Nokia of America ONEBTS-11 UMTS-CDMA Transceiver System (850) User Manual 401703454i1

Alcatel-Lucent USA Inc. UMTS-CDMA Transceiver System (850) 401703454i1

users manual b

1-22 Lucent Technologies – ProprietarySee notice on first page  401-703-454FOA Draft Issue 1January, 2006...........................................................................................................................................................................................................................................................Overview of the Flexent‚ Modular Cell 4.0B cabinetinstallationRefer to Chapter 2, Heat exchanger and solar shield configurations for Modular Cell 4.0B cabinets on Page 2 - 69 for heat exchanger and solar shield applications for the following configurations4.0B dual band cabinetwithout integrated power inlegacy line-ups withcustomer-supplied powerThe following diagram shows configuration options for 4.0B dual band cabinet without integrated power in legacy line-ups with customer-supplied power.Important! Within the following section, figures depicting installation sites are provided for general information only. These figures are not to be used as a reference for an installation. Always use current and approved documentation, which is referenced in the installation procedure.FRONT OR REAR HEATEXCHANGER, AS APPLICABLE1-11C4.0BPCS1-11 PCS CARRIERS5-8 850 CARRIERSand G-1)(4.0 Primary1-3C1/2/3.08501-3C1/2/3.08501-11C4.0BPCS1-2C4.0850(4.0B Dual Band)LUCENT ORCUSTOMERSUPPLIEDPOWER ANDBATTERYLUCENT ORCUSTOMERSUPPLIEDPOWER ANDBATTERY1-11 PCS CARRIERS7-8 850 CARRIERS(1/2/3.0 Primary and(4.0B Dual Band)G-1, 4.0 G-2)1-4Cor1-4Cor1-6C8504.01-2C8504.0
Overview of the Flexent‚ Modular Cell 4.0B cabinetinstallation1- 23Lucent Technologies – ProprietarySee notice on first page401-703-454FOA Draft Issue 1January, 2006............................................................................................................................................................................................................................................................Modular Cell 4.0B primaryand dual band cabinetswith WNG24-BC batterycabinets installed on aconcrete padIllustrated below is an outdoor site maximum 4.0B configuration, with primary and dual band Modular Cell 4.0B cabinets with WNG24-BC battery cabinets installed on a concrete pad. NOTE: THE MODULAR CELL 4.0B CABINETS SHOWN HAVE INTEGRATED POWER. THEY ARE ILLUSTRATED WITH A FRONT HEAT EXCHANGER (RATHER THAN A REAR HEAT EXCHANGER WHICH ARE USED ON CERTAIN NON-INTEGRATED POWER CABINETS ONLY). THE SOLAR SHIELDS ARE NOT ILLUSTRATED. Refer to Heat exchanger and solar shield configurations for Modular Cell 4.0B cabinets ON PAGE 2 - 69 for 4.0B applications. A 4.0B DUAL BAND CABINET #2 ALSO HAS ANTENNA JUMPER CABLESNote that battery support for Cabinet #1 (primary) and Cabinet #2 (dual band) must be from independent separate sources. Currently, WNG battery cabinets may be used to support cabinet #1 (primary) only. EZBFo frames must be used to support cabinet #2 (4.0B dual band), but they must be installed to the right of the dual band cabinet (as viewed from the rear). EZBFo may also be used in place of the WNG Battery to support cabinet #1 (primary). The following (rear view) line-ups are possible: WNG #2 - WNG #1 - Primary 4.0B - Dual Band 4.0B - EZBFo #1 - EZBFo - #2 or EZBFo #2 - EZBFo - #1 - Primary 4.0B - Dual Band 4.0B - EZBFo #1 - EZBFo - #2
1-24 Lucent Technologies – ProprietarySee notice on first page  401-703-454FOA Draft Issue 1January, 2006...........................................................................................................................................................................................................................................................Overview of the Flexent‚ Modular Cell 4.0B cabinetinstallation Modular Cell 4.0B primaryand dual band cabinetswith WNG24-BC batterycabinets installed on arooftopIllustrated below is an outdoor site maximum 4.0B configuration, with primary and dual band Modular Cell 4.0B cabinets with WNG24-BC battery cabinets installed on a rooftop.NOTE: THE MODULAR CELL 4.0B CABINETS SHOWN HAVE INTEGRATED POWER. THEY ARE ILLUSTRATED WITH A FRONT HEAT EXCHANGER (RATHER THAN A REAR HEAT EXCHANGER WHICH ARE USED ON CERTAIN NON-INTEGRATED POWER CABINETS ONLY). THE SOLAR SHIELDS ARE NOT ILLUSTRATED. Refer to Heat exchanger and solar shield configurations for Modular Cell JUMPER CABLESUPPORT STRUCTUREASSEMBLY(BY CUSTOMER)2" CONDUITASSEMBLYFORT1/E1 AND USERALARMS ( TYP )ANTENNAJUMPER CABLES( TYP )RF ANTENNA CABLES TOANTENNA TOWER ( TYP )CONNECTORS ( TYP )7/16 DIN FEMALE2" CONDUIT ASSEMBLY2" CONDUIT ASSEMBLYFOR AC POWER ( TYP )FOR AC POWER ( TYP )REARMOUNTING BASE ( TYP )( OPTIONAL )CONCRETE PAD(BY CUSTOMER)WNG. BATTERY CABINET 1 *(OPTIONAL)WNG. BATTERY CABINET 2 *(OPTIONAL)1 " OPTIONAL PORTSFOR ALARMSCABINET 1CABINET 2GPS ANTENNA CABLESURGEPROTECTION (TYP)
Overview of the Flexent‚ Modular Cell 4.0B cabinetinstallation1- 25Lucent Technologies – ProprietarySee notice on first page401-703-454FOA Draft Issue 1January, 2006............................................................................................................................................................................................................................................................4.0B cabinets ON PAGE 2 - 69 for 4.0B applications. A 4.0B DUAL BAND CABINET #2 ALSO HAS ANTENNA JUMPER CABLESNote that battery support for Cabinet #1 (primary) and Cabinet #2 (dual band) must be from independent separate sources. Currently, WNG battery cabinets may be used to support cabinet #1 (primary) only. EZBFo frames must be used to support cabinet #2 (4.0B dual band), but they must be installed to the right of the dual band cabinet (as viewed from the rear). EZBFo may also be used in place of the WNG Battery to support cabinet #1 (primary). The following (rear view) line-ups are possible: WNG #2 - WNG #1 - Primary 4.0B - Dual Band 4.0B

Navigation menu