item BTS span cable Part Number CGDS1583461 or CGDS1583462 Qty Description Cable, 50–wire, shielded twisted 25 pair, 100 ohm, 24–AWG, 7.6 m (25 ft – CGDS1583461) or 15.2 m (50 ft – CGDS1583462), one male 50–contact TELCO connector attached. One end of cable is un–terminated to allow connection to site termination equipment. H-4 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 BTS Span Connections for IBR – One Span One Span Frame Figure H-1 illustrates the connection details for one span to support packet operation with IBR for non–redundant BTS. Figure H-1: Cabling Compact BTS Packet Operation Integrated BTS Router Spans – One Span Termination Equipment BTS ALL CROSS–CONNECTS ARE DONE WITHIN TERMINATION EQUIPMENT SPAN I/O A BLU–WHT RX TIP PIN 2 RX TIP A WHT–BLU RX RING ORG–WHT TX TIP PIN 1 RX RING A PIN 5 TX TIP A PIN 4 TX RING A BTS SPAN CABLE WHT–ORG TX RING SC4812TL0201 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT H-5 BTS Span Connections for IBR – One Span – continued Notes H-6 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Appendix I: Packet Backhaul Configuration Appendix Content Packet Backhaul BTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Packet Backhaul BTS Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-1 I-1 I-1 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Packet Backhaul BTS Introduction For Packet Backhaul, the LMF Help should be accessed for the appropriate procedures. Packet Backhaul BTS Procedures Optimization Procedures S Click on LMF Help S Select Optimization/ATP Process S Select Optimization procedure for SC48X – – – – – – – Important CDF Parameters CSA Optimization of SC48X High Power Configuration Optimization of SC48X Low Power Configuration Optimization of SC48X High Power in Logical Configuration Optimization of SC48X Low Power in Logical Configuration Calibrating Procedures for SC48X Expansion Frame Configurations Follow the appropriate procedure identified in the LMF Help. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT I-1 Packet Backhaul BTS – continued Notes I-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Appendix J: Highway Cell Configuration Appendix Content BTS for Highway Cell Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Highway Cell Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-1 J-1 J-1 Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Table of Contents – continued Notes 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 BTS for Highway Cell Configuration Introduction The highway cell configuration is a 1 carrier, two sector with no RX diversity and one duplexed antenna. The configuration is for 1.9 GHz and +27 V. The 1.9 GHz, +27V A & B–Band does not support highway configuration. Highway Cell Configuration Figure J-1 shows a typical highway cell configuration. DC power may be provided by a +27V Power Distribution Enclosure or other equivalent power source. Units may be pole or wall mounted. Type of mounting used is determined by the customer. Jun 2004 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT J-1 BTS for Highway Cell Configuration – continued Figure J-1: Typical Highway Cell Configuration Diagram Power and Ground not shown LOCAL GPS TME RF–GPS CONNECTOR LIGHTNING ARRESTOR cCLPA 1 STARTER SURGE ARRESTORS SAs RX MAIN TX1 RX DIV TX2 LIGHTNING ARRESTOR TME ANTENNA CONNECTORS SAs cCLPA 2 J-2 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Index Numbers code domain power acceptance test procedure, 7-19 10BaseT/10Base2 converter, LMF to BTS failure report generation, 7-23 FER test, frame error rate testing, 7-21 pilot time offset, 7-16 prerequisites, 7-2 spectral