Federal IT Dashboard
Submission Guide

Version 3.25
December 7, 2017

Revision History
VERSION
N UMBER

DATE

3.25

12/07/2017

3.24

09/07/2017

3.23

09/05/2017

3.21

08/30/2017

DESCRIPTION
•

Operational Performance Metrics section - added note that metric requirements from guidance will
only apply to major investments

•
•

Updated Baselined Fields Table to be consistent and match what is implemented in code and schema
General Instructions for CIO Evaluation Report – added guidelines of how to submit CIO Ratings for
Majors Vs Non-majors

•

Removed renaming comment for isClosed in baseline table
o

Updated the UAT URLs for IT Dashboard Submissions

•

Updated the following sections in document for FY19 submissions:
o
Obtaining Tokens for API Access
o
Renaming of Submission Sections
o
URLs for IT Dashboard Submissions
o
Submissions during August/September
o
Submitting E-Gov and Line of Business Initiatives
o
Operational Performance Metric Categories

•

Added the following sections in document for FY19 Submissions:
o
Standard Investment Report Submission
o
CIO Evaluation Report Submission

3.20

04/25/2017

•

Updated “IT Budget Submissions to include a budget account summary validation

3.19

04/06/2017

•

updated URLs for manual uploads

•

3.18

04/05/2017

added language to Obtaining API Tokens section that includes URL for UAT environment

•

Removed this Business Case validation: The criticalPath field must be provided for all in-progress and
future activities.

•

Added a new Business Case validation to prevent the addition of agile activities to Waterfall Projects.

•

Converted these 3 Business Case validations to validation warnings:
1.

The sum of capabilities for CY exceeds the DME and O&M Agency CY Funding and Agency CY
Contributions from the IT Portfolio.

2.

The sum of capabilities for PY exceeds the DME and O&M Agency PY Funding and Agency PY
Contributions from the IT Portfolio.

3.

The sum of capabilities for BY exceeds the DME and O&M Agency BY Funding and Agency BY
Contributions from the IT Portfolio.

3.17

03/24/2017

•

Added existing business case validation for performance metrics to the updated validations section

3.16

02/24/2017

•

Added new Business Case validations

3.15

02/14/2017

3.14

02/14/2017

•
•
•

replaced text “operational risk” in validations with “investment risk”
updated in baselined table to note renaming of some fields to “isActive"
Removed more references to projects risks in validations section

FY 2019 IT Investment Submission Guide

2

VERSION
N UMBER

DATE

3.13

02/13/2017

•

Removed any references to project risks, which are no longer being used

3.12

02/02/2017

•

replaced text “operational risk” in validations with “investment risk”

3.11

01/27/2017

•

replaced text “(CY) 2016 Target” in validations with “(CY) 2017 Target”

3.9

10/17/2016

3.8

10/04/2016

•
•
•

Removed IPT Contact Information Validations
Updated Responses to Agency Questions Section
Updated Baselined Fields Section for FY18

3.7

09/22/2016

•

Added new validations

3.6

09/15/2016

•

Updated Baselined Fields Section for FY18

3.5

09/13/2016

3.4

09/09/2016

•
•
•
•

3.3

01/06/2016

3.2

11/20/2015

Updated E-Gov/Lob Initiatives/Shared services section for FY18
Updated URLs for Submissions section
Updated Submissions during September/October section
Updated various sections for FY18:
o
New, updated, and continuing validations
Updated “IT Budget Submissions” to include 2 new validations related to test tokens
Updated “Business Case Submissions” to include 2 new validations related to test tokens
Updated “Business Case Details Submissions” to include 2 new validations related to test tokens
Updated manual XML upload URL

3.1

11/6/2015

DESCRIPTION

•
•
•
•

•
•
•
•

3.0

7/24/2015

•

Updated “Baseline Fields Table” to include performanceMetricBaselineCapability
Updated “URLs for IT Dashboard Submissions” to include FY17 production and UAT URLs

Updated “Obtaining Tokens for API Access” to include details on full submission keys and
test submission keys
Updated “Business Case Validations” to include 4 new validations related to agency
priority goals / agency strategic objectives
Updated various sections for FY17:
o Obtaining Tokens for API Access
o Renaming of Submission Sections
o URLs for IT Dashboard Submissions
o Submissions during August/September
o Submitting E-Gov and Line of Business Initiatives
o Baseline Fields Table
o Operational Performance Metric Categories
o IT Budget & Business Case Application Validations
o Responses to Agency Questions

FY 2019 IT Investment Submission Guide

3

Table of Contents
Getting Help ................................................................................................................................................................... 5
Accessing IT Dashboard as an Agency Reviewer or Submitter................................................................................... 5
Using the Application Programming Interface (API) ................................................................................................... 5
Obtaining Tokens for API Access .................................................................................................................................. 6
Full Submission Keys.................................................................................................................................................. 7
Test Submission Keys ................................................................................................................................................ 7
URLs for IT Dashboard Submissions ............................................................................................................................. 8
Submissions during September .................................................................................................................................... 9
General Instructions for Continuing Major Investments ............................................................................................ 9
General Instructions for Investments that are Split or Consolidated ...................................................................... 10
General Instructions for Standard Investment Reports............................................................................................ 10
General Instructions for CIO Evaluation Reports ...................................................................................................... 10
Submitting E-Gov and Line of Business Initiatives and Shared Services ................................................................. 11
Submitting System Development Life Cycle (SDLC) Methodology .......................................................................... 12
Baselined Fields Table ................................................................................................................................................. 13
Variance Calculations .................................................................................................................................................. 13
Contract Linkage with USASpending .......................................................................................................................... 19
Operational Performance Metric Categories ............................................................................................................ 20
FY 2019 Application Validations ................................................................................................................................. 20
Responses to Agency Questions ................................................................................................................................. 21
IT Budget .................................................................................................................................................................. 21
Business Case ........................................................................................................................................................... 21
Business Case Detail ................................................................................................................................................ 22

FY 2019 IT Investment Submission Guide

4

Getting Help
OMB Office of E-Government and Information Technology provides CPIC support pertaining to IT Dashboard
submissions via email from 9:00am-5:00pm Monday through Friday. Please email
itdashboardsupport@omb.eop.gov for assistance.

