I STALLATIO
OPERATION
NTE CE
ALL phases of this installation must comply with
NATIONAL, STATE AND LOCAL CODES
YCZ-|OIVI-1G
18-EB21 D4-8
Library Service Literature
Product Section Unitary
r°duct_..............................................................................................................................................................Packaged Gas/E!ect[!c
Model YCZ
Literature Type Installation, Operation, Maintenance
Sequence 1G
Date May 2004
File No. SV-UN-RT-YCZ-IOM-1G 5/04
Supercedes New
Model"
YCZ036Fl/3MOB, 4MOA
YCZ050FI/3HOA, 4HOA
YCZ060FI/3MOB, 4MOA
BAYLIFT002A
LIFTING LUG KIT
Single Package Two Stage
Gas/Electric 16 SEER
Convertible 3, 4, 5Ton
IMPORTANT-- This Document is customer property and is to remain with this unit. Please return to service information pack upon completion of work.
All phases of this installation must comply with the NATIONAL, STATE &LOCAL CODES. In the absence of local codes, the installa-
tion must conform with National Electric Code -- ANSI/NFPA 70 or "LATEST REVISION."
Since Trane has a policy of continuous product and product data improvement,
it reserves the right to change design and specification without notice.
© 2004 American Standard Inc. All rights reserved 5/04
GENERAL INFORMATION
IMPORTANT: Read this entire manual before
beginning installation procedures.
kWARNING: BOD,LY,NJURYCANRESU'TFROM
HIGHVOLTAGE ELECTRICAL COMPONENTS, FAST MOVING FANS,
AND COMBUSTIBLE GAS. FOR PROTECTION FROM THESE
INHERENT HAZARDS DURING INSTALLATION AND SERVICING,
THE ELECTRICAL SUPPLY MUST BE DISCONNECTED AND THE
MAIN GAS VALVE MUST BE TURNED OFF. IF OPERATING CHECKS
MUST BE PERFORMED WITH THE UNIT OPERATING, IT IS THE
TECHNICIANS RESPONSIBILTY TO RECOGNIZE THESE HAZARDS
AND PROCEED SAFELY.
Read this manual carefully before attempting to install, operate,
or perform maintenance on this unit. Installation and mainte-
nance should be performed by qualified service technicians
only.
As shipped from the factory, this unit is for use with natural gas
only, and is listed by Underwriters Laboratory.
Model YCY-F heating/cooling units are designed for outdoor
mounting with a vertical condenser discharge. They can be
located either at ground level or on a roof, in accordance with
local codes or National Fuel Gas Code (ANSI-Z223.1A) Latest
Revision. Since these units are designed exclusively for outdoor
operation, additional flue venting systems are not required.
Each unit contains an operating charge of Refrigerant-22 as
shipped.
INSPECTION
1. Checkfor damage after the unit is unloaded. Report promptly,
to the carrier, any damage found to the unit. Do not drop the
unit.
iMPORTANT: The use of "spreader bars" is required
when hoisting the unit (to prevent damage to sides and
top).
2. Check the unit's nameplate to determine if the unit is correct
for the intended application. The power supply must be
adequate for both the unit and all accessories.
3. Check to be sure the refrigerant charge has been retained
during shipment. Access to 1/4" flare pressure taps may be
gained by removing the furnace compartment access panel.
IMPORTANT: DO NOT CONNECT GAS PIPING TO THE UNIT
UNTIL A LINE PRESSURE TEST HAS BEEN COMPLETED.
DAMAGE TO THE GAS VALVE MAY RESULT IN AN UNSAFE
CONDITION. THIS UNIT SHOULD NEVER BE EXPOSED TO
GAS LINE PRESSURE IN EXCESS OF 14 INCHES WATER
COLUMN. (1/2 PSIG)
IMPORTANT: RECONNECT ALL GROUNDING DEVICES.
ALL PARTS OF THIS PRODUCT CAPABLE OF CONDUCTING
ELECTRICAL CURRENT ARE GROUNDED. IF GROUNDING
WIRES, SCREWS, STRAPS, CLIPS NUTS OR WASHERS
USED TO COMPLETE A PATH TO GROUND ARE REMOVED
FOR SERVICE, THEY MUST BE RETURNED TO THEIR ORIGI-
NAL POSITION AND PROPERLY FASTENED.
IMPORTANT: ALL POWER LEGS MAY NOT BE BROKEN BY
CONTACTORS. SEE WIRING DIAGRAM ON UNIT CONTROL
BOX COVER.
THIS UNIT, AS SHIPPED FROM THE FACTORY, IS DE-
SIGNED FOR NATURAL GAS ONLY.
BEFORE STARTING THE COMPRESSOR, THE CRANKCASE
HEATER SHOULD BE ENERGIZED FOR EIGHT HOURS
The following warning complies with State of California law, Proposition 65.
,&WARNING: NazardousGasses
Exposure to fuel substances or by-products of incomplete
fuel combustion is believed by the state of California to
cause cancer, birth defects, or other reproductive harm.
!
This product must be gas piped by a Licensed Plumber or I
Gas Fitter in the Commonwealth of Massachusetts. I
NOTICE
Warnings and Cautions appear at appropriate locations throughout this manual.
Read these carefully.
_WARNING: Indicates a potentially hazardous situation which, if not avoided, could
result in death or serious injury.
_CAUTION" Indicates a potentially hazardous situation which, if not avoided, may
result in minor or moderate injury. It may also be used to alert against unsafe practices
and where property-damage-only accidents could occur.
Page 2
TYPICAL ROOFTOP iNSTALLATiON WiTH FULL PERIMETER CURBS
(YCZ036,050,060F Models)
/
~FIELD SUPPLIED
SUPPORTS
AT EACH END
OF CURB
FIELD SUPPLIED
CANT STRIP
@
FIELD SUPPLIED
RIGIDINSULATION
SUPPLY AIR _ RETURN AIR
DUCT _ DUCT
ROOFMOUNTING
CURB
TYPICAL ROOFTOP iNSTALLATiON WiTH BAYCURB030A,038A
(YCZ036,050,060F Models)
I
.J
SEE NOTE1
ROOF iNSULATION I
FIELD SUPPLIED
RIGID INSULATION
NOTES:
1. The YCZ036F models extend out past this end of the
curb ONLY.
2. TheYCZ050F, YCZ060F models extend past both the
end and the side of the curb as illustrated.
SUPPLY AIR
DUCT
\
RETURN AiR
DUCT
SEE NOTE 2
ROOF MOUNTING
CURB
FIELD SUPPLIED
SUPPORTS
AT EACH END
OFCURB
CANT STRIP
Page 3
DiMENSiONAL DATA
MODEL
CORNER WEIGHT
(LBS)
NET
UNIT
WEIGHT A B C D E F G H J K L M N P
(LBS)
W1 W2 W3 W4
11-1!-
YCZO36F 161 106 104 157 528 64 36 29-3!16 18-9!16 11-1!16 6-9!16 17 18-1!2 25-1!2 17-1!2 10 3 8-3/4
8
YCZO50F 172 121 137 196 626 24 26-1!2
85-1!8 45 33-3/8 21-1!16 15-1!16 4-15!1_ 9-1!8 21-15!16 20
YCZO60F 195 129 132 199 656 22-3/4 25-1/2
14 3-1/2 8-5/16
Page 4
DiMENSiONAL DATA
©YCZ036,050,060F OUTLINE = FRONT
CONTROL BOX
ACCESS PANE
152 MM
/40 MM
GAS
ACCESS
D
FlU
(FIE[D NSTA I ED)
7COMBUST I ON
B/OWR ACC[ SS
25 MM [1"} DIA. K.O
FOR 15 MM [1/2] NPT
OAS CONNECTION
066 Y952
_CONDENS R CO L
&GUARD
RECOMMENDED SERVICE
CLEARANCE
BACK * 6.0"
LEFT SIDE 30.0"
RIGHT SIDE 24.0"
FRONT 42.0"
18" WITH FRESH AIR ACCESSORY
30" WITH ECONOMIZER
CLEARANCE TO
COMBUSTIBLE MATERIAL
BOTTOM 0.0"
BACK 1.0"
LEFT SIDE 6.0"
RIGHT SIDE 6.0"
FRONT SIDE 12.0"
TOP 36.0"
MODEL A B C D
YCZ036F-M 64 36 29-3/16 27-1/2
YCZ050F-H 65-1!8 45 33-3!8 27-15!16
YCZ060F-M
Page 5
®
NOTE
SUPPLY OPENING
1. REMOVE SCREW NEAREST TO THE
OPENINGAND PULLTHE PANEL FIRMLY
TOWARD THE OUTSIDE OF THE UNIT TO
DISENGAGE THE BACK ATTACHMENT.
