Procurement Management Support System – PMSS
User Guide - SPFU
Compulink Systems Ltd.
Plot no. 38, Rajiv Gandhi IT Park,
MIDC, Hinjewadi, Pune- 411057
Phone 91- 20- 66528000 • Fax 91- 20- 66528080

User manual for PMSS v1.0
1

Procurement Management Support System – PMSS v1.0

User Guide

Index
Introduction .............................................................................................................3
Configuration Module ..............................................................................................9
User Maintenance ..............................................................................................11
Procurement Plan..................................................................................................13
Procurement Plan Creation ....................................................................................13
Procurement Plan Approval ....................................................................................19
Institution’s Plan Approval ....................................................................................22
Plan Revision ........................................................................................................25
Procurement Process ............................................................................................28
Initiation .........................................................................................................28
In Progress .......................................................................................................29
Completed .......................................................................................................30
Cancelled ........................................................................................................30
Shopping Goods ....................................................................................................32
Shopping Works ....................................................................................................53
Direct Contracting .................................................................................................72
NCB Goods ............................................................................................................76
NCB Works ..........................................................................................................105
ICB ......................................................................................................................130
LIB ......................................................................................................................131
Quality and Cost Based Selection (QCBS) ............................................................133
Fixed Budget Selection (FBS) ..............................................................................177
Least Cost Selection (LCS) ..................................................................................178
Consultant Qualification Selection (CQS) ............................................................180
Single Source Selection (SSS) .............................................................................181
Individual Consultants – Competitive Method .....................................................187
Individual Consultants – SSS ..............................................................................199
Prior Reviews ......................................................................................................204
Request/ Queries ................................................................................................206
PMSS-MIS ...........................................................................................................210

2

Procurement Management Support System – PMSS v1.0

User Guide

Introduction
NPIU was established by Ministry of Human Resource Development, Government of India, in August
1990 for coordination, facilitation, monitoring and to provide guidance to the States/ Institutions in all
aspects of the projects.
Technical Education Quality Improvement Programme (TEQIP) was envisaged in 2003 as a long-term
programme to be implemented in 3 phases for transformation of the technical education system with
World Bank assistance. TEQIP-II is planned as a sequel to TEQIP-I to continue the development activities
initiated by TEQIP-I. Under TEQIP-II, estimate of around 200 institutions from all over the country will be
selected to achieve the following objectives:
Strengthening Institutions to produce high quality engineers for better employability
Scaling up PG education and demand driven Research & Development and Innovation
Establishing Centers of Excellence for focused applicable research
Training of faculty for effective Teaching
Enhancing Institutional and System Management effectiveness
To achieve the objectives of the programme, the institutions will be funded for various activities covered
under the programme by the World Bank through the Government of India. Substantial portion of these
funds will be used to procure various good, services, and works (civil works) by the participating
institutions. All procurement under the TEQIP-II programme will be carried out in accordance with the
World Bank guidelines, failing which, could result in penalties.
The PMSS will be used to support and monitor the procurement activities of the institutions, which are
selected for the project. PMSS will help the procurement activities by reducing time, standardizing the
processes, ensuring transparency, support decision making and compliance with agreed norms. Apart
from the institutions, PMSS will also be used by the SPFUs (State Project Facilitation Unit) and NPIU
(National Project Implementation Unit) for procurement as well as monitoring activities.

3

Procurement Management Support System – PMSS v1.0

User Guide

Client Software Requirement
Procurement management support system (PMSS) is a web based application. Client side software
requirements of PMSS are;
o

Web browser, Internet explorer 5 and above.

o

Adobe reader

Browser settings
1. Open internet explorer (IE).
2. Select option Tools->Internet Options-> Security-> Custom Level-> Automatic Prompting for file
downloads
3. Select ‘Enable’

4. Select option Tools-> Pop-up Blocker-> Pop-up Blocker Setting.
5. In the ‘Address of Website to allow’ field type the PMSS website url
6. Click ‘Add’.

4

Procurement Management Support System – PMSS v1.0

User Guide

5

Procurement Management Support System – PMSS v1.0

User Guide

1
Chapter

CONFIGURATION AND SETUP
Institution Configuration

6

Procurement Management Support System – PMSS v1.0

User Guide

Home Page
Browse the following URL to access the PMSS system;
URL: www.teqip-pmss.com
This will display the Home Page;

Login
Fill the Login ID and Password on the home page and click

to enter into the system.

Change Password
To change the password, click on ‘Change Password’ link on the home page. A pop up will be seen;

7

Procurement Management Support System – PMSS v1.0

User Guide

Fill the Login Name, Old Password, New Password, Confirm Password. The system will indicate the success or
failure of changing the password.

Forgot Password
Enter Login ID and click on the ‘Forgot Password’ link.
An email popup will be shown. Enter the required details in the email and click send.

8

Procurement Management Support System – PMSS v1.0

User Guide

Configuration Module
To access the Configuration Module, click on ‘Configuration’

1. Click on the SPFU name
2. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

2
3
4
5

Field Description

Address

SPFU’s Address

Website URL
Phone Number
Fax Number
Email ID

SPFU’s Website URL
SPFU’s Telephone Number
SPFU’s Fax Number
SPFU’s email

3. Two subtabs can be seen in the lower section


Purchase Committee



Institution Logo

Purchase Committee
Purchase Committee for the Institution can be created here.
To define the purchase committee;
o

Click on ‘Add’ link

o

Enter the Committee Member name

o

Enter his Designation
9

Sample Data
B289, Shamim
Towers, Kloar
Street
www.cslnit.com
020 26453280
020 26453288
csl@cslnit.com

Procurement Management Support System – PMSS v1.0

User Guide

o

Enter his/ her Role In Purchase Committee

o

Select the department to which this member belongs to (dropdown will list the
departments created in the above Department sub tab)

o

Click ‘Save’

To add another Committee member repeat the above steps
Note: Adding at least three purchase committee members is mandatory

Institution Logo
Institution’s logo can be uploaded here.
o

Click on ‘Add’ link

o

In the pop up browse and select the logo file

o

Click ‘Upload’

10

Procurement Management Support System – PMSS v1.0

User Guide

User Maintenance
Under this node SPFU user details can be seen. Select option Configuration-> User Maintenance
1. Click on the name of the user

2. Following details can be seen
Sr. No.
1

Field Name
Sanjay Matkar

Sample Data
Mohammed Ali Shaikh

2
3
4
5
6
7
8
9
10
11
12
13
14
15

First Name
Middle Name
Last Name
User Name
Birth Date
Gender
Email
Phone
Address
City
Pin Code
Role
State
Institution

Mohammed
Ali
Shaikh
shaikh.mohammed
02/03/1978
Male
shaikh.mohammed@cslnit.com
020-26789023
B289, Shamim Towers, Kloar Street
Mumbai
400058
Procurement Coordinator(Institution)
Maharashtra
CSL NIT

11

Procurement Management Support System – PMSS v1.0

User Guide

2
Chapter

PROCUREMENT PLANNING
Procurement Plan Creation and Approval

12

Procurement Management Support System – PMSS v1.0

User Guide

Procurement Plan
Purpose
The purpose of the procurement plan is to plan and define all the procurements for the stipulated plan
period. Procurement plan is the heart of the PMSS; procurements can be initiated in PMSS only when
the procurement plan has been approved.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – creates and submits the plan for approval

o

Procurement Coordinator – NPIU’s procurement coordinator who approves the procurement
plans

Process Details
Planning process can be segregated in two parts
Procurement Plan Creation
Procurement Plan Approval

Procurement Plan Creation
Purpose
To create all the packages and services those are to be procured in the stipulated plan period.

Role(s)
13

Procurement Management Support System – PMSS v1.0

User Guide

Procurement Coordinator (SPFU)

Process Details
To create procurement plan, select option Procurement-> Plan-> Prepare/ Revise Plan

1. Click on the Procurement Plan Title, which is in the right section

2. To plan procurements of goods/ civil works; select the ‘Goods/ Civil Works’ tab and click on ‘Add’,
which is within the tab.

3. A popup will appear. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Package Name

Enter Name of Package.
Stationary Items
A package is group of items to be purchased together.
Items belonging to the same expenditure category
(Goods, Works or Services) should be grouped

14

Procurement Management Support System – PMSS v1.0

2

Justification

3

Category

4

Sub Category

5
6

Sub Component
Activity

7

Is Proprietary

User Guide

together.
Proprietary items should be added as separate
packages.
The system will refer to the package by this name. This
name will appear in bidding documents, purchase
order/contracts and any other document related to
procurement of this package.
Enter more information about the Package.
The description will be displayed and can be changed
at the time of actual procurement of the item.
This field is not mandatory.
Select Expenditure Category of the package – Goods or
Civil Works.
This is one of the important fields related to the
package. Please note that you cannot modify the
category after you save.
After you select the category, ‘Item Details’ section will
appear.
Select Expenditure Sub-Category.
This dropdown will be populated after you select the
category.
This is one of the important fields related to the
package.
Select the sub component for this package
Mention the activity to which this package is related

This includes pens,
pencils and
computer printing
papers.
Goods

Equipments

1.2
Management
Capacity
Enhancement

This checkbox will be editable only for Category
“Goods” and Sub-Category “Equipments”.
Check the checkbox if the package is a proprietary
item.
This is one of the important fields related to the
package.

8
9

Through DGS & D

Check the checkbox if the package is going to be
procured through DGS & D.
EstimatedFinancial Enter date in DD/MM/YYYY format or select date using 12/02/2011
Sanction Date
calendar.
You cannot enter past Date.
Please enter date on which you should get financial
sanction for procurement of this package.
System will automatically calculate estimated timelines
for procurement of this package based on this date.
This is one of the important fields related to the
package.

15

Procurement Management Support System – PMSS v1.0

User Guide

4. Adding at least one Item is mandatory. To add an Item click on the ‘Add’, which is in the ‘Item
Details’ section. A row will appear where the item details can be added.

5. Fill the fields on the page. Details of the fields are mentioned below;
Sr. Field Name
No.
1
Item Name

Field Description

Sample Data

2

Justification

3

Quantity

Enter Name of an individual Item
Pencils
This name will appear in bidding documents,
purchase order/contracts and any other
document wherever list of individual items is
displayed.
Enter more information about the item.
HB Pencils
The description will be displayed in bidding
documents, purchase order/contracts and any
other document wherever list of individual items
appears.
This field is not mandatory.
Enter Quantity of the item to be procured.
100

4

Est. Cost Per
Unit

This is one of the important fields related to the
item.
Enter Estimated Cost Per Unit (.e. Rate) for the 200
item

5

Estimated Cost

This is a read-only field.
This will get auto-calculated by the system as
Quantity * Est. Cost Per Unit.

6. To add another item, repeat steps 4 and 5.
7. After adding the items, click on the ‘Suggest Methods’ link, which is in front of the
‘Indicative Procurement Method’ dropdown. This will populate the ‘Indicative Procurement
Method’ dropdown. The method(s) will be populated based on the ‘Total Estimated Cost’

16

Procurement Management Support System – PMSS v1.0

User Guide

8. Select the appropriate method in the ‘Indicative Procurement Method’ dropdown.
9. Click ‘Save’
10. Once saved, ‘Define Tentative Timelines’ link will appear in front of Est. Financial Sanction date field.
The purpose of this link is to input the estimated dates of Bid Invitation, Bid Opening, etc for that
package.

11. Click on ‘Define Tentative Timelines’ link. A pop showing auto calculated dates will be seen. Edit
these dates, if required.
12. To plan procurements of services; select the ‘Services’ tab and click on ‘Add’, which is within the tab

13. A popup will appear. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Service Name

Enter Name of Service to be procured.
Inventory System
The system will refer to the package by this name.
This name will appear in bidding documents,
contracts and any other document related to
procurement of this package.
17

Procurement Management Support System – PMSS v1.0

2

Description

3

Category

4

Sub-Category

5
5

User Guide

Enter more information about the Service to be
procured.
The description will be displayed and can be changed
at the time of actual procurement.
This field is not mandatory.
This lists only one entry “Services”. Select the item
from the list.
This is one of the important fields related to the
package.
Select Expenditure Sub-Category.
This dropdown will be populated after you select the
category.
This is one of the important fields related to the
package.

Service will include
development of
inventory
application.

Sub Component
Activity

Select the sub component for this package
Mention the activity to which this package is related

6

Service Provider

1.2
Management
Capacity
Enhancement
Firms

7

Total Estimated
Cost

This dropdown lists two items – Firms and Individual
For Services which will be procured from Individual
Consultant, select “Individual” from the dropdown.
For Services which will be procured from Firms,
select “Firm” from the dropdown.
Enter Total Estimated Cost of the service
100000

8

Indicative
Procurement
Method

9

Estimated
Financial
Sanction Date

Services

Professional
Services

After you enter Total Estimated Cost, System will SSS
calculate Indicative Procurement Methods applicable
for the estimated cost and populate this dropdown.
Select appropriate Procurement method from the
list.
Enter date in DD/MM/YYYY format or select date 12/02/2011
using calendar.
You cannot enter past Date.
Please enter date on which you are expected to get
internal financial sanction for procurement of this
package.
System will automatically calculate estimated
timelines for procurement of this package based on
this date. This is one of the important fields related
to the package.

14. Click ‘Save’
15. To add another service repeat steps from 18 to 21.

18

Procurement Management Support System – PMSS v1.0

User Guide

16. ‘Define Tentative Timelines’ link can be seen on the list page.

17. Click on ‘Define Tentative Timelines’ link. A pop showing auto calculated dates will be seen. Edit
these dates, if required.
18. After adding all the packages and services to be procured click on ‘Submit Procurement Plan’, which
is on the upper bar in the right section.
19. Plan can be viewed as per the format given in the PIP. Click on PP View/ PP View Report, which is on
the upper bar in the right section and also available on the list page of the plan.

Procurement Plan Approval
Purpose
To send the procurement plan for review and approval.

Role(s)
o

Procurement Coordinator (SPFU)

o

Procurement Coordinator – NPIU’s procurement coordinator, approves the procurement plans
of SPFUs and institutions

Prerequisite
o

Plan should be created completely.

o

Plan should be within the allocated budget.

Process Details
Once the procurement plan is created it has to be sent for approval. SPFU plan will be sent to NPIU for
approval.
1. Click on ‘Submit Procurement Plan’, which is on the upper bar in the right section.

19

Procurement Management Support System – PMSS v1.0

User Guide

2. An email pop up will be seen, click on ‘Send’. This will send an email to the approving authority.
3. When the approving authority approves the plan email will be received by the SPFU users.
4. Once the plan is approved by the approving authorities the status of the plan will change to
‘Approved’, which can be seen in the Colum after the plan title in the right section.

5. To view the approving details click on the ‘Plan Status’ link this will show the approval stages and
comments.
6. If the plan is rejected then status of the plan will be ‘Under Clarification’. SPFU users will receive an
email notification accordingly.
7. If rejected, click on the plan title. Then click on the ‘Rejection Comments’ link, which is in the upper
bar in the right section and view the rejection comments.

8. Modify the plan as required and send the plan for approval again.

20

Procurement Management Support System – PMSS v1.0

User Guide

3
Chapter

PLAN APPROVAL
Procurement Plan Approval

21

Procurement Management Support System – PMSS v1.0

User Guide

Institution’s Plan Approval
Purpose
To review and approval institutions procurement plans.

Role(s)
o

Procurement Coordinator (Institution) – Sends plan for approval

o

Procurement Coordinator (SPFU) – Reviews and approves the plan

o

Procurement Coordinator – NPIU’s procurement coordinator, reviews and approves the plan

Prerequisite
o

Institution should belong to the SPFU

o

Plan should be submitted by the institution

Process Details
1. Select option Procurement-> Plan-> Approvals

2. List of all the institutions along with its own plan can be seen by the SPFU
3. Click on the institution to see its detail procurement plan.
4. To approve the plan click on the ‘Send to NPIU’ link. To reject the plan click on ‘Send back to
Institution’ link.

22

Procurement Management Support System – PMSS v1.0

User Guide

5. Once the plan is approved it will go to NPIU for approval

23

Procurement Management Support System – PMSS v1.0

User Guide

4
Chapter

PLAN REVISION
Procurement Plan Revision

24

Procurement Management Support System – PMSS v1.0

User Guide

Plan Revision
Purpose
The purpose of the procurement plan revision is to make changes to existing packages/ services or to
add new packages/ services. Revised packages/ services can be initiated only when the revised
procurement plan has been approved.

Process flow

Role(s)
o

Procurement Coordinator (SPFU)

o

Procurement Coordinator – NPIU’s procurement coordinator, approves revisions

Prerequisite
o

Procurement Plan should be approved at least once.

25

Procurement Management Support System – PMSS v1.0

o

User Guide

Procurement budget should be available.

Process Details
To revise the procurement plan select option Procurement-> Plan-> Prepare/ Revise Plan. Click on the
procurement plan title then click ‘Revise Plan’ link, which is on the upper bar of the right section.

1. Click on the package/ service that have to be revised.
2. Make the necessary changes to package/ service
3. Click ‘Save’
4. To make changes to another package/ service repeat steps 1 to 3.
5. New packages/ services can also be added by following steps of adding packages/ services, as
described in procurement plan creation section.
6. All the package / service, which have been revised, will be shown in a different colour.
7. To send the plan for revision approval click on ‘Submit Plan for Revision Approval’ link, which is on
the upper bar in the right pane.

Note: When a procurement plan is revised and sent for approval, procurements can still be
initiated for those package/ service which are not revised. However, the package/ service
which have been revised cannot be initiated until the procurement plan is approved.

26

Procurement Management Support System – PMSS v1.0

User Guide

5
Chapter

PROCUREMENTS
Procurements Process

27

Procurement Management Support System – PMSS v1.0

User Guide

Procurement Process
Purpose
To perform the procurement of the approved packages/ services.

Role(s)
o

Procurement Coordinator (SPFU) – Performs procurement process for SFPU procurements.
Performs Prior reviews of insititution procurements, when applicable.

o

Procurement Coordinator – NPIU’s procurement coordinator, Performs Prior review, when
applicable.

Prerequisite
o

Procurement plan should be approved

Process Details
Process node is divided into;
Initiation
In Progress
Completed
Cancelled

Initiation
Approved packages/ services are listed under Procurement-> Process-> Initiate

1. Click on ‘Initiate’ link, which is in the right section. This will initiate the procurement.
2. Fill the fields on the page
28

Procurement Management Support System – PMSS v1.0

Sr.

User Guide

Field Name

Field Description

Sample Data

Actual Financial
Sanction Date

Enter the date in DD/MM/YYYY format. This date is 12/03/2011
the date on which procurement was sanctioned
internally.

No.
1

3. Click ‘Save’
4. ‘Revise Timelines’ link will appear in front of the ‘Actual Financial Sanction’ date field, click on the
link will show a pop up. Dates in this popup will be auto populated based on the Procurement
Method and Initiation date. Edit the dates, if required.
5. Click on ‘Click here to Proceed’ link this will display the Guidelines for the select method.
6. Click on ‘Click to start Procurement Process’ this will initiate the procurement and the package/
service will move to in progress.

In Progress
Initiated procurements are listed under the option Procurement-> Process-> In Progress

1. Click on the Package/ Service Name, which is in the right section. This will open the procurement in
its current stage.
2. Perform the action required for this stage and Click on ‘Move to Next Stage’. Now, Perform the
action required for this stage and click on ‘Move to Next Stage’ and so on. (Details on performing
each stage are described in detail in Chapters 6 to 11).

29

Procurement Management Support System – PMSS v1.0

User Guide

3. Thus procurement processes for the package/ service can be completed by performing all the
required stages (steps).

Note: All the stages (steps) for each procurement method are described in Chapters 6 to 11.

Completed
Completed procurements are listed under the option Procurement-> Process-> Completed
1. Click on the Package/ Service Name, which is in the right section.
2. To view details of the package/ service, click on the respective stage, steps or subtabs.
3. To view documents attached to the package/ service see the documents subtab.

Cancelled
Cancelled procurements are listed under the option Procurement-> Process-> Cancelled
1. Click on the Package/ Service Name, which is in the right section.
2. To view details of the package/ service, click on the respective stage, steps or subtabs.
3. To view documents attached to the package/ service see the documents subtab.

30

Procurement Management Support System – PMSS v1.0

User Guide

6
Chapter

SHOPPING METHOD
Procurement Using Shopping/ Direct Contracting Method

31

Procurement Management Support System – PMSS v1.0

User Guide

Shopping Goods
Purpose
To perform procurement of goods using shopping method.