Accessing IT Dashboard as an Agency Reviewer or Submitter
For access to agency-only data for review purposes, federal employees or contractors are required to obtain an
OMB MAX account. Once the MAX account has been established, users request access to IT Dashboard by
requesting the “ITDashboard” application on the MAX portal:
https://max.omb.gov/maxportal/sa/appsChangeForm.do
Agency ITDashboard administrators can approve the request. Once granted ITDashboard “Agency User” role,
users will be able to review agency-only data feeds and dashboard displays via the login link on the IT Dashboard
homepage. ITDashboard’s "Agency User" role is read-only and gives the user ability to access all data provided on
the agency's IT Budget and Business Case submissions. This is a superset of the public dataset and includes some
privacy related (agency contact information) and procurement sensitive information (future projects/contracts)
that are only viewable when logged-in via MAX as an "Agency User". The "Agency User" role does not permit the
user to submit data to IT Dashboard on behalf of the agency.
Becoming an agency submitter (ability to write and update IT Budget data on behalf of an agency) requires an
additional step. An email should be sent to Bill Curtis at OMB (wcurtis@omb.eop.gov) with the contact details of
the new agency submitter. The agency’s CIO must be copied on the same email. Once granted “Agency
Submitter” status, the user will be able to use the IT Dashboard exhibit submission APIs and manual XML upload
services on behalf of the agency. Please note: the “Agency Submitter” role is the only role able to generate
tokens specifically for dashboard submissions. If the user is not looking to perform dashboard submissions, then
another role may be more suitable.

Using the Application Programming Interface (API)
The API is a secure RESTful web service to automate data updates to IT Dashboard from agency project
reporting systems. The API accepts an XML input file based upon a defined schema that represents the inputs
required by OMB’s IT Budget and Business Cases.
The IT Portfolio is the starting point for annual IT Budget submissions. Only those investments that are
identified as Major Investments in the IT Portfolio are tracked with a Business Case and the corresponding
investment dashboard pages on IT Dashboard. Consequently, any changes in investment status and/or any
changes in funding should first be initiated within the agency’s IT Portfolio prior to any Business Case
submission. Once identified as a Major Investment in the IT Portfolio, there is no means to remove an
investment’s dashboard page from IT Dashboard without receiving OMB permission to submit a revised IT
Portfolio.
XML operations are enclosed within an investment element that specifies the UII of the investment on which an
operation is performed. Optional elements in the schema are interpreted by the server as values for which the
client application is not required to provide data (i.e. minOccurs=”0”). However, some fields may be required
FY 2019 IT Investment Submission Guide

5

based upon conditional logic and result in a validation error message if not provided. Please review the
application validation messages included in this document.
To reset a value, an empty string or null value can be provided. Example: to remove a previously provided
“Requirement Citation” string element: .
For some numeric fields designated in the XML schema definition file with the attribute: nillable=”true”, the field
can be reset to NULL with xsi:nil=”true”. Example: To remove a previously provided “Total Costs Actual”
element: .
The XML request file allows for multiple operations to be performed on multiple investments. Operations on
an investment are processed as a single transaction; either all of the operations are executed after completing
100% successful validation or none of the operations are executed for that investment. However, each
investment is processed independently, so a response may contain a mix of successfully processed investments
and investments with validation errors.
To correlate request operations with response messages, each operation has an attribute named “id”. This
attribute may be any string the client application chooses, though it should be unique within the body of the
request so that it clearly identifies an operation.
All the operations within an investment must pass validation checks before they are executed. If any of the
operations within an investment fail the validation check, then a response is generated that contains the
original data from the request and any error messages that define the problem.
Error and Warning messages are sent in a common format described in documentation as “validations.” New
validations for FY2019 are listed in this document as well. Warning messages are generated when the system
detects a condition that might be erroneous but allows the operation to pass validation.
For agencies that have not implemented the API, the manual XML upload page provides a direct UI
interface to upload XML files for processing. This functionality can be accessed using the “XML UPLOAD”
menu item after clicking on “DATA” from the IT Dashboard navigation bar.” The “Review Submissions” tab
shows a history of data submissions using the IT Dashboard Upload feature, including the file name, date and
time of submission, user name, and any associated success or error messages. Clicking the appropriate entry
in the “Request” or “Response” columns will allow the user to download a copy of the submitted request file
or IT Dashboard response file.

Obtaining Tokens for API Access
Agency submitters are required to authenticate via the OMB MAX system and obtain a new token prior to
executing IT Budget or Business Case submissions.

