Samsung Electronics Co RFV01U-D1A RRU (RFV01U) User Manual 1

Samsung Electronics Co Ltd RRU (RFV01U) 1

Contents

User Manual-1

     Radio Access Network RFV01U-D1AInstallation Manual  Describes product installation and requirement procedure. Document Version 2.0 July 2017      Document Number: 2600-00KYMEGAA
  © 2017 SAMSUNG Electronics Co., Ltd. All Rights Reserved. The contents of this document/presentation contain proprietary information that must be kept confidential. No part of this document shall be photocopied, reproduced, stored in a retrieval system, or transmitted, in any form or by any means whether, electronic, mechanical, or otherwise without the prior written permission of SAMSUNG Electronics Co., Ltd.  No warranty of accuracy is given concerning the contents of the information contained in this publication. To the extent permitted by law no liability (including liability to any person by reason of negligence) will be accepted by SAMSUNG Electronics Co., Ltd., its subsidiaries or employees for any direct or indirect loss or damage caused by omissions from or inaccuracies in this document. SAMSUNG Electronics Co., Ltd. reserves the right to change details in this publication without notice.                   SNMTC-v3-0312  This manual should be read and used as a guideline for properly installing and/or operating the product. Owing to product variations across the range, any illustrations and photographs used in this manual may not be a wholly accurate depiction of the actual products you are using. This manual may be changed for system improvement, standardization and other technical reasons without prior notice.
RFV01U-D1A Installation Manual   v2.0   iii Copyright © 2017, All Rights Reserved. Samsung Networks documentation is available at http://www.samsungdocs.com
Confidential RFV01U-D1A Installation Manual   v2.0   iv Copyright © 2017, All Rights Reserved. Contents PrefaceixConventionsinthisDocument........................................................................................................ixNewandChangedInformation........................................................................................................xRevisionHistory................................................................................................................................xOrganizationofThisDocument.......................................................................................................xRelatedDocumentation...................................................................................................................xPersonalandProductSafety...........................................................................................................xiEquipmentMarkings.......................................................................................................................xvChapter1BeforeInstallation1SystemConfigurationandInterface................................................................................................1RRHView.....................................................................................................................................1RRHExternalInterface.................................................................................................................2Specifications...................................................................................................................................4CautionsforInstallation...................................................................................................................5BeforeInstalling...........................................................................................................................5WhileInstalling............................................................................................................................5AfterInstalling.............................................................................................................................6InstallationTools..............................................................................................................................7Chapter2InstallingSystem10InstallationProcedure....................................................................................................................10SystemArrangement.....................................................................................................................11UnpackingandTransporting..........................................................................................................16BringinginItems........................................................................................................................16UnpackingItems........................................................................................................................16RRHHandling.................................................................................................................................17FixingRRH......................................................................................................................................18FixingFingerGuard....................................................................................................................18FixingUnitBracket.....................................................................................................................21FixingPoleType.........................................................................................................................24FixingWallType.........................................................................................................................36Chapter3ConnectingCables50CablingProcedure..........................................................................................................................50GuidelinesforCableConnections..................................................................................................51CablePathInspection................................................................................................................51CableCutting.............................................................................................................................52CableInstallation.......................................................................................................................52CableBinding.............................................................................................................................53ConnectorAttachment..............................................................................................................53IdentificationTagAttachment...................................................................................................54CablingDiagram.............................................................................................................................55Grounding......................................................................................................................................58ConnectingGroundCable..........................................................................................................58PowerCabling................................................................................................................................61ConnectingPowerCable............................................................................................................62InterfaceCableConnection............................................................................................................65
Confidential  Contents RFV01U-D1A Installation Manual   v2.0   v Copyright © 2017, All Rights Reserved. Remove/InsertOpticalModule..................................................................................................65ConnectingCPRICable...............................................................................................................66ConnectingUDACable...............................................................................................................71ConnectingRETCable................................................................................................................75ConnectingRFCable..................................................................................................................77Chapter4InspecttheInstallation88AppendixAAcronyms92AppendixBSectorAntennaInstallation93CautionswhenInstallingaSectorAntenna...................................................................................93SectorAntennaInstallation............................................................................................................94AppendixCCleantheOpticalConnectors95Introduction...................................................................................................................................95MeasuretheOpticalOutputandConnectingtheOpticalConnector........................................95AppendixDStandardTorque97
Confidential RFV01U-D1A Installation Manual   v2.0   vi Copyright © 2017, All Rights Reserved. List of Figures Figure1.RRHView(withoutFingerGuard)....................................................................................................1Figure2.RRHView(withFingerGuard)..........................................................................................................2Figure3.RRHExternalInterface.....................................................................................................................3Figure4.ProceduretoInstalltheRRH..........................................................................................................10Figure5.RRHArrangement_1SectorPoleTypeInstallation(StandardInstallation)...................................11Figure6.RRHArrangement_1SectorPoleTypeInstallation(SideInstallation)...........................................11Figure7.RRHArrangement_2SectorPoleTypeInstallation(SideInstallation)...........................................12Figure8.RRHArrangement_1SectorWallTypeInstallation(StandardInstallation)...................................13Figure9.RRHArrangement_1SectorWallTypeInstallation(SideInstallation)..........................................13Figure10.RRHArrangement_3SectorWallTypeInstallation(StandardInstallation)...................................14Figure11.RRHArrangement_3SectorWallTypeInstallation(SideInstallation)..........................................15Figure12.RRHHandling.................................................................................................................................17Figure13.FingerGuardFixing(1)...................................................................................................................19Figure14.FingerGuardFixing(2)...................................................................................................................19Figure15.FingerGuardFixing(3)...................................................................................................................19Figure16.FingerGuardFixing(4)...................................................................................................................20Figure17.FingerGuardFixing(5)...................................................................................................................20Figure18.FingerGuardFixing(6)...................................................................................................................20Figure19.FixingUnitBracket_StandardInstallation(1)................................................................................22Figure20.FixingUnitBracket_StandardInstallation(2)................................................................................22Figure21.FixingUnitBracket_StandardInstallation(3)................................................................................23Figure22.FixingUnitBracket_SideInstallation..............................................................................................24Figure23.AssemblingMountingBracket(1)..................................................................................................25Figure24.AssemblingMountingBracket(2)..................................................................................................26Figure25.LiftingRRH&MountingBracketAssembly....................................................................................27Figure26.LiftingRRH&MountingBracketAssembly....................................................................................28Figure27.FixingMountingBracketAssembly_1SectorPoleType(1)...........................................................29Figure28.FixingMountingBracketAssembly_1SectorPoleType(2)...........................................................29Figure29.FixingMountingBracketAssembly_1SectorPoleType(3)...........................................................30Figure30.LevellingMountingBracketAssembly_1SectorPoleType...........................................................30Figure31.FixingMountingBracketAssembly_2SectorPoleType(SideInstallation1)................................31Figure32.FixingMountingBracketAssembly_2SectorPoleType(SideInstallation2)................................31Figure33.FixingMountingBracketAssembly_2SectorPoleType(SideInstallation3)................................32Figure34.FixingRRH_1SectorPoleType(StandardInstallation)..................................................................33Figure35.FixingRRH_1SectorPoleType(SideInstallation)..........................................................................34Figure36.FixingRRH_2SectorPoleType(SideInstallation1).......................................................................36Figure37.FixingRRH_2SectorPoleType(SideInstallation2).......................................................................36Figure38.RRHmarkingdimensions_1SectorWallType(StandardInstallation)...........................................37Figure39.RRHmarkingdimensions_1SectorWallType(SideInstallation)..................................................38Figure40.RRHmarkingdimensions_3SectorWallType(StandardInstallation)...........................................38Figure41.RRHmarkingdimensions_3SectorWallType(SideInstallation)..................................................39Figure42.Marking_WallType........................................................................................................................40Figure43.Drilling&Anchoring.......................................................................................................................41Figure44.FixingMountingBracket_1SectorWallType................................................................................42Figure45.FixingMountingBracket_3SectorWallType................................................................................43Figure46.FixingRRH_1SectorWallType(StandardInstallation)..................................................................44Figure47.FixingRRH_1SectorWallType(SideInstallation).........................................................................45
