Geotech PVC Bladder Pumps 18 & 36” Installation And Operations Manual Pump
User Manual: Pdf Geotech PVC Bladder Pump
Open the PDF directly: View PDF .
Page Count: 6
Download | |
Open PDF In Browser | View PDF |
Geotech PVC Bladder Pumps 18” (91cm) & 36” (46cm) Installation and Operations Manual Rev 12/13/2012 Part# 11150188 Function and Theory Geotech’s pneumatic Bladder Pumps operate with a unique action, ideal for both, gentle low-flow sampling and high flow rate purging. Timed on/off cycles of compressed air alternately squeeze the flexible bladder to displace water out of the pump to the surface and exhaust allowing the pump to refill. Fluid enters the pump through the fluid inlet check valve at the bottom of the pump body, via hydrostatic pressure (automatically by submergence). The bladder then fills with fluid. Compressed air enters the space between the bladder and the interior of the pump wall housing. The intake check valve closes and the discharge check valve opens. The compressed air squeezes the bladder, pushing the fluid to the surface. The discharge check valve prevents back flow from the discharge tubing. Driven by the Geocontroller II or Geocontrol PRO, this cycle automatically repeats. Compressed air does not contact the sample! The bladder prevents contact between the pump drive air and the sample. Selecting an Air Source To determine the required capacity of the air source used, use the following chart as reference. AIR CONSUMPTION PER CYCLE NO PUMP GEO1.66SS18 NO TUBING 39in2 .17"ID x.25"OD (100' L) 27in2 66.25in2 .25"ID x .38"OD (100' L) 59in2 95in2 GEO1.66SS36 78in2 105in2 137in2 AIR CONSUMPTION PER HOUR (6 CYCLES/MIN) GEO1.66SS18 GEO1.66SS36 25,000 in3 45,000 in3 .17"ID x.25"OD /hr /hr 3 35,000 in .25"ID x .38"OD /hr 50,000 in3 /hr 1 Pump Specifications GEO1.66PVC18 GEO1.66PVC36 PVC PVC Bladder Material Virgin PTFE Virgin PTFE O.D.: 1.66”/4.2cm 1.66”/4.2cm Weight 1.1lb/0.5kg 1.8lb/.82kg Volume/Cycle 3.5oz./105ml 7oz./207ml Min. Well I.D. 2”/50mm 2”/50mm Operating Press. 10-125psi .7-8.6bar 10-125psi 7-8.6 bar Min. Operating Range 5psi/.34bar 5psi/.34bar Maximum Depth 250’/76.2M 250’/76.2M 176°F (80C) 176°F (80C) Pump Components Maximum Operating Temperature System Maintenance As with any pump, scheduled or periodic maintenance should be performed, according to your sampling program and specific site conditions. Generally, the more turbid or sandy your water, the more often you should maintain and clean your pumps. Disassemble the bladder pump per instructions, decontaminate or replace as needed, then reassemble. Inspect all check balls for wear and replace as necessary. Inspect all O-rings for splits or cracks and replace as necessary. Disassembly and Bladder Replacement Pull pump from the well, it is not necessary to remove the air and sample lines from the pump. Unscrew the lower cap from the housing, followed by removing the housing from the upper cap. Wrench flat features are present on both upper and lower caps. Unscrew the compression rings from the upper cap and lower head. Spanner wrench holes are located on the lower head to avoid spiral damage to the internal tube. Pull the bladder assembly out from the upper cap. The internal bladder cartridge can now be removed for maintenance or replacement. Please refer to the Components and Assembly diagram located on the inside of this manual for reassembly. 