FY 2019 IT Investment Submission Guide

6

For the FY19 Edition, authorized agency submitters may obtain an API Key by first logging into the FY19
environment (https://myit-2019.itdashboard.gov) via the “LOGIN” link. Once authenticated, API Keys can be
obtained by navigating to the “API Settings” page under the “DATA” navigation option.
For the Test Environment, authorized agency submitters may obtain an API Key by first logging into the UAT
environment (https://myuat.itdashboard.gov) via the “LOGIN” link. Once authenticated, API Keys can be
obtained by navigating to the “API Settings” page under the “DATA” navigation option.
Full Submission Keys
On the API Settings page, the “Full Submission Keys” tab lists the API keys that can be used for any type of API
update to the IT Dashboard. This includes validateOnly submissions, “get”, “update” and “add” operations. To
obtain a new key, click “Generate New API Key” and the key will appear in the table below the button. Once
generated, the Full Submission API Key will be valid for 12 hours with the option of revoking the key early if
needed.

Test Submission Keys
The “Test Submission Keys” tab lists test API keys that can be used for validateOnly=”true” submissions (to test
the submission but not update records in the system), along with validateOnly=”false” submissions for “get”
operations (to retrieve existing data from the system). To obtain a new test key, click “Generate New Test API
Key” and the test key will appear in the table below the button. Once generated, the Test Submission API Key
will be valid for 30 days with the option of revoking the key early if needed.

FY 2019 IT Investment Submission Guide

7

URLs for IT Dashboard Submissions
FY2019 Agency Test Environment (after September 5 COB)
Data
IT Budget API
Business Case
FY19 testing

SIR API
CIO Rating API
Manual

URL
https://myuat-2019.itdashboard.gov/api/v1/itbudget?apikey=xxxx
https://myuat-2019.itdashboard.gov/api/v1/businesscase?apikey=xxxx
https://myuat-2019.itdashboard.gov/api/v1/investmentreport?apikey=xxxx
https://myuat-2019.itdashboard.gov/api/v1/ciorating?apikey=xxxx
https://myuat-2019.itdashboard.gov/drupal/data/submissions/xml-upload

FY2019 Production Environment (after September 5 COB)
Data
FY19
submissions

IT Budget API
Business Case API
SIR API
CIO Rating API
Manual Upload

URL
https://myit-2019.itdashboard.gov/api/v1/itbudget?apikey=xxxx
https://myit-2019.itdashboard.gov/api/v1/businesscase?apikey=xxxx
https://myit-2019.itdashboard.gov/api/v1/investmentreport?apikey=xxxx
https://myit-2019.itdashboard.gov/api/v1/ciorating?apikey=xxxx
https://myit-2019.itdashboard.gov/drupal/data/submissions/xml-upload

Note: IT Dashboard uses a RESTful API. Users should post XML operations to the URL. Empty requests to the
RESTful API will result in an error message. Replace “xxxx” with the API Key (token).

FY 2019 IT Investment Submission Guide

8

Submissions during September
For testing purposes, the FY19 environment will accept sample IT Budget, Business Case, and Standard
Investment Reports submissions in August and September. Agencies should use this environment to test their
FY19 submissions against the new API, schemas, and validations.
After COB on September 4, 2017, all data submitted during the test period will be deleted from the FY19
environment. At this time, a copy of the latest data from FY18 production will be migrated to the FY19
environment in preparation for agencies’ FY19 preliminary submissions. At this time, the UAT environment will
also be updated to reflect the FY19 API/Schema in order for agencies to continue testing FY19 submissions.
For the first September Business Case submission of each continuing major investment, the tags from the
updateInvestment operation listed below will be required. Once provided, these tags will remain optional (per
the schema) for subsequent updateInvestment submissions.
capitalAssetSummary
-investmentDetails
-investmentStartEndDates
- investmentStartYear
- investmentEndYear
investmentDetails
-investmentDescription
-objectivesOrGoals
-returnOnInvestmentDescription
-investmentRequirements
-programCodeFPI
-investmentSharedService
-investmentPivEnabled
-pmDetials

General Instructions for Continuing Major Investments
Use the regular update process on the IT Dashboard to provide information for continuing major investments
consistent with FY19 Capital Planning Guidance. During the September Business Case preliminary submission
window, complete the following steps for continuing major investments:
1. Using “updateInvestment,” submit a complete Business Case and Business Case Detail, which provides
information for all necessary fields for each section.
2. Use regular updates to add new projects, metrics, and activities or revise the lifecycle costs table. These
actions will not require a rebaseline, replan, or correction operation. These changes can now be done
through regular updates.
3. If necessary, based on agency rebaseline policies, use “revise investment” actions such as rebaseline or
replan to make changes to “baselined” fields such as the planned costs of activities. Baselined fields are
those which are not editable using regular updates. (See “Baselined Fields Table” for more information)
Note as per the guidance: Business Cases are only required for Mission and Administrative Services and Support
Systems Investments (Part 1 and Part 2).

FY 2019 IT Investment Submission Guide

9

General Instructions for Investments that are Split or Consolidated
An investment that is made up of more than one previous investment (multiple prior-UIIs) is considered a
consolidated investment. This consolidated investment must be assigned a new UII and should not use one of
the prior UIIs established previously.
An investment that is split out of an existing investment (i.e. the FY18 IT Portfolio lists more than one investment
with the same prior-UII) it is considered a split investment. The split investment must be assigned a new UII and
should not use one of the prior UIIs established previously.
For split or consolidated major investments, the “addInvestment” operation is used to create a new Business
Case Submission following the general instructions for adding a new major investment. Using the
“updateInvestment” for these investments will cause a validation error since only unchanged continuing major
investments are allowed to update an existing UII.

