Tait TBCH2B Base Station Transceiver User Manual TB9400 Installation and Operation Manual

Tait Limited Base Station Transceiver TB9400 Installation and Operation Manual

Exhibit D Users Manual per 2 1033 c3

Download: Tait TBCH2B Base Station Transceiver User Manual TB9400 Installation and Operation Manual
Mirror Download [FCC.gov]Tait TBCH2B Base Station Transceiver User Manual TB9400 Installation and Operation Manual
Document ID2341215
Application IDEtQa+hstHfU9O0KLifxcSg==
Document DescriptionExhibit D Users Manual per 2 1033 c3
Short Term ConfidentialNo
Permanent ConfidentialNo
SupercedeNo
Document TypeUser Manual
Display FormatAdobe Acrobat PDF - pdf
Filesize361.65kB (4520597 bits)
Date Submitted2014-07-31 00:00:00
Date Available2014-07-31 00:00:00
Creation Date2014-07-17 09:43:51
Producing SoftwareAcrobat Distiller 7.0 (Windows)
Document Lastmod2014-07-17 09:43:51
Document TitleTB9400 Installation and Operation Manual
Document CreatorPScript5.dll Version 5.2.2
Document Author: Tait Limited

Installation
This chapter provides information on the site requirements for your
TB9400 equipment and also describes how to install the base station in a
standard 19 inch rack or cabinet.
If this is your first time installing a TB9400 base station, we recommend
that you read the entire chapter before beginning the actual installation.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
67
5.1
Before You Begin
5.1.1
Equipment Security
The security of your base station equipment is a high priority. If the site is
not fully secure, the base station should at least be locked in a secure
cabinet to prevent unauthorized access.
5.1.2
Grounding and Lightning Protection
Electrical Ground
The base station modules are grounded by physical contact between the
module case and the subrack. To ensure a good ground connection you
must tighten each module retaining clamp securely (refer to “Final
Reassembly” on page 112 for the correct torque).
A threaded grounding connector is provided on the rear of the subrack for
connection to the site ground point (refer to “Connecting Up the Base
Station” on page 88 for more details).
Lightning Ground
5.1.3
It is extremely important for the security of the site and its equipment that
you take adequate precautions against lightning strike. Because it is outside
the scope of this manual to provide comprehensive information on this
subject, we recommend that you conform to your country’s standards
organization or regulatory body.
Equipment Ventilation
Always ensure there is adequate ventilation around the base station.
Notice Do not operate it in a sealed cabinet. You must keep the
ambient temperature within the specified range, and we strongly recommended that you ensure that the cooling airflow is not restricted.
Notice The cooling fans are mounted on the front panel and will only
operate when the panel is fitted correctly to the front of the subrack. To
ensure adequate airflow through the base station, do not operate it for
more than a few minutes with the front panel removed (e.g. for servicing
purposes).
5.1.4
Ambient Temperature Sensor
The ambient temperature reading for the base station is provided by the
temperature sensor located on the front panel circuit board.
68
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.1.5
Cabinet and Rack Ventilation
The cooling airflow for the base station enters through the front panel and
exits at the rear of the subrack. For optimum thermal performance, the
heated air that has passed through a base station must not be allowed to reenter the air intakes on the front panel. Any space at the front of the cabinet
not occupied by equipment should be covered by a blanking panel. Refer
to Figure 5.1 on page 70.
To allow enough cooling airflow through a cabinet-mounted base station,
we recommend the following:
■
■
■
an area of at least 23in2 (150cm2) of unrestricted ventilation slots or
holes in front of the air intakes for the fans for each subrack; for
example, thirty 0.25x3.3in (6x85mm) slots will allow the
recommended airflow
a vent in the top of the cabinet with an area of approximately 23in2
(150cm2) per subrack, or a similar area of ventilation per subrack at the
rear of the cabinet behind each subrack
a 2U gap at the top of the cabinet.
Notice The ventilation opening must be unrestricted. If the slots or
holes are covered with a filter, mesh or grille, the open area must be
increased to allow the same airflow as an unrestricted opening.
The maximum ambient temperature entering the cabinet must not exceed
+140°F (+60°C).
If you are installing multiple subracks in a cabinet, ensure that there will be
enough cooling airflow through the cabinet after the equipment has been
installed. For example, the recommended maximum number of subracks in
a 38U cabinet is five, as shown in Figure 5.1 on page 70.
