Nokia of America ONEBTS-11 UMTS-CDMA Transceiver System (850) User Manual 401703454i1

Alcatel-Lucent USA Inc. UMTS-CDMA Transceiver System (850) 401703454i1

users manual b

Download: Nokia of America ONEBTS-11 UMTS-CDMA Transceiver System (850) User Manual 401703454i1
Mirror Download [FCC.gov]Nokia of America ONEBTS-11 UMTS-CDMA Transceiver System (850) User Manual 401703454i1
Document ID635453
Application IDhJiQHsm2QbXgx4Q59K5tTw==
Document Descriptionusers manual b
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize152.48kB (1905992 bits)
Date Submitted2006-03-10 00:00:00
Date Available2006-03-09 00:00:00
Creation Date2006-03-06 14:53:50
Producing SoftwareAcrobat Distiller 5.0.5 (Windows)
Document Lastmod2006-03-08 15:37:23
Document Title401703454i1.book
Document CreatorPScript5.dll Version 5.2.2

Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
Refer to Chapter 2, Heat exchanger and solar shield configurations for
Modular Cell 4.0B cabinets on Page 2 - 69 for heat exchanger and solar
shield applications for the following configurations
4.0B dual band cabinet
without integrated power in
legacy line-ups with
customer-supplied power
The following diagram shows configuration options for 4.0B dual band
cabinet without integrated power in legacy line-ups with customersupplied power.
FRONT OR REAR HEAT
EXCHANGER, AS APPLICABLE
5-8 850 CARRIERS
(4.0 Primary and G-1)
1-11 PCS CARRIERS
(4.0B Dual Band)
7-8 850 CARRIERS
(1/2/3.0 Primary and
G-1, 4.0 G-2)
1-11 PCS CARRIERS
(4.0B Dual Band)
1 - 11 C
PCS
4.0B
1 - 11 C
PCS
4.0B
1 - 4 C or
1 - 2C
850
4.0
1 - 4 C or
1-6C
850
4.0
LUCENT OR
CUSTOMER
SUPPLIED
POWER AND
BATTERY
1 - 2C
850
4.0
1 - 3C
850
1/2/3.0
1-3C
850
1/2/3.0
LUCENT OR
CUSTOMER
SUPPLIED
POWER AND
BATTERY
Important! Within the following section, figures depicting
installation sites are provided for general information only. These
figures are not to be used as a reference for an installation. Always
use current and approved documentation, which is referenced in
the installation procedure.
...........................................................................................................................................................................................................................................................
1 - 22
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
Modular Cell 4.0B primary
and dual band cabinets
with WNG24-BC battery
cabinets installed on a
concrete pad
Illustrated below is an outdoor site maximum 4.0B configuration, with
primary and dual band Modular Cell 4.0B cabinets with WNG24-BC
battery cabinets installed on a concrete pad.
NOTE: THE MODULAR CELL 4.0B CABINETS SHOWN HAVE
INTEGRATED POWER. THEY ARE ILLUSTRATED WITH A
FRONT HEAT EXCHANGER (RATHER THAN A REAR HEAT
EXCHANGER WHICH ARE USED ON CERTAIN NONINTEGRATED POWER CABINETS ONLY). THE SOLAR
SHIELDS ARE NOT ILLUSTRATED. Refer to Heat exchanger and
solar shield configurations for Modular Cell 4.0B cabinets ON PAGE 2 - 69
for 4.0B applications. A 4.0B DUAL BAND CABINET #2 ALSO
HAS ANTENNA JUMPER CABLES
Note that battery support for Cabinet #1 (primary) and Cabinet #2 (dual
band) must be from independent separate sources. Currently, WNG
battery cabinets may be used to support cabinet #1 (primary) only.
EZBFo frames must be used to support cabinet #2 (4.0B dual band),
but they must be installed to the right of the dual band cabinet (as
viewed from the rear). EZBFo may also be used in place of the WNG
Battery to support cabinet #1 (primary). The following (rear view) lineups are possible: WNG #2 - WNG #1 - Primary 4.0B - Dual Band 4.0B
- EZBFo #1 - EZBFo - #2 or EZBFo #2 - EZBFo - #1 - Primary 4.0B Dual Band 4.0B - EZBFo #1 - EZBFo - #2