Confidential  List of Figures RFV01U-D1A Installation Manual   v2.0   vii Copyright © 2017, All Rights Reserved. Figure48.FixingRRH_3SectorWallType(StandardInstallation1)...............................................................47Figure49.FixingRRH_3SectorWallType(StandardInstallation2)...............................................................47Figure50.FixingRRH_3SectorWallType(SideInstallation1).......................................................................49Figure51.FixingRRH_3SectorWallType(SideInstallation2).......................................................................49Figure52.ProceduretoConnectSystemCable..............................................................................................50Figure53.CableConnectionProcedure..........................................................................................................51Figure54.CableDiagram_2.1GHzRFConnection:2T2R...............................................................................55Figure55.CableDiagram_2.1GHzRFConnection:2T4R,4T4R.....................................................................55Figure56.CableDiagram_1.9GHzRFConnection:2T2R...............................................................................56Figure57.CableDiagram_1.9GHzRFConnection:2T4R,4T4R.....................................................................56Figure58.ConnectingGroundCable(1).........................................................................................................59Figure59.ConnectingGroundCable(2).........................................................................................................60Figure60.PowerEquipmentElements...........................................................................................................61Figure61.ConnectingPowerCable(1)...........................................................................................................63Figure62.ConnectingPowerCable(2)...........................................................................................................63Figure63.OpticalModuleRemoval(1)..........................................................................................................65Figure64.OpticalModuleRemoval(2)..........................................................................................................65Figure65.OpticalModuleRemoval(3)..........................................................................................................65Figure66.OpticalModuleInset......................................................................................................................66Figure67.ConnectingCPRICable(1)..............................................................................................................67Figure68.ConnectingCPRICable(2)..............................................................................................................68Figure69.ConnectingCPRICable(3)..............................................................................................................68Figure70.ConnectingCPRICable(4)..............................................................................................................69Figure71.ConnectingCPRICable(5)..............................................................................................................69Figure72.ConnectingCPRICable(6)..............................................................................................................70Figure73.ConnectingUDACable(1)..............................................................................................................72Figure74.ConnectingUDACable(2)..............................................................................................................72Figure75.ConnectingUDACable(3)..............................................................................................................72Figure76.ConnectingUDACable(4)..............................................................................................................73Figure77.ConnectingUDACable(5)..............................................................................................................73Figure78.ConnectingUDACable(6)..............................................................................................................74Figure79.ConnectingRETCable(1)...............................................................................................................76Figure80.ConnectingRETCable(2)...............................................................................................................76Figure81.ConnectingRETCable(3)...............................................................................................................77Figure82.ConnectingRETCable(4)...............................................................................................................77Figure83.ConnectingRFCable_2.1GHz2T2RConnection(1)......................................................................79Figure84.ConnectingRFCable_2.1GHz2T2RConnection(2)......................................................................79Figure85.ConnectingRFCable_2.1GHz2T2RConnection(3)......................................................................80Figure86.ConnectingRFCable_2.1GHz2T4R,4T4RConnection(1)............................................................81Figure87.ConnectingRFCable_2.1GHz2T4R,4T4RConnection(2)............................................................81Figure88.ConnectingRFCable_2.1GHz2T4R,4T4RConnection(3)............................................................82Figure89.ConnectingRFCable_1.9GHz2T2RConnection(1)......................................................................83Figure90.ConnectingRFCable_1.9GHz2T2RConnection(2)......................................................................83Figure91.ConnectingRFCable_1.9GHz2T2RConnection(3)......................................................................84Figure92.ConnectingRFCable_1.9GHz2T4R,4T4RConnection(1)............................................................85Figure93.ConnectingRFCable_1.9GHz2T4R,4T4RConnection(2)............................................................85Figure94.ConnectingRFCable_1.9GHz2T4R,4T4RConnection(3)............................................................86Figure95.InstallationInspectionProcedure..................................................................................................88Figure96.SectorAntenna...............................................................................................................................94
Confidential RFV01U-D1A Installation Manual   v2.0   viii Copyright © 2017, All Rights Reserved. List of Tables Table1.Specifications...................................................................................................................................4Table2.BasicInstallationTools.....................................................................................................................7Table3.PartsandToolsforfixingFingerGuard..........................................................................................18Table4.PartsandToolsforfixingUnitBracket_Standardinstallation.......................................................21Table5.PartsandToolsforfixingUnitBracket_StandardInstallation.......................................................23Table6.PartsandToolsforassemblingMountingBracket........................................................................24Table7.PartsandToolsforfixingMountingBracketAssembly_1SectorPoleType..................................28Table8.PartsandToolsforfixingMountingBracketAssembly_2SectorPoleType(SideInstallation).....31Table9.FixingRRH_1SectorPoleType(Standard&SideInstallation).......................................................32Table10.PartsandToolsforfixingRRH_2SectorPoleType(SideInstallation)...........................................34Table11.ToolsforMarking...........................................................................................................................37Table12.PartsandToolsforDrilling&Anchoring........................................................................................40Table13.AnchorBoltDrillBitsandHoleDepth............................................................................................41Table14.PartsandToolsforfixingMountingBracket_1SectorWallType..................................................42Table15.PartsandToolsforfixingMountingBracket_3SectorWallType..................................................42Table16.PartsandToolsforfixingRRH_1SectorWallType(Standard&SideInstallation)........................44Table17.PartsandToolsforfixingRRH_3SectorWallType(StandardInstallation)...................................45Table18.PartsandToolsforfixingRRH_3SectorWallType(SideInstallation)...........................................48Table19.RecommendedMinimumAllowedCablebendRadius..................................................................52Table20.RRHConnectionCable...................................................................................................................56Table21.PartsandToolsforconnectingGroundCable...............................................................................58Table22.PartsandToolsforconnectingPowerCable.................................................................................62Table23.PowerCable/ConnectorPinMap...................................................................................................62Table24.PartsandToolsforconnectingCPRICable....................................................................................66Table25.PartsandToolsforconnectingUDACable....................................................................................71Table26.UDACablePinMap........................................................................................................................71Table27.PartsforconnectingRETCable......................................................................................................75Table28.RETCablePinMap.........................................................................................................................75Table29.RFCableMinimumRadiusofCurvature........................................................................................77Table30.PartsandToolsforconnectingRFcable........................................................................................78Table31.RFCableIdentificationTag.............................................................................................................87Table32.ConstructionSituationChecklist...................................................................................................89Table33.StandardTorqueValueforFasteningBolts...................................................................................97Table34.BrassBoltsTorqueValue...............................................................................................................97Table35.ConnectorConnectionTorqueValue.............................................................................................97
Confidential RFV01U-D1A Installation Manual   v2.0   ix Copyright © 2017, All Rights Reserved. Preface This manual describes how to install the 1.9/2.1 GHz RRH including how to connect cables. This manual includes the following 1.9/2.1 GHz RRH:  RFV01U-D1A Conventions in this Document Samsung Networks product documentation uses the following conventions.  Symbols Symbol  Description      Indicates a task.      Indicates a shortcut or an alternative method.  Provides additional information.  Provides information or instructions that you should follow to avoid service failure or damage to equipment.  Provides information or instructions that you should follow to avoid personal injury or fatality.  Provides antistatic precautions that you should observe. Menu Commands menu | command This indicates that you must select a command on a menu, where menu is the name of the menu, and command is the name of the command on that menu.  File Names and Paths These are indicated by a bold typeface. For example: Copy filename.txt into the /home/folder1/folder2/bin/ folder. User Input and Console Screen Output Text Input and output text is presented in the Courier font. For example, context <designated epc-context-name> CLI commands are presented in bold small caps. For example, Type the RTRV-NE-STS command in the input field.