If the base station is installed in a rack or cabinet with other equipment with
different ventilation requirements, we recommend that the base station be
positioned below this equipment.
Auxiliary Extractor
Fans
The base station does not require auxiliary extractor fans mounted in the
top of the cabinet. If your cabinet is already fitted with fans, the following
procedures apply:
■
if there are six or more 4.75in (12cm) fans, each capable of extracting
94.2 ft3 per minute (160m3 per hour), they must run continuously
■
if there are fewer than six fans, you must remove them and ensure the
vent in the top of the cabinet has an area of approximately 23in2
(150cm2) per subrack.
If you have any other configuration, the performance of your system will
depend on how closely you comply with the base station airflow
requirements described above.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
69
Figure 5.1
Typical cabinet ventilation requirements
top view
8in
(20cm)
side view
front view
2U
≥7in
(≥17.5cm)
70
ventilation slots
blanking panels
Installation
airflow entry
airflow exit path
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.2
Unpacking and Moving the Subrack
The subrack is packed in a strong corrugated cardboard carton with top and
bottom foam cushions. To prevent personal injury and damage to the
equipment, we recommend that two people unpack and move the subrack.
To remove the subrack from the carton, follow the procedure illustrated in
Figure 5.2.
Caution A subrack complete with modules can weigh up to 46lb
(21kg), or up to 53lb (24kg) complete with packaging. We recommend
that you have another person help you unpack and move the equipment.
The TBAA03-16 carrying handles will make it easier to move the
equipment once it has been unpacked. If necessary, remove the modules
from the subrack before moving it (refer to “Replacing Modules” on
page 101). In all cases follow safe lifting practices.
Figure 5.2
Unpacking the subrack
1.
Cut the tape securing the flaps at the top of the carton and fold them
flat against the sides b.
2.
Rotate the carton carefully onto its side c and then onto its top d,
ensuring that none of the flaps is trapped underneath.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
71
Disposal of
Packaging
72
Installation
3.
Slide the carton upwards over the foam cushions and lift it away e.
Remove the cushion from the bottom of the subrack f.
4.
Rotate the subrack and cushion carefully over the rear of the subrack
g so that it is the right way up with the cushion on top h. Remove
the cushion from the top of the subrack i.
If you do not need to keep the packaging, we recommend that you recycle
it according to your local recycling methods. The foam cushions are CFCand HCFC-free and may be burnt in a suitable waste-to-energy combustion
facility, or compacted in landfill.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.3
Identifying the Equipment
You can identify the model and hardware configuration of the TB9400
modules by referring to the product code printed on labels at the rear of
each module. The meaning of each character in the product code is
explained in the tables below.
This explanation of product codes is not intended to suggest that any
combination of features is necessarily available in any one product.
Consult your regional Tait office for more information regarding the
availability of specific models and options.
Reciter Product
Codes
Product Code
Description
T01-0110X-XXXX
3 = reciter
4 = receive-onlya
T01-0110X-XXXX
Frequency Band
D = 148MHz to 174MHz
K = 400MHz to 440MHz
L = 440MHz to 480MHz
N = 762MHz to 870MHzb
T01-0110X-XXXX
A = standard
T01-0110X-XXXX
A = default
T01-0110X-XXXX
A = default
Tait Band Identifier
B3 band
H1 band
H2 band
K4 band
a. Receive-only base stations are currently available for operation only on B3 band.