purity TX mask, 7-11 test set–up, 6-61 Advantest R3267/R3562, DRDCs, 6-64 Advantest R3465, 6-61 Agilent 8935, DRDCs, 6-61 Agilent 8935/E4432B, DRDCs, 6-63 Agilent E4406A/E4432B, DRDCs, 6-63 CyberTest, 6-61 HP 8921A, 1.9 GHz, 6-62 HP 8921A, 800 MHz, 6-59 , 6-62 waveform quality (Rho), 7-14 waveform quality (RHO) acceptance test procedure, 7-14 connection, 6-17 Abbreviated RX acceptance test, all–inclusive, 7-5 TX acceptance test, all–inclusive, 7-5 Acceptance Test Procedure. See ATP Accessing OMCR CLI Window, 10-2 Advantest R3267 Spectrum Analyzer GPIB Address, B-7 Advantest R3465 Communications Test Set GPIB Address, B-12 Advantest R3562 Signal Generator GPIB Address, B-9 Agilent 8935 Series E6380 (formerly HP 8935) Test Set GPIB Address, B-9 Agilent E4406A, calibration, B-28 Agilent E4406A Transmitter Tester GPIB Address, B-5 Agilent E4432B Signal Generator GPIB Address, B-6 ATP – Reduced, 7-1 Attenuator, required test equipment, 1-20 Basic Troubleshooting Overview, 11-1 Bay Level Offset calibration description, 6-76 purpose, 6-76 when to calibrate, 6-76 All TX ATP Test Procedure, 7-7 BBX carrier spectral purity, 7-11 primary and redundant, TX tests to be performed, 7-9 All TX/RX ATP Test Procedure, 7-6 BLO. See Bay Level Offset calibration ATP all inclusive TX acceptance test outline, 7-5 automated introduction, 7-1 code domain noise floor acceptance test procedure, 7-19 Broad Band Receiver. See BBX All Cal/Audit procedure, 6-82 All RX ATP Test Procedure, 7-8 Jun 2004 BTS download, 6-36 Ethernet LAN interconnect diagram, 6-33 LMF connection, 6-16 , 6-17 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Index-1 Index – continued RX sensitivity/frame error rate, 7-10 system software download, 6-6 BTS Frame Erasure Rate. See FER BTS Log In Procedure, GUI, 6-25 subscriber mobile radiotelephone, optional test equipment, 1-21 Cell Site equipage verification, 6-2 types configuration, 6-5 BTS login CLI environment, 6-27 General, 6-25 GUI environment, 6-25 CLI, 6-24 BTS Logout CLI environment, 6-29 GUI environment, 6-28 Code domain power/noise floor acceptance test, 7-18 analyzer display, 7-20 Create CAL File, 6-88 Command Line Interface, 6-24 Cell Site Data File. See CDF Clock Sync Module. See CSM Communication test set, rear panel, B-18 , B-20 communications test set, TX acceptance tests, 7-4 cable calibration, automatic, test set–up, 6-56 Advantest R3267/R3562, 6-57 Advantest R3465, 6-56 Agilent 8935, 6-56 Agilent E4406A/E4432B, 6-57 CyberTest, 6-56 HP 8921A, 6-56 Connect BTS E1/T1 spans, 8-4 CAL file. See calibration data file Copy BTS CDF (or NECF) and CBSC CDF Files to the LMF, 6-12 Calibrate Test Cabling Using Signal Generator & Spectrum Analyzer, 6-71 Calibrating, Test Equipment, 6-68 Calibrating Cables, Overview, 6-69 Connect BTS T1/E1 spans, 8-4 Connecting test equipment to the BTS, 6-51 Control, TX output verification, 7-4 Copy and Load Cal File to to CBSC, 8-1 Copying CAL files from CDMA LMF to the CBSC, 8-1 Copying CAL files to the CBSC, 8-2 Calibrating Test Cabling using Communications System Analyzer, 6-70 CSM clock source, select, 6-40 enable, 6-41 LEDs, 6-43 system description, 6-43 Calibration, required test equipment, 1-16 CSM clock source, select, 6-40 calibration calibration data file, 6-77 Gigatronics 8542B, B-31 CSM frequency verification, 6-45 calibration data file, description of, 6-77 Devices, download. See Download Cannot communicate to Power Meter, 11-5 Digital multimeter, required test equipment, 1-21 CCP shelf illustration, left side, 1-26 Download See also Devices BTS, 6-36 BTS system software, 6-6 Calibrating Test Cable Setup, PCS Interface HP83236B, B-32 CDF, 