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   x Copyright © 2017, All Rights Reserved. New and Changed Information This section describes information that has been added/changed since the previous publication of this manual.  Changed weight. (Table 1 Specifications)  Changed UDA cable pin map. (Table 26 UDA Cable Pin Map) Revision History The following table lists all versions of this document. Document Number  Product/Software Version Document Version Publication Date Remarks 2600-00KYMEGAA RFV01U-D1A  1.0  July 2017  - 2600-00KYMEGAA RFV01U-D1A  2.0  July 2017  - Organization of This Document Section  Title  Description Chapter 1  Before Installation  This chapter introduces RRH and describes items should be understood before installation. Chapter 2  Installing System  This chapter describes the procedures to install the RRH. Chapter 3  Connecting Cables  This chapter describes the procedures to connect the cables to the RRH installed. Chapter 4  Inspect the Installation  This chapter describes the procedures of inspecting installation status after RRH installation and cabling is completed. Appendix A  Acronyms  This annex describes the acronyms used in this manual. Appendix B  Sector Antenna Installation  This annex describes the sector antenna installation. Appendix C  Clean the Optical Connectors  This annex describes the procedure of cleaning the optical connector and cleaning tool. Appendix D  Standard Torque  This annex describes the standard torque when fastening the bolt. Related Documentation  LTE eNB System Description
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   xi Copyright © 2017, All Rights Reserved. Personal and Product Safety This product safety information includes European directives, which you must follow. If these do not apply in your country, please follow similar directives that do apply in your country. Proposition 65 Warning (US Only) State of California Proposition 65 Warning (US only)  WARNING: This product contains chemicals known to the State of California to cause cancer and birth defects or other reproductive harm. Electrical The product is designed to operate from a -48 V DC supply and is therefore classified as Safe Extra Low Voltage (SELV) equipment. All structural parts are grounded and all input and outputs have built-in isolation from the network. All input and output ports that connect to external power sources are designed to meet relevant national safety requirements. The product contains hazardous energy levels as defined by EN 60950. Care must be taken when maintaining this equipment as injury to personnel or damage to the equipment could result from mistakes. Maintenance should only be carried out by trained and competent engineers who are familiar with the relevant procedures and instructions. Lasers The product is fitted with optic modules rated as Class 1 radiation-emitting devices under EN 60825-1. During installation, operation, and maintenance, never look into the end of an optical fiber directly or by reflection either with the naked eye or through an optical instrument. Do not operate equipment with exposed fiber connectors-cover these with fiber cables or blanking caps. Do not remove equipment covers during operation unless requested to do so in the documentation. Carry out normal safety precautions when trimming fibers during installation. Manual Handling Care should be taken when handling equipment. Give due consideration to the weight of the equipment, the physical capability of the individual(s) handling the equipment, and movements such as twisting, bending and stooping, which could lead to skeletal and muscular injuries. Installation Installation must be carried out by trained and competent engineers only. All relevant safety measures should be taken to ensure equipment is not connected to
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   xii Copyright © 2017, All Rights Reserved. live power and transmission sources during installation. Equipment must be correctly installed in order to meet the relevant safety standards and approval conditions. Each power feed to the unit requires a separate fused feed from the provided power supply. The cable between the power distribution point and the installed equipment must have a minimum cross-sectional area of 2.5 mm2. Rack-mountable equipment must be placed in a standard 19-inch rack and secured with the appropriate fixings as detailed in the installation manual. Maintenance Maintenance must only be carried out by a suitably trained and competent technician. All safety instructions must be carefully observed at all times. Equipment covers should not be removed while live power and transmission is connected unless in a controlled environment by trained technicians. Fire The product is powered from a -48 V DC supply. To protect against fire, the equipment is fused.  Environment The product must be operated in an environment with the specified relative humidity and ambient temperature ranges.  Keep all liquids away from the equipment as accidental spillage can cause severe damage. Cooling The product cools down by its own set of cooling fans housed in a fan module. Each fan module detects a fan that is not operating normally. LEDs on the front panel of the fan module provide an alarm indication in the event of fan failure.  In the event of fan failure, take urgent remedial action to restore full cooling capacity. Take appropriate measures to ensure that fan modules do not start spinning during repair and maintenance procedures. Anti-Static Precautions The circuit boards and other modules in the product are sensitive to and easily damaged by static electricity. If any card or sub-assembly is removed from the unit, the following anti-static precautions must be observed at all times:  Service personnel must wear anti-static wrist straps.  Circuit boards and sub-assemblies must be placed on ground conductive mats
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   xiii Copyright © 2017, All Rights Reserved. or in conductive bags.  All tools must be discharged to ground before use.  The anti-static wrist strap and cord must be checked at regular intervals for their suitability for use. Grounding To comply with EN 60950, the equipment must be connected to a safety grounding point via a permanent link. Grounding points are located on the product for this purpose. Always connect the ground cable before fitting other cables. The product must remain grounded continuously unless all connections to the power supply and data network are all removed. If equipment is grounded through a cabinet or rack, make sure it is done so properly according to the installation instructions. Power Supply Connection The equipment is designed to be powered from a -48 V DC supply. Power connections and installation of associated wiring must be carried out by a suitably qualified technician. Only devices that comply with all relevant national safety requirements should be connected to the unit’s power supply inlets. Other usage will invalidate any approval given to this equipment. Connection of this equipment to devices that are not marked with all relevant national safety requirements may produce hazardous conditions on the network. When the power supply is obtained by a rectifier/safety isolation transformer, the supply must meet the requirements of EN 60950 providing double/reinforced insulation between hazardous voltages and SELV/TNV circuits. Any battery must be separated from hazardous voltages by reinforced insulation. Indirect Connection Before indirectly connecting any equipment to another device through a shared power supply, ALWAYS seek advice from a competent engineer. Devices that are not marked according to the relevant national safety standards may produce hazardous conditions on the network. Product Disposal To reduce the environmental impact of products, Samsung has joined WEEE compliance activities. The WEEE symbol on the product indicates that the product is covered by the European Directive 2002/96/CE for the disposal of Waste Electrical and Electronic Equipment (WEEE). This means that the product should be disposed of separately from the municipal waste stream via designated collection facilities appointed by
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   xiv Copyright © 2017, All Rights Reserved. the government or the local authorities. This will help prevent potential negative consequences for the environment and human health. Please check the terms and conditions of the purchase contract for information about correct disposal. Battery Disposal The product contains a battery on the processor card. The battery should not be disposed of with other household waste. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66. The battery incorporated in this product is not user replaceable. For information on its replacement, please contact your service provider. Do not attempt to remove the battery or dispose it in a fire. Do not disassemble, crush, or puncture the battery.  End of life recycling materials information is available from Samsung. California USA Only This Perchlorate warning applies only to primary CR (Manganese Dioxide) Lithium coin cells in the product sold or distributed ONLY in California USA ‘Perchlorate Material-special handling may apply, See www.dtsc.ca.gov/hazardouswaste/perchlorate.’  Antenna Gain The antenna gain with a maximum of 19.7 dBi should be used to satisfy maximum ERP. But the antenna gain can be grown up to 22.7 dBi, when the operator is extending the coverage to the unserved area.