Process flow

Role(s)
o

Procurement Coordinator (SPFU)

Prerequisite
o

Package to be procured should fall under category goods.

o

Value of the package should be <=USD 20,000

Process Details
First stage of Shopping is ‘Invitation Letter’.

Invitation Letter
In this stage suppliers are added. Invitation letters are generated & sent out to these suppliers.

32

Procurement Management Support System – PMSS v1.0

User Guide

1. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Quotation Validity

2

Last Date & Time of
Submission

3

Training Clause

4
5

Testing/Installation
Clause
Warranty

6

AMC

Enter the number of days for which Quotation is 15
required to be Validity.
Enter the date and time by which quotation 12/03/2011
should be submitted. Date format is 16:00
DD/MM/YYYY and time format is HH:MM, 24 hrs
format.
Enter the training requirement, if any. Else enter
NA.
Enter the testing/installation requirement, if any.
Else enter NA.
Enter the warranty period in months. It should not
be less than 6 months. In-case of no warranty
enter NA.
Mention whether AMC is applicable Yes/ No or
enter the AMC amount.

2. Click ‘Save’
3. Click on ‘Step 2: Enter Item Details’ link. ‘Items’ subtab is shown in the lower section.

33

Procurement Management Support System – PMSS v1.0

User Guide

a. Click ‘Item Name’, a pop up will be seen.

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

4
5

Field Name

Field Description

Sample Data

Is Training Required Check this option if training is required for the
selected item
Is Installation
Check this option if installation is required for the
Required
selected item
Specifications
Enter the item specification. Click on ‘Search
Specification from PMSS Database’ link to get
specifications from other items.
Place Of Delivery
Mention the place of delivery where the selected
item is required to be delivered
Installation
Mention the installation requirement details for
Requirements (If
the selected item, if any
Any)

c. Click ‘Save’
d. If there is more than one item, repeat steps from a. to c.
4. Click on ‘Step 3: Add Evaluation Questions, If Required’ link (this is an optional step, to be
performed only if additional evaluation question are required). ‘Questions’ subtab is shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

34

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Question

Does the supplier have a
local service center?

2

Non Responsive
Value

Enter the description of the question
to be asked during quotation
evaluation. Form the question such
that response (answer) is Yes/ No/ NA.
Select the value (Yes/ No/ NA) based
on which the supplier will become
non- responsive.

E.g. if the question is
‘Does the Contractor have
a local service center?’
then the non- responsive
value could be ‘No’.

c. Click ‘Save’.
d. To add another Question repeat steps from a. to c.
5. Click on ‘Step 4: Enter Supplier Details’ link. Supplier Details subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Supplier Name

Enter the supplier name.
FTTI Pvt Ltd
Supplier can also be searched using ‘Select
Supplier from PMSS Database’ link. Click on this
link will display the existing list of suppliers, if
any. Once the list is displayed click on the
supplier’s name this will auto populated the
selected supplier’s data. To search additional
suppliers within the state or city use the filters
provided on the page
35

Sample Data

Procurement Management Support System – PMSS v1.0

2

Address

3
4
5

City
State
Supplier Source

6

Specify Source

7
8
9
10

Email ID
Pin Code
Name Of
Representative
Phone Number

11
12
13

PAN Number
TAN Number
Tax Number

User Guide

Enter the address of the Supplier

STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR
Road
Enter the city of the Supplier
Pune
Enter the state of the Supplier
Maharashtra
Select the source of supplier i.e. the source from Website
which the supplier was found
Only if ‘Supplier Source’ is ‘Others’ then type the Pamphlets
source
Enter the Email ID of the Supplier
ftti@efttil.com
Enter the Pin Code of the Supplier
411232
Enter the Representative of the Supplier
Mr. Mohan
Solanki
Enter the Phone Number of the Supplier. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the PAN Number of the Supplier
ANS44874
Enter the TAN Number of the Supplier
Enter the TAX Number of the Supplier

c. Click ‘Save’
d. To add another Supplier repeat steps from a. to c.
6. Click on ‘Step 5: Define Payment Terms’ link. ‘Payments’ subtab is shown in the lower section.
a. By default two Payment Terms are shown

b. Click on the Payment Term a pop up will be seen
c. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.

Field Name

Field Description

36

Sample Data

Procurement Management Support System – PMSS v1.0

1
2

Expected
Delivery Period
Payment
Percentage

User Guide

Mention the period in which this delivery is 30
expected once the contract is signed.
By default percentage will be show, edit the 10
percentage if required

d. Click ‘Save’
e. Update the second payment term by repeating steps b. to d.
7. You can also add new payment terms, if required. Total of payment percentage of the payment
terms should be 100.
8. After filling mandatory data, click on ‘Step 6: Generate Invitation Letters’ link. This will generate the
invitation letters for the added suppliers.
9. Click on ‘Step 7: View & Print Invitation Letter’. ‘Supplier Details’ subtab is shown in the lower
section

a. Click on the Invitation letter to view/ print the invitation letter.
b. Click on Send Mail to send the invitation letter via email
c. Repeat above steps for all suppliers.
10. All the invitations letters generated are editable and necessary changes can be made to the
invitation letters before sending the letters to the suppliers. [It is not possible to email the updated
invitation letters through the “Send Mail” link]
11. Click on ‘Step 8 : Upload Invitation Letter” . The Documents sub tab is shown in the lower section.
Click on the “Add “ link to add the updated invitation letter. Any one Invitation letter
generated/updated for this package is to updated for reference.
12. On completion of ‘Invitation Letter’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Quotation Opening’ stage.

Quotation Opening
In this stage the quotation opening is performed and responsive quotations are identified.

37

Procurement Management Support System – PMSS v1.0

User Guide

13. On the ‘Quotation Opening’ tab click on ‘Step 1: Print Quotation Opening Form’. This will open a
quotation opening form. This form can be used during Quotation Opening. Print of this form can be
taken and Quotation opening details can be recorded on this form. The supplier names (which were
added during Invitation letter stage) are seen on this form against which quotation opening details
can be mentioned. Three extra columns are provided to accommodate names of any new suppliers
who have submitted their quotations directly.
14. Click on ‘Step 2: Enter Quotation Opening Data’ and Fill the fields on the page. Details of the fields
are mentioned below;
Sr. No.

Field Name

Field Description

1

Quotation
Opening Date

2

Quotation MoM

Enter the actual date and time when quotation 12/03/2011 16:00
was opened. Date format is DD/MM/YYYY and
time format is HH:MM, 24 hrs format. It is
recommended that opening should be done at
the start of the week so that there is ample time
to enter opening data in PMSS.
Enter the Minutes of Meeting.
Larger MoM’s can be uploaded using the
documents subtab

15. Click ‘Save’
16. Click on the ‘Enter Quotation Opening Data’ link. A pop up will be seen

38

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

a. Enter the Responsiveness Criteria.
b. Click ‘Save’.
17. Click on ‘Step 3: Upload Quotation Opening Form’ link. ‘Documents’ subtab will be shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;

39

Procurement Management Support System – PMSS v1.0

Sr.
No.
1
2
3

Field Name

User Guide

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Quotation
Opening Form
Signed Quotation
Opening Form

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
18. On completion of ‘Quotation Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Quotation Evaluation’ stage.

Quotation Evaluation
In this stage evaluation is performed and lowest evaluated supplier is identified.

19. On the ‘Quotation Evaluation’ tab click on ‘Step 1: Print Quotation Evaluation Form’. This will open a
quotation evaluation form. This form can be used during Quotation Evaluation. Print of this form can
be taken and Quotation Evaluation details can be recorded on this form.
20. Click on the ‘Step 2: Enter Quotation Evaluation Data’ link. A pop up will be seen

40

Procurement Management Support System – PMSS v1.0

User Guide

a. Enter the comparative data for all the supplier.
b. Click ‘Save’.
c. Click on ‘Quotation Details’ link, which is in front of each responsive supplier. A popup will be
seen.
d. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Basic Cost per
unit

2

Comments

Basic cost for each item can be entered in 2000
this field. Enter the basic cost per item as
given by the supplier
Enter comments, if any
Quotation Opening
Form

e. Click on ‘Save’
f.

Quotation details of all responsive Suppliers can be entered by repeating steps from c. to e.

21. System will show the lowest evaluated responsive supplier (L1) on the main page.
22. Click on ‘Step 3: Upload Quotation Evaluation Form’ link. ‘Documents’ subtab will be shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

41

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Quotation
Evaluation Form
Signed Quotation
Evaluation Form

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
23. Click on ‘Step 4: View/Edit Supplier Details’ link to update supplier details which are unavailable at
this time of invitation letter generation. The list of all participation suppliers is shown on the lower
half of the screen. Click on the supplier name to update the necessary details.
24. On completion of ‘Quotation Evaluation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Recommendation for Award’ stage.

Recommendation for Award
In this stage appropriate responsive supplier can be recommend. If the lowest evaluated responsive
supplier (L1) is not acceptable by the committee then another supplier can be selected in this stage

42

Procurement Management Support System – PMSS v1.0

User Guide

25. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
L1 Supplier

Field Description
Sample Data
If the lowest evaluated responsive
supplier (L1) is not acceptable by the
committee then another supplier can be
selected

2

Recommendation Comments

Enter the comments

Note: If the Contract price (i.e. Evaluated Price) is more than 25% of the estimated price then the
package will be sent for prior review. Once the user clicks on ‘Move to Next Stage’ system
will ask for a confirmation before sending the package for prior review.

26. On completion of ‘Recommendation for Award’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘Purchase Order’ stage.

Purchase Order
In this stage PO is generated and Payment terms are updated with expected completion and
payment dates

43

Procurement Management Support System – PMSS v1.0

User Guide

27. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
Generated On

Field Description
System will show the current date (i.e.
today’s date) by default. Click on ‘Save’

2

PO#

PO number will be generated
automatically

Sample Data
Today’s date

Note: If Generated date is greater than the bid validity (i.e. difference between Bid opening date
and Generated date is more than the bid validity given by the selected supplier) system will
ask to provide a new bid validity. Enter the total new bid validity. E.g. if original validity was
90 days and supplier has extended it by 30 days then enter 120 days.

28. Click on ‘Step 2: Generate Purchase Order’. A Pop up will be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.

Field Name

Field Description

44

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

1

PO date

Will be auto populated as the PO generation date. The 12/12/2011
field is editable.

2

VAT %

Enter the Value Added Tax percentage for this PO. If 12
there is no VAT enter 0.

3

Octroi and
Others
Total Cost
(Contract
Value)
Evaluated Cost

Enter the Octroi and Others charges amount

1200

Will be auto calculated as (Total Base Cost + VAT)

System
calculated

Will be auto populated from the Evaluated Price

Total Base Cost
(Item)
Basic Cost Per
Unit

Will be auto calculated as (Qty*Basic Cost Per Unit)

System
calculated
System
calculated

Quantity

Quantity is editable

4

5
6
7

8

This can be seen in the lower row, i.e. in the items
section. Edit the basic cost per unit as required.

b. Click ‘Save’
c. Click ‘Print PO’. System will give an option to Open/ Save the PO. Save the PO on your computer
with a proper name. Update the sections highlighted in yellow and save the document.
29. Click on ‘Step 2: View/Update Payments details’ link. ‘Payments’ subtab will be seen in the lower
section.
a. Click on the payment term name a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

Sample Data

1

Expected Delivery
Date

2

Expected Payment
Date

This is auto calculated as Purchase Order 10/04/2011
Date + Expected Delivery Period. Edit the
date if required. Date format is DD/MM/YYYY
Enter the expected date when payment will 12/04/2011
be made against this completion. Date
format is DD/MM/YYYY

c. Click ‘Save’.
d. Update the other payment terms by repeating steps a. to c.
30. Click on ‘Step 3: Upload Purchase Order’. ‘Documents’ subtab will be shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

45

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Quotation
Evaluation Form
Signed Quotation
Evaluation Form

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
31. If the PO has been finalized then select YES in the “PO Finalized drop down. All finalized contracts
will be listed in the “Awarded Contracts” section on the Home page.

46

Procurement Management Support System – PMSS v1.0

User Guide

32. On completion of ‘Purchase Order’ stage Click on ‘Move to Next Stage’. This will move the
procurement to ‘GRN & Payments’ stage.

GRN & Payments
In this stage Goods received details are captured and Payment tracking is performed.
33. Click on ‘Setp1: Fill GRN Details’. ‘GRN’ subtab will be shown in the lower section;

a. Click on ‘Add’, a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Supplier Name

This field is auto populated with the System
selected supplier’s name
populated

2

Date of Supply

Enter the date when Goods are supplied. 12/8/2011
Date format is DD/MM/YYYY

c. Click ‘Add’ link which is in the Items section.

d. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

47

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

1

Item Code

Enter a short (abbreviated) name for LMPrinter – can be a short
the item that is supplied
name for item ‘LaserJet
Monolithic Printer’

2

Item Name

Select the item that is supplied

LaserJet Monolithic Printer

3

Comments

Enter the comments, if required

Received ok

4

Enter the quantity of item received

2

5

Received
Quantity
Stock
Resistor
Name

Enter the name of the resistor
where the entry of this item is made
for manual records

TEQIP – II stock resistor

6

Page No.

Enter the page number of the stock
resistor on which this entry is made

32

7

Serial No.

Enter the serial number of this item

ABC Institution/ TEQIP – II/
LMP - 43

e. To add another Item repeat steps c. & d.
f.

Click ‘Save’, which is on the upper bar of the main (GRN) section.

g. Once saved, ‘Item Distribution’ link will appear against each item.

h. Click on ‘Item Distribution’ link a pop up will be seen. Enter the Actual Quantity supplied to each
department.

48

Procurement Management Support System – PMSS v1.0

User Guide

i.

Click ‘Save’.

j.

Click on ‘Print GRN’, which is on the upper bar of the main (GRN) section. GRN Report will be
generated.

k. The GRN Report can be uploaded using the Browse function, which is in front of the ‘GRN
Document’ field. Once uploaded, link will appear besides the browse function.

49

Procurement Management Support System – PMSS v1.0

l.

User Guide

Report can be downloaded, if required by clicking on the link.

m. Click on ‘Print Asset Register’, which is on the upper bar of the main (GRN) section. Asset
Register will be generated.

Note: Asset Register can be generated only once. System will give a warning message to confirm
that all the items have been added etc. Once Asset Register is generated no changes can be
made to that GRN record

n. Fill the fields in the Asset Register. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Unique
Number

Auto populated by the system based on the quantity
of items received

2

Model
Number
Serial
Number

Enter the model number of the item

3

Sample Data

HP LazerJet 3005

Enter the serial number of the item

o. Once the Asset Register is filled it can be uploaded using the Browse function, which is in front
of the ‘Asset Document’ field. Once uploaded, link will appear besides the browse function.

50

Procurement Management Support System – PMSS v1.0

User Guide

p. Asset Register can be downloaded by clicking on the link.

34. To add another record for GRN repeat steps from a. to p.
35. Click on ‘Setp2: Enter Payment details’. ‘Payments’ subtab will be shown in the lower section;

a. Click on the Payment Term a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Goods Received?

Check this box if goods are received against
this payment

2

Goods received
generated?

note Check this box if GRN is generated for the
received goods

3

Actual Completion
Date

Sample
Data

Enter the actual date of delivery. Date 12/07/2011
format is DD/ MM/ YYYY
51

Procurement Management Support System – PMSS v1.0

User Guide

Enter the actual amount paid

4

Actual Payment
Amount
Actual Payment Date

5

Cheque/Draft Number

Enter the Cheque/ Draft number by which 40023467
payment is made

6

Comments

Enter the comments, if any

12000

Enter the date when payment is made. Date 13/08/2011
format is DD/MM/YYYY

c. Click ‘Save’
d. To enter details of another payment repeat steps a. to c.
36. Once all the details for all the payments are recorded, Procurement can be marked as complete.
Click on ‘Completion Checklist’, checklist will be seen

a. Fill in the completion checklist
b. Click ‘Save’
37. Click on ‘Complete Procurement Process’ this will complete the procurement for that Package.

52

Procurement Management Support System – PMSS v1.0

User Guide

Shopping Works
Purpose
To perform procurement of civil works using shopping method.

Process flow

Role(s)
o

Procurement Coordinator (SPFU)

Prerequisite
o

Package to be procured should fall under category civil works.

o

Value of the package should be < USD 30, 000

Process Details
First stage of Shopping is ‘Invitation Letter’.

Invitation Letter
In this stage contractors are added. Invitation letters are generated & sent out to these contractors.

53

Procurement Management Support System – PMSS v1.0

User Guide

1. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Quotation Validity

15

2

Last Date & Time of
Submission

3

Work Completion
Period
Liquidated Damages
Per Day

Enter the number of days for which Quotation is
required to be Validity.
Enter the date and time by which quotation
should be submitted. Date format is DD/MM/YYYY
and time format is HH:MM, 24 hrs format.
Enter the total period in days by which work is
expected to be completed
Will be auto populated as 0.05%. Edit this field, if
required. Value in this field will be used to
calculated the Liquidated damages per day incase
of any completion delays.
Will be auto populated as 2%. Edit this field, if
required. Value in this field will be used to
calculated the maximum amount of liquidated
damages applicable

4

5

Liquidated Damages
(Maximum)

12/03/2011
16:00
120

2. Click ‘Save’
3. Click on ‘Step 2: View Item Details, if required’ link (This is an optional step, used to only view the
item details). ‘Items’ subtab is shown in the lower section;
a. Click ‘Item Name’, a pop up will be seen
b. View the item details, if required
c. If there is more than one item then, repeat steps a. and b.
4. Click on ‘Step 3: Add Evaluation Questions, If Required’ link (This is an optional step, to be
performed only if additional evaluation question are required). ‘Questions’ subtab is shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen
54

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Question

Does the supplier have a
local service center?

2

Non Responsive
Value

Enter the description of the question
to be asked during quotation
evaluation. Form the question such
that response (answer) is Yes/ No/ NA.
Select the value (Yes/ No/ NA) based
on which the supplier will become
non- responsive.

E.g. if the question is
‘Does the Contractor have
a local service center?’
then the non- responsive
value could be ‘No’.

c. Click ‘Save’.
d. To add another Question repeat steps from a. to c.
5. Click on ‘Step 4: Enter Contractor Details’ link. ‘Contractor Details’ subtab is shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.

Field Name

Field Description

55

Sample Data

Procurement Management Support System – PMSS v1.0

1

Contractor
Name

2

Address

3
4
7
8
9
10

City
State
Email ID
Pin Code
Name Of
Representative
Phone Number

11
12
13

PAN Number
TAN Number
Tax Number

User Guide

Enter the contractor name.
FTTI Construction
Contractor can also be searched using ‘Select
Contractor from PMSS Database’ link. Click on
this link will display the existing list of
contractors, if any. Once the list is displayed
click on the contractor’s name this will auto
populated the selected contractor’s data. To
search additional contractors within the state
or city use the filters provided on the page
Enter the address of the Supplier
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR Road
Enter the city of the Supplier
Pune
Enter the state of the Supplier
Maharashtra
Enter the Email ID of the Supplier
ftti@efttil.com
Enter the Pin Code of the Supplier
411232
Enter the Representative of the Supplier
Mr. Mohan Solanki
Enter the Phone Number of the Supplier. 26422689
To enter more than one number use comma (,)
as a separator.
Enter the PAN Number of the Supplier
ANS44874
Enter the TAN Number of the Supplier
Enter the TAX Number of the Supplier

c. Click ‘Save’
d. To add another Contractor repeat steps from a. to c.
6. Click on ‘Step 5: Add/View Payment Terms’ link. ‘Payments’ subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

56

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Payment Terms

Enter the payment title

2

Completion
Period
Payment
Percentage

3

Sample Data

1. On reaching
plinth level
(first level)
2. On Completion
Enter the period in days in which completion is 60
expected once the contract is signed.
By default percentage will be show, edit the 10
percentage if required

c. Click ‘Save’.
d. To add another payment term repeat steps from a. to c.
7. After filling mandatory data, click on ‘Step 6: Generate Invitation letter’ link. This will generate the
invitation letters for the added contractors.
8. Click on ‘Step 7: View & Print Invitation Letter’. ‘Contractors Details’ subtab is shown in the lower
section

d. Click on the Invitation letter to view/ print the invitation letter.
e. Click on Send Mail to send the invitation letter via email
f.

Repeat above steps for all contractors.