b. The actual frequency coverage in this band is:
Transmit: 762MHz to 776MHz and 850MHz to 870MHz
Receive: 792MHz to 824MHz
PA Product Codes
Product Code
Description
T01-01121-XXXX
Frequency Band
D = 148MHz to 174MHz
K = 400MHz to 440MHz
L = 440MHz to 480MHz
N = 762MHz to 870MHza
T01-01121-XXXX
A = 50W
B = 100W
T01-01121-XXXX
A = default
T01-01121-XXXX
A = default
Tait Band Identifier
B3 band
H1 band
H2 band
K4 band
a. The actual frequency coverage in this band when used with a K-band TB9400 reciter is 762MHz to 776MHz and 850MHZ to 870MHz.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
73
PMU Product
Codes
74
Installation
Product Code
Description
TBAXXXX-XXXX
3 = PMU
TBA3XXX-XXXX
0 = default
TBA3XXX-XXXX
0 = AC module not fitted
A = AC module fitted
TBA3XXX-XXXX
0 = DC module not fitted
1 = 12V DC module fitted
2 = 24V DC module fitted
4 = 48V DC module fitted
TBA3XXX-XXXX
0 = standby power supply card not fitted
1 = 12VDC standby power supply card fitted
2 = 24VDC standby power supply card fitted
4 = 48VDC standby power supply card fitted
TBA3XXX-XXXX
0 = auxiliary power supply board not fitted
1 = 12VDC auxiliary power supply board fitted
2 = 24VDC auxiliary power supply board fitted
4 = 48VDC auxiliary power supply board fitted
TBA3XXX-XXXX
0 = default
TBA3XXX-XXXX
0 = default
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.4
Initial Setting Up
Before putting the base station into service, you may want to carry out
some basic functional testing, configuration, and tuning (if required). This
section provides an overview of these procedures:
5.4.1
■
checking that the base station powers up correctly
■
checking the basic functionality of the base station by using the tests
available in the web interface
■
customizing the configuration for the intended installation and
verifying that the configuration is correct
■
changing the root password
■
tuning the base station (if required).
Confirming Operation
Notice Make sure that the RF output is connected to a suitable attenuator or dummy load. Do not remove the load while the PA is transmitting as this may damage the PA output stage.
Applying Power
1.
Apply power by turning on the PMU.
2.
Check that the base station powers up correctly:
■
The front panel display will show “Please wait...” while the base
station starts up (this may take up to two minutes). When the
startup process is complete, the display will show the home
screen.
■
The cooling fans in the front panel will run at full speed for a few
seconds, then run at low speed while the base station starts up,
and then assume standard operation. One or more fans may
operate, depending on the temperature of the modules.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
75
Functional Tests
Test
The following table provides an overview of the tests available using the
web interface. Refer to the Help for full details of these tests.
Notes
Menu
receiver operation
requires a suitable RF source
Diagnose > RF Interface > Receiver
transmitter operation
requires connection to the
network
Diagnose > RF Interface > Transmitter
synchronized transmit
checks the simulcast operation of Diagnose > RF Interface > Synchronized
a channel group or the
Transmit
transmitters in it
ping
checks the IP connection to
Diagnose > Connection > Network
another device with an IP address
NTP query
checks if the NTP-based time
synchronization is working
PMU mains failure
requires a DC backup supply
Diagnose > Subsystems > PMU Control
Tests
fan operation
checks the operation of each fan
individually
Diagnose > Subsystems > Fan Tests
76
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.4.2
Customizing the Configuration
The following steps provide an overview of the process used to configure
the base station with the settings it needs. Refer to the Help for detailed
information.
1.
Log in to the base station (refer to “Connecting Your PC to the Base
Station” on page 48 for more details).
2.
Select Configure. The base station has many different settings that
can be configured before it is put into operation, such as:
3.
■
channel configurations
■
alarm control and SNMP agent
■
network interfaces
■
channel groups and quality of service
■
channel and signaling profiles
■
CWID
■
miscellaneous items such as minimum battery voltages, fan
control, NTP and package servers.
Make the changes needed in each form and click Save.
We recommend that you save the configuration to your PC or network.
First make a backup copy of the configuration (which is stored in the base
station as a file), then save this file to a folder on your PC or network. This
provides a backup which can be restored to the base station if the
configuration information becomes lost or corrupted.
5.4.3
Recommended Configuration Settings
In a dual base station only reciter 1 communicates directly with the PMU
and front panel. Therefore the following configuration settings are
recommended for dual base station operation:
■
Disable the “PMU not detected” alarm on base station 2 (Configure >
Alarms > Control > PMU).
■
Disable the “FP not detected” alarm on base station 2 (Configure >
Alarms > Control > Front panel).
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
77
5.4.4
Restricted Port Numbers
Certain configuration settings in the base station’s web interface require
you to enter a port number (for example, the trunking interface and channel
groups).
Two ranges of port numbers are unavailable for use with the base station.
The web interface will prevent you from entering a number from these
ranges, as explained below.
Restricted Port Numbers
5.4.5
Details
0 – 1023
The “well-known ports”, commonly used by other
devices in a network. Using a port number in this
range could cause compatibility problems with other
devices.