Confidential  Preface RFV01U-D1A Installation Manual   v2.0   xv Copyright © 2017, All Rights Reserved.  Equipment Markings  This marking on the product, accessories or literature indicates that the product and its electronic accessories (e.g. charger, headset, USB cable) should not be disposed of with other household waste at the end of their working life. To prevent possible harm to the environment or human health from uncontrolled waste disposal, please separate these items from other types of waste and recycle them responsibly to promote the sustainable reuse of material resources. Household users should contact either the retailer where they purchased this product, or their local government office, for details of where and how they can take these items for environmentally safe recycling.  Business users should contact their supplier and check the terms and conditions of the purchase contract. This product and its electronic accessories should not be mixed with other commercial wastes for disposal.   Correct disposal of batteries in this product (Applicable in countries with separate collection systems.)  The marking on the battery, manual or packaging indicates that the battery in this product should not be disposed of with other household waste. Where marked, the chemical symbols Hg, Cd or Pb indicate that the battery contains mercury, cadmium or lead above the reference levels in EC Directive 2006/66.  The battery incorporated in this product is not user replaceable. For information on its replacement, please contact your service provider. Do not attempt to remove the battery or dispose it in a fire. Do not disassemble, crush, or puncture the battery. If you intend to discard the product, the waste collection site will take the appropriate measures for the recycling and treatment of the product, including the battery.   Protective earth RRH should be grounded.
Confidential RFV01U-D1A Installation Manual   v2.0   1 Copyright © 2017, All Rights Reserved. Chapter 1 Before Installation System Configuration and Interface RRH View The view of RRH is as follows. Figure 1. RRH View (without Finger Guard)  [Bottom View]14.96 (380) [Front View][Top View] [Left View]  [Right View] [Rear View] 19.73 (501.2) 10.04 (255) 14.96 (380) Unit: in. (mm)
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   2 Copyright © 2017, All Rights Reserved. Figure 2. RRH View (with Finger Guard)  RRH External Interface The external interface structure of RRH is as follows. [Bottom View]15.49 (393.5) [Front View][Top View] [Left View]  [Right View] [Rear View] 19.73 (501) 11.93 (303) 15.88 (403.5) Unit: in. (mm)
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   3 Copyright © 2017, All Rights Reserved. Figure 3. RRH External Interface    [Right View]Ground Terminal[Bottom View]ANT 1 (Bias-T)  ANT2ANT 3(Bias-T)DC_PWR ANT4RETUDAL0L1ANT 5(Bias-T)ANT 6ANT 7(Bias-T)ANT 8
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   4 Copyright © 2017, All Rights Reserved. Specifications The table below lists the main specifications of the RRH. Table 1. Specifications Item  RRH Technology  3GPP Rel. 13 Duplex type  FDD Operating Frequency    Band66 (2,100 MHz) o  DL: 2,110 to 2,180 MHz o  UL: 1,710 to 1,780 MHz   Band2 (1,900 MHz) o  DL: 1,930 to 1,990 MHz o  UL: 1,850 to 1,910 MHz Channel Bandwidth  5 MHz, 10 MHz, 15 MHz, 20 MHz 2Tx2Rx/2Tx4Rx/4Tx4Rx per RRH Input Voltage  -48 V DC (-38~-57 V DC) Input Current (Max)  28 A Dimension (in./mm)    without Finger Guard: 14.96/380 (W) × 10.04/255 (D) × 14.96/380 (H)   with Finger Guard: 15.88/403.5 (W) × 11.93/303 (D) × 15.49/393.5 (H) Weight (kg)   Approx. 38.3   With Finger Guard: 40.4 Operating Temperature (Ambient) -40~55°C (without solar load) Operating Humidity  5~100 % RH, condensing, not to exceed 30 g/m3 absolute humidity Altitude (m)  -60~1,800 (Telcordia GR-63-CORE) Earthquake  Telcordia Earthquake Risk Zone4 (Telcordia GR-63-CORE) Vibration    Office Vibration (Section 4.4.4)   Transportation Vibration (Section 4.4.5) Noise  Fanless (natural convection cooling) EMC  FCC Title 47 CFR Part 15 Safety  UL 60950-1 2nd Ed. RF  FCC Title 47 CFR Part 27
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   5 Copyright © 2017, All Rights Reserved. Cautions for Installation Observe the following safety instructions when installing the system: Installation shall be in accordance with the applicable local electric codes. Before Installing  Post warning signs in areas where high-voltage cables are installed.  Post ‘off limit’ signs in areas where accidents are most expected.  With guardrails or fences, block open areas such as connecting parts, roof, and scaffold.  Install the system in the Restrict Access Area. While Installing  The system power must be cut off before installing.  Be careful not to damage or scratch the boards mounted on the system and the cables among the boards when the system is transported or installed.  Make sure the power switch of power supply is off when installing the system. Installing the system with power switch on may cause system damage or fatal human injury when cables are not correctly connected.  Make sure that worker wears protection gloves and goggles to prevent damage from debris while drilling holes in a wall or ceiling.  Do not wear accessories such as watches and rings in order to prevent electrical shock.   Never allow foreign substances to be inserted into unused ports by covering them with a cap.  To prevent foreign substances, outdoor air and moisture from entering the cable inlet (including cable gland and conduit), finish it as follows:  - Unused inlet  Use the hole finishing materials including cap and rubber packing. - Cable-installed inlet  After cable installation, block any space in the inlet with tape, compressed sponge, rubber packing, and silicon.  Keep a safe distance between the base station antenna and people.