9. All the invitations letters generated are editable and necessary changes can be made to the
invitation letters before sending the letters to the suppliers. [It is not possible to email the updated
invitation letters through the “Send Mail” link]
10. Click on ‘Step 8 : Upload Invitation Letter” . The Documents sub tab is shown in the lower section.
Click on the “Add “ link to add the updated invitation letter. Any one Invitation letter
generated/updated for this package is to updated for reference.
11. On completion of ‘Invitation Letter’ stage click on ‘Move to Next Stage’. This will move the

procurement to ‘Quotation Opening’ stage.

57

Procurement Management Support System – PMSS v1.0

User Guide

Quotation Opening
In this stage the quotation opening is performed and responsive quotations are identified.

12. On the ‘Quotation Opening’ tab click on ‘Step 1: Print Quotation Opening Form’. This will open a
quotation opening form. This form can be used during Quotation Opening. Print of this form can be
taken and Quotation opening details can be recorded on this form. The Contractor names (which
were added during Invitation letter stage) are seen on this form against which quotation opening
details can be mentioned. Three extra columns are provided to accommodate names of any new
contractors who have submitted their quotations directly.
13. Click on ‘Step 2: Enter Quotation Opening Data’ and Fill the fields on the page. Details of the fields
are mentioned below;
Sr. No.

Field Name

Field Description

1

Quotation
Opening Date

2

Quotation MoM

Enter the actual date and time when quotation 12/03/2011
was opened. Date format is DD/MM/YYYY and 16:00
time format is HH:MM, 24 hrs format. It is
recommended that opening should be done at
the start of the week so that there is ample time
to enter opening data in PMSS.
Enter the Minutes of Meeting.
Larger MoM’s can be uploaded using the
documents subtab

14. Click ‘Save’
15. Click on the ‘Enter Quotation Opening Data’ link. A pop up will be seen

58

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

a. Enter the Responsiveness Criteria.
b. Click ‘Save’.
16. Click on ‘Step 3: Upload Quotation Opening Form’ link. ‘Documents’ subtab will be shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;

59

Procurement Management Support System – PMSS v1.0

Sr.
No.
1
2
3

Field Name

User Guide

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Quotation
Opening Form
Signed Quotation
Opening Form

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
17. On completion of ‘Quotation Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Quotation Evaluation’ stage.

Quotation Evaluation
In this stage evaluation is performed and lowest evaluated contractor is identified.

18. On the ‘Quotation Evaluation’ tab click on ‘Step 1: Print Quotation Evaluation Form’. This will open a
quotation evaluation form. This form can be used during Quotation Evaluation. Print of this form can
be taken and Quotation Evaluation details can be recorded on this form.
19. Click on the ‘Step 2: Enter Quotation Evaluation Data’ link. A pop up will be seen
a. Enter the comparative data for all the contractors.
b. Click ‘Save’.

60

Procurement Management Support System – PMSS v1.0

User Guide

c. Click on ‘Quotation Details’ link, which is in front of each responsive supplier. A popup will be
seen.
d. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Basic Cost per
unit

2

Comments

Basic cost for each item can be entered in 2000
this field. Enter the basic cost per item as
given by the supplier
Enter comments, if any

e. Click on ‘Save’
f.

Quotation details of all responsive Contractors can be entered by repeating steps from c. to e.

20. System will show the lowest evaluated responsive contractor (L1) on the main page.

21. Click on ‘Perform Post Qualification’ link, which is in front of the contractor name. A pop up will be
seen

a. Enter the post qualification details
b. If the Contractor becomes non-responsive in this step then automatically next lowest evaluated
contractor will be seen.
c. Repeat the Post Qualification process for this Contractor.
22. Click on ‘Step 3: Upload Quotation Evaluation Form’ link. ‘Documents’ subtab will be shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen
61

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Quotation
Evaluation Form
Signed Quotation
Evaluation Form

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
23. Click on ‘Step 4: View/Edit Contractor Details’ link to update supplier details which are unavailable at
this time of invitation letter generation. The list of all contractors is shown on the lower half of the
screen. Click on the contractor name to update the necessary details.
24. On completion of ‘Quotation Evaluation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Recommendation for Award’ stage.

Recommendation for Award

62

Procurement Management Support System – PMSS v1.0

User Guide

In this stage appropriate responsive supplier can be recommend. If the lowest evaluated responsive
contractor (L1) is not acceptable by the committee then another supplier can be selected in this
stage

25. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
L1 Contractor

Field Description
Sample Data
If the lowest evaluated responsive
contractor (L1) is not acceptable by the
committee then another contractor can
be selected

2

Recommendation Comments

Enter the comments

Note: If the Contract price (i.e. Evaluated Price) is more than 25% of the estimated price then the
package will be sent for prior review. Once the user clicks on ‘Move to Next Stage’ system
will ask for a confirmation before sending the package for prior review.

26. On completion of ‘Quotation Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Letter of Acceptance’ stage.

Letter of Acceptance
In this stage Letter of Acceptance is generated and acceptance is taken from the contractor

63

Procurement Management Support System – PMSS v1.0

User Guide

27. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
LOA Generated Date

Field Description
System will show the current date (i.e.
today’s date) by default. Click on ‘Save’.

2

Performance Security
Amount

Will be auto calculated by the system

3

Maintenance Period Expiry Enter the maintenance period date. Date
Date
format is DD/MM/YYYY

Sample Data
Today’s Date

29/8/2011

Note: If Generated date is greater than the bid validity (i.e. difference between Bid opening date
and Generated date is more than the bid validity given by the selected supplier) system will
ask to provide a new bid validity. Enter the total new bid validity. E.g. if original validity was
90 days and contractor has extended it by 30 days then enter 120 days.
28. Click on ‘Step 2: Generate Acceptance Letter’ link. System will give an option to Open/ Save the LOA.
Save the LOA on your computer with a proper name. Update the sections highlighted in yellow and
save the document.
29. Click on ‘Step 3: Upload Letter Of acceptance’ link. ‘Documents’ subtab will be shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

64

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
LOA
Category
Description
Enter more information about the uploaded Signed LOA
document.
uploaded

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
30. On completion of ‘Letter of Acceptance’ stage Click on ‘Move to Next Stage’. This will move the
procurement to ‘Gen of WO’ stage.

Gen of WO
In this stage Work Order is generated and Payment terms are updated with expected completion
and payment dates

65

Procurement Management Support System – PMSS v1.0

User Guide

31. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Description
Enter the date when Performance
Security was received from the
contractor. Date format is DD/MM/YYYY
Performance Security Expiry Enter the date when Performance
Date
Security will expiry. This date should be
more than Work Completion Date +
Maintenance Period Expiry Date + 28
days
Contract Start Date
Enter the date when contract is expected
to start. Date format is DD/MM/YYYY

Sample Data
12/05/2011

4

Work Start Date

Enter the date when work is expected to
start. Date format is DD/MM/YYYY

01/06/2011

5

Work Completion Date

Enter the date when work is expected to
complete. Date format is DD/MM/YYYY

23/05/2012

6

Basic Value

Will be auto populated from the
Evaluated Price

System
calculated

7

Sum of all Applicable Taxes

Enter the total amount of all the taxes

2300

8

Contract Value

Will be auto populated as Basic Value +
Sum of all Applicable Taxes

System
calculated

9

WO Generated Date

Will be auto populated as Current Date.
The field is editable. Enter the date on
which Work Order has been generated.
Date format is DD/MM/YYYY

30/05/2011

2

3

Field Name
Performance Security rcvd
Date

29/06/2013

01/06/2011

32. Click on ‘Step 2: View/Update Payments details’ link. ‘Payments’ subtab will be seen in the lower
section.
a. Click on payment term a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

66

Sample Data

Procurement Management Support System – PMSS v1.0

1

Expected
Completion Date

2

Expected Payment
Date

User Guide

This is auto calculated as Contract Start Date 30
+ Expected Completion Period. Edit the date
if required.
Enter the expected date when payment will 12/06/2011
be made against this completion. Date
format is DD/MM/YYYY

c. Click ‘Save’.
d. Update the other payment terms by repeating steps a. to c.
33. Click on ‘Generate Work Order‘link. System will give an option to Open/ Save the WO. Save the LOA
on your computer with a proper name. Update the sections highlighted in yellow and save the
document.
34. Click on ‘Step 4: Upload Work Order’ link. ‘Documents’ subtab will be shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Work Order
Category
Description
Enter more information about the uploaded Signed WO
document.
uploaded

c. Click ‘Upload’ to upload the document in the system.
67

Procurement Management Support System – PMSS v1.0

User Guide

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
35. If the WO has been finalized then select YES in the “WO Finalized drop down. All finalized contracts
will be listed in the “Awarded Contracts” section on the Home page.
36. On completion of ‘Work Order’ stage Click on ‘Move to Next Stage’. This will move the procurement
to ‘WCC & Payments’ stage.

WCC & Payments
In this stage Work completion details are captured and Payment tracking is performed.
37. Click On ‘Step 1: Add/View Work Completion’ link. ‘Work Completion’ subtab will be seen
a. Click on ‘Add’, a pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3
4

Field Name

Field Description

Sample Data

Actual Date of
Completion
Work Done
Balance Work
Comments

Enter the completion date. Date format is 22/18/2011
DD/MM/YYYY
Mention the work completion details
Mention the details of the remaining work
Enter comments, if any

c. Click ‘Save’
d. Click on ‘ Generate WCC’ , which is on the upper bar of the main (WCC) section. WCC Report will
be generated.

68

Procurement Management Support System – PMSS v1.0

User Guide

e. To add another record for WCC repeat steps from a. to d.
38. Click on ‘Step 2: Enter/View Payment Details’. ‘Payments’ subtab will be seen in the lower section
a. Click on the Payment Term a popup will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

1

WCC Generated?

Check this box if Work completion certificate is
generated

2

Work Completed?

Check this box if work is completed

3

Actual Completion
Date
Liquidated
Damages Waived?
Liquidated
Damages
Actual Completion
Period
Comments

Enter the actual date of completion. Date 12/10/2011
format is DD/ MM/ YYYY
Check this box if Liquidated Damages are going
to be waived
Will be auto populated if ‘Actual Completion
date’ is more than ‘Expected completion date’
Enter the actual completion period in days

4
5
6
7
8
9

Actual Payment
Date
Comments

8

Actual Payment
Amount

10

Comments

11

Retention Money

Comment on Actual completion period, if
required
Enter the date when payment is made. Date
format is DD/MM/YYYY
Comment on Actual Payment Date, if required

Sample
Data

13/08/2011

Enter the actual amount paid. Ideally, this 12000
amount + the Retention Money amount should
match the Expected Payment amount
Comment on Actual Payment Amount, if
required
Will be auto calculated as 5% of Expected 2300
payment amount

69

Procurement Management Support System – PMSS v1.0

12

Cheque/Draft
Number

User Guide

Enter the Cheque/ Draft number by which 40023467
payment is made

c. Click ‘Save’
d. To enter details of another payment repeat steps a. to c.
39. In cases where Amendment is made click on ‘Fill Amendment details, if required’ link.
40. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

1

Is Amendment required?

2

Maintenance Period Expiry Date

4

Work Completion Date

3

Performance Security Amount

5

Field Description

Sample
Data
Select yes to perform amendment. Yes
Other fields (described below) will be
shown once ‘Yes’ option is selected.
System will show the Maintenance
Period Expiry Date. Edit the date, if
required.
System will show the completion date.
Edit the date as per new completion
date.
System will show the performance
security amount. Edit the amount, if
required
System will show the performance
security expiry Date. Edit the date as
per new expiry date

Performance Security Expiry
Date

a. Click ‘Save’
b. ‘Payments’ subtab is shown in the lower section. Click on the payment term name and update
the details as per new terms.
Note: Only those payment terms are editable which do not have any actual completion date
c. Select ‘Yes’ in the ‘Amendment Complete?’ field.
d. Click ‘Save’. This will complete the amendment process. After completing the amendment user
can continue to track WCC and Payments.

41. Once all the details for all the payments are recorded this Procurement can be marked as complete.
Click on ‘Completion Checklist’, checklist will be seen

70

Procurement Management Support System – PMSS v1.0

User Guide

c. Fill in the completion checklist
d. Click ‘Save’
42. Click on ‘Complete Procurement Process’ this will complete the procurement for that Package.

71

Procurement Management Support System – PMSS v1.0

User Guide

Direct Contracting
Purpose
To perform procurement of goods using Direct Contracting method.

Process flow

Role(s)
o

Procurement Coordinator (institution)

Prerequisite
o

Package to be procured should fall under category goods/ civil works.

Process Details
Direct Contracting is similar to Shopping except;
Quotations are invited from only one supplier/ contractor. Thus the condition on minimum
three suppliers/ contractors does not exist for Direct Contracting.
Quotation Opening and Quotation Evaluation steps are not present for Direct Contracting.

First stage of Direct contracting is ‘Invitation Letter’.

Invitation Letter
43. Steps 1 through 7 for direct contracting are the same as Shopping with the invitation letter being
generated the single supplier.
44. After uploading the invitation letter in step 7 , click on Step 8 to enter the price received from the
supplier in response to the invitation letter and click on the save button on top of the screen..

72

Procurement Management Support System – PMSS v1.0

User Guide

45. After uploading the invitation letter in step 7, click on Step 8: Enter Quoted Price to enter the price
received from the supplier in response to the invitation letter and click on the save button on top of
the screen.
46. Click on Step 9 : Upload Proprietary certificate to upload the proprietary certificate. [This step is
applicable only for procurement of proprietary items]. The ‘Documents’ subtab will be shown in the
lower section.

a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
73

Sample Data

Procurement Management Support System – PMSS v1.0

2

Document
Category
Description

3

User Guide

Select the appropriate document category.

Proprietary
Certificate

Enter more information about the uploaded
document.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
47. Click on Step 10 : Upload Justification to upload the justification document. Follow steps a to e to
upload the document.
48. If price quoted by the supplier exceeds 20,000$, the package will be sent to NPIU for prior review
49. Next step is “Purchase Order” in case of Goods and "Gen of WO” in case of Works. All the further
steps are similar to Shopping method.

DGS & D
Process Details
DGS & D is similar to Direct Contracting except;
Rate Contract No., RC Item No. and Model No. have to be mentioned for the item(s).
Instead of invitation letter a letter of enquiry is generated.

74

Procurement Management Support System – PMSS v1.0

User Guide

7
Chapter

COMPETITIVE BIDDING METHOD
Procurement Using NCB/ ICB/ LIB Method

75

Procurement Management Support System – PMSS v1.0

User Guide

NCB Goods
Purpose
To perform procurement of goods using NCB method.

Process flow

Role(s)
o

Procurement Coordinator (institution)

o

Procurement Coordinator (SPFU) – Performs Prior review, when applicable. All NCB’s regardless
of value are to be prior reviewed at SPFU

o

Procurement Coordinator – NPIU’s procurement coordinator, Performs Prior review, when
applicable.

Prerequisite
o

Package to be procured should fall under category goods.

o

Value of the package should be > USD 20,000 and Less than USD 300,000.
o

For value range US$ 100,000 up to US$ 200,000, prior review is done by SPFU

o

For value range US$ 200,000 up to US$ 300,000, prior review is done by NPIU also.
76

Procurement Management Support System – PMSS v1.0

User Guide

Process Details
First stage of NCB is ‘Gen. of Bid’.

Gen of Bid
In this stage Standard Bidding Document is generated

1. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2

3
4
5
6
7

Field Name

Field Description

Start Date of Sale of
SBD
Last Date for receipt
of Bids

Sample Data

Enter the date on which SBD sale will start. Date 15
format is DD/MM/YYYY
Will be auto populated as 30 days from start of 12/03/2011 16:00
sale date. Edit the date, if required. Date format is
DD/MM/YYYY and time format is HH:MM, 24 hrs
format.
Last Date of Sale of
Will be auto populated and will match the Last
SBD
Date for receipt of Bids
Date of opening of
Will be auto populated and will match the Last
Bids
Date for receipt of Bids
Validity of Bid
Will be auto populated as 90 days
Bid Security Validity
Will be auto populated as 134 days
Cost of Bid Document Enter the price of Bid document

2. Click ‘Save’
3. Click on ‘Step 2: Enter Bidder Instruction & SCC Information’ a pop up will be seen

77

Procurement Management Support System – PMSS v1.0

User Guide

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

1

Cheque/Draft in
favour of

2

Payable At

Mention the name that has to be put on the CSL NIT
cheque/ draft for purchase of complete bidding
document
Mention where draft should be payable
Delhi

3

Bidding
Document Sell
Start Time

4

Bidding
Document Sell
End Time

5

Postal charges,
Inland
Bid Security

6
7
8
9
10
11
12
13

Officer Inviting
Bids
Prebid Meeting
Date
Prebid Meeting
Time
Warranty
Arbitration
proceedings shall
be held at
Address of the
Purchaser for
Notice

Liquidated

Sample Data

Mention office hrs, start time when bid doc can 9:00
be obtained. Time format is HH:MM, 24 hrs
format
Mention office hrs, end time till when bid doc 18:00
can be obtained. Time format is HH:MM, 24 hrs
format
Mention postal charges in Rs
230
Mention bid security amount in Rs. It should be 36000
within 2% to 5% of estimated cost of package
Mention the name of the officer
Mr. Mohan Lal
If Prebid meeting is planned then enter the 12/08/2011
date. Date format is DD/MM/YYYY
Enter Prebid meeting time. Time

format is 12:00

HH:MM, 24 hrs format
Enter the warranty period in months
Mention the place
Mention the address
Will be auto populated as 0.01%. Edit this field,
78

12

Procurement Management Support System – PMSS v1.0

Damages (Per
Day)
14

Liquidated
Damages
(Maximum)

User Guide

if required. Value in this field will be used to
calculated the Liquidated damages per day
incase of any completion delays.
Will be auto populated as 10%. Edit this field, if
required. Value in this field will be used to
calculated the maximum amount of liquidated
damages applicable

b. Click ‘Save’
4. Click on ‘Step 3: Enter Item Details’ link. ‘Item Specifications’ subtab will be seen in the lower section

a. Click ‘Item Name’, a popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Specifications

Enter the item specification. Click on ‘Search
Specification from PMSS Database’ link to get
specifications from other items.

Sample Data

c. Click ‘Save’
d. If there is more than one item then, repeat steps from a. to c.
5. Click on ‘Step 4: Add/View Payment Terms’ link. ‘Payment Terms’ subtab will be seen in the lower
section.
a. By default three Payment Terms are shown

79

Procurement Management Support System – PMSS v1.0

User Guide

b. Click on the payment term name a pop up will be seen
c. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2

Field Name

Field Description

Sample Data

Expected
Delivery Period
Payment
Percentage

Mention the period in which this delivery is 30
expected once the contract is signed.
By default percentage will be show, edit the 10
percentage if required

d. Click ‘Save’.
e. To add another payment term repeat steps from a. to c.
6. Click on ‘Step 5: Define Question, If Required’ link. (This is an optional step, to be performed only if
additional evaluation/ post qualification questions are required). ‘Questions’ subtab is shown in
the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Question

Enter the description of the question Does the supplier have a
to be asked during quotation local service center?
evaluation/ post qualification. Form
the question such that response
(answer) is Yes/ No/ NA.
80

Sample Data

Procurement Management Support System – PMSS v1.0

2

Non Responsive
Value

User Guide

Select the value (Yes/ No/ NA) based E.g. if the question is
on which the supplier will become ‘Does the Contractor have
non- responsive.
a local service center?’
then the non- responsive
value could be ‘No’.

c. Click ‘Save’.
d. To add another Question repeat steps from a. to c.

7. After filling mandatory data, click on ‘Step 6: Generate SBD’ link. System will give an option to Open/
Save the SBD. Save the SBD on your computer with a proper name. Update the sections highlighted
in yellow and save the document.
8. Click on ‘Step 7: Upload SBD Document’ link. ‘Documents’ subtab will be seen in the lower section
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Standard Bidding
Category
Document
Description
Enter more information about the uploaded SBD
document.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
81

Procurement Management Support System – PMSS v1.0

User Guide

e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
9. On completion of ‘Gen of SBD’ stage click on ‘Move to Next Stage’. This will move the procurement
to ‘Advertisement & Issue of Bids’ stage.