RETURN OPENING
2. REMOVE RIGHT HAND SCREW AND
MOVE PANEL TO THE RIGHT OR RE-
MOVE BOTH SCREWS.
CONVERTING HORIZONTAL TO DOWNFLOW
HEATER EXCHANGER
TUBES
®
SHEET METAL HORIZONTAL RETURN
SCREWS AIR COVER
HORIZONTAL SUPPLY
AIR COVER
REQUIRED CLEARANCE FOR UNIT INSTALLATION
AND ROOF PENETRATION HOLE SiZE REQUIRED
SERVICE
CLEARANCE
LINES
SERVICE
CLEARANCE
LINES
SIDE RAIL /
WOOD NAILER _
SERVICE CLEARANCE & PENETRATION DIMENSIONS
MODEL NO. A B C D E F
YCZ036F 30" 30" "12" 30" 44" 25"
YCZ050F 42" 30" "12" 36" 50" 25"
YCZ060F
* 18" WITH FRESH AIR ACCESSORY
* 30" WITH ECONOMIZER
Page 6
LOCATIONS AND RECOMMENDATIONS
HORIZONTAL AIRFLOW APPLiCATiON
1. These units are design certified for outdoor installations. These
units may be installed directly on wood flooring or on Class A,
Class B, or Class C roof covering material. The discharge air
from the condenser fans must be unrestricted for a minimum of
3 feet above the unit.
NOTE: The unit is shipped for horizontal installation.
The Air Inlet Hood in the combustion blower access panel must
have adequate clearance around the air opening into the
combustion area. See Outline Drawing, Figure 3.
Examine all flue product-carrying areas of the furnace, its vent
system, and the main burner for safe operation. A periodic
inspection of the furnace should be made by a qualified service
agency at the start of each heating season.
Replacement parts tistfor this Gas/ElectricAir Conditioner, may be
obtained by contacting your local manufacturer representative.
NOTE: If any internal accessories are to be added to the unit,
install them at the shop if at all practical.
2. Location of the unit must allow service clearance around it.
Clearance of the unit must be given careful consideration. See
Figures 2, 3, and 4.
IMPORTANT: Air outlet duct must have 1" clearance to
combustible material downstream from the unit.
3. Check the handling facilities to ensure the safety of personnel
and the unit(s).
4 CAUTION MUST BE TAKEN AT ALL TIMES TO AVOID
PERSONAL INJURIES AND/OR DAMAGE TO EQUIPMENT
5. The unit must be mounted level for proper drainage of water
through the holes in the base pan.
6. The unit must not be exposed to direct roof water runoff.
7. Flexible duct connectors must be of a flame retardant material.
All duct work outside of the structure must be insulated and
weatherproofed in accordance with local codes.
8. Holes through exterior walls must be sealed in accordance with
local codes.
9. All fabricated outdoor ducts should be as short as possible.
CLEARANCES
1. The recommended clearances for single-unit installations are
illustrated in Figure 4. These minimum requirements are not
only an important consideration when determining unit place-
ment, but they are also essential to ensure adequate service-
ability, maximum capacity, and peak operating efficiency.
2. Any reduction of the unit clearances indicated in these illustra-
tions may result in condenser coil starvation or the recirculation
of warm condenser air. Actual clearances which appear to be
inadequate should be reviewed with a local engineer.
3. See the unit's nameplate for the absolute minimum clearance
between the unit and any combustible surface(s).
IMPORTANT:
1. Remove the Flue and Air Inlet Hood with gasket from the return
air section of the unit.
The screws that attach the flue and air inlet hood will be installed
in their proper location at the factory. Therefore, they must be
removed and then used to attach the flue and the air inlet hood.
2, Remove the packaging material from the components and
secure the Flue and Air Inlet Hood with the gasket to the unit with
sheet metal screws as illustrated in Figure 5. See "Firing Rate
Selection" section for additional information.
NOTE: Outdoor air or other requirements during heating
operation that result m supply air temperatures below 80
degrees F or return air temperatures below 50 degrees F may
cause flue gas condensate to form and is to be avoided.
DOWNFLOW APPLICATION -= CURB MOUNTING
1. The Roof Mounting Curb, (field assembled
BAYCURBO30,O38,033,034A), or a field fabricated curb must
be in place before the unit is hoisted to the roof top.
2, The Roof Mounting Curb (frame) must be installed on aflat,
level section of the roof (maximum of 1/4" per foot pitch)
and provide alevel mounting surface for the unit. In
addition, be sure to provide sufficient height above the roof
to prevent water from entering the unit.
NOTE: This unit was shipped for horizontal installation. Con-
vert to downflow per instructions:
Remove covers from the downflow supply and return air open-
ings and place them over the horizontal supply return air
openings (painted side out) and secure with sheet metal screws.
See Figure 6.
3, Be sure the mounting curb spans structural members (trusses)
of the roof, thereby providing sufficient support for the weight of
the unit, the curb, the duct(s), and any factory or field installed
accessories. See Figures 1, 7, 8, 9, 10, and 11.
4. Be sure the hole in the structure for the ducts is large enough to
accommodate the fabricated ducts and the insulation surround-
ing them. See Figure 4.
Note: If any internal accessories are to be added to the unit,
install them at the shop if at all practical.
5, These units are design certified for outdoor installation. These
units may be installed directly on wood flooring or on Class A,
Class B, or Class C roof covering material. The discharge air
from the condenser fans must be unrestricted for a minimum of
3 feet above the unit.
The air inlet hood in the combustion blower access panel must
have adequate clearance around air openings into the combus-
tion area. See Outline Drawing, Figure 3.
continued on next page
Page 7
LOCATIONS AND RECOMMENDATIONS
continued from page 7
Examine all flue product-carrying areas of the furnace, its vent
system, and the main burner for safe operation. A periodic
inspection of the furnace should be made at the start of each
heating season.
Replacement parts list for this Gas/Electric Air Conditioner may
be obtained by contacting your local manufacturer representa-
tive.
6. Location dthe unit must allow for service clearance around it.
Clearance of the unit must be given careful consideration. See
Figure 4.
7. IMPORTANT: The air outlet duct must have one (1) inch
clearance to combustible material downstream from the
unit.
8. Exhaust vents or other sources of contaminated air should not
be near the unit's air inlet, if outside air is to be introduced as
makeup air or a ventilation feature is to be used,
9. Check the handling facilities to ensure the safety of personnel
and the unit(s).
10. Caution must be taken at all times to avoid personal
injuries and/or damage to the equipment.
11. The unit must be mounted level for proper drainage of water
through the holes in the base pan.
12. The unit must not be exposed to direct roof water runoff.
13. Flexible duct connectors must be of a flame retardant material.
All duct work outside of the structure must be insulated and
weatherproofed in accordance with local codes.
14. Roof flashing must be installed to seal the roof curb cavity and
must conform to local building codes.
15. Access and service clearances for the unit must be given careful
consideration when locating the duct entrance openings. Fig-
ure 4 provides unit dimensions.
16. All fabricated outdoor ducts should be as short as possible.
CLEARANCES
1, The recommended clearances for single-unit installations are
illustrated in Figure 4. These minimum requirements are not
only an important consideration when determining unit place-
ment, but they are also essential to ensure adequate service-
ability, maximum capacity, and peak operating efficiency.
2, Any reduction of the unit clearances indicated in these illustra-
tions may result in condenser coil starvation or the recirculation
of warm condenser air. Actual clearances which appear to be
inadequate should be reviewed with a local sales engineer.
IMPORTANT:
1. Remove the Flue and Air Inlet Hood with the gasket from the
return air section of the unit.
The screws that attach the flue and air inlet hood will be installed
in their proper location at the factory. Therefore, they must be
removed and then used to attach the flue and air inlet hood.
2. Remove the packaging material from the components and
secure the Flue and Air Inlet Hood with the gasket to the unit with
sheet metal screws as illustrated in Figure 16 on page 14.
NOTE: Outdoor air or other requirements during heating
operation that result in supply air temperatures below 80
degrees F or return air temperatures below 50 degrees F may
cause flue gas condensate to form and is to be avoided.
INSTALLATION
UNIT SUPPORT
If the unit is to be roof mounted, check the appropriate building
codes for weight distribution requirements. Refer to the applicable
roof curb mounting instruction. Check the unit's nameplate for
supply voltage required. Determine if adequate electrical power is
available. The furnace may be installed on Class A, B, or C roofing
material.
LOCATION AND CLEARANCES
Installation dthe unit should conform to local building codes or, in
the absence of local codes, to the National Fuel Gas Code,
ANSlZ223.1, Latest Revision, and the National Electrical Code.
Canadian installations must conform to CSA and local codes.