12000 – 14999
Reserved for internal use in the base station. Using a
port number in this range could cause the base
station to malfunction.
Changing the Root Password
The root password to the Linux operating system of the reciter is a possible
security risk. The equipment is delivered with a default password that is
well known. Knowledge of the password could be used to render the
equipment inoperable, for example by deleting files. If you are concerned
about the security risk that this poses, change the password. If Tait provides
support services, it may need to know the password.
Notice If you change the password and then lose it, the equipment
must be returned to Tait. Make sure that you store the password securely
and do not lose it.
To change the root password, follow these steps.
78
Installation
1.
Log in from your PC to the base station using SSH client software
such as PuTTY. The username is “root” and the default password is
“k1w1”.
2.
At the # prompt, enter the command “passwd”.
3.
Follow the on-screen instructions.
4.
Record the password in a secure location.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.4.6
Tuning the Reciter
This section also applies to receive-only reciters.
B3-Band Reciter
Before the base station is installed on site, you may need to tune the
receiver front end. The receiver front end requires tuning if the receive
frequency is shifted more than 2MHz away from the previously set
frequency, or the RSSI level of the new frequency is more than 1dB lower
than the RSSI level of the previously set frequency.
The receiver in the B3-band reciter covers the 148 to 174MHz frequency
band. This is split into two sub-bands: 148 to 159MHz and
159 to 174MHz. Each sub-band has its own helical filter (shown in
Figure 5.3 below) which is electronically switched in or out of circuit
depending on the frequency programmed into the reciter. The bandwidth of
these helical filters is approximately ±1.5MHz.
Figure 5.3
Identifying the B3-band receiver front end helical filters
159 to 174MHz
148 to 159MHz
To check the RSSI level and tune the receiver front end (if required), follow
these steps.
1.
Remove the reciter from the subrack and reconnect the system
control bus cable to power up the reciter.
2.
Log in to the reciter and select Monitor > Interfaces > RF Interface.
For information on connecting directly to the reciter, refer to
“Connecting a Networked PC to a Base Station” on page 52.
3.
Feed a signal at the currently tuned receive frequency and at a level
of –80dBm into the reciter’s RF input. Check that the RSSI reading
on the RF Interface page is –80dBm ±1dB. Note this reading.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
79
4.
Set the reciter to the new receive frequency.
5.
Change the RF input signal to the new receive frequency at
–80dBm. Check that the RSSI reading is –80dBm ±1dB. If it is, the
receiver front end does not require tuning. If it is not, go to the next
step.
6.
Using the Johanson tuning tool1, adjust the correct helical filter for
the new frequency (as shown in Figure 5.3) to obtain a peak RSSI
reading. This reading should be within 1dB of the reading at the
previous frequency.
Adjust the center resonator of the filter first, followed by the two
outer resonators (in any order). Each resonator should require
approximately the same amount of adjustment when tuning.
A change in frequency of 5MHz requires approximately one turn of the
tuning slug. If tuning to a lower frequency, adjust the slug in (clockwise); for a higher frequency, adjust the slug out (counterclockwise).
7.
Change the RF input signal and the reciter’s receive frequency to
0.5MHz above and below the required frequency and check that the
RSSI reading does not drop by more than 0.5dB from the reading at
the required frequency.
8.
Recalibrate the RSSI at the new frequency (Calibrate > Reciter >
RSSI).
If you wish to confirm the accuracy of the tuning procedure, carry out a
sensitivity measurement at the new frequency.
1. Included in the TBA0ST2 tool kit. Also available separately as part number 937-00013-00.
80
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
H-Band Reciter
Before the base station is installed on site, you may need to tune the
receiver front end. The receiver front end requires tuning if the receive
frequency is shifted more than 5MHz away from the previously set
frequency, or the RSSI level of the new frequency is more than 1dB lower
than the RSSI level of the previously set frequency.
The receiver in the H-band reciter covers one of the following frequency
sub-bands, depending on the model:
■
H1 - 400 to 440MHz
■
H2 - 440 to 480MHz.
Both sub-bands use the same helical filter (shown in Figure 5.4 below).
The bandwidth of the helical filter is approximately ±5MHz.
Figure 5.4
Identifying the H-band receiver front end helical filter
H-band helical filter
To check the RSSI level and tune the receiver front end (if required), follow
these steps.