Advertisement & Issue of Bids
In this stage tender is floated and info of supplier purchasing bid is captured, if available

10. Click on ‘Step 1: Generate Advertisement’. A pop up will be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Select Package

2

Local Paper Name(s)

3

National Paper

All the packages which are in Advt. Stage
will be displayed. Press control button on
the keyboard to select more than one
package.
Enter the name of the local paper in Lokamat
which this advertisement will be printed
Enter the name of the national paper in Times of India
82

Sample Data

Procurement Management Support System – PMSS v1.0

Name(s)
4

User Guide

which this advertisement will be printed

Date of Release of Enter the date in format DD/MM/YYYY
Advertisement

12/09/2011

b. Click ‘Save’
c. ‘Print Advertisement’ link will be seen, click on this link to generate the advertisement.

11. Click on ‘Step 2: Enter/View Advertisement Details’.

12. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

2

Field Name

Field Description
Sample Data
Actual Publication Date Enter the date when Advertisement was 16/09/2011
(Local)
actually published in the Local paper. Date
format is DD/MM/YYYY
Actual Publication Date Enter the date when Advertisement was 16/09/2011
(National)
actually published in the N paper. Date
format is DD/MM/YYYY

13. Click ‘Save’
14. Click on ‘Step 3: Upload/View Advertisement’ link. ‘Documents’ subtab will be seen in the lower
section
83

Procurement Management Support System – PMSS v1.0

User Guide

a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Copy of
Category
Advertisement
Description
Enter more information about the uploaded
document.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
15. Click on ‘Step 4: Add/View Bidder Details’ link. ‘Bidder Details’ subtab will be seen in the lower
section
a. Click ‘Add’, which is with the subtab a pop up will be seen

84

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Bidder Name

2

Address

3
4
5
6
7
8

City
State
Email ID
Pin Code
Name Of
Representative
Phone Number

9
10
11

PAN Number
TAN Number
Tax Number

Enter the Bidder name.
FTTI Pvt Ltd
Bidder can also be searched using ‘Select Bidder
from PMSS Database’ link. Click on this link will
display the existing list of Bidders, if any. Once
the list is displayed click on the Bidder’s name this
will auto populated the selected Bidder’s data. To
search additional Bidders within the state or city
use the filters provided on the page
Enter the address of the Bidder
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR
Road
Enter the city of the Bidder
Pune
Enter the state of the Bidder
Maharashtra
Enter the Email ID of the Bidder
ftti@efttil.com
Enter the Pin Code of the Bidder
411232
Enter the Representative of the Bidder
Mr. Mohan
Solanki
Enter the Phone Number of the Bidder. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the PAN Number of the Bidder
ANS44874
Enter the TAN Number of the Bidder
Enter the TAX Number of the Bidder

c. Click ‘Save’
d. To add another Supplier repeat steps from a. to c.
85

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

16. Click on ‘Step :5 Enter Prebid Meeting Information’ link (This link will be shown only if Prebid Date
and Prebid Time fields are added in ‘Instruction to Bidder & SCC Information Popup’). A popup will
be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2

3

4
5

Field Name

Field Description

Sample Data

Actual Date of Prebid
meeting
Pre-bid Meeting
Clarification Issued
Date
Was there any
Corrigendum and
Addendum?
Is Clarification issued
to all Bidders
Prebid MOM

Enter the date when prebid was actually 22/09/2011
conducted. Date format is DD/MM/YYYY
Enter the date when clarification was 23/09/2011
issued. Date format is DD/MM/YYYY
Select Yes/ No

Yes

Select Yes/ No

Yes

Enter the MoM. Larger MoM can also be
uploaded in the documents tab

b. Click ‘Save
17. Incase of extension to bid submission date, Click on ‘Extension of Bid submission date (if required)’
link. A popup will be seen.
a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description
System will show the current date

2

Current Submission
Date
Extended Date

3

Reason for Extension

Sample Data

Enter the new date. Date format is 22/09/2011
DD/MM/YYYY
Enter the reason

b. Click ‘Save’
18. Incase of Corrigendum, Click on ‘Upload Corrigendum (If any)’ link and upload the documents
86

Procurement Management Support System – PMSS v1.0

User Guide

19. On completion of ‘Advertisement & Issue of Bids’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘Bid Opening’ stage.

Bid Opening
In this stage Bid opening is performed and responsive bids are identified.

20. On the ‘Bid Opening’ tab click on ‘Step 1: Add/View Bidder Details’ link. Repeat point 15, if required.
21. Click on ‘Step 2: Print Bid Opening Form’. This will open a Bid opening form. This form can be used
during Bid Opening. Print of this form can be taken and Bid opening details can be recorded on this
form. The bidder names (which were added) are seen on this form against which Bid opening details
can be mentioned. Three extra columns are provided to accommodate names of any new bidders
who have submitted their Bids directly.
22. Click on ‘Step 3: Enter/ View Bid Opening Data’ and Fill the fields on the page. Details of the fields
are mentioned below;
Sr. No.

Field Name

Field Description

1

Bid Opening
Date

2

Bid MoM

Enter the actual date and time when Bid was 12/03/2011
opened. Date format is DD/MM/YYYY and time 16:00
format is HH:MM, 24 hrs format. It is
recommended that opening should be done at
the start of the week so that there is ample time
to enter opening data in PMSS.
Enter the Minutes of Meeting.
Larger MoM’s can be uploaded using the
documents subtab

23. Click ‘Save’
24. Click on the ‘Enter Bid Opening Data’ link. A pop up will be seen

87

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

c. Enter the Responsiveness Criteria.
d. Click ‘Save’.
25. Click on ‘Step 4: Upload Bid Opening Document & MOM’ link. ‘Documents’ subtab will be shown in
the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.

Field Name

Field Description
88

Sample Data

Procurement Management Support System – PMSS v1.0

No.
1
2
3

User Guide

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Bid Opening Form
Category
Description
Enter more information about the uploaded Signed Bid
document.
Opening Form

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
26. On completion of ‘Bid Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Bid Evaluation’ stage.

Bid Evaluation
In this stage evaluation is performed and lowest evaluated bidder is identified.

27. On the ‘Bid Evaluation’ tab click on ‘Step 1: Print Quotation Evaluation Form’. This will open a bid
evaluation form. This form can be used during Bid Evaluation. Print of this form can be taken and Bid
Evaluation details can be recorded on this form.
28. Click on the ‘Step 2: Enter/ View Bid Evaluation Data’ link. A pop up will be seen
a. Enter the comparative data for all the bidders.
b. Click ‘Save’.
c. Click on ‘Quotation Details’ link, which is in front of each responsive supplier. A popup will be
seen.
89

Procurement Management Support System – PMSS v1.0

User Guide

d. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Basic Cost per unit

2

Comments

Basic cost for each item can be entered in 2000
this field. Enter the basic cost per item as
given by the supplier
Enter comments, if any

e. Click on ‘Save’
f.

Quotation details of all responsive Bidders can be entered by repeating steps from c. to e.

29. System will show the lowest evaluated responsive bidder (L1) on the main page.

30. Click on ‘Perform Post Qualification’ link, which is in front of the bidder name. A pop up will be seen

a. Enter the post qualification details
b. If the bidder becomes non-responsive in this step then automatically next lowest evaluated
bidder will be seen.
c. Repeat the Post Qualification process for this Bidder.
31. Click on ‘Step 3: Upload Bid Evaluation Details’ link. ‘Documents’ subtab will be shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

90

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Bid Evaluation
Form
Signed Bid
Evaluation Form
uploaded

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
32. Click on ‘Step 4: View/Edit Bidder Details’ link to update bidder details which are unavailable at
initial stage. The list of all bidders is shown on the lower half of the screen. Click on the bidder name
to update the necessary details.
33. On completion of ‘Bid Evaluation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Recommendation for Award’ stage.

Recommendation for Award

91

Procurement Management Support System – PMSS v1.0

User Guide

In this stage appropriate responsive bidder can be recommend. If the lowest evaluated responsive
bidder (L1) is not acceptable by the committee then another bidder can be selected in this stage

34. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
L1 Bidder

Field Description
Sample Data
If the lowest evaluated responsive bidder
(L1) is not acceptable by the committee
then another contractor can be selected

2

Recommendation Comments

Enter the comments

35. Click on ‘Step 2: Generate Bid evaluation Report’ link. System will give an option to Open/ Save the

Bid evaluation Report. Save the report on your computer with a proper name. Update the sections
highlighted in yellow and save the document.
36. Click on ‘Step 3: Upload Bid Evaluation Report’ link. ‘Documents’ subtab will be shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

92

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Bid Evaluation
Report
Signed Bid
Evaluation report
uploaded

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

Note: If the Contract price (i.e. Evaluated Price) is more than 25% of the estimated price then the
package will be sent for prior review. Once the user clicks on ‘Move to Next Stage’ system
will ask for a confirmation before sending the package for prior review.

37. On completion of ‘Recommendation for Award’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘LOA, Contract Award and PO’ stage.

LOA, Contract Award and PO
In this stage LOA, Contract Award and PO are generated and Payment terms are updated.
93

Procurement Management Support System – PMSS v1.0

User Guide

38. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
LOA Generated Date

Field Description
System will show the current date (i.e.
today’s date) by default. Click on ‘Save’

Sample Data
Today’s Date

39. Click ‘Save’
Note: If Generated date is greater than the bid validity (i.e. difference between Bid opening date
and Generated date is more than the bid validity given by the selected supplier) system will
ask to provide a new bid validity. Enter the total new bid validity. E.g. if original validity was
90 days and contractor has extended it by 30 days then enter 120 days.
40. Click on ‘Step 2: Generate Letter of Acceptance’ link. System will give an option to Open/ Save the
LOA. Save the LOA on your computer with a proper name. Update the sections highlighted in yellow
and save the document.
41. Click on ‘Step 3: Generate Contract & PO’ link. A Pop up will be seen

94

Procurement Management Support System – PMSS v1.0

User Guide

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

2
3
4

Field Name

Field Description

Performance Security
Received Date

Enter the date when Performance
Security was received from the bidder.
Date format is DD/MM/YYYY
Contract Document signed - Enter the contract signed date. Date
date
format is DD/MM/YYYY
Contract Start Date
Enter the date when contract is expected
to start. Date format is DD/MM/YYYY
Expected Delivery Date
Enter the date when delivery is expected
to complete. Date format is
DD/MM/YYYY

Sample Data
12/05/2011

20/05/2011
01/06/2011
23/08/2011

5

Performance Security
Amount

Will be auto calculated as 5% of the 36000
estimated cost. Edit the amount, if
required.

6

Arbitrator Agreed?

Select Yes/ No. Whether arbitrator is Yes
agreed or otherwise.

7

Performance Security
Instrument

Select the Performance Security

8

9
10
11

DD

Instrument

Performance Security Expiry Enter the date when Performance
Date
Security will expiry. This date should be
more than Expected Delivery Date +
Warranty + 28 days
VAT Percent
Enter the Value added tax percentage
Octroi And Others
Enter amount in Rs
Evaluated Price
Will be auto populated

95

29/06/2013

12
1600
System
calculated

Procurement Management Support System – PMSS v1.0

12

Total Base Cost (Item)

13

Qty

14

Basic Cost Per Unit

15

Total Cost (Contract Value)

User Guide

Will be auto calculated as (Qty*Basic Cost System
Per Unit)
calculated
This field can be seen in the lower row, 12
i.e. in the items section. Edit the Quantity
if required. For NCB goods Quantity can
be increase/ decrease by 15% of the
planned quantity.
This can be seen in the lower row, i.e. in
the items section. Edit the basic cost per
unit as required.
Will be auto populated as (Total Base
Cost (Item) + VAT)

System
calculated

b. Click ‘Save’
c. Click ‘Print PO’. System will give an option to Open/ Save the PO. Save the PO on your computer
with a proper name. Update the sections highlighted in yellow and save the document.
d. Click ‘Print Contract’. System will give an option to Open/ Save the Contract. Save the
Contract on your computer with a proper name. Update the sections highlighted in yellow and

save the document.
42. Click on ‘Step 4: View/Update Payments details’ link. ‘Payments’ subtab will be seen in the lower
section.
a. Click on the payment term name
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

Sample Data

1

Expected
Completion Date

2

Expected Payment
Date

This is auto calculated as Contract Start Date 30
+ Expected Completion Period. Edit the date
if required.
Enter the expected date when payment will 12/08/2011
be made against this completion. Date
format is DD/MM/YYYY

c. Click ‘Save’.
d. Update the other payment terms by repeating steps a.to c.
43. Click on ‘Step 5: Upload PO, LOA & Contract Form’ link. ‘Documents’ subtab will be shown in the
lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

96

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Letter of
Acceptance
Signed LOA
uploaded

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
f.

To upload PO repeat Steps a. to c. (Select document category as ‘Purchase Order’)

g. To upload Contract repeat Steps a. to c. (Select document category as ‘Contract Form’)
44. On completion of ‘LOA, Contract Award and PO’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘GRN & Payments’ stage.

GRN & Payments
In this stage Goods received details are captured and Payment tracking is performed.
45. Click on ‘Setp1: Fill GRN Details’. ‘GRN’ subtab will be shown in the lower section;

97

Procurement Management Support System – PMSS v1.0

User Guide

a. Click on ‘Add’, a pop up will be seen;

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Supplier Name

This field is auto populated with the System
selected supplier’s name
populated

2

Date of Supply

Enter the date when Goods are supplied. 12/8/2011
Date format is DD/MM/YYYY

c. Click ‘Add’ link which is in the Items section.

d. Fill the fields on the page. Details of the fields are mentioned below;
98

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

Sr. No.
1

Field Name

2

Item Name

Select the item that is supplied

LaserJet Monolithic Printer

3

Comments

Enter the comments, if required

Received ok

4

Enter the quantity of item received

2

5

Received
Quantity
Stock
Resistor
Name

Enter the name of the resistor
where the entry of this item is made
for manual records

TEQIP – II stock resistor

6

Page No.

Enter the page number of the stock
resistor on which this entry is made

32

7

Serial No.

Enter the serial number of this item

ABC Institution/ TEQIP – II/ LMP
- 43

Item Code

Field Description
Sample Data
Enter a short (abbreviated) name for LMPrinter – can be a short name
the item that is supplied
for item ‘LaserJet Monolithic
Printer’

e. To add another Item repeat steps c. & d.
f.

Click ‘Save’, which is on the upper bar of the main (GRN) section.

g. Once saved, ‘Item Distribution’ link will appear against each item.

h. Click on ‘Item Distribution’ link a pop up will be seen. Enter the Actual Quantity supplied to each
department.

99

Procurement Management Support System – PMSS v1.0

User Guide

i.

Click ‘Save’.

j.

Click on ‘Print GRN’, which is on the upper bar of the main (GRN) section. GRN Report will be
generated.

k. The GRN Report can be uploaded using the Browse function, which is in front of the ‘GRN
Document’ field. Once uploaded, link will appear besides the browse function.

l.

Report can be downloaded, if required by clicking on the link.

m. Click on ‘Print Asset Register’, which is on the upper bar of the main (GRN) section. Asset
Register will be generated.

100

Procurement Management Support System – PMSS v1.0

User Guide

Note: Asset Register can be generated only once. System will give a warning message to confirm
that all the items have been added etc. Once Asset Register is generated no changes can be
made to that GRN record.

n. Fill the fields in the Asset Register. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Unique
Number

Auto populated by the system based on the quantity
of items received

2

Model
Number
Serial
Number

Enter the model number of the item

3

Sample Data

HP LazerJet 3005

Enter the serial number of the item

o. Once the Asset Register is filled it can be uploaded using the Browse function, which is in front
of the ‘Asset Document’ field. Once uploaded, link will appear besides the browse function.

p. Asset Register can be downloaded by clicking on the link.

46. To add another record for GRN repeat steps from a. to p.

101

Procurement Management Support System – PMSS v1.0

User Guide

47. Click on ‘Setp2: Enter Payment details’. ‘Payments’ subtab will be shown in the lower section;

a. Click on the Payment Term a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

1

Goods Received?

Check this box if goods are received
against this payment

2

Goods received note
generated?

Check this box if GRN is generated
for the received goods

3

Actual Completion Date

4

Liquidated Damages
Waived?

5

Liquidated Damages
Amount

6

Actual Completion Period

7

Comments

8

Actual Payment Date

9

Comments

8

Actual Payment Amount

Enter the actual date of delivery. 12/07/2011
Date format is DD/ MM/ YYYY
Check this box if Liquidated
Damages are going to be waived
Will be auto populated if ‘Actual
Completion date’ is more than
‘Expected completion date’
Enter the actual completion period
in days
Comment on Actual completion
period, if required
Enter the date when payment is
13/08/2011
made. Date format is DD/MM/YYYY
Comment on Actual Payment Date,
if required
Enter the actual amount paid
12000

10

Comments

Comment on Actual
Amount, if required

5

Cheque/Draft Number

Enter the Cheque/ Draft number by 40023467
which payment is made

6

TDS

Enter the TDS amount

a. Click ‘Save’
b. To enter details of another payment repeat steps a. to c.
102

Sample
Data

Payment

Procurement Management Support System – PMSS v1.0

User Guide

48. In cases where Amendment is made click on ‘Fill Amendment details, if required’ link.
49. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

Sample
Data
Select yes to perform amendment. Yes
Other fields (described below) will be
shown once ‘Yes’ option is selected.
System will show the warranty period.
Edit the warrant, if required.

1

Is Amendment required?

2

Warranty

3

Performance Security Amount

4

Expected Delivery Date

5

Performance Security Expiry Date

System will show the performance
security amount. Edit the amount, if
required
System will show the delivery date.
Edit the date as per new delivery date.
System will show the performance
security expiry Date. Edit the date as
per new expiry date

50. Click ‘Save’
51. ‘Payments’ subtab is shown in the lower section. Click on the payment term name and update the
details as per new terms.
Note: Only those payment terms are editable which do not have any actual completion date
52. Select ‘Yes’ in the ‘Amendment Complete?’ field.
53. Click ‘Save’. This will complete the amendment process. After completing the amendment user can
continue to track GRN and Payments.

54. Once all the details for all the payments are recorded, Procurement can be marked as complete.
Click on ‘Completion Checklist’, checklist will be seen

103

Procurement Management Support System – PMSS v1.0

User Guide

a. Fill in the completion checklist
b. Click ‘Save’
38. Click on ‘Complete Procurement Process’ this will complete the procurement for that Package.

104

Procurement Management Support System – PMSS v1.0

User Guide

NCB Works
Purpose
To perform procurement of civil works using NCB method.

Process flow

Role(s)
o

Procurement Coordinator (SPFU)

o

Procurement Coordinator – NPIU’s procurement coordinator, Performs Prior review, when
applicable.

Prerequisite
o

Package to be procured should fall under category Civil Works.

o

Value of the package should be > USD 30,000.
o

For value range US$ 100,000 up to US$ 200,000, prior review is done by SPFU

o

For value range US$ 200,000 up to US$ 300,000, prior review is done by NPIU also.

Process Details
First stage of NCB is ‘Gen. of Bid’.