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   6 Copyright © 2017, All Rights Reserved.  After Installing Remove any debris produced during the work and clean up the installation site.  In the system, the laser beam light runs through the optical cable. Handle the optical cables with care as the laser beam can seriously damage the worker’s eyes.   Make sure that worker does not damage installed cables while cleaning the system.  While cleaning the power supply device, take caution that the device does not come in contact with foreign objects that may cause power failure.   SRU  Safe Distance RFV01U-D1A 1510 cm
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   7 Copyright © 2017, All Rights Reserved. Installation Tools The basic tools for installation are listed in the table below. The additional tools required for each site need to be identified and prepared during a site survey before starting installation. Table 2. Basic Installation Tools No.  Name  Specification  Purpose of use 1 Torque Driver  Apply a torque range : 2~10 lbf·in For fastening finger guard (M3) Apply a torque range : 20~90 lbf·in For fastening RRH ground pressure terminal (M5, M6) 2 Screw Driver Bit  ‘+’, No. 2  For fastening finger guard (M3, M5) ‘+’, No. 3  For fastening RRH ground pressure terminal (M6) 3 Screw Driver  ‘+’, No. 2  For loosening M3, M5 screw ‘+’, No. 3  For loosening M6 screw 4 Torque Wrench  Apply a torque range : 10~50 lbf·in For tightening M6 Hex.Bolt and RF connector of system (4.3-10 Type) Apply a torque range : 100~400 lbf·in For tightening M10 Hex.Bolt and RF connector of antenna (DIN Type) 5  Torque Wrench Spanner Head  Apply Hex. Bolt Head: 10 mm (for 10~50 lbf·in) For tightening M6 Hex.Bolt  Apply Hex. Bolt Head: 17 mm (for 100~400 lbf·in) For tightening M10 Hex.Bolt  Apply Hex. Bolt Head: 22 mm (for 10~50 lbf·in) For tightening RF connector of system (4.3-10 Type) Apply Hex. Bolt Head: 32 mm (for 100~400 lbf·in) For tightening RF connector of antenna (DIN Type) 6 Spanner  10 mm  For loosening M6 Hex.Bolt 17 mm  For loosening M10 Hex.Bolt 22 mm   For loosening RF connector of system (4.3-10 Type) 32 mm  For loosening RF connector of antenna (DIN Type) 7 Ratchet Wrench  10 × 13/17 × 19 (4 in 1)  For fastening Hex. Bolt 8 Tape Measure  16 ft./150 ft.   Tape measure for length measurement 9  Power Extension Cable  100 ft.  Basic tool
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   8 Copyright © 2017, All Rights Reserved. No.  Name  Specification  Purpose of use 10 Level  Normal  For horizontality and verticality 11 Hammer Drill  Normal  Wall Type Drilling 12  Concrete Drill Bit  0.55 in. (14 mm)  For M10 Strong Anchor  13 Anchor Punch  M10  For M10 Strong Anchor 14 Hammer  Normal Anchor fixing 15 Vacuum Cleaner  Normal  For removing dust during the drilling work 16 Heating Gun  122~572°F (50~300°C)  Shrinking Feeder cable tube 17 Cable Cutter  0.24~1.26 in. (6~32 mm)  Cable cutting 18 Crimping Tool  AWG14~AWG4 (1.5~16 mm2) Pressure terminal for crimping 19 Wire Stripper  Apply cable thickness: 1.5~6.2 in. (4~16 mm) Cable sheath for removal 20 Nipper  Basic Tool  For cutting cable 21 LAN Tool  Basic Tool  RJ45 Crimper 22 Industrial Scissor  Basic Tool  Cutting 23 Knife  Basic Tool  Cutting
Confidential   Chapter 1 Before Installation RFV01U-D1A Installation Manual   v2.0   9 Copyright © 2017, All Rights Reserved. No.  Name  Specification  Purpose of use 24  Optical Connector Cleaner   For LC Connector  For Optical Connector Cleaning 25  Optical Transceiver Removal  Tool  Normal  Separate the Optical Module 26 Multi tester  Digital Pocket Tester  The voltage and current measurements  Whether measured cable disconnection  27  Fiber Optical Test Set  Wave length: 1310 nm, 1550 nm (single mode) 850 nm, 1310 nm (multi mode) Optical level check  28 Angle Meter  Normal Antenna angle measurement 29  Multi master (VSWR & RF Power)  Normal Feeder VSWR measurement 30 Compass  Normal  Check azimuth during installation   The required installation tools may vary depending on the conditions at the site.  In addition to the basic tools, a protractor, ladder, safety equipment, cleaning tools, and so on should also be prepared in consideration of the site conditions.
Confidential RFV01U-D1A Installation Manual   v2.0   10 Copyright © 2017, All Rights Reserved. Chapter 2 Installing System Installation Procedure The procedure to install the RRH is as follows. Figure 4. Procedure to Install the RRH   Make sure that the power switch of the power supply is OFF when installing the system. Installing the system with the power switch ON may cause system damage or fatal human injury when connecting or disconnecting the cables.  To prevent the risk of electrical shock do not wear accessories such as watches and rings.    Foundation Work Unpacking and Transporting Fixing System Unpacking Items Bringing in Items Marking and Drilling (only wall type) System Levelling Fixing System
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   11 Copyright © 2017, All Rights Reserved. System Arrangement A minimum distance must be secured around the RRH, in each direction for installation and maintenance. Figure 5. RRH Arrangement_1 Sector Pole Type Installation (Standard Installation)  Figure 6. RRH Arrangement_1 Sector Pole Type Installation (Side Installation)  [Front View] Unit: in. (mm)[Top View] ≥ 12 (300) ≥ 16 (400) ≥ 8 (200)≥ 8 (200) 21.26 (540) ≥ 32 (800) W: 15.88 (403.5) H: 19.73 (501.2) [RRH Front]Unit: in. (mm)[Side View]  [Top View] ≥ 8 (200)≥ 8 (200) 25.8 (655.4) D: 11.93 (303) H: 19.73 (501.2) ≥12 (300) ≥ 16 (400) ≥ 32 (800)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   12 Copyright © 2017, All Rights Reserved. Figure 7. RRH Arrangement_2 Sector Pole Type Installation (Side Installation)   When fixing a pole mounting bracket, the length of a carriage bolt is 220 mm for the pole diameter 50~100 A.    When 2 sector pole type (side installation) is installed, it is recommended to install it to the pole of the 80 to 100 A specification. Unit: in. (mm)[RRH Front] [Side View]  [Top View] ≥ 8 (200) 25.8 (655.4) ≥ 12 (300) ≥ 15.74 (400) ≥ 32 (800) D: 29.84 (758) H: 19.73 (501.2)≥ 8 (200)Pole Size (Diameter)  Length of Carriage Bolt 50 A (60.5 mm)  220 mm 65 A (76.3 mm) 80 A (89.2 mm) 90 A (101.6 mm) 100 A (114.3 mm) Pole Size PoleSizeCarriage Bolt Carriage Bolt [1 Sector]  [2 Sector]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   13 Copyright © 2017, All Rights Reserved. Figure 8. RRH Arrangement_1 Sector Wall Type Installation (Standard Installation)  Figure 9. RRH Arrangement_1 Sector Wall Type Installation (Side Installation)  [Front View] Unit: in. (mm)[Top View] 14.74 (373.4) ≥ 32 (800) ≥ 12 (300) ≥ 16 (400) ≥ 8 (200)  ≥8 (200)W: 15.88 (403.5) H: 19.72 (501.2) [RRH Front]Unit: in. (mm)[Side View]  [Top View] 19.25 (489) ≥ 32 (800) ≥ 12 (300) ≥ 16 (400) ≥ 8 (200)≥ 8 (200) D: 11.93 (303) H: 19.72(501.2)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   14 Copyright © 2017, All Rights Reserved. Figure 10. RRH Arrangement_3 Sector Wall Type Installation (Standard Installation)  [Front View] Unit: in. (mm)[Top View] 14.7 (3734) ≥ 32 (800)  ≥ 16 (400)  ≥ 12 (300) W: 63.4 (1610.5)/H: 19.73 (501.2) ≥ 8 (200) ≥8 (200)≥ 8 (200)  ≥ 8 (200)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   15 Copyright © 2017, All Rights Reserved. Figure 11. RRH Arrangement_3 Sector Wall Type Installation (Side Installation)    [RRH Front][Front View] Unit: in. (mm)[Top View] ≥ 32 (800) 19.25 (489) ≥ 16 (400) W: 51.54 (1309)/H: 19.73 (501.2) ≥8 (200) ≥8 (200) ≥8 (200) ≥ 8 (200) ≥ 12 (300)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   16 Copyright © 2017, All Rights Reserved. Unpacking and Transporting This paragraph describes the work to unpack cabinets and other components and transport them to the place to be installed. Bringing in Items Bring in items, taking care of the followings:  When carrying a system, fasten the system firmly to the transport vehicle or carrier to prevent damage to the system for a vibration or shock.  When carrying system, use a lift to prevent accidents. However, if the system must be carried by people, enough people are required to carry the system.  Before moving the system, check the storage place for the system and remove obstacles in advance.  While moving system, the system should not be shocked physically and damaged caused by dust, moisture, and static electricity. Unpacking Items The procedure to unpack items is as follows:  The packing items must be packed until they reach the installation place.   The items are classified in accordance with each job specification and stored on a place that does not interfere with working.  Unpacked systems must be installed immediately. If not installed immediately, the systems must be stored in the installation place temporarily.  Unpack only external packing, leaving the internal packing in unpacked status.  Unpack the inner packaging after each system is placed on its installation location.  Scrap by-products (packaging waste) in accordance with the rule. Do not recycle the by-products.