General Instructions for Standard Investment Reports
Standard Investment Reports are required for IT Security and Compliance Standard Investments. Reporting on
other Standard Investment reports is optional during the FY19 budget cycle. Submission of Standard Investment
Reports for FY19 should follow the same cadence as Business Cases for major investments. For more details on
the schema and technical development of Standard Investment Reports, please visit the GitHub ITDB Schema
Repository at https://github.com/ombegov/ITDB-schema.

General Instructions for CIO Evaluation Reports
The CIO Evaluation Report Submission contains the CIO Rating section of the FY19 Guidance separated from the
Major Business Case in order to allow submission of CIO Ratings with any non-major investment in the Agency IT
Portfolio Summary.
Submitting updates to CIO ratings outside of the annual submissions:
1. For Major Investments (with Investment Type 1) – agencies should continue to use the business case
monthly operations to set the CIO Ratings (use updateCIORating).
2. For Non-Major Investments (with Investment Type NOT 1) – agencies can only use the setCIORating
Operation to set the CIO Ratings. Please do NOT use the business case monthly operation
(updateCIORating). Even for Type 6 Investments that have business cases, please only use the
setCIORating Operation to set the CIO Ratings.
For more information on the schema and technical development of the CIO Evaluation Report, please visit the
GitHub ITDB Schema Repository at https://github.com/ombegov/ITDB-schema.

FY 2019 IT Investment Submission Guide

10

Submitting E-Gov and Line of Business Initiatives and Shared Services
Per the FY2019 IT Budget – Capital Planning Guidance, Managing Partners for the Government-wide E-Gov and
Line of Business Investments listed below are required to submit Major IT Business Cases unless they get a
waiver from OMB. For Agencies’ shared services investments which are not included in the two tables below,
these should be coded “48” for the “Shared Services Category” field in the IT Portfolio Summary.
In addition, Managing Partner agencies are encouraged (where appropriate) to use the “E-gov or LoB Initiative”
name as the Investment Title for the principle IT investment related to the initiative. Alternatively, Managing
Partners may include the initiative name in the investment description. Partner agencies with contributions
would be expected to use the “E-Gov or LoB initiative” name as their Investment Title.

E-Gov and Lob Initiative Investments (Shared Services Category Code “24”)

E-Gov or LoB Initiative

Benefits.Gov
Budget Formulation and
Execution LoB
Disaster Assistance
Improvement Plan
E-Rulemaking
Federal Health Architecture LoB
Financial Management LoB
Geospatial LoB
Grants.Gov
Human Resources LoB
Integrated Award Environment
Performance Management LoB
Federal PKI Bridge
Recreation.Gov
Security, Suitability, and
Credentialing LoB
USAJOBS
USA Services

Acronym

BFELoB

FHALoB
FMLoB
GeoLoB
HRLoB
IAE
PMLoB
FPKI
SSCLoB
USAJOBS

Managing
Partner
Agency

Includes:

Shared
Services
Identifier

Labor
Education

0020
3200

DHS

4100

EPA
HHS
Treasury
Interior
HHS
OPM
GSA
GSA
GSA
USDA
OPM

0060
1400
1100
3100
0160
1200
0230
0900
0090
0010
1250

OPM
GSA

Former GMLoB

Former IAE-Loans & Grants

New UII ending assigned for
FY17 process.
Former RecruitOnestop

1218
0040

OMB M-16-11 defined shared service providers as providers designated by Treasury FIT or OPM HRLOB
previously and USSM going forward. The below table reflects current USSM designated shared services.

FY 2019 IT Investment Submission Guide

11

A Partner Agency should list its Investment as Type 04 Funding Transfer and report funding in the Agency
Funding fields. Managing Partner Agency should report their Investment as a Type 01 Major Investment and
reports funding from customers in the Agency Contribution fields.
USSM Designated Shared Services Investment/Providers (Shared Services Category “36”)

Shared Service Investment

Acronym

USSM
Designated
Provider

Shared Service

Agency Accounting Services
(AAS)
HR LoB - HR Connect

ARC

Treasury

Administrative
Resource Center

TSSC

Treasury

Defense Civilian Personnel Data
System

DCPAS

DoD

Defense Civilian Pay System

DFAS

DoD

IBC FMLoB Shared Service
Provider
IBC Shared Service Center
(HRLoB)
DOTXX129: Delphi Version Two

IBC

DOI

Treasury Shared
Service Center
Defense Civilian
Personnel
Advisory Service
Defense Finance
and Accounting
Service
Interior Business
Center

IBC

DOI

Interior Business
Center

ESC

DOT

Enterprise Services
Center

HHS Integrated Personnel
Management Service
Human Capital Information
Technology Services
PAR (e-Payroll)

PSC

HHS

Program Support
Center

HRLoB SSC

GSA

HRLoB SSC

GSA

OCFO FSSP

NFC

USDA

OCFO-NFC Shared Services

NFC

USDA

Includes:

Shared
Services
Identifier

Financial
Management
Core HR

1101

Core HR

1202

Payroll

1203

Financial
Management
Core HR,
Payroll
Financial
Management
Core HR

1102

HRLoB Shared
Service Center

Core HR

1206

HRLoB Shared
Service Center
National Finance
Center

Payroll

1207

Financial
Management
Core HR,
Payroll

1104

National Finance
Center

1201

1204
1103
1205

1208

Submitting System Development Life Cycle (SDLC) Methodology
For FY19 submissions, IT Dashboard will accept only these 3 options for SDLC methodology as per the guidance:
1) Waterfall
2) Iterative: Incremental, Spiral, Agile
3) Not Primarily a Software Development Project
For the existing projects that already had one of the 7 SDLC methodologies from FY18, database changes were
made within IT Dashboard to ensure that the old methodologies were updated to one of the 3 new ones for
FY19.