1.
Remove the reciter from the subrack and reconnect the system
control bus cable to power up the reciter.
2.
Log in to the reciter and select Monitor > Interfaces > RF Interface.
For information on connecting directly to the reciter, refer to
“Connecting a Networked PC to a Base Station” on page 52.
3.
Feed a signal at the currently tuned receive frequency and at a level
of –80dBm into the reciter’s RF input. Check that the RSSI reading
on the RF Interface page is –80dBm ±1dB. Note this reading.
4.
Set the reciter to the new receive frequency.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
81
5.
Change the RF input signal to the new receive frequency at
–80dBm. Check that the RSSI reading is –80dBm ±1dB. If it is, the
receiver front end does not require tuning. If it is not, go to the next
step.
6.
Using the Johanson tuning tool1, adjust the helical filter for the new
frequency (as shown in Figure 5.4) to obtain a peak RSSI reading.
This reading should be within 1dB of the reading at the previous
frequency.
Adjust the center resonator of the filter first, followed by the two
outer resonators (in any order). Each resonator should require
approximately the same amount of adjustment when tuning.
If tuning to a lower frequency, adjust the slug in (clockwise); for a
higher frequency, adjust the slug out (counterclockwise).
7.
Change the RF input signal and the reciter’s receive frequency to
2MHz above and below the required frequency and check that the
RSSI reading does not drop by more than 0.5dB from the reading at
the required frequency.
8.
Recalibrate the RSSI at the new frequency (Calibrate > Reciter >
RSSI).
If you wish to confirm the accuracy of the tuning procedure, carry out a
sensitivity measurement at the new frequency.
K-Band Reciter
The K-band reciter does not require tuning.
1. Included in the TBA0ST2 tool kit. Also available separately as part number 937-00013-00.
82
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.5
Installing the Base Station on Site
5.5.1
Base Stations for Trunked Systems
When installing base stations that are part of a trunked system, it is very
important to observe good site engineering rules. This is especially true
when the channels are combined into a single antenna.
If at all possible, the RF planner should avoid frequency plans in which the
Rx to Tx spacing is an exact multiple of the trunked channel spacing, thus
forcing Tx intermodulation products to fall outside the Rx channels.
Cables and antennas should be of high quality construction. Solid shield
heliax type cables are best, but if braided shield cables must be used for
short distances, their braids must be silver-plated.
When the outputs of more than one transmitter are combined, their voltages
add, and the resulting peak envelope power is not simply the sum of their
powers, but is equal to the power of one of them multiplied by the square
of the number of sources. Cables, components, and hardware must be rated
to withstand the peak envelope power.
During the commissioning process, all transmitters should be activated
together using a diagnostic test tone, while the receiver RSSI is monitored.
There should be no perceptible increase in RSSI while the transmitters are
active.
5.5.2
Equipment Required
It is beyond the scope of this manual to list every piece of equipment that
an installation technician should carry. However, the following tools are
specifically required for installing the base station:
■
Pozidriv PZ3 screwdriver for the M6 screws used in the DC input
terminals on the PMU; M6 (0.25in) screws are also used to secure the
subrack to the cabinet in factory-assembled systems
■
Pozidriv PZ2 screwdriver for the M4 screws used to secure the module
retaining clamps, and for the fasteners used to secure the front panel to
the subrack
■
8mm AF spanner for the SMA connectors, and the subrack ground
connector.
You can also obtain the TBA0ST2 tool kit from your regional Tait office.
It contains the basic tools needed to install, tune, and service the base
station.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
83
5.5.3
Mounting the Subrack
Caution A subrack complete with modules can weigh up to 55lb
(25kg), or up to 62lb (28kg) complete with packaging. We recommend
that you have another person help you unpack and move the equipment.
The TBAA03-16 carrying handles will make it easier to move the
equipment once it has been unpacked. If necessary, remove the modules
from the subrack before moving it (refer to “Replacing Modules” on
page 101). In all cases follow safe lifting practices.
Figure 5.5
Subrack mounting points
front view
rear view
main mounting holes - front
auxiliary mounting holes - rear
1.
Remove the front panel, as described in “Preliminary Disassembly”
on page 103.
2.
Fit the subrack into the cabinet or rack and secure it firmly with an
M6 (0.25in) screw, flat and spring washer in each of the four main
mounting holes b, as shown in Figure 5.5.
