Design of pipeline installation

D-Geo Pipeline

Verification Report

D-G EO P IPELINE
Design of pipeline installation

Verification Report

Version: 15.1
Revision: 00
13 April 2015

D-G EO P IPELINE, Verification Report

Published and printed by:
Deltares
Boussinesqweg 1
2629 HV Delft
P.O. 177
2600 MH Delft
The Netherlands

For sales contact:
telephone: +31 88 335 81 88
fax:
+31 88 335 81 11
e-mail:
sales@deltaressystems.nl
www:
http://www.deltaressystems.nl

telephone:
fax:
e-mail:
www:

+31 88 335 82 73
+31 88 335 85 82
info@deltares.nl
http://www.deltares.nl

For support contact:
telephone: +31 88 335 81 00
fax:
+31 88 335 81 11
e-mail:
support@deltaressystems.nl
www:
http://www.deltaressystems.nl

Copyright © 2015 Deltares
All rights reserved. No part of this document may be reproduced in any form by print, photo
print, photo copy, microfilm or any other means, without written permission from the publisher:
Deltares.

Contents

Contents
Introduction

1

1 Group 1: Benchmarks from literature (exact solution)
1.1 Soil type and displacement at maximal friction (Micro-tunneling and Trenching)
1.1.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.2 Benchmark results . . . . . . . . . . . . . . . . . . . . . . . . . .
1.1.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . .

3
3
3
4
5

2 Group 2: Benchmarks from literature (approximate solution)

9

3 Group 3: Benchmarks from spreadsheets
11
3.1 HDD with 2D geometry – Steel pipe in two compressible undrained layers . . . 11
3.1.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.1.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
3.1.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 17
3.2 HDD with 2D geometry – Vertical bearing capacity in homogeneous compressible undrained layer with ϕ = 0 . . . . . . . . . . . . . . . . . . . . . . . . 21
3.2.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.2.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.2.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 22
3.3 HDD with 2D geometry – Polyethylene (PE 80) pipe in two compressible undrained
layers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
3.3.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.3.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
3.3.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 24
3.4 HDD with 2D geometry – Steel pipe in two incompressible drained layers . . . 26
3.4.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26
3.4.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.4.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 28
3.5 HDD with 2D geometry – Steel pipe in a sequence of a compressible undrained
layer and a compressible drained layer . . . . . . . . . . . . . . . . . . . . 29
3.5.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.5.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
3.5.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 30
3.6 HDD with 2D geometry – Steel pipe in a sequence of an incompressible
undrained layer and an incompressible drained layer . . . . . . . . . . . . . 30
3.6.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.6.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.6.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 31
3.7 HDD with 3D geometry – Steel pipe in 4 layers – Compressible border above
drainage border . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.7.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
3.7.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
3.7.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 36
3.8 Special strength analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
3.8.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
3.8.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
3.8.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 38
3.9 HDD with 3D geometry – Bundled pipeline (3 steel pipes and 2 PE pipes) . . . 40
3.9.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
3.9.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
3.9.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 45
3.10 HDD with 3D geometry – Bundled pipeline (2 PE pipes) . . . . . . . . . . . . 53

Deltares

iii

D-G EO P IPELINE, Verification Report

3.11

3.12

3.13

3.14

3.15

3.16

3.17

3.18

3.19

3.20

3.21

3.22

iv

3.10.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.10.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.10.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD with 3D geometry – Bundled pipeline (3 steel pipes) . . . . . . . . . .
3.11.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.11.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.11.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Micro tunneling with 3D geometry – Steel pipe . . . . . . . . . . . . . . .
3.12.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.12.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.12.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Micro tunneling with 3D geometry – Synthetic pipe . . . . . . . . . . . . .
3.13.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.13.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.13.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Micro tunneling with 3D geometry – Concrete pipe . . . . . . . . . . . . .
3.14.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.14.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.14.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Trenching (3 sections) – 3D geometry in four layers – Compressible border
above drainage border . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.15.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.15.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.15.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Trenching (3 sections) – 3D geometry in four layers – Drainage border above
compressible border . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.16.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.16.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.16.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
Bundled pipeline with Special Stress Analysis . . . . . . . . . . . . . . . .
3.17.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.17.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.17.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD with 3D geometry – Pipeline configuration not ending at surface and with
an angle between radii . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.18.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.18.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.18.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD with 2D geometry – Stress Analysis per Vertical – Steel pipe . . . . .
3.19.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.19.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.19.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD with 3D geometry – Stress Analysis per Vertical – PE pipe . . . . . . .
3.20.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.20.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.20.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD – Determination of the minimum allowable radius . . . . . . . . . . .
3.21.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.21.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.21.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .
HDD – PE pipe not filled with water on rollers . . . . . . . . . . . . . . . .
3.22.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.22.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . . . . .
3.22.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . .

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

54
54
56
56
56
56
58
59
59
59
60
64
64
64
64
65
65
65
65

.
.
.
.

68
68
69
70

.
.
.
.
.
.
.
.

74
74
75
75
75
76
76
78

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

79
79
79
81
82
82
82
83
88
88
88
89
94
94
97
99
101
101
101
102

Deltares

Contents

3.23 HDD – PE pipe always filled (100%) – Implosion . . . . . . . . . . .
3.23.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . .
3.23.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . .
3.23.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . .
3.24 HDD with 2D geometry – Effect of traffic loads . . . . . . . . . . . .
3.24.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . .
3.24.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . .
3.24.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . .
3.25 HDD with safety factors from the European Standard CEN – Steel pipe
3.25.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . .
3.25.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . .
3.25.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . .
3.26 HDD with safety factors from the European Standard CEN – PE pipe .
3.26.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . .
3.26.2 Analytical results . . . . . . . . . . . . . . . . . . . . . . .
3.26.3 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . .

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

102
102
103
103
104
104
104
107
109
109
110
111
113
113
113
115

4 Group 4: Benchmarks generated by D-G EO P IPELINE
117
4.1 HDD with 3D geometry – Check of the pulling direction . . . . . . . . . . . . 117
4.1.1 Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
4.1.2 D-G EO P IPELINE results . . . . . . . . . . . . . . . . . . . . . . . 117
5 Group 5: Benchmarks compared with other programs
5.1 Settlements according to Koppejan model . . . . .
5.1.1 Description . . . . . . . . . . . . . . . .
5.1.2 D-S ETTLEMENT results . . . . . . . . . .
5.1.3 D-G EO P IPELINE results . . . . . . . . .
5.2 Settlements according to Isotache model . . . . .
5.2.1 Description . . . . . . . . . . . . . . . .
5.2.2 D-S ETTLEMENT results . . . . . . . . . .
5.2.3 D-G EO P IPELINE results . . . . . . . . .
Bibliography

Deltares

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

.
.
.
.
.
.
.
.

119
119
119
119
120
120
120
120
121
123

v

D-G EO P IPELINE, Verification Report

vi

Deltares

List of Figures

List of Figures
1.1

Geometry of benchmark 1-1a (Construction in Trench) . . . . . . . . . . . .

3.1

2D Geometry of benchmark 3-1 (steel pipeline in two compressible undrained
layers) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Locations of the characteristic points T1 to T6 . . . . . . . . . . . . . . . .
3D view of the pipeline configuration (benchmark 3-7) . . . . . . . . . . . .
Lateral view of the 3 trench sections (benchmark 3-15) . . . . . . . . . . .
Locations of the characteristic points T1 to T6 for case A (positive angle between radii) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Locations of the characteristic points T1 to T6 for case B (negative angle between radii) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Locations of the characteristic points (T1 to T6) and the 3 verticals . . . . .
Geometry of benchmark 3-21a . . . . . . . . . . . . . . . . . . . . . . .
Geometry of benchmark 3-21b . . . . . . . . . . . . . . . . . . . . . . .
Warning message displayed for benchmark 3-21a . . . . . . . . . . . . . .
Warning message displayed for benchmark 3-21b . . . . . . . . . . . . . .
Geometry of benchmark 3-12 with 2 traffic loads . . . . . . . . . . . . . .
Traffic load as a function of the depth, for different pipe diameters, according
to NEN 3650-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13

5.1

Deltares

Geometry of benchmark 5-1

.
.
.
.

4

12
14
33
69

. 80
.
.
.
.
.
.
.

81
82
95
97
99
100
104

. 105

. . . . . . . . . . . . . . . . . . . . . . . . . 119

vii

D-G EO P IPELINE, Verification Report

viii

Deltares

List of Tables

List of Tables
1.1
1.2
1.3
1.4
1.5
1.6

Material properties of the different layers (benchmark 1-1) . . . . . . . . . .
Displacement at maximal friction and classification of the soil type . . . . .
Results of benchmark 1-1a, Global soil type for Construction in Trench . . .
Results of benchmark 1-1a, Maximal displacement for Construction in Trench
Results of benchmark 1-1b, Global soil type for Micro Tunneling . . . . . . .
Results of benchmark 1-1b, Maximal displacement for Micro Tunneling . . .

3.1
3.2
3.3
3.4
3.6
3.7
3.8
3.9
3.10
3.11

Soil material properties (bm3-1) . . . . . . . . . . . . . . . . . . . . . . . .
Pipe material data (bm3-1) . . . . . . . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of dp/dz for the three stages . . . . . . .
Analytical results for the calculation of the maximum drilling fluid pressures . .
Results of benchmark 3-01, Pulling forces in the pipeline . . . . . . . . . . .
Set for calculation of the maximum stresses for load combination 1A . . . . .
Set for calculation of the maximum stresses for load combination 1B . . . . .
Set for calculation of the maximum stresses for load combination 3 . . . . . .
Set for calculation of the maximum stresses for load combination 4 . . . . . .
Results of benchmark 3-01, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole) . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover) . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Minimum required drilling fluid pressure (from left
to right) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Minimum required drilling fluid pressure (from right
to left) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Equilibrium between drilling fluid pressure and
pore pressure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Vertical soil stresses . . . . . . . . . . . . . . .
Results of benchmark 3-01, Neutral horizontal soil stress and bearing capacities
Results of benchmark 3-01, Vertical and horizontal moduli of subgrade reaction
Results of benchmark 3-01, Maximal axial friction and displacements . . . . .
Results of benchmark 3-01, Buoyancy control . . . . . . . . . . . . . . . . .
Results of benchmark 3-01, Pulling forces in the pipeline . . . . . . . . . . .
Results of benchmark 3-01, Strength calculation for Combination 1A . . . . .
Results of benchmark 3-01, Strength calculation for Combination 1B . . . . .
Results of benchmark 3-01, Strength calculation for Combination 2 . . . . . .
Results of benchmark 3-01, Strength calculation for Combination 3 . . . . . .
Results of benchmark 3-01, Strength calculation for Combination 4 . . . . . .
Results of benchmark 3-01, Maximum allowable stresses . . . . . . . . . . .
Results of benchmark 3-01, Deflection of the pipeline . . . . . . . . . . . . .
Results of benchmark 3-01, Implosion . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the vertical bearing capacity . . . . . .
Results of benchmark 3-02, Ultimate vertical bearing capacity . . . . . . . . .
Pipe material data (benchmark 3-3) . . . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the six characteristic points . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-03, Buoyancy control . . . . . . . . . . . . . . . . .
Results of benchmark 3-03, Pulling forces in the pipeline . . . . . . . . . . .
Results of benchmark 3-03, Strength calculation for Combination 1A . . . . .
Results of benchmark 3-03, Strength calculation for Combination 1B . . . . .
Results of benchmark 3-03, Strength calculation for Combination 2 . . . . . .
Results of benchmark 3-03, Strength calculation for Combination 3 . . . . . .
Results of benchmark 3-03, Strength calculation for Combination 4 . . . . . .

3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
3.32
3.34
3.35
3.36
3.37
3.38
3.39
3.40
3.41

Deltares

.
.
.
.
.
.

3
4
5
6
7
8
11
12
13
13
15
15
16
16
16
17
17
17
18
18
18
19
19
19
19
20
20
20
20
20
21
21
21
21
22
22
23
24
24
25
25
25
25
25
26

ix

D-G EO P IPELINE, Verification Report

3.42
3.43
3.44
3.45
3.46
3.47
3.48
3.49
3.50
3.51
3.52
3.53
3.54
3.55
3.56
3.57
3.59
3.60
3.61
3.62
3.63
3.64
3.65
3.66
3.67
3.68
3.69
3.70
3.71
3.72
3.73
3.74
3.75
3.76
3.77
3.78
3.79
3.80
3.81
3.82
3.83

x

Results of benchmark 3-03, Maximum allowable stresses . . . . . . . . . . .
Results of benchmark 3-03, Deflection of the pipeline . . . . . . . . . . . . .
Results of benchmark 3-03, Implosion . . . . . . . . . . . . . . . . . . . .
Analytical results – General data’s . . . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the neutral reduced vertical stress . . .
Analytical results for the calculation of the maximum drilling fluid pressures . .
Results of benchmark 3-04, Vertical soil stresses . . . . . . . . . . . . . . .
Results of benchmark 3-04, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole) . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-04, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover) . . . . . . . . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the maximum drilling fluid pressures . .
Results of benchmark 3-05, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole) . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-05, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover) . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-06, Vertical soil stresses . . . . . . . . . . . . . . .
Soil material properties (benchmark 3-07) . . . . . . . . . . . . . . . . . . .
Pipe material data (benchmark 3-07) . . . . . . . . . . . . . . . . . . . . .
Position of the characteristic points (benchmark 3-07a) . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points for case a . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points for case b . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-07a, Vertical soil stresses . . . . . . . . . . . . . .
Results of benchmark 3-07a, Neutral horizontal soil stress and bearing capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-07a, Vertical and horizontal moduli of subgrade reaction
Results of benchmark 3-07a, Maximal axial friction and displacements . . . .
Results of benchmark 3-07a, Pulling forces in the pipeline . . . . . . . . . . .
Results of benchmark 3-07b, Pulling forces in the pipeline . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-08) . . . . . . . . . . . . . . . . . . .
Results of benchmark 3-08, Buoyancy Control . . . . . . . . . . . . . . . .
Results of benchmark 3-08, Pulling forces in the pipeline . . . . . . . . . . .
Results of benchmark 3-08, Strength calculation for Combination 1A . . . . .
Results of benchmark 3-08, Strength calculation for Combination 1B . . . . .
Results of benchmark 3-08, Strength calculation for Combination 2 . . . . . .
Results of benchmark 3-08, Strength calculation for Combination 3 . . . . . .
Results of benchmark 3-08, Strength calculation for Combination 4 . . . . . .
Results of benchmark 3-08, Maximum allowable stresses . . . . . . . . . . .
Results of benchmark 3-08, Deflection of the pipeline . . . . . . . . . . . . .
Results of benchmark 3-08, Implosion . . . . . . . . . . . . . . . . . . . .
Pipe material data (benchmark 3-09) . . . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .
Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .

26
26
26
27
27
28
28
28
29
29
30
30
31
32
32
33
35
35
36
36
36
37
37
37
38
38
38
39
39
39
39
40
40
40
40
41
42
43
43
43
44

Deltares

List of Tables

3.84 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09) . . . . . . . . . . . . . . . . . . .
3.85 Maximal pulling forces without partial factors (bm3-09) . . . . . . . . . . . .
3.86 Results of benchmark 3-09, Buoyancy control . . . . . . . . . . . . . . . . .
3.87 Results of benchmark 3-09, Pulling forces in the pipeline . . . . . . . . . . .
3.88 Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.89 Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.90 Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination 2
3.91 Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination 3
3.92 Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination 4
3.93 Results of benchmark 3-09 for pipe nr. 1, Maximum allowable stresses . . . .
3.94 Results of benchmark 3-09 for pipe nr. 1, Deflection of the pipeline . . . . . .
3.95 Results of benchmark 3-09 for pipe nr. 1, Implosion . . . . . . . . . . . . . .
3.96 Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.97 Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.98 Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination 2
3.99 Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination 3
3.100 Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination 4
3.101 Results of benchmark 3-09 for pipe nr. 2, Maximum allowable stresses . . . .
3.102 Results of benchmark 3-09 for pipe nr. 2, Deflection of the pipeline . . . . . .
3.103 Results of benchmark 3-09 for pipe nr. 2, Implosion . . . . . . . . . . . . . .
3.104 Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination
1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.105 Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination
1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.106 Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 2
3.107 Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 3
3.108 Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 4
3.109 Results of benchmark 3-09 for pipe nr. 3, Maximum allowable stresses . . . .
3.110 Results of benchmark 3-09 for pipe nr. 3, Deflection of the pipeline . . . . . .
3.111 Results of benchmark 3-09 for pipe nr. 3, Implosion . . . . . . . . . . . . . .
3.112 Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination
1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.113 Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination
1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.114 Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 2
3.115 Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 3
3.116 Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 4
3.117 Results of benchmark 3-09 for pipe nr. 4, Maximum allowable stresses . . . .
3.118 Results of benchmark 3-09 for pipe nr. 4, Deflection of the pipeline . . . . . .
3.119 Results of benchmark 3-09 for pipe nr. 4, Implosion . . . . . . . . . . . . . .
3.120 Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination
1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.121 Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination
1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.122 Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 2
3.123 Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 3
3.124 Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 4
3.125 Results of benchmark 3-09 for pipe nr. 5, Maximum allowable stresses . . . .
3.126 Results of benchmark 3-09 for pipe nr. 5, Deflection of the pipeline . . . . . .

Deltares

44
44
45
45
45
45
46
46
46
46
46
47
47
47
47
47
48
48
48
48
48
49
49
49
49
50
50
50
50
50
51
51
51
51
51
52
52
52
52
52
53
53
53

xi

D-G EO P IPELINE, Verification Report

3.127 Results of benchmark 3-09 for pipe nr. 5, Implosion . . . . . . . . . . . . . .
3.128 Pipe material data (benchmark 3-10) . . . . . . . . . . . . . . . . . . . . .
3.129 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-10) for the equivalent pipe . . . . . . . .
3.130 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-10) for pipe nr. 1 . . . . . . . . . . . . .
3.131 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-10) for pipe nr. 2 . . . . . . . . . . . . .
3.132 Results of benchmark 3-10, Buoyancy control . . . . . . . . . . . . . . . . .
3.133 Results of benchmark 3-10, Pulling forces in the pipeline . . . . . . . . . . .
3.134 Pipe material data (benchmark 3-11) . . . . . . . . . . . . . . . . . . . . .
3.135 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-11) for the equivalent pipe . . . . . . . .
3.136 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-11) for pipe nr. 1 . . . . . . . . . . . . .
3.137 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-11) for pipe nr. 2 . . . . . . . . . . . . .
3.138 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-11) for pipe nr. 3 . . . . . . . . . . . . .
3.139 Results of benchmark 3-11, Buoyancy control . . . . . . . . . . . . . . . . .
3.140 Results of benchmark 3-11, Pulling forces in the pipeline . . . . . . . . . . .
3.141 Analytical results for the calculation of the face support pressures . . . . . . .
3.142 Analytical results for the calculation of the uplift safety factor . . . . . . . . .
3.143 Results of benchmark 3-12a, Vertical soil stresses . . . . . . . . . . . . . .
3.144 Results of benchmark 3-12a, Neutral horizontal soil stress and bearing capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.145 Results of benchmark 3-12a, Vertical and horizontal moduli of subgrade reaction
3.146 Results of benchmark 3-12a, Maximal axial friction and displacements . . . .
3.147 Results of benchmark 3-12a, Face support pressures . . . . . . . . . . . .
3.148 Results of benchmark 3-12a, Thrust forces . . . . . . . . . . . . . . . . . .
3.149 Results of benchmark 3-12b, Thrust forces . . . . . . . . . . . . . . . . . .
3.150 Results of benchmark 3-12a, Uplift safety factor . . . . . . . . . . . . . . . .
3.151 Results of benchmark 3-12a, Trough . . . . . . . . . . . . . . . . . . . . .
3.152 Results of benchmark 3-12a, Subsidence at different horizontal distances of Z
axis (from 0 to 0.7W) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.153 Results of benchmark 3-12a, Subsidence at different horizontal distances of Z
axis (from 1W to 2.5W) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.154 Results of benchmark 3-13, Vertical and horizontal moduli of subgrade reaction
3.155 Results of benchmark 3-14, Vertical soil stresses . . . . . . . . . . . . . . .
3.156 Results of benchmark 3-14, Neutral horizontal soil stress and bearing capacities
3.157 Results of benchmark 3-14, Vertical and horizontal moduli of subgrade reaction
3.158 Results of benchmark 3-14, Maximal axial friction and displacements . . . . .
3.159 Results of benchmark 3-14, Face support pressures . . . . . . . . . . . . .
3.160 Results of benchmark 3-14, Thrust forces . . . . . . . . . . . . . . . . . . .
3.161 Results of benchmark 3-14, Uplift safety factor . . . . . . . . . . . . . . . .
3.162 Results of benchmark 3-14, Trough . . . . . . . . . . . . . . . . . . . . . .
3.163 Results of benchmark 3-14, Subsidence at different horizontal distances of Z
axe (from 0 to 0.7W) . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.164 Results of benchmark 3-14, Subsidence at different horizontal distances of Z
axe (from 1W to 2.5W) . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.165 Configuration of the 3 trench sections (benchmark 3-15a) . . . . . . . . . . .
3.166 Analytical results for the calculation of the uplift safety factor . . . . . . . . .
3.167 Analytical results for the hydraulic heave check . . . . . . . . . . . . . . . .
3.168 Results of benchmark 3-15a, Vertical and horizontal soil stresses . . . . . . .

xii

53
54
55
55
55
56
56
56
57
57
58
58
58
59
60
60
60
61
61
61
62
62
62
63
63
63
64
64
65
65
66
66
66
67
67
67
68
68
69
70
70
70

Deltares

List of Tables

3.169 Results of benchmark 3-15a, Initial vertical stress qk for sand poorly compacted
3.170 Results of benchmark 3-15b, Initial vertical stress qk for stiff clay poorly compacted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.171 Results of benchmark 3-15c, Initial vertical stress qk for soft soil poorly compacted . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.172 Results of benchmark 3-15d, Initial vertical stress qk for sand well compacted .
3.173 Results of benchmark 3-15e, Initial vertical stress qk for stiff clay well compacted
3.174 Results of benchmark 3-15f, Initial vertical stress qk for soft soil well compacted
3.175 Results of benchmark 3-15a, Horizontal modulus of subgrade reaction and
bearing capacities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.176 Results of benchmark 3-15a, Vertical moduli of subgrade reaction upward . .
3.177 Results of benchmark 3-15a, Vertical moduli of subgrade reaction downward .
3.178 Results of benchmark 3-15a, Maximal axial friction and displacements . . . .
3.179 Results of benchmark 3-15a, Uplift check . . . . . . . . . . . . . . . . . . .
3.180 Results of benchmark 3-15a, Hydraulic heave check . . . . . . . . . . . . .
3.181 Analytical results for the hydraulic heave check . . . . . . . . . . . . . . . .
3.182 Results of benchmark 3-16, Hydraulic heave check . . . . . . . . . . . . . .
3.183 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for the equivalent pipe . . . . . . . .
3.184 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for pipe nr. 1 . . . . . . . . . . . . .
3.185 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for pipe nr. 2 . . . . . . . . . . . . .
3.186 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for pipe nr. 3 . . . . . . . . . . . . .
3.187 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for pipe nr. 4 . . . . . . . . . . . . .
3.188 Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-17) for pipe nr. 5 . . . . . . . . . . . . .
3.189 Results of benchmark 3-17, Buoyancy Control . . . . . . . . . . . . . . . .
3.190 Results of benchmark 3-17, Pulling forces in the pipeline . . . . . . . . . . .
3.191 Position of the 6 characteristic points (bm3-18a) for case a (positive angle
between radii) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.192 Position of the 6 characteristic points (bm3-18b) for case b . . . . . . . . . .
3.193 Results of benchmark 3-18a, Pulling forces in the pipeline . . . . . . . . . . .
3.194 Results of benchmark 3-18b, Pulling forces in the pipeline . . . . . . . . . . .
3.195 Results of benchmark 3-19, Buoyancy Control . . . . . . . . . . . . . . . .
3.196 Results of benchmark 3-19, Pulling forces in the pipeline . . . . . . . . . . .
3.197 Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.198 Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.199 Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.200 Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.201 Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.202 Results of benchmark 3-19 for vertical nr. 1, Maximum allowable stresses . . .
3.203 Results of benchmark 3-19 for vertical nr. 1, Deflection of the pipeline . . . . .
3.204 Results of benchmark 3-19 for vertical nr. 1, Implosion . . . . . . . . . . . .
3.205 Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Deltares

71
71
71
72
72
72
73
73
73
74
74
74
75
75
76
77
77
77
78
78
78
79
80
80
81
81
83
83
83
83
84
84
84
84
84
85
85

xiii

D-G EO P IPELINE, Verification Report

3.206 Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.207 Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.208 Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.209 Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.210 Results of benchmark 3-19 for vertical nr. 2, Maximum allowable stresses . .
3.211 Results of benchmark 3-19 for vertical nr. 2, Deflection of the pipeline . . . .
3.212 Results of benchmark 3-19 for vertical nr. 2, Implosion . . . . . . . . . . .
3.213 Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.214 Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.215 Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.216 Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.217 Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.218 Results of benchmark 3-19 for vertical nr. 3, Maximum allowable stresses . .
3.219 Results of benchmark 3-19 for vertical nr. 3, Deflection of the pipeline . . . .
3.220 Results of benchmark 3-19 for vertical nr. 3, Implosion . . . . . . . . . . .
3.221 Results of benchmark 3-20, Buoyancy Control . . . . . . . . . . . . . . .
3.222 Results of benchmark 3-20, Pulling forces in the pipeline . . . . . . . . . .
3.223 Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.224 Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.225 Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.226 Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.227 Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.228 Results of benchmark 3-20 for vertical nr. 1, Maximum allowable stresses . .
3.229 Results of benchmark 3-20 for vertical nr. 1, Deflection of the pipeline . . . .
3.230 Results of benchmark 3-20 for vertical nr. 1, Implosion . . . . . . . . . . .
3.231 Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.232 Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.233 Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.234 Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.235 Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.236 Results of benchmark 3-20 for vertical nr. 2, Maximum allowable stresses . .
3.237 Results of benchmark 3-20 for vertical nr. 2, Deflection of the pipeline . . . .
3.238 Results of benchmark 3-20 for vertical nr. 2, Implosion . . . . . . . . . . .
3.239 Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 1A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

xiv

. 85
. 85
. 85
.
.
.
.

