Savant Technologies GE Lighting a Savant 90003 Lightgrid Wireless Outdoor Light Control Node User Manual
GE Lighting Lightgrid Wireless Outdoor Light Control Node
User Manual
GE Lighting Installation Guide LightGrid Wireless Outdoor Lighting Control WARNING RISK OF ELECTRIC SHOCK INSTALL IN ACCORDANCE WITH NATIONAL ELECTRIC CODE ! WANING WARNING RISK OF INJURY. The gateway or cellular should be mounted securely upon pole so that it will not move or rotate freely. FCC statements: IC Statements: This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: This device may not cause harmful interference, and This device complies with Industry Canada licenceexempt RSS standards. Operation is subject to the following two conditions: This device may not cause harmful interference, and this device must accept any interference received, including interference that may cause undesired operation. Caution: Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate this equipment. this device must accept any interference received, including interference that may cause undesired operation. Cet appareil est conforme aux normes RSS exemptees de licence de Industrie Canada. Son fonctionnement est soumis aux deux conditions suivantes: Cet appareil ne doit pas provoquer d'interférences et cet appareil doit accepter toute interférence, y compris celles pouvant causer un mauvais fonctionnement de l'appareil. Contents Components ................................................................................................................................................. 3 Specifications ................................................................................................................................................ 4 Electrical Connections .................................................................................................................................. 5 Mounting Gateway and Cellular ................................................................................................................... 6 Powering Gateway & System Check ............................................................................................................. 7 Troubleshooting Cellular Modem............................................................................................................... 10 Controller Installation................................................................................................................................. 11 Components The Gateway and Cellular Units have been packed so that no parts should have been damaged during transit, inspect to confirm. Gateway Package Includes: ELWG0CXXGC – 120/277vac or ELWGHCXXGC – 347-480vac Gateway Unit (1pc) Conduit fitting (2pcs) – mounted to enclosure; Grey Gland (3pcs), Antenna cable (1pc), - mounted to gland; Antenna Pole (1pc), - to be installed; Pole mounting bracket (2pcs), -mounted to enclosures; Cellular Package (optional) Includes: ELWM0CXV – Cellular Unit – 120/277v (1pc) Conduit fittings 30” (2pcs), - mounted to enclosure; Ethernet cable 42” (1pcs), mounted to fitting; Power Cable 36” (1pc), mounted to fitting; Pole mounting bracket (2pcs), mounted to enclosure; Additional parts/tools (customer supplied) Customer may require parts listed below: o Conduit: Nonmetallic Type B liquid-tight ¾” Dia. (e.g. Cooper LTCOND75NM100); o Power Cable: 12AWG~18AWG per cord; o Ethernet Cable: Cat5e outdoor Ethernet cable; o Tools: - Philips Head Screw driver; - Steel Strap Cutter; Optional: o Caps over gland/conduit fittings; o RIPLEY Ancillary Power Tap #5731 Specifications Part Number Input Voltage Weight Gateway ELWG0CXXGC 120-277vac 7 lbs (3.18kg) Gateway ELWGHCXXGC 347-480VAC 7 lbs (3.18kg) Cellular ELWM0CXV 120-277VAC 8 lbs (3.63kg) 7.6"x16"x11" 7.6"x16"x11" 15"x13"x7" Dimensions (L x W x H) (193x406x280mm) (193x406x280mm) (381x330x178mm) FCC ID PUU90002 PUU90002 FCC Compliance Part 15 Subpart C (Class B) Part 15 Subpart C (Class B) Part 15 Subpart C (Class B) Mounting Height 24 ft. - 40 ft (8.2 m-12.2 m) 24 ft. - 40 ft (8.2 m-12.2 m) 24 ft. - 40 ft (8.2 m-12.2 m) Temperature -40°- 120°F (-40 - 50C) -40°- 120°F (-40 - 50C) -40°- 120°F (-40 - 50C) Controller Part Number ELWN0A_._._1B_._AD Input Voltage 120-277VAC Weight 1 lb (0.45kg) Dimensions (L x W x H) 1.5"x0.6"x0.6" (38.1x15.24x15.24mm) FCC ID PUU90003 FCC Compliance FCC 47 CFR Part 15 C.247 (Class B) IC ID 10798A-PUU90003 IC Compliance RSS-247, Section 5 Mounting Height Temperature -40° to 120°F (-40 to 50C) Controller Standard ANSI 7 Pin Controller Meter 0.5% Utility Grade Electrical Connections Depending on configuration of your LightGrid™ system select best option for making connections. Mounting Gateway and Cellular NOTE: Before mounting gateway to pole, ensure circuit powering the gateway is constant power and not switched. Powering gateway with switched circuit will result in damaging gateway and unstable web application for customer. If you have any questions during installation please contact our support team at 1-877-843-5590 or at lightgridsupport@ge.com NOTE: Mount Gateway and Cellular Units securely in horizontal orientation to a vertical pole and inspect periodically. Carefully unpack unit from its packing. Properly inspect for defects before installing. 