If you need extra mounting security, additional mounting holes c are
provided at the rear of the subrack for auxiliary support brackets.
84
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Figure 5.6 below gives the dimensions of the subrack and its mounting
holes.
Figure 5.6
Subrack dimensions
17 in (432 mm)
14.8 in
(375.5 mm)
19 in (482.6 mm)
14.7 in (373.5 mm)
18.3 in (465.1 mm)
14.37 in (365 mm)
4 in
6.96 in
(176.8 mm) (101.6 mm)
5.25 in
(133.4 mm)
0.42 in
(10.6 mm)
0.26 in
(6.6 mm)
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
85
Auxiliary Support
Bracket
TBAA03-13 auxiliary support brackets can be fitted to the rear of the
subrack to provide additional mounting security. Figure 5.7 shows a
standard TBAA03-13 bracket b fitted in a typical Tait cabinet c. If you
are not using the Tait cabinet, you may have to make your own brackets to
suit your installation.
Figure 5.7
Auxiliary support bracket
Notice You must fit the auxiliary support brackets if you intend to
transport a cabinet fitted with a fully built-up base station.
We also recommend that you fit the brackets under the following
conditions:
General Cabling
86
Installation
■
when the installation is in an area prone to earthquakes
■
when third party equipment is installed hard up underneath the base
station subrack.
We recommend that you try to route all cables to and from the base station
along the side of the cabinet so the cooling airflow is not restricted.
TB9400 Installation and Operation Manual
© Tait Limited April 2014
DC Power Cabling
DC power cables should be well supported so that the terminals on the
PMU and on the ends of the cables do not have to support the full weight
of the cables.
Figure 5.8 shows two recommended methods of securing these cables to
prevent straining either set of terminals.
We recommend that you fit the supplied covers to the DC terminals to
protect against accidental shorts.
Figure 5.8
DC power cabling
secure the cables to the
cabinet to support their
weight
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
87
5.6
Connecting Up the Base Station
This section provides information relevant to the task of connecting up the
various inputs and outputs of the base station.
5.6.1
Connection Overview
The connections at the rear of a 100W base station are identified in
Figure 5.9. External connections are all located at the rear of the subrack.
Figure 5.9
100W base station inputs and outputs
b c d e
1@ 1!
1)
Reciter 1
serial RS-232 connectora
1PPS input
external reference frequency input
RF input
RF output
–VDC input
PA
PMU
1)
1!
1@
+VDC input
auxiliary DC output
AC mains input
Ethernet interface connector
subrack ground connector
system interface connector
a. Factory use only.
88
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.6.2
Connecting AC Power
The PMU is designed to accept a mains input of 88 to 264VAC at 45 to
65Hz. A standard 3-wire grounded socket outlet must be used to supply the
AC power. The socket outlet must be installed near the equipment and must
be easily accessible. This outlet should be connected to an AC power
supply capable of providing at least 600W. The requirements of two typical
AC supplies are given in the following table.
Nominal Supply
Current Requirementa
Circuit Breaker/Fuse
Ratinga
115VAC
8A
10A
230VAC
4A
6A
a. The actual current consumption of the base station will be lower than these requirements (refer to the Specifications Manual for more information).
Your base station should come supplied
with a power supply cord to connect the
male IEC connector on the PMU to the
local AC supply. The pins of the IEC
connector on the PMU are identified at
right.
phase
ground
neutral
rear view
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
89
5.6.3
Connecting DC Power
The PMU is designed to accept a nominal 12VDC, 24VDC or 48VDC
input (depending on the model) with negative or positive ground. There is
a minimum DC startup threshold to prevent damaging a battery which has
little capacity left.
You must connect the DC supply from the battery to the PMU via a fuse or
DC-rated circuit breaker with a contact separation of 3mm, and with the
appropriate rating, as shown in the table below. The DC input leads should
be of a suitable gauge to ensure less than 0.2V drop at maximum load over
the required length of lead.
Nominal Supply
Voltage
Input Voltage
Range
Circuit Breaker/
Fuse Ratinga
Recommended
Wire Gaugeb
12VDC
10VDC to 16.8VDC 60A
2AWG / 35mm2
24VDC
20VDC to 33.6VDC 30A
5AWG / 16mm2
48VDC
40VDC to 60VDC
8AWG / 8mm2
15A
a. The actual current consumption of the base station will be lower than these requirements (refer to the Specifications Manual for more information).
b. For a length of 5ft to 6.5ft (1.5m to 2m) (typical).