86
86
86
86

. 86
. 87
. 87
. 87
.
.
.
.
.
.

87
88
88
88
89
89

. 89
. 89
. 90
. 90
.
.
.
.

90
90
90
91

. 91
. 91
. 91
. 91
.
.
.
.

92
92
92
92

. 92

Deltares

List of Tables

3.240 Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 1B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.241 Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.242 Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.243 Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3.244 Results of benchmark 3-20 for vertical nr. 3, Maximum allowable stresses . .
3.245 Results of benchmark 3-20 for vertical nr. 3, Deflection of the pipeline . . . .
3.246 Results of benchmark 3-20 for vertical nr. 3, Implosion . . . . . . . . . . .
3.247 Properties of the different layers in benchmark 21a . . . . . . . . . . . . .
3.248 Values of constant C (according to table E.1 of NEN 3650-1 (NEN, 2012a)) .
3.249 Soil type as a function of the cohesion and the friction angle . . . . . . . .
3.250 Bending factor (acc. to table 6 of NEN 3650-3) . . . . . . . . . . . . . . .
3.251 Results of benchmark 3-21a, Allowable minimum radius for steel pipes . . .
3.252 Results of benchmark 3-21b, Allowable minimum radius for PE pipes . . . .
3.253 Analytical results for the calculation of the five components of the pulling force
for the six characteristic points . . . . . . . . . . . . . . . . . . . . . . .
3.254 Results of benchmark 3-22, Pulling forces in the pipeline . . . . . . . . . .
3.255 Analytical results for the calculation of the five components of the pulling force
for the six characteristic points . . . . . . . . . . . . . . . . . . . . . . .
3.256 Results of benchmark 3-23, Buoyancy Control . . . . . . . . . . . . . . .
3.257 Results of benchmark 3-23, Pulling forces in the pipeline . . . . . . . . . .
3.258 Results of benchmark 3-23, Implosion . . . . . . . . . . . . . . . . . . .
3.259 Analytical results for the calculation of the traffic load . . . . . . . . . . . .
3.261 Results of benchmark 3-24, Buoyancy control . . . . . . . . . . . . . . . .
3.262 Results of benchmark 3-24, Pulling forces in the pipeline . . . . . . . . . .
3.263 Results of benchmark 3-24, Strength calculation for Combination 1A . . . .
3.264 Results of benchmark 3-24, Strength calculation for Combination 1B . . . .
3.265 Results of benchmark 3-24, Strength calculation for Combination 2 . . . . .
3.266 Results of benchmark 3-24, Strength calculation for Combination 3 . . . . .
3.267 Results of benchmark 3-24, Strength calculation for Combination 4 . . . . .
3.268 Results of benchmark 3-24, Maximum allowable stresses . . . . . . . . . .
3.269 Results of benchmark 3-24, Deflection of the pipeline . . . . . . . . . . . .
3.270 Results of benchmark 3-24, Implosion . . . . . . . . . . . . . . . . . . .
3.272 Results of benchmark 3-25, Buoyancy Control . . . . . . . . . . . . . . .
3.273 Results of benchmark 3-25, Pulling forces in the pipeline . . . . . . . . . .
3.274 Results of benchmark 3-25, Strength calculation for Combination 1A . . . .
3.275 Results of benchmark 3-25, Strength calculation for Combination 1B . . . .
3.276 Results of benchmark 3-25, Strength calculation for Combination 2 . . . . .
3.277 Results of benchmark 3-25, Strength calculation for Combination 3 . . . . .
3.278 Results of benchmark 3-25, Strength calculation for Combination 4 . . . . .
3.279 Results of benchmark 3-25, Maximum allowable stresses . . . . . . . . . .
3.280 Results of benchmark 3-25, Deflection of the pipeline . . . . . . . . . . . .
3.281 Results of benchmark 3-25, Implosion . . . . . . . . . . . . . . . . . . .
3.283 Results of benchmark 3-26, Buoyancy control . . . . . . . . . . . . . . . .
3.284 Results of benchmark 3-26, Pulling forces in the pipeline . . . . . . . . . .
3.285 Results of benchmark 3-26, Strength calculation for Combination 1A . . . .
3.286 Results of benchmark 3-26, Strength calculation for Combination 1B . . . .
3.287 Results of benchmark 3-26, Strength calculation for Combination 2 . . . . .
3.288 Results of benchmark 3-26, Strength calculation for Combination 3 . . . . .
3.289 Results of benchmark 3-26, Strength calculation for Combination 4 . . . . .
3.290 Results of benchmark 3-26, Maximum allowable stresses . . . . . . . . . .

Deltares

. 93
. 93
. 93
.
.
.
.
.
.
.
.
.
.

93
94
94
94
96
97
98
98
100
101

. 102
. 102
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.

103
103
103
104
106
107
107
108
108
108
108
109
109
109
109
111
111
111
112
112
112
112
113
113
113
115
115
115
115
115
116
116
116

xv

D-G EO P IPELINE, Verification Report

3.291 Results of benchmark 3-26, Deflection of the pipeline . . . . . . . . . . . . . 116
3.292 Results of benchmark 3-26, Implosion . . . . . . . . . . . . . . . . . . . . 116
4.1

Results of benchmark 4-01, Pulling forces in the pipeline . . . . . . . . . . . 117

5.1
5.2
5.3
5.4

Koppejan’s parameters (benchmark 5-1) . . . . . . . . . . . . . . . . . .
Results of benchmark 5-01, Settlements according to Koppejan . . . . . . .
Isotache’s parameters (bm5-02) . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 5-02a, Settlements according to Isotache with OCR
consolidation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Results of benchmark 5-02b, Settlements according to Isotache with POP consolidation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5.5

xvi

. 119
. 120
. 120
. 121
. 121

Deltares

Introduction
Deltares Systems commitment to quality control and quality assurance has leaded them to
develop a formal and extensive procedure to verify the correct working of all of their geotechnical engineering tools. An extensive range of benchmark checks have been developed to
check the correct functioning of each tool. During product development these checks are run
on a regular basis to verify the improved product. These benchmark checks are provided
in the following sections, to allow the user to overview the checking procedure and verify for
themselves the correct functioning of D-G EO P IPELINE.
The benchmarks are subdivided into five separate groups as described below.

 Group 1 [chapter 1] – Benchmarks from literature (exact solution)





Simple benchmarks for which an exact analytical result is available from literature.
Group 2 [chapter 2] – Benchmarks from literature (approximate solution)
More complex benchmarks described in literature for which an approximate solution is
known.
Group 3 [chapter 3] – Benchmarks from spread sheets
Benchmarks which test program features specific to MSheet.
Group 4 [chapter 4] – Benchmarks generated by D-G EO P IPELINE
Benchmarks for which the reference results are generated using D-G EO P IPELINE.
Group 5 [chapter 5] – Benchmarks compared with other programs
Benchmarks for which the results of D-G EO P IPELINE are compared with the results of other
programs.

The number of benchmarks in group 1 may grow in the future. The benchmarks in this chapter
are well documented in literature. There are no exact solutions available for these problems,
however in the literature estimated results are available. When verifying the program, the
results should be close to the results found in the literature.
The number of benchmarks in group 2 will grow as new versions of the program are released.
These benchmarks are designed so that (new) features specific to the program can be verified. The benchmarks are kept as simple as possible so that only one specific feature is
verified from one benchmark to the next.
As much as software developers would wish they could, it is impossible to prove the correctness of any non-trivial program. Re-calculating all the benchmarks in this report, and making
sure the results are as they should be, proves to some degree that the program works as it
should. Nevertheless, there will always be combinations of input values that will cause the
program to crash or to produce wrong results. Hopefully by using the verification procedure
the number of ways this can occur will be limited.
The benchmarks are all described in sufficient detail for reproduction to be possible at any
time. The results are presented in text format with each benchmark description. The results
in graphic format are available in the appendix, together with a copy of a part of the output file.
This information is enough to be able to make the calculation. For each benchmark at least
one picture is presented which shows the relevant results.
The different benchmarks from literature with an exact solution (group 1) are described in the
following paragraphs.

Deltares

1 of 126

D-G EO P IPELINE, Verification Report

2 of 126

Deltares

1 Group 1: Benchmarks from literature (exact solution)
1.1
1.1.1

Soil type and displacement at maximal friction (Micro-tunneling and Trenching)
Description
This benchmark checks the classification of the soil type and the displacement at maximal
friction associated to each soil type. Many combinations of parameters c and ϕ are simulated
as shown in Table 1.1.
Table 1.1: Material properties of the different layers (benchmark 1-1)

Vertical
nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Deltares

Material description

c

ϕ

Dense sand 1
Dense sand 2
Stiff clay 1
Medium dense sand 1
Medium dense sand 2
Stiff clay 2
Loose sand 1
Loose sand 2
Stiff sandy clay 1
Stiff sandy clay 2
Stiff clay 3
Clayey sand 1
Clayey sand 2
Stiff sandy clay 3
Medium stiff clay 1
Medium stiff clay 2
Stiff clay 4
Soft clay 1
Soft clay 2
Medium stiff clay 3
Stiff clay 5
Organic clay
Peat

[kPa]
0.2
0.5
3
0.3
0.5
1
0.1
1
5
10
35
4
5
12
6
10
15
4.9
5
5.3
10
15
30

[◦ ]
32.6
40
35
30.1
32
32.5
25.1
26
27
29
30
22.6
23
25
20.1
21
22.5
17.1
18
19
20
17
14

Friction displac.
[mm]
2
2
3
4
4
3
7
7
5
3
3
7
7
3
5
5
4
8
8
5
5
10
13

Global soil
type
Sand
Sand
Clay
Sand
Sand
Clay
Sand
Sand
Clay
Clay
Clay
Sand
Sand
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Peat
Peat

3 of 126

D-G EO P IPELINE, Verification Report

Figure 1.1: Geometry of benchmark 1-1a (Construction in Trench)

1.1.2

Benchmark results
The displacement necessary to develop the maximal axial friction along the pipeline and the
classification of global soil types are determined using Table 1.2.
Table 1.2: Displacement at maximal friction and classification of the soil type

Soil type

Global soil type

ϕ
◦

[ ]
Dense sand
Medium dense sand
Medium dense sand
Loose sand
Stiff sandy clay
Stiff sandy clay
Clayey sand
Stiff clay
Medium stiff clay
Stiff clay
Medium stiff clay
Soft clay
Peat / organic clay

Sand
Sand
Sand
Sand
Clay
Clay
Sand
Clay
Clay
Clay
Clay
Clay
Peat

ϕ > 32.5
30 < ϕ ≤ 32.5
ϕ > 30
25 < ϕ ≤30
25 < ϕ ≤ 30
22.5 < ϕ 25
22.5 < ϕ ≤ 25
20 < ϕ ≤ 22.5
20 < ϕ ≤ 22.5
17 < ϕ ≤ 20
17 < ϕ ≤ 20
17 < ϕ ≤ 20
ϕ ≤ 17

c
[kN/m2 ]
c ≤ 0.5
c ≤ 0.5
c > 0.5
c≤1
c>1
c>5
c≤5
c > 10
c ≤ 10
c > 10
5 < c ≤ 10
c≤5

Displacement
[mm]
1-3
3-5
3-5
5-8
4-6
2-4
5-8
2-4
4-6
2-4
4-6
6-10
10-15

The Construction in trench model (bm1-1a) and the Micro-tunneling model (bm1-1b) are
checked. Benchmark results are presented in both tables below.

4 of 126

Deltares

Group 1: Benchmarks from literature (exact solution)

1.1.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 1.3: Results of benchmark 1-1a, Global soil type for Construction in Trench

Vertical nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Deltares

Benchmark
Sand
Sand
Clay
Sand
Sand
Clay
Sand
Sand
Clay
Clay
Clay
Sand
Sand
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Peat
Peat

D-G EO P IPELINE
Sand
Sand
Clay
Sand
Sand
Clay
Sand
Sand
Clay
Clay
Clay
Sand
Sand
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Peat
Peat

Result
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

5 of 126

D-G EO P IPELINE, Verification Report

Table 1.4: Results of benchmark 1-1a, Maximal displacement for Construction in Trench

Vertical
nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

6 of 126

Benchmark
[mm]
2
2
3
4
4
3
7
7
5
3
3
7
7
3
5
5
4
8
8
5
5
10
13

D-G EO P IPELINE
[mm]
2
2
3
4
4
3
7
7
5
3
3
7
7
3
5
5
4
8
8
5
5
10
13

Rel. error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 1: Benchmarks from literature (exact solution)

Table 1.5: Results of benchmark 1-1b, Global soil type for Micro Tunneling

Vertical nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Deltares

Benchmark
Sand
Sand
Clay
Sand
Sand
Clay
Sand
Sand
Clay
Clay
Clay
Sand
Sand
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Peat
Peat

D-G EO P IPELINE
Sand
Sand
Clay
Sand
Sand
Clay
Sand
Sand
Clay
Clay
Clay
Sand
Sand
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Clay
Peat
Peat

Error
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

7 of 126

D-G EO P IPELINE, Verification Report

Table 1.6: Results of benchmark 1-1b, Maximal displacement for Micro Tunneling

Vertical
nr.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

Benchmark
[mm]
2
2
3
4
4
3
7
7
5
3
3
7
7
3
5
5
4
8
8
5
5
10
13

D-G EO P IPELINE
[mm]
2
2
3
4
4
3
7
7
5
3
3
7
7
3
5
5
4
8
8
5
5
10
13

Rel. error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input files bm1-1a.dri and bm1-1b.dri to run this benchmark.

8 of 126

Deltares

2 Group 2: Benchmarks from literature (approximate solution)
The different benchmarks from literature for which an approximate solution is known are described in this chapter. Currently, no benchmarks are available.

Deltares

9 of 126

D-G EO P IPELINE, Verification Report

10 of 126

Deltares

3 Group 3: Benchmarks from spreadsheets
The benchmarks in this chapter (group 3) check if the output of D-G EO P IPELINE is according
to the formula’s given in the User Manual of D-G EO P IPELINE [Deltares] using spreadsheets.
Those formula’s are based on the Dutch standards NEN 3650-1, NEN 3650-2, NEN 3650-3
and NEN 3651 (NEN, 2012a,b,c,d).
3.1
3.1.1

HDD with 2D geometry – Steel pipe in two compressible undrained layers
Description
The pipe is constructed in two compressible undrained layers (clay and sand) with the characteristics given in Table 3.1. The boundaries between compressible/incompressible layers and
drained/undrained layers are situated at the bottom of the sand layer. The ground level is at
depth Z = 0 m and the phreatic line is at depth Z = -3 m. The steel pipe properties are given
in Table 3.2. Calculations are performed for 8 verticals with L coordinates of 20, 50, 100, 200,
350, 500, 650 and 680 m.
The configuration of the pipeline is given by:
Xleft
10 m
X-coordinate of the left entry point
Xright 690 m X-coordinate of the right exit point
ϕleft
13 deg Left angle of the pipe
ϕright
15 deg Right angle of the pipe
Zlowest -50 m
Lowest level of the pipe
Rleft
600 m
Bending radius of the pipe at the left side
Rright 800 m Bending radius of the pipe at the right side
Rrol
1000 m Bending radius in pipe string (on rollers)
Table 3.1: Soil material properties (bm3-1)

Bottom depth of the layer
Unit weight above phreatic level
Unit weight below phreatic level
Cohesion
Friction angle
Undrained cohesion at the top
Undrained cohesion at the bottom
Young modulus at the top
Young modulus at the top
Poisson ratio

Deltares

Zlowest
γunsat
γsat
c
ϕ
cu;top
cu;bot
Etop
Ebot
ν

[m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[deg]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[-]

Sand
-60
18
20
0.2
30
0.2
0.5
20000
25000
0.45

Clay
-15
14
16
5
22.5
25
30
1500
2000
0.4

11 of 126

D-G EO P IPELINE, Verification Report

Table 3.2: Pipe material data (bm3-1)

Material
Negative wall thickness tolerance
Yield strength
Partial material factor
Partial material factor for test pressure
Young’s modulus
Outer diameter
Nominal wall thickness
Unit weight
Design pressure
Test pressure
Temperature variation

δt
Reb
γm
γm;test
Eb
D0
dn
γb
pd
pt
∆t

[%]
[N/mm2 ]
[-]
[-]
[N/mm2 ]
[m]
[mm]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[◦ ]

Steel
15
235
1.1
1
205800
0.8
19
78.5
600
834
10

Figure 3.1: 2D Geometry of benchmark 3-1 (steel pipeline in two compressible undrained
layers)

3.1.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter Calculation of
soil mechanical data in the Background section of the User Manual of D-G EO P IPELINE. The
maximal axial friction between the pipe and the drilling fluid is constant along the pipeline and
equal to f2 = 50 N/m2 . The displacement necessary to develop the maximal axial friction
along the pipeline is estimated between 6 and 9 mm (= 7.5 mm).

12 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Minimum drilling fluid pressures
For the minimum drilling fluid pressures, calculations are performed during the three stages
of the drilling process using the formulas given in paragraph “Minimum required drilling fluid
pressure” in the Background section of the User Manual of D-G EO P IPELINE [Deltares]. The
minimum required pressure dp/dz is the optimal value for which the calculated flow rate Q is
equal to the requested flow rate Qreq (necessary to initiate flow of drilling fluid). Calculations
are performed in an Excel spreadsheet using the solver option and lead to the values of dp/dz
given in Table 3.3.
Table 3.3: Analytical results for the calculation of dp/dz for the three stages

Pipe diameter
Hole radius
Circulation loss factor floss
Annular back flow rate Qann
Request back flow rate Qreq
Minimum required pressure dp/dz

[m]
[m]
[-]
[m3 /s]
[m3 /s]
[kN/m3 ]

Pilot
0.114
0.1
0.3
0.0025
0.00175
0.63631

Pre-ream
0.5
0.3
0.2
0.0067
0.00536
0.56048

Pull back
0.8
0.45
0.2
0.0033
0.00264
0.56018

Maximum drilling fluid pressures
For the maximum drilling fluid pressures in undrained conditions, calculations are performed
using the formulas given in paragraph Maximum required drilling fluid pressure in the Background section of the User Manual of D-G EO P IPELINE. Analytical results are given in the table
below.
Table 3.4: Analytical results for the calculation of the maximum drilling fluid pressures

Vert.
u
0.9 plimit
plastic zone related to :
[-]
[kN/m2 ] [kN/m2 ]
1
0
88.6
2
62.35
122.71
3
177.78
107.92
4
394.42
222.39
5
470
264.87
6
404.81
228.21
7
77.18
129.29
8
0
91.95

ppilot

ppreream

pback

deformation bore hole
[kN/m2 ] [kN/m2 ] [kN/m2 ]
95.29
80.21
69.47
136.09
134.22
131.85
119.49
117.92
117.01
246.97
246.52
246.25
294.21
293.81
293.56
253.45
253
252.74
143.47
142.02
140.14
99.75
87.08
77.24

ppilot
[kN/m2 ]
95.29
136.09
119.49
246.97
294.21
253.45
143.47
99.75

ppreream
soil cover
[kN/m2 ]
80.21
134.22
117.92
246.52
293.81
253
142.02
87.08

pback
[kN/m2 ]
69.47
131.85
117.01
246.25
293.56
252.74
140.14
77.24

Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE.
The length of the pipe in the borehole at the characteristic points (Figure 3-2) is:
LA = 0 m
LB = LA + |Zlowest + Rleft × (1 − cos ϕleft )| / sin ϕleft = 153.909 m
LC = LB + ϕleft × Rleft = 290.045 m

Ld = LC + Xright − |Zlowest + Rright (1 − cos ϕright )| / tan ϕright − Rright × sin ϕright
− Xleft − |Zlowest + Rleft × (1 − cos ϕleft )| / tan ϕleft − Rleft × sin ϕleft = 393.185 m
LE = Ld + ϕright × Rright = 602.625 m
Deltares

13 of 126

D-G EO P IPELINE, Verification Report

LF = LE + |Zlowest + Rright × (1 − cos ϕright )| / sin ϕright = 690.488 m
entry point

exit point
ground level
T6

T1

T5
T2

T3

T4

Figure 3.2: Locations of the characteristic points T1 to T6

Hereafter are some intermediate results used for the pulling force and the strength calculations:
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force
Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top
Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

14 of 126

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull
fkv
fQn2
fM
fR
fpress;bore
geff
gfill
gupw
kb ’
kt ’
kb
kt
ky
ky ’
Pwater
A
Atrek

0.1
0.00005
0.2
1.25
1.15
1.1
1.1
1.5
1.1
1.25
1.4
1.6
1.1
1.27
1.1
1.1
1.414
0.456
5.529
0.083
0.061
0.138
0.131
0.089
0.048
10
39769.979
46618.093

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[mm2 ]
[mm2 ]

Deltares

Group 3: Benchmarks from spreadsheets

Minimal wall thickness
Outer radius of the pipeline
Inner radius of the pipeline
Average radius of the pipeline
Moment of inertia of the pipe
Moment of inertia of the wall
Pipe resisting moment
Wall resisting moment
Unit weight of drilling fluid
Maximum modulus of subgrade reaction
Maximum neutral vertical soil load
Maximum corrected reduced soil load
Maximum neutral horizontal soil load
Soil reaction - Left curve
Soil reaction - Right curve
Soil reaction - Left curve (long term)
Soil reaction - Right curve (long term)
Characteristic stiffness pipeline-soil
Characteristic stiffness pipeline-soil (long term)

Ainw
dn;min
re
ri
rg
Ib
Iw
Wb
Ww
γdrill fluid
kv;max
qv;n;r;max
qn
qh;n;r
qr;left
qr;right
qr;left
qr;right
λ
λlong

456036.731
16.15
400
381
390.5
3556505999
571.583
8891265
60.167
11
30945.502
184.15
303.847
136.488
49.727
37.295
n.a.
n.a.
0.0003032
n.a.