FY 2019 IT Investment Submission Guide

12

How old SDLC methodologies were mapped to the new ones:
SDLC Methodology Type FY18 Value
(old)

SDLC Methodology Type FY19 Value (new)

1 - Waterfall

1 - Waterfall

2 - Spiral

2 – Iterative (Incremental, Spiral, Agile)

3 - Iterative

2 – Iterative (Incremental, Spiral, Agile)

4 - Agile

2 – Iterative (Incremental, Spiral, Agile)

5 - Mixed

2 – Iterative (Incremental, Spiral, Agile)

6 - Other

2 – Iterative (Incremental, Spiral, Agile)

7 - Not Primarily a Software
Development Project

3 - Not Primarily a Software Development Project

Agencies will not need to update the existing/continuing SDLC methodologies from FY18. If agencies are
submitting new projects or updating existing one projects, IT Dashboard will only accept the 3 new FY19 SDLC
Methodology values.

Baselined Fields Table
This table indicates whether each element can be changed via “regular” updates or requires a rebaseline, replan,
or correction action (described as “revise investment” in the schema and API). Elements requiring a rebaseline,
replan, or correction are identified as “baselined” fields. The FY18 Schema column indicates the baselined fields
in effect before September 2017 in the production environment. The FY19 Schema column shows the new
standard beginning in September 2017.

Element
dateOfAnalysis
analysisResults
publicURL
pmName
pmEmail
pmQualifications
addPerformanceMetric
agencyPerformanceMetricId
performanceMetricActualResult
performanceMetricDateofActual

FY18 Schema
(through August
2017)
regular
regular
regular
regular
regular
regular
regular

FY19 Schema
(starting
September 2017)
regular
regular
regular
regular
regular
regular
regular

regular

regular

regular

regular - renamed

regular

regular

FY 2019 IT Investment Submission Guide

NEW for FY18
NEW for FY18
NEW for FY18
NEW for FY18
NEW for FY18
NEW for FY18

Comments

New actual results can be added at any time.
Actual results become baselined once provided.

13

FY18 Schema
(through August
2017)
regular

FY19 Schema
(starting
September 2017)
regular

baselined

baselined

baselined

baselined

regular

regular

performanceMetricPYTarget
performanceMetricCYTarget

baselined

baselined

regular

regular

performanceMetricCondition
performancePeriodicity

baselined

baselined

regular

regular

performanceMetricObjectiveOrGoal
performanceMetricBaselineCapability

regular

regular

Regular

Regular

addPerformanceMetricActual
isActive
isClosed
SDLCmethodology

regular
baselined

regular
baselined

regular
regular

regular
regular

otherSDLC
releaseEverySixMo

regular
regular

N/A
regular

releaseEverySixMoComment

regular

regular

addInvestmentRisk
agencyInvestmentRiskId
investmentRiskName
investmentRiskCategory
investmentRiskProbability
investmentRiskImpact
investmentRiskMitigationPlan
isActive
cioRatingEval
cioComment
addContract
agencyContractId
referencedPIID
isModularApproach
agileDevelopment
contractPurpose
ITLeaseCategory
informationSecurityClause
acquisitionId
agencyAcquisitionId

regular

regular

Becomes baselined once it is supplied for the
first time.
Removed
Becomes baselined once it is supplied for the
first time.
Becomes baselined once it is supplied for the
first time.
Renamed from addRisk

regular

regular

Renamed from agencyRiskId

regular

regular

Renamed from riskName

regular

regular

Renamed from riskCategory

regular

regular

Renamed from riskProbability

regular

regular

Renamed from riskImpact

regular

regular

Renamed from riskMitigationPlan

regular

regular

Renamed from isOperationalRiskActive

regular

regular

regular

regular

regular

regular

regular

regular

regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular

regular
regular

Element
performanceMetricComment
performanceMetricDescription
performanceMetricUOM
performanceMetricCategory

FY 2019 IT Investment Submission Guide

Comments

Becomes baselined once it is supplied for the
first time. Can be updated without a revise using
the annual updateInvestment operation during
the annual window. Afterwards, becomes
baselined once provided.
Becomes baselined once it is supplied for the
first time. Can be updated without a revise using
the annual updateInvestment operation during
the annual window. Afterwards, becomes
baselined once provided.
Can be updated without a revise using the
annual updateInvestment operation during the
annual window. Afterwards, becomes baselined
once provided.
Becomes baselined once it is supplied for the
first time.
For performance metric

14

FY18 Schema
(through August
2017)
regular
regular
regular

FY19 Schema
(starting
September 2017)
regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular
regular
regular

regular
regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular
regular

regular
regular

regular
regular

capability

regular

regular

purposeOrOutcome

regular

regular

PY

regular

regular

CY

regular

regular

BY

regular

regular

productionDeploymentDate
contractingAgencyId
contractNumber
referencedPIID
modularApproachesContracting
idvAgencyId
solicitationId
EVMRequired
contractTotalValue
contractTypeUsed
performanceBasedContract
contractStartDate
contractEndDate
contractCompete
contractDescription
isActive
investmentName
investmentDescription
investmentRequirementSupport
investmentSharedService
investmentPivEnabled
investmentPublicAPI

regular
regular

regular
N/A

regular

regular

regular

regular

regular

regular

regular

N/A

regular

regular

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

N/A

Removed

regular

regular

Name updated in FY18 from isContractActive

regular

regular

Removed from towerDetails

regular

regular

regular

N/A

regular

regular

regular

regular

regular

N/A

Element
plannedContractDescription
plannedAwardDate
lengthOfPlannedSupport
anticipatedValue
potentialSources
providerEngagement
containsITLease
replacedContractId
agencyReplacedContractId
systemId
agencySystemId
systemName
initialOperatingYear
techRefreshDate
endOfContractedSupportDate
averageUsersPerMonth
capabilityId
agencyCapabilityID