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   17 Copyright © 2017, All Rights Reserved. RRH Handling When transporting an RRH, hold a handle at the top of the RRH. (No tool is needed for using the handle.) Figure 12. RRH Handling   When lifting or putting down the RRH, two or more operators must hold handle and support bracket respectively. The corner of the RRH may be scratched if one operator holds and handles the handle.   HandleHandle SupportBracket
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   18 Copyright © 2017, All Rights Reserved. Fixing RRH Fixing Finger Guard   To fix Finger Guard 1  Make sure you have the following items: Table 3. Parts and Tools for fixing Finger Guard Category  Description Parts  Finger Guard_Front  1 EA/RRH Finger Guard_Rear  1 EA/RRH Finger Guard_Bottom  1 EA/RRH Fastener  M3 × 10L Screw  4 EA/RRH M5 × 10L SEMS  12 EA/RRH Recommended Torque Value  M3 Screw  5.6 lbf·in (6.4 kgf·cm) M5 SEMS  25 lbf·in (29 kgf·cm) Working Tools  Torque Driver (2~10 lbf·in, 20~90 lbf·in), Screw Driver Bit ('+', No. 2), Screw Driver ('+', No. 2)   Check the type and fixing location of Finger guard before fixing it.  2  Place a finger guard_front to the RRH front. [Finger Guard_Rear] [Finger Guard_Front][Finger Guard_Bottom]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   19 Copyright © 2017, All Rights Reserved. Figure 13. Finger Guard Fixing (1)  3  Fix the finger guard_front using fasteners. Figure 14. Finger Guard Fixing (2)  4  Place a finger guard_rear to the RRH rear. Figure 15. Finger Guard Fixing (3)  5  Fix the finger guard_rear using fasteners. [RRH Front] Finger Guard_Front [Front Side View] M5 SEMS[RRH Front]Finger Guard_Rear[RRH Rear]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   20 Copyright © 2017, All Rights Reserved. Figure 16. Finger Guard Fixing (4)  6  Place a finger guard_bottom to the RRH bottom. Figure 17. Finger Guard Fixing (5)  7  Fix the finger guard_bottom using fasteners. Figure 18. Finger Guard Fixing (6)   [RRH Rear][Rear Side View]  M5 SEMS[RRH Rear] Finger Guard_Bottom [RRH Rear] [Bottom Side View] M3 Screw
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   21 Copyright © 2017, All Rights Reserved. Fixing Unit Bracket  There are two ways to fix a unit bracket to the RRH. One is fixing a unit mounting bracket to the rear side of RRH (Standard installation). The other is fixing a unit bracket to the side of RRH (Side installation). These are the same for the wall type and pole type installation procedures.   To fix Unit Bracket_Standard Installation 1  Make sure that you have the following items: Table 4. Parts and Tools for fixing Unit Bracket_Standard installation Category  Description Parts  Unit bracket  1 EA/RRH Fasteners M6 × 35L Hex. Bolt  (washer assembly) 6 EA/RRH Recommended Torque Value  M3 Screw  5.6 lbf·in (6.4 kgf·cm) M6 Hex. Bolt  43 lbfin (50 kgf·cm) Working Tools  Torque Wrench (10~50 lbfin), Torque Wrench Spanner head (apply Hex. Head: 10 mm), Spanner (10 mm), Torque Driver (2~10 lbfin), Screw Driver Bit ('+', No. 2), Screw Driver ('+', No. 2)  2  Loosen a fastener of finger guard_rear and separate the dummy cover from it. [Unit Bracket Standard Installation] Unit Bracket (RRH left) Unit Bracket(RRH rear)[Unit Bracket Side Installation]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   22 Copyright © 2017, All Rights Reserved. Figure 19. Fixing Unit Bracket_Standard Installation (1)  3  Place a dummy cover to the RRH left and fix it using fasteners. Figure 20. Fixing Unit Bracket_Standard Installation (2)   Dummy CoverM3 Screw  M3 Screw
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   23 Copyright © 2017, All Rights Reserved. 4  Place a unit bracket to the RRH rear and fix it using fasteners. Figure 21. Fixing Unit Bracket_Standard Installation (3)   To fix Unit Bracket_Side Installation 1  Make sure that you have the following items: Table 5. Parts and Tools for fixing Unit Bracket_Standard Installation Category  Description Parts  Unit bracket  1 EA/RRH Fasteners M6 × 35L Hex. Bolt (washer assembly)  6 EA/RRH Recommended Torque Value  M6 × 20L Hex. Bolt  43 lbfin (50 kgfcm)Working Tools  Torque Wrench (10~50 lbfin), Torque Wrench Spanner head (apply Hex. Head: 10 mm), Spanner (10 mm)  2  Place a unit bracket to the RRH left and fix it using fasteners.  Unit BracketM6 Hex. Bolt(washer assembly)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   24 Copyright © 2017, All Rights Reserved. Figure 22. Fixing Unit Bracket_Side Installation  Fixing Pole Type Assembling Mounting Bracket  To assemble Mounting Bracket 1  Make sure you have the following items: Table 6. Parts and Tools for assembling Mounting Bracket  Category  Description Parts  Mounting Bracket_Front  1 EA Mounting Bracket_Rear  1 EA Fasteners  M10 × 220L Carriage Bolt M10 Plain Washer M10 Spring Washer M10 Hex. Nut 4 EA 4 EA 4 EA 4 EA Working Tools  Spanner (17 mm)   Unit BracketM6 Hex. Bolt(washer assembly)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   25 Copyright © 2017, All Rights Reserved.  When fixing the mounting bracket, the specification of pole is from 50 A (2.38 in./60.5 mm) to 100 A (4.5 in./114.3 mm) and the specification of carriage bolt is M10 × 220L.  When fixing pole, fix it using the outside hole of mounting bracket_front.  2  Insert carriage bolts to the outside hole of mounting bracket_front. Figure 23. Assembling Mounting Bracket (1)  3  Pass the carriage bolt through the side closed hole of the mounting bracket_rear, fix the fastening material, and fasten the other carriage bolt to the mounting bracket_front only. Inside holesOutside holes M10 Carriage BoltMounting Bracket_Front
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   26 Copyright © 2017, All Rights Reserved. Figure 24. Assembling Mounting Bracket (2)  Lifting RRH & Mounting Bracket Assembly  To lift RRH/Mounting Bracket Assembly 1  Tie the rope in two carrying points of RRH and Mounting bracket assembly.   M10 Spring WasherM10 Plain WasherMounting Bracket_RearM10 Carriage BoltM10 Hex. Nut Mounting Bracket_Front
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   27 Copyright © 2017, All Rights Reserved. Figure 25. Lifting RRH & Mounting Bracket Assembly  2  While Operator A hauls the rope to carry up the RRH/mounting bracket assembly, Operator B pulls the rope outward so that RRH/mounting bracket assembly would not hit the tower platform. [Lifting Mounting Bracket Assembly] [Lifting RRH]Carrying Point_1Carrying Point 2 Carrying Point_1 Carrying Point_2