1. Before attaching gateway enclosure to pole, ensure the mounting band clams are correctly oriented. 2. Attach gateway enclosure to pole by tightening steel band clamps. Fold or trim excess metal band if needed. 3. Insert the antenna in the mounting bracket and tighten the mounting bolt (45 lbs-in torque). Attach the GPS onto the bracket. NOTE: Adjustable steel band allows mounting on pole diameters up to 15 inches. 4. Insert GPS and antenna wires through two glands in bottom of gateway enclosures. 5. Before mounting cellular box to the pole, untighten the conduit nut and insert the two nonmetallic Type B liquid tight conduits into the conduit fittings. Using your hands tighten the conduit fitting nut. NOTE: Insert the conduit completely into the conduit fitting, no visible gaps should be seen with conduit inserted into conduit fitting. 6. Mount cellular unit following the same practice as mounting the Gateway Unit over the same pole. Ensure other end of the flexible conduit fits into conduit fitting hole of gateway. Metallic ring nut Ethernet Cable Power Cable 7. Insert Ethernet and Power cable from gateway into flexible conduit and terminate Ethernet cable to modem, and power cable to transformer. See powering gateway and system check for termination information. NOTE: Ensure you use separate conduit for Ethernet and power cable, do not mix them in same conduit. 8. Untighten the conduit nut on the gateway and insert the two conduits from the attached cellular modem box to the gateway conduit fitting. Using your hands tighten the conduit fitting nut. NOTE: Insert the conduit completely into the conduit fitting, no visible gaps should be seen with conduit inserted into conduit fitting. Failure of installing the conduit correctly will result in damage of outside elements entering the enclosures. 10. Locate the power switch inside the gateway enclosure and move to OFF position. 11. Reattach cellular and gateway enclosures covers. Ensure the latches are securely engaged securely engaged. 9. Inside the cellular modem box check both ring nuts are tight and the conduit fitting does not rotate. Powering Gateway & System Check NOTE: Confirm Gateway ON/OFF switch at OFF position. NOTE: Ensure circuit powering Gateway is constant power and not switched. Powering gateway with switched circuit will result in damaging gateway and unstable web application for customer. The system should be powered on by following sequence as below: If you have any questions during system check please contact our support team at 1-877-843-5590 or at lightgridsupport@ge.com 1. Verify that power-in voltage is 120-277v. Turn on external power source. 4. After 3 to 5 minutes, check the Ethernet status of the modem inside the cellular enclosure. A) Two LED will be Yellow/Orange indicates antenna signal reaches midrange. B) Solid GREEN and Orange combined indicate antenna signal reaches wide range. 2. Turn the ON/OFF switch to ON position. The LED indicator will turn solid green indicating good connection. Otherwise check all wiring or consult with GE Engineering Team. 5. Inside the gateway enclosure, check Ethernet port connected with YELLOW port LED blinking. 3. Inside the cellular enclosure, check the power supply. A) DC/LO will illuminate solid RED after power up. B) DC/OK will illuminate solid GREEN after power stabilizes. 7. Locate cellular modem MEID inside cellular modem box door. Email all MEID to LightGridSupport@ge.com 8. Reattach cellular and gateway enclosures covers. Ensure the latches are securely engaged. Troubleshooting Cellular Modem In the event that technical support is unable to communicate to the cellular modem we will need to troubleshoot the cellular modem as outlined below. During the troubleshooting process please contact our technical support team at 1-877-843-5590. 1. Inside the cellular enclosure, check the power supply, the DC/OK will be illuminated solid GREEN. If LED is not illuminated GREEN, check power source and connections to power supply terminal are secure. Proceed to step two if power is restored or reset to power supply. If power supply DC/OK is solid GREEN proceed to step three. 4. If all LED are correct, reset the power to the cellular power supply as outlined in step two. Contact the technical support team and supply them with the MEID of the cellular modem located inside door of the cellular box. 2. If power source has been restored or reset. A) DC/LO will illuminate solid RED after power up. B) DC/OK will illuminate solid GREEN after power stabilizes. 3. Solid GREEN and ORANGE LED combined indicate antenna signal reaches wide range. If antenna signal hasn’t reached wide range, check if cellular modem antenna is securely connected. Controller Installation
Source Exif Data:
File Type : PDF File Type Extension : pdf MIME Type : application/pdf PDF Version : 1.5 Linearized : No Page Count : 11 Language : en-US Author : Muchalla, Vivek (GE, Appl & Light) Creator : Microsoft® Word 2010 Create Date : 2016:08:19 17:36:48-04:00 Modify Date : 2016:08:19 17:36:48-04:00 Producer : Microsoft® Word 2010EXIF Metadata provided by EXIF.tools