FY 2019 IT Investment Submission Guide

Comments

For FY19 moved to SIR
For FY19 moved to SIR and renamed from
agencyCapabilityId
For FY19 moved to SIR and renamed from
capabilityCode
For FY19 moved to SIR and renamed from
purposeOutcome
For FY19 moved to SIR and renamed from
totalSpendingPY
For FY19 moved to SIR and renamed from
totalSpendingCY
For FY19 moved to SIR and renamed from
totalSpendingBY
Removed
Renamed from idvPIID
Removed

Removed

Removed

15

FY18 Schema
(through August
2017)
regular

FY19 Schema
(starting
September 2017)
N/A

Removed

regular

N/A

Removed

regular

regular

regular

regular

N/A

N/A

regular

N/A

regular

regular

baselined

baselined

baselined

baselined

regular

regular

baselined

baselined

regular
baselined

regular
baselined

baselined

baselined

baselined

baselined

baselined

baselined

baselined

baselined

regular

regular

regular

regular

Removed

N/A

baselined

Deactivating a project requires a “revise
investment” submission.

releaseName
releaseNumber
releaseDescription
NPI:
NPE:
NCE
NCI
DTC
DPC
addProjectActivity
agencyActivityId
activityName
activityDescription
structureId
activityType
criticalPath

regular
regular

regular
regular

NEW for FY18
NEW for FY18

regular
regular
regular
regular

regular
regular
regular
regular

NEW for FY18
becomes baselined once activity is in-progress
becomes baselined once activity is in-progress
becomes baselined once value is provided

regular
regular
regular

becomes baselined once value is provided

regular

regular
regular
regular
regular

regular

regular

baselined

baselined

baselined

baselined

baselined

baselined

baselined

baselined

regular

regular

plannedStartDate
projectedStartDate
actualStartDate

baselined

baselined

regular

regular

regular

regular

plannedTotalCost
projectedTotalCost
actualTotalCost

baselined

baselined

regular

regular

regular

regular

plannedCompletionDate
projectedCompletionDate

baselined

baselined

regular

regular

Element
investmentIncrementalDevelopment
investmentRelatedURL
investmentsEliminatedorReduced
returnOnInvestmentDescription
IPTContactInformation
noEVMExplanation
lifeCycleCosts
investmentStartYear
investmentEndYear
addProject
uniqueProjectId
agencyProjectId
projectName
objectivesExpectedOutcomes
projectStartDate
projectCompletionDate
projectLifeCycleCost
pmDetails
projectManagerExperienceLevel
isActive

FY 2019 IT Investment Submission Guide

Comments

Removed

Renamed from projectManagerContactDetail

Renamed from addActivity

Can be changed from “no” to “yes” via regular
operations, but requires a reviseInvestment for
changing from “yes” to “no”

Becomes baselined after value is supplied for the
first time

Becomes baselined after value is supplied for the
first time

16

FY18 Schema
(through August
2017)
regular

FY19 Schema
(starting
September 2017)
regular

isActive
investmentRiskId
agencyInvestmentRiskId

baselined

baselined

Renamed from isActivityActive

regular

regular

Name updated in FY18 from operationalRiskId

regular

regular

investmentRiskName

regular

regular

investmentRiskCategory

regular

regular

investmentRiskProbability

regular

regular

investmentRiskImpact

regular

regular

investmentRiskMitigationPlan

regular

regular

Name updated in FY18 from
agencyOperationalRiskId
Name updated in FY18 from
operationalRiskName
Name updated in FY18 from
operationalRiskCategory
Name updated in FY18 from
operationalRiskProbability
Name updated in FY18 from
operationalRiskImpact
Name updated in FY18 from
operationalRiskMitigationPlan

Element
actualCompletionDate

Comments

Becomes baselined after value is supplied for the
first time

Variance Calculations
The IT Dashboard will calculate schedule variance for activities by comparing the planned completion date of an
activity with the actual completion date. If the actual completion date is not available, the projected date is
used. For example, if an activity or sub-activity is planned to be completed in 5 days, but the current projected
completion date is 8 days away; the schedule variance is 3 days.
The Dashboard will calculate cost variance for activities by comparing the planned total cost of an activity with
the actual total cost or use the projected total cost if the activity is not yet complete. For example, if an activity
is planned to have a cost of $1000, but the actual cost reported is $1200; the cost variance is -$200.
If something is "Planned" at $100, and "Actual" is ZERO (Not Null), the IT Dashboard will consider this completed
at NO cost.
Cost Calculations
Always use the “Actual” value if both “Projection” and “Actual” are provided for the same activity. Rollups are obtained by summing the costs of all the included lowest level child activities.
1. For Individual Future Activities or Roll-Ups that contain only future activities:
Cost Variance = 0%
2. For Completed or In-Progress Activities and Roll-Ups (which may include some future
activities):
Cost Variance = “Planned Total Costs” - “Projected OR Actual Total Cost”
% Cost Variance = “Cost Variance” / “Planned Total Cost” * 100
Definitions
Future Activities:
FY 2019 IT Investment Submission Guide