Select a location that will permit adequate combustion and ventila-
tion air in accordance with Section 5.3, Air For Combustion and
Ventilation, of the National Fuel Gas Code, ANSlZ223.1, Latest
Revision, or applicable provisions of the local building code.
Page 8
PLACING AND RIGGING
1. Before preparing the unit for lifting, check the outline drawing for
center of gravity for lifting safety. Because dplacement of
internal components, the unit's weight may be unevenly distrib-
uted. Approximate unit weights are given in Figure 2, page 3.
NOTE. Accessory BA YLIFTOO2AA, a kit of four (4) lifting lugs, is ]
required for rigging the unit for hoisting. See Figure 7, insert B. l
2, Insert the four lifting lugs in the openings provided in the drip lip
on the perimeter of the unit. See Figure 7, insert B. Atap or jerk
to the lug will overcome the interference that arises due to the
nipple on the lug.
3, Before hoisting the unit, be sure that the proper method of
rigging is used, with straps or slings and spreader bars for
protection during lifting. Always test-lift the unit to determine the
exact unit balance and stability before hoisting it to the installa-
tion location.
iNSTALLATiON
IMPORTANT: Do not lift the unit without test lifting for
balance and rigging. Do not lift the unit in windy conditions
or above personnel. Do not lift the unit by attaching a
clJvus, hooks, pins, or bolts to the unit casing, casing
hardware, corner lugs, angles, tabs, or flanges. Failure to
observe these warnings may result in equipment damage.
4. When the curb and air ducts have been properly installed, the
unit is ready to be hoisted to the roof and set in position.
IMPORTANT: "Spreader Bars" must be used when hoist-
ing the unit.
5 IMPORTANT: The unit must be lowered into position. The
P.V.C. rubber tape on the curb flange permits the unit to be
repositJoned if required without destroying the P.V.C. rub-
ber seals affixed to the mounting curb.
©
PLACING THE UNiT ON A MOUNTING CURB
1. The unit is designed with a perimeter drip lip that is lower that
the unit base bar, see Figure 7, inset A.
2. Position the unit drip lip down over and in contact with the
outside corner of the curb, as illustrated in Figure 8, insert A.
Continue to lower the unit on top of the curb, with the unit drip
lip astraddle and in contact with both the end and side rail of the
curb. The unit should now rest on top of the curb.
3. Take the two (2) hold-down brackets shipped with the curb and
secure the unit to the curb with hold-down brackets as illustrated
in Figure 8, insert A.
SPREADER BARS
OUTDOOR COIL
END OF UNIT
iIBn
DRIP_ BA_L_OO, A
DIMPLE LIFTING LUGS
NOTE:
THE INNER PERIMETER OF THE DRIP LIP ON ALL UNITS
SHOULD BE FLUSH WITH THE OUTER PERIMETER OF THE
CURB ON THE TWO SIDES SHOWN HERE SEE FIGURE 2 FOR
THE LOCATION OF THE UNIT OVERHANG ON THE YCZO36-O60F
MODELS
BASE OF UNIT DRIP LIP ON
REST ON TOP OF PERIMETER OF UNIT
CURB RAILS
CURB CORNER
J
®
FLANGE OF
CURB
EXISTING
SHEET METAL
I SCREW
HOLD-DOWN
BRACKET WITH
CURB
!
Page 9
INSTALLATION
ROOFTOP -- UNITS
For roof top applications using a field fabricated frame and ducts,
use the following procedure:
1. The frame must be located and secured by bolting or welding to
the roof. Flashing is required.
2. The hole in the roof must be prepared in advance of installing
the unit.
3. Secure the ducts to the roof.
4. Place the unit on the frame or roof curb. Refer to Figures 9 or
10.
5. Secure the unit to the frame or roof curb.
6. Insulate any ductwork outside of the structure with at least two
(2) inches of insulation and then weatherproof. There must be
a weatherproof seal where the duct enters the structure.
7. Complete the installation according to the instructions in the
following sections of this manual.
®TYPICAL ROOFTOP APPLICATION WITH FRAME
(YCZO36,050,O60F) -,
, \
®TYPICAL ROOFTOP APPLICATION WITH FRAME
(YCZ036,060F MODELS)
_/ INLET HOOD
Page 10
DUCT
ROOF FLASHING
/
ROOF FLASHING
_< SUPPLY AIR
IRON
FRAME
INSTALLATION
GROUND LEVEL -= HORIZONTAL UNITS 2. Attach the supply and return air ducts to the unit•
For ground level installations, the unit should be positioned on a pad
the size of the unit or larger• The unit must be level on the pad. The
pad must not come in contact with the structure (See Figure 11.) Be
sure the outdoor portion of the supply and return air ducts are as
short as possible•
Proceed with the installation as follows:
3. Insulate any ductwork outside of the structure with at least 2
inches of insulation and weatherproof• There must be a weather-
proof seal where the duct enters the structure•
4. Complete the installation according to the instructions in the
following sections of this manual•
1. Place the unit on the pad and the five (5) rubber isolators
provided•
®TYPICAL GROUND LEVEL APPLICATION
(YCZ036,050,060F MODELS)
SUPPLY
RETURN AIR DUCT
DUCT
SIDING /_"_1_
OUTDOOR AIR
DISCHARGE
OUTDOOR AIR
INTAKE
EXTERIOR
WALL i- :'.
INSULATE
WEATHERPROOF FLEXIBLE DUCT ISOLATORS
OR RAIN SHIELD CONNECTORS (1 PER CORNER
AND 1UNDER
UNIT CONTROL BOX)
HOOD
SUPPORTPAD
FOUNDATION
CONDENSATE DRAIN PiPiNG
A 3/4-inch female NPT condensate drain connection is provided on
the evaporator access panel end of the unit. See Figure 4. Provide
a trap and fill it with water before starting the unit to avoid air from
being drawn through• Follow local codes and standard piping
practices when running the drain line. Pitch the line downward away
from the unit. Avoid long horizontal runs. See Figure 12.
NOTE: Do not use reducing fittings in the drain lines• The
condensate drain must be:
Made of 3/4" pipe size.
Pitched 1/4" per foot to provide free drainage to convenient drain
system•
Trapped•
Must not be connected to closed drain system•
(_ TYPICAL CONDENSATE DRAIN PiPiNG
3/4" PVC OR COPPER
Page 11
DUCTWORK
ATTACHING DOWNFLOW DUCTWORKTO ROOF CURB
Supply and return air flanges are provided on the roof curb for easy
duct installation. All ductwork must be run and attached to the curb
before the unit is set into place.
Follow these guidelines for ductwork construction:
Connections to the unit should be made with three-inch canvas
connectors to minimize noise and vibration transmission.
Elbows with turning vanes or splitters are recommended to mini-
mize air noise and resistance.
The first elbow in the ductwork leaving the unit should be no closer
than two feet from the unit, to minimize noise and resistance.
AIR PROOF
THIS SEAM _T BASE
FIELBDUCT.ql\
JJ 'UNIT DUCT
FLANGE
_I_ /AIR PROOF
UN,TBASE
" FIELD DUCT
AIR PROOF
_ THIS SEAM
FIELDDucTJL _TBASE
a UNIT DUCT FLANGE
UNIT
FLANGE
UNIT BASE
NOT RECOMMENDED
SEAM
WITH BUTYL OR
SILICONE
FIELD DUCT
ATTACHING HORIZONTAL DUCTWORK TO UNIT
All conditioned air ductwork should be insulated to minimize heating
and cooling duct losses. Use a minimum of two (2) inches of
insulation with a vapor barrier. The outside ductwork must be
weatherproofed between the unit and the building.
When attaching ductwork to a horizontal unit, provide a flexible
watertight connection to prevent noise transmission from the unit to
the ducts. The flexible connection must be indoors and made out of
heavy canvas.
NOTE: Do not draw the canvas taut between the solid ducts, i
WEATHERPROOF
UNIT THIS SEAM
FLANGE FIELD DUCT
DOWNFLOW
The following warning complies with State of California law, Proposition 65.
kWARNING: This product contains
fiberglass wool insulation! Fiberglass dust and ceramic
UNIT EXTERIOR
UNIT DUCT FLANGE
WEATHERPROOF
THIS SEAM
FIELD DUCT
UNIT EXTERIOR
/]I - WEATHERPROOF
/_ THIS SEAM
UNIT DUCT
FLANGE FIELD DUCT
HORIZONTAL
Wash clothes separately from other clothing: rinse
washer thoroughly.
fibers are believed by the State of California to cause
cancer through inhalation. Glasswool fibers may also
cause respiratory, skin, or eye irritation.
PRECAUTIONARY MEASURES
Avoid breathing fiberglass dust.
Use a NIOSH approved dust/mist respirator.
Avoid contact with the skin or eyes. Wear long-
sleeved, loose-fitting clothing, gloves, and eye
protection.