6-5 site equipage verification, 6-6 site type and equipage data information, 6-1 CDMA allocation diagram for the North American, cellular telephone frequency spectrum, 1-11 Index-2 Download BLO Procedure, 6-84 download ROM and RAM code. See ROM code Download/Enable MCCs, 6-42 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Index – continued Download/Enable MGLIs, 6-39 Gigatronics 8541C Power Meter, B-15 Hewlett Packard HP8921a & HP83236A/B, B-11 Motorola CyberTest, B-13 E1, isolate BTS from the E1 spans, 6-16 GPIB Interface Box, RS232, B-16 E4406A, calibration, B-28 Enable CSMs. See CSM GPS Initialization/Verification estimated position accuracy, 6-46 surveyed position accuracy, 6-46 Equipment, warm–up, required test equipment, 1-16 GPS satellite system, 6-41 Equipment warm-up, 6-55 GUI, 6-19 establish MMI communication, 6-30 Ethernet LAN, interconnect diagram, 6-33 Ethernet LAN termination, 6-3 Hardware Requirements, 1-17 External Test Equipment Removal, 8-3 Hewlett Packard, 10833A or equivalent, required test equipment, 1-19 Hewlett Packard HP8921A and HP83236A/B GPIB Address, B-11 Failure report generation, 7-23 FER, acceptance test, 7-21 Files, intermediate file, 7-23 files, calibration data, 6-77 Fluke, model 8062A with Y8134 test lead kit, test equipment, 1-21 Folder Structure Overview, 6-9 Frame, equipage preliminary operations, 6-1 Frequency counter, optional test equipment, 1-21 General Purpose Interface Bus, IEEE–488 protocol interface bus. See GPIB Generating an ATP Report, 7-23 Gigatronics 8541C Power Meter GPIB Address, B-15 Gigatronics 8542 power meter, calibration, B-31 GPIB, B-17 , B-21 , B-22 cables required test equipment, 1-19 set address, HP 437B, B-14 GPIB Address Advantest R3267, B-7 Advantest R3465, B-12 Advantest R3562, B-9 Agilent (formerly HP) 8935, B-9 Agilent E4406A, B-5 Agilent E4432B, B-6 Jun 2004 High–impedance conductive wrist strap, required test equipment, 1-20 HP 437 Pre–calibration, B-29 setting GPIB address, B-14 HP 83236A, B-21 HP 8921A PCS interface, Cables Connection for 10 MHz Signal and GPIB , B-18 , B-20 HP 8921A/600 test set, 1-18 HP8921A, B-21 Test equipment connections , B-17 HyperTerminal, Creating named HyperTerminal connection, 6-14 HyperTerminal , create named connection, 6-14 IEEE–488 protocol interface bus. See GPIB Initial HP8921A setup, B-32 Initial Installation of Boards/Modules, preliminary operations, 6-2 Intermediate file, generate ATP file using, 7-23 LAN, tester optional test equipment, 1-21 LAN termination, 6-3 LED, CSM, 6-43 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Index-3 Index – continued LIF, Load Information File, 6-10 Pilot time offset, acceptance test, 7-16 LMF, B-17 , B-22 1X FER acceptance test, 7-4 1X upgrade preparation, home directory, 6-9 BTS connection, 6-17 to BTS connection, 6-16 TX acceptance tests, 7-4 view CDF information, 6-6 Ping, 6-33 LMF BTS displays, 6-19 Pre–calibration, HP 437, B-29 LMF Removal, 8-4 Preliminary operations, cell Site types, 6-1 Load Information File, 6-10 Prepare to leave site connect BTS E1/T1 spans, 8-4 connect BTS T1/E1 spans, 8-4 Logging Into a BTS, 6-25 Logging Out, 6-28 Motorola CyberTest GPIB Address, B-13 Multi Channel Card. See MCC Policy, required test equipment, 1-16 Power Meter, setting GPIB address, HP437B, B-14 Power meter required test equipment, 1-19 , 1-20 TX acceptance tests, 7-4 Prepare to Leave the Site External Test Equipment Removal, 8-3 Final Checks before leaving site, 8-5 LMF Removal, 8-4 Re–connect BTS T1 spans, 8-4 Prerequisites, automated acceptance tests, 7-2 Procedures to Copy CAL Files From Diskette to the CBSC, 8-2 National Instruments, GPIB–232–CT