[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]
[mm-1 ]

The total pulling force is the contribution of five components. Results are given in Table 3-5.
Table 3.6: Results of benchmark 3-01, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
284
154
284
290
468
393
468
603
622
690
622
5187

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
284
154
284
290
468
393
468
603
622
690
622
5187

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

The maximum combined stress at the top or the bottom, and inside or outside the pipe is
calculated in the tables below and used for checking the calculated stresses.
Table 3.7: Set for calculation of the maximum stresses for load combination 1A

σx [N/mm2 ]
σy [N/mm2 ]
σV [N/mm2 ]

Deltares

Top outside
115.5
0
115.5

Top inside
115.5
0
115.5

Bottom inside
137.51
0
137.51

Bottom outside
137.51
0
137.51

15 of 126

D-G EO P IPELINE, Verification Report

Table 3.8: Set for calculation of the maximum stresses for load combination 1B

2

σx [N/mm ]
σy [N/mm2 ]
σV [N/mm2 ]

Top outside
186.75
-15.81
195.14

Top inside
186.75
15.81
179.37

Bottom inside
234.92
21.51
224.94

Bottom outside
234.92
-21.51
246.38

Table 3.9: Set for calculation of the maximum stresses for load combination 3

σx;2 [N/mm2 ]
σy;2 [N/mm2 ]
σV;2 [N/mm2 ]
σx;3 [N/mm2 ]
σy;3 [N/mm2 ]
σV;3 [N/mm2 ]
σx;4 [N/mm2 ]
σy;4 [N/mm2 ]
σV;4 [N/mm2 ]

Top outside
0
-207.43
207.43
-210.84
0
210.84
-210.84
-223.23
217.3

Top inside
0
207.43
207.43
-210.84
0
210.84
-210.84
223.23
375.97

Bottom inside
0
218.51
218.51
210.84
0
210.84
210.84
240.02
226.84

Bottom outside
0
-218.51
218.51
210.84
0
210.84
210.84
-240.02
390.72

Table 3.10: Set for calculation of the maximum stresses for load combination 4

σx;1 [N/mm2 ]
σy;1 [N/mm2 ]
σV;1 [N/mm2 ]
σx;2 [N/mm2 ]
σy;2 [N/mm2 ]
σV;2 [N/mm2 ]
σx;3 [N/mm2 ]
σy;3 [N/mm2 ]
σV;3 [N/mm2 ]
σx;4 [N/mm2 ]
σy;4 [N/mm2 ]
σV;4 [N/mm2 ]

16 of 126

Top outside
8.37
16.74
14.5
8.37
-179.93
184.26
-202.46
16.74
211.33
-202.46
-195.29
198.97

Top inside
8.37
16.74
14.5
8.37
213.42
209.36
-202.46
16.74
211.33
-202.46
228.78
373.7

Bottom inside
8.37
16.74
14.5
8.37
223.93
219.86
219.21
16.74
211.33
219.21
244.82
233.07

Bottom outside
8.37
16.74
14.5
8.37
-190.44
194.76
219.21
16.74
211.33
219.21
-211.33
372.88

Deltares

Group 3: Benchmarks from spreadsheets

3.1.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.11: Results of benchmark 3-01, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole)

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
Pilot
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
286
286
286
617
617
617
735
735
735
633
633
633
206
206
206
92
87
77

D-G EO P IPELINE
Pilot
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
286
286
286
617
617
617
735
735
735
634
634
634
206
206
206
92
87
77

Pilot
[%]
0.00
0.00
0.00
0.00
0.00
0.16
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.16
0.00
0.00
0.00
0.00

Table 3.12: Results of benchmark 3-01, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover)

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
286
286
286
617
617
617
735
735
735
633
633
633
206
206
206
92
87
77
Pilot

D-G EO P IPELINE
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
286
286
286
617
617
617
735
735
735
634
634
634
206
206
206
92
87
77
Pilot

Pilot
[%]
0.00
0.00
0.00
0.00
0.00
0.16
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.16
0.16
0.00
0.00
0.00
0.00

Table 3.13: Results of benchmark 3-01, Minimum required drilling fluid pressure (from left
to right)

Vert.
[-]
1
2
3
4
5
6
7
8

Deltares

Benchmark
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
32
31
31
128
125
125
287
280
280
591
576
576
770
743
743
794
602
588
531
144
141
462
36
35
Pilot

D-G EO P IPELINE
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
32
31
31
129
125
125
290
281
281
597
578
577
780
747
745
808
608
590
551
145
142
483
36
35
Pilot

Pilot
[%]
0.00
0.78
1.03
1.01
1.28
1.73
3.63
4.35

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.36
0.36
0.35
0.17
0.54
0.27
0.99
0.34
0.69
0.7
0.00
0.00

17 of 126

D-G EO P IPELINE, Verification Report

Table 3.14: Results of benchmark 3-01, Minimum required drilling fluid pressure (from
right to left)

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
458
32
31
515
128
125
609
287
280
782
591
576
770
744
743
602
588
588
144
141
141
36
35
35
Pilot

D-G EO P IPELINE
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
479
32
31
534
129
125
627
290
281
797
597
578
780
747
745
608
590
589
145
142
141
36
35
35
Pilot

Pilot
[%]
4.38
3.56
2.87
1.88
1.28
0.99
0.69
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.78
0.00
1.03
0.36
1.01
0.35
0.4
0.27
0.34
0.17
0.7
0.00
0.00
0.00

Table 3.15: Results of benchmark 3-01, Equilibrium between drilling fluid pressure and
pore pressure

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
Drilling Water
Safety
fluid
[kN/m2 ] [kN/m2 ] [-]
25.4
0
101.58 62.35
1.63
228.56 177.78 1.29
466.86 394.42 1.18
550
470
1.17
478.29 404.81 1.18
117.9
77.18
1.53
29.47
0
-

D-G EO P IPELINE
Drilling Water
Safety
fluid
[kN/m2 ] [kN/m2 ] [-]
25.4
0
101.58 62.35
1.63
228.56 177.78 1.29
466.86 394.42 1.18
550
470
1.17
478.29 404.81 1.18
117.9
77.18
1.53
29.47
0

Relative error
Drilling Water
Safety
fluid
[%]
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.16: Results of benchmark 3-01, Vertical soil stresses

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

[kN/m2 ]
47
234
916
1656
1887
1688
253
60

[kN/m2 ]
28
77
169
385
461
396
86
33

[kN/m2 ]
28
62
114
178
184
179
68
33

[kN/m2 ]
47
234
916
1656
1887
1688
253
60

[kN/m2 ]
28
77
169
385
461
396
86
33

[kN/m2 ]
28
62
114
178
184
179
68
33

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

18 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.17: Results of benchmark 3-01, Neutral horizontal soil stress and bearing capacities

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

ph;n

Pv;e
2

D-G EO P IPELINE

Ph;e
2

ph;n
2

Pv;e
2

Relative error

Ph;e
2

ph;n
2

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
21
508
105
21
508
105
0.00
46
1090
234
46
1090
234
0.00
84
4612
916
84
4612
916
0.00
132
10388 1656
132
10388 1656
0.00
136
12404 1887
136
12404 1887
0.00
133
10665 1688
133
10665 1688
0.00
50
1199
253
50
1199
253
0.00
24
568
121
24
568
122
0.00

Pv;e

Ph;e

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.82

Table 3.18: Results of benchmark 3-01, Vertical and horizontal moduli of subgrade reaction

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

kv;top

kv;bot

D-G EO P IPELINE

kv;bot

kh

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
797
865
606
797
865
606
0.00
904
992
695
904
992
695
0.00
12768 13121 9185
12768 13121 9185
0.00
14365 14720 10304 14365 14720 10304 0.00
14924 15280 10696 14924 15280 10696 0.00
14441 14797 10358 14441 14797 10358 0.00
931
1317
922
931
1317
922
0.00
800
872
611
800
872
611
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3

kv;top
3

kv;bot

Relative error

kv;top

3

kh

3

kh
3

3

Table 3.19: Results of benchmark 3-01, Maximal axial friction and displacements

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

tmax

dv

dmax

tmax

dv

dmax

tmax

dv

dmax

[kN/m2 ]
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

[mm]
5
10
20
40
80
60
50
35

[mm]
8
8
8
8
8
8
8
8

[kN/m2 ]
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

[mm]
5
10
20
40
80
60
50
35

[mm]
8
8
8
8
8
8
8
8

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.20: Results of benchmark 3-01, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Deltares

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
553
412
141

D-G EO P IPELINE
553
412
141

Error [%]
0.00
0.00
0.00

19 of 126

D-G EO P IPELINE, Verification Report

Table 3.21: Results of benchmark 3-01, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
284
154
284
290
468
393
468
603
622
690
622
5187

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
284
154
284
290
468
393
468
603
622
690
622
5187

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.22: Results of benchmark 3-01, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
127
11
138
138

D-G EO P IPELINE
127
11
138
138

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.23: Results of benchmark 3-01, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
211
24
235
0.000303
0.04973
22
22
246

D-G EO P IPELINE
211
24
235
0.000303
0.04973
22
22
246

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.24: Results of benchmark 3-01, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
18
9
22
16

D-G EO P IPELINE
18
9
22
16

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.25: Results of benchmark 3-01, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqr
σt;max
σV;max

20 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
211
211
22
219
240
391

D-G EO P IPELINE
211
211
22
219
240
391

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.26: Results of benchmark 3-01, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqr
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
211
17
8
22
26
219
22
219
374

D-G EO P IPELINE
211
17
8
22
26
219
22
219
374

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.27: Results of benchmark 3-01, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Benchmark
235
213.64
235
363.18
n.a.
n.a.

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

D-G EO P IPELINE
235
213.64
235
363.18
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.28: Results of benchmark 3-01, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
6.7
136
64

D-G EO P IPELINE
6.7
136
64

Rel. error [%]
0.00
0.00
0.00

Table 3.29: Results of benchmark 3-01, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-1.dri to run this benchmark.
3.2

HDD with 2D geometry – Vertical bearing capacity in homogeneous compressible
undrained layer with ϕ = 0

Deltares

21 of 126

D-G EO P IPELINE, Verification Report

3.2.1

Description
The same configuration as benchmark 3-1 (section 3.1) is used, except that both layers have
the same properties:
Unit weight above phreatic level
Unit weight below phreatic level
Cohesion
Friction angle

3.2.2

[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[◦ ]

γunsat
γsat
c
ϕ

14
16
5
0

Analytical results
Analytical results for the ultimate vertical bearing capacity Pv;e with ϕ = 0 are worked out in an
Excel spreadsheet using the formula given in paragraph ”Ultimate vertical bearing capacity” in
the Background section of the User Manual of D-G EO P IPELINE. Intermediate results are given
in the tables below.
Table 3.30: Analytical results for the calculation of the vertical bearing capacity

Vert.
[-]
1
2
3
4
5
6
7
8

3.2.3

L

Z

σV ’

hh

dC

sC

Pv;e

[m]
20
50
100
200
350
500
650
680

[m]
-2.309
-9.235
-20.778
-42.442
-50
-43.481
-10.718
-2.679

[kN/m2 ]
32.322
79.408
148.669
278.651
324
284.883
88.308
37.513

[m]
2.309
9.235
20.778
42.442
50
43.481
10.718
2.679

[-]
0.513
0.595
0.613
0.621
0.622
0.621
0.6
0.527

[-]
0.02
0.02
0.02
0.02
0.02
0.02
0.02
0.02

[kN/m2 ]
68.156
114.885
181.123
304.792
347.901
310.717
123.447
73.41

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.31: Results of benchmark 3-02, Ultimate vertical bearing capacity

Vert. nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
[kN/m2 ]
68.16
114.88
181.12
304.79
347.9
310.72
123.45
73.41

D-G EO P IPELINE
[kN/m2 ]
68.16
114.88
181.12
304.79
347.9
310.72
123.45
73.41

Relative error
[kN/m2 ]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-2.dri to run this benchmark.
3.3

HDD with 2D geometry – Polyethylene (PE 80) pipe in two compressible undrained
layers

22 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.3.1

Description
The same data used for benchmark 3-1 (section 3.1) is used except that polyethylene is used
as pipe material instead of steel as shown in Table 3.32.
Table 3.32: Pipe material data (benchmark 3-3)

Material
Young’s modulus (long term)
Young’s modulus (short term)
Allowable strength (long term)
Allowable strength (short term)
Tensile factor
Outer diameter
Nominal wall thickness
Unit weight
Design pressure
Test pressure
Temperature variation

3.3.2

Polyethylene

Epipe;long
Epipe;short
Re;long
Re;short
α
D0
dn
γb
pd
pt
∆t

PE 80
200 N/mm2
1000 N/mm2
6.3 N/mm2
8 N/mm2
0.65
0.8 m
47.4 mm
9.54 kN/m3
600 kN/m2
834 kN/m2
10◦

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. Intermediate results are given
below.
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force
Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top

Deltares

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull
fkv
fQn2
fM
fR
fpress;bore
geff
gfill
gupw
kb ’
kt ’
kb
kt

0.1
0.00005
0.2
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
1.25
1.4
1.6
1.1
1.4
n.a.
1.1
4.069
0.391
5.529
0.083
0.061
0.138
0.131

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]

23 of 126

D-G EO P IPELINE, Verification Report

Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

Minimal wall thickness
Outer radius of the pipeline
Inner radius of the pipeline
Average radius of the pipeline
Moment of inertia of the pipe
Moment of inertia of the wall
Pipe resisting moment
Wall resisting moment
Unit weight of drilling fluid
Maximum modulus of subgrade reaction
Maximum neutral vertical soil load
Maximum corrected reduced soil load
Maximum neutral horizontal soil load
Soil reaction - Left curve
Soil reaction - Right curve
Soil reaction - Left curve (long term)
Soil reaction - Right curve (long term)
Characteristic stiffness pipeline-soil
Characteristic stiffness pipeline-soil (long term)

ky
ky ’
Pwater
A
Atrek
Ainw
dn;min
re
ri
rg
Ib
Iw
Wb
Ww
γdrill fluid
kv;max
qv;n;r;max
qn
qh;n;r
qr;left
qr;right
qr;left
qr;right
λ
λlong

0.089
0.048
10
112070.789
112070.789
390584.036
47.4
400
352.6
376.3
7966181061
8874.702
19915453
374.46
11
51037.814
184.15
202.565
136.488
6.057
4.543
2.709
2.031
0.0010639
0.001591

[-]
[-]
[%]
[mm2 ]
[mm2 ]
[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]
[mm-1 ]

The total pulling force is the contribution of five components. Results are given in the table
below.
Table 3.34: Analytical results for the calculation of the five components of the pulling force
for the six characteristic points

Charac.
point
1
2
3
4
5
6

3.3.3

Length
[m]
0
153.91
290.04
393.19
602.62
690.49

T1

T2

T3a

T3b

T3c

[kN]
100.79
78.33
58.45
43.4
12.83
0

[kN]
0
144.61
0
45.17
0
82.55

[kN]
0
0
127.91
0
196.78
0

[kN]
0
0
5.72
0
4.29
0

[kN]
0
0
15.25
0
31.55
0

Total
[kN]
100.79
222.93
351.94
433.79
635.84
705.56

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.35: Results of benchmark 3-03, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

24 of 126

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
553
146
407

D-G EO P IPELINE
553
146
407

Error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.36: Results of benchmark 3-03, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
100.79
153.91
222.93
290.04
351.94
393.19
433.79
602.62
635.84
690.49
705.56
829

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
100.79
153.91
222.93
290.05
351.94
393.19
433.79
602.63
635.84
690.49
705.56
829

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.37: Results of benchmark 3-03, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.56
1.26
1.62
n.a.

D-G EO P IPELINE
0.56
1.26
1.62
n.a.

Rel. error [%]
0.00
0.00
0.00

Table 3.38: Results of benchmark 3-03, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.93
8.81
9.42
0.001064
0.00606
0.4
0.4
n.a.

D-G EO P IPELINE
0.93
8.81
9.42
0.001064
0.00606
0.4
0.4
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.39: Results of benchmark 3-03, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
4.78
2.39
6.65
4.14

D-G EO P IPELINE
4.78
2.39
6.65
4.14

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.40: Results of benchmark 3-03, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqr
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.19
0.12
0.18
22.47
14.72
n.a.

D-G EO P IPELINE
0.19
0.12
0.18
22.47
14.72
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

25 of 126

D-G EO P IPELINE, Verification Report

Table 3.41: Results of benchmark 3-03, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqr
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.19
4.78
2.39
6.65
0.36
2.51
0.18
22.47
n.a.

D-G EO P IPELINE
0.19
4.78
2.39
6.65
0.36
2.51
0.18
22.47
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.42: Results of benchmark 3-03, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Benchmark
8
6.3
n.a.
n.a.
8
6.3

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

D-G EO P IPELINE
8
6.3
n.a.
n.a.
8
6.3

Rel. error [%]
0.00
0.00

8
6.3

Table 3.43: Results of benchmark 3-03, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
121.4
64
40

D-G EO P IPELINE
121.4
64
40

Rel. error [%]
0.00
0.00
0.00

Table 3.44: Results of benchmark 3-03, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
396.55
39.66
0
0

D-G EO P IPELINE
396.55
39.66
0
0

Error
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-3.dri to run this benchmark.
3.4
3.4.1

HDD with 2D geometry – Steel pipe in two incompressible drained layers
Description
The same input values as benchmark 3-1 (section 3.1) are used, only the position of the
boundaries between compressible/incompressible layers and drained/undrained layers is different: the boundary coincides with the surface level.Calculations of the pulling forces and the
minimum drilling fluid pressure are independent of the soil material. Therefore, in this benchmark, only the calculation of the maximum drilling fluid pressure and the reduced vertical
stress are checked.

26 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.4.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation
of soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.
Intermediate results are given in the tables below.
Table 3.45: Analytical results – General data’s

Vert.
[-]
1
2
3
4
5
6
7
8

L

Z

hp

HL

hh

σV ’

σv;H ’

[m]
20
50
100
200
350
500
650
680

[m]
-2.309
-9.235
-20.778
-42.442
-50
-43.481
-10.718
-2.679

[m]
1.859
8.785
20.328
41.992
49.55
43.031
10.268
2.229

[m]
1.898
8.824
20.368
42.037
49.6
43.077
10.304
2.265

[m]
2.309
9.235
20.778
42.442
50
43.481
10.718
2.679

[kN/m2 ]
32.322
79.408
171.781
388.418
464
398.806
88.308
37.513

[kN/m2 ]
26.574
76.945
167.676
384.367
460
394.773
85.823
31.715

Table 3.46: Analytical results for the calculation of the neutral reduced vertical stress

Vert.
[-]
1
2
3
4
5
6
7
8

B1

Fr

Fr;max

qnr1

qnr2

qv;n

qv;r;n

[m]
0.935
0.935
0.862
0.862
0.862
0.862
0.935
0.935

[kN/m]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.

[kN/m]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.

[kN/m2 ]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.

[kN/m2 ]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.

[kN/m2 ]
27.808
77.474
168.557
385.237
460.858
395.638
86.322
32.813

[kN/m2 ]
27.808
28.587
26.621
28.21
28.448
28.247
28.299
32.813

Maximum drilling fluid pressures
For the maximum drilling fluid pressures in drained conditions, calculations are performed
using the formulas given in paragraph “Maximum required drilling fluid pressure” in the Background section of the User Manual of D-G EO P IPELINE [Deltares]. Intermediate results are
given in the table below.

Deltares

27 of 126

D-G EO P IPELINE, Verification Report

Table 3.47: Analytical results for the calculation of the maximum drilling fluid pressures

Vert.
u
0.9 plimit
plastic zone related to :
[-]
[kN/m2 ] [kN/m2 ]
1
0
85.33
2
62.35
111.81
3
177.78
163.77
4
394.42
285.63
5
470
328.15
6
404.81
291.48
7
77.18
116.82
8
0
88.25

3.4.3

ppilot

ppreream

pback

deformation bore hole
[kN/m2 ] [kN/m2 ] [kN/m2 ]
93.1
83.32
75.01
124.13
123.26
122.1
181.95
181.77
181.53
317.36
317.32
317.26
364.6
364.57
364.53
323.86
323.82
323.76
129.72
129.07
128.19
96.77
88.89
81.63

ppilot
[kN/m2 ]
93.1
124.13
181.95
317.36
364.6
323.86
129.72
96.77

ppreream
soil cover
[kN/m2 ]
83.32
123.26
181.77
317.32
364.57
323.82
129.07
88.89

pback
[kN/m2 ]
75.01
122.1
181.53
317.26
364.53
323.76
128.19
81.63

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.48: Results of benchmark 3-04, Vertical soil stresses

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

[kN/m2 ]
47
234
916
1656
1887
1688
253
60

[kN/m2 ]
28
77
169
385
461
396
86
33

[kN/m2 ]
28
29
27
28
28
28
28
33

[kN/m2 ]
47
234
916
1656
1887
1688
253
60

[kN/m2 ]
28
77
169
385
461
396
86
33

[kN/m2 ]
28
29
27
28
28
28
28
33

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.49: Results of benchmark 3-04, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole)

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
48
48
48
152
152
152
503
503
503
992
992
992
1153
1153
1153
1014
1014
1014
175
175
175
53
53
53
Pilot

28 of 126

D-G EO P IPELINE
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
48
48
48
152
152
152
503
503
503
992
992
992
1153
1153
1153
1015
1015
1015
175
175
175
53
53
53
Pilot

Pilot
[%]
0.00
0.00
0.00
0.00
0.00
0.1
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.1
0.1
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.50: Results of benchmark 3-04, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover)

Benchmark
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
88
74
62
221
221
221
800
800
800
1545
1545
1545
1785
1785
1785
1579
1579
1579
249
249
249
96
86
74

Vert.

Pilot

[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
88
74
62
221
221
221
800
800
800
1545
1545
1545
1785
1785
1785
1579
1579
1579
249
249
249
96
86
74
Pilot

Pilot
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-4.dri to run this benchmark.
3.5

3.5.1

HDD with 2D geometry – Steel pipe in a sequence of a compressible undrained layer
and a compressible drained layer
Description
The same input data’s as benchmark 3-1 (section 3.1) are used, except that the position of the
boundary between undrained/drained layers is different: the boundary coincides with the top
of the sand layer. Changing the position of the boundary between undrained/drained layers
will only effect the maximum drilling fluid pressures calculation.

3.5.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Maximum drilling fluid pressures
For the maximum drilling fluid pressures in drained conditions, calculations are performed
using the formulas given in paragraph “Maximum required drilling fluid pressure” in the Background section of the User Manual of D-G EO P IPELINE [Deltares]. Intermediate results are
given in the table below.
Table 3.51: Analytical results for the calculation of the maximum drilling fluid pressures

Vert.
u
0.9 plimit
plastic zone related to :
[-]
[kN/m2 ] [kN/m2 ]
1
0
88.6
2
62.35
122.71
3
177.78
180.76
4
394.42
302.62
5
470
345.13
6
404.81
308.46
7
77.18
129.29
8
0
91.95

Deltares

ppilot

ppreream

pback

deformation bore hole
[kN/m2 ] [kN/m2 ] [kN/m2 ]
95.29
80.21
69.47
136.09
134.22
131.85
200.46
197.59
194.1
336.23
336.09
335.9
383.47
383.39
383.27
342.72
342.59
342.41
143.47
142.02
140.14
99.75
87.08
77.24

ppilot
[kN/m2 ]
95.29
136.09
200.46
336.23
383.47
342.72
143.47
99.75

ppreream
soil cover
[kN/m2 ]
80.21
134.22
197.59
336.09
383.39
342.59
142.02
87.08

pback
[kN/m2 ]
69.47
131.85
194.1
335.9
383.27
342.41
140.14
77.24

29 of 126

D-G EO P IPELINE, Verification Report

The intermediate analytical results for the calculation of the maximum drilling fluid pressures
in drained conditions are the same as benchmark 3-4 (see section 3.4.2).
3.5.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.52: Results of benchmark 3-05, Maximum allowable drilling fluid pressure (plastic
zone related to deformation bore hole)

Benchmark
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
503
503
503
992
992
992
1153
1153
1153
1014
1014
1014
206
206
206
92
87
77
Pilot

1
2
3
4
5
6
7
8

D-G EO P IPELINE
PrePull
ream
back
[kN/m2 ] [kN/m2 ] [kN/m2 ]
89
80
69
185
185
185
502
502
502
992
992
992
1153
1153
1153
1014
1014
1014
206
206
206
92
87
77
Pilot

Pilot
[%]
0.00
0.00
0.2
0.00
0.00
0.00
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.2
0.2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.53: Results of benchmark 3-05, Maximum allowable drilling fluid pressure (plastic
zone related to soil cover)

nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
89
80
69
185
185
185
800
767
697
1545
1545
1545
1785
1785
1785
1579
1579
1579
206
206
206
92
87
77
Pilot

D-G EO P IPELINE
PrePull
ream
back
2
2
[kN/m ] [kN/m ] [kN/m2 ]
89
80
69
185
185
185
799
766
696
1545
1545
1545
1785
1785
1785
1578
1578
1578
206
206
206
92
87
77
Pilot

Pilot
[%]
0.00
0.00
0.13
0.00
0.00
0.06
0.00
0.00

Relative error
PrePull
ream
back
[%]
[%]
0.00
0.00
0.00
0.00
0.13
0.14
0.00
0.00
0.00
0.00
0.06
0.06
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-5.dri to run this benchmark.
3.6

3.6.1

HDD with 2D geometry – Steel pipe in a sequence of an incompressible undrained
layer and an incompressible drained layer
Description
The same input data’s as benchmark 3-1 (section 3.1) are used, except for the position of the
boundary between undrained/drained layers which coincides with the top of the sand layer and
for the boundary between compressible/incompressible layers which coincides with the top of
the ground line. Changing the position of the boundary between undrained/drained layers
will only affect the maximum drilling fluid pressures calculation and changing the position of
the boundary between compressible/incompressible layers will only affect the neutral reduced

30 of 126

Deltares

Group 3: Benchmarks from spreadsheets

vertical stress.
3.6.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation
of soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.
Intermediate results are given in the tables below. Analytical results for the neutral reduced
vertical stress are the same as benchmark 3-4 (section 3.4.2) because the position of the
boundary between compressible/incompressible layers is the same.
Maximum drilling fluid pressures
For the maximum drilling fluid pressures in drained conditions, calculations are performed
using the formulas given in paragraph “Maximum required drilling fluid pressure” in the Background section of the User Manual of D-G EO P IPELINE [Deltares]. Analytical results for the
maximum drilling fluid pressures are the same as benchmark 3-5 (section 3.5.2) because the
position of the boundary between undrained/drained layers is the same.