Operations such as sawing, blowing, tear-out, and
spraying may generate fiber concentrations requiring
additional respiratory protection. Use the appropriate
NIOSH approved respirator in these situations.
FIRST AID MEASURES
Eye Contact - Flush eyes with water to remove dust.
If symptoms persist, seek medical
attention.
Skin Contact - Wash affected areas gently with soap
and warm water after handling.
Page 12
GAS PiPiNG iNSTALLATiON
IMPORTANT: Before making the gas pipe connection give
serious consideration to providing the required clearance nec=
essary to remove the access panels on the unit
(e.g., economizer and filter access panels).
1
NOTE: In the absence of local codes, the installation must_
conform with American National Standard--Z223. 1--National Fuel
Gas Code, Latest Revision.
The available gas supply must agree with the required gas supply
marked on the unit nameplate. Minimum permissible gas supply
pressure for purpose of input adjustment must be at least 5.0" W.
C. (inches Water Column) for natural gas and 11' W.C. for propane.
PIPE DELIVERY SCHEDULE (NATURAL GAS ONLY)
NOTE: The following procedure and tables below apply to
Natural Gas only.
1.Obtain from the gas company the heating value and specific
gravity of the gas delivered.
2.Determine the exact length of pipe needed.
3.Read the BTUH input nameplate on the furnace.
4.Use the multiplier opposite the specific gravity of the gas given in
Table 1 below and insert in the following formula:
TABLE 1
MULTIPIER
MULTIPIERS TO BE USED
WHEN THE SPECIFIC
GRAVITY OF THE GAS IS
OTHER THAN 0.60
SPECIFIC
GRAVITY
.50
.55
.60
.65
1.10
1.04
1.00
.962
CFH = Furnace Input in BTUH
Gas Heat Content in BTU/Cu. Ft. X Multiplier
This will give the factor for columns 2 through 6 in Table 2.
5.Using Table 2, select the pipe length nearest to yours.
&Follow this line vertically down to the exact CFH found in Step 4
above or the next highest value.
7.Read horizontally to the left of this column for the required pipe
size diameter.
TABLE 2
NATURAL GAS ONLY
TABLE OF CUBIC FEET PER HOUR OF GAS
FORVARIOUS PIPE SIZES AND LENGTHS
PIPE LENGTH OF PIPE (feet)
SIZE
(inch) 10 20 30 40 50 60 70
1/2 132 92 73 63 56 50 46
3/4 278 190 152 130 115 105 96
1 520 350 285 245 215 195 180
1-1/4 1050 730 590 520 440 400 370
THIS TABLE IS BASED QN PRESSURE DROP OF 0.3 INCH W.C. AND 0.6 SP.GR. GAS
i
NOTE: If this is an propane appfication, consult your propane |
suppfler for pipe sizes and defiveries. J
GAS PRESSURE SET-UP PRECAUTIONS
WARNING: NEVERUSEANOPENFLAME
TO TEST FOR GAS LEAKS: AN EXPLOSION COULD
OCCUR, CAUSING INJURY OR DEATH.
IMPORTANT: The furnace and its individual shut-off valve
must be disconnected from the gas supply piping system
during any pressure testing of that system at test pressures
exceeding 1/2 psig (3.48 kPa).
The furnace must be isolated from the gas supply piping system by
closing its individual manual shut-off valve during any pressure
testing of the gas supply piping system at test pressures less than
or equal to 1/2 psig (3.48 kPa).
GAS SUPPLY LINE PRESSURE (ALL FUELS)
Before connecting the unit to the gas supply line, be sure to
determine the gas pressure in the line.
If the gas supply pressure is excessive (above 13.8 inches water
column or 1/2 psig), install a pressure regulator either at the supply
source or in the branch circuit serving the unit. Once the regulator
is installed, set it to provide a maximum pressure of 13.8" W.C. to
the gas valve for natural gas with a minimum supply pressure of 5.0"
W.C. Maximum supply pressure of 13.8" W.C. to the gas valve for
propane with a minimum pressure of 11.0" W.C.
NOTE: Maximum pressure to the gas valve for natural gas
is 13.8" W.C. Minimum pressure is 5.0" W.C. Maximum
pressure to the gas valve for propane is 13.8"W.C. Minimum
pressure to the gas valve is 11.0" W.C.
If the supply line pressure is below the minimum supply pressure
indicated on the unit nameplate, contact the gas supply company.
Follow these steps to complete the installation of the unit gas piping.
See Figure 14.
1. Install a tapped, Style A (1/8-inch NPT tap) shut-offgas cock at
the end of the gas supply line near the unit. Be sure the tapped
gas cock is downstream of the pressure regulator, if used.
(_ DEALER INSTALLED
GROUND UNION
1!8" N.P.T.PLUGGED
ACCESS FOR TEST
GAUGE CONNECTION I
FROM _ Ir-6"--
GAIS S'-_PPLY
F'ELD SUPFLIE'_D D_ LEG _ UN,T_
GAS VALVE, MUST BE
INSTALLED BY DEALER
OUTSIDE UNIT.
TO MAIN
CONTROL
VALVE
Page 13
GAS PiPiNG iNSTALLATiON
i NOTE: The shut-off gas cock must be installed outside of |
3
the unit and should meet the specifications of all applicable 1national and local codes.
2.Install a ground union joint downstream of the shut-off cock.
This joint must also be installed outside of the unit,
3.Install a drip leg at least six (6) inches in depth next to the
union as shown in Figure 14. This drip leg is required to
collect any sediment that may be deposited in the line,
4.Before connecting the piping circuit to the unit, bleed the air
from the supply line. Then cap or plug the line and test the
pressure at the tapped shut-off cock. The pressure reading
should not exceed 13.8 inches water column.
5.Using an appropriate backup wrench on the gas valve inlet
boss, connect the gas piping to the unit. Check the
completed piping for leaks using a soap and water solution
or the equivalent.
6.After installation of the gas pipe in the unit, the pipe chase
opening should be closed with the fitter/barrier plug pro-
vided.
MANIFOLD PRESSURE
Check the manifold pressure at the unit gas valve. Do not
exceed the recommended pressure shown on the unit name-
plate.
®FLUE AND HOOD ILLUSTRATION
F[ i.i CLgT
(/ A.%KE J [LE }LC ]
TOP ACC LS P_,NE ,
JE -..
I N E H(}O} --,
\
}ET PRESSURE POST .....
BURNER & VALVE ILLUSTRATION
j OUT T PRISSURE POS1
S_F SCI:/IW: 3/32" HrX HrAD
\
P/
SET SCREW: 51/32" HEX HEAD \ /
N/n
Jl
REGOLATORCOVER
15t STAG"
REGULATOR COVER
....... TOP ViEW //
MANUAl
"oN/o_" /
SWITCH
\
\\ \\
\
VIEW I_BI_ BETAIL::A::
_TE N_LOCK WHITE RODGERS 36G
CONNECTOR GAS VALVE WITH
MANUAL "ON/OFF"
SWITCH
SWITCH
BRASS
/
SPRING _
DETAIL_:At
WHITE RODGERS 36E
GAS VALVE WITH
MANUAL "ON/OFF"
SWITCH
Page 14
GAS PiPiNG INSTALLATION
INPUT CHECK AND ADJUSTMENT
1. Make sure all gas appliances are off except the furnace.
2. Clock the gas meter with the furnace operating (determine the
dial rating of the meter) for one revolution.
3. Match the "Sec" column in the gas flow (in cfh) Table 3 with the
time clocked.
4. Read the "Flow" column opposite the number of seconds
clocked.
5. Use the following factors if necessary.
For 1 Cu. Ft. Dial Gas Flow CFH =
Chart Flow Reading /2
For 1/2 Cu Ft. Dial Gas Ftow CFH =
Chart Flow Reading /4
For 5 Cu. Ft. Dial Gas Flow CFH =
10X Chart Flow Reading /4
6. Multiply the final figure by the heating value of the gas obtained
from the utility company and compare to the nameplate rating.
This must not exceed the nameplate rating.
7. Changes can be made by adjusting the manifold pressure.
a. Attach a manifold pressure gauge.
b. Remove the slot screw on top of the gas valve for 1st stage
manifold pressure adjustment. Remove slot screw on outlet
side for 2nd stage adjustment (See Figure 17).
c. Turn the adjustment nut in to increase the gas flow rate, and
out to decrease the gas flow rate using a 3/32" hex wrench.
HIGH ALTITUDE INSTALLATION
Unit nameplate ratings are based on equipment operation from sea
level to 2000 feet elevation above sea level. If the unit installation
is from 2000 - 4500 feet elevation, it wilt be necessary to change
the burner orifices to the noted sizes, (ref. National Fuel Gas Code,
sec 8.1.2, Appendix F, Table F4).