2 Item Qty Description Part No. 1 2 O-RING,VITON,#125,BROWN 17500120 2 2 O-RING,VITON,2.5MM X 23MM 11150319 3 2 O-RING,VITON,#014,BROWN 17500119 4 1 O-RING,VITON,2mm x 7.5mm,BROWN 16600108 5 2 BALL,VITON ,3/8, PVC BLADDER PUMP 1.66,TOP 17500115 6 1 HOSEBARB,CLEAR PVDF,1/8 NPT TO 5/32 BARB 11150187 7 1 HOSEBARB,POLY,MODIFIED,.25, PVC BLADDER PUMP 1.66 11150134 8 1 UPPER CAP,1.66,PVC,BP,CE 21150122 9 1 TUBE INTRNLSMPL,PVC,1.66BP,18" 11150124 10 2 RING,COMPRESSION,PVC,1.66,BP 21150115 11 1 BLADDER,PTFE,1.66"X18",PVC,CE 21150119 12 1 LOWER,HEAD,PVC,1.66,BP,CE 21150117 13 1 HOUSING,PVC,1.66X18",BP,CE 21150120 14 1 WEIGHT,SS6,INTERNAL,BP,PVC 11150132 15 1 PLUG,BALL RETAINER,1.66 PVC BP, CE 21150116 16 1 CAP,LOWER,PVC,1.66,BP,CE 21150114 17 1 SCREEN,INTAKE,1.66,PVC,BP,CE 21150118 18 1 CAP,SCREEN,INTAKE,1.3,PVC 11150131 19 1 CAP,LOWER,DROP TUBE,1.66,PVC, BP, CE 21150125 20 2 HOSEBARB,PP,1/2X3/8MPT 11150189 21 1 BODY,INTAKE,DROP TUBE,1.66,PVC, BP,CE 21150126 22 1 HOUSING,PVC,36",BP,CE 21150123 23 1 BLADDER,PTFE,1.66"X36",PVC,CE 21150124 24 1 TUBE,INTERNALSAMPLE,BP,36,PVC, 1.66X36 11150125 25 § ASSY,LOWER CAP,1.66 PVC,DROPTUBE,CE,WITH 1/2" HOSEBARB 51150072 26 § ASSY,INTAKE,1.66 PVC,DROP TUBE, CE,WITH 1/2" HOSEBARB 51150073 § KIT, 1.66, PVC, 0-RING SET, CE [ITEMS: #1(2), #2(2),#3(2), #4(1)] 91150018 1 MANUAL § SOLD SEPERATLY 3 4 Troubleshooting Cycling air with no sample •Adjust the controller charge/exhaust times properly. •Excessive drawdown may be preventing pump submergence. •Screen intake needs to be submerged at least 5ft deep. •Test cords and battery to ensure you have a sufficient power source. •Clean any debris that may be clogging the intake screen. Air bubbles present in sample •Replace any O-Rings and bladder if showing tearing or damage. •Repair or replace air and discharge lines if damaged or split. Discharge line draining back into pump •Remove the discharge hose barb and check ball and clean any debris in the check ball area. Warranty For a period of one (1) year from date of first sale, product is warranted to be free from defects in materials and workmanship. Geotech agrees to repair or replace, at Geotech’s option, the portion proving defective, or at our option to refund the purchase price thereof. Geotech will have no warranty obligation if the product is subjected to abnormal operating conditions, accident, abuse, misuse, unauthorized modification, alteration, repair, or replacement of wear parts. User assumes all other risk, if any, including the risk of injury, loss, or damage, direct or consequential, arising out of the use, misuse, or inability to use this product. User agrees to use, maintain and install product in accordance with recommendations and instructions. User is responsible for transportation charges connected to the repair or replacement of product under this warranty. Equipment Return Policy A Return Material Authorization number (RMA #) is required prior to return of any equipment to our facilities, please call 800 number for appropriate location. An RMA # will be issued upon receipt of your request to return equipment, which should include reasons for the return. Your return shipment to us must have this RMA # clearly marked on the outside of the package. Proof of date of purchase is required for processing of all warranty requests. Model Number: ________________ Serial Number: ________________ Date: ________________ Geotech Environmental Equipment, Inc. 2650 East 40th Avenue Denver, Colorado 80205 (303) 320-4764 ● (800) 833-7958 ● FAX (303) 322-7242 email: sales@geotechenv.com website: www.geotechenv.com 5
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.6 Linearized : Yes Author : David Drake Create Date : 2013:02:15 16:11:53-07:00 Keywords : 91, cm, and, 36, cm, PVC, Bladder, Pumps Modify Date : 2013:02:18 10:55:48-07:00 Language : en-US Tagged PDF : Yes XMP Toolkit : Adobe XMP Core 5.2-c001 63.139439, 2010/09/27-13:37:26 Format : application/pdf Creator : David Drake Title : Geotech PVC Bladder Pumps 18" & 36” Installation and Operations Manual Description : Geotech PVC Bladder Pumps 18” & 36” Manual Rev 06/19/2012 Part#11150188 Subject : 91 cm and 36 cm PVC Bladder Pumps Creator Tool : Microsoft® Word 2010 Metadata Date : 2013:02:18 10:55:48-07:00 Producer : Microsoft® Word 2010 Document ID : uuid:5c75858d-1d20-ae4a-989b-3fde59a7052b Instance ID : uuid:78f3cb6f-07f9-3247-85c6-a0972cabde25 Page Count : 6EXIF Metadata provided by EXIF.tools