or equivalent, required test equipment, 1-18 Procedures to Copy Files to a Diskette, 8-1 NECF, 6-5 North American, cellular telephone system frequency spectrum, CDMA allocation, 1-11 RAM code, described, 6-36 Re–connect BTS T1 Spans, 8-4 OMCR CLI access procedure, 10-2 Online Help, 6-32 Optional, test equipment list, 1-21 Optional test equipment CDMA subscriber mobile or portable radiotelephone, 1-21 frequency counter, 1-21 LAN tester, 1-21 oscilloscope, 1-21 RF test cable, 1-21 spectrum analyzer, 1-21 Oscilloscope, optional test equipment, 1-21 PCMCIA, Ethernet adapter, LMF to BTS connection, 6-17 Index-4 receive path, calibration, 6-76 component verification, 6-76 Reduced ATP, 7-1 Report generation, ATP report, 7-23 Required test equipment calibration, 1-16 communications system analyzer, 1-18 digital multimeter, 1-21 equipment warm–up, 1-16 GPIB cables, 1-19 high–impedance conductive wrist strap, 1-20 list, 1-17 optional equipment, 1-21 policy, 1-16 power meter, 1-19 , 1-20 RF adaptors, 1-20 RF attenuator, 1-20 RF load, 1-20 RS232 to GPIB interface, 1-18 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 Index – continued test cable calibration, 1-16 Restore Carrier Signaling Operations for a Circuit BTS, 10-29 Restore Carrier Signaling Operations for a Packet BTS, 10-59 Restore Carrier Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-29 Restore Carrier Signaling Operations Procedure For a Packet BTS, Starting Up, 10-59 Restore Sector Signaling Operations for a Circuit BTS, 10-26 Restore Sector Signaling Operations for a Packet BTS, 10-56 Restore Sector Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-26 Restore Sector Signaling Operations Procedure For a Packet BTS, Starting Up, 10-56 Restore Site Signaling Operations for a Circuit BTS, 10-23 Restore Site Signaling Operations Procedure For a Circuit BTS, Starting Up, 10-23 Restore Site Signaling Operations for a Packet BTS, 10-53 Restore Site Signaling Operations Procedure For a Packet BTS, Starting Up, 10-53 RF attenuator, 1-20 load for required test equipment, 1-20 required test equipment load, 1-20 test cable, 1-20 RF path calibration. See Bay Level Offset calibration Rho TX waveform quality acceptance test, 7-14 waveform quality requirements, 7-14 ROM code described, 6-36 downloading, C-1 procedure, C-2 RS232 GPIB Interface Box, B-16 RS232 to GPIB interface, required test equipment, 1-18 RX acceptance tests, FER, 7-21 sensitivity/frame error rate, 7-10 Jun 2004 Selecting Test Equipment, 6-66 Set–up for TX Calibration, 6-81 Setting Cable Loss Values, 6-73 Setting TX Coupler Loss Value, 6-74 Shut Down Carrier Signaling Functions for a Circuit BTS, 10-16 Shut Down Carrier Signaling Functions for a Packet BTS, 10-46 Shut Down Carrier Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-16 Shut Down Carrier Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-47 Shut Down Sector Signaling Functions for a Packet BTS, 10-39 Shut Down Sector Signaling Functions for a Circuit BTS, 10-9 Shut Down Sector Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-9 Shut Down Sector Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-40 Shut Down Site Signaling Functions for a Circuit BTS, 10-3 Shut Down Site Signaling Functions for a Packet BTS, 10-32 Shut Down Site Signaling Functions Procedure For a Circuit BTS, Shutting Down, 10-3 Shut Down Site Signaling Functions Procedure For a Packet BTS, Shutting Down, 10-33 signal generator, 1X FER acceptance test, 7-4 Site, equipage verification, 6-6 Site equipage, CDF/NECF, 6-5 Software Release caveats, 8-1 Span line, J1 verification equipment, optional test equipment, 1-21 Spectral