GAS MAN. PRESS ORIFICE SIZE ORIFICE SIZE
TYPE (in. W.C. ) 0=2000 ft 2000 =4G00 ft
NATURAL 3.3 42* 43
PROPANE 10.0 54 55
FACTORY SHIPPED
TABLE 3
GAS FLOW IN CUBIC FEET PER HOUR
2 CUBIC FOOT DIAL
Sec. Flow Sec. Flow Sec. Flow Sec. Flow
8 900 29 248 50 144 82 88
9 800 30 240 51 141 84 86
10 720 31 232 52 138 86 84
11 655 32 225 53 136 88 82
12 600 33 218 54 133 90 80
13 555 34 212 55 131 92 78
14 514 35 206 56 129 94 76
15 480 36 200 57 126 96 75
16 450 37 195 58 124 98 73
17 424 38 189 59 122 100 72
18 400 39 185 60 120 104 69
19 379 40 180 62 116 108 67
20 360 41 176 64 112 112 64
21 343 42 172 66 109 116 62
22 327 43 167 68 106 120 60
23 313 44 164 70 103 124 58
24 300 45 160 72 100 128 56
25 288 46 157 74 97 132 54
26 277 47 153 76 95 136 53
27 267 48 150 78 92 140 51
28 257 49 147 80 90 144 50
®IMPUT ADJUSTMENT
LGAS VALVE ON/OFF
TOGGLE SWITCH
°@0
wh,,:::ogo
ADJUSTMENT
2rid Stage (Hi)
Manifold
Pressure
Adjustment
1st Stage (Lo)
Manifold
Pressure
Adjustment
Page 15
FILTER INSTALLATION
AIR FILTERS TABLE 4
Filters are to be used with the YCZ036,050,060F heating/cooling
units. The basic unit does not have filters in it. However, a filter
frame accessory is offered that wilt allow filters to be installed within
the unit.
Otherwise a filter rack must be installed by the installer in the duct
work,
Affix the filter label supplied with the unit adjacent to the filter area.
NOMINAL FILTER* FILTER
UNIT CFM Sq.Ft.- SIZE RESISTANCE
YCZ036F 1200 40.05
YCZ050F 1600 5.33 0.05
YCZ060F 2000 6.67 0.05
*Filters must be installed in the return air system. The above square
footages are based on 300 F.PM. face velocity. If permanent filters are
used, size per mfg. recommendation with clear resistance of 0.05" WC.
ELECTRICAL WIRING
ELECTRICAL CONNECTIONS
Electrical wiring and grounding must be installed in accordance with
local codes or, in the absence of local codes, with the National
Electrical Code ANSI/NFPA 70, Latest Revision.
ELECTRICAL POWER
It is important that proper electrical power be available for the unit.
Voltage variation should remain within the limits stamped on the unit
nameplate,
DISCONNECT SWITCH
Provide an approved weatherproof disconnect either on the side of
the unit or within close proximity and within sight of the unit.
OVER CURRENT PROTECTION
The branch circuit feeding the unit must be protected as shown on
the unit rating plate.
POWER WIRING
The power supply lines must be run in weathertight conduit to the
disconnect and into the bottom of the unit control box. Provide strain
relief for all conduit with suitable connectors.
Provide flexible conduit supports whenever vibration transmission
may cause a noise problem within the building structure.
Be sure all connections are made tight. See Figure 18.
NOTE: Unit must be grounded for ignitor to operate prop-
erly. Gas pipe to unit is not an adequate ground. Ground
the unit internally as provided. See wiring diagram for
location.
CONTROL WIRING (CLASS II)
Low voltage control wiring should not be run in conduit with power
wiring unless Class 1 wire of proper voltage rating is used. Route
the thermostat cable or equivalent single leads of No. 18 AWG
colored wire from the thermostat subbase terminals through the
rubber gromment on the unit. See Figures 3 and 4 for the control
entry location. Make connections as shown on the unit wiring
diagram and in Figure 18.
Do not short thermostat wires since this wilt damage the control
transformer.
Recommended wire sizes and lengths for installing the unit thermo-
stat are provided in Table 5. The total resistance of these low voltage
wires must not exceed one (1) ohm. Any resistance in excess of 1
ohm may cause the control to malfunction because of the excessive
voltage drop.
TABLE 5
THERMOSTAT WIRE SIZE AND MAXIMUM LENGTH
WIRE SIZE MAXIMUM LENTGH (Ft)
18 75
16 125
14 200
NOTES: For branch circuit wiring (mare power supply to unit
disconnect), wire size forthe length of run should be determined
using the circuit ampacity found on the unit nameplate and the
N.E.C.
For more than 3 conductors in a raceway or cable, see the
N.E.C. for derating the ampacity of each conductor.
GROUNDING: THE UNITMUST BE ELECTRICALLYGROUNDED
IN ACCORDANCE WITH LOCAL CODES OR THE NATIONAL
ELECTRIC CODE.
Page 16
THERMOSTAT HEAT ANTICIPATOR
The thermostat heat anticipators should be set to .4 amps on single
or two stage thermostats.
IMPORTANT: Upon completion of wiring check all electrical
connections, including factory wiring within the unit, make
sure all connections are tight. Replace and secure all electrical box
covers and access doors before leaving the unit or turning on the
power to the unit.
ELECTRICAL WIRING
After all electrical wiring is complete, set the thermostat system
switch in the OFF position so that the compressor will not run
and then apply power by closing the system main disconnect switch.
This wilt activate the compressor sump heat. Do not change the
Thermostat System Switch until power has been applied long
enough to evaporate any liquid R-22 in the compressor. It is
recommended that the sump heater be energized for eight (8) hours
prior to starting.
®
GROUND_
WIRE JL -y-
PI
ROWER
L_, )TYPICAL 2 STAGE
HEAT THERMOSTAT
3PH
POWER
UNIT
NOTE I
YCZ-F FIELD WIRING DIAGRAM
PACKAGED GAS-ELECTRIC UNIT
I UNIT CONTROL BOX ""
IITHERMOSTAT CONNECT IONSI l
1
i____ 36(BL ) B I COMMON
Q ....... 47A(BK) G FAN
/F]_-...... 44A(YL) Y COMPRESSOR FIRST STAGE
'_ 41A[BR) Wl HEAT F_RST STAGE
Z_ 41C(BR) W2 I HEAT SECOND STAGE
_-----55A(RD) R I 24V
"_ 45A(YL) Y2 .. COMPRESSOR SECOND STAGEUNIT LOW VOLTAGE AREA
ECONOMIZER ACCESSORY
CONNECT IONS
TO ECONOMIZER
FACTORY PROVIDED
F_ELD INSTALLED
WIRES
IIII
_2!222222!2_ _
I
II I 1LI I36E_(BLI___ 56B(BL) e
I I I I--------
i _ f_ ,
IIL--.--I--44--ELYL)--_TC 44AIYL) YI
', ,TA,°K,
' tF"
I........ E(OR)
111 2:::::
ON,;LOWIII -,,c,oR,w2
TYPICAL 2-STAGE
THERMOSTAT
NOTES:
I. FUSED DISCONNECT SIZE, POWER WIRING AND GROUNDING
OF EQUIPMENT MUST COMPLY WITH CODES.
2. BE SURE POWER SUPPLY AGREES WITH EQUIPMENT AND
HEATER NAMEPLATE.
3. LOW VOLTAGE WIRING TO BE 18 AWG MINIMUM CONDUCTOR,
4. SEE UNIT DIAGRAM FOR ELECTRICAL CONNECTION DETAILS.
5. THE THERMOSTAT ON THE GAS/ELECTRIC UNiT MUST PROVIDE
A 'G' SIGNAL IN THE COOLING MODE ONLY. DURING THE
HEATING MODE THE FAN WILL BE ENERGIZED BY THE SYSTEM,
6. FOR SINGLE STAGE THERMOSTATS JUMPER Wt AND W2 TOGETHER.
SECOND STAGE HEAT WILL BEGIN 10 MINUTES AFTER FIRST
STAGE.
INTER-COMPONENT WIRING
24V. } FACTORY
LINE V. WIRING
24V. _ F_ELDLINE V, WIRING
WIRE COLOR DESIGNATION
ABBR COLOR ABBR COLOR
BK BLACK PR PURPLE
BL BLUE RD RED
BR BROWN WH WHITE
GR GREEN YL YELLOW
OR ORANGEi
Page 17
START - UP
PRE-START QUICK CHECKLIST
Is the unit properly located and level with the proper clearance?
See Figure 4.
Is the duct work correctly sized, run, taped, insulated, and
weatherproofed with proper unit arrangement? See Ductwork
Installation section.