17

•

If Planned Start Date is > Today AND Actual Start Date, Actual Completion Date and Actual
Total Cost are zero/blank

In-Progress Activities:
•

If Actual Start Date is provided OR Projected Start Date is ≤ Today

Completed Activities:
•

If Actual Completion Date is provided (not blank)

Colors for Cost Variance
% Cost Variance

Color

(use absolute value)
0% , < 10%
≥ 10% , < 30%
≥ 30%

Green
Yellow
Red

Schedule Calculations
Always use the “Actual” value if both a “Projected” and an “Actual” date are provided for the
same activity.
Schedule Variance in days for an Activity:
Planned Completion Date – Actual OR Projected* Completion Date
*use today’s date if the Projected Completion Date has passed without reporting an
Actual Completion Date
Schedule Variance in days for a Roll-Up:
Latest Planned Completion Date of all activities – Latest Actual OR Projected* Date of all
activities
*use today’s date if the Projected Completion Date has passed without reporting an
Actual Completion Date
Schedule Duration in days for an Activity:
Planned Completion Date – Planned Start Date
Schedule Duration in days for a Roll-Up:
Latest Planned Completion Date of all activities – Earliest Planned Start Date of all activities
Percentage Schedule Variation:
FY 2019 IT Investment Submission Guide

18

Investment % Schedule Variance =
Colors for Schedule Variance

variance in days
duration

*100

% Schedule Variance

Color

0% , < 10%
≥ 10% , < 30%
≥ 30%

Green
Yellow
Red

Contract Linkage with USASpending
Since the Federal Procurement Data System (FPDS) is the authoritative source for all federal contract data,
agencies are required to ensure that contract data residing in www.FPDS.gov is timely and accurate, prior
to submitting contract data to the IT Dashboard. In an effort to honor FPDS.gov and USASpending.gov as
the authoritative sources for contracts data and IT spending reporting, respectively, the IT Dashboard will
link to www.USASpending.gov for contract information.
The IT Dashboard links to a corresponding www.USASpending.gov record when an awarded contract
submitted to the IT Dashboard matches with the following fields: ‘PIID,’ ‘Referenced PIID’ (applicable only if
the contract is an IDIQ order), and Submitting Agency (agency of the investment for which the contract is
submitted).
If a match is not determined based on the data provided, the dashboard will display “A matching record is
not available in www.USASpending.gov.”
For contracts with matching records in www.USASpending.gov, the following key fields will be available to the
public on the IT Dashboard via a link:
•
•
•
•

Contract Description
Type of Contract
Contractor Name
Performance Based Service Acquisition (PBSA) designation

•
•
•
•

Start Date
End Date
Action Obligation
Extent Competed

Agencies must keep in mind that the IT Dashboard is not the authoritative source for either contracts or
solicitation data. Consequently, should an agency identify data that is not correct, that incorrect data must be
modified in the respective authoritative source (e.g., FPDS) rather than in the IT Dashboard.

FY 2019 IT Investment Submission Guide

19

Operational Performance Metric Categories
As per the Capital Programming Guide, the Performance Metric Categories should be mapped to one of the 4
categories below:
•
•
•
•

Customer Satisfaction (Results)
Strategic and Business Results
Financial Performance
Innovation

Investments with operational performance data must provide a minimum of five open metrics.
•

A minimum of one (1) metric should be “Customer Satisfaction (Results)” (i.e. service quality, end user
satisfaction) with respect to the impact to major stakeholders (customers, affected citizens, inter and
intra-agency end users).

•

A minimum of three (3) metrics should be “Strategic and Business Results”, which measures how the
investment contributes to the Strategic Objectives / Priority Goals or business need of the Agency. At
least one Strategic and Business Results metric must have a monthly reporting frequency. At least one
Strategic and Business Result must be tied to an Agency Strategic Objective or Agency Priority Goal that
was submitted at the investment level. Metrics in this category could come in two different areas:
•

•

Effectiveness –quantified desired effect the investment has on the Agency’s mission or business
needs (e.g. processing speed, processing quality, backlog reduction, mission outcomes, business
outcomes, etc.)
Efficiency - quantified desired effect the investment has on the agency’s operational/technical
needs (e.g. reliability, availability, throughput, response time/latency, utilization, etc.)

A minimum of one (1) metric should be “Financial Performance”, which measures the reasonableness
and cost efficiency of the investment.
Note: The metrics requirements above only apply to business cases for Major (Type 1) Investments
•

FY 2019 Application Validations
The FY 19 Validations for the IT Dashboard submission can be found at this link:
https://github.com/ombegov/ITDB-schema
The validations can be found in the “Quick Links to Files” section of the READMe.md file, listed as “Current
Validations”.

FY 2019 IT Investment Submission Guide

20

Responses to Agency Questions
This section provides responses to selected agency questions concerning the Capital Planning Guidance, the
Budget process, and IT Dashboard schema files.

QUESTIONS
ITB-1. Will the OMB Budget Account Codes be
updated this year?

RESPONSES
IT Budget
To provide investment funding sources, agencies
should use the OMB Budget Account Codes (not
Treasury Account codes). Please coordinate any
questions regarding budget account information with
your agency budget office, which should be the first
place that CIO staff consults when questions arise.
Please see the Appendix C of OMB A-11 to see a
complete list of available OMB Budget Account codes.
If you believe there to be an error in this list, please
contact your E-Gov desk officer.