............................................................................................................................................................................................................................................................
401-703-454
FOA Draft Issue 1
January, 2006
Lucent Technologies – Proprietary
See notice on first page
1 - 23
Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
WNG. BATTERY CABINET 2 *
(OPTIONAL)
WNG. BATTERY CABINET 1 *
(OPTIONAL)
CABINET 1
1 " OPTIONAL PORTS
FOR ALARMS
CABINET 2
JUMPER CABLE
SUPPORT STRUCTURE
ASSEMBLY
(BY CUSTOMER)
2" CONDUIT
ASSEMBLYFOR
T1/E1 AND USER
ALARMS ( TYP )
2" CONDUIT ASSEMBLY
FOR AC POWER ( TYP )
GPS ANTENNA CABLE
2" CONDUIT ASSEMBLY
FOR AC POWER ( TYP )
CONCRETE PAD
(BY CUSTOMER)
ANTENNA
JUMPER CABLES
( TYP )
REAR
RF ANTENNA CABLES TO
ANTENNA TOWER ( TYP )
SURGE
PROTECTION (TYP)
MOUNTING BASE ( TYP )
( OPTIONAL )
7/16 DIN FEMALE
CONNECTORS ( TYP )
Modular Cell 4.0B primary
and dual band cabinets
with WNG24-BC battery
cabinets installed on a
rooftop
Illustrated below is an outdoor site maximum 4.0B configuration, with
primary and dual band Modular Cell 4.0B cabinets with WNG24-BC
battery cabinets installed on a rooftop.
NOTE: THE MODULAR CELL 4.0B CABINETS SHOWN HAVE
INTEGRATED POWER. THEY ARE ILLUSTRATED WITH A FRONT
HEAT EXCHANGER (RATHER THAN A REAR HEAT EXCHANGER
WHICH ARE USED ON CERTAIN NON-INTEGRATED POWER
CABINETS ONLY). THE SOLAR SHIELDS ARE NOT ILLUSTRATED.
Refer to Heat exchanger and solar shield configurations for Modular Cell
...........................................................................................................................................................................................................................................................
1 - 24
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
4.0B cabinets ON PAGE
2 - 69 for 4.0B applications. A 4.0B DUAL
BAND CABINET #2 ALSO HAS ANTENNA JUMPER CABLES
Note that battery support for Cabinet #1 (primary) and Cabinet #2 (dual
band) must be from independent separate sources. Currently, WNG
battery cabinets may be used to support cabinet #1 (primary) only.
EZBFo frames must be used to support cabinet #2 (4.0B dual band),
but they must be installed to the right of the dual band cabinet (as
viewed from the rear). EZBFo may also be used in place of the WNG
Battery to support cabinet #1 (primary). The following (rear view) lineups are possible: WNG #2 - WNG #1 - Primary 4.0B - Dual Band 4.0B
............................................................................................................................................................................................................................................................
401-703-454
FOA Draft Issue 1
January, 2006
Lucent Technologies – Proprietary
See notice on first page
1 - 25

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : No
Encryption                      : Standard V1.2 (40-bit)
User Access                     : Print, Fill forms, Extract, Assemble, Print high-res
Modify Date                     : 2006:03:08 15:37:23-05:00
Create Date                     : 2006:03:06 14:53:50-05:00
Title                           : 401703454i1.book
Creator                         : PScript5.dll Version 5.2.2
Producer                        : Acrobat Distiller 5.0.5 (Windows)
Page Count                      : 4
Mod Date                        : 2006:03:08 15:37:23-05:00
Creation Date                   : 2006:03:06 14:53:50-05:00
Metadata Date                   : 2006:03:08 15:37:23-05:00
EXIF Metadata provided by EXIF.tools
FCC ID Filing: AS5ONEBTS-11

Navigation menu