Gen of Bid
In this stage Standard Bidding Document is generated
105

Procurement Management Support System – PMSS v1.0

User Guide

1. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2

3
4
5
6
7

Field Name

Field Description

Start Date of Sale of
SBD
Last Date for receipt
of Bids

Sample Data

Enter the date on which SBD sale will start. Date 15
format is DD/MM/YYYY
Will be auto populated as 30 days from start of 12/03/2011 16:00
sale date. Edit the date, if required. Date format is
DD/MM/YYYY and time format is HH:MM, 24 hrs
format.
Last Date of Sale of
Will be auto populated and will match the Last
SBD
Date for receipt of Bids
Date of opening of
Will be auto populated and will match the Last
Bids
Date for receipt of Bids
Validity of Bid
Will be auto populated as 90 days
Bid Security Validity
Will be auto populated as 134 days
Cost of Bid Document Enter the price of Bid document

2. Click ‘Save’
3. Click on ‘Step 2: Enter Bidder Instruction & SCC Information’ a pop up will be seen.

106

Procurement Management Support System – PMSS v1.0

User Guide

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr. Field Name
No.
1
Cheque/Draft in
favour of
2

Payable At

3

Bidding Document
Sell Start Time

4

Bidding Document
Sell End Time

5
6

Postal charges,
Inland
Bid Security

7
8

Officer Inviting Bids
Prebid Meeting Date

9

Prebid Meeting Time

10

Defects Liability
Period
Arbitration
proceedings shall be
held at
Address of the
Purchaser for Notice

11

12

Field Description

Sample Data

Mention the name that has to be put on the CSL NIT
cheque/ draft for purchase of complete bidding
document
Mention where draft should be payable
Delhi
Mention office hrs, start time when bid doc can 9:00
be obtained. Time format is HH:MM, 24 hrs
format
Mention office hrs, end time till when bid doc 18:00
can be obtained. Time format is HH:MM, 24 hrs
format
Mention postal charges in Rs
230
Mention bid security amount in Rs. It should be
within 2% to 5% of estimated cost of package
Mention the name of the officer
If Prebid meeting is planned then enter the
date. Date format is DD/MM/YYYY
Enter Prebid meeting time. Time format is
HH:MM, 24 hrs format
Enter the Defects Liability Period in days
Mention the place

Mention the address

107

36000
Mr. Mohan Lal
12/08/2011
12:00
120

Procurement Management Support System – PMSS v1.0

13

Liquidated Damages
(Per Day)

14

Liquidated Damages
(Maximum)

User Guide

Will be auto populated as 0.01%. Edit this field,
if required. Value in this field will be used to
calculated the Liquidated damages per day
incase of any completion delays.
Will be auto populated as 10%. Edit this field, if
required. Value in this field will be used to
calculated the maximum amount of liquidated
damages applicable

b. Click ‘Save’
4. Click on ‘Step 3: View Item Details, if required’ link (This is an optional step, used to only view the
item details). ‘Items’ subtab is shown in the lower section
a. Click ‘Item Name’, a pop up will be seen
b. View the item details
c. If there is more than one item then, repeat steps a. and b.
5. Click on ‘Step 4: Add/View Payment Terms’ link. ‘Payments’ subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Payment Terms

Enter the payment title

2

Completion
Period
Payment
Percentage

3

Sample Data

3. On reaching
plinth level
(first level)
4. On Completion
Enter the period in days in which completion is 60
expected once the contract is signed.
By default percentage will be show, edit the 10
percentage if required

c. Click ‘Save’.
108

Procurement Management Support System – PMSS v1.0

User Guide

d. To add another payment term repeat steps from a. to c.
6. Click on ‘Step 5: Define Additional Question, If Required’ link (This is an optional step, to be
performed only if additional evaluation/ post qualification question are required). ‘Questions’
subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Question

Does the supplier have a
local service center?

2

Non Responsive
Value

Enter the description of the question
to be asked during quotation
evaluation. Form the question such
that response (answer) is Yes/ No/ NA.
Select the value (Yes/ No/ NA) based
on which the supplier will become
non- responsive.

E.g. if the question is
‘Does the Contractor have
a local service center?’
then the non- responsive
value could be ‘No’.

c. Click ‘Save’.
d. To add another Question repeat steps from a. to c.
7. After filling mandatory data, Click on ‘Step 6: Generate SBD’ link. System will give an option to
Open/ Save the SBD. Save the SBD on your computer with a proper name. Update the sections
highlighted in yellow and save the document.
8. Click on ‘Step 7: Upload SBD Document’ link. ‘Documents’ subtab will be seen in the lower section
a. Click ‘Add’, which is within the subtab. A pop up will be seen

109

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Standard Bidding
Category
Document
Description
Enter more information about the uploaded SBD
document.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
9. On completion of ‘Gen of SBD’ stage click on ‘Move to Next Stage’. This will move the procurement
to ‘Advertisement & Issue of Bids’ stage.

Advertisement & Issue of Bids
In this stage tender is floated and info of contractor purchasing SBD is captured, if available

110

Procurement Management Support System – PMSS v1.0

User Guide

10. Click on ‘Step 1: Generate Advertisement’. A pop up will be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Select Package

2

Local Paper Name(s)

3

National Paper
Name(s)

All the packages which are in Advt. Stage
will be displayed. Press control button on
the keyboard to select more than one
package.
Enter the name of the local paper in Lokamat
which this advertisement will be printed
Enter the name of the national paper in Times of India
which this advertisement will be printed

4

Date of Release of Enter the date in format DD/MM/YYYY
Advertisement

12/09/2011

b. Click ‘Save’
c. ‘Print Advertisement’ link will be seen, click on this link to generate the advertisement.

111

Procurement Management Support System – PMSS v1.0

User Guide

11. Click on ‘Step 2: Enter/View Advertisement Details’.

12. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

2

Field Name

Field Description
Sample Data
Enter the date when Advertisement was 16/09/2011
actually published in the Local paper. Date
format is DD/MM/YYYY
Actual Publication Date Enter the date when Advertisement was 16/09/2011
(National)
actually published in the N paper. Date
format is DD/MM/YYYY
Actual Publication Date
(Local)

13. Click ‘Save’

14. Click on ‘Step 3: Upload/View Advertisement’ link. ‘Documents’ subtab will be seen in the
lower section
a. Click ‘Add’, which is within the subtab. A pop up will be seen

112

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Copy of
Category
Advertisement
Description
Enter more information about the uploaded
document.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
15. Click on ‘Step 4: Add/View Contractor Details’ link. ‘Contractor Details’ subtab will be seen in the
lower section
a. Click ‘Add’, which is with the subtab a pop up will be seen

113

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Contractor
Name

2

Address

3
4
5
6
7
8

City
State
Email ID
Pin Code
Name Of
Representative
Phone Number

9
10
11

PAN Number
TAN Number
Tax Number

Enter the Contractor name.
FTTI Pvt Ltd
Contractor can also be searched using ‘Select
Contractor from PMSS Database’ link. Click on
this link will display the existing list of
Contractors, if any. Once the list is displayed click
on the Contractor’s name this will auto populated
the selected Contractor’s data. To search
additional Contractors within the state or city use
the filters provided on the page
Enter the address of the Contractor
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR
Road
Enter the city of the Contractor
Pune
Enter the state of the Contractor
Maharashtra
Enter the Email ID of the Contractor
ftti@efttil.com
Enter the Pin Code of the Contractor
411232
Enter the Representative of the Contractor
Mr. Mohan
Solanki
Enter the Phone Number of the Contractor. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the PAN Number of the Contractor
ANS44874
Enter the TAN Number of the Contractor
Enter the TAX Number of the Contractor

114

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

c. Click ‘Save’
d. To add another Supplier repeat steps from a. to c.
16. Click on ‘Step :5 Enter Prebid Meeting Information’ link (This link will be shown only if Prebid Date
and Prebid Time fields are added in ‘Instruction to Bidder & SCC Information Popup’). A popup will
be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Actual Date of
Prebid meeting

2

Pre-bid Meeting
Clarification Issued
Date
Was there any
Corrigendum and
Addendum?
Is Clarification
issued to all
Contractors
Prebid MOM

Enter the date when prebid was actually 22/09/2011
conducted. Date format is DD/MM/YYYY
Enter the date when clarification was 23/09/2011
issued. Date format is DD/MM/YYYY

3
4
5

Sample Data

Select Yes/ No

Yes

Select Yes/ No

Yes

Enter the MoM. Larger MoM can also be
uploaded in the documents tab

b. Click ‘Save
17. Incase of extension to bid submission date, Click on ‘Extension of Bid submission date (if required)’
link. A popup will be seen.
c. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description
System will show the current date

2

Current Submission
Date
Extended Date

3

Reason for Extension

Sample Data

Enter the new date. Date format is 22/09/2011
DD/MM/YYYY
Enter the reason

115

Procurement Management Support System – PMSS v1.0

User Guide

d. Click ‘Save’
18. Incase of Corrigendum, Click on ‘Upload Corrigendum (If any)’ link and upload the documents
19. On completion of ‘Advertisement & Issue of Bids’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘Bid Opening’ stage.

Bid Opening
In this stage Bid opening is performed and responsive bids are identified.

20. On the ‘Bid Opening’ tab click on ‘Step 1: Add/View Contractor Details’ link. Repeat point 15, if
required.
21. Click on ‘Step 2: Print Bid Opening Form’. This will open a Bid opening form. This form can be used
during Bid Opening. Print of this form can be taken and Bid opening details can be recorded on this
form. The Contractor names (which were added) are seen on this form against which Bid opening
details can be mentioned. Three extra columns are provided to accommodate names of any new
Contractors who have submitted their Bids directly.
22. Click on ‘Step 3: Enter/ View Bid Opening Data’ and Fill the fields on the page. Details of the fields
are mentioned below;
Sr. No.

Field Name

Field Description

1

Bid Opening
Date

2

Bid MoM

Enter the actual date and time when Bid was 12/03/2011
opened. Date format is DD/MM/YYYY and time 16:00
format is HH:MM, 24 hrs format. It is
recommended that opening should be done at
the start of the week so that there is ample time
to enter opening data in PMSS.
Enter the Minutes of Meeting.
Larger MoM’s can be uploaded using the
documents subtab
116

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

23. Click ‘Save’
24. Click on the ‘Enter Bid Opening Data’ link. A pop up will be seen

a. Enter the Responsiveness Criteria.
b. Click ‘Save’.
25. Click on ‘Step 4: Upload Bid Opening Document & MOM’ link. ‘Documents’ subtab will be shown in
the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

117

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Bid Opening Form
Category
Description
Enter more information about the uploaded Signed Bid
document.
Opening Form

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
26. On completion of ‘Bid Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Bid Evaluation’ stage.

Bid Evaluation
In this stage evaluation is performed and lowest evaluated Contractor is identified.

118

Procurement Management Support System – PMSS v1.0

User Guide

27. On the ‘Bid Evaluation’ tab click on ‘Step 1: Print Quotation Evaluation Form’. This will open a bid
evaluation form. This form can be used during Bid Evaluation. Print of this form can be taken and Bid
Evaluation details can be recorded on this form.
28. Click on the ‘Step 2: Enter/ View Bid Evaluation Data’ link. A pop up will be seen
a. Enter the comparative data for all the Contractors.
b. Click ‘Save’.
c. Click on ‘Quotation Details’ link, which is in front of each responsive supplier. A popup will be
seen.
d. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Basic Cost per unit

2

Comments

Basic cost for each item can be entered in 2000
this field. Enter the basic cost per item as
given by the supplier
Enter comments, if any

e. Click on ‘Save’
f.

Quotation details of all responsive Contractors can be entered by repeating steps from c. to e.

29. System will show the lowest evaluated responsive Contractor (L1) on the main page.

30. Click on ‘Perform Post Qualification’ link, which is in front of the Contractor name. A pop up will be
seen

119

Procurement Management Support System – PMSS v1.0

User Guide

a. Enter the post qualification details
b. If the Contractor becomes non-responsive in this step then automatically next lowest evaluated
Contractor will be seen.
c. Repeat the Post Qualification process for this Contractor.
31. Click on ‘Step 3: Upload Bid Evaluation Details’ link. ‘Documents’ subtab will be shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
120

Procurement Management Support System – PMSS v1.0

Sr.
No.
1
2
3

Field Name

User Guide

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Bid Evaluation
Form
Signed Bid
Evaluation Form
uploaded

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
32. Click on ‘Step 4: View/Edit Bidder Details’ link to update bidder details which are unavailable at
initial stage. The list of all bidders is shown on the lower half of the screen. Click on the bidder name
to update the necessary details.
33. On completion of ‘Bid Evaluation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Recommendation for Award’ stage.

Recommendation for Award
In this stage appropriate responsive Contractor can be recommend. If the lowest evaluated
responsive Contractor (L1) is not acceptable by the committee then another Contractor can be
selected in this stage

34. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description
121

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

1

L1 Contractor

If the lowest evaluated responsive
Contractor (L1) is not acceptable by the
committee then another contractor can
be selected

2

Recommendation Comments

Enter the comments

35. Click on ‘Step 2: Generate Bid evaluation Report’ link. System will give an option to Open/ Save the

Bid evaluation Report. Save the report on your computer with a proper name. Update the sections
highlighted in yellow and save the document.
36. Click on ‘Step 3: Upload Bid Evaluation Report’ link. ‘Documents’ subtab will be shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
122

Sample Data

Bid Evaluation
Report
Signed Bid
Evaluation report
uploaded

Procurement Management Support System – PMSS v1.0

User Guide

e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

Note: If the Contract price (i.e. Evaluated Price) is more than 25% of the estimated price then the
package will be sent for prior review. Once the user clicks on ‘Move to Next Stage’ system
will ask for a confirmation before sending the package for prior review.
37. On completion of ‘Recommendation for Award’ stage Click on ‘Move to Next Stage’. This will move
the procurement to ‘LOA, Contract Award & WO’ stage.

LOA, Contract Award & WO
In this stage LOA, Contract Award and WO are generated and Payment terms are updated.

38. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.
1

Field Name
Performance Security
Amount

Field Description
Will be auto calculated as 5% of contract
value

Sample Data

2

LOA Generated Date

System will show the current date (i.e.
today’s date) by default. Click on ‘Save’

Today’s Date

39. Click ‘Save’
Note: If Generated date is greater than the bid validity (i.e. difference between Bid opening date
and Generated date is more than the bid validity given by the selected supplier) system will
ask to provide a new bid validity. Enter the total new bid validity. E.g. if original validity was
90 days and contractor has extended it by 30 days then enter 120 days.

123

Procurement Management Support System – PMSS v1.0

User Guide

40. Click on ‘Step 2: Generate Letter of Acceptance’ link. System will give an option to Open/ Save the
LOA. Save the LOA on your computer with a proper name. Update the sections highlighted in yellow
and save the document.
41. Click on ‘Step 3: Generate Contract & WO’. A Pop up will be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Sample Data

Contract Start Date

Enter the date when contract is expected 01/06/2011
to start. Date format is DD/MM/YYYY
Contract Document signed - Enter the contract signed date. Date 20/05/2011
date
format is DD/MM/YYYY
Work Start Date
Enter the date when work is expected to 01/06/2011
start. Date format is DD/MM/YYYY

4

Work Completion Date

Enter the date when work is expected to
complete. Date format is DD/MM/YYYY

5

Performance Security
Received Date

6

Performance Security
Amount

Enter the date when Performance 12/05/2011
Security was received from the bidder.
Date format is DD/MM/YYYY
Will be auto calculated as 5% of the 36000
estimated cost. Edit the amount, if
required.

7

Performance Security
Instrument

8

9
1

Select the Performance Security

23/05/2012

DD

Instrument

Performance Security Expiry Enter the date when Performance 29/06/2013
Date
Security will expiry. This date should be
more than Expected Delivery Date +
Warranty + 28 days
Has Arbitrator been Agreed Select Yes/ No. Whether arbitrator is Yes
upon?
agreed or otherwise.
Mobilization advance will be

Select Yes/ No. Whether Mobilization Yes
124

Procurement Management Support System – PMSS v1.0

User Guide

paid or not?

advance will be paid or otherwise.

10

Bank Security given against
Mobilization Advance?

Select Yes/ No. Whether Bank Security Yes

12

Total Base Cost (Item)

13

Mobilization Amount

Will be auto calculated as (Qty*Basic Cost System
Per Unit)
calculated
Enter the mobilization amount. Enter 0 if 12000
no mobilization amount is taken

14

Evaluated Price

Will be auto populated

15

Sum of all Applicable Taxes

Enter the total amount of all the taxes

System
calculated
2300

16

Total Cost (Contract Value)

Will be auto populated as (Total Base
Cost (Item) + Sum of all Applicable Taxes)

System
calculated

given against Mobilization Advance

b. Click ‘Save’
c. Click ‘Print WO’. System will give an option to Open/ Save the WO. Save the WO on your
computer with a proper name. Update the sections highlighted in yellow and save the
document.
d. Click ‘Print Contract’. System will give an option to Open/ Save the Contract. Save the
Contract on your computer with a proper name. Update the sections highlighted in yellow and

save the document.
42. Click on ‘Step 2: View/Update Payments details’ link. ‘Payments’ subtab will be seen in the lower
section.
a. Click on the payment term name a pop up will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

Sample Data

1

Expected
Completion Date

2

Expected Payment
Date

This is auto calculated as Contract Start Date 30
+ Expected Completion Period. Edit the date
if required.
Enter the expected date when payment will 12/08/2011
be made against this completion. Date
format is DD/MM/YYYY

c. Click ‘Save’.
d. Update the other payment terms by repeating steps a.to c.
43. Click on ‘Step 5: Upload WO , LOA & Contract Form’ link. ‘Documents’ subtab will be shown in the
lower section.
125

Procurement Management Support System – PMSS v1.0

User Guide

a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3

Field Name

Field Description

Document to be Browse the document that you want to
uploaded
upload.
Document
Select the appropriate document category.
Category
Description
Enter more information about the uploaded
document.

Sample Data

Letter of
Acceptance
Signed LOA
uploaded

c. Click ‘Upload’ to upload the document in the system.

d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the

procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
f.

To upload WO repeat Steps a. to c. (Select document category as ‘Work Order’)

g. To upload Contract repeat Steps a. to c. (Select document category as ‘Contract Form’)
44. On completion of ‘Work Order’ stage Click on ‘Move to Next Stage’. This will move the procurement
to ‘WCC & Payments’ stage.

WCC & Payments
In this stage Work completion details are captured and Payment tracking is performed.
45. Click On ‘Step 1: Add/View Work Completion’ link. ‘Work Completion’ subtab will be seen
126

Procurement Management Support System – PMSS v1.0

User Guide

a. Click on ‘Add’, a pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2
3
4

Field Name

Field Description

Sample Data

Actual Date of
Completion
Work Done
Balance Work
Comments

Enter the completion date. Date format is 22/18/2011
DD/MM/YYYY
Mention the work completion details
Mention the details of the remaining work
Enter comments, if any

c. Click ‘Save’
d. Click on ‘ Generate WCC’ , which is on the upper bar of the main (WCC) section. WCC Report will
be generated.

e. To add another record for WCC repeat steps from a. to d.

46. Click on ‘Step 2: Enter/View Payment Details’. ‘Payments’ subtab will be seen in the lower section
a. Click on the Payment Term a popup will be seen
b. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

Field Description

1

WCC Generated?

Check this box if Work completion certificate is
generated

2

Work Completed?

Check this box if work is completed

127

Sample
Data

Procurement Management Support System – PMSS v1.0

3

Actual Completion
Date
Liquidated
Damages Waived?
Liquidated
Damages
Actual Completion
Period
Comments

4
5
6
7
8

Actual Payment
Date
Comments

9

User Guide

Enter the actual date of completion. Date 12/10/2011
format is DD/ MM/ YYYY
Check this box if Liquidated Damages are going
to be waived
Will be auto populated if ‘Actual Completion
date’ is more than ‘Expected completion date’
Enter the actual completion period in days
Comment on Actual completion period, if
required
Enter the date when payment is made. Date
format is DD/MM/YYYY
Comment on Actual Payment Date, if required

13/08/2011

10

Actual Payment
Amount

Enter the actual amount paid. Ideally, this 12000
amount + the Retention Money amount should
match the Expected Payment amount
Comment on Actual Payment Amount, if
required

11

Comments

12

Retention Money

Will be auto calculated as 5% of Expected 2300
payment amount

13

Deduction For
Mobilization

Enter the deduction for mobilization amount if 2000
any

14

Cheque/Draft
Number

Enter the Cheque/ Draft number by which 40023467
payment is made

15

TDS

Enter the TDS amount

16

Quality Check
Carried Out

Select Yes if Quality check is carried Out

Yes

c. Click ‘Save’
d. To enter details of another payment repeat steps a. to c.
47. In cases where Amendment is made click on ‘Fill Amendment details, if required’ link.
48. Fill the fields on the page. Details of the fields are mentioned below;
Sr. No.

Field Name

1

Is Amendment required?

2

Defects Liability Period

Field Description

Sample
Data
Select yes to perform amendment. Yes
Other fields (described below) will be
shown once ‘Yes’ option is selected.
System will show the Defects Liability
period. Edit the period, if required.

128

Procurement Management Support System – PMSS v1.0

User Guide

4

Work Completion Date

3

Performance Security Amount

5

Performance Security Expiry Date

System will show the completion date.
Edit the date as per new completion
date.
System will show the performance
security amount. Edit the amount, if
required
System will show the performance
security expiry Date. Edit the date as
per new expiry date

49. Click ‘Save’
50. ‘Payments’ subtab is shown in the lower section. Click on the payment term name and update the
details as per new terms.
Note: Only those payment terms are editable which do not have any actual completion date
51. Select ‘Yes’ in the ‘Amendment Complete?’ field.
52. Click ‘Save’. This will complete the amendment process. After completing the amendment user can
continue to track WCC and Payments.

53. Once all the details for all the payments are recorded this Procurement can be marked as complete.
Click on ‘Completion Checklist’, checklist will be seen

a. Fill in the completion checklist
b. Click ‘Save’
50. Click on ‘Complete Procurement Process’ this will complete the procurement for that Package.