3.6.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.54: Results of benchmark 3-06, Vertical soil stresses

Benchmark
nr.
[-]
1
2
3
4
5
6
7
8

qv;p

qv;n
2

D-G EO P IPELINE

qv;r;n
2

qv;p
2

qv;n
2

Relative error

qv;r;n
2

qv;p
2

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
47
28
28
47
28
28
0.00
234
77
29
234
77
29
0.00
916
169
27
916
169
27
0.00
1656
385
28
1656
385
28
0.00
1887
461
28
1887
461
28
0.00
1688
396
28
1688
396
28
0.00
253
86
28
253
86
28
0.00
60
33
33
60
33
33
0.00

qv;n

qv;r;n

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-6.dri to run this benchmark.
3.7

3.7.1

HDD with 3D geometry – Steel pipe in 4 layers – Compressible border above drainage
border
Description
The pipe is constructed in four compressible undrained layers with the characteristics given in
Table 3.57. The boundaries between compressible/uncompressible layers and drained/undrained
layers are respectively situated at the bottom of the second and third layers. The ground level
is not plane as shown in Figure 3.3 and the phreatic line is at depth Zphreatic = -5 m. The
hydraulic head at the surface level is 1 m and 10 m at the bottom (i.e. Z = -46 m). The
steel pipe properties are given in Table 3.56. Calculations are performed for 8 verticals with

Deltares

31 of 126

D-G EO P IPELINE, Verification Report

L coordinates of 60, 100, 150, 170, 1000, 1650, 1775 and 1800 m. The configuration of the
pipeline is given by:
Xleft
50 m
X-coordinate of the left entry point
Yleft
-5 m
Y-coordinate of the left entry point
Zleft
-2 m
Z-coordinate of the left entry point
Xright
1800 m
X-coordinate of the right exit point
Yright
104.21 m Y-coordinate of the right exit point
Zright
10 m
Z-coordinate of the right exit point
ϕleft
13◦
Left angle of the pipe
ϕright
15◦
Right angle of the pipe
Zbottom -45 m
Lowest level of the pipe
Rleft
1300 m
Bending radius of the pipe at the left side
Rright
1050 m
Bending radius of the pipe at the right side
Rrol
800 m
Bending radius in pipe string (on rollers)
with two horizontal bendings:
X-coordinate of the first point X1
Z-coordinate of the first point Z1
X-coordinate of the second point X2
Z-coordinate of the second point Z2
Bending radius
Direction

[m]
[m]
[m]
[m]
[m]

bending 1
450
10
687.664
61.157
700.004
Right

bending 2
800
106.880
1313.615
171.288
1000.008
Left

Table 3.55: Soil material properties (benchmark 3-07)

Unit weight above phreatic level
Unit weight below phreatic level
Cohesion
Angle of internal friction
Undrained cohesion top
Undrained cohesion bottom
Young modulus top
Young modulus bottom
Poisson ratio

γunsat
γsat
c
ϕ
Cu;top
Cu;bottom
Eu;top
Eu;bottom
ν

[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[◦ ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[-]

Mat 1
18
20
0.2
35
1
2
20000
25000
0.5

Mat 2
17
19
1.5
30
3
5
30000
40000
0.45

Mat 3
14
16
5
0
30
25
1500
2000
0.25

Mat 4
11
13
20
15
50
40
1000
500
0.35

Table 3.56: Pipe material data (benchmark 3-07)

Material
Negative wall thickness tolerance
Yield strength
Partial material factor
Partial material factor for test pressure
Young’s modulus
Outer diameter
Nominal wall thickness
Unit weight
Design pressure
Test pressure
Temperature variation

32 of 126

δt
Re
γm
γm;test
Eb
D0
dn
γb
pd
pt
∆t

[%]
[N/mm2 ]
[-]
[-]
[N/mm2 ]
[m]
[mm]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[◦ ]

Steel
25
200
1.3
1.15
180500
1.5
35
65
500
900
10

Deltares

Group 3: Benchmarks from spreadsheets

Figure 3.3: 3D view of the pipeline configuration (benchmark 3-7)

3.7.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation of
soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE. The
maximal axial friction between the pipe and the drilling fluid is constant along the pipeline and
equal to f2 = 50 N/m2 . The displacement necessary to develop the maximal axial friction
along the pipeline is estimated between 6 and 9 mm (= 7.5 mm).
Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. The length of the pipe in the
borehole at the 10 characteristic points (see Figure 3.3) is:
Table 3.57: Position of the characteristic points (benchmark 3-07a)

Point
1
2
3
4
5
6
7
8
9
10

Deltares

L-coord.
[m]
50
91.93
384.37
450.28
694.63
815.91
1339.51
1487
1758.76
1830.5

X-coord.
[m]
50
91.9
384.13
450
687.66
800
1313.62
1459.72
1728.93
1800

Z-coord.
[m]
-2
-11.68
-45
-45
-45
-45
-45
-45
-9.22
10

Traject length
[m]
0
43.036
337.997
403.908
648.255
769.539
1293.138
1440.628
1715.518
1789.786

33 of 126

D-G EO P IPELINE, Verification Report

Hereafter are some intermediate results used for the pulling force and the strength calculations:

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull
fkv
fQn2
fM
fR
fpress;bore
geff
gfill
gupw
kb ’
kt ’
kb
kt
ky
ky ’
Pwater
A
Atrek
Ainw
Minimal wall thickness
dn;min
Outer radius of the pipeline
re
Inner radius of the pipeline
ri
Average radius of the pipeline
rg
Moment of inertia of the pipe
Ib
Moment of inertia of the wall
Iw
Pipe resisting moment
Wb
Wall resisting moment
Ww
Unit weight of drilling fluid
γdrill fluid
Maximum modulus of subgrade reaction
kv;max
Maximum neutral vertical soil load
qv;n;r;max
Maximum traffic load
qT;max
Max. red. neutral vertical soil load (incl. traffic load) qv;n;r;maxT
Max. corrected red. soil load (without traffic load)
qn
Max. corrected red. soil load (incl. traffic load)
qnT
Maximum neutral horizontal soil load
qh;n;r
Soil reaction - Left curve
qr;left
Soil reaction - Right curve
qr;right
Soil reaction - Left curve (long term)
qr;left
Soil reaction - Right curve (long term)
qr;right
Characteristic stiffness pipeline-soil
λ
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force
Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top
Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

34 of 126

0.2
0.00035
0.3
1.1
1.3
0.9
1.2
1.3
1.2
1.4
1.1
1.1
1.2
1.15
1.3
1.15
10.093
2.409
22.973
0.073
0.056
0.139
0.139
0.091
0.043
15
121535.457
161085.163
1606060.704
26.25
750
715
732.5
43240291745
3572.917
57653722
204.167
13
20467.554
154.787
5
154.787
241.467
241.467
101.846
52.606
65.131
n.a.
n.a.
0.0001771

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[mm2 ]
[mm2 ]
[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]

Deltares

Group 3: Benchmarks from spreadsheets

Characteristic stiffness pipeline-soil (long term)

λlong

[mm-1 ]

n.a.

The total pulling force is the contribution of five components. Two cases are checked:

 Case A (bm3-7a): pulling direction from left to right (see results in Table 3.59);
 Case B (bm3-7b): pulling direction from right to left (see results in Table 3.60).
Table 3.59: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points for case a

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
4610.36
4499.5
3739.7
3569.92
2940.5
2628.08
1279.33
899.4
191.31
0

[kN]
0
201.29
0
308.29
0
567.29
0
689.86
0
347.38

[kN]
0
0
1379.62
0
2702.75
0
3540.94
0
1285.74
0

[kN]
0
0
839.93
0
889.15
0
1797.78
0
1039.92
0

[kN]
0
0
418.44
0
0
0
0
0
823.38
0

Total
[kN]
4610.36
4700.79
6578.99
6717.5
9679.98
9934.85
13924.82
14234.75
16675.7
16831.77

Table 3.60: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points for case b

Charac.
point
10
9
8
7
6
5
4
3
2
1

Deltares

Length
[m]
0
74.27
349.16
496.65
1020.25
1141.53
1385.88
1451.79
1746.75
1789.79

T1

T2

T3a

T3b

T3c

[kN]
4610.36
4419.05
3710.95
3331.03
1982.28
1669.86
1040.44
870.66
110.86
0

[kN]
0
347.38
0
689.86
0
567.29
0
308.29
0
201.29

[kN]
0
0
1285.74
0
3540.94
0
2702.75
0
1379.62
0

[kN]
0
0
1039.92
0
1372.13
0
1336.7
0
839.93
0

[kN]
0
0
499.97
0
0
0
0
0
724.1
0

Total
[kN]
4610.36
4766.42
6883.96
7193.89
10758.22
11013.08
14423.12
14561.63
16745.49
16835.92

35 of 126

D-G EO P IPELINE, Verification Report

3.7.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.61: Results of benchmark 3-07a, Vertical soil stresses

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

qv;p

qv;n

qv;r;n

[kN/m2 ]
24
74
582
913
2006
1610
284
203

[kN/m2 ]
19
24
114
156
442
346
155
83

[kN/m2 ]
19
24
52
60
52
107
155
83

[kN/m2 ]
24
74
582
913
2006
1610
284
204

[kN/m2 ]
19
24
114
156
442
346
155
83

[kN/m2 ]
19
24
53
59
52
107
155
83

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.49

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
1.89
1.69
0.00
0.00
0.00
0.00

Table 3.62: Results of benchmark 3-07a, Neutral horizontal soil stress and bearing capacities

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

qh;n

Pv;e

Ph;e

qh;n

Pv;e

Ph;e

qh;n

Pv;e

Ph;e

[kN/m2 ]
12
16
34
39
34
71
102
55

[kN/m2 ]
442
196
3332
4449
21154
16672
1233
831

[kN/m2 ]
98
115
794
1020
2006
1610
284
211

[kN/m2 ]
12
16
35
39
34
71
102
55

[kN/m2 ]
442
196
3332
4449
21154
16672
1233
831

[kN/m2 ]
99
115
794
1020
2006
1610
284
211

[%]
0.00
0.00
2.86
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
1.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.63: Results of benchmark 3-07a, Vertical and horizontal moduli of subgrade reaction

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

kv;top

kv;bot

kh

kv;top

kv;bot

kh

kv;top

kv;bot

kh

[kN/m3 ]
253
188
3871
9140
8287
10516
184
233

[kN/m3 ]
190
2365
12208
13024
9074
7949
309
166

[kN/m3 ]
133
1655
8546
9117
6352
5564
216
116

[kN/m3 ]
253
188
3871
9140
8287
10516
184
233

[kN/m3 ]
190
2365
12208
13024
9074
7949
309
166

[kN/m3 ]
133
1655
8546
9117
6352
5564
216
116

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

36 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.64: Results of benchmark 3-07a, Maximal axial friction and displacements

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

tmax

dv

dmax

tmax

dv

dmax

tmax

dv

dmax

[kN/m2 ]
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.35

[mm]
5
10
20
40
80
60
50
35

[mm]
8
8
8
8
8
8
8
8

[kN/m2 ]
0
0
0
0
0
0
0
0

[mm]
5
10
20
40
80
60
50
35

[mm]
8
8
8
8
8
8
8
8

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.65: Results of benchmark 3-07a, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
4610
43
4701
338
6579
1441
14235
1716
16676
1790
16832
0

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
4610
43
4701
338
6579
1441
14235
1716
16676
1790
16832
0

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.66: Results of benchmark 3-07b, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
4610
74
4766
349
6884
1452
14562
1747
16745
1790
16836
0

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
4610
74
4766
349
6884
1452
14562
1747
16745
1790
16836
0

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input files bm3-7a.dri and bm3-7b.dri to run this benchmark.
3.8
3.8.1

Special strength analysis
Description
The same input values as for benchmark 3-7a (section 3.7) are used. Calculations are performed using the Special Stress Analysis calculation which means that the maximum modulus
of subgrade reaction and the maximum reduced soil load are input values instead of calculated values: kV;max = 45000 kN/m3 , qn;max = 0.14 N/mm2 and R = 700 m.

Deltares

37 of 126

D-G EO P IPELINE, Verification Report

3.8.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. The total pulling force is the
contribution of five components. Results are given in Table 3.67.
Table 3.67: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-08)

Charac.
point
2
3
4
5
6
7
8
9
10

3.8.3

Length
[m]
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79
0

T1

T2

T3a

T3b

T3c

[kN]
4499.5
3739.7
3569.92
2940.5
2628.08
1279.33
899.4
191.31
0
0

[kN]
201.29
0
308.29
0
567.29
0
689.86
0
347.38
0

[kN]
0
1379.62
0
3042.32
0
3778.64
0
1285.74
0
0

[kN]
0
1022.78
0
944.88
0
1926.4
0
1266.3
0
0

[kN]
0
430.86
0
0
0
0
0
856.4
0
0

Total
[kN]
4700.79
6774.25
6912.76
10270.54
10525.4
14881.69
15191.62
17891.97
18048.04
0

D-G EO P IPELINE results
A Special Stress Analysis calculation must be performed by selecting Special Stress Analysis
for the Start menu. D-G EO P IPELINE results presented in the tables below can be found in the
Report.
Table 3.68: Results of benchmark 3-08, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
2297
1288
1009

D-G EO P IPELINE
2297
1288
1009

Error [%]
0.00
0.00
0.00

Table 3.69: Results of benchmark 3-08, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

38 of 126

Benchmark
Length
Force
[m]
[kN]
0
4610
43
4701
338
6774
1441
15192
1716
17892
1790
18048
0

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
4610
43
4701
338
6774
1441
15192
1716
17892
1790
18048
0

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.70: Results of benchmark 3-08, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
304
50
354
354

D-G EO P IPELINE
304
50
354
354

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.71: Results of benchmark 3-08, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
347
196
543
0.000216
0.1449
57
57
574

D-G EO P IPELINE
347
196
543
0.000216
0.1449
57
57
574

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.72: Results of benchmark 3-08, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
15
8
23
13

D-G EO P IPELINE
15
8
23
13

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.73: Results of benchmark 3-08, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqr
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
347
347
57
164
222
496

D-G EO P IPELINE
347
347
57
164
222
496

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

39 of 126

D-G EO P IPELINE, Verification Report

Table 3.74: Results of benchmark 3-08, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqr
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
347
18
9
23
15
356
57
164
484

D-G EO P IPELINE
347
18
9
23
15
356
57
164
484

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.75: Results of benchmark 3-08, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Benchmark
173.91
153.85
169.23
261.54
n.a.
n.a.

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

D-G EO P IPELINE
173.91
153.85
169.23
261.54
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.76: Results of benchmark 3-08, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
16.1
255
120

D-G EO P IPELINE
16.1
255
120

Rel. error [%]
0.00
0.00
0.00

Table 3.77: Results of benchmark 3-08, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-8.dri to run this benchmark.
3.9

HDD with 3D geometry – Bundled pipeline (3 steel pipes and 2 PE pipes)

40 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.9.1

Description
The same input as for benchmark 3-7a (section 3.7) is used except that five pipes are used
instead of one. Their characteristics are given in Table 3.78.
Table 3.78: Pipe material data (benchmark 3-09)

PE80
Synthetic

Material

δt
Eb
Epipe;long
Reb
Reb;long
γm
γm;test
α
D0
dn
γb
pd
pt
∆T
3.9.2

[%]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[-]
[-]
[-]
[mm]
[mm]
[kN/m3 ]
[Bar]
[Bar]
[◦ C]

1000
200
8
6.3

FE385
Steel
10
205800
385

PE100
Synthetic
1200
300
10
8

1.2
1.1
0.65
50
3.7
9.54
3
6
5

219.1
22.2
85
3
6
4

0.5
355
26.1
13
5
5.5
6

FE360
Steel
15
205800

Steel 1
Steel
25
180500

360

200

1.1
1.05

1.3
1.15

457
9.52
78.5
4
6.5
8

1000
35
65
5
9
10

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation for bundled pipelines
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. The pulling force is calculated
for an equivalent pipeline with the parameters of the bundle:

EIeq =

n
X

EIi

(3.1)

i=1

Gtot =

n 
X
π
i=1

Deq = f ×

4

2
−
D0;i

n
X


π
(D0;i − 2 × dn;i )2 × γi
4

D0;i

(3.2)

(3.3)

i=1


Gtot
π
2
=
Deq
− (Deq − 2 × dn;eq )2
γeq
4
Deltares

(3.4)

41 of 126

D-G EO P IPELINE, Verification Report

q

Deq −
dn;eq =

2 −
Deq

Pn

i=1

2
− (D0;i − 2 × dn;i )2
D0;i

(3.5)

2

The properties of the equivalent pipe are:

Deq
dn;eq
γeq
Ieq
Eeq
kV;max;eq

[mm]
[mm]
[kN/m3 ]
[m4 ]
[N/mm2 ]
[kN/m3 ]

1284.11
41.16
58.92
0.031073
74520.87
24550.63

The calculated pulling force is acting on all the pipelines in the bundle. The magnitude of the
pulling force of a single pipeline can be determined as follows:

Ai
Ti = Pn

i=1

Ai

× Ttotal where Ai =

π 2
π
D0;i − (D0;i − 2 × dn;i )2
4
4

(3.6)

The total pulling force is the contribution of five components. Results are given in the 6 tables
below, for the equivalent pipeline and for each single pipeline.
Table 3.79: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

42 of 126

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
3887.97
3794.48
3153.74
3010.56
2479.76
2216.29
1078.88
758.48
161.33
0

[kN]
0
103.16
0
157.99
0
290.72
0
353.53
0
178.02

[kN]
0
0
707.01
0
1216.92
0
1696.91
0
658.9
0

[kN]
0
0
339.9
0
549.03
0
989.82
0
420.82
0

[kN]
0
0
292.32
0
0
0
0
0
417.14
0

Total
[kN]
3887.97
3897.64
4596.13
4610.93
5846.09
5873.34
7422.66
7455.79
8355.52
8372.2

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.80: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2.6
2.54
2.11
2.02
1.66
1.48
0.72
0.51
0.11
0

[kN]
0
2.6
0
3.98
0
7.33
0
8.92
0
4.49

[kN]
0
0
17.83
0
14.77
0
31.65
0
16.62
0

[kN]
0
0
0
0
3.66
0
10.66
0
0
0

[kN]
0
0
1.53
0
0
0
0
0
8.25
0

Total
[kN]
2.6
5.14
24.08
27.97
46.05
53.21
94.76
103.46
127.93
132.31

Table 3.81: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
430.7
420.34
349.36
333.5
274.7
245.52
119.52
84.02
17.87
0

[kN]
0
19.57
0
29.98
0
55.16
0
67.08
0
33.78

[kN]
0
0
134.16
0
124.15
0
247.26
0
125.03
0

[kN]
0
0
7.01
0
62.31
0
120.77
0
8.67
0

[kN]
0
0
34.65
0
0
0
0
0
66.45
0

Total
[kN]
430.7
439.92
544.75
558.87
686.52
712.5
954.53
986.12
1120.12
1136.03

Table 3.82: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

Deltares

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
164.16
160.21
133.16
127.11
104.7
93.58
45.55
32.03
6.81
0

[kN]
0
27.49
0
42.1
0
77.47
0
94.21
0
47.44

[kN]
0
0
188.42
0
156.95
0
335.07
0
175.59
0

[kN]
0
0
0.46
0
49.7
0
124.81
0
0.57
0

[kN]
0
0
23.74
0
0
0
0
0
88.3
0

Total
[kN]
164.16
187.7
373.27
409.33
593.56
659.91
1071.77
1152.45
1391.71
1432.33

43 of 126

D-G EO P IPELINE, Verification Report

Table 3.83: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
456.95
445.96
370.66
353.83
291.44
260.48
126.8
89.14
18.96
0

[kN]
0
32.68
0
50.04
0
92.09
0
111.98
0
56.39

[kN]
0
0
223.95
0
229.82
0
428.55
0
208.71
0

[kN]
0
0
23.85
0
86.94
0
187.44
0
29.53
0

[kN]
0
0
44.23
0
0
0
0
0
111.14
0

Total
[kN]
456.95
478.64
695.36
728.57
982.95
1044.07
1526.37
1600.7
1879.89
1917.32

Table 3.84: Analytical results for the calculation of the five components of the pulling force
for the 10 characteristic points (bm3-09)

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2833.56
2765.42
2298.45
2194.1
1807.25
1615.24
786.29
552.78
117.58
0

[kN]
0
76.94
0
117.84
0
216.84
0
263.69
0
132.78

[kN]
0
0
527.34
0
1039.44
0
1357.92
0
491.46
0

[kN]
0
0
324.47
0
425.87
0
782.44
0
401.73
0

[kN]
0
0
219.2
0
0
0
0
0
323.45
0

Total
[kN]
2833.56
2842.36
3446.4
3459.89
4538.35
4563.17
5874.58
5904.76
6686.2
6701.4

In this benchmark, the stiffness of the steel and PE materials is significantly different. Therefore, a different approach is applied. In addition to the previous equation, the total pulling force
is divided over the stiff steel pipelines. Table 3.85 gives the maximal calculated pulling forces
for each pipeline in both cases: single and bundled calculation.
Table 3.85: Maximal pulling forces without partial factors (bm3-09)

Ai

Tmax;i (Single)
[mm2 ]
[kN]
PE80
538.19
132.31
FE385
13732.47
1346.74
PE100
26968.34
1432.33
FE360
13383.21
892.91
Steel 1
106107.29 6369.34
Bundled (all)
160729.50 8024.37
Bundled (only steel)
133222.97
1)
827.11 = 8024.37 × 13732.47 / 133222.97
2)
806.11 = 8024.37 × 13383.21 / 133222.97
3)
6391.12 = 8024.37 × 106107.29 / 133222.97

44 of 126

Tmax;i (Bundled steel pipes)
[kN]
132.56
827.111)
1432.33
806.112)
6391.123)

Deltares

Group 3: Benchmarks from spreadsheets

3.9.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.86: Results of benchmark 3-09, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Benchmark
1414
1086
328

Unit
[kg/m]
[kg/m]
[kg/m]

D-G EO P IPELINE
1415
1086
328

Error [%]
0.07
0.00
0.00

Table 3.87: Results of benchmark 3-09, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
3887.97
43.04
3897.64
338
4596.13
1440.63 7455.79
1715.52 8355.52
1789.79 8372.2
4

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
3887.97
43.04
3897.64
338
4596.13
1440.63 7455.8
1715.52 8355.52
1789.79 8372.21
4

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.88: Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.04
5.32
5.34
n.a.

D-G EO P IPELINE
0.04
5.32
5.34
n.a.

Rel. error [%]
0.00
0.00
0.00

Table 3.89: Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.04
270.44
270.46
0.016823
0.00038
0.01
0.01
n.a.

D-G EO P IPELINE
0.04
270.44
270.46
0.016823
0.00038
0.01
0.01
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

45 of 126

D-G EO P IPELINE, Verification Report

Table 3.90: Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
2

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σpy
σpx
σptest
σpm

Benchmark
1.89
0.94
3.78
1.64

D-G EO P IPELINE
1.89
0.94
3.78
1.64

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.91: Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
3

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σa;max
σqr
σqn
σt;max
σV;max

Benchmark
0.01
0.01
0.01
5.96
3.88
n.a.

D-G EO P IPELINE
0.01
0.01
0.01
5.96
3.88
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

Table 3.92: Results of benchmark 3-09 for pipe nr. 1, Strength calculation for Combination
4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
0.01
1.89
0.94
3.78
0.18
0.95
0.01
5.96
n.a.

D-G EO P IPELINE
0.01
1.89
0.94
3.78
0.18
0.95
0.01
5.96
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.93: Results of benchmark 3-09 for pipe nr. 1, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
6.4
5.04
n.a.
n.a.
6.4
5.04

D-G EO P IPELINE
6.4
5.04
n.a.
n.a.
6.4
5.04

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.94: Results of benchmark 3-09 for pipe nr. 1, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

46 of 126

Unit
[mm]
[mm]
[mm]

Benchmark
2.4
4
2.8

D-G EO P IPELINE
2.4
4
2.8

Rel. error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.95: Results of benchmark 3-09 for pipe nr. 1, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
607.55
60.76
0
0

D-G EO P IPELINE
607.55
60.76
0
0

Error
0.00
0.00
0.00
0.00

Table 3.96: Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
55.83
42.33
98.16
98.16

D-G EO P IPELINE
55.83
42.33
98.16
98.16

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.97: Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
63.81
91.14
154.95
0.000831
0.02618
0.51
0.51
155.21

D-G EO P IPELINE
63.81
91.14
154.95
0.000831
0.02618
0.51
0.51
155.2

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01

Table 3.98: Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1.66
0.83
2.69
1.44

D-G EO P IPELINE
1.66
0.83
2.69
1.44

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.99: Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination
3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
63.81
63.81
0.51
4.06
4.57
66.21

D-G EO P IPELINE
63.81
63.81
0.51
4.06
4.57
66.21

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

47 of 126

D-G EO P IPELINE, Verification Report

Table 3.100: Results of benchmark 3-09 for pipe nr. 2, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
63.81
1.96
0.98
2.69
11.56
64.79
0.51
4.06
66.27

D-G EO P IPELINE
63.81
1.96
0.98
2.69
11.56
64.79
0.51
4.06
66.27

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.101: Results of benchmark 3-09 for pipe nr. 2, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
350
320.83
352.92
545.42
n.a.
n.a.

D-G EO P IPELINE
350
320.83
352.92
545.42
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.102: Results of benchmark 3-09 for pipe nr. 2, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
0
37.2
17.5

D-G EO P IPELINE
0
37.2
17.5

Rel. error [%]
0.00
0.00
0.00

Table 3.103: Results of benchmark 3-09 for pipe nr. 2, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Table 3.104: Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

48 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.31
6.7
6.85
n.a.

D-G EO P IPELINE
0.31
6.7
6.85
n.a.

Rel. error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.105: Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.35
58.42
58.6
0.002253
0.0029
0.11
0.11
n.a.

D-G EO P IPELINE
0.35
58.42
58.6
0.002253
0.0029
0.11
0.11
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.106: Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
3.17
1.59
3.49
2.75

D-G EO P IPELINE
3.17
1.59
3.49
2.75

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.107: Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.09
0.04
0.05
6.05
3.05
n.a.

D-G EO P IPELINE
0.09
0.04
0.05
6.05
3.05
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

Table 3.108: Results of benchmark 3-09 for pipe nr. 3, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.09
3.17
1.59
3.49
0.32
1.63
0.05
6.05
n.a.