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   28 Copyright © 2017, All Rights Reserved. Figure 26. Lifting RRH & Mounting Bracket Assembly  Fixing Mounting Bracket Assembly For 1 Sector The way to fix 1 Sector mounting bracket assembly is as follows:  To fix Mounting Bracket Assembly_1 Sector Pole Type 1  Make sure you have the following items: Table 7. Parts and Tools for fixing Mounting Bracket Assembly_1 Sector Pole Type Category  Description Parts  1 Sector Mounting Bracket Assembly  1 Set Recommended Torque Value  M10 Hex. Nut  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm), Level  2  Place a mounting bracket assembly to the pole. Pulley RRH/Mounting Bracket Assembly Tower Platform Rope Operator A Operator B
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   29 Copyright © 2017, All Rights Reserved. Figure 27. Fixing Mounting Bracket Assembly_1 Sector Pole Type (1)  3  Locate the upper carriage bolt in the upper side hole of the mounting bracket_rear and fix the fastening materials temporarily on upper side. Figure 28. Fixing Mounting Bracket Assembly_1 Sector Pole Type (2)  4  Locate the lower carriage bolt in the lower side hole of the mounting bracket_rear and fix the all fastening materials. Mounting Bracket AssemblySide HoleM10 Carriage BoltMounting Bracket_Rear
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   30 Copyright © 2017, All Rights Reserved. Figure 29. Fixing Mounting Bracket Assembly_1 Sector Pole Type (3)  5  Check the level of mounting bracket assembly on a pole and adjust the level. Figure 30. Levelling Mounting Bracket Assembly_1 Sector Pole Type   When fixing the pole mounting bracket assembly on a pole, be sure to check the level of bracket. After finishing the installation, you can adjust the level minutely.   When occurring poor levelling, adjust the position of fasteners used to fix the Mounting bracket assembly or its levelling status. For 2 Sector The way to fix 2 Sector mounting bracket assembly is as follows:  To fix Mounting Bracket Assembly_2 Sector Pole Type (Side Installation) 1  Make sure you have the following items: Side HoleM10 Carriage BoltMounting Bracket_Rear If it is level, the bubble of the spirit level is positioned at the center of both lines. [1 Sector Side & Standard Mounting Bracket Assembly]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   31 Copyright © 2017, All Rights Reserved. Table 8. Parts and Tools for fixing Mounting Bracket Assembly_2 Sector Pole Type (Side Installation) Category  Description Parts  1 Sector Mounting Bracket Assembly  1 Set Extension Mounting Bracket  2 EA Fastener M10 × 25L Hex. Bolt  (washer assembly) 2 EA Recommended Torque Value  M10 Hex. Bolt/Nut  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm), Level  2  Fix 1 sector mounting bracket assembly to the pole. (Refer to ‘For 1 Sector’) Figure 31. Fixing Mounting Bracket Assembly_2 Sector Pole Type (Side Installation 1)  3  Fit the Extension mounting bracket’s groove into the mounting bracket_front‘s right hook, fix it using fasteners. Figure 32. Fixing Mounting Bracket Assembly_2 Sector Pole Type (Side Installation 2)  4  Fit the Extension mounting bracket’s groove into the mounting bracket_front‘s  M10 Hex. Bolt (washer assembly)Mounting Bracket_Front HookExtension Mounting BracketHook Groove
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   32 Copyright © 2017, All Rights Reserved. left hook, fix it using fasteners. Figure 33. Fixing Mounting Bracket Assembly_2 Sector Pole Type (Side Installation 3)  Fixing RRH For 1 Sector The way to fix 1 sector RRH is as follows:  To fix RRH_1 Sector Pole Type (Standard & Side Installation) 1  Make sure you have the following items: Table 9. Fixing RRH_1 Sector Pole Type (Standard & Side Installation) Category  Description Parts  M10 × 35L Hex. Bolt (washer assembly, attached to the unit bracket) 1 EA Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)  2  Hang the unit bracket hook of RRH side on the mounting bracket_front hook’s groove and fix it using fasteners.  M10 Hex. Bolt (washer assembly) Mounting Bracket _Front Hook Extension Mounting BracketHook Groove
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   33 Copyright © 2017, All Rights Reserved. Figure 34. Fixing RRH_1 Sector Pole Type (Standard Installation)    M10 Hex. Bolt(washer assembly)Unit Bracket HookMounting Bracket_FrontHook Groove
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   34 Copyright © 2017, All Rights Reserved. Figure 35. Fixing RRH_1 Sector Pole Type (Side Installation)   For 2 Sector The way to fix 2 sector RRH is as follows:  To fix RRH_2 Sector Pole Type (Side Installation) 1  Make sure you have the following items: Table 10. Parts and Tools for fixing RRH_2 Sector Pole Type (Side Installation)  Category  Description Parts  M10 × 35L Hex. Bolt (washer assembly, attached to the unit bracket) 1 EA/RRH Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)   Check the location to install the RRH.   M10 Hex. Bolt(washer assembly)Unit Bracket HookMounting Bracket_FrontHook Groove
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   35 Copyright © 2017, All Rights Reserved.   Fix the RRH according to the order of [RRH-0  RRH-1].  2  Hang the unit bracket hook of RRH-0 side on the mounting bracket_front hook’s groove and fix it using fasteners. RRH-0  RRH-1RRH-1RRH-0
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   36 Copyright © 2017, All Rights Reserved. Figure 36. Fixing RRH_2 Sector Pole Type (Side Installation 1)  3  Fix RRH-1 in the same way as the RRH-0. Figure 37. Fixing RRH_2 Sector Pole Type (Side Installation 2)  Fixing Wall Type Marking and Drilling for Wall Mounting  To mark on a wall 1  Make sure you have the following items:   [RRH-0][RRH-0]M10 Hex. Bolt(washer assembly)Unit Bracket HookMounting Bracket_FrontHook Groove[RRH-0]  [RRH-0] [RRH-1]