129

Procurement Management Support System – PMSS v1.0

User Guide

ICB
Purpose
To perform procurement of goods using ICB method.

Process flow

Role(s)
o

Procurement Coordinator (institution)

Prerequisite
o

Package to be procured should fall under category goods.

o

Value of the package should be >USD 300,000

Process Details
Steps for ICB are same as NCB except;
At the advertisement stage ‘International site details’ and ‘UNDB’ published data can be
inputted.
At every stage World Bank prior review is required thus after every stage package will go for
World Bank review.

130

Procurement Management Support System – PMSS v1.0

User Guide

LIB
Purpose
To perform procurement of goods using ICB method.

Process flow

Role(s)
o

Procurement Coordinator (institution)

Prerequisite
o

Package to be procured should fall under category goods.

o

Value of the package should be >USD 300,000

Process Details
Steps for LIB are same as ICB except;
Advertisement is not done in LIB, it is done by direct invitation.

131

Procurement Management Support System – PMSS v1.0

User Guide

8
Chapter

SERVICES METHOD
User Guide – Procurement Using QCBS/FBS/LCS/CQS/SSS/Individual Consultant –
Competitive/Individual Consultant - SSS

132

Procurement Management Support System – PMSS v1.0

User Guide

Quality and Cost Based Selection (QCBS)
Purpose
QCBS is most generally used method for selecting service providers. QCBS method can be used for
selecting providers for Research contracts, professional services, training, workshops and fellowships.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

o

Procurement Coordinator – reviews the procurement if submitted to him for prior review.

Prerequisite
o

Financial Sanction should be obtained for procurement of the service.

o

TOR (Terms of References) should be prepared and reviewed by reviewing authorities at SPFU
and NPIU.

o

TOR should be reviewed and approved by World Bank Officials.

133

Procurement Management Support System – PMSS v1.0

o

User Guide

Technical Review Committee should be formed for this procurement. This committee will
review and evaluate technical proposals received by the consultants based on the evaluation
criteria given in the RFP document.

Prior Review Scenarios
o

If estimated cost is <10,000 US$ and shortlisted consultants at EOI Shortlisting stage are not
equal to 6, then the procurement will be sent to respective NPIU procurement coordinator for
prior review.

o

If estimated cost is 2,00,000 US$ and above, then the procurement will be submitted to NPIU
procurement Coordinator to obtain World Bank NOC.

Process Details
The following section explains procurement of services using QCBS method step-by-step.

The first stage is “Generation of TOR”

Generation of TOR
In this stage activities related to TOR approval are performed. Technical Evaluation Committee will be
defined in this stage. This committee will be involved in evaluation of technical proposals submitted by
the consultants.

‘TOR’ tab will be selected by default.

134

Procurement Management Support System – PMSS v1.0

User Guide

1. Fill following details on the page related to World Bank NOC for TOR.

Sr.
No.
1

2

Field Name

Field Description

Sample Data

Bank NOC for TOR

Enter the checkbox if World Bank NOC has been
obtained for the TOR
This field is not mandatory.
Bank NOC Date for Enter date in DD/MM/YYYY format or select date
TOR
using calendar.
You cannot enter past Date.
Please enter date on which World Bank has given
its NOC for the TOR.

2. Click ‘Save’.
3. Click “Step 2: Define Tech Evaluation Committee” link. ‘Technical Evaluation Committee’ subtab is
shown in the lower section.
4. Define Technical Evaluation Committee members.
a. To add a Technical Evaluation Committee member, click on the ‘Add’ link, which is within the
subtab. A popup will be seen

135

Procurement Management Support System – PMSS v1.0

User Guide

b. It has only one field – Member Name. Fill the name of member in the field.
c. Click ‘Save’
d. To add another member, repeat steps a to c.
5. Click “Step 3: Upload TOR Document” link. ‘Documents’ subtab is shown in the lower section. It
contains all documents uploaded in the system at various stages of the procurement.
6. Upload finalized and approved TOR Document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

2

Document
Category

Field Description

Sample Data

Document to be Browse the document that you want to upload.
uploaded
Select the appropriate document category.

136

TOR

Procurement Management Support System – PMSS v1.0

3

Description

User Guide

Enter more information about the uploaded This is approved
document.
TOR.

c. Click ‘Upload’ to upload the document in the system.
7. After the document is uploaded, it will appear on the list shown in ‘Documents’ section.
8. You can select and delete any document that has been uploaded in current stage of the
procurement. For e.g. if you are in ‘TOR Generation’ stage, you can delete documents that you have
uploaded in this stage. To delete a document, select ‘Delete’ checkbox against the document and
click ‘Delete’ link.
9. On completion of ‘Generation of TOR’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Adv & Issue of EOI’ stage.

Adv & Issue of EOI
In this stage Advertisement related activities are performed.
‘Advt. and EOI’ tab is selected by default.

10. Click ‘Step 1: Generate Advertisement’. The advertisement will be generated. Save the locally and
make necessary changes.
11. Click “Step 2: Fill Advt. Details” link. Fill the fields on the page. Details of the fields are mentioned
below;
Sr.

Field Name

Field Description
137

Sample Data

Procurement Management Support System – PMSS v1.0

No.
1

2

3

4

User Guide

Local Paper Name

Enter name of the local newspaper in which the Sakal
advertisement for procurement of the service will
be published.
National Paper
Enter name of the national newspaper in which Times of India
Name
the advertisement for procurement of the service
will be published.
Date of Release of Please enter date on which the advertisement will
Advertisement
be released to the Publishing Agency/Department.
Enter date in DD/MM/YYYY format or select date
using calendar.
This date cannot be earlier to date on which the
procurement was initiated.
Last Date of EOI
This date is the last date for submission of EOI.
15/03/2011
Submission
System will auto-calculate as 21 days from date of
Release of Advertisement.

5

Actual Date of
Publication (Local)

6

Actual Date of
Publication
(National)

If required, you can modify this date by entering
date in DD/MM/YYYY format or selecting date
using calendar.
Enter date in DD/MM/YYYY format or select date
using calendar.
Please enter date on which the advertisement was
published in local news paper.
Enter date in DD/MM/YYYY format or select date
using calendar.
Please enter date on which the advertisement was
published in national news paper.

12. Click ‘Save’.
13. Click “Step 3: Enter Consultant Details” link. ‘Consultant Details’ subtab is shown in the lower
section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

138

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

Consultant Name

2

Address

3
4
5
6
7
8

City
State
Email ID
Pin Code
Name Of
Representative
Phone Number

Enter Name of the consultant.
ABC Consultants
Consultant can also be searched using ‘Select
Consultant from PMSS Database’ link. Click on this
link will display the existing list of consultants, if
any. Once the list is displayed, click on the
consultant’s name. This will auto populated the
selected consultant’s data. In order to search
additional consultants within the state or city use
the filters provided on the page.
Enter the address of the Consultant
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR Road
Enter the city of the Consultant
Pune
Enter the state of the Consultant
Maharashtra
Enter the Email ID of the Consultant
ftti@efttil.com
Enter the Pin Code of the Consultant
411232
Enter the Representative of the Consultant
Mr. Mohan Solanki

9
10
11

PAN Number
TAN Number
Tax Number

Enter the Phone Number of the Consultant. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the PAN Number of the Consultant
ANS44874
Enter the TAN Number of the Consultant
Enter the TAX Number of the Consultant

c. Click ‘Save’.
139

Procurement Management Support System – PMSS v1.0

User Guide

d. To add another consultant, repeat steps a to c.
14. Click “Step 4: Upload/View Advertisement” link. ‘Documents’ subtab is shown in the lower section.
It contains all documents uploaded in the system at various stages of the procurement.
15. Upload the Advertisement Document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

140

Procurement Management Support System – PMSS v1.0

User Guide

16. On completion of ‘Adv & EOI Opening’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘EOI Opening & Shortlisting of Consultants’ stage.

EOI Opening & Shortlisting of Consultants
In this stage the EOI opening is performed and responsive consultants are identified.
‘Shortlisting’ tab is selected by default.

17. On “Step 1: Fill following Details”, fill actual EOI Opening Date in DD/MM/YYYY format or select date
using calendar. This date cannot be earlier to date on which the procurement was initiated.
18. Click “Step 2: Add/View Consultants” link. ‘Consultant Details’ subtab is shown in the lower section.
a. The subtab displays list of consultants added at ‘TOR Generation’ stage. If there are any new

consultants who have submitted their EOI Proposals, follow these steps to add new consultant;
b. Click ‘Add’, which is within the subtab. A pop up will be seen

141

Procurement Management Support System – PMSS v1.0

User Guide

c. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

Consultant Name

2

Address

3
4
5
6
7
8

City
State
Email ID
Pin Code
Name Of
Representative
Phone Number

Enter Name of the consultant.
ABC Consultants
Consultant can also be searched using ‘Select
Consultant from PMSS Database’ link. Click on this
link will display the existing list of consultants, if
any. Once the list is displayed, click on the
consultant’s name. This will auto populated the
selected consultant’s data. In order to search
additional consultants within the state or city use
the filters provided on the page.
Enter the address of the Consultant
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR Road
Enter the city of the Consultant
Pune
Enter the state of the Consultant
Maharashtra
Enter the Email ID of the Consultant
ftti@efttil.com
Enter the Pin Code of the Consultant
411232
Enter the Representative of the Consultant
Mr. Mohan Solanki

9
10
11

PAN Number
TAN Number
Tax Number

Enter the Phone Number of the Consultant. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the PAN Number of the Consultant
ANS44874
Enter the TAN Number of the Consultant
Enter the TAX Number of the Consultant

d. Click ‘Save’.
142

Procurement Management Support System – PMSS v1.0

User Guide

e. To add another consultant, repeat steps a to c.
19. Click “Step 3: Print EOI Opening Form” link. This will open EOI opening form. This form can be used
during EOI Opening. Print of this form can be taken and EOI opening details can be recorded on this
form. The consultant names are seen on this form against which EOI opening details can be
mentioned. Shortlisting of consultants can be done using the data filled on this form.
20. Click “Step 4: Shortlisting of Consultants” link. A popup will be seen

a. Fill fields mentioned below for each consultant;

Sr.
No.
1

Field Name

Field Description

Sample Data

Is Shortlisted

2

Comments

Select Yes or No.
No
Select Yes if the consultant has been shortlisted
Select No if the consultant has not been
shortlisted
Enter reasons for short listing or rejection of the Not adequate
consultant.
project experience

b. Click ‘Save’. At the time of saving, if shortlisted consultants are not 6, the system will ask for
confirmation to continue the process.
c. Click ‘Close’ to close the popup window.
21. If shortlisted consultants are not exactly 6, the system will show a message as shown below;

143

Procurement Management Support System – PMSS v1.0

User Guide

22. Click “Step 5: Upload EOI Opening MOM and EOI Shortlisting” link. ‘Documents’ subtab is shown in
the lower section. It contains all documents uploaded in the system at various stages of the
procurement.
23. To upload the EOI Opening MOM Document;
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded

144

TOR

Procurement Management Support System – PMSS v1.0

User Guide

c. Click ‘Upload’ to upload the document in the system.
d. Repeat the step 1-c to upload EOI Shortlisting document.
e. Uploaded documents will appear on the list shown in ‘Documents’ section.
f.

User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

24. On completion of ‘EOI Opening & Shortlisting of Consultants’ stage click on ‘Move to Next Stage’.
25. If Prior review is applicable to the procurement, it will be sent for prior review. Please refer section
‘Prior Review Scenarios’ for details.
26. After necessary approvals are obtained, the procurement will move to the next stage ‘RFP
Preparation’.

RFP Preparation
In this stage the required information for RFP is accepted and RFP document is generated.
‘RFP’ tab is selected by default.

27. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.

Field Name

Field Description

145

Sample Data

Procurement Management Support System – PMSS v1.0

1

Type of Contract

2

Proposal
Submission Date

User Guide

Select appropriate Contract Type from the list– Lump sum
Lump sum or Timebased.
According to Procurement Manual, Lump-sum
contracts are used for assignments in which the
content and the duration of the work are clearly
defined.
Time Based Contracts are used for assignments in
which it is difficult to define the scope and the
duration of the work to be performed.
This is one of the important fields.
This date is the last date for submission of 30/04/2011
Proposal.
System will auto-calculate and display this date as
45 days from date of Release of Advertisement.
If required, you can modify this date by entering
date in DD/MM/YYYY format or selecting date
using calendar. If you modify this date, please
verify Pre-proposal Meeting Date.

3

Proposal
Submission Time

4

Pre-proposal
Meeting Date

This date should be atleast 45 days from date of
Release of Advertisement.
Enter Time in HH:MM format
11:00

This date is the last date for submission of 16/04/2011
Proposal.
System will auto-calculate and display this date as
14 days prior to Proposal Submission Date.

5

Pre-proposal
Meeting Time

If required, you can modify this date by entering
date in DD/MM/YYYY format or selecting date
using calendar.
Enter Time in HH:MM format
12:00

28. Click “Step 2: Instruction to Consultants” link. A popup will be seen;

146

Procurement Management Support System – PMSS v1.0

User Guide

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

This is minimum qualifying score for 75
Technical Proposals.
This will be auto-populated by the system.
This is weightage for technical proposal. 75
This will be auto-populated by the system.

4

Min Score for
Technical
Proposal
Weightage for
technical
proposal
Weightage for
financial
proposal
1.2

5

1.3

6

1.4

2

3

Sample Data

This is weightage for financial proposal. 25
This will be auto-populated by the system.
Select the checkbox if Financial Proposal is
required along with technical proposal
Enter name of the representative from the Prof A U Digraskar, CPA, NPIU
client
Enter inputs and facilities to be provided (i) An orientation about the
by the client
agreed procurement
procedures for the
project;
(ii) Procurement Manual
developed for the
147

Procurement Management Support System – PMSS v1.0

User Guide

project;
7

1.14

8

2.1

Enter Proposal Validity Period in days.
120
Based on this value Proposal Validity Date
will be auto-calculated by the system.
This date is the last date for seeking 20/04/2011
clarifications on the RFP
This date will be auto-calculated by the
system as 10 days prior to Proposal
Submission Date.
If required, you can modify this date by
entering date in DD/MM/YYYY format or
selecting date using calendar.

8

2.1

9

3.3(b)

10

3.4

11

3.4(g)

12

3.7

13

4.3

14

4.5

This date should not be less than last date
of EOI submission.
Enter of address for requesting National Project
clarifications
Implementation Unit
EdCIL House, 4th Floor, 18- A,
Sector 16- A,
Gautum Budh Nagar,
Noida (U.P) – 201301
Enter estimated number of staff months 40
for this assignment
Select the format of technical Proposal FTP
required to be submitted by the
consultants – FTP or STP
This depends on nature of the assignment
Enter here training related needs, if any.
The consultant will
Select the checkbox is the training is undertake one day Training
needed and enter information about and Orientation, estimated
training requirement in the given text to be 40 Training Days (One
area.
Day training is estimated for
each batch, comprising 20-25
end users.)
This information is related to local taxation Yes
is applicable. Select ‘Yes’ from the list if
the location taxation is to be applied to
the amounts paid to the consultant under
the contract.
Enter no. of copies of proposal to be 2
submitted
Enter address where proposal should be National Project
submitted.
Implementation Unit
EdCIL House, 4th Floor, 18- A,
148

Procurement Management Support System – PMSS v1.0

15

6.1

16

6.1

17

7.2

18

7.2

User Guide

Enter expected contract negotiation date.
If required, you can modify this date by
entering date in DD/MM/YYYY format or
selecting date using calendar.

Sector 16- A,
Gautum Budh Nagar,
Noida (U.P) – 201301
01/06/2011

This date should not be less than last date
of submission of Proposal.
Enter address of location at which contract National Project
negotiation meeting will be conducted
Implementation Unit
EdCIL House, 4th Floor, 18- A,
Sector 16- A,
Gautum Budh Nagar,
Noida (U.P) – 201301
Enter expected date on which the contract 15/06/2011
will be commenced
Enter location at which consulting services NPIU, Noida
will be commenced

b. Click ‘Save’.
29. Click “Step 3: Define Technical Criteria” link. ‘Technical Criteria’ subtab is shown in the lower
section.
30. Initially, list of some default technical criterias will be displayed. These are some basic criterias

added by NPIU Administrator as part of configuration settings of the system.
31. You can add new criteria, modify or delete existing criterias.
a. To add new criteria, Click ‘Add’ which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
149

Procurement Management Support System – PMSS v1.0

User Guide

Sr.
No.
1

Field Name

Field Description

Sample Data

Technical Criteria
Description

2

Marks

Enter name of technical criteria. This name will Experience of the
appear in bidding documents and evaluation organisation/
forms.
consultant relevant
to the assignment
Total marks for this technical criteria
9

c. Click ‘Save’
d. To add sub-criteria , click on the ‘Add’, which is in the ‘Sub Criteria’ section. A row will appear
where the sub-criteria can be added.
e. Fill the fields on the page. Details of the fields are mentioned below;
Sr. Field Name
Field Description
No.
1
Sub
Criteria Enter Sub Criteria description
Question

2

f.

Marks

Enter marks for the sub-criteria

Sample Data
Specific experience in
software development
related to procurement
management (indicate
max. 2 projects in last 3
years)
5

To add another sub-criteria, repeat steps a to c. Click ‘Save’.

32. To add another criteria, repeat steps a to f.
33. Please ensure that total of marks for all technical criteria defined for the procurement is exactly 100.
34. Click “Step 4: Define Milestones” link. ‘Milestones’ subtab is shown in the lower section.
a. To add a milestone, Click ‘Add’ which is within the subtab. A pop up will be seen

150

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

Milestone Name

Enter name of the milestone

BRD Signoff

2

Milestone
Description
Payment Amount
(%)

Enter description for the milestone

After BRD signoff

3

4

Expected Delivery
Period

Enter percentage of amount to be paid for this 10
milestone
Total of Payment Amount % for all milestones
should be exactly 100.
Enter period in days in which this milestone 30
should be accomplished.
In later stages of the procurement, expected
delivery date will be calculated using this value.

c. Click ‘Save’ or ‘Save and Add’. ‘Save and Add’ link should be used if you want to
save the data and add another milestone. Alternatively, you can click ‘Save’ and to
repeat steps a to c.

35. Please ensure total of ‘Payment Amount %’ for all milestones is exactly 100.
36. Click ‘Step 5: Generate RFP’. The RFP document will be generated. Save the file locally and make
necessary changes to the sections highlighted in yellow. Before generating the document, system
validates the required information and prompts for missing information.
37. After completing changes to the locally saved RFP document, click “Step 6: Upload RFP” link.
‘Documents’ subtab is shown in the lower section. It contains all documents uploaded in the system
at various stages of the procurement.
38. Upload the RFP Document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

151

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
39. On completion of ‘RFP Generation’ stage click on ‘Move to Next Stage’.
40. If Prior review is applicable to the procurement, it will be sent for prior review. Please refer section
‘Prior Review Scenarios’ for details.
41. After necessary approvals are obtained, the procurement will move to the next stage ‘Issue of RFP’.

152

Procurement Management Support System – PMSS v1.0

User Guide

Issue of RFP
In this stage invitation letters are generated for shortlisted consultants and RFP document is issued to
them. Pre-proposal meeting details are also recorded in this stage.
‘Issue of RFP’ tab is selected by default.

42. Click ‘Step 1: Generate Invitation Letters’ link. Request will be sent for generating Invitation letters
for shortlisted consultants. The letters are generated by a separate service. Please revisit this page
after some time to view or print the letters.
43. Click ‘Step 2: View/Print Invitation Letters’ link. ‘Shortlisted Consultants’ subtab is shown in the
lower section. This subtab lists consultants which are been shortlisted.