D-G EO P IPELINE
0.09
3.17
1.59
3.49
0.32
1.63
0.05
6.05
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

49 of 126

D-G EO P IPELINE, Verification Report

Table 3.109: Results of benchmark 3-09 for pipe nr. 3, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
8
6.4
n.a.
n.a.
8
6.4

D-G EO P IPELINE
8
6.4
n.a.
n.a.
8
6.4

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.110: Results of benchmark 3-09 for pipe nr. 3, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
11.7
28.4
19.9

D-G EO P IPELINE
11.7
28.4
19.9

Rel. error [%]
0.00
0.00
0.00

Table 3.111: Results of benchmark 3-09 for pipe nr. 3, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
713.89
89.24
0
0

D-G EO P IPELINE
713.89
89.24
0
0

Error
0.00
0.00
0.00
0.00

Table 3.112: Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
116.46
45.18
161.63
161.63

D-G EO P IPELINE
116.46
45.18
161.63
161.63

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.113: Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

50 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
133.09
97.28
230.38
0.000569
0.02927
14.51
14.51
237.96

D-G EO P IPELINE
133.09
97.28
230.38
0.000569
0.02927
14.51
14.51
238

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.114: Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 2

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σpy
σpx
σptest
σpm

Benchmark
12.2
6.1
16.23
10.57

D-G EO P IPELINE
12.2
6.1
16.23
10.57

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.115: Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 3

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σa;max
σqr
σqn
σt;max
σV;max

Benchmark
133.09
133.09
14.51
103.79
118.3
217.84

D-G EO P IPELINE
133.09
133.09
14.51
103.79
118.3
217.8

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.02

Table 3.116: Results of benchmark 3-09 for pipe nr. 4, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
133.09
14.42
7.21
16.23
23.12
140.31
14.51
103.79
216.05

D-G EO P IPELINE
133.09
14.42
7.21
16.23
23.12
140.31
14.51
103.79
216.1

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.02

Table 3.117: Results of benchmark 3-09 for pipe nr. 4, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
342.86
327.27
360
556.36
n.a.
n.a.

D-G EO P IPELINE
342.86
327.27
360
556.36
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.118: Results of benchmark 3-09 for pipe nr. 4, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Deltares

Unit
[mm]
[mm]
[mm]

Benchmark
2.4
77.7
36.6

D-G EO P IPELINE
2.4
77.7
36.6

Rel. error [%]
0.00
0.00
0.00

51 of 126

D-G EO P IPELINE, Verification Report

Table 3.119: Results of benchmark 3-09 for pipe nr. 4, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Table 3.120: Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
223.5
50.9
274.41
274.41

D-G EO P IPELINE
223.5
50.9
274.41
274.41

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.121: Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
255.43
109.61
365.04
0.000239
0.07646
13.31
13.31
371.88

D-G EO P IPELINE
255.43
109.61
365.04
0.000239
0.07646
13.31
13.31
371.9

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01

Table 3.122: Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
10.2
5.1
15.02
8.83

D-G EO P IPELINE
10.2
5.1
15.02
8.83

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.123: Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

52 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
255.43
255.43
13.31
44.12
57.43
288.47

D-G EO P IPELINE
255.43
255.43
13.31
44.17
57.48
288.5

Rel. error [%]
0.00
0.00
0.00
0.11
0.09
0.01

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.124: Results of benchmark 3-09 for pipe nr. 5, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
255.43
12.06
6.03
15.02
25.34
261.46
13.31
44.12
287.87

D-G EO P IPELINE
255.43
12.06
6.03
15.02
25.34
261.46
13.31
44.17
287.9

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.11
0.01

Table 3.125: Results of benchmark 3-09 for pipe nr. 5, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
173.91
153.85
169.23
261.54
n.a.
n.a.

D-G EO P IPELINE
173.91
153.85
169.23
261.54
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.126: Results of benchmark 3-09 for pipe nr. 5, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
1.8
170
80

D-G EO P IPELINE
1.8
170
80

Rel. error [%]
0.00
0.00
0.00

Table 3.127: Results of benchmark 3-09 for pipe nr. 5, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-9.dri to run this benchmark.
3.10

HDD with 3D geometry – Bundled pipeline (2 PE pipes)

Deltares

53 of 126

D-G EO P IPELINE, Verification Report

3.10.1

Description
The same input as for benchmark 3-7a (section 3.7) is used except that five pipes are used
instead of one. Their characteristics are given in the table below.
Table 3.128: Pipe material data (benchmark 3-10)

Material

Eb
Epipe;long
Reb
Reb;long
α
D0
dn
γb
pd
pt
∆T
3.10.2

[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[-]
[mm]
[mm]
[kN/m3 ]
[Bar]
[Bar]
[◦ C]

PE80
Synthetic
1000
200
8
6.3
0.65
50
3.7
9.54
3
6
5

PE100
Synthetic
1200
300
10
8
0.5
355
26.1
13
5
5.5
6

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation for bundled pipelines
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in the
Background section of the User Manual of D-G EO P IPELINE. The properties of the equivalent
pipe are:
Deq
[mm]
328.96
dn;eq
[mm]
29.21
γeq
[kN/m3 ]
12.93
Ieq
[m4 ]
0.00031187
Eeq
[N/mm2 ]
1412.43
kV;max;eq
[kN/m3 ]
133262.93
The total pulling force is the contribution of five components. Results are given in the tables
below for the equivalent pipeline and for the 2 single pipelines.

54 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.129: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-10) for the equivalent pipe

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
166.76
162.75
135.27
129.13
106.36
95.06
46.28
32.53
6.92
0

[kN]
0
26.49
0
40.58
0
74.67
0
90.8
0
45.72

[kN]
0
0
181.59
0
151.28
0
322.94
0
169.23
0

[kN]
0
0
0.46
0
48.58
0
121.04
0
0.57
0

[kN]
0
0
23.35
0
0
0
0
0
85.16
0

Total
[kN]
166.76
189.25
367.16
401.6
578.69
642.06
1037.25
1114.31
1343.66
1382.46

Table 3.130: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-10) for pipe nr. 1

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2.6
2.54
2.11
2.02
1.66
1.48
0.72
0.51
0.11
0

[kN]
0
2.6
0
3.98
0
7.33
0
8.92
0
4.49

[kN]
0
0
17.83
0
14.77
0
31.65
0
16.62
0

[kN]
0
0
0
0
3.66
0
10.66
0
0
0

[kN]
0
0
1.53
0
0
0
0
0
8.25
0

Total
[kN]
2.6
5.14
24.08
27.97
46.05
53.21
94.76
103.46
127.93
132.31

Table 3.131: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-10) for pipe nr. 2

Charac.
point
1
2
3
4
5
6
7
8
9
10

Deltares

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
164.16
160.21
133.16
127.11
104.7
93.58
45.55
32.03
6.81
0

[kN]
0
27.49
0
42.1
0
77.47
0
94.21
0
47.44

[kN]
0
0
188.42
0
156.95
0
335.07
0
175.59
0

[kN]
0
0
0.46
0
49.7
0
124.81
0
0.57
0

[kN]
0
0
23.74
0
0
0
0
0
88.3
0

Total
[kN]
164.16
187.7
373.27
409.33
593.56
659.91
1071.77
1152.45
1391.71
1432.33

55 of 126

D-G EO P IPELINE, Verification Report

3.10.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.132: Results of benchmark 3-10, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
131
47
85

D-G EO P IPELINE
131
47
85

Error [%]
0.00
0.00
0.00

Table 3.133: Results of benchmark 3-10, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
167
43
189
338
367
1441
1114
1716
1344
1790
1382
4

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
167
43
189
338
367
1441
1114
1716
1344
1790
1382
4

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-10.dri to run this benchmark.
3.11
3.11.1

HDD with 3D geometry – Bundled pipeline (3 steel pipes)
Description
The same input as for benchmark 3-7a (section 3.7) is used except that five pipes are used
instead of one. Their characteristics are given in the table below.
Table 3.134: Pipe material data (benchmark 3-11)

Material

δt
Eb
Reb
γm
γm;test
D0
dn
γb
pd
pt
∆T
3.11.2

[%]
[N/mm2 ]
[N/mm2 ]
[-]
[-]
[mm]
[mm]
[kN/m3 ]
[Bar]
[Bar]
[◦ C]

FE385
Steel
10
205800
385
1.2
1.1
219.1
22.2
85
3
6
4

FE360
Steel
15
205800
360
1.1
1.05
457
9.52
78.5
4
6.5
8

Steel 1
Steel
25
180500
200
1.3
1.15
1000
35
65
5
9
10

Analytical results
Analytical results are worked out in an Excel spreadsheet.

56 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Strength calculation for bundled pipelines
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE [Deltares]. The properties of
the equivalent pipe are:
Deq
[mm]
1205.49
dn;eq
[mm]
36.27
γeq
[kN/m3 ]
68.42
4
Ieq
[m ]
0.0227877
Eeq
[N/mm2 ]
101597.36
kV;max;eq
[kN/m3 ]
25604.32
The total pulling force is the contribution of five components. Results are given in the tables
below for the equivalent pipeline and for the 3 single steel pipelines.
Table 3.135: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-11) for the equivalent pipe

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
3721.21
3631.73
3018.47
2881.43
2373.4
2121.23
1032.6
725.95
154.41
0

[kN]
0
88.51
0
135.55
0
249.44
0
303.33
0
152.74

[kN]
0
0
606.62
0
1130.34
0
1516.31
0
565.34
0

[kN]
0
0
338.05
0
515.78
0
915.32
0
418.54
0

[kN]
0
0
275.2
0
0
0
0
0
369.21
0

Total
[kN]
3721.21
3720.24
4326.85
4325.36
5463.45
5460.71
6803.71
6800.39
7581.95
7580.28

Table 3.136: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-11) for pipe nr. 1

Charac.
point
1
2
3
4
5
6
7
8
9
10

Deltares

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
430.7
420.34
349.36
333.5
274.7
245.52
119.52
84.02
17.87
0

[kN]
0
19.57
0
29.98
0
55.16
0
67.08
0
33.78

[kN]
0
0
134.16
0
124.15
0
247.26
0
125.03
0

[kN]
0
0
7.01
0
62.31
0
120.77
0
8.67
0

[kN]
0
0
34.65
0
0
0
0
0
66.45
0

Total
[kN]
430.7
439.92
544.75
558.87
686.52
712.5
954.53
986.12
1120.12
1136.03

57 of 126

D-G EO P IPELINE, Verification Report

Table 3.137: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-11) for pipe nr. 2

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
456.95
445.96
370.66
353.83
291.44
260.48
126.8
89.14
18.96
0

[kN]
0
32.68
0
50.04
0
92.09
0
111.98
0
56.39

[kN]
0
0
223.95
0
229.82
0
428.55
0
208.71
0

[kN]
0
0
23.85
0
86.94
0
187.44
0
29.53
0

[kN]
0
0
44.23
0
0
0
0
0
111.14
0

Total
[kN]
456.95
478.64
695.36
728.57
982.95
1044.07
1526.37
1600.7
1879.89
1917.32

Table 3.138: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-11) for pipe nr. 3

Charac.
point
1
2
3
4
5
6
7
8
9
10

3.11.3

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2833.56
2765.42
2298.45
2194.1
1807.25
1615.24
786.29
552.78
117.58
0

[kN]
0
76.94
0
117.84
0
216.84
0
263.69
0
132.78

[kN]
0
0
527.34
0
1039.44
0
1357.92
0
491.46
0

[kN]
0
0
324.47
0
425.87
0
782.44
0
401.73
0

[kN]
0
0
219.2
0
0
0
0
0
323.45
0

Total
[kN]
2833.56
2842.36
3446.4
3459.89
4538.35
4563.17
5874.58
5904.76
6686.2
6701.4

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.139: Results of benchmark 3-11, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

58 of 126

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
1283
1040
244

D-G EO P IPELINE
1283
1040
244

Error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.140: Results of benchmark 3-11, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
3721
43
3720
338
4327
1441
6800
1716
7582
1790
7580
6493

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
3721
43
3720
338
4327
1441
6800
1716
7582
1790
7580
6493

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-11.dri to run this benchmark.
3.12
3.12.1

Micro tunneling with 3D geometry – Steel pipe
Description
The same input data’s as for benchmark 3-7 (section 3.7) are used except that the calculation
is performed for micro tunneling instead of horizontal directional drilling. Few input values
must be added compare to HDD calculation:
Friction with injection of lubricant
7.5 [kPa]
Friction without injection of lubricant
10
[kPa]
Allowable thrust force
200 [kN]
Volume loss for surface settlement
15
[%]
Two cases are checked:

 Case A (bm3-12a): thrusting direction from left to right;
 Case B (bm3-12b): thrusting direction from right to left.
3.12.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation of
soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.

Deltares

59 of 126

D-G EO P IPELINE, Verification Report

Operation Parameters
The face support pressures, the thrust forces and the uplift safety factor are determined using
the formulas given in chapter “Micro Tunneling” in the Background section of the User Manual
of D-G EO P IPELINE. Intermediate results are given in the tables below.
Table 3.141: Analytical results for the calculation of the face support pressures

Vert.
[-]
1
2
3
4
5
6
7
8

σv ’

u

C/D

β

O/A

α

K

KA3

Qs

[kN/m2 ]
25.396
27.34
120.537
162.667
448.99
353.117
161.58
89.894

[kN/m2 ]
0
116.373
192.742
218.871
352.192
250.214
0
0

[-]
n.a.
n.a.
3.199
6.643
21.924
7.226
n.a.
n.a.

[-]
n.a.
n.a.
66.706
66.706
68.683
68.683
n.a.
n.a.

[-]
n.a.
n.a.
6.645
6.645
7.125
7.125
n.a.
n.a.

[-]
n.a.
n.a.
1.432
1.465
1.489
1.468
n.a.
n.a.

[-]
n.a.
n.a.
0.417
0.417
0.349
0.349
n.a.
n.a.

[-]
n.a.
n.a.
0.214
0.212
0.167
0.168
n.a.
n.a.

[kN/m2 ]
n.a.
n.a.
3.376
3.842
9.702
9.343
n.a.
n.a.

Table 3.142: Analytical results for the calculation of the uplift safety factor

Vert.
[-]
1
2
3
4
5
6
7
8

3.12.3

Part dry
[%]
100
0
0
0
0
0
66.256
100

guplift

gweight

fuplift

[kN/m2 ]
0
7.854
7.854
7.854
7.854
7.854
2.65
0

[kN/m2 ]
6.897
6.897
6.897
6.897
6.897
6.897
6.897
6.897

[-]
999
4.009
15.493
20.858
57.269
45.074
61.495
999

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.143: Results of benchmark 3-12a, Vertical soil stresses

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

qv;p

qv;n
2

D-G EO P IPELINE

qv;r;n
2

qv;p
2

qv;n
2

Relative error

qv;r;n
2

qv;p
2

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
32
21
21
32
21
21
0.00
106
25
45
106
25
45
0.00
830
116
79
830
116
79
0.00
1048
158
90
1048
158
90
0.00
2010
444
109
2010
444
109
0.00
1615
348
113
1615
348
141
0.00
284
157
102
284
157
102
0.00
213
85
85
213
85
85
0.00

60 of 126

qv;n

qv;r;n

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
19.86
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.144: Results of benchmark 3-12a, Neutral horizontal soil stress and bearing capacities

Benchmark

qh;n

Vert.
[-]
1
2
3
4
5
6
7
8

Pv;e
2

D-G EO P IPELINE

Ph;e
2

[kN/m ] [kN/m ]
16
455
19
494
58
3315
79
4434
189
21114
149
16630
116
1240
63
838

qh;n
2

[kN/m ]
208
147
1715
2364
12962
8152
702
451

Pv;e
2

Relative error

Ph;e
2

[kN/m ] [kN/m ]
16
455
19
494
58
3315
79
4435
189
21114
149
16630
116
1240
63
838

2

[kN/m ]
208
147
1715
2364
12962
8152
702
451

qh;n

Pv;e

Ph;e

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.02
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.145: Results of benchmark 3-12a, Vertical and horizontal moduli of subgrade reaction

Benchmark

kv;top

Vert.
[-]
1
2
3
4
5
6
7
8

kv;bot
3

[kN/m ]
371
253
9424
16574
12499
16911
254
327

D-G EO P IPELINE

kh
3

[kN/m ]
303
544
17421
18611
13305
11410
367
260

kv;top
3

[kN/m ]
212
380
12195
13028
9313
7987
257
182

kv;bot

Relative error

kv;top

kv;bot

kh

[kN/m ] [kN/m ] [kN/m ] [%]
371
303
212
0.00
253
544
380
0.00
9424
17421 12195 0.00
16574 18611 13028 0.00
12499 13305 9313
0.00
16911 11410 7987
0.00
254
367
257
0.00
327
260
182
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3

kh
3

3

Table 3.146: Results of benchmark 3-12a, Maximal axial friction and displacements

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

Deltares

D-G EO P IPELINE

Relative error

tmax

dv

dmax

tmax

dv

dmax

tmax

dv

dmax

[kN/m2 ]
17
19
25
27
35
33
32
27

[mm]
5
10
20
40
80
60
50
35

[mm]
12
12
5
5
2
2
12
12

[kN/m2 ]
17
19
25
27
35
36
32
27

[mm]
5
10
20
40
80
60
50
35

[mm]
12
12
5
5
2
2
12
12

[%]
0.00
0.00
0.00
0.00
0.00
8.33
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

61 of 126

D-G EO P IPELINE, Verification Report

Table 3.147: Results of benchmark 3-12a, Face support pressures

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

Pmax

Pmin

Ptarget

Pmax

Pmin

Ptarget

Pmax

Pmin

Ptarget

[kN/m2 ]
21
120
261
318
668
503
135
75

[kN/m2 ]
0
128
248
242
390
277
0
0

[kN/m2 ]
19
137
253
300
544
401
120
67

[kN/m2 ]
21
120
261
318
668
503
135
75

[kN/m2 ]
0
128
248
242
389
276
0
0

[kN/m2 ]
19
137
253
300
544
401
120
67

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.26
0.36
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.148: Results of benchmark 3-12a, Thrust forces

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

Flubricated

Fnormal

Flubricated

Fnormal

Flubricated

Fnormal

[kN]
337
1719
3414
4089
30386
50715
54517
55288

[kN]
498
2525
5021
6015
45366
75915
81728
82906

[kN]
337
1719
3414
4089
30386
50715
54517
55288

[kN]
498
2525
5021
6015
45366
75915
81728
82906

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.149: Results of benchmark 3-12b, Thrust forces

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

Flubricated

Fnormal

Flubricated

Fnormal

Flubricated

Fnormal

[kN]
55920
54723
53211
52611
26696
6142
1899
1044

[kN]
83873
82031
79718
78798
39830
9056
2802
1540

[kN]
55920
54723
53211
52611
26696
6142
1899
1044

[kN]
83873
82031
79718
78798
39830
9056
2802
1540

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

62 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.150: Results of benchmark 3-12a, Uplift safety factor

Benchmark
Calculated
Required
[-]
[-]
n.a.
1.15
4.01
1.15
15.49
1.15
20.86
1.15
57.27
1.15
45.07
1.15
61.49
1.15
n.a.
1.15

Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE
Calculated
Required
[-]
[-]
999
1.15
4
1.15
15.48
1.15
20.85
1.15
57.27
1.15
45.07
1.15
57.7
1.15
999
1.15

Relative error
Calculated
Required
[%]
[%]
0.00
0.25
0.00
0.06
0.00
0.05
0.00
0.00
0.00
0.00
0.00
6.57
0.00
0.00

Table 3.151: Results of benchmark 3-12a, Trough

v1
v2
v3
v4
v5
v6
v7
v8

Benchmark
ftrough
Trough
[-]
[-]
0.02156 2.093
0.00746 6.052
0.00433 10.431
0.00376 12
0.00235 19.235
0.0026
17.349
0.00608 7.416
0.00978 4.614

Depth
[m]
2.309
11.516
21.699
25.349
49.182
41.18
14.689
8.172

D-G EO P IPELINE
ftrough
Trough Depth
[-]
[-]
[m]
0.02156 2.093
2.309
0.00746 6.052
11.516
0.00433 10.431 21.699
0.00376 12
25.349
0.00235 19.235 49.182
0.0026
17.349 41.18
0.00608 7.416
14.689
0.00978 4.614
8.172

Relative error
ftrough Trough Depth
[%]
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.152: Results of benchmark 3-12a, Subsidence at different horizontal distances of
Z axis (from 0 to 0.7W)

0

Benchmark [mm]
0.1 0.2 0.4 0.7

0

D-G EO P IPELINE [mm]
0.1 0.2 0.4 0.7

×W
v1
v2
v3
v4
v5
v6
v7
v8

22
7
4
4
2
3
6
10

Deltares

21
7
4
4
2
3
6
10

21
7
4
3
2
2
6
9

0

Relative error [%]
0.1 0.2 0.4 0.7

×W
20
6
3
3
1
2
4
8

16
3
1
1
0
1
2
5

22
7
4
4
2
3
6
10

21
7
4
4
2
3
6
10

21
7
4
3
2
2
6
9

×W
20
6
3
3
1
2
4
8

16
3
1
1
0
1
2
5

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

63 of 126

D-G EO P IPELINE, Verification Report

Table 3.153: Results of benchmark 3-12a, Subsidence at different horizontal distances of
Z axis (from 1W to 2.5W)

1

Benchmark [mm]
1.3 1.6 2 2.5

1

D-G EO P IPELINE [mm]
1.3 1.6 2 2.5

×W
v1
v2
v3
v4
v5
v6
v7
v8

12
1
0
0
0
0
1
2

8
0
0
0
0
0
0
1

5
0
0
0
0
0
0
0

Relative error [%]
1.3 1.6 2
2.5

1

×W
2
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

12
1
0
0
0
0
1
2

8
0
0
0
0
0
0
1

×W

5
0
0
0
0
0
0
0

2
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Use D-G EO P IPELINE input files bm3-12a.dri and bm3-12b.dri to run this benchmark.
3.13
3.13.1

Micro tunneling with 3D geometry – Synthetic pipe
Description
The same input data’s as for benchmark 3-12a (section 3.12) are used except that a synthetic
pipe (with a Young’s modulus at short term of 30000 kPa) instead of a steel pipe is used.
Results are expected to be the same as bm3-12a except for the moduli of subgrade reaction.

3.13.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The moduli of subgrade reaction are determined using the formulas given in chapter “Calculation of soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.

3.13.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the table below can be found in the Report.
Table 3.154: Results of benchmark 3-13, Vertical and horizontal moduli of subgrade reaction

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

kv;top

kv;bot
3

[kN/m ]
405
277
10477
18504
13924
18883
278
358

64 of 126

D-G EO P IPELINE

kh
3

[kN/m ]
331
594
19458
20827
14829
12703
402
285

kv;top
3

[kN/m ]
232
416
13620
14579
10380
8892
281
199

kv;bot

Relative error

kv;top

kv;bot

kh

[kN/m ] [kN/m ] [kN/m ] [%]
405
331
232
0.00
277
594
416
0.00
10477 19458 13620 0.00
18504 20827 14579 0.00
13924 14829 10380 0.00
18883 12703 8892
0.00
278
402
281
0.00
358
285
199
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3

kh
3

3

Deltares

Group 3: Benchmarks from spreadsheets

Use D-G EO P IPELINE input file bm3-13.dri to run this benchmark.
3.14
3.14.1

Micro tunneling with 3D geometry – Concrete pipe
Description
The same input data’s as for benchmark 3-12a (section 3.12) are used except that a concrete
pipe instead of a steel pipe is used, but the properties are the same. Therefore, results are
expected to be the same as bm3-12a.

3.14.2

Analytical results
The same Excel spreadsheet as for benchmark 3-12a (section 3.12) is used.