purity, TX mask – primary and redundant BBX, 7-9 Spectral purity transmit mask, acceptance test, 7-11 Spectrum analyzer, optional test equipment, 1-21 Supported Test Sets, 6-51 System Connectivity Test, B-21 T1, isolate BTS from the T1 spans, 6-16 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Index-5 Index – continued Tektronics, model 2445 or equivalent, optional test equipment, 1-21 Test cable calibration, required test equipment, 1-16 Test Equipment, Calibrating, 6-68 Test equipment set up, TX output verification/control, 7-4 system analyzer, 1-18 TX acceptance tests, 7-4 Test equipment connections , preliminary Agilent E4406A/E4432B set–up, B-26 Test Equipment Setup Calibration for TX Bay Level Offset, B-36 Test Equipment Setup Chart, 6-53 Test equipment setup RF path calibration, 6-78 transmit path, calibration, 6-76 component verification, 6-76 TX and RX Frequency vs Channel , 1-9 TX Audit Test, 6-85 Tx BLO Nominal Offset, Setup for TX Cal, 6-82 TX calibration, 6-82 All Cal/Audit, 6-82 set–up, 6-58 Advantest R3267, 6-60 Agilent 8935, 6-58 Agilent E4406A, 6-60 CyberTest, 6-58 TX path calibration, 6-82 Updating Calibration Data Files Copy and Load Cal File to to CBSC, 8-1 Software Release caveats, 8-1 UTP, LMF to BTS connection, 6-17 Transmit TX path audit, 6-85 Transmit TX path calibration, 6-79 TX acceptance tests code domain power/noise floor, 7-18 equipment setup, 7-4 pilot time offset, 7-16 spectral purity mask, 7-11 spectrum analyzer display, 7-13 waveform quality (rho), 7-14 all inclusive TX ATP test, 7-5 output acceptance tests code domain power noise, 7-9 pilot time offset, 7-9 waveform quality, 7-9 verification during calibration, 6-76 Index-6 Verify, TX output, 7-4 Verify GLI ROM code load, 6-38 Waveform quality (Rho), acceptance test procedure, 7-14 Xircom Model PE3–10B2, LMF to BTS connection, 6-17 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU DRAFT Jun 2004 *68P09262A08−1* 68P09262A08–1 Technical Information 1X SC480 BTS HARDWARE INSTALLATION, OPTIMIZATION/ATP, AND FRU SOFTWARE RELEASE 2.16.5.X 1.9 GHZ CDMA2000 1X DRAFT ENGLISH JUN 2004 68P09262A08–1 1X SC480 BTS HARDWARE INSTALLATION, OPTIMIZATION/ATP, AND FRU SOFTWARE RELEASE 2.16.5.X 1.9 GHZ CDMA2000 1X DRAFT JUN 2004 ENGLISH 68P09262A08–1 Technical Information Products and Services STANDARD MANUAL PRINTING INSTRUCTIONS Filename: Part Number: 68P09262A08–1 262A08–1 APC: 379 Title: 1X SC480 BTS Hardware Installation, Optimization/ATP, and FRU Volume 1 of 1 Print Vendor: eDOC Date Jun 2004 ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ STANDARD SPECIFICATIONS – FOR REFERENCE–DO NOT MODIFY ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ ÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇÇ PAPER: 1st. LEVEL TABS: 2nd. LEVEL TABS: Body: 70 lb. Inside Cover: 65 lb. Cougar Tabs: 110 lb. Index Binder Cover: Standard TED cover – 10 pt. Carolina Single Sided 5 Cuts Clear Mylar Pantone 2706–C Black Ink Single Sided 7 Cuts Clear Mylar White Black Ink FINISHING: 3–Ring Binder Slant–D 3–Hole Punched (5/16–in. dia.) Shrink Wrap Body Black ink for body, inside cover, and binder cover. TAB and SHEET SIZE/QUANTITY 7X9 8.5x11 660 1st Level Tabs 11x17 Sheets = (Total Pages) / 2 2nd Level Tabs NON–STANDARD SPECIFICATIONS Tape Bound Corner Stitch Other: Meet with manager to determine the deliverable. SPECIAL INSTRUCTIONS
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.3 Linearized : No Modify Date : 2004:07:07 12:02:22-05:00 Create Date : 2004:07:07 12:02:02-05:00 Title : print_instructions Author : Win32 user Producer : Acrobat Distiller 6.0 (Windows) Page Count : 58EXIF Metadata provided by EXIF.tools