TS 450 Hardware 31715002 TRACE 1300 Series GC Manual
2016-05-17
: Pdf 31715002 Trace 1300 Series Gc Hardware Manual 31715002 TRACE 1300 Series GC Hardware Manual TRACE 1300 TRACE 1310 GC AS Manuals User ation
Open the PDF directly: View PDF
Page Count: 624 [warning: Documents this large are best viewed by clicking the View PDF Link!]
- Contents
- Preface
- Installation
- Positioning the TRACE 1300/TRACE 1310
- Installing the External Accessories
- Installing the Injector and Detector Modules
- Making the Gas Supply Plumbing Connections
- Connecting the Oven Cryogenic System
- Connecting the PTV/PTVBKF Cryogenic System
- Coupling to a Mass Spectrometer
- Installing the Autosampler
- Installing the Data System Software
- Making Power Connections
- Setting the LAN Communication
- Column Installation Requirements
- Installing the Column the First Time
- Performing Routine Maintenance
- Performing Injectors Routine Maintenance
- Maintaining a Split/Splitless Injector (SSL)
- Maintaining a Split/Splitless Injector with Backflush (SSLBKF)
- Maintaining a Gas Sampling Valve Injector (GSV)
- Maintaining an Instant Connect Helium Saver Injector (HeS-S/SL)
- Maintaining a Programmable Temperature Vaporizing Injector (PTV)
- Maintaining a Programmable Temperature Vaporizing Injector with Backflush (PTVBKF)
- Performing Detectors Routine Maintenance
- GC Main Frame Advanced Maintenance
- Removing/Replacing the GC Top Cover
- Removing/Replacing the GC Left Side Panel
- Removing/Replacing the GC Right Side Panel
- Removing/Replacing the GC Back Cover
- Removing/Replacing the GC Front Door Cover
- Removing/Replacing the Electronic Module
- Replacing the Oven Heater Baffle
- Replacing the Oven Heater Temperature Sensor
- Replacing the Oven Motor
- Replacing the Flap Motor
- Injectors Advanced Maintenance
- Detectors Advanced Maintenance
- Removing/Replacing a Detector Module
- Measuring the FID Gas Flows
- Cleaning or Replacing the FID Jet
- Measuring the NPD Gas Flows
- Cleaning or Replacing the NPD Jet
- Measuring the FPD Gas Flows
- Cleaning or Replacing the FPD Mirror Metal Plug
- Cleaning or Replacing the FPD Filter-side Heat Shields
- Cleaning or Replacing the FPD Flame-side Heat Shields
- Replacing the FPD Photomultiplier Tube
- Installing Optional Kits
- Installing the Oven Exhaust Kit
- Installing the Merlin Microseal High Pressure Valve Kit
- Installing the Purge & Trap Adapter Kit on the SSL/SSLBKF Injector
- Installing the Packed Column Adapters
- Installing the HS Adapter Kit on the SSL/SSLBKF Injector
- Installing the Large Volume Splitless Kit
- Installing the Manual On/Off Valve for Single Gas Line
- Connecting a SSL/PTV Backflush System
- Connecting a SSL/PTV Backflush System for High Temperature
- Connecting a GSV Backflush System
- Installing the NoVent Microfluidics
- Connecting the NoVent Microfludics Module to the TRACE 1300/1310
- Installing the Mounting Bracket
- Preparing the NoVent Microfluidics Restrictor Tubing
- Attaching the Ferrule and Nut to the GC Column
- Attaching the New Tubing to the Transfer Line
- Connecting the Capillaries to the Microfluidics Splitter
- Configuring the Post-Column
- Using the Module
- Installing a FTIR Make-up Module
- Installing the Hot Injection Adapter Kit on the SSL/SSLBKF Injector
- Performing the Dual FPD Detector Configuration
- Adding Modules
- Adding a SSL, SSLBKF, PTV, or PTVBKF Injector Module
- Adding a GSV Injector Module
- Adding a FID, TCD/TCD In-Series, ECD, or FPD Detector Module
- Adding a NPD Detector Module
- Adding an Aux Temperature/Cryo Module
- Adding a Helium Saver Injector Module
- Adding a PDD Module
- Adding a Generic Detector Interface
- Preliminary Operations
- Getting Started
- Removing the GC Back Cover
- Assembling the GDI Electrical Interface
- Replacing the Encapsulated Flow Restrictors
- Installing and Connecting the GDI Electrical Interface
- Connecting a GDI Interface to the TRACE 1310 Auxiliary Oven
- Installing a GDI Mechanical Module
- Connecting the Detector Gas Tubings to the Manifolds
- Connecting Heater and Signal Cables
- Restarting the GC
- Performing the Third-party Detector Start-up and Optimization
- Configuring and Setting GDI Detector
- Adding an Analog Output Interface
- Adding Systems
- Adding the Oven Cryo System
- Adding the PTV and PTVBKF Cryo System
- Adding an Auxiliary Gas System
- Auxiliary Gas Module Overview
- Auxiliary Gas Interface Overview
- Preliminary Operations
- Getting Started
- Installing the Auxiliary Gas Interface on the Left Wall of the Oven
- Installing the Auxiliary Gas Interface on the Right Wall of the Oven
- Installing the Auxiliary Gas Interface on the Oven for HRMS
- Installing and Connecting the Auxiliary Gas Module
- Adding the Hydrogen Sensor
- Upgrade Equipment
- Troubleshooting
- Glossary