Is the gas piping correctly sized, run, trapped, and purged dair?
See Gas Piping section.
Is the condensate line properly sized, run, trapped, and pitched?
Isthe fitterofthe correct size and number? Is it clean and in place?
Is the wiring properly sized and run according to the unit wiring
diagram?
Are all the wiring connections, including those in the unit, tight?
Has the unit been properly grounded and fused with the recom-
mended fuse size? See Wiring Data.
Is the thermostat level, correctly wired, welt located, and set for
the proper heat anticipation?
Have the air conditioning systems been checked at the service
ports for charge and leak tested if necessary?
Does the condenser fan and indoor blower turn free without
rubbing, and are they tight on the shafts?
Has the indoor blower speed been determined and the proper
speed been set? See the Unit Wiring Diagram.
Has all work been done in accordance with applicable local and
national codes?
Are all covers and access panels in place to prevent air loss and
safety hazards?
STARTING THE UNIT iN THE COOLING MODE
CAUTION: Before starting the system on the cooling cycle, turn the
thermostat switch to OFF and close the unit disconnect switch. This
procedure energizes the compressor crankcase heater, vaporizing
any liquid refrigerant in the crankcase. This is a precaution against
foaming at start-up which could damage the compressor bearings.
Allow the heater to operate a minimum of eight (8) hours.
NOTE: See the section on "Sequence of Operation" for a
description of the cooling operating sequence.
To start the unit in the cooling mode, set the thermostat system
switch to COOL and move the thermostat COOL indicator to a
setting below room temperature. The condenser (outdoor) fan
motor compressor and evaporator (indoor) fan motor will operate
automatically.
OPERATING PRESSURES
After the unit has operated in the cooling mode for a short period of
time, install pressure gauges on the gauge ports of the discharge
and suction line valves. Check the suction and discharge pressures
and compare them to the normal operating pressures provided in
the unit's SERWCE FACTS.
NOTE: Do not use the pressures from the unff's SERVICE FACTS
to determine the unit refrigerant charge. The correct charge is
shown on the unit nameplate. To charge the system accurately,
weigh in the charge according to the unit nameplate.
VOLTAGE
With the compressor operating, check the line voltage at the unit.
The voltage should be within the range shown on the unit name-
plate. If tow voltage is encountered, check the size and length of the
supply line from the main disconnect to the unit. The line may be
undersized for the length of the run.
COOLING SHUT DOWN
Place the system selector in the OFF position or reset thermostat at
a setting above room temperature.
Do not de-energize the main power disconnect except when unit is
to be serviced. Power is required to keep the heat pump compres-
sor warm and boil off refrigerant in the compressor.
HEATING CYCLE
NOTE: See Sequence of Heating Operation.
These units are equipped with a solid-state ignition control that
lights the burners each time the thermostat calls for heat. The
burners are extinguished during the OFF cycle.
The gas heating section of the unit can be started using the following
procedure:
1. Be sure the thermostat is at its lowest setting and the power to
the unit is off.
2,
3,
4,
5,
6,
7,
a. Turn the main shutoff valve on the gas supply line ON.
b. Turn or switch the manual valve on the combination gas
valve ON position.
Be sure the burner compartment access panel is in place.
a. Turn on the electrical power to the unit.
b. Turn the thermostat to the highest setting in the heating
cycle.
As the thermostat calls for heat, the system cycles as follows:
a. The combustion blower is energized.
b. The pressure switch is closed.
c. The gas valve opens and the ignitor lights the burner.
d. Cycle the thermostat on and off a few times to check out the
control system and burner operation characteristics.
With the burners operating, check the manifold pressure with a
manometer. Do not exceed recommended pressures.
Adjust the unit to obtain an air temperature rise with that
specified on the unit nameplate.
NOTE: For manifold pressures and orifice sizes for gas with
other BTU ratings, contact the local gas utility. Manifold
pressure should be 3.3 inches water column (+0.1). Input must
not exceed the value shown on the rating plate.
Set the heat anticipator of the thermostat to equal the amperage
draw of the gas valve, approximately 0.7.
Page 18
START - UP
8. Set the thermostat at the desired temperature setting and the
unit wilt function automatically.
STARTING THE UNIT IN THE GAS HEATING MODE
1. Check to make sure all grilles and registers are open and all unit
access doors are closed before start-up.
2. Purge the gas supply line of air by opening the union ahead of
the unit. When the odor of gas is detected, retighten the union
and wait five (5) minutes before proceeding.
3. Set the walt thermostat to its lowest position and place the fan
switch in the AUTO or ON position.
4. Open the main gas valve(s) and turn on the unit power supply.
5. Reset the heating temperature lever on the room thermostat at
the highest value above room temperature. The combustion
blower motor should energize. The main burners should light
within 20-25 seconds. Initial start may be delayed somewhat if
the unit has not been purged and air is trapped in the gas line.
NOTE: Blue smoke produced by the heat exchanger during the
initial burner firing is caused by a thin film of off on the surface
of the heat exchanger. This off will burn off quickly.
6. Cycle the thermostat OFF and ON a few times at a rate of not
more than once every thirty (30) seconds. Check both the
control operation and the burner operating conditions.
MANIFOLD PRESSURE
1,
2,
Connect a manometer to the pressure tap at the outlet side of
the unit's gas valve. Read the manifold pressure with the main
burners firing.
If the manifold pressure reading does not match the value
indicated on the unit nameplate, the unit pressure regulator
must be adjusted as follows:
a. Remove the cover screw on the gas regulator located on the
front side of the unit's gas valve.
b. Turn the adjusting screw clockwise to increase manifold
pressure or counterclockwise to decrease manifold pres-
sure.
3. Check the temperature rise during furnace operation to insure
that it falls within the range specified on the unit nameplate.
4. If the temperature rise noted is outside of the specified limits,
adjust the indoor air flow to cause the temperature rise dthe
heat exchanger to fall within the required range.
SEQUENCE OF OPERATION
Operation of the unit heating or cooling cycles is controlled by the
setting of the system switch on the room thermostat. Once the
system switch is placed either in the "HEAT" or "COOL" position, unit
operation is automatic. Afan switch on the thermostat also provides
for it continuous operation of the evaporator fan when desired. The
fan switch "ON" position provides continuous operation while the
"AUTO" position provides operation during the heating or cooling
cycles.
HEATING CYCLE
Thermostat call for heat ( 2-stage thermostat)
Call for 1st stage only:
(R) and (W1) thermostat contacts close signaling the control module
(IGN) to run its self-check routine. After the control has verified that
the pressure switch (PS) contacts are open, the limit switch (TCO)
contacts are closed, and the flame rollout (FL) switch is closed, the
induced draft blower (CBM) will be energized on high speed for
approximately 15 seconds.
After the induced draft blower (CBM) has come up to speed, the
control will verify that the pressure switch (PS) contacts are closed
and switch the induced draft blower to low speed for an additional
5 seconds of prepurge. The gas valve (GV) is energized in the first
stage to permit gas flow and the spark ignitor (IP) is energized. The
flame detector (FD) confirms that ignition has been achieved within
the 7 second trial period.
As the flame detector confirms that ignition has been achieved the
delay to indoor fan on period begins timing and after approximately
45 seconds, the indoor blower motor (IDM) will be energized at low
speed and will continue to run during the heating cycle.
Call for 2nd stage after 1st stage:
(R) and (W2) thermostat contacts close signaling a call for second
stage heat. The induced draft motor (CBM) is energized on high
speed and the gas valve on second stage. After approximately 30
seconds the control energizes the indoor blower on high speed.
2rid stage satisfied, 1st stage still called:
(R) and (W2) opens, the induced draft blower is reduced to low
speed the gas valve is reduced to first stage. After aprox. 30
seconds the indoor blower motor is reduced to low speed.
1st stage satisfied:
(R) and (Wl) opens, the gas valve (GV) will close. The induced draft
blower (CBM) will be de-energized after approximately 5 seconds
postpurge. The indoor btower motor (IDM)witt continue to run for the
fan off period (field setectabte 60 or 90 seconds [by jumpers]), then
wilt be de-energized by the control module.
Thermostat satisfied:
(R) and (W1/W2) (jumpered) contacts open signaling the control
module to close the gas valve and de-energize the induced draft
blower after approximately 5 second postpurge. The I.D. blower
motor will continue to operate at the current speed for 60 or 90
seconds after the flames are extinguished.
SAFETY SEQUENCES
This product is equipped with safety devices to protect against
abnormal conditions.
The temperature limit switch (TCO) is located in the gas com-
partment on the vestibule panel above the burner assembly. This
automatic reset device protects against excessive leaving air tem-
perature. If this device opens, the gas valve is immediately closed
and will not permit operation until the limit switch closes.