ITB-2. For the President’s Budget submission, should
the “Change in Status Identifier” reflect the change
since the last submission in the Fall or since last year’s
budget submission?

It should continue to reflect the change as of last year’s
budget submission. For example, if an investment was
submitted with a “Change in Status Identifier” as
“New” in the Fall, it should still be submitted as “New”
for the President’s Budget submission.

Business Case
BC-2. Additional guidance is needed for the meaning
See “Contracting Guidance to Support Modular
of Modular Approaches/ Contracting.
Development” at
https://www.whitehouse.gov/sites/whitehouse.gov/fil
es/omb/procurement/guidance/modular-approachesfor-information-technology.pdf.
BC-3. How do I find the Agency Priority Goal / Agency
Strategic Objective codes referred to in Business Case
Question #2 and Business Case Detail Operational
Performance Metrics?

FY 2019 IT Investment Submission Guide

Agency Priority Goal / Agency Strategic Objective codes
are listed in the Data Dictionary included on the GitHub
development page for the IT Dashboard. These are the
same codes used internally on Performance.gov.

21

Business Case Detail
BCD-1.
In the Capital Planning Guidance, there is
If any of a parent activity’s child activities occurs in the
a note that says projects/activities commencing
current year or budget year (CY or BY), then all child
beyond the BY should be reported “as available”. Are activities of the parent activity must be reported,
BY+1 and beyond activities required for
regardless of their timing. This is to ensure that a
September? We see that CY and BY activities are
complete view of the parent activity is available.
now required, but we are wondering if BY+1 and
beyond is a requirement or optional for this year’s
submission?
BCD-2.
Can users leave the Performance Metric
For an existing investment, only CY (2018) Targets are
PY (2017) Target field blank? If so, will this generate
required, as all other metrics details are carried-over
an xml error?
from the existing Business Case.

BCD-3.
In the Business Case Detail Table C.1.A/B,
does the investment owner update the Actual Result
field when an actual result is obtained, such as
monthly, quarterly, semi-annually, or annually, and
report the dates these actuals were obtained in the
Date of Actual Result field?
BCD-4.
If an investment will not be in operations
until after 2017, can the investment owner leave the
Business Case Detail operational metrics table blank?
BCD-5. Should agencies remove completed activities
and projects?

BCD-6. For performance metrics with long term
cumulative goals (e.g. X objects by the end of the
year) but monthly reporting of actuals, should we
report 12 separate metrics with specific targets for
each month along the way?

BCD-7. Should Project Start and Completion dates be
updated to reflect “Actual” values once they become
available?

FY 2019 IT Investment Submission Guide

The “Date of Actual Result” should be the date the
metric was measured. Not the date it is reported.

Either Section C operational data or Section B projects
data must be provided in the Business Case Detail for
an investment.
Agencies should only remove completed projects and
activities as a result of a rebaseline or replan.
Completed activities and projects reported to the IT
Dashboard will be retained to be used as historical
records and to be available for the IT Dashboard user
interface and calculations.
No. Do not create multiple metric objects just to
describe different reporting periods for a single
underlying measure.
Consider reporting such a metric with estimated semiannual targets. Agencies may submit actuals to the IT
Dashboard more frequently than the selected reporting
frequency of targets.
Values provided for the Projects table in the Business
Case Detail should generally represent “planned”
values. The only case when “actual” values should be
entered for Project Start Date, Project End Date, and
Project Lifecycle is when reporting historical
information. For example, when adding a project to the
ITDB that has already started, the “actual” start date
would be provided for Project Start Date.

22

However, as a project progresses, updates regarding
“projected” and “actual” start date, completion date,
and cost should only be entered in the Activities table.
All cost and variance calculations only use values from
the activities table, so it is not necessary to make
changes to the projects table to ensure correct variance
calculations.
For example:
Latest Activity Planned Completion Date: 9/30/2013
Latest Activity Actual Completion Date: 10/05/2013
Project Completion Date: 9/30/2013
In this example, though the last activity in the project
took longer to complete than expected, the Project
Completion Date should not be updated as it indicates
what was planned when the project was added initially.
Keep in mind that most project-related fields are
“baselined” and require a reviseInvestment operation
to change. In general, once provided for a project, these
baselined fields should not be changed unless a baseline
event happens. For a complete list of these fields,
please refer to the “Baselined Fields Table.”

FY 2019 IT Investment Submission Guide

23



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.5
Linearized                      : Yes
Author                          : OMB
Company                         : OMB
Create Date                     : 2017:12:07 13:45:05-05:00
Modify Date                     : 2017:12:07 13:45:17-05:00
Source Modified                 : D:20171207184408
Tag New Review Cycle            : 
Language                        : EN-US
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 5.4-c006 80.159825, 2016/09/16-03:31:08
Metadata Date                   : 2017:12:07 13:45:17-05:00
Creator Tool                    : Acrobat PDFMaker 11 for Word
Document ID                     : uuid:a649632e-359c-46c5-a0cb-f74b32a3eff3
Instance ID                     : uuid:cf18f2f5-9cf5-4efa-bc23-2ea7f83538f0
Subject                         : 10
Format                          : application/pdf
Title                           : 
Creator                         : OMB
Producer                        : Adobe PDF Library 11.0
Page Layout                     : OneColumn
Page Count                      : 23
EXIF Metadata provided by EXIF.tools

Navigation menu