SmartLabs 4773 120-277V Heavy-Duty RF InLine Switch User Manual 4773 QSG 20110429

SmartLabs, Inc. 120-277V Heavy-Duty RF InLine Switch 4773 QSG 20110429

Contents

Users Manual

Page 1 of 1 Rev. 04-29-2011   SMART Limited Warranty – SMART warrants to original consumer of this product for a period of 2 years from date of purchase, this product will be free from defects in material & workmanship & will perform in substantial conformity with its Installation and Programming Guide. Warranty shall not apply to defects caused by misuse or neglect.   U.S. Patent No. 7,345,998, International patents pending © Copyright 2011  SMART, 16542 Millikan Ave., Irvine, CA 92606, 866-883-9220                                                                                                                *Setup Modes will automatically time out after 4 minutes. Wiring Diagram NOTE: Home’s wire color and wire location may vary  Figure 1 Installation 1) Be sure to write down the INSTEON ID and location of the fixture you’ll be controlling (e.g., 01.F7.G5, Mike’s bedroom light) 2) At the circuit breaker or fuse panel, disable the circuit supplying power to the fixture 3) Remove the wallplate from the fixture you are replacing. Then, unscrew the fixture itself and pull it out from the junction box.  4) Disconnect the wires from the fixture you will be controlling and ensure you have 1/2” of bare wire on the ends. If the wires cannot be detached by unscrewing them, cut the wires where they enter the switch and then strip ½ inch of insulation off the ends.  5) See Figure 1 to identify and connect the LINE, LOAD, NEUTRAL, and GROUND wires on In-Line Switch. Be sure you have correctly identified the wires in the junction box before connecting them.  6) After you have connected all the wires, ensure that the wire connectors are firmly attached and that there is no exposed copper except for the GROUND wire  7) Prior to reinstalling the fixture, enable power to the fixture from the circuit breaker or fuse panel 8) Use the On/Off buttons to test that the module is working and controlling the load 9) Link In-Line Switch to the desired INSTEON Controllers: a. Set the Controller to Linking Mode.* (For most Controllers, press & hold an On or Scene button for 10 seconds or the Set button for 3 seconds.) b. Press & hold the Set button on In-Line Switch until it double-beeps (3 seconds) The In-Line Switch Status LED will flash once and then turn on solid if the load is off or turn off if the load is on  c. Confirm that Linking was successful by tapping the button you just Linked to on the Controller In-Line Switch will respond appropriately  10) Gently place In-Line Switch into the junction box, making sure that nothing could accidentally be pressing any of the buttons on its face 11) Reinstall the fixture Quick-Start Guide In-Line Switch, 277V Model: 4773 Tools Needed • Phillips screwdriver • Wire cutter / stripper • Voltage tester  • Non-conductive probe Complete Instructions, Troubleshooting, and Tech Support Call: Tech. Support @ 866-883-9220 Contact Us Online: www.smartproline.com Set buttonOn button Off button

Navigation menu