3.14.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report and are identical to the results of benchmark 3-12a (section 3.12) .
Table 3.155: Results of benchmark 3-14, Vertical soil stresses

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

qv;p

qv;n
2

D-G EO P IPELINE

qv;r;n
2

qv;p
2

qv;n
2

Relative error

qv;r;n
2

qv;p
2

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
32
21
21
32
21
21
0.00
106
25
45
106
25
45
0.00
830
116
79
830
116
79
0.00
1048
158
90
1048
158
90
0.00
2010
444
109
2010
444
109
0.00
1615
348
113
1615
348
141
0.00
284
157
102
284
157
102
0.00
213
85
85
213
85
85
0.00

qv;n

qv;r;n

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
19.86
0.00
0.00

Table 3.156: Results of benchmark 3-14, Neutral horizontal soil stress and bearing capacities

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

Deltares

qh;n

Pv;e
2

D-G EO P IPELINE

Ph;e
2

[kN/m ] [kN/m ]
16
455
19
494
58
3315
79
4434
189
21114
149
16630
116
1240
63
838

qh;n
2

[kN/m ]
208
147
1715
2364
12962
8152
702
451

Pv;e
2

Relative error

Ph;e
2

[kN/m ] [kN/m ]
16
455
19
494
58
3315
79
4435
189
21114
149
16630
116
1240
63
838

2

[kN/m ]
208
147
1715
2364
12962
8152
702
451

qh;n

Pv;e

Ph;e

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.02
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

65 of 126

D-G EO P IPELINE, Verification Report

Table 3.157: Results of benchmark 3-14, Vertical and horizontal moduli of subgrade reaction

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

kv;top

kv;bot
3

[kN/m ]
371
253
9424
16574
12499
16911
254
327

D-G EO P IPELINE

kh
3

[kN/m ]
303
544
17421
18611
13305
11410
367
260

kv;top
3

[kN/m ]
212
380
12195
13028
9313
7987
257
182

kv;bot

Relative error

kv;top

kv;bot

kh

[kN/m ] [kN/m ] [kN/m ] [%]
371
303
212
0.00
253
544
380
0.00
9424
17421 12195 0.00
16574 18611 13028 0.00
12499 13305 9313
0.00
16911 11410 7987
0.00
254
367
257
0.00
327
260
182
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

3

kh
3

3

Table 3.158: Results of benchmark 3-14, Maximal axial friction and displacements

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

tmax

dv

dmax

tmax

dv

dmax

tmax

dv

dmax

[kN/m2 ]
16.83
18.93
24.55
26.97
35.39
33.21
32.4
26.77

[mm]
5
10
20
40
80
60
50
35

[mm]
12
12
5
5
2
2
12
12

[kN/m2 ]
17
19
25
27
35
36
32
27

[mm]
5
10
20
40
80
60
50
35

[mm]
12
12
5
5
2
2
12
12

[%]
0.00
0.00
0.00
0.00
0.00
8.33
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.159: Results of benchmark 3-14, Face support pressures

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

Pmax

Pmin

Ptarget

Pmax

Pmin

Ptarget

Pmax

Pmin

Ptarget

[kN/m2 ]
21
120
261
318
668
503
135
75

[kN/m2 ]
0
128
248
242
390
277
0
0

[kN/m2 ]
19
137
253
300
544
401
120
67

[kN/m2 ]
21
120
261
318
668
503
135
75

[kN/m2 ]
0
128
248
242
389
276
0
0

[kN/m2 ]
19
137
253
300
544
401
120
67

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.26
0.36
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

66 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.160: Results of benchmark 3-14, Thrust forces

Benchmark
Vert.
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

Flubricated

Fnormal

Flubricated

Fnormal

Flubricated

Fnormal

[kN]
337
1719
3414
4089
30386
50715
54517
55288

[kN]
498
2525
5021
6015
45366
75915
81728
82906

[kN]
337
1719
3414
4089
30386
50715
54517
55288

[kN]
498
2525
5021
6015
45366
75915
81728
82906

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.161: Results of benchmark 3-14, Uplift safety factor

Vert.
[-]
1
2
3
4
5
6
7
8

Benchmark
Calculated
Required
[-]
[-]
999
1.15
4.01
1.15
15.49
1.15
20.86
1.15
57.27
1.15
45.07
1.15
61.49
1.15
999
1.15

D-G EO P IPELINE
Calculated
Required
[-]
[-]
999
1.15
4
1.15
15.48
1.15
20.85
1.15
57.27
1.15
45.07
1.15
57.7
1.15
999
1.15

Relative error
Calculated
Required
[%]
[%]
0.00
0.00
0.25
0.00
0.06
0.00
0.05
0.00
0.00
0.00
0.00
0.00
6.57
0.00
0.00
0.00

Table 3.162: Results of benchmark 3-14, Trough

v1
v2
v3
v4
v5
v6
v7
v8

Benchmark
ftrough
Trough
[-]
[-]
0.02156 2.093
0.00746 6.052
0.00433 10.431
0.00376 12
0.00235 19.235
0.0026
17.349
0.00608 7.416
0.00978 4.614

Deltares

Depth
[m]
2.309
11.516
21.699
25.349
49.182
41.18
14.689
8.172

D-G EO P IPELINE
ftrough
Trough Depth
[-]
[-]
[m]
0.02156 2.093
2.309
0.00746 6.052
11.516
0.00433 10.431 21.699
0.00376 12
25.349
0.00235 19.235 49.182
0.0026
17.349 41.18
0.00608 7.416
14.689
0.00978 4.614
8.172

Relative error
ftrough Trough Depth
[%]
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

67 of 126

D-G EO P IPELINE, Verification Report

Table 3.163: Results of benchmark 3-14, Subsidence at different horizontal distances of
Z axe (from 0 to 0.7W)

0

Benchmark [mm]
0.1 0.2 0.4 0.7

0

D-G EO P IPELINE [mm]
0.1 0.2 0.4 0.7

×W
v1
v2
v3
v4
v5
v6
v7
v8

22
7
4
4
2
3
6
10

21
7
4
4
2
3
6
10

21
7
4
3
2
2
6
9

0

Relative error [%]
0.1 0.2 0.4 0.7

×W
20
6
3
3
1
2
4
8

16
3
1
1
0
1
2
5

22
7
4
4
2
3
6
10

21
7
4
4
2
3
6
10

21
7
4
3
2
2
6
9

×W
20
6
3
3
1
2
4
8

16
3
1
1
0
1
2
5

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Table 3.164: Results of benchmark 3-14, Subsidence at different horizontal distances of
Z axe (from 1W to 2.5W)

1

Benchmark [mm]
1.3 1.6 2 2.5

1

D-G EO P IPELINE [mm]
1.3 1.6 2 2.5

×W
v1
v2
v3
v4
v5
v6
v7
v8

12
1
0
0
0
0
1
2

8
0
0
0
0
0
0
1

5
0
0
0
0
0
0
0

1

Relative error [%]
1.3 1.6 2
2.5

×W
2
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

12
1
0
0
0
0
1
2

8
0
0
0
0
0
0
1

5
0
0
0
0
0
0
0

×W
2
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Use D-G EO P IPELINE input file bm3-14.dri to run this benchmark.
3.15

3.15.1

Trenching (3 sections) – 3D geometry in four layers – Compressible border above
drainage border
Description
The same input data’s as for benchmark 1-7 (section 3.7) are used except that a construction
in trench is modeled. The trenching configuration (3 trench sections) is given in Table 3-114.
Calculations are performed for 8 verticals with L coordinates of 70, 150, 400, 600, 900, 1200,
1500 and 1800 m. Six cases are considered depending on the type of filling of the trench:








Case A (bm3-15a): sand poorly compacted;
Case B (bm3-15b): stiff clay poorly compacted;
Case C (bm3-15c): soft soil poorly compacted;
Case D (bm3-15d): sand well compacted;
Case E (bm3-15e): stiff clay well compacted;
Case F (bm3-15f): soft soil well compacted.

The type of filling will influence only the actual soil stress.

68 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.165: Configuration of the 3 trench sections (benchmark 3-15a)

Xbegin
Ybegin
Zbegin
Xend
Yend
Zend
Eb
D0
dn
γb
Width
Slope of the wall [1:x]
Offset

[m]
[m]
[m]
[m]
[m]
[m]
[N/mm2 ]
[mm]
[mm]
[kN/m3 ]
[mm]
[-]
[m]

Trench 1
50
0
-1
400
10
-4
1500
500
35
78.5
550
2
0.1

Trench 2
400
10
-4
1300
-6
-2
2000
300
20
90
400
3
0.2

Trench 3
1300
-6
-2
1900
5
0.5
3500
600
50
56
700
4
0.3

Figure 3.4: Lateral view of the 3 trench sections (benchmark 3-15)

3.15.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation of
soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.

Deltares

69 of 126

D-G EO P IPELINE, Verification Report

Operation Parameters
The safety factors for uplift and hydraulic heave are determined using the formulas given in
chapter “Trench” in the Background section of the User Manual of D-G EO P IPELINE. Intermediate results are given in the tables below.
Table 3.166: Analytical results for the calculation of the uplift safety factor

Vert.
[-]
1
2
3
4
5
6
7
8

Part dry
[%]
0
0
0
0
0
0
0
100

σv;top ’

qpipe

quplift

f

[kN/m2 ]
0.367
4.458
30.326
27.931
23.082
19.085
12.564
6.774

[kN/m2 ]
4.014
4.014
4.014
1.583
1.583
1.583
4.838
4.838

[kN/m2 ]
1.963
1.963
1.963
0.707
0.707
0.707
2.827
0

[-]
2.138
3.179
9.767
14.094
12.036
10.34
4.377
999

Table 3.167: Analytical results for the hydraulic heave check

v1
v2
v3
v4
v5
v6
v7
v8

3.15.3

a

b

d2;d

fBous

[m]
2.6
4
8.7
12.1
10.8
9.4
10.2
6.1

[m]
0.28
0.28
0.28
0.2
0.2
0.2
0.35
0.35

[m]
2.08
1.39
-0.84
-0.47
0.09
0.65
1.34
2.48

[-]
0.34
0.15
-0.04
-0.01
0
0.03
0.05
0.2

σv
54.7
54.7
55.1
55.4
55.8
56.2
56.7
57.1

σbot

Wbot

16.6
28.2
71.9
64.7
54.1
44
33.1
16.7

[kN/m2 ]
38.1
16.6
26.5
28.2
-16.8 71.9
-9.4
64.7
1.7
54.1
12.3
44
23.6
33.1
40.4
16.7

Wtop

Ww
10.2
17.1
38.5
34.1
27.4
20.7
12.7
0.2

uopw

ϕ

f

28.5
28.5
27.7
27.1
26.1
25.1
24.1
23.1

[m]
-0.8
-0.8
-0.7
-0.7
-0.7
-0.7
-0.7
-0.7

[-]
1.9
1.7
100
100
1.1
1.4
1.6
1.9

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.168: Results of benchmark 3-15a, Vertical and horizontal soil stresses

Benchmark

qv;p

qv;n
2

v1
v2
v3
v4
v5
v6
v7
v8

D-G EO P IPELINE

qh;n
2

qv;p
2

qv;n
2

Relative error

qh;n
2

qv;p
2

[kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [kN/m ] [%]
1
1
0
1
1
0
0.00
9
5
4
9
5
4
0.00
99
31
13
99
31
13
0.00
127
28
12
127
28
12
0.00
95
23
12
95
23
12
0.00
70
19
18
70
19
18
0.00
23
13
13
23
13
13
0.00
10
7
6
10
8
6
0.00

70 of 126

qv;n

qh;n

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
12.5

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.169: Results of benchmark 3-15a, Initial vertical stress qk for sand poorly compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
[kN/m2 ]
1
6
99
127
95
70
16
8

D-G EO P IPELINE
[kN/m2 ]
1
6
99
127
95
70
16
8

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.170: Results of benchmark 3-15b, Initial vertical stress qk for stiff clay poorly compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
[kN/m2 ]
1
8
99
127
95
70
19
9

D-G EO P IPELINE
[kN/m2 ]
1
8
99
127
95
70
19
9

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.171: Results of benchmark 3-15c, Initial vertical stress qk for soft soil poorly compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

Deltares

Benchmark
[kN/m2 ]
1
9
99
127
95
70
21
9

D-G EO P IPELINE
[kN/m2 ]
1
9
99
127
95
70
21
9

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

71 of 126

D-G EO P IPELINE, Verification Report

Table 3.172: Results of benchmark 3-15d, Initial vertical stress qk for sand well compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
[kN/m2 ]
1
5
99
127
95
36
14
8

D-G EO P IPELINE
[kN/m2 ]
1
5
99
127
95
36
14
8

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.173: Results of benchmark 3-15e, Initial vertical stress qk for stiff clay well compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

Benchmark
[kN/m2 ]
1
6
99
127
95
70
16
8

D-G EO P IPELINE
[kN/m2 ]
1
6
99
127
95
70
16
8

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.174: Results of benchmark 3-15f, Initial vertical stress qk for soft soil well compacted

Vertical nr.
[-]
1
2
3
4
5
6
7
8

72 of 126

Benchmark
[kN/m2 ]
1
7
99
127
95
70
17
8

D-G EO P IPELINE
[kN/m2 ]
1
7
99
127
95
70
17
8

Relative error
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.175: Results of benchmark 3-15a, Horizontal modulus of subgrade reaction and
bearing capacities

Benchmark

kh

Pv;e
3

[kN/m ]
2970
3699
15130
16398
10278
767
1212
4105

v1
v2
v3
v4
v5
v6
v7
v8

D-G EO P IPELINE

Ph;e
2

[kN/m ]
64
261
1622
1433
733
615
52
363

kh
2

[kN/m ]
36
59
448
416
234
15
23
53

Pv;e
3

[kN/m ]
2970
3699
15130
16407
10301
774
1217
4095

Relative error

Ph;e
2

[kN/m ]
64
261
1622
1433
733
615
52
363

2

[kN/m ]
36
59
448
416
234
16
23
53

kh

Pv;e

Ph;e

[%]
0.00
0.00
0.00
0.05
0.22
0.9
0.41
0.24

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
6.25
0.00
0.00

Table 3.176: Results of benchmark 3-15a, Vertical moduli of subgrade reaction upward

Benchmark

v1
v2
v3
v4
v5
v6
v7
v8

D-G EO P IPELINE

Relative error

kv;top1

kv;top2

kv;top1

kv;top2

kv;top1

kv;top2

[kN/m3 ]
1
37
158782
734587
129440
3080
76
12

[kN/m3 ]
6
85
231275
945256
172065
4265
170
57

[kN/m3 ]
1
37
158781
735567
129743
3084
76
12

[kN/m3 ]
6
85
231274
946483
172460
4270
170
57

[%]
0.00
0.00
0.00
0.13
0.23
0.13
0.00
0.00

[%]
0.00
0.00
0.00
0.13
0.23
0.12
0.00
0.00

Table 3.177: Results of benchmark 3-15a, Vertical moduli of subgrade reaction downward

Benchmark

v1
v2
v3
v4
v5
v6
v7
v8

D-G EO P IPELINE

Relative error

kv;bot1

kv;bot2

kv;bot1

kv;bot2

kv;bot1

kv;bot2

[kN/m3 ]
1621
7876
39240
55098
31184
29860
812
3695

[kN/m3 ]
324
1575
7848
11020
6237
5972
162
591

[kN/m3 ]
1621
7876
39240
55116
31186
29863
813
3692

[kN/m3 ]
324
1575
7848
11023
6237
5973
163
591

[%]
0.00
0.00
0.00
0.03
0.01
0.01
0.12
0.08

[%]
0.00
0.00
0.00
0.03
0.00
0.02
0.61
0.00

Deltares

73 of 126

D-G EO P IPELINE, Verification Report

Table 3.178: Results of benchmark 3-15a, Maximal axial friction and displacements

Benchmark

v1
v2
v3
v4
v5
v6
v7
v8

D-G EO P IPELINE

Relative error

tmax

dv

dmax

tmax

dv

dmax

tmax

dv

dmax

[kN/m2 ]
19.76
7.09
12.59
11.03
9.6
11.11
14.05
25.53

[mm]
5
10
20
40
80
60
50
35

[mm]
12
15
2
2
5
15
15
12

[kN/m2 ]
24
7
13
11
10
11
14
26

[mm]
5
10
20
40
80
60
50
35

[mm]
12
15
2
2
5
15
15
12

[%]
16.67
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.179: Results of benchmark 3-15a, Uplift check

Benchmark
Vertical
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

fcalc

freq

fcalc

freq

fcalc

freq

[-]
2.14
3.18
9.77
14.09
12.04
10.34
4.38
999

[-]
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15

[-]
2.14
3.18
9.77
14.1
12.04
10.34
4.38
999

[-]
1.15
1.15
1.15
1.15
1.15
1.15
1.15
1.15

[%]
0.00
0.00
0.00
0.07
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.180: Results of benchmark 3-15a, Hydraulic heave check

Benchmark
Vertical
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

fcalc

freq

fcalc

freq

fcalc

freq

[-]
1.89
1.68
100
100
1.11
1.36
1.58
1.89

[-]
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

[-]
1.89
1.68
100
100
1.11
1.36
1.58
1.89

[-]
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input files bm3-15a.dri until bm3-15f to run this benchmark.
3.16

3.16.1

Trenching (3 sections) – 3D geometry in four layers – Drainage border above
compressible border
Description
The same input values as benchmark 3-15 (section 3.15) are used, only the positions of the
boundaries between compressible/incompressible layers and drained/undrained layers have

74 of 126

Deltares

Group 3: Benchmarks from spreadsheets

been turned around. This modification will only have an influence on the hydraulic heave
check.
3.16.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Operation Parameters
The safety factors for hydraulic heave are determined using the formulas given in chapter
“Trench” in the Background section of the User Manual of D-G EO P IPELINE. Intermediate results are given in the table below.
Table 3.181: Analytical results for the hydraulic heave check

v1
v2
v3
v4
v5
v6
v7
v8

3.16.3

a

b

d2;d

fBous

[m]
2.6
4
8.7
12.1
10.8
9.4
10.2
6.1

[m]
0.28
0.28
0.28
0.2
0.2
0.2
0.35
0.35

[m]
0.48
-0.21
-2.27
-1.77
-1.01
-0.25
0.64
1.98

[-]
0.04
0
-0.13
-0.08
-0.04
0
0.02
0.15

σv
24.3
24.3
27.8
30.7
34.9
39.1
43.4
47.6

σbot

Wbot

16.6
28.2
71.9
64.7
54.1
44
33.1
16.7

[kN/m2 ]
7.7
16.6
-3.9
28.2
-44
71.9
-34.1 64.7
-19.2 54.1
-4.8
44
10.3
33.1
30.9
16.7

Wtop

Ww
10.2
17.1
38.5
34.1
27.4
20.7
12.7
0.2

uopw

ϕ

f

16.5
16.5
16.8
17.1
17.6
18
18.6
19.1

[m]
-0.4
-0.4
-0.4
-0.4
-0.5
-0.5
-0.6
-0.6

[-]
1.1
100
100
100
100
100
1.3
1.8

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.182: Results of benchmark 3-16, Hydraulic heave check

Benchmark
Vertical
[-]
1
2
3
4
5
6
7
8

D-G EO P IPELINE

Relative error

fcalc

freq

fcalc

freq

fcalc

freq

[-]
1.13
100
100
100
100
100
1.27
1.76

[-]
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

[-]
1.13
100
100
100
100
100
1.26
1.75

[-]
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.79
0.57

[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-16.dri to run this benchmark.
3.17

Bundled pipeline with Special Stress Analysis

Deltares

75 of 126

D-G EO P IPELINE, Verification Report

3.17.1

Description
The same input data’s as for benchmark 3-9 (section 3.9) are used except that calculations
are performed using the Special Stress Analysis calculation which means that the maximum
modulus of subgrade reaction and the maximum reduced soil load are input values instead of
calculated values: kV;max = 45000 kN/m3 , qn;max = 0.14 N/mm2 and R = 700 m.

3.17.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation for bundled pipelines
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in the
Background section of the User Manual of D-G EO P IPELINE. The properties of the equivalent
pipe are:
D0;eq
[mm]
1284.11
dn;eq
[mm]
41.16
γeq
[kN/m3 ]
58.92
Ieq
[m4 ]
0.031073
Eeq
[N/mm2 ] 74520.87
kV;max;eq
[kN/m3 ]
45000
The total pulling force is the contribution of five components. Results are given in the tables
below for the equivalent pipeline and for each single pipelines.
Table 3.183: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for the equivalent pipe

Charac.
point
1
2
3
4
5
6
7
8
9
10

76 of 126

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
3887.97
3794.48
3153.74
3010.56
2479.76
2216.29
1078.88
758.48
161.33
0

[kN]
0
103.16
0
157.99
0
290.72
0
353.53
0
178.02

[kN]
0
0
707.01
0
1320.17
0
1769.18
0
658.9
0

[kN]
0
0
395.49
0
565.97
0
1028.93
0
489.65
0

[kN]
0
0
296.1
0
0
0
0
0
427.18
0

Total
[kN]
3887.97
3897.64
4655.49
4670.3
6025.65
6052.89
7713.58
7746.72
8725.31
8742

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.184: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for pipe nr. 1

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2.6
2.54
2.11
2.02
1.66
1.48
0.72
0.51
0.11
0

[kN]
0
2.6
0
3.98
0
7.33
0
8.92
0
4.49

[kN]
0
0
17.83
0
14.77
0
31.65
0
16.62
0

[kN]
0
0
0
0
3.66
0
10.66
0
0
0

[kN]
0
0
1.53
0
0
0
0
0
8.25
0

Total
[kN]
2.6
5.14
24.08
27.97
46.05
53.2
94.76
103.46
127.93
132.31

Table 3.185: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for pipe nr. 2

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
430.7
420.34
349.36
333.5
274.7
245.52
119.52
84.02
17.87
0

[kN]
0
19.57
0
29.98
0
55.16
0
67.08
0
33.78

[kN]
0
0
134.16
0
121.3
0
245.27
0
125.03
0

[kN]
0
0
5.47
0
61.84
0
119.69
0
6.78
0

[kN]
0
0
34.54
0
0
0
0
0
66.17
0

Total
[kN]
430.7
439.92
543.11
557.23
681.57
707.55
946.51
978.1
1109.92
1125.83

Table 3.186: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for pipe nr. 3

Charac.
point
1
2
3
4
5
6
7
8
9
10

Deltares

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
164.16
160.21
133.16
127.11
104.7
93.58
45.55
32.03
6.81
0

[kN]
0
27.49
0
42.1
0
77.47
0
94.21
0
47.44

[kN]
0
0
188.42
0
156.75
0
334.93
0
175.59
0

[kN]
0
0
0.36
0
49.67
0
124.74
0
0.44
0

[kN]
0
0
23.73
0
0
0
0
0
88.28
0

Total
[kN]
164.16
187.7
373.16
409.21
593.22
659.57
1071.21
1151.9
1391
1431.63

77 of 126

D-G EO P IPELINE, Verification Report

Table 3.187: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for pipe nr. 4

Charac.
point
1
2
3
4
5
6
7
8
9
10

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
456.95
445.96
370.66
353.83
291.44
260.48
126.8
89.14
18.96
0

[kN]
0
32.68
0
50.04
0
92.09
0
111.98
0
56.39

[kN]
0
0
223.95
0
226.19
0
426.01
0
208.71
0

[kN]
0
0
21.9
0
86.34
0
186.06
0
27.12
0

[kN]
0
0
44.09
0
0
0
0
0
110.78
0

Total
[kN]
456.95
478.64
693.27
726.49
976.64
1037.76
1516.16
1590.48
1866.91
1904.33

Table 3.188: Analytical results for the calculation of the five components of the pulling
force for the 10 characteristic points (bm3-17) for pipe nr. 5

Charac.
point
1
2
3
4
5
6
7
8
9
10

3.17.3

Length
[m]
0
43.04
338
403.91
648.25
769.54
1293.14
1440.63
1715.52
1789.79

T1

T2

T3a

T3b

T3c

[kN]
2833.56
2765.42
2298.45
2194.1
1807.25
1615.24
786.29
552.78
117.58
0

[kN]
0
76.94
0
117.84
0
216.84
0
263.69
0
132.78

[kN]
0
0
527.34
0
1108.12
0
1405.99
0
491.46
0

[kN]
0
0
361.45
0
437.14
0
808.45
0
447.51
0

[kN]
0
0
221.71
0
0
0
0
0
330.13
0

Total
[kN]
2833.56
2842.36
3485.89
3499.38
4657.8
4682.62
6068.11
6098.3
6932.19
6947.39

D-G EO P IPELINE results
A Special Stress Analysis calculation must be performed by selecting Special Stress Analysis
for the Start menu. D-G EO P IPELINE results can be found in the Report.
Table 3.189: Results of benchmark 3-17, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

78 of 126

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
1414
1086
328

D-G EO P IPELINE
1415
1086
328

Error [%]
0.07
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.190: Results of benchmark 3-17, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
3887.97
43.04
3897.64
338
4655.49
1440.63 7746.72
1715.52 8725.31
1789.79 8742
4

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
3887.97
43.04
3897.64
338
4655.49
1440.63 7746.72
1715.52 8725.31
1789.79 8742
4

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-17.dri to run this benchmark.
3.18

3.18.1

HDD with 3D geometry – Pipeline configuration not ending at surface and with an
angle between radii
Description
The same input values as benchmark 3-1 (section 3.1) are used, only the pipeline configuration is slightly different: the configuration is not ending at surface but 5 meters below the
surface and an angle between the radii is present. Two cases are checked:

 Case A (bm3-18a): the angle between the radii is positive;
 Case B (bm3-18b): the angle between the radii is negative.
The configuration of the pipeline is given by:
Xleft
10 m
X-coordinate of the left entry point
Yleft
10 m
Y-coordinate of the left entry point
Zleft
0m
Z-coordinate of the left entry point
Xright
690 m
X-coordinate of the right exit point
Yright
-30 m
Y-coordinate of the right exit point
Zright
-5 m
Z-coordinate of the right exit point
◦
ϕleft
13
Left angle of the pipe
ϕright
15◦
Right angle of the pipe
Zbottom -50 m
Lowest level of the pipe
α
±2◦
Angle of pipe between radii
Rleft
600 m
Bending radius of the pipe at the left side
Rright
800 m
Bending radius of the pipe at the right side
Rrol
1000 m Bending radius in pipe string (on rollers)
3.18.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. The position of the six characteristic points of the pipeline configuration is represented in Figure 3.5 and Figure 3.6. Their
coordinates are given in the tables below.

Deltares

79 of 126

D-G EO P IPELINE, Verification Report

Table 3.191: Position of the 6 characteristic points (bm3-18a) for case a (positive angle
between radii)

Point
1
2
3
4
5
6

L-coord.
[m]
10
161.55
317.46
350.59
441.52
620.66

X-coord.
[m]
10
161.29
316.93
350
440.78
619.6

Z-coord.
[m]
0
-34.99
-50
-48.84
-45.67
-18.9

Traject length
[m]
0
155.534
312.614
345.764
436.752
618.266

Table 3.192: Position of the 6 characteristic points (bm3-18b) for case b

Point
1
2
3
4
5
6

L-coord.
[m]
10
144.81
258.84
350.59
369.51
604.49

X-coord.
[m]
10
144.57
258.41
350
368.89
603.46

Z-coord.
[m]
0
-31.12
-46.14
-49.34
-50
-23.23

Traject length
[m]
0
138.353
253.545
345.35
364.287
601.652

Figure 3.5: Locations of the characteristic points T1 to T6 for case A (positive angle between radii)

80 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Figure 3.6: Locations of the characteristic points T1 to T6 for case B (negative angle
between radii)

3.18.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Dumpfile.
Table 3.193: Results of benchmark 3-18a, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
284.5
155.53
284.01
312.61
471.53
436.75
471.14
618.27
620.94
691.27
620.71
5188

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
284.5
155.53
284.01
312.61
471.53
436.75
471.14
618.27
620.94
691.27
620.71
5188

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.194: Results of benchmark 3-18b, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Deltares

Benchmark
Length
Force
[m]
[kN]
0
284.55
138.35
284.11
253.54
465.66
364.29
465.31
601.65
622.87
691.4
622.58
5187

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
284.55
138.35
284.11
253.55
465.66
364.29
465.31
601.65
622.87
691.4
622.59
5187

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

81 of 126

D-G EO P IPELINE, Verification Report

Use D-G EO P IPELINE input files bm3-18a.dri and bm3-18b.dri to run this benchmark.
3.19
3.19.1

HDD with 2D geometry – Stress Analysis per Vertical – Steel pipe
Description
The same sub-soil as benchmark 3-7 (section 3.7) is used, with a simple pipeline configuration as shown in Figure 3-7. A stress analysis per vertical is performed using 3 verticals at
L = 70 m, L = 200 m and L = 1600 m.