Page 19
SEQUENCE OF OPERATION
The rollout switch (FS) is located in the gas compartment near the
inlet of the burners. This is a single use device designed to protect
against any form of flame rollout. If this device is opened the gas
valve is immediately de-energized and the control (IGN)will lockout
the system. The roltout switch (FS) must be replaced before
operation is allowed to continue.
The pressure switch (PS) is located in the upper right side of the gas
compartment. This automatic device assures adequate combustion
air pressure. If pressure against the induced draft blower outlet
becomes excessive, the pressure switch will react and shut off the
gas valve, until acceptable combustion pressure is again available.
If the control (IGN) does not sense flame within the first trial for
ignition period. The gas valve wilt be de-energized. The control
(IGN) will initiate a 60 seconds interpurge. Following the interpurge,
on the second trial the gas valve wilt be energized on second stage
(high heat input). If the flame is sensed within 10 seconds after the
second try and only a call for first stage exists, the gas valve will be
reduced to first stage. If the second try is not successful. The control
wilt start other 60 second interpurge. After the interpurge, a third
attempt will be tried. The gas valve wilt be energized on second
stage (high heat input). Ifthe flame is sensed within 10 seconds after
the third try and only a call for first stage exists, the gas valve wilt be
reduced to first stage. If the third try is not successful. The control
will lock out.
If loss of flame occurs during a heating cycle, the control (IGN) wilt
close the gas valve. The control will than recycle the ignition
sequence, then if ignition is not achieved, itwill shut off the gas valve
and lock out the system.
If control lock out occurs, the control (IGN) wilt retry a complete
ignition sequence in 1 hour.
The control (IGN) can be reset by removing power to the unit or by
turning the thermostat from "on" to "off" for approximately three
seconds, then back "on."
COOLING CYCLE
Thermostat call for cool (2-stage thermostat)
Call for 1st stage only:
With the room thermostat system switch in the "COOLING" position
and the fan switch in the "AUTO" position, the YI thermostat
contacts closes to the micro board, (the board will wait 3 seconds to
check ff the Y2 may also be calling) the micro will energize (CCI)
and the outdoor fan relay for towspeed and the G thermostat contact
to G-IGN and to G1 on the ICMC is energized. (The status light is
flashing and the Y1 light is on.)
The energized compressor contactor (CCI) completes the circuit to
the compressor (CPR1), If the compressor safety controls are
closed, the compressor (CPR1) will operate with the outdoor fan
motor (ODM) on tow speed. The indoor fan motor (IDM) will operate
on tow speed. The thermostat will continue to cycle the compressor
and fans to maintain the desired temperature.
With the thermostat fan switch in the "ON" position, the G thermostat
contact is closed to G1 on the ICMC board and the indoor fan motor
(IDM) will continue to run on low speed regardless of compressor
and condenser fan operation.
Page 20
Call for 2rid stage after 1st stage:
The Y2 thermostat contact closes to the control board. For 1 minute
both compressors are off, (all lights are flashing for 1 minute), than
the board will energize the (CC2) compressor contactor, and the
outdoor fan relay for high speed then the board (YCZ050 ON LY- will
energize the (CC1) and 1 second later the (CC2) compressor
contactors) and the indoor fan high to the Y on the ICMC board is
energized for indoor high speed fan operation. (The status light is
flashing and the Y1 and Y2 lights are on.)
2nd stage satisfied, 1st stage still called:(YCZ036,060F ONLY)
The Y2 thermostat contact opens to the control board. For 1 minute
both compressors are off, (the status and Yf light are flashing for I
minute), than the board will energize (CC1)tow compressor contactor,
and the outdoor fan retay for low speed and indoor fan for low speed.
(The status light is flashing and the Y1 light is on.)
2rid stage satisfied, 1st stage still called:( YCZ050 ONLY)
The Y2 thermostat contact opens to the control board. The board
wilt de-energize (CC2) second compressor contactor, and energize
the outdoor fan relay for low speed and indoor fan for low speed.
(The status light is flashh_g and the Y1 light is on.)
ICM FAN MOTOR ADJUSTMENTS
If the airflow needs to be increased or decreased, see the Indoor
Blower Performance Table below. Information on changing the dip
switch settings for speed control of the blower motor is in this table.
Blower speed changes are made on the ICM Fan Control mounted
in the control box. The ICM Fan Control controls the variable speed
motor.
There is a bank of 8 dip switches, (See Figure below), located at the
lower right side of the board. The dip switches work in pairs to select
the cooling/heat airflow (CFM/TON), and Fan off-delay options.
INDOOR BLOWER TIMING
The ICM Fan Control controls the variable speed indoor blower. The
FAN-OFF period is set on the ICM Fan Control board by dip switches
#5 and #6.
®CFMICM FAN CONTROL
SELECTION DIP
I_ LIGHT/! jjSWITCHES
012345678
CFM FAN
z
o
21C800796P0 I_
CNT03600
Y Y L0
÷
o12345678
DIP SWITCHES (TYPICAL SETTINGS)
IGN LED DIAGNOSTIC INDICATOR
FLASHING SLOW NORMAL CALL FOR HEAT
CONTINUOUS ON NORMAL
CONTINUOUS OFF CHECK POWER /INTERNAL FAILURE
2 FLASHES SYSTEM LOCKOUT ( NO FLAME )
3 FLASHES PRESSURE SWITCH PROBLEM
4 FLASHES HIGH LIMIT (TCO) OPEN
5 FLASHES FLAME SENSED WITH GAS VALVE OFF
6 FLASHES FLAME ROLLOUT SWITCH (FL) OPEN
7 FLASHES W1 & W2 SWAPPED
CHECKOUT PROCEDURE
(_ TROUBLESHOOTING CHART
.................u:7..........................................................................................:....
Liquid Pressure Too high P S P S S
SP SS S
S PP SP
S SPS
SS
P SS SP
P PS
SP PS SPS
Liquid Pressure Too Low
Suction Pressure Too High
Suction Pressure Too Low
Liquid Refrigerant floodback (TXV System)
Liquid Refrig. floodback (Cap. Tube System)
I. D. Coil Frosting
Compressor Runs Inadequate or No Cooling
ELECTRICAL
Compressor & O.D. fan Do Not Start P P S P P P
CompressorWill Not Start But O.D. Fan Runs P S P P P S
O.D. Fan Won't Start p p
Compressor Hums ButWill Not Start p P P P S S
Compressor Cycles on IOL p S P P P S P S P S S S S S
I.D. BIowerWon't Start P S S P P
P-PRIMARY CAUSES S-SECONDARY CAUSES X66,€590
Page 21
MAINTENANCE
ROUTINE MAINTENANCE BY OWNER
You can do some of the periodic maintenance functions for your
YCZ-F unit yourself; this includes replacing the disposable or
cleaning the permanent air filters, cleaning the unit cabinet,
cleaning the condenser coil, and conducting a general unit
inspection on a regular basis.
When the system is in constant operation. In new homes,
check the filters every week for the first four (4) weeks.
If you have disposable-type filters, replace them with new filters
of the same type and size. Do not attempt to clean disposable
filters.
Permanent-type filters can be cleaned by washing them with a
mild detergent and water. Make sure that the filters are thor-
oughly dry before reinstalling them in the unit (or duct system).
NOTE: It may be necessary to replace permanent filters
annually if washing fails to clean the filter or if the filter shows
signs of deterioration. Be sure to use the same type and size
as was originally installed.
CONDENSER COIL
Unfiltered air circulates through the unit's condenser coil and
can cause the coil's surface to become clogged with dust, dirt,
etc. To clean the coil, vertically (i.e., with the fins) stroke the coil
surface with a soft-bristled brush.
Be sure to keep all vegetation away from the condenser coil
area.
,&WARNING: TO PREVENT AN EXPLOSION
OR POSSIBLE INJURY, DEATH AND EQUIPMENT DAMAGE,
DO NOT STORE COMBUSTIBLE MATERIALS, GASOLINE
MAINTENANCE PERFORMED BY SERVICEMAN--
COOLING SEASON
To keep your unit operating safely and efficiently, the manufac-
turer recommends that a qualified serviceman check the entire
system at least once each year and any other time that you feel
one is needed. Your serviceman should examine these areas of
your DCX-F unit:
filters (for cleaning or replacement)
motors and drive system components
economizer gaskets (for possible replacement)
safety controls (for mechanical cleaning)
electrical components and wiring (for possible replacement
and connection tightness)
condensate drain (for cleaning)
unit duct connections (to see that they are physically sound
and sealed to the unit casing)
unit mounting support (for structural integrity)
the unit (for obvious unit deterioration)
MAINTENANCE PERFORMED BY SERVICEMAN--
HEATING SEASON
Completethe unitinspectionsand serviceroutinesdescribed
below atthebeginningofeachheatingseason.