Terminate and insulate the DC input leads to protect them from
accidentally shorting to the subrack if the PMU is removed before the leads
are disconnected. Protective covers for the DC terminals are supplied with
each PMU.
Figure 5.10
Recommended DC power connection
Circuit Breaker
or Fuse
PMU
Battery
We recommend a screw torque of 18–20lbf·in (2–2.25N·m).
90
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.6.4
Connecting the Auxiliary DC Power Output
The PMU can provide an auxiliary DC output from the auxiliary power
supply board. This board is available with an output of 13.65VDC,
27.3VDC, or 54.6VDC (depending on the model), and is current limited to
3A, 1.5A or 750mA respectively. This power supply is permanently on as
soon as the base station has finished powering up, and is available on the
auxiliary output connector on the rear panel.
You can connect multiple auxiliary power supply boards in parallel for
redundancy purposes, or to provide an output greater than 40W. Although
no active current sharing is used, auxiliary boards connected in parallel will
current-share before reaching their power limit. The failure (or switching
off) of one auxiliary board will not load any other paralleled auxiliary
boards in the circuit.
The auxiliary power supply turns off briefly when the PMU restarts
after a firmware upgrade. This interruption may also cause any ancillary
equipment powered from the auxiliary supply to restart. If this is a problem for your system, we recommend connecting auxiliary power supply
boards in parallel to ensure an uninterrupted power supply for the ancillary equipment.
Auxiliary DC Power
Output Cabling
Network elements are supplied with a connector, as shown in Figure 5.11.
You can use this to connect the PMU’s auxiliary DC power output to
another device (refer to “PMU Auxiliary DC Output” on page 113 for the
pin allocations).
Contact your regional Tait office for details on the full range of wiring kits
available.
Figure 5.11
Auxiliary DC power connector
Phoenix MVSTBR2.5HC/2-ST/5.08 female
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
91
5.6.5
Connecting RF
Notice Do not remove the load from the PA while it is transmitting
as this may damage the PA output stage. Before disconnecting any RF
cables, put the base station into Offline mode to prevent any transmissions.
The RF input to the base station is via the marked BNC connector on the
rear panel of the reciter. The RF output is via the N-type connector on the
rear panel of the PA (refer to Figure 5.9 on page 88).
Cables and antennas should be of high quality construction. Solid shield
heliax type cables are best, but if braided shield cables must be used for
short distances, their braids must be silver-plated.
Recommendations
for Installing the PA
We recommend the following installation procedures, which should protect
the PA from damage under all but the most extreme operating conditions.
1.
Do not connect the PA directly to the antenna. Fit an isolator or
duplexer between the PA and the load. Fit the isolator as close as possible to the RF output connector on the PA. Do not connect any
switching equipment between the isolator and the PA, unless the
switch cannot operate while there is RF present (i.e. the base station
is transmitting).
2.
Fit a surge suppressor to the antenna cabling where it enters the
building.
3.
Inspect all cables and equipment connected to the base station for
defects.
Ice on the antenna, or a broken antenna, is unlikely to cause damage to the
PA.
Explanation
The circuit design of the PA protects the circuitry from high VSWR. This
makes it difficult to damage the RF power device by keying the PA into a
mismatched load, or if the load deteriorates over even a short period of time
(milliseconds).
However, it is possible to damage the device if all the following conditions
happen at the same time:
■
there is a step change in the PA load (for example, the load is removed)
■
the PA is transmitting
■
the feed line loss between the PA and the mismatch is <1dB.
The effect of such conditions is variable: some devices will not be
destroyed, and some may fail after repeated load interruptions.
92
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.6.6
Connecting an External Frequency Reference
For K4 Band, the internal frequency reference accuracy is inadequate, and
an external reference must be used. An external reference is also required
for simulcast. The external reference frequency can be 10MHz or
12.8MHz, with an input level of 300mVpp to 5V pp. The stability of this
reference should be better than 50 parts per billion (for non-simulcast) or
≤1 part per billion (for simulcast). The reciter automatically detects the
frequency of the external reference and configures itself accordingly.