Figure 3.7: Locations of the characteristic points (T1 to T6) and the 3 verticals

3.19.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Soil mechanical data
The soil mechanical data’s are determined using the formulas given in chapter “Calculation of
soil mechanical data” in the Background section of the User Manual of D-G EO P IPELINE.
Strength calculation
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. For the radius, the following
values are used for each vertical:

 Vertical 1, situated in the first (left) descending straight part: R = 100 000 000 m;
 Vertical 2, situated in the left curved part: R = 1300 m;
 Vertical 3, situated in the right curved part: R = 1050 m.

82 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.19.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.195: Results of benchmark 3-19, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
2297
1288
1009

D-G EO P IPELINE
2297
1288
1009

Error [%]
0.00
0.00
0.00

Table 3.196: Results of benchmark 3-19, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
4532
43
4622
338
6477
1410
8730
1685
11136
1759
11292
36460

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
4532
43
4622
338
6477
1410
8730
1685
11136
1759
11292
36460

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.197: Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
304
49
353
353

D-G EO P IPELINE
304
49
353
353

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.198: Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
123
123
0.000065
0
0
0
123

D-G EO P IPELINE
0
123
123
0.000065
0
0
0
123

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

83 of 126

D-G EO P IPELINE, Verification Report

Table 3.199: Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 2

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σpy
σpx
σptest
σpm

Benchmark
15
8
23
13

D-G EO P IPELINE
15
8
23
13

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.200: Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 3

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σa;max
σqr
σqn
σt;max
σV;max

Benchmark
0
0
0
0
0
0

D-G EO P IPELINE
0
0
0
0
0
0

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.201: Results of benchmark 3-19 for vertical nr. 1, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
0
18
9
23
25
9
0
0
16

D-G EO P IPELINE
0
18
9
23
25
9
0
0
16

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.202: Results of benchmark 3-19 for vertical nr. 1, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
173.91
153.85
169.23
261.54
n.a.
n.a.

D-G EO P IPELINE
173.91
153.85
169.23
261.54
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.203: Results of benchmark 3-19 for vertical nr. 1, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

84 of 126

Unit
[mm]
[mm]
[mm]

Benchmark
0
255
120

D-G EO P IPELINE
0
255
120

Rel. error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.204: Results of benchmark 3-19 for vertical nr. 1, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Table 3.205: Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
304
49
353
353

D-G EO P IPELINE
304
49
353
353

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.206: Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
187
123
309
0.000174
0.05052
20
20
320

D-G EO P IPELINE
187
123
309
0.000174
0.05052
20
20
320

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.207: Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
15
8
23
13

D-G EO P IPELINE
15
8
23
13

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.208: Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
187
187
20
65
85
241

D-G EO P IPELINE
187
187
20
65
85
241

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

85 of 126

D-G EO P IPELINE, Verification Report

Table 3.209: Results of benchmark 3-19 for vertical nr. 2, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
187
18
9
23
25
196
20
65
239

D-G EO P IPELINE
187
18
9
23
25
196
20
65
239

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.210: Results of benchmark 3-19 for vertical nr. 2, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
173.91
153.85
169.23
261.54
n.a.
n.a.

D-G EO P IPELINE
173.91
153.85
169.23
261.54
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.211: Results of benchmark 3-19 for vertical nr. 2, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
6.1
255
120

D-G EO P IPELINE
6.1
255
120

Rel. error [%]
0.00
0.00
0.00

Table 3.212: Results of benchmark 3-19 for vertical nr. 2, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Table 3.213: Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

86 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
304
49
353
353

D-G EO P IPELINE
304
49
353
353

Rel. error [%]
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.214: Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
231
123
354
0.000167
0.0578
23
23
366

D-G EO P IPELINE
231
123
354
0.000167
0.0578
23
23
366

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.215: Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
15
8
23
13

D-G EO P IPELINE
15
8
23
13

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.216: Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
231
231
23
95
117
307

D-G EO P IPELINE
231
231
23
95
117
307

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.217: Results of benchmark 3-19 for vertical nr. 3, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
231
18
9
23
25
240
23
95
304

D-G EO P IPELINE
231
18
9
23
25
240
23
95
304

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

87 of 126

D-G EO P IPELINE, Verification Report

Table 3.218: Results of benchmark 3-19 for vertical nr. 3, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
173.91
153.85
169.23
261.54
n.a.
n.a.

D-G EO P IPELINE
173.91
153.85
169.23
261.54
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.219: Results of benchmark 3-19 for vertical nr. 3, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
8.2
255
120

D-G EO P IPELINE
8.2
255
120

Rel. error [%]
0.00
0.00
0.00

Table 3.220: Results of benchmark 3-19 for vertical nr. 3, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-19.dri to run this benchmark.
3.20
3.20.1

HDD with 3D geometry – Stress Analysis per Vertical – PE pipe
Description
The same input as for benchmark 3-10 (section 3.10) is used except that a stress analysis per
vertical instead of a standard analysis is performed using 3 verticals at L = 60 m, L = 170 m
and L = 1000 m and only one synthetic pipe (PE 80) is used.

3.20.2

Analytical results
Analytical results are worked out in an Excel spreadsheet.
Strength calculation for bundled pipelines
For the buoyancy control, the pulling forces in the pipeline and the strength calculation, calculations are performed using the formulas given in chapter “Strength pipeline calculation” in
the Background section of the User Manual of D-G EO P IPELINE. For the radius, the following
values are used for each vertical:

 Vertical 1, situated in the first (left) descending straight part: R = 100 000 000 m;
 Vertical 2, situated in the left curved part: R = 1300 m;
 Vertical 3, situated in the second bending: R = 1000.008 m.

88 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.20.3

D-G EO P IPELINE results
D-G EO P IPELINE results presented in the tables below can be found in the Report.
Table 3.221: Results of benchmark 3-20, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
653
166
488

D-G EO P IPELINE
654
166
488

Error [%]
0.15
0.00
0.00

Table 3.222: Results of benchmark 3-20, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
582
43
669
338
1353
1410
3510
1685
4387
1759
4537
897

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
582
43
669
338
1353
1410
3510
1685
4387
1759
4537
897

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.223: Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1
6
6
n.a.

D-G EO P IPELINE
1
6
6
n.a.

Rel. error [%]
0.00
0.00
0.00

Table 3.224: Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
45
45
0.000398
0
0
0
n.a.

D-G EO P IPELINE
0
45
45
0.000398
0
0
0
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

89 of 126

D-G EO P IPELINE, Verification Report

Table 3.225: Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 2

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σpy
σpx
σptest
σpm

Benchmark
5
2
7
4

D-G EO P IPELINE
5
2
7
4

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.226: Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 3

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σa;max
σqr
σqn
σt;max
σV;max

Benchmark
0
0
0
0
0
n.a.

D-G EO P IPELINE
0
0
0
0
0
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

Table 3.227: Results of benchmark 3-20 for vertical nr. 1, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
0
5
2
7
0
2
0
0
n.a.

D-G EO P IPELINE
0
5
2
7
0
2
0
0
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.228: Results of benchmark 3-20 for vertical nr. 1, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
6.4
5.04
n.a.
n.a.
6.4
5.04

D-G EO P IPELINE
6.4
5.04
n.a.
n.a.
6.4
5.04

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.229: Results of benchmark 3-20 for vertical nr. 1, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

90 of 126

Unit
[mm]
[mm]
[mm]

Benchmark
0
64
44.8

D-G EO P IPELINE
0
64
44.8

Rel. error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.230: Results of benchmark 3-20 for vertical nr. 1, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
297
30
0
0

D-G EO P IPELINE
297
30
0
0

Error
0.00
0.00
0.00
0.00

Table 3.231: Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1
6
6
n.a.

D-G EO P IPELINE
1
6
6
n.a.

Rel. error [%]
0.00
0.00
0.00

Table 3.232: Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
45
45
0.001125
0.00313
0
0
n.a.

D-G EO P IPELINE
0
45
45
0.001125
0.00313
0
0
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.233: Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
5
2
7
4

D-G EO P IPELINE
5
2
7
4

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.234: Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
0
0
4
3
n.a.

D-G EO P IPELINE
0
0
0
4
3
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

91 of 126

D-G EO P IPELINE, Verification Report

Table 3.235: Results of benchmark 3-20 for vertical nr. 2, Strength calculation for Combination 4

Result

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Benchmark
0
5
2
7
0
2
0
4
n.a.

D-G EO P IPELINE
0
5
2
7
0
2
0
4
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.236: Results of benchmark 3-20 for vertical nr. 2, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
6.4
5.04
n.a.
n.a.
6.4
5.04

D-G EO P IPELINE
6.4
5.04
n.a.
n.a.
6.4
5.04

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.237: Results of benchmark 3-20 for vertical nr. 2, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
32.6
64
44.8

D-G EO P IPELINE
33
64
44.8

Rel. error [%]
1.22699386503067
0.00
0.00

Table 3.238: Results of benchmark 3-20 for vertical nr. 2, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
297
30
0
0

D-G EO P IPELINE
297
30
0
0

Error
0.00
0.00
0.00
0.00

Table 3.239: Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

92 of 126

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1
6
6
n.a.

D-G EO P IPELINE
1
6
6
n.a.

Rel. error [%]
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.240: Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1
45
45
0.000994
0.00302
0
0
n.a.

D-G EO P IPELINE
1
45
45
0.000994
0.00302
0
0
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.241: Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
5
2
7
4

D-G EO P IPELINE
5
2
7
4

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.242: Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
0
0
4
3
n.a.

D-G EO P IPELINE
0
0
0
4
3
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00

Table 3.243: Results of benchmark 3-20 for vertical nr. 3, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0
5
2
7
0
2
0
4
n.a.

D-G EO P IPELINE
0
5
2
7
0
2
0
4
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

93 of 126

D-G EO P IPELINE, Verification Report

Table 3.244: Results of benchmark 3-20 for vertical nr. 3, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
6.4
5.04
n.a.
n.a.
6.4
5.04

D-G EO P IPELINE
6.4
5.04
n.a.
n.a.
6.4
5.04

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.245: Results of benchmark 3-20 for vertical nr. 3, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
36.6
64
44.8

D-G EO P IPELINE
37
64
44.8

Rel. error [%]
1.09289617486339
0.00
0.00

Table 3.246: Results of benchmark 3-20 for vertical nr. 3, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
297
30
0
0

D-G EO P IPELINE
297
30
0
0

Error
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-20.dri to run this benchmark.
3.21
3.21.1

HDD – Determination of the minimum allowable radius
Description
This benchmark checks the determination of the minimum allowable radius in two cases:

 Case A (bm3-21a): 4 different steel pipes with a diameter of 399, 400, 401 and 2000 mm
are tested;

 Case B (bm3-21b): 20 different PE pipes with a diameter of 63, 100, 160, 180, 200, 225,
250, 290, 315, 335, 355, 380, 400, 500, 630, 680, 710, 760, 800 and 1000 mm are tested.

94 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Case A
In case A, two bending radius are present: a radius of 1750 m at the left and 500 m at the
right as shown in Figure 3.8.

Figure 3.8: Geometry of benchmark 3-21a

The soil properties of the different are given in Table 3.247.

Deltares

95 of 126

D-G EO P IPELINE, Verification Report

Table 3.247: Properties of the different layers in benchmark 21a

Name
Dense sand Phi 35
Stiff clay Phi 22.5
Dense sand Phi 32.6
Stiff clay Phi 21
Med dense sand Phi 35
Stiff clay Phi 20
Med dense sand Phi 32.5
Stiff clay Phi 17.1
Med dense sand Phi 30.1
Med stiff clay Phi 22.5
Loose sand Phi 30
Med stiff clay Phi 21
Loose sand Phi 25.1
Med stiff clay Phi 20
Stiff sandy clay Phi 30
Med stiff clay Phi 17.1
Stiff sandy clay Phi 25
Soft clay Phi 20
Stiff sandy clay Phi 22.6
Soft clay Phi 17.1
Clayey sand Phi 25
Organic clay Phi 17
Clayey sand Phi 22.6
Organic clay Phi 16

Soil type
Dense sand
Stiff clay
Dense sand
Stiff clay
Med dense sand
Stiff clay
Med dense sand
Stiff clay
Med dense sand
Med stiff clay
Loose sand
Med stiff clay
Loose sand
Med stiff clay
Stiff sandy clay
Med stiff clay
Stiff sandy clay
Soft clay
Stiff sandy clay
Soft clay
Clayey sand
Organic clay
Clayey sand
Organic clay

c
[kN/m2 ]
1
15
0.5
10.1
0.6
15
2
10.1
0.6
10
1
7
0.1
10
1.1
5.1
5.1
5
12
3
5
15
4
30

ϕ
◦

[ ]
35
22.5
32.6
21
35
20
32.5
17.1
30.1
22.5
30
21
25.1
20
30
17.1
25
20
22.6
17.1
25
17
22.6
16

Top level
[m]
0
-1
-2
-4
-6
-8
-10
-12
-14
-16
-18
-20
-22
-24
-26
-28
-30
-32
-34
-36
-38
-40
-42
-44

Constant C
[-]
9400
10500
9400
10500
9400
10500
9400
10500
9400
11500
10500
11500
10500
11500
10500
11500
10500
12500
10500
12500
10500
12500
10500
12500

Case B
In case B, four bending radius are present as shown in Figure 3.9.

96 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Figure 3.9: Geometry of benchmark 3-21b

3.21.2

Analytical results
Case A: Allowable curve radius for steel pipes
The minimum allowable radius for steel pipes is:
R ≥ 1000 √
× D0
for small pipe diameter (D0 ≤ 0.4 m)
R ≥ C × D0 × dn
for large pipe diameter (D0 > 0.4 m)
where C is a constant (without dimension) depending on the soil type as shown in Table 3.248.
Table 3.248: Values of constant C (according to table E.1 of NEN 3650-1 (NEN, 2012a))

Soil type
Dense packed sand
Moderate packed sand
Loose packed sand
Stiff clay
Medium stiff clay
Soft clay and peat

Constant C [-]
8500
9400
10200
10500
11500
12500

In D-G EO P IPELINE, the soil type is a function of the cohesion and the friction angle of the soil,
as shown in Table 3.249.

Deltares

97 of 126

D-G EO P IPELINE, Verification Report

Table 3.249: Soil type as a function of the cohesion and the friction angle

Soil type
Dense sand
Medium dense sand
Medium dense sand
Loose sand
Stiff sandy clay
Stiff sandy clay
Clayey sand
Stiff clay
Medium stiff clay
Stiff clay
Medium stiff clay
Soft clay
Peat /organic clay

ϕ [◦ ]
ϕ > 32.5
ϕ > 32.5
30 < ϕ ≤ 32.5
25 < ϕ ≤ 30
25 < ϕ ≤ 30
22.5 < ϕ ≤ 25
22.5 < ϕ ≤ 25
20 < ϕ ≤ 22.5
20 < ϕ ≤ 22.5
17 < ϕ ≤ 20
17 < ϕ ≤ 20
17 < ϕ ≤ 20
ϕ ≤ 17

c [kN/m2 ]
c ≤ 0.5
c > 0.5
c≤1
c>1
c>5
c≤5
c > 10
c ≤ 10
c > 10
5 < c ≤ 10
c≤5

Constant C [-]
8500
9400
9400
10200
10500
10200
10500
10500
11500
10500
11500
12500
12500

In the case of a layered sub-soil, the highest C-value of a layer with a significant thickness is
normative. In the case of a sub-soil with an alternation of layers with relative small thicknesses,
a weighted interpolation can be performed to determine the C-value:

Cd =

n 
X
i=1

Ci ×

di
dtotal


where dtotal =

n
X

di

(3.7)

i=1

in which:
n
Total number of layers in the curve [-]
Ci
C-value of layer i [-]
di
Thickness of layer i [m]
dtotal Total thickness of all layers in the curve [m]
Case B: Allowable curve radius for polyethylene pipes
According to article 8.6.4 of NEN 3650-3 (NEN, 2012c), the minimal curve-radius for PE pipes
is equal to the bending factor as given in Table 3.250 times the diameter.
Table 3.250: Bending factor (acc. to table 6 of NEN 3650-3)

Diameter in mm
63 → 160
200 → 250
315 → 355
400 → 630
710 → 800

98 of 126

Bending factor
50
75
100
100
125

Deltares

Group 3: Benchmarks from spreadsheets

3.21.3

D-G EO P IPELINE results
The check for the minimum curve radius is performed in D-G EO P IPELINE by means of warning
messages appearing when starting a calculation, as shown in Figure 3.10 and Figure 3.11.

Figure 3.10: Warning message displayed for benchmark 3-21a

Deltares

99 of 126

D-G EO P IPELINE, Verification Report

Figure 3.11: Warning message displayed for benchmark 3-21b

Table 3.251: Results of benchmark 3-21a, Allowable minimum radius for steel pipes

Pipe
R [m] →
399 mm
400 mm
401 mm
2000 mm

100 of 126

Benchmark
1750
398
[m]
[m]
399
399
1631
2195
1633
2197
3647
4907

D-G EO P IPELINE
1750
398
[m]
[m]
399
1000
1002
2082
2237

Error [%]
1750
398
[%]
[%]
0
119.5
119.26
75.17
119.36

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.252: Results of benchmark 3-21b, Allowable minimum radius for PE pipes

R [m] →
63 mm
100 mm
160 mm
180 mm
200 mm
225 mm
250 mm
290 mm
315 mm
335 mm
355 mm
380 mm
400 mm
500 mm
630 mm
680 mm
710 mm
760 mm
800 mm
1000 mm

3
[m]
3
5
8
14
15
17
19
29
32
34
36
38
40
50
63
85
89
95
100
125

Benchmark
15
20
70
[m]
[m]
[m]

15
17
19
29
32
34
36
38
40
50
63
85
89
95
100
125

29
32
34
36
38
40
50
63
85
89
95
100
125

85
89
95
100
125

D-G EO P IPELINE
3
15
20
70
[m]
[m]
[m]
[m]
3
5
8
14
15
15
17
17
19
19
29
29
29
32
32
32
34
34
34
36
36
36
38
38
38
40
40
40
50
50
50
63
63
63
85
85
85
85
89
89
89
89
95
95
95
95
100 100 100 100
125 125 125 125

3
[%]
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Error [%]
15
20
[%] [%]

70
[%]

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0

Use D-G EO P IPELINE input files bm3-21a.dri and bm3-21b.dri to run this benchmark.
3.22
3.22.1

HDD – PE pipe not filled with water on rollers
Description
This benchmark checks the effect of not-filling the pipe on rollers with water. The same input
data’s as for benchmark 3-3 (section 3.3) are used except that the option Pipe filled with water
on rollers is unchecked. This should have an influence on the calculation of T1 , the pulling
force due to friction of the pipeline on the roller-lane.

3.22.2

Analytical results
The pulling force due to friction of the pipeline on the roller-lane is:

T1 = f1 × Lrol × g

(3.8)

where g = gpipe = 1.069 N/mm is the weight of the pipe on roller, without water filling, whereas
for benchmark 3-3 (pipe filled with water on rollers) this weight is equal to:
g = gpipe + gfill =1.069 + 0.391= 1.460 N/mm.
Analytical results are worked out in an Excel spreadsheet. Results are given in the table
below.

Deltares

101 of 126

D-G EO P IPELINE, Verification Report

Table 3.253: Analytical results for the calculation of the five components of the pulling
force for the six characteristic points

Charac.
point
1
2
3
4
5
6

3.22.3

Length
[m]
0
153.91
290.04
393.19
602.62
690.49

T1

T2

T3a

T3b

T3c

[kN]
73.82
57.37
42.81
31.79
9.39
0

[kN]
0
144.61
0
45.17
0
82.55

[kN]
0
0
127.91
0
196.78
0

[kN]
0
0
5.72
0
4.29
0

[kN]
0
0
14.54
0
31.33
0

Total
[kN]
73.82
201.97
335.59
421.47
631.48
704.64

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.254: Results of benchmark 3-22, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
73.82
153.91
201.97
290.04
335.59
393.19
421.47
602.62
631.48
690.49
704.64
829

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
73.82
153.91
201.98
290.05
335.59
393.19
421.47
602.63
631.48
690.49
704.64
829

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-22.dri to run this benchmark.
3.23
3.23.1

HDD – PE pipe always filled (100%) – Implosion
Description
This benchmark checks the effect of completely filling the pipe with fluid during pull back. The
same input data’s as for benchmark 3-3 (section 3.3) are used except that the part of the pipe
filled with fluid during pull back is 100% instead of 10%. This should have an influence on the
calculation of the effective weight of the pipe (and the the pulling forces) and on the internal
pressure during implosion check.

102 of 126

Deltares

Group 3: Benchmarks from spreadsheets

3.23.2

Analytical results
The weight of the filling with fluid is equal to:
gfill = 100% ×γw × Ainw = 3.906 N/mm
whereas for benchmark 3-3 (pipe filled with 10% fluid) this weight is equal to:
gfill = 0.3906 N/mm.
This will therefore have an infuence on the pulling forces. Analytical results are worked out in
an Excel spreadsheet. Results are given in Table 3.255.
Table 3.255: Analytical results for the calculation of the five components of the pulling
force for the six characteristic points

Charac.
point
1
2
3
4
5
6

Length
[m]
0
153.91
290.04
393.19
602.62
690.49

T1

T2

T3a

T3b

T3c

[kN]
343.52
266.95
199.22
147.91
43.71
0

[kN]
0
36.4
0
11.37
0
20.78

[kN]
0
0
32.2
0
49.53
0

[kN]
0
0
5.72
0
4.29
0

[kN]
0
0
12.39
0
10.89
0

Total
[kN]
343.52
303.35
285.93
259.01
219.53
196.6

During implosion check, the internal pressure due to complete filling is not nil but equal to:

Pfilling = γfluid × [min (Zleft ; Zright ) − Zbottom ]

(3.9)

This leads to: Pfilling = 12 × (0 + 50) = 600 kN/m2 .
3.23.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.256: Results of benchmark 3-23, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
553
497
55

D-G EO P IPELINE
553
498
55

Error [%]
0.00
0.20
0.00

Table 3.257: Results of benchmark 3-23, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Deltares

Benchmark
Length
Force
[m]
[kN]
0
343.52
153.91
303.35
290.04
285.93
393.19
259.01
602.62
219.53
690.49
196.6
829

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
343.52
153.91
303.35
290.05
285.93
393.19
259.01
602.63
219.53
690.49
196.6
829

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

103 of 126

D-G EO P IPELINE, Verification Report

Table 3.258: Results of benchmark 3-23, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
396.55
39.66
600
600

D-G EO P IPELINE
396.55
39.66
600
600

Error
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-23.dri to run this benchmark.
3.24
3.24.1

HDD with 2D geometry – Effect of traffic loads
Description
This benchmark checks the effect of two traffic loads on the stress analysis. The same input
data’s as for benchmark 3-1 (section 3.1) are used except that the Z co-ordinates of the top
of the layers and the pipe configuration are divided by 10 in order to optimize the effect of the
traffic load. The new geometry is given in Figure 3.12. The traffic loads have the following
properties:
Traffic Load 1:
X co-ordinate at start
X co-ordinate at end
Load type
Traffic Load 2:
X co-ordinate at start
X co-ordinate at end
Load type

0m
110 m
Graph I
600 m
700 m
Graph II

Figure 3.12: Geometry of benchmark 3-12 with 2 traffic loads

3.24.2

Analytical results
According to article C.5.1 from NEN 3650-1 (NEN, 2012a), the traffic load qv is given by
Figure 3.13, for both types of load and for four diameters: 200, 600, 1000 and 1600 mm.

104 of 126

Deltares

Group 3: Benchmarks from spreadsheets

Intermediary diameters are lineary interpolated. D-G EO P IPELINE uses the following formulas
to convert this figure into numbers:










For Graph I,
For Graph I,
For Graph I,
For Graph I,
For Graph II,
For Graph II,
For Graph II,
For Graph II,

200 mm: qv = 53.988 ×Z −1.058
600 mm: qv = 51.403 ×Z −1.016
1000 mm: qv = 46.522 ×Z −0.94
1600 mm: qv = 39.448 ×Z −0.804
200 mm: qv = 31.716 ×Z −1.457
600 mm: qv = 29.501 ×Z −1.4
1000 mm: qv = 26.776 ×Z −1.324
1600 mm: qv = 21.963 ×Z −1.172

Figure 3.13: Traffic load as a function of the depth, for different pipe diameters, according
to NEN 3650-1

In this benchmark, the pipe diameter is 800 mm, a linear interpolation between curves
600 mm and 1000 mm is performed and leads to the results given in Table 3.259.

