Teledyne 200A Users Manual INSTRUCTION MANUAL, NITROGEN OXIDE ANALYZER
200A to the manual a3e4ba3e-82e5-4b25-ad28-471092c109ab
2015-02-03
: Teledyne Teledyne-200A-Users-Manual-464570 teledyne-200a-users-manual-464570 teledyne pdf
Open the PDF directly: View PDF
Page Count: 225 [warning: Documents this large are best viewed by clicking the View PDF Link!]
- HIGHLIGHTS
- INSTRUCTION MANUAL MODEL 200A, 02246, Rev. G NITROGEN OXIDES ANALYZER
- SAFETY MESSAGES
- TABLE OF CONTENTS
- LIST OF FIGURES
- LIST OF TABLES
- 1 HOW TO USE THIS MANUAL
- 2 GETTING STARTED
- 3 SPECIFICATIONS, AGENCY APPROVALS, WARRANTY
- 4 THE M200A NOX ANALYZER
- 5 SOFTWARE FEATURES
- 5.1 Index To Front Panel Menus
- 5.2 Sample Mode
- 5.3 Set-Up Mode
- 5.4 Status Output
- 5.5 RS-232 Interface
- 6 OPTIONAL HARDWARE AND SOFTWARE
- 7 CALIBRATION AND ZERO/SPAN CHECKS
- 7.1 Manual Zero/Span Check or Cal With Zero/Span Gas in the Sample Port
- 7.2 Manual Zero/Span Check or Calibration with Zero/Span Valves Option
- 7.3 Manual Zero/Span Check with IZS Option
- 7.4 Automatic Zero/Span Check
- 7.5 Dynamic Zero/Span Calibration
- 7.6 Calibrate on NO2 Permeation Tube
- 7.7 Use of Zero/Span Valves or IZS with Remote Contact Closure
- 7.8 EPA Protocol Calibration
- 7.8.1 Calibration of Equipment
- 7.8.2 Calibration Gas and Zero Air Sources
- 7.8.3 Data Recording Device
- 7.8.4 Gas Phase Titration (GPT) System
- 7.8.5 Dynamic Multipoint Calibration Procedure
- 7.8.6 Moly Converter Efficiency
- 7.8.7 Calibration Frequency
- 7.8.8 Other Quality Assurance Procedures
- 7.8.9 Summary of Quality Assurance Checks
- 7.8.10 ZERO and SPAN Checks
- 7.8.11 Recommended Standards for Establishing Traceability
- 7.8.12 Certification Procedures of Working Standards
- 7.9 Calibration of Independent Ranges or Autoranging
- 7.10 Calibration Quality
- 7.11 References
- 8 MAINTENANCE
- 8.1 Maintenance Schedule
- 8.2 Replacing the Sample Particulate Filter
- 8.3 Replacing the Ozone Scrubber Charcoal
- 8.4 Replacing the Permeation
- 8.5 Replacing the IZS Zero Air Scrubber
- 8.6 Replacing the Molybdenum Converter
- 8.7 Cleaning the Reaction Cell
- 8.8 Pneumatic Line Inspection
- 8.9 Leak Check Procedure
- 8.10 Light Leak Check Procedure
- 8.11 Prom Replacement Procedure
- 9 TROUBLESHOOTING, ADJUSTMENTS
- 9.1 Operation Verification-M200A Diagnostic Techniques
- 9.2 Performance Problems
- 9.3 Subsystem Troubleshooting and Adjustments
- 10 M200A SPARE PARTS LIST