153

Procurement Management Support System – PMSS v1.0

User Guide

44. Click on link in ‘Invitation Letter’ column to view the invitation letter for the consultant. Save the file
locally and make necessary changes to the sections highlighted in yellow.
45. Issue of RFP to the consultants is an offline process. Please follow the steps below to create RFP
document to be issued to a consultant ;
a. Open the invitation letter for the consultant and copy the contents.
b. Open the RFP document and locate section ‘Section 1. Letter of Invitation’ in the document.
c. Replace the copied invitation letter in place of ‘’
d. Save the RFP document with a new suitable name.
e. Repeat steps a to d for all shortlisted consultants.
46. After completing these steps, you can proceed to sending the RFP documents to the consultants
along with other essential documents.
47. Click “Step 3: Fill Pre-proposal Meeting Details” link.
48. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

2

3

4

5

Field Name

Field Description

Actual Pre
proposal Date

Enter date on which Pre-proposal meeting was
conducted
Enter date in DD/MM/YYYY format or select
date using calendar.
Pre-proposal MOM Enter Minutes of Pre-proposal Meeting.
Alternatively you can provide summary about
the meeting in this text box and upload a
separate Pre-proposal MOM document as part
of ‘Step 4 – Upload Pre-proposal Meeting
Documents’.
Clarification Issued Select Yes or No or Not required.
to all Consultants
Select Not required if there are no clarifications
that can be issued.
Select No if clarifications have not yet been
issued to the consultants.
Select Yes if clarifications are issued to all the
consultants.
Date of
Enter date on which clarifications are issued to
Clarification Issued the consultants.
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Pre-proposal
Meeting date.
Clarification Details Enter details of clarification issued to the
consultants.

154

Sample Data
21/03/2011

Please see details in
‘Pre-Proposal Meeting
Document’

Yes

22/03/2011

Revised copy of
Procurement Manual
has been circulated.

Procurement Management Support System – PMSS v1.0

User Guide

49. Click ‘Save’.
50. Click “Step 4: Upload Pre-proposal Meeting Documents” link. ‘Documents’ subtab is shown in the
lower section. It contains all documents uploaded in the system at various stages of the
procurement.
51. Upload Pre-proposal Meeting related documents. The documents can include Pre-proposal Meeting
Minutes, presentations exhibited during the meeting, clarifications etc.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.

155

TOR

Procurement Management Support System – PMSS v1.0

User Guide

e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
52. If Extension of Proposal Submission Date is required, click link ‘Extension of Proposal Submission
Date, if required’. A popup will be seen;

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Current
Submission Date

This will be displayed by the system and cannot be 01/05/2011
edited.

2

Extended Date

3

Reason
Extension

Enter new Proposal Submission Date.
10/05/2011
Enter date in DD/MM/YYYY format or select date
using calendar.
This date should not be less than current
Submission Date.
for Specify reason for extending the date.
Scope of
Procurement Plan
module has been
revised.

156

Procurement Management Support System – PMSS v1.0

User Guide

b. Click ‘Save’
c. A record for the extended date will be added to the list on the top of the page.

d. Click ‘Print Amendment Form’ link to generate the amendment letter. Save the file locally. The
letter should be sent to all shortlisted consultants.
53. If there is any corrigendum/addendum issued to the consultants, Click “Step 4: Upload
Corrigendum” link. ‘Documents’ subtab is shown in the lower section. It contains all documents
uploaded in the system at various stages of the procurement.
54. Upload the corrigendum/addendum document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;

157

Procurement Management Support System – PMSS v1.0

User Guide

Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
55. On completion of ‘Issue of RFP’ stage click on ‘Move to Next Stage’. This will move the procurement
to ‘Technical Evaluation’ stage.

158

Procurement Management Support System – PMSS v1.0

User Guide

Technical Evaluation
In this stage Technical Proposal are evaluated and technical scores are calculated for the Proposals.
‘Technical Evaluation’ tab is selected by default.

56. As step 1, fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Technical Proposal
Opening Date

Enter date on which technical proposals are 13/05/2011
opened and evaluated.
Enter date in DD/MM/YYYY format or select
date using calendar.

57. Click ‘Save’.
58. Click “Step 2: Tech Proposal Opening Form” link. This will open Technical Proposal opening form.
This form can be used during Technical Opening Meeting. Print of this form can be taken and
Technical Proposal opening details can be recorded on this form. The consultant names are seen on
this form against which Technical opening details can be mentioned.
59. Click “Step 3: Tech Eval Report” link. This will open Technical Evaluation Report in form of an excel
sheet. Save the document locally. This document can be used during Technical Proposal Evaluation.
Technical scores on different criterias can be recorded in this excel sheet.
159

Procurement Management Support System – PMSS v1.0

User Guide

60. Click “Step 4: Enter Tech Proposal Opening Data” link. A popup will be seen;

61. Fill Technical Proposal Opening data on this page which was recorded as part of ‘Step 2: Tech
Proposal Opening Form’.
62. Click ‘Save’
63. System will identify non-responsive consultants based on entered data. Reason for nonresponsiveness will be shown in ‘Reason for Non-responsiveness’ column. Non-responsive
Consultants are marked in Red.

160

Procurement Management Support System – PMSS v1.0

User Guide

64. ‘Technical Evaluation’ link will be shown against Responsive Consultant names.
65. Fill Technical Score for all responsive consultants
a. Click ‘Technical Evaluation’ link against a consultant. A popup will be seen;

b. Fill score for each technical criteria/sub-criteria.
c. Click ‘Save’.
d. System will calculate and display total marks obtained by the consultant.
e. Click ‘Close’.
66. Score obtained by the consultant will be shown against the consultant name. System evaluates and
ranks the consultants based on their scores.
67. After recording technical evaluation details for all responsive consultants, Click ‘Close’ link to close
the popup.
68. Click ‘Step 5: Print Invitation Letter’ link. Fill the fields on the page. Details of the fields are
mentioned below;
Sr.
No.
1

Field Name

Field Description

Planned Financial
Proposal Opening
Date

2

Planned Financial

Enter date on which financial proposals will be 13/05/2011
opened.
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Technical
Proposal Opening Date.
Enter time at which financial proposals will be 11:00
161

Sample Data

Procurement Management Support System – PMSS v1.0

Proposal Opening
Time

User Guide

opened.
Enter the time in HH:MM format.
Planned Financial Opening Date and Time will
appear in invitation letters for financial
proposal opening meeting sent to technically
responsive consultants.

69. Click ‘Save’
70. ‘Consultant Score’ subtab is shown in the lower section. This subtab lists technical responsive
consultants and their scores. Technical Responsive consultants are the consultants for whom
technical evaluation scores are entered in the system.
71. On ‘Consultant Score’ list, link ‘Invitation Letter for Financial Proposal Opening’ will be shown for
consultants who have obtained minimum qualifying technical score specified in RFP document.
72. Click ‘Invitation Letter for Financial Proposal Opening’ link against each consultant to generate the
invitation letter for the financial proposal opening meeting to the consultant. Save the letter locally
and send to the consultant.
73. Click “Step 5: Upload Opening Form and Eval Report” link. ‘Documents’ subtab is shown in the lower
section. It contains all documents uploaded in the system at various stages of the procurement.
74. Upload copy of duly signed Technical Proposal Opening Form.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.

Field Name

Field Description

162

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

1

Document to be Browse the document that you want to upload.
uploaded

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
75. Upload Technical Proposal Evaluation Report following above steps.
76. On completion of ‘Technical Evaluation’ stage click on ‘Move to Next Stage’.
77. If Prior review is applicable to the procurement, it will be sent for prior review. Please refer section
‘Prior Review Scenarios’ for details.
78. After necessary approvals are obtained, the procurement will move to the next stage ‘Combined
Evaluation’.

Combined Evaluation
In this stage combined evaluation of the technical and financial proposals submitted by the
consultants will be performed.
‘Financial Opening’ tab is selected by default.

163

Procurement Management Support System – PMSS v1.0

User Guide

79. As step 1, fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Financial Proposal
Opening Date

2

Financial Proposal
Opening Time

Enter date on which financial proposals are 16/05/2011
opened.
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Technical
Proposal Opening Date.
Enter time at which financial proposals are 11:00
opened.
Enter the time in HH:MM format.
Planned Financial Opening Date and Time will
appear in invitation letters for financial
proposal opening meeting sent to technically
responsive consultants.

80. Click ‘Save’.
81. Click “Step 2: Print Financial Opening Form” link. This will open Financial Proposal Opening Form.
This form can be used during Financial Opening Meeting. Print of this form can be taken and
Financial Proposal opening details can be recorded on this form. The consultant names are seen on
this form against which financial opening details can be mentioned.
164

Procurement Management Support System – PMSS v1.0

User Guide

82. Click “Step 3: Enter Financial Proposal Opening Data” link. A popup will be seen;

83. Fill Price in INR for all technically responsive consultants.
84. Click ‘Save’.
85. System will calculate total score and rank for all consultants
a. System will calculate financial scores based on lowest price in INR.
b. Lowest Priced proposal will be given financial score as 100. Financial scores for other consultants
will be calculated using formula
Sf = 100 x Fm / F (Sf is the financial score, Fm is the lowest price and F the price of the
proposal)
c. Total Score will be calculated as technical score + financial score.
d. Consultants will be ranked. Consultants with highest total score will be ranked as 1.
86. System will automatically select and display consultant with highest total score for inviting for
negotiations.

87. Click “Step 4: View Score” link. ‘Consultant Score’ subtab is shown in the lower section.

165

Procurement Management Support System – PMSS v1.0

User Guide

88. This subtab displays list of consultants, their technical and combined scores and overall rank.
89. Click “Step 5: Upload Financial Proposal Opening Form” link. ‘Documents’ subtab is shown in the
lower section. It contains all documents uploaded in the system at various stages of the
procurement.
90. Upload copy of duly signed Financial Proposal Opening Form.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

2

Document
Category

Field Description

Sample Data

Document to be Browse the document that you want to upload.
uploaded
Select the appropriate document category.

166

TOR

Procurement Management Support System – PMSS v1.0

3

Description

User Guide

Enter more information about the uploaded This is approved
document.
TOR.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
91. On completion of ‘Combined Evaluation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Recommendation and Contract Generation’ stage.

Recommendation and Contract Generation
In this stage recommendation of award meeting details and negotiation meeting details are recorded
in the system. If negotiations are successful, contract will be generated.
‘Contract Gen.’ tab is selected by default.

167

Procurement Management Support System – PMSS v1.0

User Guide

92. As step 1 ‘Recomm. Details’ fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Recommended
Consultant

Compulink Systems
Ltd.

2

Recomm.
Comments

System will display name of the selected
consultant. Highest scored consultants will be
displayed initially. In subsequent stage if
negotiations fail with the selected consultant,
next highest scoring consultant will be
displayed in this field.
Enter reason or comments recommending the
consultant.

Consultant has vast
experience in the
developing
procurement
softwares.

93. Click ‘Step 2: Negotiation Details’ link in order to enter details about negotiation meeting with the
selected consultant. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Date of
Negotiation

2

Negotiation
Comments

Enter date on which negotiation meeting has 20/05/2011
been conducted
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Financial
Proposal Opening Date.
Enter details about negotiation meeting

3

Is Negotiation
Successful

Select Yes or No.
If negotiations have been successful with the
consultant, select ‘Yes’.
If negotiations have failed, select ‘No’.
Failed negotiation will be sent for approval to
World Bank.

Sample Data

Yes

94. Click ‘Save’.
95. Click ‘Negotiation History’ link to view history of negotiations for the procurement. A popup is seen;

168

Procurement Management Support System – PMSS v1.0

User Guide

96. Click ‘Save’.
97. History of negotiations will be displayed on the popup in descending order. Recent negotiation will
be first in the list.
98. If negotiations have failed, the procurement will be sent for review ;
a. Click ‘Move to Next Stage’ link.
i)

The procurement will be sent to NPIU to obtain NOC from World Bank.

b. After necessary approvals are obtained, negotiations with consultant with next highest score
can be performed. Repeat steps 93 to 98 for recording negotiations with the newly selected
consultant.
c. Repeat this process until negotiations are successful with the selected consultant.
99. On successful negotiations, next set of links will be displayed.

100.

Click ‘Step 3: Contract Details’ link. A popup is shown;

169

Procurement Management Support System – PMSS v1.0

101.

User Guide

Fill the fields on the page. Details of the fields are mentioned below;

Sr. Field Name
No.
Contract Details
1
Member in Charge

Field Description

Sample Data

2

Enter name of the member at the consultant Mr. Yash Mehra
who will be in charge of this project
Authorized
Enter name of authorized representative of the Mr. Nikhil Pandit
Representative of client
Client

3

Contract Start Date

4

Date of
commencement of
services

5

Arbitrator
Proceedings to be
held at
Delivery Period (In
months)
Interest on
delayed payments
(%)
Basic Value

6
7

8

Enter date on which Contract will be started
05/06/2011
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Date of
Negotiations
Enter date on which Contract will be started
10/06/2011
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Contract Start
Date
Enter location at which arbitration will be held
New Delhi

Enter period in months within which the service 20
under this contract will be completed
Enter percentage interest that will be charged 2
to the SPFU in case of delayed payments.
This field will be read-only and auto-populated 1200
as value proposed by the consultant in his
financial proposal and entered in the system at
the time of Financial Proposal Opening stage.
170

Procurement Management Support System – PMSS v1.0

9
10

User Guide

Applicable Tax
Contract Value

Enter tax applicable in Indian Rupees.
This field will be read-only and auto-calculated
as Basic Value + Applicable Tax.
Award Generation Checklist
11
Is Advance
Select Yes or No.
Payment Required
12
Bank Guarantee
Select Yes or No
Submitted
13
Payment
Select Yes or No
Milestones
Defined
14
Arbitrator Agreed
Select Yes or No

200
1400

No
No
Yes

Yes

102. Click ‘Save’.
103. Contract Value will be displayed on the page. System will auto-calculate payment amount for all
milestones of the procurement based on the Payment Amount % for the milestone.
104. Click “Step 4: Define Milestones” link. ‘Milestones’ subtab is shown in the lower section. The list of
milestones defined for the procurement will be displayed. You can modify or delete existing
milestones or add new milestones. Refer to stage “RFP Generation” for detailed steps.
105. Please ensure total of ‘Payment Amount %’ for all milestones is exactly 100.
106. Click ‘Step 5: Generate Contract’. The contract document will be generated. Save the file locally and
make necessary changes to the sections highlighted in yellow. Before generating the document,
system validates the required information and prompts for missing information.
107. After completing changes to the locally saved draft contract document, click “Step 6: Upload
Contract Form” link. ‘Documents’ subtab is shown in the lower section. It contains all documents
uploaded in the system at various stages of the procurement.
108. Upload the draft contract document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

171

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
109. You can also upload Minutes of negotiation meeting by following above steps.
110. On completion of ‘Recommendation and Contract Generation’ stage click on ‘Move to Next Stage’.
111. If Prior review is applicable to the procurement, it will be sent for prior review. Please refer section
‘Prior Review Scenarios’ for details.
112. After necessary approvals are obtained, the procurement will move to the next stage ‘Award of
Contract and Payments’.

172

Procurement Management Support System – PMSS v1.0

User Guide

Award of Contract and Payments
This is last stage of QCBS process. In this stage Contract sign date is entered and delivery dates are
calculated. Actual Payment information is entered into the system against each payment milestone.
‘Contract Award and Payments’ tab is selected by default.

113. As step 1 ‘Enter Contract Sign Date’ fill the fields on the page. Details of the fields are mentioned
below;
Sr.
No.
1

Field Name

Field Description

Sample Data

Contract Sign Date

Enter date on which Contract has been signed 10/06/2011
by both parties.
Enter date in DD/MM/YYYY format or select
date using calendar.
This date should not be less than Contract
Generation Date

114. Click ‘Save’.
115. Click ‘Step 2: Print Prior Review Checklist’. Prior Review Checklist will be generated in MS Word
format. Save the file locally. This checklist should be sent to the World Bank for review and obtaining
WBR number.
116. Click “Step 3: Upload Signed Copy of Contract” link. ‘Documents’ subtab is shown in the lower
section. It contains all documents uploaded in the system at various stages of the procurement.
117. Upload the contract document signed by both parties.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

173

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
118. Click “Step 4: Track Milestones” link. ‘Milestones’ subtab is shown in the lower section.

174

Procurement Management Support System – PMSS v1.0

User Guide

119. List of milestones is displayed in the subtab. System auto-calculates and displayed
‘Expected Delivery Date’ for all milestones based on Contract Sign Date.
120. Click link in ‘Milestone Name’ column to enter payment information for the milestone. A
pop up will be seen

a. Expected Delivery Date and Milestone Amount will be auto-calculated by the system on
Contract Sign Date and Contract Amount respectively.
b. Fill the fields on the page. Details of the fields are mentioned below;

175

Procurement Management Support System – PMSS v1.0

User Guide

c. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Actual Delivery
Date

2

Actual Delivery
Comments

3

Cheque/Draft
Number
Actual Payment
Amount
Actual Payment
Comments
Actual Payment
date

Enter date on which service/work against the 10/07/2011
milestone was completed and delivered.
Enter date in DD/MM/YYYY format or select date
using calendar.
This date should not be less than contract sign
date.
Enter comments related to actual delivery date, if
Expected Delivery Date is not matching with
Actual Delivery Date.
Enter Instrument number by which the payment 411004
was made i.e. Cheque or Draft Number
Enter Actual amount paid to the consultant
120

4
5
6

7
8

9

Sample Data

Enter comments if Actual Amount paid doesn’t
match with the milestone amount
Enter date on which actual payment was made.
20/07/2011
Enter date in DD/MM/YYYY format or select date
using calendar.
Payment Date
Enter comments if any related to actual payment
Comments
date
Upload Completion Browse and select completion certification
Certificate
document for the milestone specifying that the
milestone has been completed.
Comments
Enter any general comment, if any related to this
milestone.

d. Click ‘Save’.
121. Repeat above steps to enter tracking information for all milestones of the procurement.
122. After payments against all milestones have been completed, click on ‘Completion
Checklist’.

123. A popup will be seen. Enter responses to the process completion checklist.
124. Click link ‘Complete Procurement Process’ to mark the procurement as Complete.

176

Procurement Management Support System – PMSS v1.0

User Guide

Fixed Budget Selection (FBS)
Purpose
FBS method can be used for selecting providers for Research contracts, professional services, training,
workshops and fellowships. This method is used when estimated budget for the procurement has been
fixed. Consultants who has quoted price within the indicated budget are evaluated.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

o

Procurement Coordinator – reviews the procurement if submitted to him for prior review.

Prerequisite
o

Indicative Budget should be finalized.

o

Other Prerequisites are similar to QCBS method. Please refer to section “Prerequisites’ under
“Quality and Cost Based Selection”.

Prior Review Scenarios
177

Procurement Management Support System – PMSS v1.0

User Guide

Prior Review Scenarios are similar to QCBS method. Please refer to section “Prior Review Scenarios’
under “Quality and Cost Based Selection”.

Process Details
1. Procurement using FBS method will follow same stages as QCBS method with few variations as
mentioned below;

RFP Preparation
2. On “Step 2: Instruction to Consultants’ step page, available budget for the procurement should be
specified in paragraph ‘3.3(b)’. In QCBS method, this paragraph has details about estimated
duration of the contract in person months.

Combined Evaluation
3. Financial proposal Evaluation will be carried only for proposals which have quoted price within
indicated budget. After “Step 3 Enter Financial Proposal Opening Data”, Proposals exceeding the
indicated budget shall be marked as technically non-responsive.
1. A Consultant who has obtained the highest technical score shall be selected and displayed as
recommended consultant.

Least Cost Selection (LCS)
Purpose

178

Procurement Management Support System – PMSS v1.0

User Guide

FBS method can be used for selecting Consultants for assignments of a standard routine nature like
audits, engineering design of non-complex works etc. Consultant Firm which is technically responsive
and has quoted lowest price of all consultants is selected.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

o

Procurement Coordinator (NPIU) – reviews the procurement if submitted to him for prior
review.

Prerequisite
o

Prerequisites are similar to QCBS method. Please refer to section “Prerequisites’ under “Quality
and Cost Based Selection”.

Prior Review Scenarios
Prior Review Scenarios are similar to QCBS method. Please refer to section “Prior Review Scenarios’
under “Quality and Cost Based Selection”.

179

Procurement Management Support System – PMSS v1.0

User Guide

Process Details
1. Procurement using LCS method will follow same stages as QCBS method with few variations as
mentioned below;

Combined Evaluation
2. System doesn’t perform combined evaluation. A Consultant who has scored “minimum” qualifying
technical score (% specified in RFP document) and has lowest quoted price shall be selected and
displayed as recommended consultant.

Consultant Qualification Selection (CQS)
Purpose
CQS method can be used for selecting Consultants for assignments of a standard routine nature like
audits, engineering design of non-complex works etc. Consultant Firm which is technically responsive
and has quoted lowest price of all consultants is selected.

Process flow

180

Procurement Management Support System – PMSS v1.0

User Guide

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

o

Procurement Coordinator (NPIU) – reviews the procurement if submitted to him for prior
review.

Prerequisite
o

Prerequisites are similar to QCBS method. Please refer to section “Prerequisites’ under “Quality
and Cost Based Selection”.