Deltares

105 of 126

D-G EO P IPELINE, Verification Report

Table 3.259: Analytical results for the calculation of the traffic load

Traffic Load 1
Vert.
[-]
1
2
3
4
5
6
7
8

Z

qv ;

[m]
-1.986
-4.686
-4.686
-4.686
-4.686
-4.686
-4.686
-2.34

[kN/m2 ]
34.556
14.448
14.448
n.a.
n.a.
n.a.
n.a.
n.a.

600

qv;

1000

[kN/m2 ]
32.949
14.705
14.705
n.a.
n.a.
n.a.
n.a.
n.a.

Traffic Load 2

qv;

800

[kN/m2 ]
33.752
14.576
14.576
n.a.
n.a.
n.a.
n.a.
n.a.

qv;

600

[kN/m2 ]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
4.582
12.113

qv ;

1000

[kN/m2 ]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
4.677
11.728

qv;

800

[kN/m2 ]
n.a.
n.a.
n.a.
n.a.
n.a.
n.a.
4.63
11.92

Hereafter are some intermediate results used for the pulling force and the strength calculations:
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force
Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Factor of importance
Allowable deflection of pipe (Steel)
Piggability (Steel)
Allowable deflection of pipe (PE)
Piggability (PE)
Unit weight water
Safety factor cover (Drained layer)
Safety factor cover (Undrained layer)
Traffic load factor
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top
Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

106 of 126

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull
fkv
fQn2
fM
fR
fpress;bore
S

γw
fqv
geff
gfill
gupw
kb ’
kt ’
kb
kt
ky
ky ’
Pwater
A

0.1
0.00005
0.2
1.25
1.15
1.1
1.1
1.5
1.1
1.25
1.4
1.6
1.1
1.27
1.1
1.1
1
17
8
n.a.
n.a.
10
0.67
0.5
1.35
1.414
0.456
5.529
0.083
0.061
0.138
0.131
0.089
0.048
10
39769.979

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[%]
[%]
[%]
[N/mm3 ]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[mm2 ]

Deltares

Group 3: Benchmarks from spreadsheets

Atrek
Ainw
Minimal wall thickness
dn;min
Outer radius of the pipeline
re
Inner radius of the pipeline
ri
Average radius of the pipeline
rg
Moment of inertia of the pipe
Ib
Moment of inertia of the wall
Iw
Pipe resisting moment
Wb
Wall resisting moment
Ww
Unit weight of drilling fluid
γdrill fluid
Maximum modulus of subgrade reaction
kv;max
Maximum neutral vertical soil load
qv;n;r;max
Maximum traffic load
qT;max
Max. red. neutral vertical soil load (incl. traffic load) qv;n;r;maxT
Max. corrected red. soil load (without traffic load)
qn
Max. corrected red. soil load (incl. traffic load)
qnT
Maximum neutral horizontal soil load
qh;n;r
Soil reaction - Left curve
qr;left
Soil reaction - Right curve
qr;right
Soil reaction - Left curve (long term)
qr;left
Soil reaction - Right curve (long term)
qr;right
Characteristic stiffness pipeline-soil
λ
Characteristic stiffness pipeline-soil (long term)
λlong
3.24.3

46618.093
456036.731
16.15
400
381
390.5
3556505999
571.583
8891265
60.167
11
31637.947
57.835
33.752
43.258
71.376
95.427
42.866
502.806
377.104
n.a.
n.a.
0.0003049
n.a.

[mm2 ]
[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]
[mm-1 ]

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.261: Results of benchmark 3-24, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
553
412
141

D-G EO P IPELINE
553
412
141

Error [%]
0.00
0.00
0.00

Table 3.262: Results of benchmark 3-24, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Deltares

Benchmark
Length
Force
[m]
[kN]
0
280
15
280
29
2026
651
2024
672
3437
681
3437
0

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
280
15
280
29
2026
651
2024
672
3437
681
3437
0

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

107 of 126

D-G EO P IPELINE, Verification Report

Table 3.263: Results of benchmark 3-24, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
1265
11
1276
1276

D-G EO P IPELINE
1265
11
1276
1276

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.264: Results of benchmark 3-24, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
2108
133
2241
0.000305
0.5028
217
217
2358

D-G EO P IPELINE
2108
133
2241
0.000305
0.5028
217
217
2358

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.265: Results of benchmark 3-24, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
18
9
22
16

D-G EO P IPELINE
18
9
22
16

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.266: Results of benchmark 3-24, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

108 of 126

Benchmark
2108
2108
217
69
286
2265

D-G EO P IPELINE
2108
2108
217
69
286
2265

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.267: Results of benchmark 3-24, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
2108
17
8
22
26
2117
217
69
2258

D-G EO P IPELINE
2108
17
8
22
26
2117
217
69
2258

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.268: Results of benchmark 3-24, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
235
213.64
235
363.18
n.a.
n.a.

D-G EO P IPELINE
235
213.64
235
363.18
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.269: Results of benchmark 3-24, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
12.1
136
64

D-G EO P IPELINE
12.1
136
64

Rel. error [%]
0.00
0.00
0.00

Table 3.270: Results of benchmark 3-24, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-24.dri to run this benchmark.
3.25
3.25.1

HDD with safety factors from the European Standard CEN – Steel pipe
Description
This benchmark checks the use of the safety factors from the European Standard CEN in
combination with a steel pipe. The same input data’s as for benchmark 3-7a (section 3.7) are
used except that the safety factors are different: when selecting the European Standard CEN,
no factor is apllied on the loads. The choice of a different standard will have effects only on
the strength calculation.

Deltares

109 of 126

D-G EO P IPELINE, Verification Report

3.25.2

Analytical results
Hereafter are some intermediate results used for the pulling force and the strength calculations:
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force
Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Factor of importance
Allowable deflection of pipe (Steel)
Piggability (Steel)
Allowable deflection of pipe (PE)
Piggability (PE)
Unit weight water
Safety factor cover (Drained layer)
Safety factor cover (Undrained layer)
Traffic load factor
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top
Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

Minimal wall thickness
Outer radius of the pipeline
Inner radius of the pipeline
Average radius of the pipeline
Moment of inertia of the pipe
Moment of inertia of the wall
Pipe resisting moment
Wall resisting moment
Unit weight of drilling fluid
Maximum modulus of subgrade reaction
Maximum neutral vertical soil load

110 of 126

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull
fkv
fQn2
fM
fR
fpress;bore
S

γw
fqv
geff
gfill
gupw
kb ’
kt ’
kb
kt
ky
ky ’
Pwater
A
Atrek
Ainw
dn;min
re
ri
rg
Ib
Iw
Wb
Ww
γdrill fluid
kv;max
qv;n;r;max

0.2
0.00035
0.3
n.a
n.a
n.a
n.a
n.a
n.a
1.4
1.1
1.1
1.2
n.a
1.3
1.15
1
17
8
n.a.
n.a.
10
0.67
0.5
1.35
10.093
2.409
22.973
0.073
0.056
0.139
0.139
0.091
0.043
15
121535.457
161085.163
1606060.704
26.25
750
715
732.5
43240291745
3572.917
57653722
204.167
13
20467.554
154.787

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[%]
[%]
[%]
[N/mm3 ]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[mm2 ]
[mm2 ]
[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]

Deltares

Group 3: Benchmarks from spreadsheets

Maximum traffic load
Max. red. neutral vertical soil load (incl. traffic load)
Max. corrected red. soil load (without traffic load)
Max. corrected red. soil load (incl. traffic load)
Maximum neutral horizontal soil load
Soil reaction - Left curve
Soil reaction - Right curve
Soil reaction - Left curve (long term)
Soil reaction - Right curve (long term)
Characteristic stiffness pipeline-soil
Characteristic stiffness pipeline-soil (long term)

3.25.3

qT;max
qv;n;r;maxT
qn
qnT
qh;n;r
qr;left
qr;right
qr;left
qr;right
λ
λlong

0
154.787
185.744
185.744
101.846
52.606
65.131
n.a.
n.a.
0.0001771
n.a.

[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]
[mm-1 ]

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.272: Results of benchmark 3-25, Buoyancy Control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Unit
[kg/m]
[kg/m]
[kg/m]

Benchmark
2297
1288
1009

D-G EO P IPELINE
2297
1288
1009

Error [%]
0.00
0.00
0.00

Table 3.273: Results of benchmark 3-25, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
4610
43
4701
338
6579
1441
14235
1716
16676
1790
16832
3332

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
4610
43
4701
338
6579
1441
14235
1716
16676
1790
16832
3332

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.274: Results of benchmark 3-25, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
220
42
262
262

D-G EO P IPELINE
220
42
262
262

Rel. error [%]
0.00
0.00
0.00
0.00

111 of 126

D-G EO P IPELINE, Verification Report

Table 3.275: Results of benchmark 3-25, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
251
152
404
0.000177
0.0977
39
39
424

D-G EO P IPELINE
251
152
404
0.000177
0.0977
39
39
424

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.276: Results of benchmark 3-25, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
14
7
25
12

D-G EO P IPELINE
14
7
25
12

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.277: Results of benchmark 3-25, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
251
251
39
140
178
374

D-G EO P IPELINE
251
251
39
140
178
374

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.278: Results of benchmark 3-25, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

112 of 126

Benchmark
251
14
7
25
13
258
39
140
365

D-G EO P IPELINE
251
14
7
25
13
258
39
140
365

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Deltares

Group 3: Benchmarks from spreadsheets

Table 3.279: Results of benchmark 3-25, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
173.91
153.85
169.23
278
n.a.
n.a.

D-G EO P IPELINE
173.91
153.85
169.23
278
n.a.
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00

Table 3.280: Results of benchmark 3-25, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
10.5
255
120

D-G EO P IPELINE
10.5
255
120

Rel. error [%]
0.00
0.00
0.00

Table 3.281: Results of benchmark 3-25, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
n.a.
n.a.
n.a.
n.a.

D-G EO P IPELINE
n.a.
n.a.
n.a.
n.a.

Error

Use D-G EO P IPELINE input file bm3-25.dri to run this benchmark.
3.26
3.26.1

HDD with safety factors from the European Standard CEN – PE pipe
Description
This benchmark checks the use of the safety factors from the European Standard CEN in
combination with a PE pipe. The same input data’s as for benchmark 3-24 (section 3.24) are
used except that a PE pipe is used instead of a steel pipe.

3.26.2

Analytical results
Hereafter are some intermediate results used for the pulling force and the strength calculations:
Factor of friction pipe-roller
Friction pipe-mud
Factor of friction pipe-soil
Load factor - Design pressure
Load factor - Design pressure (combination)
Load factor - Test pressure
Load factor - Installation
Load factor - Soil load Qn
Load factor - Temperature
Contingency factor - E-modulus
Contingency factor - Pulling force

Deltares

f1
f2
f3
fpd
fpd;comb
fpt
finstall
fQn1
ftemp
fE
fpull

0.2
0.00035
0.3
n.a
n.a
n.a
n.a
n.a
n.a
1.4
1.1

[-]
[N/mm2 ]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]
[-]

113 of 126

D-G EO P IPELINE, Verification Report

Contingency factor - Modulus of subgrade reaction
Contingency factor - Soil load Qn
Contingency factor - Bending moment
Contingency factor - Bending radius
Contingency factor - Pressure borehole
Factor of importance
Allowable deflection of pipe (Steel)
Piggability (Steel)
Allowable deflection of pipe (PE)
Piggability (PE)
Unit weight water
Safety factor cover (Drained layer)
Safety factor cover (Undrained layer)
Traffic load factor
Effective weight of pipe
Weight of pipeline (incl. filling)
Uplift force
Moment coefficient indirect bottom
Moment coefficient indirect top
Moment coefficient direct bottom
Moment coefficient direct top
Direct deflection factor
Indirect deflection factor
Part of pipe filled with water during pull back
Cross sections of the pipe

fkv
fQn2
fM
fR
fpress;bore
S

γw

fqv
geff
gfill
gupw
kb ’
kt ’
kb
kt
ky
ky ’
Pwater
A
Atrek
Ainw
Minimal wall thickness
dn;min
Outer radius of the pipeline
re
Inner radius of the pipeline
ri
Average radius of the pipeline
rg
Moment of inertia of the pipe
Ib
Moment of inertia of the wall
Iw
Pipe resisting moment
Wb
Wall resisting moment
Ww
Unit weight of drilling fluid
γdrill fluid
Maximum modulus of subgrade reaction
kv;max
Maximum neutral vertical soil load
qv;n;r;max
Maximum traffic load
qT;max
Max. red. neutral vertical soil load (incl. traffic load) qv;n;r;maxT
Max. corrected red. soil load (without traffic load)
qn
Max. corrected red. soil load (incl. traffic load)
qnT
Maximum neutral horizontal soil load
qh;n;r
Soil reaction - Left curve
qr;left
Soil reaction - Right curve
qr;right
Soil reaction - Left curve (long term)
qr;left
Soil reaction - Right curve (long term)
qr;right
Characteristic stiffness pipeline-soil
λ
Characteristic stiffness pipeline-soil (long term)
λlong

114 of 126

1.1
1.2
n.a
n.a.
1.15
1
n.a.
n.a.
8
5
10
0.67
0.5
1.35
4.874
0.585
6.535
0.073
0.056
0.139
0.139
0.091
0.043
15
112735.141
112735.141
389919.683
47.7
400
352.3
376.15
8007444342
9044.278
20018611
379.215
13
61938.505
76.383
0
76.383
91.659
91.659
50.258
3.087
3.823
1.381
1.71
0.0011153
0.0016677

[-]
[-]
[-]
[-]
[-]
[-]
[%]
[%]
[%]
[%]
[N/mm3 ]
[-]
[-]
[-]
[N/mm]
[N/mm]
[N/mm]
[-]
[-]
[-]
[-]
[-]
[-]
[%]
[mm2 ]
[mm2 ]
[mm2 ]
[mm]
[mm]
[mm]
[mm]
[mm4 ]
[mm3 ]
[mm4 m]
[mm3 m]
[kN/m3 ]
[kN/m3 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[kN/m2 ]
[mm-1 ]
[mm-1 ]

Deltares

Group 3: Benchmarks from spreadsheets

3.26.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 3.283: Results of benchmark 3-26, Buoyancy control

Result
Uplift forces
Weight of pipeline (incl. filling)
Effective weight of pipe

Benchmark
653
166
487

Unit
[kg/m]
[kg/m]
[kg/m]

D-G EO P IPELINE
654
166
488

Error [%]
0.15
0.00
0.21

Table 3.284: Results of benchmark 3-26, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

Benchmark
Length
Force
[m]
[kN]
0
594.34
43.04
680.84
338
1364.62
1440.63 4234.93
1715.52 5116.67
1789.79 5265.94
860

D-G EO P IPELINE
Length
Force
[m]
[kN]
0
594.34
43.04
680.84
338
1364.62
1440.63 4234.93
1715.52 5116.67
1789.79 5265.94
860

Relative error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.285: Results of benchmark 3-26, Strength calculation for Combination 1A

Result

σb
σt
σa;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.5
5.8
6.12
n.a.

D-G EO P IPELINE
0.5
5.8
6.12
n.a.

Rel. error [%]
0.00
0.00
0.00

Table 3.286: Results of benchmark 3-26, Strength calculation for Combination 1B

Result

σb
σt
σa;max
λ
qr
σqr
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[mm-1 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.57
51.38
51.75
0.001115
0.00573
0.33
0.33
n.a.

D-G EO P IPELINE
0.57
51.38
51.75
0.001115
0.00573
0.33
0.33
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 3.287: Results of benchmark 3-26, Strength calculation for Combination 2

Result

σpy
σpx
σptest
σpm

Deltares

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
4.75
2.38
6.6
4.11

D-G EO P IPELINE
4.75
2.38
6.6
4.11

Rel. error [%]
0.00
0.00
0.00
0.00

115 of 126

D-G EO P IPELINE, Verification Report

Table 3.288: Results of benchmark 3-26, Strength calculation for Combination 3

Result

σb
σa;max
σqr
σqn
σt;max
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.11
0.07
0.15
10.11
6.67
n.a.

D-G EO P IPELINE
0.11
0.07
0.15
10.26
6.76
n.a.

Rel. error [%]
0.00
0.00
0.00
1.48
1.35

Table 3.289: Results of benchmark 3-26, Strength calculation for Combination 4

Result

σb
σpy
σpx
σptest
σptemp
σa;max
σqr
σqn
σV;max

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
0.11
4.75
2.38
6.6
0.36
2.45
0.15
10.11
n.a.

D-G EO P IPELINE
0.11
4.75
2.38
6.6
0.36
2.45
0.15
10.26
n.a.

Rel. error [%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.48

Table 3.290: Results of benchmark 3-26, Maximum allowable stresses

Result

σptest
σpy
σpm
σV;max
σa/t (short)
σa/t (long)

Unit
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]
[N/mm2 ]

Benchmark
6.4
5.04
n.a.
n.a.
6.4
5.04

D-G EO P IPELINE
6.4
5.04
n.a.
n.a.
6.4
5.04

Rel. error [%]
0.00
0.00

0.00
0.00

Table 3.291: Results of benchmark 3-26, Deflection of the pipeline

Result
Calculated
Max. allowable
Max. allow. (piggability)

Unit
[mm]
[mm]
[mm]

Benchmark
85.4
64
44.8

D-G EO P IPELINE
86.6
64
44.8

Rel. error [%]
1.41
0.00
0.00

Table 3.292: Results of benchmark 3-26, Implosion

Result
Max. allow. external pressure (short)
Max. allow. external pressure (long)
Int. pressure due to 100% filling (short)
Int. pressure due to 100% filling (long)

Unit
[kPa]
[kPa]
[kPa]
[kPa]

Benchmark
303.46
30.35
0
0

D-G EO P IPELINE
303.46
30.35
0
0

Error
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm3-26.dri to run this benchmark.

116 of 126

Deltares

4 Group 4: Benchmarks generated by D-G EO P IPELINE
This chapter contains benchmarks for which the reference results are generated using D-G EO P IPELINE.
4.1
4.1.1

HDD with 3D geometry – Check of the pulling direction
Description
This benchmark checks the pulling direction. The same input data’s as for benchmark 3-7b
(section 3.7) are used except that the geometry is inversed (mirror symmetry) and the pulling
direction is from left to right instead of right to left. Results for the pulling forces are therefore
expected to be the same.

4.1.2

D-G EO P IPELINE results
Both files give identical results.
Table 4.1: Results of benchmark 4-01, Pulling forces in the pipeline

Charac. points
T1
T2
T3
T4
T5
T6
Max. rep. pulling force

D-G EO P IPELINE
(bm3-7b)
Length
Force
[m]
[kN]
0
4610
74
4766
349
6884
1452
14562
1747
16745
1790
16836
20468

D-G EO P IPELINE
(bm4-1)
Length
Force
[m]
[kN]
0
4610
74
4766
349
6884
1452
14562
1747
16745
1790
16836
20467

Relative
error
Length
Force
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm4-1.dri to run this benchmark.

Deltares

117 of 126

D-G EO P IPELINE, Verification Report

118 of 126

Deltares

5 Group 5: Benchmarks compared with other programs
These benchmarks are intended to verify specific features of D-G EO P IPELINE comparing D-G EO P IPELINE
results with those from an other program.
5.1
5.1.1

Settlements according to Koppejan model
Description
The same input data’s as benchmark 1-1 (section 3.1) are used, except that a trapezoidal load
(γunsat = 17 kN/m3 and γsat = 20 kN/m3 ) is added at the top of the Clay layer as shown in Figure 5.1. A settlement calculation is performed using the Koppejan model with the parameters
given in Table 5.1.
Table 5.1: Koppejan’s parameters (benchmark 5-1)

Parameter

OCR
Cp
Cp ’
Cs
Cs ’

Unit
[-]
[-]
[-]
[-]
[-]

Sand
1.3
200
100
500
150

Clay
1.1
1.1
10
200
80

Figure 5.1: Geometry of benchmark 5-1

5.1.2

D-S ETTLEMENT results
Benchmark results for the settlements calculation are calculated using the D-S ETTLEMENT
program (formally known as MSettle). Calculations are performed for 8 verticals and the
results for each vertical are worked out in an Excel spreadsheet. A linear interpolation is used
to get the settlement at the desired depth. Results are given in Table 5.2.

Deltares

119 of 126

D-G EO P IPELINE, Verification Report

5.1.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 5.2: Results of benchmark 5-01, Settlements according to Koppejan

Vert.
nr.
[-]
1
2
3
4
5
6
7
8

Settl.
[mm]
1
2
21
35
18
32
2
1

Benchmark
Add.
dv
[mm]
[mm]
5
6
10
12
20
41
50
85
50
68
20
52
10
12
5
6

D-G EO P IPELINE
Settl.
Add.
dv
[mm]
[mm]
[mm]
1
5
6
2
10
12
21
20
41
35
50
85
18
50
68
32
20
52
2
10
12
1
5
6

Settl.
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Relative error
Add.
dv
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input file bm5-1.dri to run this benchmark.
5.2
5.2.1

Settlements according to Isotache model
Description
The same input data’s as benchmark 1-1 (section 3.1) are used, except that a trapezoidal load
(γunsat = 17 kN/m3 and γsat = 20 kN/m3 ) is added at the top of the Clay layer (see section 5.1).
A settlement calculation is performed using the Isotache model with the parameters given in
Table 5.3. Benchmark 5-2a uses an OCR parameter whereas benchmark 5-2b uses a P OP
parameter for the modelisation of the preconsolidation process.
Table 5.3: Isotache’s parameters (bm5-02)

Parameter
OCR (bm5-2a)
P OP (bm5-2b)

a
b
c
5.2.2

Unit
[-]
[kN/m2 ]
[-]
[-]
[-]

Sand
1.3
15
0.005
0.05
0.005

Clay
1.1
20
0.001
0.01
0.001

D-S ETTLEMENT results
Benchmark results for the settlements calculation are calculated using the D-S ETTLEMENT
program (formally known as MSettle). Calculations are performed for 8 verticals and the
results for each vertical are worked out in an Excel spreadsheet. A linear interpolation is used
to get the settlement at the desired Z depth. Results are given in Table 5.4 and Table 5.5.

120 of 126

Deltares

Group 5: Benchmarks compared with other programs

5.2.3

D-G EO P IPELINE results
D-G EO P IPELINE results can be found in the Report.
Table 5.4: Results of benchmark 5-02a, Settlements according to Isotache with OCR consolidation

Vert.
nr.
[-]
1
2
3
4
5
6
7
8

Settl.
[mm]
1524
1483
1339
702
397
659
1473
1522

Benchmark
Add.
dv
[mm]
[mm]
5
1529
10
1493
20
1359
50
752
50
447
20
679
10
1483
5
1527

D-G EO P IPELINE
Settl.
Add.
dv
[mm]
[mm]
[mm]
1524
5
1529
1483
10
1493
1339
20
1359
702
50
752
397
50
447
659
20
679
1473
10
1483
1522
5
1527

Relative error
Settl.
Add.
dv
[%]
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Table 5.5: Results of benchmark 5-02b, Settlements according to Isotache with POP consolidation

Vert.
nr.
[-]
1
2
3
4
5
6
7
8

Settl.
[mm]
1891
1867
1695
872
495
820
1859
1890

Benchmark
Add.
dv
[mm]
[mm]
5
1896
10
1877
20
1715
50
922
50
545
20
840
10
1869
5
1895

D-G EO P IPELINE
Settl.
Add.
dv
[mm]
[mm]
[mm]
1891
5
1896
1867
10
1877
1695
20
1715
872
50
922
495
50
545
820
20
840
1859
10
1869
1890
5
1895

Relative error
Settl.
Add.
dv
[%]
[%]
[%]
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Use D-G EO P IPELINE input files bm5-2a.dri and bm5-2b.dri to run this benchmark.

Deltares

121 of 126

D-G EO P IPELINE, Verification Report

122 of 126

Deltares

Bibliography
Deltares. D-Geo Pipeline User Manual. Deltares.
NEN, 2012a. NEN 3650-1:2012. Eisen voor buisleidingsystemen - Deel 1: Algemene eisen
(Requirements for pipeline systems - Part 1: General requirements), in Dutch.
NEN, 2012b. NEN 3650-2:2012. Eisen voor buisleidingsystemen - Deel 2: Aanvullende eisen
voor leidingen van staal (Requirements for pipeline systems - Part 2: Additional specifications for steel pipelines), in Dutch.
NEN, 2012c. NEN 3650-3:2012. Eisen voor buisleidingsystemen - Deel 3: Aanvullende eisen
voor leidingen van kunststof (Requirements for pipeline systems - Part 3: Additional specifications for plastic pipelines), in Dutch.
NEN, 2012d. NEN 3651:2012. Aanvullende eisen voor buisleidingen in of nabij belangrijke waterstaatswerken (Additional requirements for pipelines in or nearby important public
works), in Dutch.

Deltares

123 of 126

D-G EO P IPELINE, Verification Report

124 of 126

Deltares

PO Box 177
2600 MH Delft
Rotterdamseweg 185
2629 HD Delft
The Netherlands

+31 (0)88 335 81 88
sales@deltaressystems.nl
www.deltaressystems.nl



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.5
Linearized                      : No
Page Count                      : 144
Page Mode                       : UseOutlines
Author                          : Deltares
Title                           : D-Geo Pipeline Verification Report
Subject                         : 
Creator                         : LaTeX hyperref
Producer                        : ps2pdf
Create Date                     : 2015:04:13 08:57:02+02:00
Modify Date                     : 2015:04:13 08:57:02+02:00
Trapped                         : False
PTEX Fullbanner                 : This is MiKTeX-pdfTeX 2.9.4902 (1.40.14)
EXIF Metadata provided by EXIF.tools

Navigation menu