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   37 Copyright © 2017, All Rights Reserved. Table 11. Tools for Marking Category  Description Working Tools  Tape Measure, Permanent Maker, Level   To mount the system on a wall, perform the leveling test by referring to System Leveling to check the positions are marked to be horizontal or vertical before drilling. If the result shows they are not horizontal or vertical, modify the marking positions.   When the position where the system will be placed is determined, place the system on that position and then mark the positions where anchor bolts will be fixed. This will reduce marking error range. 2  Check the distance between the location for fixing the RRH and anchor bolt hole.  Figure 38. RRH marking dimensions_1 Sector Wall Type (Standard Installation)   [Rear View] Unit: in. (mm)  4.48 (114) 5.12 (130)15.88 (403.5)5.47 (139)  5.28 (134)19.73 (501.2)    : Anchor Bolt Hole 2.36 (60)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   38 Copyright © 2017, All Rights Reserved. Figure 39. RRH marking dimensions_1 Sector Wall Type (Side Installation)  Figure 40. RRH marking dimensions_3 Sector Wall Type (Standard Installation)   Unit: in. (mm)    : Anchor Bolt Hole [Side View] 5.12 (130)11.93 (303) 3.8 (96.5) 3.01 (76.5)4.48   19.73 (501.2) 2.36   (60)  (114)  Unit: in. (mm)      : Anchor Bolt Hole [Rear View] 5.12 (130)15.88 (403.5) 5.28 (134)≥ 63.4 (1610) ≥ 8 (200)5.47 (139)4.48  (114) 19.73 (501.2)  ≥ 8 (200) 2.36  (60)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   39 Copyright © 2017, All Rights Reserved. Figure 41. RRH marking dimensions_3 Sector Wall Type (Side Installation)  3  Place a mounting bracket on the fixing location, Check the level status using a level and adjust the level of bracket assembly.  4  If the level status is normal, mark the anchor bolt holes on a wall.  Unit: in. (mm)       : Anchor Bolt Hole4.48  (114) 19.73 (501.2) [Side View] ≥ 51.54 (1309) ≥ 8 (200)≥ 8 (200)11.93 (303)5.12 (130)3.8 (96.5)3.01 (76.5)2.36  (60)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   40 Copyright © 2017, All Rights Reserved. Figure 42. Marking_Wall Type   To drill anchor holes and fix anchors 1  Make sure you have the following items: Table 12. Parts and Tools for Drilling & Anchoring Category  Description Parts  1, 3 Sector Installation  M10 Strong Anchor  4 EA/RRH Woking Tools  Hammer Drill, Concrete Drill Bit [0.55 in. (14 mm)], Vacuum Cleaner, Hammer, Anchor Punch (For M10 Strong Anchor)  If it is level, the bubble of the spirit level is positioned at the center of both lines. [1 Sector Side & Standard Mounting Bracket Assembly] 5.11 (130)[3 Sector Standard Installation Mounting Bracket Assembly] ≥ 18.64 (473) Unit: in. (mm)/   : Marking Point 2.36  (60) ≥ 18.64 (473) [3 Sector Side Installation Mounting Bracket Assembly] ≥ 14.69 (373)  ≥ 14.69 (373)
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   41 Copyright © 2017, All Rights Reserved. Table 13. Anchor Bolt Drill Bits and Hole Depth Category  Anchor Bolt  Drill Bits  Hole Depth RRH (Wall Type)  M10  0.55 in. (14 mm)  1.73 in. (44 mm)   2  Drill anchor holes at marked points with removing dust from the holes using a cleaner. Fix strong anchor to the drilled hole. Figure 43. Drilling & Anchoring    When fixing the mounting bracket_front or 2 sector mounting bracket assembly_front on a wall, ‘A’ side should stick on the wall.    [O] * Remove the debris from the drilled hole. [Anchor Hole Cross Section] 1.73 in.(44 mm)[X] 0.55 in.  (14 mm) Hammer DrillVacuum Cleaner 0.55 in.(14 mm)M10 Strong AnchorAnchor PunchHammer [Top View] A  Wall Mounting Bracket_Front A
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   42 Copyright © 2017, All Rights Reserved. For 1 Sector The way to fix 1 sector mounting bracket is as follows:  To fix Mounting Bracket_1 Sector Wall Type 1  Make sure you have the following items: Table 14. Parts and Tools for fixing Mounting Bracket_1 Sector Wall Type  Category  Description Parts  Mounting Bracket_Front  1 EA Fastener  M10 Plain Washer M10 Spring Washer M10 × 70L Hex. Bolt 4 EA 4 EA 4 EA Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgfcm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)  2  Place the mounting bracket_front along with the fixed strong anchors and fix it using fasteners. Figure 44. Fixing Mounting Bracket_1 Sector Wall Type  For 3 Sector The way to fix 3 sector mounting bracket is as follows:  To fix Mounting Bracket_3 Sector Wall Type  1  Make sure you have the following items: Table 15. Parts and Tools for fixing Mounting Bracket_3 Sector Wall Type  Category  Description Parts  Mounting Bracket_Front  1 EA/RRH Mounting Bracket_Front M10 Plain Washer M10 Spring WasherM10 Hex. Bolt
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   43 Copyright © 2017, All Rights Reserved. Category  Description Fastener  M10 Plain Washer M10 Spring Washer M10 × 70L Hex. Bolt 4 EA/RRH 4 EA/RRH 4 EA/RRH Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgfcm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)  2  Place the mounting bracket_front along with the fixed strong anchors and fix it using fasteners. Figure 45. Fixing Mounting Bracket_3 Sector Wall Type  Fixing RRH For 1 Sector The way to fix 1 sector RRH is as follows:  To fix RRH_1 Sector Wall Type (Standard & Side Installation) 1  Make sure you have the following items:  Mounting Bracket_Front M10 Plain Washer M10 Spring WasherM10 Hex. Bolt
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   44 Copyright © 2017, All Rights Reserved. Table 16. Parts and Tools for fixing RRH_1 Sector Wall Type (Standard & Side Installation) Category  Description Parts  M10 × 35L Hex. Bolt (washer assembly, attached to the unit bracket) 1 EA Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)  2  Hang the unit bracket hook of RRH side on the mounting bracket_front hook’s groove and fix it using fasteners. Figure 46. Fixing RRH_1 Sector Wall Type (Standard Installation)    M10 Hex. Bolt(washer assembly)Unit Bracket HookMounting Bracket_FrontHook Groove
Confidential   Chapter 2 Installing System RFV01U-D1A Installation Manual   v2.0   45 Copyright © 2017, All Rights Reserved. Figure 47. Fixing RRH_1 Sector Wall Type (Side Installation)  For 3 Sector The way to fix 3 sector RRH is as follows:  To fix RRH_3 Sector Wall Type (Standard Installation) 1  Make sure you have the following items: Table 17. Parts and Tools for fixing RRH_3 Sector Wall Type (Standard Installation) Category  Description Parts  M10 × 35L Hex. Bolt(washer assembly, attached to the unit bracket) 1 EA/RRH Recommended Torque Value  M10 Hex. Bolt  217 lbfin (250 kgf·cm) Working Tools  Torque Wrench (100~400 lbf·in), Torque Wrench Spanner head (apply Hex. Head: 17 mm), Spanner (17 mm)   Check the location to install the RRH.   M10 Hex. Bolt(washer assembly)Unit Bracket HookMounting Bracket_FrontHook Groove

Navigation menu