Prior Review Scenarios
o

If estimated cost is between 10,000 US$ and 2,00,000 US$, then the procurement will be sent to
NPIU procurement coordinator for prior review.

o

If estimated cost is 2,00,000 US$ and above, then the procurement will be submitted to NPIU
procurement Coordinator to obtain World Bank NOC.

Process Details
1. Procurement using CQS method will follow same stages as QCBS method with few variations as
mentioned below;

EOI Opening & Shortlisting of Consultants
2. On “Step 4: Shortlisting of Consultants’, only one consultant will shortlisted and will be issued RFP.
3. Technical and Financial Evaluation will be done for only one consultant.

Single Source Selection (SSS)
Purpose
SSS method can be used for selecting consulting firms only if it presents a clear advantage over
competition due to various reasons like continuation of same work, Rapid selection is necessary, small

181

Procurement Management Support System – PMSS v1.0

User Guide

assignment, or the consultant has experience of exceptional significance of the assignment. As this is not
competitive method of selection, technical or financial evaluation will not be carried out.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

o

Procurement Coordinator (NPIU) – reviews the procurement if submitted to him for prior
review.

Prerequisite
o

Justification for selection of the consultant should be documented and duly signed.

o

Other Prerequisites are similar to QCBS method. Please refer to section “Prerequisites’ under
“Quality and Cost Based Selection”.

Prior Review Scenarios
o

The procurement will be submitted to NPIU procurement Coordinator to obtain World Bank
NOC.

182

Procurement Management Support System – PMSS v1.0

User Guide

Process Details
1. Procurement using SSS method will go through following stages;

Generation of TOR
The steps on this stage are similar to QCBS except few variations;
2. On “Step 1: Enter Bank NOC Details’, ‘Upload/View Consultant Justification’ link will be shown.

3. Click the link. ‘Documents’ subtab is shown in the lower section. It contains all documents uploaded
in the system at various stages of the procurement.
4. Upload the justification document justifying selection of the consultant.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Document to be Browse the document that you want to upload.
183

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

uploaded
2

Document
Category

Select the appropriate document category.

TOR

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

RFP Preparation

184

Procurement Management Support System – PMSS v1.0

User Guide

The steps on this stage are similar to QCBS except few variations;
5. On “Step 2: Instruction to Consultants” popup page, few fields are not displayed
o

Min. Score for Technical Proposal

o

Weightage for technical proposal

o

Weightage for financial proposal

Issue of RFP
6. The steps on this stage are similar to QCBS except that RFP will be issued to only one consultant in
case of SSS.

Recommendation and Contract Generation
In this stage recommendation of award meeting details and negotiation meeting details are recorded
in the system. If negotiations are successful, contract will be generated.
‘Contract Gen.’ tab is selected by default.

7. On ‘Step 1: Financial Proposal Details’, fill the fields on the page. Details of the fields are mentioned
below;
Sr.

Field Name

Field Description
185

Sample Data

Procurement Management Support System – PMSS v1.0

No.
1

Proposal Amount

User Guide

Enter amount quoted by the consultant in the 12000
financial proposal.
This value will be considered as basic value at
the time of contract generation.

8. Click ‘Save’.
9. All other steps on this stage are similar to QCBS procurement method.

Award of Contract and Payments
10. The steps on this stage are similar to QCBS procurement method.

186

Procurement Management Support System – PMSS v1.0

User Guide

Individual Consultants – Competitive Method
Purpose
This method is used for obtain services from individual consultant using competitive bidding.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

Prerequisite
o

Financial Sanction should be obtained for procurement of the service.

o

TOR (Terms of References) should be prepared and reviewed by reviewing authorities.

o

Technical Review Committee should be formed for this procurement. This committee will
review and evaluate technical proposals received by the firms based on the evaluation criteria
given in the RFP document.

Process Details
The first stage is “TOR”
187

Procurement Management Support System – PMSS v1.0

User Guide

TOR
In this stage activities related to TOR approval are performed. Technical Evaluation Committee will be
defined in this stage. This committee will be involved in evaluation of technical proposals submitted by
the consultants.

‘Generation of TOR’ tab will be selected by default.

1. Fill following details on the page related to World Bank NOC for TOR.

Sr.
No.
1

2

Field Name

Field Description

Bank NOC for TOR

Enter the checkbox if World Bank NOC has been
obtained for the TOR
This field is not mandatory.
Bank NOC Date for Enter date in DD/MM/YYYY format or select date
TOR
using calendar.
You cannot enter past Date.
Please enter date on which World Bank has given
its NOC for the TOR.

2. Click ‘Save’.
188

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

3. Click “Step 2: Define Tech Evaluation Committee” link. ‘Technical Evaluation Committee’ subtab is
shown in the lower section.
4. Define Technical Evaluation Committee. Defining Technical Evaluation Committee members is
mandatory.
a. To add a Technical Evaluation Committee member, click on the ‘Add’ link, which is within the
subtab. A popup will be seen

b. It has only one field – Member Name. Fill the name of member in the field.
c. Click ‘Save’
d. To add another member, repeat steps a to c.
5. Click “Step 3: Upload TOR Document” link. ‘Documents’ subtab is shown in the lower section. It
contains all documents uploaded in the system at various stages of the procurement.
6. Upload finalized and approved TOR Document.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

189

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
7. After the document is uploaded, it will appear on the list shown in ‘Documents’ section.
8. You can select and delete any document that has been uploaded in current stage of the procurement.
For e.g. if you are in ‘TOR Generation’ stage, you can delete documents that you have uploaded in
this stage. To delete a document, select ‘Delete’ checkbox against the document and click ‘Delete’
link.
9. On completion of ‘Generation of TOR’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Shortlisting’ stage.

Shortlisting
In this stage short-listing of firms will be performed.
‘Shortlisting’ tab is selected by default.

190

Procurement Management Support System – PMSS v1.0

User Guide

10. Click “Step 1: Add/View Consultants” link. ‘Consultant Details’ subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Consultant Name

Enter Name of the consultant.
ABC Consultants
Consultant can also be searched using ‘Select
Consultant from PMSS Database’ link. Click on this
link will display the existing list of consultants, if
any. Once the list is displayed, click on the
consultant’s name. This will auto populated the
selected consultant’s data. In order to search
additional consultants within the state or city use
the filters provided on the page.
191

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

2

Address

Enter the address of the Consultant

3
4
5
6

City
State
Pin Code
Phone Number

7

Fax Number

STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR Road
Enter the city of the Consultant
Pune
Enter the state of the Consultant
Maharashtra
Enter the Pin Code of the Consultant
411232
Enter the Phone Number of the Consultant. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the Fax Number of the Consultant. 26422680

8
9
10
11

Email ID
PAN Number
TAN Number
Tax Number

Enter the Email ID of the Consultant
Enter the PAN Number of the Consultant
Enter the TAN Number of the Consultant
Enter the TAX Number of the Consultant

ftti@efttil.com
ANS44874

c. Click ‘Save’.
d. To add another consultant, repeat steps a to c.
11. Click “Step 2: Shortlisting of Consultants” link. A popup will be seen

a. Fill fields mentioned below for each consultant;

Sr.
No.
1

Field Name

Field Description

Sample Data

Is Shortlisted

Select Yes or No.
Select Yes if the consultant has been shortlisted

No

192

Procurement Management Support System – PMSS v1.0

2

Comments

User Guide

Select No if the consultant has not been
shortlisted
Enter reasons for short listing or rejection of the Not adequate
consultant.
project experience

b. Click ‘Save’.
c. Click ‘Close’ to close the popup window.
12. Click “Step 3: Recommendation Details” link. Fill the fields on the page. Details of the fields
are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

L1 Consultant

2

Recommendation
Comments

Select lowest price consultant i.e. L1 consultant ABC Ltd.
who should be awarded this contract
Enter comments recommending the selected Vast experience in
consultant
the domain

13. Click ‘Save’
14. On completion of ‘Shortlisting’ stage click on ‘Move to Next Stage’. This will move the procurement
to ‘Contract Generation’ stage.

Contract Generation
In this stage the contract terms will be defined and contract will be generated.
‘Contract’ tab is selected by default.

193

Procurement Management Support System – PMSS v1.0

User Guide

15. On “Step 1: Fill below details (Contract Details), fill the fields on the page. Details of the fields
are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

Contract Type

Select type of contract - Lumpsum or Time based

Lumpsum

Enter value quoted by the shortlisted consultant
Enter no. of intervals at which payment will be
made to the consultant
System will auto-populate ‘Amount’ field value in
this field
Enter date on which contract will be started
Enter date in DD/MM/YYYY format or select date
using calendar.

12000
4

Select billing cycle for the contract – Daily or
Monthly.
Enter Fees per day or month depending on billing
cycle.
If Billing Cycle is ‘Daily’, fees per day should be
entered.
If Billing Cycle is ‘Monthly’, fees per month should
be entered.
Enter period of the contract in days or month
depending on billing cycle.
If Billing Cycle is ‘Daily’, Contract Period should be
entered in days.
If Billing Cycle is ‘Monthly’, Contract Period should
be entered in months.
System will auto-populate ‘Amount’ field value in
this field
Enter date on which contract will be started
Enter date in DD/MM/YYYY format or select date
using calendar.

Daily

For Lumpsum Type
2
Amount
3
Frequency
4

Contract Value

5

Contract Start Date

For Time based Type
6
Billing Cycle
7

Fees

8

Total Contract
Period

9

Contract Value

10

Contract Start Date

12000
01/04/2011

100

20

2000
01/04/2011

16. Click ‘Save’
17. Click “Step 2: Define Payment Terms” link. ‘Milestones’ subtab is shown in the lower section.
a. To add a milestone/payment term, Click ‘Add’ which is within the subtab. A pop up
will be seen

194

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Sample Data

Milestone Name

Enter name of the milestone

BRD Signoff

2

Milestone
Description
Expected Payment
Date

Enter description for the milestone

After BRD signoff

3

4

Milestone Amount

Enter expected payment date for this milestone
30/04/2011
Enter date in DD/MM/YYYY format or select date
using calendar.
Enter milestone amount
1200

c. Click ‘Save’
d. To add new payment terms, repeat steps a to c.

18. Please ensure total of ‘Payment Amount %’ for all milestones is exactly 100.
19. Click ‘Step 3: Generate Contract’. The contract document will be generated. Save the file locally and
make necessary changes to the sections highlighted in yellow. Before generating the document,
system validates the required information and prompts for missing information.
20. After completing changes to the locally saved draft contract document, click “Step 4: Upload Signed
Copy of Contract” link. ‘Documents’ subtab is shown in the lower section. It contains all documents
uploaded in the system at various stages of the procurement.

195

Procurement Management Support System – PMSS v1.0

User Guide

21. Upload the signed contract document.

a. Enter the date on which the contract is signed.
b. Click ‘Add’ link, which is within the subtab. A popup will be seen

c. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded

d. Click ‘Upload’ to upload the document in the system.

196

TOR

Procurement Management Support System – PMSS v1.0

User Guide

e. Uploaded document will appear on the list shown in ‘Documents’ section.
f.

User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.

22. On completion of ‘Contract Generation’ stage click on ‘Move to Next Stage’. This will move the
procurement to ‘Track Payment’ stage.

Track Payment
This is last stage of the process. In this stage information about actual Payment will be entered into
the system.
‘Track Payment’ tab is selected by default.
23. Click “Step 1: Track Payment” link. ‘Milestones’ subtab is shown in the lower section. List of
milestones is displayed in the subtab.
24. Click link in ‘Milestone Name’ column to enter payment information for the milestone. A
pop up will be seen

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1
2

3
4

Field Name

Field Description

Cheque/Draft
Number
Actual Payment
date

Enter Instrument number by which the payment 411004
was made i.e. Cheque or Draft Number
Enter date on which actual payment was made.
20/07/2011
Enter date in DD/MM/YYYY format or select date
using calendar.
Enter comments if any related to actual payment
date
Enter Actual amount paid to the consultant
120

Payment Date
Comments
Actual Payment
Amount

197

Sample Data

Procurement Management Support System – PMSS v1.0

5

Actual Payment
Comments

User Guide

Enter comments if Actual Amount paid doesn’t
match with the milestone amount

b. Click ‘Save’.
25. Repeat above steps to enter tracking information for all milestones of the procurement.
26. After payments against all milestones have been completed, click on ‘Complete
Procurement Process’ to mark the procurement as Complete.

198

Procurement Management Support System – PMSS v1.0

User Guide

Individual Consultants – SSS
Purpose
This method is used for obtain services from individual consultant using Single Source Selection.

Process flow

Role(s)
o

Procurement Coordinator (SPFU) – initiates and carries out the process of selection of providers.

Prerequisite
o

Justification for the consultant should be prepared and duly signed.

o

Other Prerequisites are similar to Individual Consultant – Competitive method.

Process Details
TOR
1. The steps on this stage are similar to Individual Consultant – Competitive method.

Shortlisting
In SSS method, there will be no short-listing process. Instead, justification for selection of consultant will
be uploaded in the system.
‘Shortlisting’ tab is selected by default.

199

Procurement Management Support System – PMSS v1.0

User Guide

2. Click “Step 1: Add/View Consultants” link. Only one consultant can be uploaded. ‘Consultant
Details’ subtab is shown in the lower section.
a. Click ‘Add’, which is within the subtab. A pop up will be seen

b. Fill the fields on the page. Details of the fields are mentioned below;

Sr.
No.
1

Field Name

Field Description

Consultant Name

Enter Name of the consultant.
ABC Consultants
Consultant can also be searched using ‘Select
Consultant from PMSS Database’ link. Click on this
link will display the existing list of consultants, if
any. Once the list is displayed, click on the
200

Sample Data

Procurement Management Support System – PMSS v1.0

User Guide

2

Address

3
4
5
6

City
State
Pin Code
Phone Number

7

Fax Number

consultant’s name. This will auto populated the
selected consultant’s data. In order to search
additional consultants within the state or city use
the filters provided on the page.
Enter the address of the Consultant
STI Towers,
Unit# 141/38,
Campus 29. RMZ
Millenia Business
Park.
881, Dr. MGR Road
Enter the city of the Consultant
Pune
Enter the state of the Consultant
Maharashtra
Enter the Pin Code of the Consultant
411232
Enter the Phone Number of the Consultant. 26422689
To enter more than one number use comma (,) as
a separator.
Enter the Fax Number of the Consultant. 26422680

8
9
10
11

Email ID
PAN Number
TAN Number
Tax Number

Enter the Email ID of the Consultant
Enter the PAN Number of the Consultant
Enter the TAN Number of the Consultant
Enter the TAX Number of the Consultant

ftti@efttil.com
ANS44874

c. Click ‘Save’.
3. Click “Step 4: Upload Consultant Justification” link. ‘Documents’ subtab is shown in the lower
section. It contains all documents uploaded in the system at various stages of the procurement.
4. Upload justification document explaining selection of the consultant for the contract.
a. Click ‘Add’ link, which is within the subtab. A popup will be seen

201

Procurement Management Support System – PMSS v1.0

User Guide

b. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Sample Data

2

Document
Category

Select the appropriate document category.

3

Description

Enter more information about the uploaded This is approved
document.
TOR.

Document to be Browse the document that you want to upload.
uploaded
TOR

c. Click ‘Upload’ to upload the document in the system.
d. Uploaded document will appear on the list shown in ‘Documents’ section.
e. User can select and delete the document that has been uploaded in current stage of the
procurement. To delete a document, select ‘Delete’ checkbox against the document and click
‘Delete’ link.
5. On completion of ‘Shortlisting’ stage click on ‘Move to Next Stage’. This will move the procurement
to ‘Contract Generation’ stage.

Contract Generation
6. The steps on this stage are similar to Individual Consultant – Competitive method.

Track Payment
7. The steps on this stage are similar to Individual Consultant – Competitive method.

202

Procurement Management Support System – PMSS v1.0

User Guide

9
Chapter

PRIOR REVIEWS OF PROCUREMENTS
User Guide – Prior Reviews

203

Procurement Management Support System – PMSS v1.0

User Guide

Prior Reviews
Purpose
In this module, procurements sent for prior review can be reviewed.

Role(s)
o

Procurement Coordinator (SPFU) – submits a request.

Process Details

1. All procurements submitted for prior review will be listed. The list will be grouped on Institution
name.
2. Click on link at package name to view the details of the procurement.
3. Review the details on the page.
4. After you have completed the review,
a. Click ‘No Objection’ to give NOC to continue the process.
b. Click ‘Revise & Resubmit’ link if you wish to suggest changes. Suggestions can be
entered in the text area on Comments dialog box.

204

Procurement Management Support System – PMSS v1.0

User Guide

Chapter

10
0
REQUEST/ QUERIES
User Guide – Request/ queries

205

Procurement Management Support System – PMSS v1.0

User Guide

Request/ Queries
Purpose
This module is an interface used for answering the queries/ requests raised by the users.

Role(s)
o

Procurement Coordinator (SPFU) – submits a request.

o

Procurement Coordinator (NPIU) – reviews the request and resolves the request/query.

Process Details

1. Click ‘Add’ link to add new request. A popup will be seen;

a. Fill the fields on the page. Details of the fields are mentioned below;
Sr.
No.
1

Field Name

Field Description

Request Type

Select Request Type – Process Related or Technical
Technical
Select ‘Process Related’ if the query is related to
206

Sample Data

Procurement Management Support System – PMSS v1.0

2
3

4
5
6

User Guide

World Bank procurement process guidelines or
procurement manual.
Select ‘Technical’ if the query is related to the
PMSS Application.
Subject
Enter some brief description about the query as
subject.
Description
Enter detailed description of the query. In case of
technical query, you should provide steps to the
problem or functionality.
Priority
Select severity – High, Medium or Low depending
on your priority or urgency to get the solution.
Severity
Select – Critical, Major or Minor depending on
criticality of the functionality
Exp.
Resolution Enter date by which the query should be resolved.
Date
Enter date in DD/MM/YYYY format or select date
using calendar.

Unable to add new
consultant

High
Critical
23/03/2011

b. Click ‘Save’
2. User will be able to add attachment using the ‘Add Attachment’ link, if required.
3. Email will be sent to all the users of NPIU and SPFU.
4. All the users of NPIU will be able to see the request in the Request/ Queries module.
5. User can click on the request to see the details of the request.

6. User can provide his/ her comments (resolution) using the discussion thread or change
the status.
7. Click ‘Save’ if you change the status.
8. Email will be sent to the requestor.

207

Procurement Management Support System – PMSS v1.0

User Guide

9. The requestor can click on the request and see the comments (resolution) in discussion
thread.
10. If the user is satisfied with the resolution, he/ she can mark the status as ‘Closed’ else
the user can change the status to ‘Re-open’ and mention the comments (reason for reopening) in the discussion thread.
11. All the discussion threads will be recorded with the timestamp.

208

Procurement Management Support System – PMSS v1.0

User Guide

Chapter

11
PMSS-MIS
User Guide – MIS

209

Procurement Management Support System – PMSS v1.0

User Guide

PMSS-MIS
Purpose
This module will be used to print reports.

Role(s)

o

Procurement Coordinator

Process Details

1. Click on a link for the report that you want generate seen in left side navigation bar.
2. Specify the period for which the report should be generated. For e.g. for generating a report for
March, 2010, enter ‘01/03/2010’ as ‘From Date’ and ‘31/03/2010’ as ‘To Date’.
3. Click on the format in which the report should be generated. Report can be generated in any of the
three formats PFD, HTML and Excel.

210

Procurement Management Support System – PMSS v1.0

User Guide

Procurement Management Support System – PMSS
Thank You

211



Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.5
Linearized                      : Yes
Create Date                     : 2012:02:01 15:07:20Z
Creator                         : Microsoft® Office Word 2007
Modify Date                     : 2017:12:03 17:26:24+05:30
Language                        : en-US
Tagged PDF                      : Yes
XMP Toolkit                     : Adobe XMP Core 5.6-c015 84.159810, 2016/09/10-02:41:30
Creator Tool                    : Microsoft® Office Word 2007
Metadata Date                   : 2017:12:03 17:26:24+05:30
Producer                        : Microsoft® Office Word 2007
Document ID                     : uuid:7203ffa9-cc1f-4739-bc27-890a5469dca3
Instance ID                     : uuid:4188d63a-0d0b-4fee-8f6d-03dd0ed8e695
Format                          : application/pdf
Page Count                      : 211
EXIF Metadata provided by EXIF.tools

Navigation menu