If an external reference is required, enable the external reference “Absent”
alarm (Configure > Alarms > Control).
Use a 50Ω coaxial cable (RG58 or RG223) to connect the external
reference to the base station’s external reference frequency input. You can
daisy-chain up to eight base stations using F-junctions. The maximum
overall cable length is 30m. Terminate the last connection with a 50Ω load.
Figure 5.12
Daisy-chaining an external frequency reference input
maximum overall cable
length is 30m
maximum of eight base
station loads on one
frequency reference output
50Ω termination
TB9400 Installation and Operation Manual
© Tait Limited April 2014
Installation
93
5.6.7
Connecting a 1PPS Source
A 1PPS signal is required for simulcast base stations. Use a 50Ω coaxial
cable (RG58 or RG223) to connect the source to the base station’s 1PPS
input. You can daisy-chain up to eight base stations using F-junctions. We
recommend that the cable length between the first and last load is kept to a
minimum. This will reduce any propagation variation between base
stations. The maximum overall cable length is 30m. Terminate the last
connection with a 50Ω resistor, otherwise reflections of the 1PPS pulse
may occur.
A 1PPS signal will be required for all base stations operating in a P25
Phase 2 system. If you intend to upgrade TB9400 base stations to P25
Phase 2 operation at a later date, we suggest that you provide the 1PPS
source, or at least the necessary cables, at the time of installation.
Figure 5.13
Daisy-chaining a 1PPS input
The longest length of cable must be between
the source and the first base station
use short lengths of cable
between each base station
maximum of eight base station
loads on one 1PPS output
50 Ω termination
5.6.8
Ethernet Connection
The RJ-45 socket on the reciter’s rear panel provides the 10BASE-T or
100BASE-T Ethernet connection to the other devices in the network. Use
Cat-5 cable to connect this socket to the Tait P25 Network via a router or
switch.
If necessary, refer to “Ethernet Connector” on page 113 for a list of
Ethernet connection pin allocations.
94
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014
5.6.9
Connecting General Purpose Inputs and Outputs
The base station has a number of general purpose inputs and outputs. These
are connected via the 25-way D-range on the rear panel.
The pin allocations for the D-range connector are given in the following
table. Not all pins are used in this release of the base station.
Pin
Signal Name
Signal Type
Notes
1)
1!
1@
1#
1$
1%
1^
1&
1*
1(
2)
2!
2@
2#
2$
2%
external view
not used
reserved for future use
10
11
digital in 1
12
digital in 2
13
+5.2VDC output
14
digital in 3
15
digital in 4
16
digital in 5
17
digital in 6
18
digital in 7
19
digital in 8
20
digital in 9
21
digital in 10
22
digital in 11
23
digital in 12
24
not used
25
ground
TB9400 Installation and Operation Manual
© Tait Limited April 2014
input
5V TTL logic
active low
power output
maximum current 200mA
input
5V TTL logic
active low
reserved for future use
ground
Installation
95
96
Installation
TB9400 Installation and Operation Manual
© Tait Limited April 2014

Source Exif Data:
File Type                       : PDF
File Type Extension             : pdf
MIME Type                       : application/pdf
PDF Version                     : 1.4
Linearized                      : Yes
XMP Toolkit                     : 3.1-701
Producer                        : Acrobat Distiller 7.0 (Windows)
Create Date                     : 2014:07:17 09:43:51+12:00
Modify Date                     : 2014:07:17 09:43:51+12:00
Metadata Date                   : 2014:07:17 09:43:37+12:00
Creator Tool                    : PScript5.dll Version 5.2.2
Document ID                     : uuid:2867B13E320DE4119369F5C13B425ADB
Instance ID                     : uuid:925a9f76-1278-4e19-93f6-52b7ae31711c
Derived From Instance ID        : uuid:58a92245-7824-4e29-8e83-5c56fd36e22a
Derived From Document ID        : uuid:8c88cffe-81fa-4619-b7fa-ffae954ebaa2
Format                          : application/postscript
Creator                         : Tait Limited
Description                     : TB9400 Installation and Operation
Title                           : TB9400 Installation and Operation Manual
Page Count                      : 30
Subject                         : TB9400 Installation and Operation
Author                          : Tait Limited
EXIF Metadata provided by EXIF.tools
FCC ID Filing: CASTBCH2B

Navigation menu