Visually inspect the unit to ensure that the airflow required for
combustion and condenser coil is not obstructed from the
unit.
Inspect the control panel wiring to verify that all electrical
connections are tight and that the wire insulation is intact.
Check the operation of the gas ignition system as follows:
Turn off the gas supply with the unit operating to verify that the
gas valve closes and that a ignition cycle is initiated by the
unit.
Visually inspect the inside of the burners and the burner ports
for deposit buildup and corrosion. Wipe and brush the inside
of the burner and the burner ports and then clean with a dry
cloth. If the deposit buildup or corrosion is excessive, replace
the burners.
FLUE CLEANING
Before each heating season, the flue should be inspected for
signs of flaking rust and soot deposits. Dirty flues should be
cleaned by qualified service personnel ONLY using the
following procedure:
1. Turn the room thermostat to the OFF position. Turn the main
power disconnect OFF. Turn the manual gas valve OFF.
2. Remove the flue cap, the lower access panel, and the upper
access panel.
3. Remove the combustion blower assembly from the fluebox.
Remove the flue box and the flue restrictors.
4. Remove all wires from the gas value while carefully noting
their location.
5. Disconnect the gas supply line from the valve.
6. Remove the manifold retaining screws and pull the burner-
manifold assembly from the heat exchanger.
7. Remove the inlet turbulators being careful not to break or
damage them.
8. Wipe the flue box and flue baffles clean with a clean, dry
cloth.
9. CAUTION: Never use combustible cleaning fluids on
any part of the furnace.
10. Replace all gaskets with new ones.
11. Replace all damaged or broken turbulators with new ones.
12. Reassemble the unit by reversing Steps 2 through 7 above.
Take care that all gaskets seat properly.
13. Check all wires for correct installation by referring to the
unit's electrical wiring diagram.
14. Leak test all gas line connections with a soap and water
solution or the equivalent.
15. Reinstall the top and bottom access panels and the flue
stack.
16. Visually inspect the unit to ensure that the airflow opening for
combustion is not obstructed.
17. Follow the start-up procedure above to place the unit back
in service.
,&WARNING: DO NOT OPERATE THE UNIT
WITHOUT THE EVAPORATOR FAN ACCESS PANEL IN
PLACE. REINSTALL THE ACCESS PANEL AFTER
PERFORMING ANY MAINTENANCE PROCEDURES ON THE
FAN. OPERATING THE UNIT WITHOUT THE ACCESS
PANEL PROPERLY INSTALLED MAY RESULT IN SEVERE
PERSONAL INJURY OR DEATH.
Page 22
LIMITED WARRANTY
COMBINATION GAS ELECTRIC AIR CONDITIONER
YCZ, YCY AN D YCX
Models Less Than 20 Tons for Residential Use*
(Parts Only)
This limited warranty is extended byAmerican Standard Inc., to the original purchaser and to any succeeding
)wner of the real property to which the Combination Gas Electric Air Conditioner is originally affixed, and
applies to products purchased and retained for use within the US.A. and Canada.
f any part of your Combination Gas Electric Air Conditioner fails because of a manufacturing defect within
_veyears from the date of the original purchase, Warrantor will fumish without charge the required
eplacement part. Any local transportation, related service labor, diagnosis calls, air filters, refrigerant and
elated items are not included.
n addition, if the sealed motor-compressor(s) fail(s) or the outdoor coiF should become defective, either or
_oth events occurring because of a manufacturing defect within the sixth through tenth year from the date of
_riginal purchase, Warrantor will fumish without charge the required replacement compressor and/or outdoor
:oil. Any local transportation, related service labor, diagnosis calls, refrigerant and related items are not
ncluded.
NOTE: If your Combination Gas Electric Air Conditioner is installed within one mile of salt water, including but
_ot limited to seacoasts and inland waterways, your outdoor coil warranty as stated above is limited to five
,ears from the date of original purchase.
n addition, ifthe steel heat exchanger fails because of a manufacturing defect within the sixth through
.wentieth year
•Tomthe date of original purchase, Warrantor will fumish without charge a replacement heat exchanger. Any
ocal transportation, related service labor and diagnosis calls are not included.
This limited warranty does not cover failure of your combination gas electric air conditioner if it is damaged
ivhile in your possession, damage caused by unreasonable use of the combination gas electric air
_onditioner and/or damage from failure to properly maintain the combination gas electric air conditioner as
_etforth in the Use and Care manual (see Proper Maintenance section).
This limited warranty applies to product installed on or after 10/1/2001 where product is manufactured after
1/1/2000. This limited warranty is not retroactive to any installations prior to 10/1/2001 or on product produced
_rior to 2000.
THE LIMITED WARRANTY AND LIABILITY SET FORTH HEREIN ARE IN LIEU OF ALL OTHER
NARRANTIES AND LIABILITIES, WHETHER IN CONTRACT OR IN NEGLIGENCE, EXPRESS
DR IMPLIED, IN LAW OR IN FACT, INCLUDING IMPLIED WARRANTIES OF
VlERCHANTABILITY AND FITNESS FOR PARTICULAR USE, AND IN NO EVENT SHALL
NARRANTOR BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES.
;ome states do not allow limitations on how long an implied limited warranty lasts or do not allow the
xclusion or limitation of incidental or consequential damages, so the above limitation or exclusion may not
apply to you. This limited warranty gives you specific legal rights, and you may also have other rights which
zary from state to state.
_arts will be provided by our factory organization through an authorized service organization in your area
isted in the yellow pages. If you wish further help or information concerning this limited warranty, contact:
_,merican Standard Inc.
Troup Highway
Tyler, TX 75711-9010
_,ttention: Manager, After Sales Support
GW-631-1802
This limited warranty is for residential usage of this equipment and not applicable when this equipment is
Bed for a commercial application. A commercial use is any application where the end purchaser uses the
_roduct for other than personal, family or household purposes.
Page 23
LiMiTED WARRANTY
COMBiNATiON GAS ELECTRIC AiR CONDiTiONER
YCZ, YCY, YCX, YCC, YCD, YCH, YCP, YHC and YSC
Models Less Than 20 Tons for Commercial Use*
(Parts Only)
his warranty is extended byAmerican Standard Inc., to the original purchaser and to any succeeding owner of
the real property to which the Combination Gas Electric Air Conditioner is originally affixed, and applies to
products purchased and retained for use within the USA. and Canada. There is no warranty against
corrosion, erosion or deterioration.
If any part of your Combination Gas Electric Air Conditioner fails because of a manufacturing defect within one
year from the date of the original purchase, Warrantor will furnish without charge the required replacement
)art.
n addition, if the sealed motor-compressor fails because of a manufacturing defect within the second through
fifth year from the date of original purchase, Warrantor will fumish without charge the required replacement
compressor.
In addition, if the steel heat exchanger fails because of a manufacturing defect within the second through fifth
year from the date of original purchase, Warrantor will fumish without charge a replacement heat exchanger.
Warrantor's obligations and liabilities under this warranty are limited to fumishing F.O.B. Warrantor factory or
warehouse at Warrantor designated shipping point, freight allowed to Buyer's city, replacement parts for
Warrantor's products covered under this warranty. Warrantor shall not be obligated to pay for the cost of lost
refrigerant. No liability shall attach to Warrantor until products have been paid for and then liability shall be
limited solely to the purchase price of the equipment under warranty shown to be defective.
THE WARRANTY AND LIABILITY SET FORTH HEREIN ARE IN LIEU OF ALL OTHER
WARRANTIES AND LIABILITIES, WHETHER IN CONTRACT OR IN NEGLIGENCE, EXPRESS
OR IMPLIED, IN LAW OR IN FACT, INCLUDING IMPLIED WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR PARTICULAR USE, AND IN NO EVENT SHALL
WARRANTOR BE LIABLE FOR ANY INCIDENTAL OR CONSEQUENTIAL DAMAGES.
Some states do not allow limitations on how long an implied warranty lasts or do not allow the exclusion or
limitation of incidental or consequential damages, so the above limitation or exclusion may not apply to you.
This warranty gives you specific legal rights, and you may also have other rights which vary from state to
state.
American Standard Inc.
Troup Highway
Tyler, TX 75711-9010
Attention: Manager, After Sales Support
GW-6064800
* This warranty is for commercial usage of said equipment and not applicable when the equipment is used for
a residential application. Commercial use is any application where the end purchaser uses the product for
other than ersonal famit or household ur oses.
Trane
6200 Troup Highway
Tyler, TX 75707-9010
A business of AmericanStandard Companies
Page 24
Since Trane has a policy of continuous product and
product data improvement, it reserves the right to
change design and specification without notice.
Technical Literature -Printed in U.S.A.

Navigation menu